Loading...
HomeMy WebLinkAbout20051285 Ver 1_Complete File_20050810?0, vvn?FRP G r O ? KrrUNDSA 'WATERQUq(I vJ August 10, 2005 ? 'ArE "%CN Henderson County DWQ Project No. 051285 NCSR 1572 (Kyles Creek Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. J. B. Setzer, P.E. Division Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Selzer: You have our approval, in accordance with the attached condi Kyles Creek and eight (8) unnamed tributaries to Kyles Creek ( order to make improvements to NCSR 1572 (Kyles Creek Road) in accordance with your application dated July 12, 2005 (receiv( made in the application letter. After reviewing your applicati( Water Quality Certification Nos. 3404 and 3366, corresponding Numbers 14 and 33. In addition, you must acquire any other fet project including (but not limited to) Sediment and Erosion regulations. This approval will expire with the accompanying 4( Certification. ns and those listed below, to impact 87 lin linear feet of new pipe and temporary dew, Henderson County. The project should be c July 15, 2005), including the environmental we have decided that this fill is covered I the U.S. Army Corps of Engineers Nationw at, state or local permits before you proceed nrtrol, Non-Discharge and Water Supply Permit unless otherwise specified in the Wal Secretary Director feet of ng), in General e Permit iith your atershed Quality This approval is valid solely for the purpose and design described in your application (finless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner insist be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the fiiture) exceed one acre, or if total impacts to streams (now or in the fittlire) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. 'Ivaulrat4, North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296.4500 Customer Service Internet: h2o.enr.state.mus FAX (828) 299-7043 1-877-623-6748 An Equal OpportunitylAffirmalive Action Employer QA Michael F. Easley, Governor William G. North Carolina Department of Environment and Alan w' L It ?CF VV ti / ?9Q G l7 ? Alan W. Klimek, P.E. Director Division of Water Quality 'VErtg1VDS 'NrER vJ August 10, 2005 AND SrORmgAu y NCH Henderson County DWQ Project No. 051285 NCSR 1572 (Kyles Creek Road) APPROVAL of 401 Water Quality Certification with Additional Conditions Mr. J. B. Setzer, P.E. Division Engineer N C Department of Transportation 253 Webster Road Sylva, North Carolina 28779 Dear Mr. Setzer: You have our approval, in accordance with the attached conditions and those listed below, to impact 87 linear feet of Kyles Creek and eight (8) unnamed tributaries to Kyles Creek (87 linear feet of new pipe and temporary dewatering), in order to make improvements to NCSR 1572 (Kyles Creek Road) in Henderson County. The project should be constructed in accordance with your application dated July 12, 2005 (received July 15, 2005), including the environmental comments made in the application letter. After reviewing your application, we have decided that this fill is covered by General Water Quality Certification Nos. 3404 and 3366, corresponding to the U.S. Army Corps of Engineers Nationwide Permit Numbers 14 and 33. In addition, you must acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 Permit unless otherwise specified in the Water Quality Certification. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ in writing and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. I . Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. One No •thCarolina J?W@'t??4 Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources North Carolina Division of Water Quality 2090 U.S. Highway 70 Swannanoa, NC 28778 Phone (828) 296-4500 Customer Service Internet: h2o.enr.state.nc.us FAX (828) 299-7043 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer Mr. J. B. Setzer, P.E. August 10, 2005 Page Two d. Any reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 2. No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Preconstruction Notice Application. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Quality has released the project. 4. In-stream work and land disturbance within the 25-foot buffer zone are prohibited during the trout-spawning season of January 1 through April 15 to protect the egg and try stages of trout from off-site sedimentation during construction of the roadway. 5. Adequate sediment and erosion control measures should be implemented prior to any ground disturbing activities to minimize impacts to downstream aquatic resources. Seeding for a temporary cover of wheat, millet or similar annual grain or a permanent herbaceous vegetation cover should be planted on all bare soil within 15 days of ground disturbing activities to provide long-term erosion control. Erosion control mating should be used in conjunction with appropriate seeding on disturbed soils in steep slope and riparian areas. Matting should be secured in place with stables or wherever possible, live stakes of native trees. Straw mulch and tall fescue should not be used in riparian areas. Riparian vegetation must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. 6. Culverts that are less than 48-inch in diameter should be buried to a depth equal to or greater than 20% of their size to allow for aquatic life passage. Culverts that are 48-inch diameter or larger should be buried at least 12 inches below the stream bottom to allow natural stream bottom material to become established in the culvert following installation and to provide aquatic life passage during periods of low flow. This may require increasing the size of the culvert to meet flow conveyance requirements. If any of the existing pipes are perched, they shall be removed and replaced, and re-installed correctly, unless demonstrated that this is topographically unfeasible. 