HomeMy WebLinkAbout20030147 Ver 2_More Info Received_201103169?1 Progress Energy
Mr. John Dorney
N.C. Division of Water Quality
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
Dear Mr. Dorney:
March 14, 2011
MAR 1 6 2011
Wetland+. ? sr? d? ttw a6
SUBJECT: Yadkin-Pee Dee Hydroelectric Project No. 2206
Request for Approval to Discontinue Interim Continuous Water Quality
Monitoring Stations
Progress Energy requests the N.C. Division of Water Quality (NC DWQ) approve a reduction in
the number of interim continuous dissolved oxygen (DO) and temperature monitoring stations in
the Pee Dee River below the Tillery and Blewett Falls Hydroelectric Developments (Yadkin-Pee
Dee Hydroelectric Project No. 2206), effective May 2011. The proposed reduction in
monitoring effort is a culmination of long-term data results obtained during the 2004-2010
monitoring period' 2,3 and the transition to permanent compliance monitoring equipment
scheduled to be installed by the U.S. Geological Survey (USGS) during this year.
As part of the Dissolved Oxygen Enhancement Plan filed with Progress Energy's 401 Water
Quality Certificate Application (WQC), dated May 11, 2007, Progress Energy agreed to conduct
continuous DO and temperature monitoring as an interim measure during the DO enhancement
testing and equipment selection and installation phase of the Plan. The Plan specifies installation
of permanent compliance monitoring stations to be installed and operational prior to the 401
WQC required compliance date. This request is consistent with the schedule of phasing out the
interim monitoring equipment with installation of the permanent compliance monitoring stations.
Progress Energy is currently working with the USGS to install permanent compliance monitoring
equipment at a specifed station location below each power plant. We have previously met on-site
with NC DWQ staff on January 13, 2011, to discuss the proposed compliance monitoring station
1 Progress Energy. 2005. Yadkin-Pee Dee River Hydroelectric Project FERC No. 2206. Continuous water quality
monitoring in the Pee Dee River below the Tillery and Blewett Falls Hydroelectric Plant. Progress Energy.
November 2005.
2Progress Energy. 2006. Yadkin-Pee Dee River Hydroelectric Project FERC No. 2206. Continuous water quality
monitoring in the Pee Dee River below the Tillery and Blewett Falls Hydroelectric Plants, May-October 2005.
November 2006.
3Progress Energy. 2010. Yadkin-Pee Dee River Hydroelectric Project FERC No. 2206. Continuous water quality
monitoring in the Pee Dee River below the Tillery and Blewett Falls Hydroelectric Plants, May-October, 2006-
2009. December 2010.
Progress Energy Carolinas, Inc.
Tillery Hydro Plant
IN Tillery Dam Road
Mount Gilead, NC 27306
locations. As a result of that meeting, we have requested NC DWQ approval of these stations for
installation of the permanent monitoring equipment by the USGS (see Progress Energy letter
from Mr. Ken Kennedy to Mr. John Dorney, NCDWQ, dated January 25, 2011). This permanent
monitoring equipment will ensure compliance consistent with the 401 WQC issued by the NC
DWQ on September 30, 2008, and the terms and conditions expected in the new Project license,
once issued by the FERC.
We request that the following stations be dropped from the interim continuous monitoring
program due to the installation of the USGS permanent compliance monitoring equipment this
year (see Enclosures 1 and 2 for station locations):
Hydroelectric Development Monitoring
Station Station Description
Tillery TYCM2 Pee Dee River, approximately 0.5 miles
(Enclosure 1) above Rocky River confluence
Blewett Falls BFCMIA Below Peninsula Separating Power Plant
(Enclosure 2) Tailrace and Dam, 0.7 downstream of
power plant
Blewett Falls BFCM2A Below confluence of Cartledge Creek,
(Enclosure 2) approximately 2.1 miles downstream of
power plant
Progress Energy will continue as an interim measure in 2011 to deploy and operate three
continuous monitors at the N.C. Highway 731 Bridge (Stations TYCM1-1, TYCM1-2, and
TYCM1-3) at the Tillery Development and one continuous monitor at the the Blewett Falls
Development (Station BFCMI, midchannel in Blewett Falls tailrace area). We also plan to
continue periodic monitoring of DO and temperature vertical profiles in Tillery (Station TYB2)
and Blewett Falls (Station BFB2) reservoirs in conjunction with the interim river continuous
monitoring. We anticipate that the interim monitors will be discontinued during 2012 with the
operation of the permanent USGS compliance monitoring station located at each respective
hydroelectric development.
