Loading...
HomeMy WebLinkAbout20070503 Ver 1_More Info Received_20070430S I N C E FROEHLING & ROBERTSON, INC. MAIN OFFICE AND LABORATORIES 3015 DUMBARTON ROAD GEOTECHNICAL .ENVIRONMENTAL .MATERIALS RICHMOND, VIRGINIA 23229 ENGINEERS .LABORATORIES PHONE: (804) 264-2701 "OVER ONE HUNDRED YEARS OF SERVICE" FAX: (804) 264-1202 1 a a ~ ® 310 Hubert Street Raleigh, North Carolina 27603 /~ C, Telephone: 919-828-3441 ~, Xp ~ l ~ ~ -+ Q Fax: 919-828-5751 To: NC DWQ Express Permit Review 2321 Crabtree Blvd Raleigh NC 27604 Attn: Ms. Cynthia Van Der Weile We are sending you The following items: ^ Engineering Reports ^ Test Reports Date: April 27, 2007 F&R No.: G66-273GE Reference: Mills Park Drive (E-22 Access Road) ^/ Attached ^ Under separate cover via ^ Prints ^ Copy of Letter ^ Plans ^ Samples ^ Contract ^/ Other: PcN COPIES DATE NO. DESCRIPTION 5 4-13-07 PCN Addendum Express Review 5 each 4-13-07 Full Size Plans for the access road and school 5 4-13-07 Sand filter calculations for the access road 3 4-13-07 Storm Water Management plan for the school 15 4-13-07 Signed and noterized O&M Agreements for sand filter and 2 bio retentio 3 4-13-07 Wetland worksheets for each basin (6 total) 3 4-13-07 Stormwater managment application for express review for the school Remarks: Distribution: n ~~~" 1.007 ~ ~~~ ~~~- ,~~ _ _. pEl~r- .N tiE7Y ~F~,,„ '~ ~ ;7n„ . ~ 1NETUNp3lti ~k ; ~ ~ ; I~.. ; ~:~ ~.rt ~R.ANCi~t i''i f ~ l~ ~ ~~~ ~~ Liu o lair Signed Form Na. 1027 SINCE FROEHLING & ROBERTSON, INC GEOTECHNICAL • ENVIRONMENTAL • MATERIALS ENGINEERS • LABORATORIES "OVER ONE HUNDRED YEARS OF SERVICE" ~ 310 Hubert Street ~ s $ ~ Raleigh, North Carolina 27603 Telephone: (919) 828-3441 Fax: (919) 828-5751 Apri120, 2007 North Carolina Division of Water Quality Express Permit Review 2321 Crabtree Blvd. Suite 250, Raleigh, NC 27604 Attn: Cynthia Van Der Wiele Re: Response to Request for more Information Mills Park Drive (E-22 Elementary School Access Road) Cary, North Carolina F&R Project No. G66-273GE Dear Ms. Cynthia Van Der Wiele: ~x~o~-oSo3 Froehling & Robertson, Inc., (F&R) has been contracted by Wake County Public School System to provide wetland and stream consulting services for the proposed Mills Park Drive (E-22 Access Road) project site. F&R is submitting this letter in response to your two requests for more information dated April 17 and 18, 2007 respectively. The project site is located in Cary, Wake County approximately 4,000 feet south of the intersection of Green Level Road and Durham Road in Cary, North Carolina. The project site will impact approximately 0.491 acres of wetlands and an unnamed tributary of Panther Creek, which is located in the Cape Fear River Basin, Cataloging Unit Number 03030002. The request for more information identified four deficiencies in the submitted PCN. Below is the information/explanation requested. 1. Stormwater management plan for the access road completed by Dewberry with corrected wetland planting plan 2. Complete full size plans for the school completed by McNeely and Associates. 3. PCN Addendum 4. EEP Acceptance letter HEADQUARTERS: 3015 DUMBARTON ROAD ~ BOX 27524 ~ RICHMOND, VA 23261-7524 TELEPHONE (804) 264-2701 ~ FAX (804) 264-1202 ~ www.FandR.com BRANCHES: ASHEVILLE, NC ~ BALTIMORE, MD ~ CHARLOTTE, NC ~ CHESAPEAKE, VA CROZET, VA ~ FAYETTEVILLE, NC ~ FREDERICKSBURG, VA GREENVILLE, SC ~ HICKORY, NC • RALEIGH, NC ~ ROANOKE, VA ~ STERLING, VA SINCE F& ,881 5. 3 complete Stormwater management plans for the school completed by Mcneally and Associates. If you have any questions/comments or require further information, please do not hesitate to contact us at (919) 828-3441. Respectfully submitted, & ROBERTSON, INC. Project Manager Mills Park Drive (E-22 Access Road) 2 April 13, 2007 Cary, North Carolina F&R Project No. G66-273GE Addendum to the Pre-Construction Notification and "Buffer Rules" Application Required for Projects Submitted Under the "Express Review Program" North Carolina Division of Water Quality Version 5.0 October 1, 2006 Email Address: 401 express@ncmail.net Purpose: To provide a detailed explanation of the information required by the Division of Water Quality in order to expedite the review of applications for 401 General Water Quality Certifications, Isolated Wetland Permits, Stream and Wetland Mitigation Plans and Riparian Buffer Approvals (Please Note: do not leave any questions unanswered or use terms such as "N/A" without an explanation). Fees: 401 Water Quality Certifications: Riparian Buffer Authorization: Riparian Buffer Minor Variance: Coastal General "Major Variance": Isolated Wetland Permit: Major (>/= 150' stream or >/= 1 acre wetlands) $2,000.00 Minor (< 150' stream or < 1 acre wetlands) $1,000.00 (exclusively or "in addition" to) $2,000.00 $1, 000.00 $1,500.00 General $1,000.00 Please read the entire document before attempting to determine the proper fee. Fees are additive for particular projects. Things to keep in mind when filling out the application: A specific answer must be provided for each question. For instance, if a numerical answer is requested then a numerical answer must be provided along with the supporting information necessary for DWQ staff to verify that the number is accurate. Likewise, if