7. Rock check dams at culvert outlets should be removed at the project completion to avoid impeding the movement of aquatic life. 8. The dimension, pattern and profile of the stream, above and below the culverts, should not be modified by widening the stream channel or reducing the stream depth. Disturbed floodplains and streams should be restored to natural geomorphic conditions. 9. Stormwater shall be directed to vegetated buffer areas, grass lined ditches or other means appropriate to the site for the purpose of pre-treating stormwater runoff, and must not be routed directly into streams. Mowing of existing vegetated buffers is strongly discouraged, so that they may be utilized for stormwater diffuse flow. 10. Removal of vegetation at the stream crossing and adjacent to streams should be minimized. Native trees and shrubs (e.g. Rhododendron, dog hobble, willows, alders, sycamores, dogwoods, black walnut and red maple) should be planted along the streambank to reestablish the riparian zone and to provide long-term erosion control in the vicinity of the road crossing and along the streams within dedicated rights of way. 11. Any riprap placed for bank stabilization should be limited to the streambank below the high water mark, and vegetation should be used for stabilization above the high water elevation. Riprap should not be place in stream channels in such a manner that it impedes aquatic life passage. 12. Heavy equipment must be operated from the banks rather than in the stream channel in order to minimize sedimentation and to reduce the likelihood of introducing other pollutants into the stream. 13. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 14. Excavation of the stream crossings and relocations should be conducted in the dry, if possible. Sandbags, cofferdams, flexible pipe or other diversion structures should be used to minimize excavation in flowing water. 15. If concrete is used during culvert construction (e.g., headwalls), a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for fish kills. 16. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is strictly prohibited. Mr. J. B. Setzer, P.E. August 10, 2005 Page Three 17. The presence of equipment in the channels must be minimized. Under no circumstances must rock, sand or other materials be dredged from the wetted stream channel under authorization of this permit, except in the immediate vicinity of the culverts. In-stream dredging has catastrophic effects on aquatic life, and disturbance of the natural form of the stream channel will likely cause downstream erosion problems, possibly affecting other landowners. 18. This certification does not authorize the discharge of waste rock and dirt into the stream or riparian zone except for permitted areas associated with the culvert extensions. 19. All work shall be performed during low flow conditions (below bankfull). 20. Upon completion of the project, the NCDOT shall complete and return the enclosed "Certificate of Completion " form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the Transportation Permitting Unit of the NC Division of Water Quality upon completion of the project. The NCDOT is strongly advised to send in photographs upstream and downstream of each structure to document correct installation. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Mike Parker of the Asheville Regional Office at 828.296.4500. Sincerely, Alan W. Klimek, P.E., Director Division of Water Quality Attachment cc: Mark Davis, Division 14, DEO Ed Ingle, Roadside Environmental Angie Pennock, USACE Asheville Field Office Transportation Permitting Unit Mike Parker, Asheville Regional Office ,.. STA7F q STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY GOVERNOR V ? Ov l?Np FNR. '00S SAN?6ATFR Cy LYNDO TIPPETT SECRETARY July 12, 2005 Ms. Angie Pennock, NCDOT Regulatory Project Manager U.S. Army Corps of Engineers 151 Patton Avenue, Room 208 051285 Asheville, NC 28801-2714 Subject: Nationwide 14 Permit Application SR 1572, Kyles Creek Road Henderson County State Project # 14C.045123 (DWQ Major Permit Fee $200.00) Dear Ms. Pennock: The North Carolina Department of Transportation (NCDOT) is proposing to widen, grade, drain and pave SR 1572, Kyles Creek Road, in Henderson County. This proposal entails widening and paving the existing gravel road to a standard 18-foot roadway. The work is necessary to improve safety and reduce maintenance costs. Funds have been allocated for this project and NCDOT would like to perform this work during the 2005-06 paving season. Kyles Creek Road is a secondary gravel road, which conveys only local traffic. I am enclosing a PCN, a straight-line diagram with the proposed erosion control and construction limits along this project. In addition, I am sending a typical section of the road, drawings for pipe culvert replacements as well as a marked county and USGS quad map. The North Carolina Natural Heritage Database was checked for records of threatened and endangered species. There are no records for threatened or endangered species for the Kyles Creek watershed. Additionally, there are no records of aquatic threatened and endangered species for the entire Clear Creek watershed. Kyles Creek and the unnamed tributaries to be impacted are small (1-5 feet wide) and do not have sufficient flow to support mussels. The impacts from the culvert replacements will be minimal. For these reasons, there will be "no effect" on threatened or endangered species. Impacts to historic or cultural resources are not anticipated. If the State Historic Preservation Office (SHPO) and the Office of State Archaeology determines that further investigations are required, NCDOT will conduct the appropriate site investigations and obtain compliance from SHPO prior to project construction. DA1E? 0 The best management practices will be used to minimize and control sedimentation and erosion on this project. The construction foreman will review all sedimentation control measures during installation to ensure sedimentation is being effectively controlled. If the planned devices are not functioning as intended, they will be replaced immediately with better devices. The sedimentation control devices will be in place prior to pipe culvert removal and will remain in place until the new pipe is in place. Impacts to Waters of the United States Kyles Creek and the unnamed tributaries have perennial flow. The channels are well defined and are composed of sand and gravel. The channels lack vegetation. For these reasons, we believe that the streams are under the jurisdiction of the U.S. Army Corps of Engineers. In order to replace these culverts, it will be necessary to impact waters of the United States in the French Broad River Basin. Specifically, NCDOT is requesting to replace 12 metal culverts in Kyles Creek and unnamed tributaries to Kyles Creek. (DWQ Class: C, Tr). Listed below is a summary of the proposed impacts. Site Existing Proposed Net Impacts No. Condition Condi tion Station Site 1 30' x 30" CMP 38' x 36" CMP 8' 9+75 Site 2 30' x 30" CMP 40' x 36" CMP 10' 11+10 Site 3 35' x 24" CMP 40' x 36" CMP 5' 14+65 Site 4 40' x 18" CMP 40' x 24" CMP 0' 16+40 Site 5 2 Each 40' x 57" x 38" 10' 27+00 30' x 24" Arched C MP Site 6 20' x 18" CMP 20" x 36" CMP 0" 27+90 Site 7 20' x 24" CMP 40' x 36" CMP 20' 28+70 Site 8 20' x 36" CMP 20' x 48" CMP 0" 30+60 Site 9 40' x 24" CMP 40' x 24" CMP 0' 36+40 Site 10 30' x 60" CMP 40' x 60" CMP 10' 40+30 Site 11 30' x 24" CMP 40' x 30" CMP 10' 63+80 Site 12 36' x 24" CMP 50' x 30" CMP 14' 65+50 Total Impact 87 linear feet Permits Requested NCDOT is hereby requesting authorization under Section 404 of the Clean Water Act to proceed with the construction project outlined above. By copy of this letter, I am asking Mr. David McHenry, Mountain Region Coordinator, of the North Carolina Wildlife Resources Commission (NCWRC) to comment directly to you concerning the 404 Nationwide Permit request. Also, by copy of this letter, I am requesting authorization under Section 401 of the Clean Water Act from the North Carolina Department of Environment and Natural Resources (DENR), Division of Water Quality (DWQ). In addition, I am asking Mr. McHenry and Mr. Ed Ingle, Roadside Environmental Field Operations Engineer (NCDOT), to comment directly to me concerning this permit request. If you have any questions or need additional information, please contact Lori Jones or me at (828) 891-7911. Sincerely, ?'?j ?' Mark Gibbs, P.E. District Engineer Enclosures cc: Mr. John Hennessy, DWQ, DENR, Raleigh ( 7 copies) Mr. David McHenry, Mountain Region Coordinator, NCWRC Mr. Mike Parker, Highway Coordinator, DWQ (Courtesy Copy) Mr. Steve Cannon, P.E. Henderson County Maintenance Engineer, NCDOT Mr. J. B. Setzer, P.E., Division Engineer, NCDOT Mr. Mark Davis, Division Environmental Officer File 'r OF WATER QG Pre-Construction Notification (PCN) Application Form For Section 404 and/or Section 10 Nationwide, Regional and General Permits, Section 401 General Water Quality Certifications, and Riparian Buffer and Watershed Buffer Rules SR 1572 - Kyles Creek Rd. Henderson County '01 7NYOr iR AHSfO NCDOT Division 14 VP Office Use Only: Forn Version May 2002 USACE Action ID No. DWQ No. 2 0 0 5 1 2 8 5 (If any particular item is not applicable to this protect, please enter root Appucaoie or iN/A .) Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ® 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: NW 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Ecosystem Enhancement Program (NCEEP) is proposed for mitigation of impacts (verify availability with NCEEP prior to submittal of PCN), complete section VIII and check here: 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: 4142 Haywood Rd Horse Shoe NC 28742 Telephone Number: 828-891-7911 Fax Number: 828-891-5026 E-mail Address: 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: Mark T. Gibbs P.E. Company Affiliation: North Carolina Department of Transportation Mailing Address: 4142 Haywood Rd. Horse Shoe, NC 28742 Telephone Number: 828-891-7911 Fax Number: 828-891-5026 E-mail Ad-&R:i[H tote nc us J1 11, 1 5 2005 Page 1 of 8 i'A .r,'NCH III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: SR 1572, Kyles Creek Road 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Henderson Nearest Town: Clear Creek Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From the intersection of I-26 and US 64, go east on US 64 towards Edneyyille. Go approx. 4 miles and turn left of SR 1577, Gilliam Rd At end of road turn right. Go approx..16 mi. Turn left on SR 1574, Fruitland Rd. Go .74 miles. This now becomes SR 1572. Go another 1.19 mi. This is the intersection of SR 1572 and SR 1573 The project starts at this intersection. Turn right for the project. 5. Site coordinates, if available (UTM or Lat/Long): See Attached Sheet (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): N/A 7. Nearest body of water (stream/river/sound/ocean/lake): Kyles Creek (DWO Class: C, Tr__ 8. River Basin: French Broad (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.nc.us/admin/maps/.) 