HomeMy WebLinkAbout20070438 Ver 1_No Written Concurrence_20070424' ~oF w a rF9Q Michael F Easley, Governor
,`~ ~i William G. Ross Jr., Secretary
~/J ~ North Carolina Department of Environment and Natural Resources
~ ~
~ .~ Alan W. Klimek, P.E. Director
Division of Water Quality
~f .~
`_ ',: ~ ~ April 24, 2007
Onslow County
DWQ Project #: 070438
~'s;
Mike Jones
108-C South Kerr Avenue
Wilmington, NC 28403
Subject Property: 7122 7`h Street, Surf City
NO WRITTEN CONCURRENCE NEEDED
Dear Mr. Jones:
You have our approval, in accordance with the attached conditions, to construct a bulkhead; a
boat ramp and docking facility as described in your LAMA Major application dated March 2,
2007. After reviewing your application, we have decided this impact is below the threshold for
written authorization as long as all conditions of General Water Quality Certification Numbers
3624 (GC 3624) and 3626 (GC 3626) are met. This certification may also be viewed on our
website at http://h2o.enr.state.nc.us/ncwetlands. This Certification allows you to use the
Regional General # 198700056, 197800125 and 197800080 Permits when issued by the US
Army Corps of Engineers.
This approval is only valid for the purpose and design that you described in your application. If
you change your project, you must notify us and you may be required to send us a new
application. If the property is sold, the new owner must be given a copy of this Certification
and approval letter and is thereby responsible for complying with all conditions. If total
wetland fills for this project (now or in the future) exceed one acre, compensatory mitigation
may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). This approval shall
expire when the corresponding Nationwide Permit expires or as otherwise provided in the
General Certification. For this approval to be valid, you must follow the conditions listed in the
attached certification and any additional conditions listed below.
Conditions of Certification:
1. Upon completion of the project, the applicant shall complete and return the enclosed
"Certification of Completion Form" to notify DWQ that all the work included in the
401 Certification has been completed. The responsible party shall complete the
attached form and return it to the 401/Wetlands Unit of the Division of Water Quality.
Violations of any condition herein set forth may result in revocation of this Certification and
may result in criminal and/or civil penalties. This Certification shall become null and void
unless the above conditions and the General Certifications are made conditions of the Coastal
Area Management Act Permit.
North Carolina Division of Water Quality 127 Cardinal Drive Extension Phone (910) 796-7215 Customer Service1-877-623-6748
Wilmington Regional Office Wilmington, NC 28405-3845 FAX (910) 350-2004 Internet: w~uw.ncwaterqualit~g One
An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarollna
~aturallt~
Page Two
Mike Jones
DWQ Project #: 070438
Apri124, 2007
If you do not accept any of the conditions of this certification, you may ask for an adjudicatory
hearing. You must act within 60 days of the date that you receive this letter. To ask for a
hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General
Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C.
27699-6714. This certification and its conditions are final and binding unless you ask for a
hearing.
This letter completes the review of the Division of Water Quality under Section 401 of the
Clean Water Act. If you have any questions, please telephone Ian McMillan at 919-715-4631
or Joanne Steenhuis at our Wilmington Regional Office at (910) 796-7215.
Sincerely,
Joanne Steenhuis
Environmental Specialist III
Enclosures
GC 3624
GC 3626
Certification of Completion
cc: Jim Hundley -Waterline Marine Construction and Consulting
Dave Timpy - USACE Wilmington
Jon Giles -DCM Wilmington
Doug Huggett -DCM Morehead
Ian McMillan -DWQ 401 Oversight Unit
Central Files
WiRO
20070438
~~~~
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor Charles $. ~OneS, Director WiAiam G. Ross Jr., Secretary
March 2, 2007
MEMORANDUM:
TO: Cyndi Karoly, Supervisor
401 Oversight 8~ Express Permits Unit
Division of Water Quality-Surface Water Protection
FROM: Doug Huggett, Major Permits Coordinator - ,~ ~._, .. _
SUBJECT: CAMA Dredge 8 Fill Permit Application Review ~ '~-1
Applicant: Mike Jones _w~ .varErz ~(
.~n
Project Location: 7122 W. 7"' St., in Surf City, Onslow County
Proposed Project: installation of a bulkhead, boat ramp and docking facility
Please indicate below your agency's position or viewpoint on the proposed project and return this
form by April 2, 2007_ If you have any questions regarding the proposed project, contact Jon Giles
at (910) 796-7221, when appropriate, in-depth comments with supporting data is requested.
t~j( ~ v~
REPLY: This agency has no objection to the project as proposed. y/~/~ 7 ~.S
This agency has no comment on the proposed project. l
This agency approves of the project only if the recommended changes are
incorporated. See attached.
This ency objects to the project for reasons described in the attached
ments.
SIGNED DATE ~ ~ Y r7 7
127 Cardinal Drive Ext., Wilmington, North Carolina 28405-3845
Phone: 910-796-72151 FAX: 910-395-39641 Internet: www.nccoastalmanagement.net
An Equal OppoAunity t Affim~ive Action Employer -5096 Recycled 11096 Post consumer Paper