explanations are presented to justify certain responses, the explanations must be completely supported by documentation. DWQ staff cannot assume that unsupported or undocumented information is accurate. "N/A" is not an acceptable answer for any question since the DWQ Staff reviewing the application must have an opportunity to determine whether or not any requested information is pertinent. All forms, guidance, worksheets, applications, etc. used must be the current versions as posted on our web site at http://h2o.enr.state.nc.us/ncwetlands. The Express Review Program website can be found at http://h2o.enr.state.nc.us/ncwetlands/express_review.htm. Please note that it will be responsibility of the applicant or the applicant's consultant to verify that the current versions are used. The versions posted on our web site will be considered to be the current versions. You are a very important part of the success of this program, if you have suggestions or clarifications please send your comments to the Wetlands/401 Unit of the DWQ (via email at 401 express@ncmail.net). Filling Out the Pre-Construction Notification Application: The Corps of Engineers (USAGE)/DWQ official, joint Pre-Construction Notification (PCN) Application must be used as a basis for the expedited review process. The completed application should be presented first and the supporting information tabbed and collated in the same order. Using a custom format is not recommended. The open squares ~ are checklist items. The following items correspond to the numbering system on the Pre-Construction Notification Form (PCN): IMPORTANT: USE CHECK BOXES TO TRACK PROJECT INFORMATION!! SECTION I. PROCESSING ~ 1 & 2.The USACE determines which Nationwide, Regional, or General Permit is required. If you have verified with the USACE which permit they intend to use for your project or if you already have written approval from the USACE, please indicate by adding "verified" or "verified, attached", respectively, in the blank next to the Permit number requested. ^ Attach the USACE Approval if you have it. >!S 3. It is not anticipated that the expedited process will be requested for this situation. I~ 4. If you propose to impact 150 feet or more of perennial stream or 1 acre or more of wetland and onsite mitigation is not proposed, it is recommended that you either locate an acceptable private bank with available credits (with documentation to show that the bank can and shall provide the credits needed) or obtain approval from the EEP for the entire amount of stream and or wetland as DWQ will make the final determination as to whether or not mitigation applies. A complete Express application is not considered received unless an EEP approval letter is attached if mitigation is requested through EEP. Please note that the USACE may have different mitigation requirements and thresholds. N/A ^ 5. State whether your project will require a CAMA Minor, Major or General Permit and give the status of the permit. SECTION II - APPLICATION INFORMATION 1. 75 NCAC 2H .502(fl reads as follows: "Who Must Sign Applications. The application shall be considered a "valid application" only if the application bears the signature of a responsible officer of the company, municipal official, partner or owner. This signature certifies that the applicant has title to the property, has been authorized by the owner to apply for certification or is a public entity and has the power of eminent domain. Said official in signing the application shall also certify that all information contained therein or in support thereof is true and correct to the best of his/her knowledge." ~ Please indicate how the applicant meets the above definition and provide supporting documentation. ^~ Please provide all of the requested contact information including a fax number and email address. 2. ~ If the application is not signed by the applicant, please attach the agent authorization letter. The applicant must sign the agent authorization letter. The applicant's name and position must also be spelled out as many signatures are difficult to read. 3. ~ Please provide all of the requested contact information including a fax number and email address. SECTION III -PROJECT INFORMATION The following is the most critical of all the information that you must provide. The quality and detail of the information will often determine the expeditiousness of the review. The following is a checklist of the types of pertinent information required at a minimum: Maps and Plans: 1/ The most recent version of the 1:24,000 USGS Topographic Map- Please cleanly delineate the site boundaries, etc. on the map. If the delineation obscures any of the features, it is recommended that a clean copy be provided. Please indicate the quadrangle name. You can go to the USGS web site (http://mac.usgs.gov/maplists/) to verify the most recent version. L~ The most recent version of the NRCS Soil Survey Map - (required for projects within the Neuse River Basin, Tar-Pamlico River Basin, Randleman Lake Watershed and the Catawba River Basin, also recommended for all projects) -Please cleanly delineate the site boundaries, etc. on the map. If the delineation obscures any of the features, it is recommended that a clean