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Residential Page 2 of 8 6 10. Describe the overall project in detail, including the type of equipment to be used: The existing deteriorating pipes will be excavated and replaced. Crosspipes will be replaced/extended to accommodate standard shoulder widths for safety. A backhoe, loader, dump truck and standard hand tools will be used to complete this work. 11. Explain the purpose of the proposed work: To widen, grade, drain and pave an existing substandard road to meet current NCDOT secondary road standards. IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. N/A V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: In order to construct the project in accordance with our current secondary road standards it will be necessary to impact waters of the United States in the Broad River Basin. Specifically NCDOT is requesting to Page 3 of 8 extend/replace 12 culverts in unnamed tributaries to Kyles Creek (DWQ Class: C, Tr) Impacts are listed in table below. 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact (acres) Located within 100-year Floodplain** (es/no) Distance to Nearest Stream (linear feet) Type of Wetland*** N/A * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, till, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year tloodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fema.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (detennination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: N/A Total area of wetland impact proposed: N/A 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) Site #1 Culvert 8 Kyles Creek 5' Perennial Site #2 Culvert 10 UT to Kyles Creek 3' Perennial Site #3 Culvert 5 UT to Kyles Creek 3' Perennial Site #4 Culvert 0 UT to Kyles Creek I' Perennial Site #5 Culvert 10 UT to Kyles Creek 2' Perennial Site #6 Culvert 0 UT to Kyles Creek 1' Perennial Site #7 Culvert 20 UT to Kyles Creek 2' Perennial Site #8 Culvert 0 Kyles Creek 5' Perennial Site #9 Culvert 0 UT to Kyles Creek 2' Perennial Site #10 Culvert 10 Kyles Creek 5' Perennial Site #11 Culvert 10 UT to Kyles Creek 2' Perennial Site # 12 Culvert 14 Kyles Creek 1' Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Page 4 of 8 ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usas.aov. Several internct sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.mapguest. com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 87 Linear Feet 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number indicate on ma) Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A * List each impact separately and identity temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): N/A Size of watershed draining to pond: N/A Expected pond surface area: N/A VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Water will be diverted during the installation of the pipe to minimize sedimentation. The pipe will be placed below the stream bottom to minimize fragmentation of aquatic habitat. Arch vine was used on Site #5 to eliminate two smaller pipes. Mitigation Page 5 of 8 If DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCEEP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htti)://h2o.enr.state.nc.us/newetIands/sti-i-ngidc.htm1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Ecosystem Enhancement Program (NCEEP). Please note it is the applicant's responsibility to contact the NCEEP at (919) 715-0476 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCEEP, check the NCEEP website at http://www.nceep.net. If use of the NCEEP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): 87 Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Page 6 of 8 lip Amount of Coastal wetland mitigation requested (acres): N/A VIII. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? IX. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Neuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify N/A )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total * Zone 1 extends out 30 teet perpendicular trom near bank of channel; Gone 1 extends an additional 20 feet from the edge of Zone 1. Page 7 of 8 10 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A X. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. XI. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H.0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIII. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). Applicant/Agent's Sfgnature i5atd (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 8 of 8 SR 1572, Kyles Creek Road Henderson County Site Number Station N E Site #1 9+75 35.42111 82.40527 Site #2 11+10 35.42167 82.40528 Site #3 14+65 35.42278 82.40528 Site #4 16+40 35.42305 82.40500 Site #5 27+00 35.42472 82.40333 Site #6 27+90 35.42500 82.40333 Site #7 28+70 35.42500 82.40305 Site #8 30+60 35.42583 82.40277 Site #9 36+40 35.42666 82.40139 Site #10 40+30 35.42722 82.40055 Site #11 63+80 35.43194 82.39583 Site #12 65+50 35.43222 82.39583 N.C. DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS SECONDARY ROAD SURVEY SUBJECT: SR 1572 Kyles Creek Road LOCATION: Begin at the intersection of SR 1573 and SR 1572 and continue in a northerly direction for a total distance of 6,770 feet to the end of project. WORK TYPE: Grade, Drain,•Base, Pave & Erosion Control WORK ORDER: 14C.045123 PRIORITY: 73 SUBlRES COUNTY: Henderson TOWNSHIP: Hoopers Creek DATE: 04/17/2005 SCALE: 1"9=50' NOTES: 50' R/W Current ADT Bracket 0-360 1.3 mi. Design ADT Bracket 0-600 Water: Class C, Trout PREPARED BY: TSW 50, 0» RIGHT OF WAY CENTERLINE 6' 9' 9' 4' 3' ASPHALT ;PAVEMENT SHOULDER SHOULDER M DITCH - 0 MAX SLOPE FILL 112:1 CUT 1:1 y STATE OF NORTH CAROLINA DIVISION OF HIGHWAYS EROSION SYMBOLS STD # DESCRIPTION 245.03 TEMPORARY SILT DITCH --------------------------------------------- TsD 245.05 TEMPORARY DIVERSION ---------------------------------------------- ---- TD ------- 893.01 TEMPORARY SILT FENCE ---------------------------- ----------------- 890.05 TEMPORARY SLOPE DRAIN WITH EARTH BERM -------------------I 245.01 SILT BASIN TYPE A ------------------------------------ -------------- - - -0 245.02 SILT BASIN TYPE B ------------------------------------ --------------------------- 892.04 TEMPORARY ROCK SILT CHECK TYPE A --- ----------- - - 895.10 TEMPORARY ROCK SILT CHECK TYPE B -------------------------------- > 892.01 TEMPORARY ROCK SEDIMENT DAM TYPE A ------------------------ TEMPORARY ROCK SEDIMENT DAM TYPE B ------------------------- 897.01 ROCK PIPE INLET PROTECTION ---------------- ---------------------------- - 894.01 ROCK SILT SCREEN ----------------------------------- ----------------------------- 245.04 STILLING BASIN ----------------------------------------------------- ----------------® 868.01 RIP RAP 1 ---- -------------------------------------------------------------- RR DITCH LINER ----------------------------------------------------------- ENVIRONMENTALLY SENSITIVE AREAc------------------------------ 7A PIPE OUTLET ENERGY DISSAPATOR---------------------------------------- =- EROSION CONTROL MATTING ------------ ECM . FIBER GLASS ROVING -------------------------- O SILT CHECK DAM TYPE--A ----------------------------- ---------------------------- SILT CHECK DAM TYfE--B--------------------------- Erosion Control Schedule • Install erosion control measures according to plans in all outlets and at other discharge points after clearing but before grubbing. Clear and clean outfall ditches leaving sideslopes at an angle that can be retained by vegetation. These areas will require stage seeding and mulching. Begin grading of roadway ditches. Place erosion control measures along roadway ditches as grading progresses and conditions allow. • Seed and mulch all disturbed areas as soon as any phase of grading is completed. (Note there are 15 working.days/30 calendar days to complete seeding and mulching. A working day is defined as a day exclusive of Saturday or Sunday during which weather conditions or soil conditions permit land-disturbing activity.) • Clean out and/or rework all temporary erosion control measures after any significant rainfall event (or as otherwise needed). These measures should be maintained until a permanent vegetative- cover is established. Wet Pipe Installation Schedule • Install erosion control devices. • Remove material and existing pipe while limiting, as much as possible, material and sediment from entering the stream and/or escaping from the project. • Prepare pipe foundation while taking care to limit material and sediment from entering the stream and/or escaping from the project. Where possible new grade should be below the existing streambed. If needed, bedding material will be clean stone (especially in Trout and HQW waters). • Place new pipe and compact fill. Install slope protection on outlet and inlet ends of pipe. Also complete installation of erosion control measures and perform maintenance as needed on existing measures. • Establish permanent vegetation as soon as possible. PIPE DATA SR 1572 K les Creek Road sheet 1 of 2 County: Henderson WORK ORDER 14C.045123 STATION PRESENT SIZE PROPOSED SIZE NOTES 1+60 40'x18"CMP Proposed Cross Pipe 5+25 40'x24" CMP Proposed Cross Pipe 9+75 32'x60" CMP 40'x60" CMP Perched, Replace Cross Pipe, Build Head Walls, Live Water 11+10 30'x30" CMP 40'x36" CMP Replace Cross Pipe, Build Head Walls, Live Water 11+10 30'x18" CMP 30'x18" HDPE Replace Driveway Pipe 14+65 35'x24" CMP 40'x36" CMP Replace Cross Pipe, Build Head Walls, Live Water 14+65 40'x18"CMP 40'x18" HDPE Replace Driveway Pipe 16+40 40'x18" CMP 40'x24" CMP Replace Cross Pipe, Live Water 19+50 50'x18"CMP Proposed Cross Pipe 26+00 50'x18"CMP Proposed Cross Pipe 27+00 2 Each 301x24" CMP 40'x57'x38" Arched CMP Perched, Replace Cross Pipes with 1 Arched Pipe, Live Water 27+60 40'x18"HDPE Proposed Driveway Pipe 27+90 20'x18"CMP 20"x36"CMP Replace Driveway Pipe, Live Water 28+70 20'x24"CMP 40'x36"CMP Replace Cross Pipe, Build Head Walls, Live Water 30+00 50'x18"CMP Proposed Cross Pipe 30+60 20'x30"RCP 20'x48"CMP Replace Driveway Pipe, Build Head Walls, Live Water 34+50 45'x18"CMP 50'x18"CMP Replace Cross Pipe 36+40 401x2411CMP 401x241'CMP Replace Cross Pipe, Live Water 37+25 30'x15"HDPE Proposed Driveway Pipe 40+30 30'x60"CMP 40'x60"CMP Perched, Replace Cross Pipe, Build Head Walls, Live Water 40+95 20'x18"CMP 20'x18"HDPE Replace Driveway Pipe 44+00 40'x18"CMP Proposed Cross Pipe 46+00 40'x18"CMP 50'x18"CMP Replace Cross Pipe 49+00 30'x18"CMP 30'x18"HDPE Replace Driveway Pipe 50+70 40'x18"CMP 50'x18"CMP Replace Cross Pipe 53+10 30'x18"CMP 40'x18"HDPE Replace Driveway Pipe 54+25 40'x18"CMP 40'x18"HDPE Replace Driveway Pipe 56+60 40'x1811CMP 40'x18"CMP Replace Cross Pipe 57+40 40'x18"CMP 50'x18"HDPE Replace Driveway Pipe PIPE DATA SR 1572 Kyles Creek Road Sheet 2 of 2 County: Henderson WORK ORDER 14C.045123 STATION PRESENT SIZE PROPOSED SIZE NOTES 59+00 40'x18" CMP Proposed Cross Pipe 62+50 20'x18"CMP 40'x18"CMP Replace Cross Pipe__ 63+30 30'x12"CMP 30'x15"HDPE Replace Drivewa Pi e 63+80 30'x24"CMP 40'x30"CMP Replace Cross Pipe, Live Water 65+50 36'x24"CMP 50'x30"CMP Replace Cross Pipe, Live Water POLE DATA Project: SR 1572 Kyles Creek Road County: Henderson Sheet 1 of 2 OWner: Duke Power Co. Station Number Pole Dist From Center Present Road Dist From Center Project Project Dist. Center Project After Moving Remarks Lt Rt. Lt Rt. Lt. Rt. 0+20 25 25 Pole 2+40 17 17 Pole 5+20 15 15 Pole 7+55 25 25 Pole 8+75 30 30 Pole 10+80 30 30 Pole 10+90 15 15 Guy 17+90 25 25 Pole 18+95 20 20 Pole 21+25 25 25 Pole 25+00 14 14 Pole 29+30 16 16 Pole 