Loading...
HomeMy WebLinkAbout20081239 Ver 2_401 Application_20110711b8-l?,3q 02 Edward Bartlett Evening: 1-919-493-5019 621 Windsong Lane Durham, NC 27713 Day: 1-336-364-6321 Amy Chapman Wetlands, Buffers, Stormwater, Compliance and Permitting Unit (WeBSCaPe) NCDENR/Division of Water Quality - Wetlands and Stormwater Branch 1650 Mail Service Center Raleigh, NC 27699-1650 Greetings from Durham, NC Thank you and Mr. Richmond for your support in filing my PCN form with your department for landscaping work on my property at 114 Chuckwagon Drive, Lot 2052 Lake Royale. Mr. Richmond was very helpful to the landscaping contractor and me in understanding the effects of our work and for correctly filling out the application. I plan to build a small home on this land in September 2011. Before construction of the home begins, I need to clear some trees and put in a gravel walkway on existing construction clearance. Once the home is constructed, I need to install a rain garden to control run-off from the home and driveway. Some of this work occurs in the Riparian Buffer Zone. I have a previous permit from 2008 when the shoreline was stabilized with hand-fitted rip-rap. The reference number is on the form. Please find attached my completed PCN form, along with a plan for the work to be done. The work would begin in August of 2011, and finish with the rain garden and replacement planning of vegetation by March of 2012. Please, if there are any questions or concerns, contact me by phone at 336 364 6321 during working hours or by email at nebish0hotmail.com. Regard Edward Bartlett a ?J riedandt Stu?r rlwater t3rancn I Page 1 of 1 ?l•1Fda Filaal?un?ARIna1 LJ "1111 Mfar Cnuar Amu Chanman nWn AnnJI-0 n 4- 1 1 O?CF W Are19?G O < og-Ia3?t,2 Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ? Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? T ? Yes ? No 1d. Type(s) of approval sought from the DWQ (check all that apply): ? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express Q Riparian Buffer Authorization le. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ? No For the record only for Corps Permit: ? Yes ? No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ? No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes No 1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Bartlett Residence 2052 Lake Royale 2b. County: Franklin 2c. Nearest municipality / town: Bunn, NC 2d. Subdivision name: Lake Royale 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Edward Pierre Bartlett ---_ _? 3b. Deed Book and Page No. Deed Book 951 Page 626 3c. Responsible Party (for LLC if applicable): Edward Pierre Bartlett b 3d. Street address: 621 Windsong Ln a o f 3e. City, state, zip: Durham NC 27713 aNR 3f. Telephone no.: Home 919 493 5019 Work 336 364 6321 3g. Fax no.: Work 336 364 6210 311. Email address: nebish@hotmail.com Page 1 of 10 PCN Form - Version 1.4 January 2009 4. Applicant Infonnation (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): Lake Royale Lot 2052 1b. Site coordinates (in decimal degrees): Latitude: Longitude: 1c. Property size: 0.42 acres 2. Surface Waters 2a. Name of nearest body of water to proposed project: Lake Royale 2b. Water Quality Classification of nearest receiving water. Fresh Water 2c. River basin: Tar 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing undeveloped wooded land, with construction access and rip rap installed along lake shore as per sketch. 3b. List the total estimated acreage of all existing wetlands on the property: 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 0 3d. Explain the purpose of the proposed project: To remove some trees and create natural lake access for residence to be built in 2011 3e. Describe the overall project in detail, including the type of equipment to be used: Remove 5 trees in 30' zone 1 of which 2 are damaged, leave 4 trees. Remove 5 tree in 20' one 2 of which 1 's damaged, leave 3. Grade and install c ? l wr?l«.?y- ?i\ ?5 ;QCt -i ce? t w in ce CkA - 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ? Yes ? No 0 Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? ? Preliminary ? Final 4c. If yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? Yes J No ? Unknown 5b. If yes, explain in detail according to "help file" instructions. -112 X239 1 b ?N 5'??Lt_-,r?