copy be provided. Please indicate the page or map number from which the copy of the map was made. Copies of the current soil survey and/or soil survey map sheets can be obtained from the local NRCS County Office (http://www.nc.nres.usda.gov/). GIS soil layers are not acceptable. ~ Vicinity map -Please clearly mark the location and approximate boundaries of the property and project on the map. Please indicate north and scale. Please include applicable road names or State Road numbers. The Site Plan -The most critical map to be provided is the site plan. You must provide full sized plans. The following is the minimum list of plans that are typically needed. ~ Pre-construction/Pre-existing conditions -This sheet must be scaled and include all jurisdictional and non jurisdictional wetland, stream, water features, State regulated buffers, topographic contours with elevations, approximate extent and nature of forest, field, landscaping, or other cover. Any existing structures and impervious area must be shown. Existing utility lines and easements must be shown. Existing roads, culverts, and other pertinent features must be shown. North arrow and the scale must be shown. Please note that the impact boundaries on the maps should correspond to the flagged impact boundaries in the field. L~ Proposed conditions -These sheets must be scaled and show all existing jurisdictional and non jurisdictional wetland, stream, water features, and State regulated buffers (delineated into Zone 1 and Zone 2) must be underlain on the site plan(s). The plans must show all built-out structures and impervious cover. The plans must include the final grading contours with elevations. The plans must indicate all utilities and easements. It is likely that several versions of the final built- out site plans will be necessary. ~ Drainage Plans -Final drainage plans must be included. The plans should include the locations and pertinent elevations and sizes of the collection system and drainage ways. All inlets and outlets must also be shown with pertinent elevations. Scaled stormwater BMPs must also be indicated as required by DWQ rules and policies. In certain cases, final stormwater management plans must also be provided, but that will be addressed later in this document. ~ Plats -The plans must show the location and layout of all sub-divided parcels with lot identifications. Platted parcels must be developable without further impacts to jurisdictional and non-jurisdictional wetlands, streams, water features, and State regulated buffers. Proposed Impacts -All impacts to jurisdictional and non jurisdictional wetland stream, water features, and State regulated buffers must be shown and labeled on the site plans. All excavation, fill, flooding, stabilization, and other impacts that will be conducted in or near jurisdictional and non jurisdictional wetland, stream, water features, and State regulated buffers must be indicated. 4 Wetland Impacts (on the site plan): ~ Precise grading and final elevation contours must be provided. Existing vegetation and any clearing must be specified. N/A ^ All subsurface utility lines must indicate the location of anti-seep collars. Construction detail for anti-seep collars must be provided. ~ Roadway or other crossings of riparian wetlands may require floodway culverts to maintain existing hydrological conditions. When surface drainage features or groundwater recharge areas that feed or would reasonably feed wetlands that are not to be filled are made impervious, it may be necessary to direct some stormwater runoff to those areas in order to maintain hydrology. You must identify these areas and address them. Supporting explanations and discharge information must be provided to show that the wetland would not be eroded or receive too much or too little hydrology. In many cases this could help satisfy part of a stormwater management plan. ~ Flooding ~ Draining Stream Impacts: ~ Stream impacts must be clearly shown on the plans. The centerline as well as the banks of the stream must be surveyed or located by GPS for the portion of the stream to be impacted. Culverting: ~ The inlet and the outlet of the culvert should be aligned with the stream as much as possible. Inlet and outlet elevations and streambed elevations should be indicated. N/A^ Any widening of the stream must be shown with elevations. ~ The extent of and plan details for all dissipation or grade control devices should be shown with pertinent elevations. ~ For shorter culvert sections, such as for road crossings, a longitudinal cross section that shows the stream bed invert at the inlet and outlet, the existing stream bank elevations and the invert of the inlet and outlet of the pipe(s) must be provided. ~ For shorter culvert sections, such as for road crossings, a vertical cross section must be provided that shows the stream cross section at the inlet and outlet overlain with the culvert and fill cross section. N/A^ For bottomless culverts or other spans, a vertical cross section should be provided that shows the minimum distance from each span to each stream bank, the stream cross section, the height of the span above the stream and the minimum distance from the edge of each footer to each stream bank. N/A^ For bottomless culverts or other spans, a plan view must be provided that shows the location of the spans and the stream banks. ~ For longer culverts or culverts that will pass beneath substantial impervious cover, it will be necessary to provide adequate plan detail to show that discharge velocity/energy will be adequately dissipated. 