30+70 20 20 Pole 30+90 20 20 Guy 40+95 40 40 Pole 43+60 20 20 Pole 46+60 10 10 Pole 48+30 18 18 Pole 48+30 12 12 Pole 52+20 12 12 Pole 54+80 23 23 Pole 54+90 14 14 Pole 56+60 30 30 Pole POLE DATA Project: SR 1572 Kyles Creek Road County: Henderson Sheet 2 of 2 Owner: Duke Power Co. Station Number Pole Dist. From Center Present Road Dist. From ject Center Project Dist. Center Project After Moving Remarks Lt. Rt. Lt. Rt. Lt. Rt. 58+70 15 15 Pole 60+75 12 12 Pole 63+00 20 20 Pole 65+20 20 20 Pole 65+30 20 20 Guy 67+00 22 22 Pole 67+20 22 22 Guy m L o ca 'V 0)F- c o r ? n W •U R r r r r r T T r T T r T r T T r ¢- U) LO Lo?? LO Lo Lo Lo to? Lo U)? LO Lo ! ? r? " L c : /; CO IA x V / N u 1 . . m ? C_ O m O C L t0 .? ++ 1 fn N w L O L O a) V a y E a N Lo C N N i ? ) MM Npp?eN- Nstr~• ~?a V-MN O) ? CL _ L O «? C clC , ? $ D C rn F- ( ?j O U n Z ?? D O - ss?? ?• fU Nf?00? CO I? ??v?t7Mf?MV0?0? U O T T T T O O T O O O T N T C L Q W O O O O O O C) O O O O O O O O O N C In N '? O y to N O a O ?L O L N ^OLnLnOOLnLOLOLOLOLOLOOOOO L ?j.. D . O aI--OfM )M MNr-t-M O N 0)MOLO000 r- ? 0 N C L Cp N Q SNPzcor- NN((0NiN--N?A??r~- r O C J 3 2 E N J co ? 0 II C ?C II O L ON OL V) N ?N O N « C D NL f? W COLON McM?LON1,1?cV)N?O00)j r C7 Cp r r CM ++ t C Ip > T N T Iq . CM ' T T „=Q _ ? OQ a 0J . 0 O L ?^+ "L T T r r T T r T T r T T r T T r N N m 7• W N m N N Q> N N N 4) O d `Q) 0 N d ` U ? O g? LO '?,?jO F L 0) L L Z15 LL.'1:it:. LL15 O N ?V Q m N rn tV 0 d N N N N .0 ,? J R J J J E J J J r - J =inm Lo ?U OtnEDLOU°O ° + + oorn m (n r LO LO 0 0) T T T T r N N N N m •• O O O O O O O O O O O O O O O O ? > C'I m MLOLO ?n?n??0 O .. N N ) p (}p ?}p pF tiN O fn ( 15 N m T? m ? F Or?LOLC) my .rwm wW TrrTTTNNN fnUon. C/)CL m .V xo r r r r r r r In In 0 T- ; r r a--- r r r r r r r r QtnLDLOU)Lnu)wmmmu.)LO ')tntntntnlA?AtnOww (V Cf) CO N V a CjCV) O ?1- ))NL07 W1s?- MOB ? t? r M r r C-4 C14 t N r CM O (o Z (0 N`Mpp(?tnLnGO? Ln?p rLnaoOOOMSt M??ppOO V' V O O O O O r 0 0 0 r r O O r N r 0 ?- 0 0 0 0 Q c 0 0 C> 0 0 0 0 0 0 0 0 0 0 0 0 0 G1 O O C O Q O O CV ^Ln OOOwww00aC)c)OM O 0 0aLOLn0 U N??aONMaNO?cNONtirntOe??L~t?nin?ON v Nu a00wvC) Q rrNNN1?MrNNqt(OMLD04C*4 I-O (Dd LO (D N C 0 7 °e t W O Oo?? -8OODN- Q hO?cOc?. etLp 0 r r r r r N fM N N ?t Ln r' r" N -r' Q J Vl? v- sr-v- v- v- ^ v-v- ?- v-T-r- T- ~ r v-v-v-v-v- v- ~ -r- ? N 'O a N? N N N NN N O O O N N N N N N N Al N N? N N cl) V- (L' L VZ ZZ2! Z25 J N (Op Or00+OQN00+OQpp(Q + LOd+ NtO+nMQOCpQ? + F LLf) C) C) F? •F LO "Irwwn ?} T LO 2(NO (D~(O Cl) NNNMM?(o (f) Cf) a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 W o g o m LnoooooooLnoosot oOgpooo p 0 LO N + + CONasOt?Cp(Q?L+ + + + + + ?+p + LO COOLOn NNNNNm OcOV) ce)Ma? LnMLnLOnNzsMM .. c m E H ft! ''g c c m m m m m `W a) (D? 0) m?mm??mmmmmmm?ma???m o p o 0 0 0 0 0 0 0 0 0 0 0 0 .22 E o c cl) co V) 65 S, Clc ta!McOO NNc0?cMo 'Md'CM MNcOONNNcOO?tmcm U CO m O co co M O O N M T O N T M O ti 0 0 T T T T T T T T T T T 0 m 0tOC??tO[+J? U F l C+O + u l+ fq e+- iNNMMCOrJMQ 4'00 a dO j OD v- W) lW) W W O O O O p 0.2 0.9 p 0.2 0 p 0.2 0 0 02 m O O O Qi O O O O O 0 0 0 0 0 0 0 0 m C) fA Ord ?+ ??+ 0 %n In LO to O.. + CO M OD O C9 v ??s?p.. O?TNNMOM?tOIR IV OOCOCo 8 N Y v .N N •L m C m t N t 'O C m X 6 N co x ,CU b O J 5 tc O m ? X C '?y J m ?b h m y ?y co x ? O .6 m ? X O s' 0 d J V U m ? X h m m c s? m U 12 0 c U) m co tU ? g o,9 CON NA(?1? 9MI 'I 'I ? N1?Inir?Nlcic? C4iCN? NCI CN?So N r I MI m U Q 9p. C* C4 CO) V)??N? to cn z NI NI NI NI NI NI NI NI NI NI NI NI NI NI NI NI cl .c col MI MI MI MI MI MI MI MI MI MI ml MI MI MI MI (01 (01 (01 COI COI (01 COI (0101 (DI (01 (01 (DI (01 (01 CDI J U) of of of Ol of Ol Ol of col of Ol Ol of of Ol Ol N m t t t t+ t t t t t t+ t t t t NI NI NI NI NI NI NI NI NI NI NI NI NI NI NI NI @- MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI t c col c01 col col col c01 (01 (01 cOl col col COI c01 col (Ol col J I vi 01col 0)lCA ml MIIl-Iml NIvi I--IO'IMININI m v J J J J J J J m J O O ?p? ?p?O¢ eO} O O O In to tO ? r r i+ iF t ? ? fn rto to ONNNN O ?? O O O O O O O O O O O O O O 00LO tO a0 LOOU)C)LO C:) ? I. N M?? T I++ 1 n N + i+ Orrtl)tOpj eM-rte--`r°T'NNN .6 N N m x X? .? V b J ? c O ? H m X ? m h CL b N D 5 h 'rn co x cl O 09 m C X O ro J V N U M X C m 11 C S4 ca m U O N C M f0 m m C N =3 M ?I MI I °I ?0 co 00 I Pi I- r- ?I NI NI V- ?I MI ?I NI ?I NI TI V-I T- ?I mU N 00N?` Mew-tfl1A?MM0v rM'SmCM2 rNNrr?Je) NrNrrrr N N J I W m m d N 10 .c C C J I m m Z .4? J i NI NI NI NI NI NI NI NI NI NI NI NI NI NI NI Nl NI NI NI NI NI NI NI v MI MI MI MI MI MI MI MI MI col MI MI MI MI MI MI MI MI MI MI MI MI MI (01 (01 WlCDIIDI(01101UNColcDlColColColColCDI(01(01(01ColCol(01(01Col Ol Ol of of Ol Ol Ot of Ol of Ol al al Ol Ol al Ol of of Ol Ol Ol Ol + + + t + + + + + t + + + + + t + + t + + + t g NI NI NI NI NI NI NI NI NI NI NI NI NI NI NI 041 041 NI NI 041 041 NI NI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI i c01 col col c01 col col col (01 (DI (01 col col (Dl col col col (Dl (01 c01 (Dl (DI col c01 NI -I d I MI MI OI vl NI MI qtI col GDI OI MI ,I C.4I col " rl MI stl vt NI J J J J J J -j J -j w J J a' '' Q' f Y d' Q' Q' J ?Op O O Op O O p O ?p? O O I O? O O O p O q O? ? Op O O ?p C) LO a 0 + t+is?stt?Fp h ++ +s+s??+?+?ppi ??hpp+ t c+cV??.F +Lo?p co r.- Go C) (D 0 O O O O O O O O 0.2 O O 0.2.2.2 O O O O O O C"01 ?i O O ?pOO_OOOOOt?Cp)OOOOOOOOOa (0 O CO + F t +00 00 C) ++ s+t O+ F + t a :3 + +p+_ F + t L'? OCDU') NNNNNMMMMCOOM'Oa'v ttn Lo ?Lc)0 co 9 20 c O M cGAR5DN I Am PS It G RACE fl4%yo/ ozs/ a/ I o ?/, i II N 3I , I? ?B I? Ky46S CREEK RD ° I SPa(? f. x3'x6 ' l YP NvLL, MRT IF I ? SS?aN?i I ? . I i 7o V I ® -r?fo f' 2'X?'K?OTyn ? pROPo$?n GROSS??PE r Ho, X l8„ GM P I f I ? I o io '• 3 J ?. J A JK ! 