Loading...
HomeMy WebLinkAbout20070438 Ver 1_No Written Concurrence_20070424' ~oF w a rF9Q Michael F Easley, Governor ,`~ ~i William G. Ross Jr., Secretary ~/J ~ North Carolina Department of Environment and Natural Resources ~ ~ ~ .~ Alan W. Klimek, P.E. Director Division of Water Quality ~f .~ `_ ',: ~ ~ April 24, 2007 Onslow County DWQ Project #: 070438 ~'s; Mike Jones 108-C South Kerr Avenue Wilmington, NC 28403 Subject Property: 7122 7`h Street, Surf City NO WRITTEN CONCURRENCE NEEDED Dear Mr. Jones: You have our approval, in accordance with the attached conditions, to construct a bulkhead; a boat ramp and docking facility as described in your LAMA Major application dated March 2, 2007. After reviewing your application, we have decided this impact is below the threshold for written authorization as long as all conditions of General Water Quality Certification Numbers 3624 (GC 3624) and 3626 (GC 3626) are met. This certification may also be viewed on our website at http://h2o.enr.state.nc.us/ncwetlands. This Certification allows you to use the Regional General # 198700056, 197800125 and 197800080 Permits when issued by the US Army Corps of Engineers. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). This approval shall expire when the corresponding Nationwide Permit expires or as otherwise provided in the General Certification. For this approval to be valid, you must follow the conditions listed in the attached certification and any additional conditions listed below. Conditions of Certification: 1. Upon completion of the project, the applicant shall complete and return the enclosed "Certification of Completion Form" to notify DWQ that all the work included in the 401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the Division of Water Quality. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. This Certification shall become null and void unless the above conditions and the General Certifications are made conditions of the Coastal Area Management Act Permit. North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service1-877-623-6748 Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: w~uw.ncwaterqualit~g One An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarollna ~aturallt~ Page Two Mike Jones DWQ Project #: 070438 Apri124, 2007 If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Ian McMillan at 919-715-4631 or Joanne Steenhuis at our Wilmington Regional Office at (910) 796-7215. Sincerely, Joanne Steenhuis Environmental Specialist III Enclosures GC 3624 GC 3626 Certification of Completion cc: Jim Hundley -Waterline Marine Construction and Consulting Dave Timpy - USACE Wilmington Jon Giles -DCM Wilmington Doug Huggett -DCM Morehead Ian McMillan -DWQ 401 Oversight Unit Central Files WiRO 20070438 ~~~~ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles $. ~OneS, Director WiAiam G. Ross Jr., Secretary March 2, 2007 MEMORANDUM: TO: Cyndi Karoly, Supervisor 401 Oversight 8~ Express Permits Unit Division of Water Quality-Surface Water Protection FROM: Doug Huggett, Major Permits Coordinator - ,~ ~._, .. _ SUBJECT: CAMA Dredge 8 Fill Permit Application Review ~ '~-1 Applicant: Mike Jones _w~ .varErz ~( .~n Project Location: 7122 W. 7"' St., in Surf City, Onslow County Proposed Project: installation of a bulkhead, boat ramp and docking facility Please indicate below your agency's position or viewpoint on the proposed project and return this form by April 2, 2007_ If you have any questions regarding the proposed project, contact Jon Giles at (910) 796-7221, when appropriate, in-depth comments with supporting data is requested. t~j( ~ v~ REPLY: This agency has no objection to the project as proposed. y/~/~ 7 ~.S This agency has no comment on the proposed project. l This agency approves of the project only if the recommended changes are incorporated. See attached. This ency objects to the project for reasons described in the attached ments. SIGNED DATE ~ ~ Y r7 7 127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845 Phone: 910-796-72151 FAX: 910-395-39641 Internet: www.nccoastalmanagement.net An Equal OppoAunity t Affim~ive Action Employer -5096 Recycled 11096 Post consumer Paper