5 L~ Cross section details must be provided showing the provisions for aquatic life passage Aquatic life passage through culverts is typically achieved by placing the invert of the culvert below the existing bed of the stream per the USACE or North Carolina Wildlife Resource Commission guidelines. Other methods such as baffles may also be used. Please be aware that such placement may require the use of grade/velocity control measures up or down stream of culverts on steeper streams to prevent head-cuts or streambed erosion. The culvert placement relative to the streambed can be indicated on the longitudinal profile. Grade and velocity control measures must be indicated on the plan view and typical designs should be provided. L~ Multiple culverts, wide culverts or sectioned box culverts typically require the use of sills, off-setting or other means to match the cross section of the existing stream (in order to maintain stream stability and provide aquatic life passage). A vertical cross section of the culverts should be shown overlain with the up and downstream stream cross section including the stream flood-prone area. N/A^ Impacts associated with dam construction must indicate and enumerate all fill associated with the dam footprint, spillway and any bank stream bank stabilization. The length of stream impounded must also be indicated and enumerated. Stream Relocations: N/A ^ Stream relocations must be conducted as specified in General Certification numbers 3402 and 3404 (available on the Wetlands Unit web site). Stream relocation plans must include: ^ Morphological measurements (see Appendix B of the Internal Technical Guide for Stream Work in North Carolina available on the Wetlands Unit web site) -not all of the measurements are applicable in every instance. ^ Typical stream cross sections - Typically, a riffle cross section and a pool cross section that includes the entire flood prone area. The bankfull and flood prone area elevations should be indicated. Similarly, a riffle cross section of the reference stream(s) should be provided. ^ Plan view -Provide scaled plans that show the location of the proposed (preferably with stationing) and the existing stream. In most instances, the bankfull contours and flood prone area contours, in stream structures, bank revetments/stabilization, channel plugs, planting plan, vegetation conditions, stormwater outlets, grade controls, bridges, culverts, sewer lines, roads, fencing, and easement lines should also be provided. ^ Longitudinal Stream Profile - A scaled profile that indicates the thalweg, bankfull, and top of bank elevations should be provided for the design and reference streams. In many cases, it will also be necessary to show the existing land elevations for the design stream. ^ Planting Plan - A planting and/or vegetation management plan should also be provided that makes use of appropriate native vegetation. The plan should indicate the extent, density, and species of plants to be provided. ^ In-stream structure, bank revetment/stabilization, and stormwater outlet typicals - Detailed, typical plans should be provided for all in stream structures, bank revetments or stabilization, and stormwater outlets. The typicals should include materials and specifications as well as relative lengths, positions, and angles. ^ Sediment transport analysis - A sediment transport analysis should be provided based on the current, relevant, accepted practices. The sediment transport analysis should be relevant to the streambed load type and should predict bed load transport equilibrium. 6 ^ Permanent conservation easement or similar means of protection must also be provided. Other Information: LEI 1. The project should always be referred to by this name in all correspondence as well as the DWO # once it is provided. N/A^ 2. This only applies to DOT projects, which are not expected to utilize the Express Review Program. L/ 3. This should be the size of the project as identified by the USACE for 404 Permits or by the Division of Water Quality for Buffer Approvals and Isolated Wetland Permits. I~ 4. Please provide the name (as depicted on the USGS topographic map and DWQ Stream Classification Lists) of the nearest water body(ies) to which your project is a tributary to (e.g. "Neuse River (Falls Lake below normal pool elevation)"). (Do not simple state "stream", "river", "ocean", "sound" or "lake".) Please provide the "stream index number" of the named water body or water body section (e.g. "27-(1)"). Also, please provide the full water quality classification (e.g. "WS-IV NSW CA") of the water body. This information can be obtained from the DWQ web site http://h2o.enr.state. nc. us/bims/Reports/reportsWB. html. 1~ 5. Please state which river basin and sub-basin that your project is in (e.g. "Neuse River Basin, NEU01"). This information can be obtained from the DWO web site