5 `! L L7 C-"P? S2 I1 <-7? k' VLr_S ?R RD b855 ?v s rn C-AM x (I o" cMP vi/4d' xtoo'cr4p r i COxtrRdcT F(EV? HCADPIALLS PRaposEO ' 70' PRoPo5Ep 100' GuFltp RAIL i I C5/? i l T I J 9 I roro I I ? ? zQ i I ... `CfFfso.V, J,911)Es -4- G JZ ACE J I I J 119 7/q D I WCARSON, TAMC--5 C?2?c? I a 0251 0261 4, I 1 4J I J I I ? I ?? J I ,ry 'p LJ I I I I LJ ? V I J I 58(o 2-'X3'X!n• TYP In ?,. / I ;? I t l J f I U ? , I I I l ' e I U PROp0SaD ; 2'X3'XG' Tyo ? X Z4"cMP 40 /0 to O ?.? wc-i VJ?nInC-K VIT H l D - ?? U( (Rq? DD/JACDso?I, RLAN 7, °F MARTHA Pn?En ?LP?A.C. 35'X 2'f"CMP g9 7 ?lt? oa I w/'io x 3b"CMP 60iLD 14 PK/pitS REa?acc /I7?0 yJ'xlg•CMP? .P _, 3'ST C-/-3M . `%o'X 16" NAPE 5 \ Nr-AcC1 MARj o,e 1,5' A. + 9v SSLC C . \ i I ----- -- -L _ _Jt L., - - loo`esP, C ?FLa J iq (qq1 I I ? 3 IIII I o DI IJ I ® 7NPc8 2'x3'xV ?YP I - , EN O -rRo?T Bu KFER ST4 13 + 10 FbCI45 , CRAA ANN I j Mc( .6RSoaj7j7) "s CRAB L 1 ????551 cc I 9 ? ? ?z 58SZ ?° ? I I '' 7?y z x3'xa- Tv 10 w 1zl ? m LIJIq? I? I I I ,? ? 3 " TRERM 'f1 g t,rp I I 3oPtq t/DVE __1 /y (?EG?/ -TROuT OuFFER STH, lIfZ5 v ?X GM? t2AVat REPO C DR. .40'x 3 CMP BUILD 440WALS / n 9 I 20ClkAVCG V/3 I I 11--?\, 1 loo Esc, I II 1 (D /rLJ ------- CL ------- ?(` ' I v 0 ' _ I- I I -f` I?? ?I I 1 I? I ?'SA X0+00 PRopescp W. ? I I i ' o i ' FRED ER ?cK RGR? ?RT L . 1 ? Bt:K?L'7Z-r? SFlMES tnl. SR, I ? 9 reel r I g 1 7D`r'z t I.j ?I t I a ? I f I ?SI B E g91 war ? I I I wcfrru?rt SPR.ir?c, ? ? ' l I I I ?tj S8? I? ?tb?E 2/x;?XG? i ? I i° t I ® ? I P TµA OND f DRAiNA,-- 111 1176 FRom por/D 0 1 8 wtrT I WE'A7NER j D rc H I ? I Z'x 3'xc' -7YP v 4 it ?l !0% 13 %, NeAce, MA R.TOR lr A. f RUSSLL Cl ,F:4 0 00(03 i i I I ? 13 R EPLAer #O/X/6,, GMP "I/HD'X 24" CP1P SMALL STREA- poND p?giNAGE F I 0 CR?SalCt? , ? . BRv? q- D DNNR M, JI D?87 °781 O R. 7 FERGCRTI FREPFPlcX, ?. JAIt'1C5 k). S ?g%391 '75S'Z LL / 9 L I 1 (' I' I I 4?, 0 I I T I z? I T t ,o I I (o Y? I I I sd? 0 I z'x4'x?' I ryp Z 3 ? i n n I S o p ? f I e? II I i 4)- I ? I I ILJ I I I t I I 0 y' SR (572 5 1 -r,pe B 1'x 3'x6' TyP O 8 sC?7',ffiiDES', ?ryTRJcK 5. + S TEYC-Al /Oz?yzgB 523) R O Nc-ACE, ?1>4RJo,e ? c R. ?- >z vss?E c . GTc? 0063 I 2 I I I I i ?0 ( 17-' 4,RfWcL DR. I i I . TJ 7Y, \ I, ?o SA12 gy29 R 0 CRlSW???, R ?RUGE st DDAIYq M. //6(0197 17"18/ z ?c MILI-CIZ, EDRIWVa -5'. Q s -7g? I 13EGItJ TRwr WFfEk loo EsA STA. Z9 +SO \? \\ ILtLII ?T z 4 . \ \ . RaM got R 'C"A P r/y:D'v ?"c?n,? I:IJ? TRrouT $dFFE2 NFRD?/AtLS S7q, ZS+ZD REYsCN, a?RaAftA ?,viv ? 543/599 9% I ?I j LI S l1 I t O'Xt ?.C-mp I? PRopos6 _RePLACE N/ 2o'X 3!0 " r- Al P $B I '`Io'XIS" tjVPE ?••ir ?$ I /lo GRAVEL DR. FOLSMONT -^ ?I _ _-? lZ 0A0 J ' C RAVEL I I ? :I 1 N A,. I \r? I y?\ 8 I I REPtP 30'X 24" ?w140` 97''X 39"09 RcN PIPE $FGi? TRottf gufFEk ?iRPV \2. ?\ \ PER #'r&LD NE19Dr/ALES ' 1H. Z7f00 ?I TftCtiM O 5CHRADER PAI TRICK s. t. loo' EsA S TCvc- / M . /oZ ?12- y0 1 6 ? ? 5z 3 0 BJicD uJ=RDwR?t ' J i I PROP056y 9 jp ( Sd'x1S' trip I Q FRA/E? DR' 0 ! I I o 9/ t.( I? ?n 11 I'? J.7w *R 15 /L, / END TRouT 0uF STA. 34 + 80 j I I t ?I 13 f I q ? I O I FREnJCH, GATgcRiNG uvINC, TRUST 119(0/030 4538 I ?O 3 Tµ I I? z'xsxtII?p ?i I 0 ? !z% I I I I 3t I I Lb TAYAJ, FRS AJKCIN C l. Type 8 5?a1z39 2X7'x?'-r,? 17 ?l i /7a I ? 45,X ?"GN1p I Ro¢t act 50' z iS" cMP END s-reCA M Btltjk 5T,413PwZ,17'lon1 STR. 744150 I / V? ?I 'I I II I/ VAIN &ARCOM,t 6W-)LD K. I I DIN/UC M, y /Ik /iz311&0 i ? ? ozgo ? N I / ? I I ? f / $EGIO 5TRtAf'n Myjk STAt3fL/7,4770/J ? sr? , ab+8o /I 15' CRvct_ DR I _ ?O x30' PCP R REP AcG vt/zo'x48"cMP u I L D WI.P.P Au s I r? I u.E2, CDN? c?,v D T BZ??1 I PFiO 0 E SO' X l8 ' GMP 17 11 9 q 1 ?- o, I I {5 ,q {, B[A?KWEU..,?ARR? D. 14MVERT, JRMES F, SR, +AUTNS. I lZo0?550 d I 1 107/ ?z II oy?? Y ? I I I Lr) ?3 i5T 0 :;r ID GR. DQ PROPOSCD ?, _ 3O"k1.! ''NDPE Y- Y- 5 co ?MNS DRIVEw)gV / p1pr . I I { ?I, R _ -'. RoMO Vr \ 0 4oxzy-c p I??% PLAcE PRO , eD ' TYP x'X 3 "xL' Typ CAI P 13 ? FRE CO CATNERINF 10 Igo' e L s?l R VIAIC) TRUST 6 lt'I0o3a 4? 3 9 D ?R vnlc /1Z311b0 S86 I z'X3'x? 0290 ry? i 12 I W ,o Y, to Ib II . IS BFVJ)Wc)F)e,-D, ROBERT F i- CiAiL T. l?981?93 /17z. QS I?f991 I . f 3 J :4 N '•? pRoposEO q-O' x 18 ? CMP ?e ?'' C99f 1 I ? c? Ig YouN(?-, MICHAC? D. ti l c . 03/q I 5 loo ?r y q I SBG zx3 zG I I - Kin T TS , D6 v 'D -r- ? ? z ? MARY N. 0 q a f 73z1S.5* 7 lH88 fI 2o')( i6" CMP REPLACE zo'x ?Q" H b PE J k 1 15 GR, OR q ?? R 515T1eEAM ° ? I 9\? ? Ibo' E5a ?i B?acKwCc?, LARRY D 2oy 5j \ ?. 8 e Tyke 8 zSr3 X G v? ?f 7 • I I \? 30'x60,,cmp PFaQcN?D RUL4CE 40' x C,.o" cm p OLD MouvralN pAsS 6UtLO HEAOL ALL5 I+oc?cR?? .i ?r?cS f. zz R. 0 ./4RThrvR., SlfANNOAl t-, 1163/o8_5 5386 zo AXTHUR, SyRNNod , Illv31os3 µ21e z? s>3? z 3 x CA USG v, j TI TN V H. t- M, o REBGG?A ?. r183/? 2 ?8 a 1098??8 3 I 4o z 16 " OA IIR Z IzX REP14cE 5o'x ?S' c??t° 4 f, I u R T i I 'A 5 I I I9 I I? 1 e 9 3o 'x ISM GMP 9 ( RE MACE z? r_ A 0 5 r t1, -7-/ y r-1 • t -REBECcF R , 9?j9?oa7 9/G4 POPE I M I R- R F9 VSG y? T/Mo! NY N. ?" . 6-c CA Sz'/?85 x'89'7 I Ia 9 I BCADINGFICCD, ROECRT G ¢ I I ' C.Au T T,/Pe B 2'x 3 ,rG ?O q31 y s' ?2. oR, 19 I ^20'n IS" CMF ({oUrVC7 )MICHACL D ' - R E PLACE c-ro3/go5 ?o 1. IE? O s I yUn 1 ?f 5700 ?f99I.? DEz-gRDsA, IDAv?o f}. y TF1N C, 1096/0 2- 08.20 \R DCLARosA, DAvip A. t- Tf} d c . . Ti I? -ryr,v F3. CANANT , ADot-aH c. -!- zr?x6 0I I Tv.DITe ?'. lo% I ? ? ? ? `IJ) O'x is" CMP I'?•'? RE P4AGE 131 `-? 4o'x 1$" HOPE lR ` I I _ 12, PAv D o R, a I ... ?I54? o ID'GR. DR. \ _ 1089?zo/ 3oX18?CMP ? I I . RE PLA[.E ~ A-D'x 1,3" HDK • « \ L3 r I I ? l-b q G5 l?/.3,, 5 '76a Z ItL I 13% B /qs3 I o .Q.d 'X 143" CM P • RE PLALE ?• 50'X 18'? fJhP I ? ZI R CAuSCy? TiM,oT/gY r. ? N I?EBCcc? ?'. I` 25 KE'F 115k) DRV ID T, 9 Z!