`2cr•J'c?rl?c??t _.c ' .,.? Zo 6. Future Project Plans 6a. Is this a phased project? ? Yes 0 No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ? Streams - tributaries ?X Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 - Choose one Choose one Yes/No - W2 - Choose one Choose one Yes/No - W3 - Choose one Choose one Yes/No - W4 - Choose one Choose one Yes/No - W5 - Choose one Choose one Yes/No - W6 - Choose one Choose one Yes/No - 2g. Total Wetland Impacts: 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 - Choose one - S2 - Choose one - S3 - Choose one S4 - Choose one - S5 - Choose one _ S6 - Choose one - 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form - Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 - Choose one Choose 02 - Choose one Choose 03 - Choose one Choose 04 - Choose one Choose 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? Yes E] No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. Project is in which protected basin? ? Neuse Q Tar-Pamlico Catawba [] Randleman ? Other: 6b. Buffer Impact number - Permanent (P) or Temporary 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet 6g. Zone 2 impact (square feet B1 P Gravel Walkway Lake Royale No 600 120 B2 - Yes/No B3 - Yes/No B4 - Yes/No B5 - Yes/No B6 - Yes/No 6h. Total Buffer Impacts: 6i. Comments: Gravel walk with timber steps r runoff absorption and diversion Page 5 of 10 D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Gravel walkways with timber steps for runoff diversion. Rain garden in design (upstream of riparian buffer) Significant tree growth maintained. No lawn. Trim and prune existing vegetation for sustainability. Integrated run off control in design 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction t piques. ??Usa?e" of existing access road, no new access ttrequired. Runoff mitigation fence now on property to be renewed. AAk (?yt( s V-"r'QYE- t YrJ?C3tl+f l9 Y e '?"?eav. ec? v\? 1t''?111,?Y 1 `"'?t ?r 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ? No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type: Choose one Type: Choose one Type: Choose one Quantity: Quantity: Quantity: 3c. Comments: 4. Complete if Makin a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: Choose one 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form - Version 1.4 January 2009 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? E] Yes © No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 7 of 10 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan I a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: 2e. Who will be responsible for the review of the Stormwater Management Plan? 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 3b. Which of the following locally-implemented stormwater management programs apply (check all that apply): ? Phase II ? NSW ? USMP ? Water Supply Watershed [] Other: 3c. Has the approved Stormwater Management Plan with proof of approval been attached? [] Yes ? No 4. DWQ Stormwater Program Review 4a. Which of the following state-implemented stormwater management programs apply (check all that apply): []Coastal counties []HQW []ORW []Session Law 2006-246 []Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes [] No Page 8 of 10 PCN Form - Version 1.4 January 2009 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) I a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Welland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ?X No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes Q No 2c. If you answered yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in dditi l d Yes ? ?X N a ona evelopment, which could impact nearby downstream water quality? o 3b. If you answered yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no,' provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9 of 10 PCN Form - Version 1.4 January 2009 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ? Yes ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ? No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. - 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ? No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? 