http://h2o.enr.state.nc. us/bims/Reports/reportsWB. html. ~ 6. Conditions should also be indicated on the existing site plan where applicable. Photos (including aerial photos) can be helpful in describing the existing conditions. ~ 7. You must provide an attachment that explicitly describes what the proposed project will entail from the planning stage to final construction. ~ 8. This can be a simple explanation, but it is critically important because the purpose dictates how the no practical alternatives are reviewed. SECTION IV -PRIOR PROJECT HISTORY N/A^ Please include copies of all 401 Water Quality Certifications, Isolated Wetland Permits, Buffer Approvals, USACE Permits, CAMA Permits for the site as well as a copy of the final approved, site plan. SECTION V -FUTURE PROJECT PLANS For projects utilizing the express review process, all impacts both present and potential future must be indicated. For instance, the location or configuration of platted lots sometimes suggests that future impacts will be necessary to build, access, or otherwise develop such lots. Failure to account for such potential impacts could delay or disqualify a project from the rapid review process. If you believe that the lot can be developed without impacts, but you anticipate that your assertion may be questioned, it is recommended that you provide a potential building foot print and/or grading plan to show that future impacts could be avoided. SECTION VI -PROPOSED IMPACTS TO WATER OF THE US 1. It is recommended that the individual impacts be described if there are special things to note about the impacts. Typically the most important thing is to have detailed accurate site plans as described above. Please make sure they are clearly labeled. ~ Please include all proposed temporary impacts. 7 ^ Also, a current, signed delineation map from the USACE should be provided (if available) and a map locating the stream origins signed by the appropriate DWQ Staff must be provided if applicable. ~ 2. Each impact to a wetland must be clearly labeled and identified on the site plan. The type of impact must be clearly stated. If the impact is temporary, a specific plan must be described or shown as to how the wetland will be restored. Keep in mind that the USACE delineates some features as wetlands that DWQ calls streams. Please list any impacts in this table that DWQ would identify as a stream. If there is any doubt, it is recommended that the impacts be listed as streams. Please follow current DWQ policy with respect to whether a stream is perennial or not. It is recommended that you assume that a stream is perennial (unless you are positive that it is not) so if mitigation is required then the appropriate amount of mitigation would be anticipated or requested from the EEP or private bank. If the EEP or private bank has pre- approved too short of an amount of stream or if inadequate mitigation is proposed, then that situation will result in delays. ~ 3. Sometimes it is difficult to determine whether a feature is a modified natural channel or a ditch, especially in the eastern part of the State. Soils, drainage features, topography, macroinvertebrates, and similar factors, all are important for making that determination. ~ 4. Other items to address not specifically requested in the application include downstream sediment starvation, thermal pollution, low flow releases from dams, and aquatic life passage. Other important considerations are buffer reestablishment or mitigation around ponds on buffered streams. The site plan should include the precise elevation contour of the normal pool as well as the dam footprint. Mitigation is required for wetland flooding of an acre or greater and for stream fill (if over the 150 foot threshold) under the dam footprint and any outlet stabilization. SECTION VII -AVOIDANCE AND MINIMIZATION Avoidance and minimization are critical aspects of an application particularly if you desire the application to be processed expeditiously. The following is a checklist of avoidance and minimization questions that DWQ Staff often look for in applications. n0 ^ Are there any stream crossings at angles less than 75° or greater than 105°? n0^ Are there any stream crossings that cross two streams above or at the confluence of those streams? rl0^ Are there any stream, wetland, water, and/or buffer impacts other than perpendicular road crossing near the edges of the property? rto^ Can the stream be relocated as a natural channel design as opposed to culverted or otherwise filled? rl0^ Is any single stream crossed more than once? n0 ^ Can property access routes be moved or reduced to avoid stream, wetland, water, and buffer impacts? n0^ Can a building, parking lot, etc. be realigned to avoid impacts? n0^ Can the site layout be reconfigured to avoid impacts? no^ Can headwalls or steeper side slopes be used to avoid/minimize impacts? 