/3a a zzyce \ R y 7 Y. 7% to i 9 9 I 24 _ ` G,iLLlAr/A? q I a A-? R /L s. Jo?, 8l13 I? ? 3497 T r 8 Z,r3 xG ® YP PRoposEa 4a'X (8" GMP 59 IgYI I I 5 8 • 18 8 I ? /. ?O GR. DR . 40'x IS CMP ' RC PLACE, ?4 ?• 5o"x ?S"? NOPc G lLLInM, BRAD E. ? f1 ??21L 5 . IMS1o13 7 8 z74/ $ 8 .I 40'x 1 9 CMP REPLgCE 0'" Ia `"`P r., I I ? Ipgi S86 r3 x? . III ? DE?l4l?oSA, ?fj-VlR A, ?!- C . 3' Z o8Zg 3 ?o 0 D 1 TH . , to s4/ o ? I I ?J 1o T; S s 5% I 1 10' MAi71f?IV S, GLFNAA GR• DR. SNy/S87 tl ENDS RouT" BOFFEk' \ ST,4, 64 }oo -?DX24 C?+I? RE PLALE 4o x 50 CMP B(AILD NEADWAL qS R zs KC--C-14&-R) DAVID T. ?L1l3oo 22y(o 1< ti 5/ BEGIO TRouT BuFFC? STA 61 4-00 7V l C, l? i 100' ESA zs SrEE[c-,6ILBPRT C ?78?o.5 gZ77 STREAM - 11 l z CIA? AC F X IS" HOPE 12 .GR. ORS.. I \ \ 1 3 v ` 11 11 1 ® rYPe 3 zk3•?6' , • S 2,0 X l4? CMP REPLACE 4o'X 1 S" CM P 27 ? I LIVIN(?5-1mV, R08 tf , • GvTHRIE, .SAM t- . 8?7?s1z I 55' ? I v I rl . _-? CL I Q 5 ($ Z K 3 X (o ?J J 1 GIUuAAll, 8 R A D C. Y- APRIL s . l0 ° x/013 399 7 14. w 2 m LU I LO Z p 4- END 05 PRD7ECT STA. 67+70 I<ccNcR, ?AvID I. f ?o'/, 3 I IC)' GR. DR, ESP I I ?o'A. rz r3'lGI 5% l? i I ADAM I? %0, M)CD V _ l1? I ? SBA Z't3 ic6 I ?0 ESA 29 51 DARRE? 6,, d N11?? `?/(9 (D 5 ! SCo? R 92- 300 2 2Yto R- S M?77NG?+IS? GC('ND -1134-0 A91cs t?TN. RD. P- 100 ICI .- __ ? I?STREgM 8 36x 24Crnp \ \ ERACE o' X 3o" c M p 51?5,e GIL $CRT C. y7g?lo5 A U1 S I -- F2 77 a O Y W W w U N W Y N ti U) r CO d a z v 0 U Z O w a z w x ! i J:? F ... ? {_, j ?,- .. ?" B / ? , ?-,r.^ ' 1 I'I''• I !S JS• t `: -? 1, 1 I ? /? ? ? t.' f `,,?r.??. ? ?.. s??7 ? 7j. 1A J d ?. f?.t\?,__ ?r C.=1?1`r?'fJI / r T `A? 1 - -4J `a. pi 4 ' • ?ea:l F??,?Y <f ?• ? ?t f ? ? ••'1 , r rC Y,/?i•,. ftil Y_+i, .':. Mfr A a'? - i 1 aryl V` \ f ?- ? 1 % %,? ?`+-q^l ? ?,% ,?: -. ,? -t-•°' ?' ? `, ate,,,,,., . N Y ) •:? \ ' / /l? _ `? ill +•7'? y/?!-?'F t. ? J? ,• \ `r .. /a f? -'i rF _ _ _ •t rats ' ?i is ?? 'A ti„ ' _v, r _ 1 I 4r ?t t, 4 " -?• . Y 1 - ?.t / 1 9z,? r y err } • ? $ - ? t '. Y . ?' , ,+ ?_ I r-, [??/-..?1,,. i f \\ J .:, Y; C ? :moo \ ? / • a^'{,,..d , J?' J , c it I., C 1, P; A It m N -? CD cc cn D CD (n o y X. ?o 6) 3 ° (N O O 3 N O c a (D O (D x U) ' 7 co O N CL O (0 r_ (D IL m (D r: fD O 0 - ' CD O X n w N O O n (0 - N < M O CD O m .. cD o ?i CD N m x c' co 90 T O -v 0 CD 7 cD I-' CD x?ccncn ID N c .? 0 v N ? N N O ? d 0 cO O O + w N -? (D (O D cc I 0 _X, 663 w fD N O O 3 cn 0 c n. CD 0 CD x N' 7 0 w n. O c CO in j f (D m CD * x ?'o .A N O 0 rn O X C) cn CD 0 3 CD CL w 0 rn 0 n 7 0 c rn (D c 0 m 0 < 0 CD N m x En' cn 90 0 n CD 7 N r CD U) ca a 0 w A n .? N N to -1 3 ? d 0 M a w O O ?i [D 0) N-? C C D (a N D co O C D C O O 0 c to co cn x. w ? 66) 3 00 w C cD _m N O (D :< O 3 O c ;:W CD =r v m o0 O X CD X e C7 N cn "0 (D O 0 =r CL (D d W CJ1 N C7 0 C co J W ? (D m (D N m x' c 7 O 90 O C7 CD CD r- ' =3 (D 27CCnca V! N -? 0 ?l W O N N 7 d O CL O> N rt 0 N D 7 O 0 m N ? O N -4? N CD t0 N D v 0 x 3 m N O O 3 N O c d CD O (D x Nm O N Q D to N j m CD * ZI ;: CD P N 00 - ' CD x n c O T O O O 0 C co W D (D m (D m x y 7 (a A? O n CD 7 cD r 7CD xXcncn CL c? m 0) o °X-wN o c CD ---I N N CCD co D v (0 co W ? X 3 9 fD N O O 3 O c n CD 0 (D X 7 (O 0 N Q. D m W ? v, < (D a m (D * x S"0 A N C) 0 _ CD x m x T X (D W n co ? Da 0 N S (D C) m n T w O x N A C) c N •D ? N _ O t0 < O CD a O . M o CD ?i CD N m x co PO O n (D (D r (D 2T?cncn n -4 N N O C d n N C ~.} :3 A) Q O ;Z O =' (o 7 O O (D N . (D Ut (D co N D O X 3 N (D l< N O O 3 y s O c a CD O (D X N-. 7 O N Q. Cfl ? O W ? L-4 < (D m (D N N 00 - ' (D O X C7 rt O T N O co n O c C J N ? CD m (D m x 7' co 90 "D O n CD 7 (D E7 7' (D x;a cncn a ^? a?OD o p- N n N O ~ C '7,? O N O V 6 --I v J CD to N D CO X (D w 3 m N O O N S O c CL fD 0 (D x c' co 0 N O_ Q 0 ?o < (D m (D * Zl ;:w CD 00 - (D x m w x C7 ?' m o X N .A n m * O p c (0 . c co ~ < CD O m O < cn E CD J m x Z' co fM 0 n CD fD r (D xTtncn cD? X Q. y cn (D 0 ~ y o N N W d n N C G °+° Q- o N w N M (a M O 0 CD N ? (0 (C O O O 7 (D 7 (D < CD a M CD * x CD =? N N 00 - - CD -A O X n y ? O ? O N O W O C7 C CO '-' CD (.? O CD m (D m x 7 (o 90 T O C7 CD 7 CD _r CD sXtncn CL ?° - m A y X W a n w o ° c rt N CD t0 N D o ? - 0 o 3 O fD N O O a N m (D O 3 N O c CL CD O CD X N' 7 O N CL * ;o «' (D =? .P N o0 X n ?. O ? O (D n (D CL 0 N C? 0 (Op f? O O (D O m (p cn n < O cD m x 0 90 O n CD fD r (D xxcnca m ate= 0 to -L CD CL 0 co y X W C/) CL 0 W o w C A I O a? co O 0 E (D 0) N-,CD (L) N D N X Qo 3 O (D N O O 3 N O c CL (D 0 (D x co 0 w o. 0 m ?CD m (D ? Z11 CD o0 x 0) m x n ' (D 0 S (D a w 0 x rn 0 n O c o oD (D M (D m x co 90 0 n (D r 7' (D =x co C4 (D '.G ;a r: _a (D N 4b n N O 3 CA 0 N C G O CL w O N N l? N (D (O N D (D o W L<. N 3 N (D N O 1 O 3 N O c a (D 1 0 (D x c' 7 (n 1 O w C. co co O N m (D C r: m ? m O0 _m x m w x T (D 1 n zr (D CL w O X N n 0 cc O Co ( 0 7 pD 7 (O < 7 (D O M E; CD (n < 9 cD N m x cn 90 T 0 -a n (D m 1 r (D z T cn cn m -< (D 0 N 0 N ? N 0 (D 7m('• 0 ? A C o (n O. N l< O SR 1572, Kyles Creek Rd. Henderson County ouc rri, iuict i I i SR 1572, Kyles Creek Rd. Henderson County Site #2, Inlet SR 1572, Kyles Creek Rd. Henderson County Site #3, Inlet SR 1572, Kyles Creek Rd. Site #4, Inlet SR 1572, Kyles Creek Rd. Henderson County Site #5, Inlet JILL /tJ, IIULICL SR 1572, Kyles Creek Rd. Henderson County Site #6, Inlet f I i i i Site #6, Outlet SR 1572, Kyles Creek Rd. Henderson County Site #7, Inlet Site #7, Outlet SR 1572, Kyles Creek Rd. Henderson County Site #8, Inlet Site #8, Outlet SR 1572, Kyles Creek Rd. Henderson County Site #9, Inlet 1 SR 1572, Kyles Creek Rd. Henderson County Site #10, Inlet Site #10, Outlet c SR 1572, Kyles Creek Rd. Henderson County SR 1572, Kyles Creek Rd. 1 Henderson County Site #12, Inlet Site #12, Outlet