7 -13 Yes ? No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Edward Bartlett ' -- ' f 12 June 2011 A ' A licant/A Si t' t D t pplicant/Agent s Printed Name pp gen s gna ure a e (Agents signature is valid only if an authorization letter from the applicant is ovided. Page 10 of 10 i a 2 1; A III 9 idaaadvl .#a fill ICI RRR RRR RR 0 ? ©®®?®aoaa?®a 0 DOS g I VIP - v 2 r? 9 N Q v V J r . f r. Y a to -Z ? .-, V 0 fVA tt'EP4 \ , 9 t ? z Q F ?_td ? J ,yv ?f ?y I ft 1 Q Ul v VI ?D ?-- vi Ln -` CA V f - --- ?' ,, ` k - VI I ? u 0 WATERways Volume 14, Number 2: November 2010 DURKAM 18b9s ONOFMMKW services Rain Gardens: Attractive Solutions to Pollution Plantsthat fit soO conditions Runafffrom roof and/or drivewa mix with 25-5o% compostand coarse sand Rain gardens are bowl:-shaped areas Steps to Building a Rain Garden in a landscape designed to capture and soak in rainwater from roofs and Find a good sport driveways. Special plants are chosen Observe how water flows in your. that can withstand "wet feet" for a yard. Choose a location that is be- few hours. tween the rainwater source and its destination. You may need to attach Rain gardens add beauty to your yard a flexible plastic pipe to a downspout while reducing the time and re- to direct water to the gar&m sources you will spend maintaining a - -"lawn' - Tfiese`gardenslteipoIIutants Check thesoii like bacteria, fertilizer, and sediment. A simple infiltration test will ensure They also help protect against ero- that the rain garden drains well. Dig sion and flooding by reducing the a hole one foot deep. Fill it with wa- surge of water that rushes to streams ter: If it drains in less than 12 hours, during a storm. you can build a rain garden. If it drains in 12-36 hours, a rain garden Rain gardens hold water for to be -1-1 -.,& 'ree Rain Gardens Do you live in a neighborhood within Northeast or Third Fork Creek watersheds? If so, you can apply for a rain garden to be in- stalled in your yard for flee! To find out your watershed, visit the City of Durham website at www.DurhamNC.gov, Click on Online Services, Online Mapping, then GoMaps. Type your address in "Quick Search" without the final word for Road, Court, Circle, etc. Click on "Water Features" and check the box for Watersheds. To apply, contact Robert Louque at 560-4326, ext. 30215 or by e-mail at Robertl,ouque@DmtamNC.gov. Northeast Creek watershed rain-gar- dens will be installed in summer, 2011 Third Fork Creels gardens will be installed the following summer. Funding for the gardens is provided through a grant from the State. up may posse a ut you will likely two days after a storm, allowing it to need design help. If it takes more one-half of your 1,000 square foot slowly soak into the ground.. Water than 36 hours to drain, choose a roof plus 200 square feet of driveway should drain in less than three days backyard wetland instead. Call 811 are contributing runoff to the garden, to prevent mosquitoes. before you dig to check the location your total drainage area is 700 square of utility lines. feet. Already have a rain garden? Size the gar?leg Next choose a ponding depth of three SQ garden to To size the garden, fast determine ' inches or six inches. Pondng depth C.gov the square footage of roof and drive- to be featured on our website! wayarea draining to the garden. If (Cm imWonPw2) ling depttc--3 to 6 inches 61chlayer 3 inches 14 r7 i ?z C Q gn ? N oN C ? N 7 O e ? LL ? L E L 0 V B • c L E a 0 n m ya W a ? Q +1 ? c U ? Z L E V W ? W W ? W Q W W L L W N N N N N ? N pp f t7 N f N NP N? M I - mm l7 N 0 Qt lII ? ?tD pNVVVN ? N ? N N p M O f N N N pp N N N ?? N pp ?{+?f n m ?^O H ?pN • -lAV O N B0 N 0 0 NO z z N N Z Z ? U U u t i /V R I lsV u? 0 R K? vO W g ? $ m~g o N ` Zw O Z G W ~ g' v gg ? ? ? ? Q Z0 ? z?ZQ 0 E gn 0 M ?' v i? n a ww g d O NN O `N ?1 ?f N f NN NN N? m 10-6u? ?u? u?u? u?t? o U? u? ugu? p n o? Z tz 2 56 q p T U a Xd' X1 W W U W Ix w p? iDW W OA `?pW W F W F W Q4 Q ? ?3 ? U F W pa4a X g W , V M N? ? ( OO JJ J F ?' m OO p 2 2 I tL r W O O' ? ? < 0 f J 14 U 0 r NN NN aV a l an nlf f f f b m