8 n0^ Can a retaining wall be used to avoid/minimize impacts? N/Ao Can cul de sacs be used in place of a crossing? N/A^ Can lots be reshaped or have shared driveways to avoid impacts? If based solely on the practicable physical possibility, the answer is "yes" to any of the above questions then you must have to provide substantial and convincing justification as to why the impacts are necessary. If the impacts are required by a local government or other agency, the claim must be supported with appropriate written documentation from the local government or other agency. Most projects typically involve the need to justify avoidance and minimization. If this information is not readily available, then the express review process may not be the appropriate venue to use. Providing alternative plans (such as plans that avoid the impact, minimize the impact and the preferred plan, similar to those used in environmental assessments) and explanations as to why the preferred plan is needed and why the alternative plans won't work are many times helpful in the no practical alternatives review. SECTION VIII -MITIGATION Mitigation for the Express Review Program, final mitigation plans must be presented up front. The final plans (except for plans that propose payment into the Ecosystem Enhancement Program (EEP), Riparian Buffer Restoration Fund, private mitigation banks, or similar banking instruments) must contain detailed plans, specifications, calculations and other supporting data that show that the appropriate mitigation will be achieved at the ratios required. The design plans must be developed to at least the "90%" level. Monitoring plans must be final and specific. Any means of permanent protection, such as a permanent conservation easement must be provided. If you elect to use the EEP or a private mitigation bank, it is recommended that you request the maximum possible mitigation amount that DWQ may require so that you will not have to get further approval from them on short notice. The EEP and private banks are not part of the expedited review process and cannot be expected to meet any such deadlines. There will be no conditional expedited approvals that require final plans at a later date. It is not recommended that innovative mitigation techniques or greater than 10% preservation be requested as part of an expedited process. SECTION IX If your project requires the preparation of an environmental document under NEPA or SEPA and an approval letter has not been issued by the State Clearinghouse, then you cannot apply under the expedited review process. It is your responsibility to find out if such documentation is required. SECTION X There are many aspects of the Buffer Rules that must be addressed in every application, if applicable. The first and most important thing to keep in mind is that allowable activities that require written Approval from DWQ triggers a review of the entire project for compliance with the Buffer Rules. Diffuse Flow 8~ stormwater Management: ~ The most common issues that arise involve the requirement for diffuse flow of stormwater through riparian buffers. Basically one of three things must be indicated in regards to all "new" stormwater that is collected and subsequently discharged. First, provisions for diffuse flow through the protected buffer must be made. This usually involves the use of level spreading devices designed to the latest DWQ guidance on level spreader design, which is available on our web site. Please keep in mind that it does not matter how far a discharge point is from a buffer. The stormwater must be flowing in a diffuse manner at whatever point it eventually reaches the buffer. If the stormwater will not be flowing in a diffuse manner through the protected buffer at the point it reaches the buffer, then one of the following options may be allowed: d You may provide a nitrogen removing measure such as a forested filter strip, grassed swale, stormwater wetland, etc. The measure employed should be 9 designed according to the NC DENR Stormwater Best Management Practices Manual or other DWQ Guidance available at http://h2o.enr.state.nc.us/ncwetlands/regcert.html. After the nitrogen is treated, the stormwater can be directly conveyed through the buffer with written DWQ approval. N/A^ You may discharge the stormwater to an existing man-made conveyance that currently conveys stormwater through the protected buffer (assuming the conveyance was not constructed in violation of the Rules) as long as that conveyance does not need to be altered to convey the flow. Please remember that there are no other choices. The following checklist is intended to help insure that your application will not be deemed incomplete as a result of improper stormwater design. Stormwater Management (for Buffer Rules compliance only -Also, see Section XI): N/A^ All stormwater out-falls must be clearly shown and labeled on the site plan for projects in Buffered watersheds. List each out-fall as labeled: ^ Option 1: Level spreading devices designed to the latest DWQ Guidance, and devices that merely control velocity but do not provide diffuse flow such as rip rap dissipators are not proposed. List each of these out-falls as labeled on the site plan and provide a DWQ worksheet available at http://h2o.en r.state. nc. us/ncwetlands/regcert. htm I: ^ Option 2: Nitrogen removing measures designed to DWQ Standards are proposed for discharges for which diffuse flow through a protected Buffer cannot be met. List each of these out-falls as labeled on the site plan and provide a DWQ worksheet available at http://h2o.enr.state.nc.us/ncwetlands/regcert.html ^ Option 3: The stormwater will be discharged to an existing man-made (not including modified natural channels) conveyance that carries the stormwater through the Buffer. The conveyance was not constructed in violation of the Buffer Rules. List each out-fall as labeled: ^ All stormwater out-fall must meet one of the options above. (Note: if you cannot check this box your application will likely not be accepted into the express review process.) Site Plans: N/A^ All applications on properties with DWQ protected buffers must clearly depict the buffers and any impacts to the buffers on the site plans. The impact maps should clearly depict both zones of the protected buffers and the proposed impact areas (provided in square feet). Surface Water 8~ Buffer Delineations: N/A^ Any surface waters subject to DWQ protected buffers must be field located and accurately depicted on the site plans and impact maps. The width, dimensions and pattern of the surface water must be delineated. The surface water location must not be taken simply from a USGS map, soil survey or local municipality's map. The buffers must be measured from the surface water as required within the applicable buffer protection rule (e.g., all buffers along streams subject to the Neuse and Tar-Pamlico Buffer Rules must be measured from the "top-of-bank° of the stream and not the centerline of the stream). All streams must be surveyed or located by GPS and shown precisely on the site plans. Impact Table: 1 10 N/A^ Please provide additional impact tables that clearly state the area of impact for each corresponding impact site. Variances: N/A^ Projects that require a Major and/or "General" Variance will not be eligible for the use of the Express Review Program (with the exception of the Coastal General "Major" Variance. Mitigation: N/A~ As opposed to applications that are submitted under our regular process, final mitigation plans must be presented upfront (see requirements for Section VIII above). The mitigation plans must comply with the applicable buffer mitigation rule. SECTION XI - STORMWATER Please provide the following information in regards to potential stormwater requirements: The total acreage of the site. 15.84 (acres) The total built-out impervious acreage 4.33 (acres) The total area that will be disturbed 8.26 (acres) ~ If the total area exceeds 20% imperviousness, the development on the site is uniform in density, and you claim that the total impervious area is less than 30%, you must provide a complete, detailed breakdown of the assumed built-out conditions. The breakdown must be detailed enough to show that all potential impervious areas are accounted for. N/A^ If there are concentrated areas of development such as multi-family, commercial, cluster, club houses, etc. that exceed 30% imperviousness and the total imperviousness for the site does not exceed 30%, a stormwater management plan will likely be required for those areas that exceed 30% imperviousness. stormwater management plans must be complete with a final design and an executed Operation and Maintenance Agreement. There will be no conditional stormwater approvals for the express review process that allow for approval of the final plans at a later date. Worksheets must be provided that are available at http://h2o.ehnr.state. nc. us/ncwetlands/mitresto. html. SECTION XII -SEWAGE DISPOSAL ~ Response must be clear and detailed. Any disposal method that suggests further impacts may be required other than those shown must be clearly addressed on the site plans. SECTION XIII ~ Answering yes to either of these responses automatically precludes you from the express review process. SECTION XIV -SIGNATURE 1~ The name, position and/or title of the applicant must be in type or long hand script here with the signature. It should be the same person as described in Part II. If you have any questions about these requirements, please email the Express Review Program at 401 express@ncmail.net and include your question and phone number and the appropriate staff will respond as soon as possible. ~~p off- oSo3 E- 22 Roadwa Stormwater Runoff Calculations Basin B Pre=develo ment condltlcin3D"basin B ~~~"'~ F~~ ~ ~ ~x~~~' '"~"' "'- Total Area 1.67 ac Tc* 10 min 'Assume Tc =minimum tc of 10min given basin size and piped flow nature of runoff. ''1yr-24 hr depth and intensity taken from 'Calculating Peak Runoff Volume for the 1-yr Design Storrs" for Upper Neuse -Wake Count **1,= 3.71 in/hr ,= 1.2 cfs 'I10 6.56 in/hr 050= 2.2 cfs '1,00= 6.90 in/hr 0,00= 2.3 cfs + Intensity values taken from NOAH Atlas 14- RALEIGH DURHAM WSFO AP, NORTH CAROLINA (31-7069) 35.8706 N 78.7864 403 feet Post-develo tcciYiiElUtiEto'Basfn B ~ ": ~. ~. z~:=~~ ~~"'_' :. Rational C Area ac CN Pervious (Managed) 0.3 0.82 69 Im ervious & O n Water 0.9 0.85 98 Woods (Unmanaged) 0.2 0 55 SmaII Waters ra h Fortnulatfon (Malcom,'~teme of Urban Stormwater Desl~~ _"' 1 r 50 r 100 10 r P in **.- 3.00 4.56 5.07 3.4 S (in) 1.9 1.9 1.9 1.9 0' in 1.5 2.8 3.3 1.8 V ft 9 089 17 268 20 073 11 110 t min 29.1 31.2 34.5 23.6 Precipitation values are for the 6hr storm. Malcolm recommends the 6hr storm event for approximation of the volume of runoff un er the hydrograph. The 1yr precipitation is for the 24 hr event. A value for the 1yr 6hr event is not known. The 1yr 24 hr precipatio value is taken from the Neuse River. '*1~= 3.71 in/hr 0~= 3.8 cfs 1~0= 5.58 in/hr 0~0= 5.6 cfs '150= 6.56 in/hr . 