We would appreciate if NC DWQ would review and approve this request. If you have
any questions regarding the continuous monitoring stations, please contact John Crutchfield
at (919) 546-2019.
Sincerely,
s '
rKten- nnedy ,
Manager, Hydro Operations
Enclosures
c: Mr. John Crutchfield
2
Uwharrie River
M
Is Dam
V Fs
Mountain
Creek
1
`7
?"?' r'onlfnluw+ q 1 ljualq ! 1lonnur 1 «Jln•nv
? .r..r
. Irll....
I ,'rl J 1 v l.r. 1 •. arlrrr
r .?i..rr.
. .r.r. •,.J
'
i '. „t ? ??II. r.i. rrrW _
-..
. '--
nil.. .
•.?. .
rl
Jacobs
Creek Y'
Lake Tillery
STANLY l
COUNTY
Cedar ?.
Creek F
MONTGOMERY
COUNTY
Clarks
Creek
Tillery Dam
TYSz
TYCMI-1
TYCM1-2
n,Rocky River* TYCM1-9
RICHMOND
COUNTY
!;y TYCM2
ANSON 1 ^ Yr
COUNTY
Turkey Top
N.C. - Creek
wr« crrlr ewruer ?o<rrorr, ? ? ,
unK Brown Creek
Enclosure 1. Continuous water quality monitoring stations at the Tillery Hydroelectric
Development, Yadkin Pee Dee Hydroelectric Project.
3
Blewett Falls Hydroelectric Development
Little River
Mountain
Creek
ANSON RICHMOND
COUNTY COUNTY
Blewett Falls Lake N.w. Q-Iih NI-sw' I..nab-
Buffalo Cartledge >I:Hwn I.IMxnlp I.p La:m
\Ixbocr,•?u uca me.lc..ur.? f...., ....n„??.w A.wi.u.l emrks
Creek Creek r.li,,.nl, :,,rn.u-1.?1.•' I.,.,,r?,.nr.,i .rmr. ,.??r.n.,?x?i ..,
Irl?"RII ?I'ec live N., eri .nrlulx?i+r.,ler .lra4r? LVI..::1•..?,alxni.c nrrLc r„lA. W.n'?
Blewett Falls Dam '""'""'
BFB2 HP 111\d'u Ur. l<nni ?.nnnrrxmuu..b.P.U. I,n.n .. kRI IS!
1,1•r'RI_.\.14e i?ee Nr.a? ?,n.,urrx.?r. ?,.il !ul)r N.I?,r?l?isl.l.?ri.l.?„A ?'„nlxlre ?.
?? Ital. ...nliivrr.c.. k l Iw,•.
Is
k
lnompson
FCM2A Creek
>ek
k
MARLBORO
COUNTY
SOCIETY HILL. 9C
CHESTERFIELD rn s section W FI
COUNTY no! to -:<ai.
Flat
Creek
1
0 76
Pa.. s....S il?r..n Ya! •. So..... ?w?... [?.u. rr.,n.. .s.•,?wn.Wi?.., .?.a.?
DARLINGTON
COUNTY
M
i
DILLON
COUNTY
Black
Creek
FLORENCE
COUNTY
FLORENCE,(
SC
Enclosure 2. Continuous water quality monitoring stations at the Blewett Falls
Hydroelectric Development, Yadkin Pee Dee Hydroelectric Project.
4