050= 6.8 cfs 'l,oo= 6.90 in/hr 0,00= 7.0 cfs RaUOnal C Area ac CN Woods 0.2 1.67 55 Com osite C: 0.20 Com site C: 0.61 Total Area 1.6 ac Com site CN 83.8 Tc 10 min BMP Desf rrfor 85% TSS Remov~l- Estimated Stora e R uired(1y2ahr 4,379 ft 0.10 acre-ft im rvious 51% Drainage Area (ac) 1.67 ac Rv. runoff cce 0:51 " 0.07 ac-ft storm) Volume (1 3,080 cf BMP Selected Sand Filter Sediment Chamber & Sand Filter Chamber Re wired Volume ft~ 901.8 cf Re wired Surface Area f~ 601 s De th 1.5 ft _ength 150 ft Nidth 4.0 ft Design Assumptions: Assume avg filtration rate of 0.04 gal/minfft2 with one ft of head on the sand surface. Assumes that drainage thru the sand chamber will be occurring throughout the duration of runoff. Calculate Weir Length for Sheet Flow to Filter Chamber Use weir equation Q=CLH~ Q =peak flow from riser spillway of dam (10yr storm) 0.83 cfs C= weir cceff 3.0 H =allowable head =tin or 0.17 ft Required Weir L= 4.08 ft Provided Weir Length = 112.50 ft Sand Bed Infiltration flow rate 0.04 gal/min/sf 24.05 gal/min 0.05 cfs Peak Outflow 1yr 24hr storm Weir flow from basin 0.24 cfs Surcharge from sand filter 0.78 Discharge from sand filter 0.05 Total Post Develop flow - 1yr 24hr 1.07 cfs Pre development flowrate 1.24 ds Therefore BMP's provide required pre/post flow control for the 1yr 24hr storm E-22 School Access Road - Basin B Stage Storage Development S CHECK CHECK Contour Area Incr Vol Accum Z Zest SA Contour (ft2) (ft3) Vol (ft3) Stage (ft) In(S) In(Z) 298 3,028.15 0 0 299 3,598.66 3313 3,313 1 8.11 0.00 1.05 3,769 300 4,205.76 3902 7,216 2 8.88 0.69 2.00 4,332 301 4,845.59 4526 11,741 3 9.37 1.10 3.00 4,700 WQ Volume (1") required 3,080 ft3 Elevation for WQ Volume 298.98 Estimate Vol for 1yr24hr Attentuation 4,379 ft3 Elevation for Attenuation Volume 299.32 xcoeff 1.2008 b = 1.20 v-intercept 8.0517 Ks = 3139 9.40 9.30 9.20 9.10 9.00 8.90 8.80 0.00 0.20 0.40 0.60 0.80 1.00 1.20 Series1 Linear (Series1) E-22 School Access Road Basic B 1 yrStorm Results Norm surf area= N/A ac Max surf area= 0.10 ac Required SA = N/A ac Peak stage 300.03 fl Peak outflow= 0.6 cfs Rise= 2.03 ft Pre-Development Freeboard Flow 1.2 fs (max stage) I,0 ft la u Stage Stooge Aydrogrsph Inpnfs Ks- 3139 Cep= a cfs b= 1.20 7p= ~9 mm Zom '98 dT= 1 min Initial Water Level Zi= 29P ft Ontflow Devices RiserBaml Spillway N= I Number of Risers Orifice #1 Drtser- 24 in Riser Diameter N= Cw= 3A0 Riser Weir Cceft D= Cd= O.v Riser Orifice Cceft Cd= Zcr-- 300 ft Riser Crest Elev Inr- Db= IS in Barrel Diameter Cd= 0.6 Barrel orifice weft Orifice #2 Zinv-- 298 ft Elev invert barrel N= D= Emergency Weir: Cd= L= 20 ft Inv= Zcr- 300 ft Cw= 3 Top of Dam L= 500 ft Zcr- 301 ft Cw= 3 2 2 in 0.6 298 ft 0 3 in 0.6 Oft 1 r24hr Volume Dr awdown WQ Volu a Eievat on = 298.98 ft Time Ste be i d awdown= 386 inutes Time Ste end drawdown= 831 minutes Drawdown time = 0.3 da Riser Riser (Weir) E Time Inflow Storage Stage Outflow Riaer (Orifice) Riser (Weir) Barrel RBspwy Orifice (1st toot) Orifice (led foot) (orifice)+ orifice +orifice mergency Weir Top of Dam (min) (cfs) (w ft)_ (fi) (cfs) (cfs) (Ms) (cfs) (cfs) (cfs) (cfs) cfs cfs (cts) (cts) 0 0 0.00E+00 298.00 0.00 0.0 0.0 0.000 0.0 0.00 0.00 0.00 0.00 0.0 0.0 1 0 0.00E+00 298.00 0.00 0.0 0.0 0.000 0.0 0.00 0.00 0.00 0.00 0.0 0.0 2 0 6.57E-01 298.00 0.00 0.0 0.0 0.000 0.0 0.01 0.00 0.01 0.01 0.0 0.0 3 0 3.27E+00 298.()0 0.00 0.0 0.0 0.001 0.0 0.01 0.00 0.01 0.01 0.0 0.0 4 0 9.10E+00 298.01 0.00 0.0 0.0 0.002 0.0 0.02 0.00 0.02 0.02 0.0 0.0 5 0 1.93E+01 298.01 0.01 0.0 0.0 0.006 0.0 0.03 0.00 0.03 0.03 0.0 0.0 6 0 3.50E+Ot 298.02 0.01 0.0 0.0 0.012 0.0 0.03 0.00 0.03 0.03 0.0 0.0 7 1 5.72E+01 298.04 0.02 0.0 0.0 0.022 0.0 0.04 0.00 0.04 0.04 0.0 0.0 8 1 8.65E+01 298.05 0.04 0.0 0.0 0.038 0.0 0.05 0.00 0.05 0.05 0.0 0.0 9 1 .1.24E+02 298.07 0.05 0.0 0.0 0.059 0.1 0.05 0.00 0.05 0.05 0.0 0.0 10 1 1.70E+02 298.09 0.06 0.0 0.0 0.087 0.1 0.06 0.00 0.06 0.06 0.0 0.0 11 1 2.26E+02 298.11 0.07 0.0 0.0 0.125 0.1 0.07 0.00 0.07 0.07 0.0 0.0 12 1 2.92E+02 298.14 0.08 0.0 0.0 0.172 0.1 0.08 0.00 0.08 0.08 0.0 0.0 13 2 3.89E+02 298.17 0.09 0.0 0.0 0.231 0.1 0.09 0.00 0.09 0.09 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 4 of 41 Riser Riser (Weir) Riser Riser Orifice OriTce (orifice)+ Emergency Time Inflow Storage Stage Ontfiow (Orifice) (Weir) Barrel RBspwy (1st foot) (2nd foot) orifice +orifice Weir Top of Dam (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cts) (cfs) (cfs) (cts) (cfs) cfs cfs (cts) (cfs) 14 2 4.58E+02 298.20 0.09 0.0 0.0 0.303 0.1 0.09 0.00 0.09 0.09 0.0 0.0 15 2 5.59E+02 298.24 0.10 0.0 0.0 0.388 0.1 0.10 0.00 0.10 0.10 0.0 0.0 16 2 6.71E+02 298.28 0.11 0.0 0.0 0.487 0.1 0.11 0.00 0.11 0.11 0.0 0.0 17 2 7.95E+02 298.32 0.12 0.0 0.0 0.602 0.1 0.12 0.00 0.12 0.12 0.0 0.0 18 3 9.30E+02 298.36 0.13 0.0 0.0 0.732 0.1 0.13 0.00 0.13 0.13 0.0 0.0 19 3 1.08E+03 298.41 0.13 0.0 0.0 0.879 0.1 0.13 0.00 0.13 0.13 0.0 0.0 20 3 1.23E+03 298.46 0.14 0.0 0.0 1.041 0.1 0.14 0.00 O.t4 0.14 0.0 0.0 21 3 1.40E+03 298.51 0.15 0.0 0.0 1.220 0.2 0.15 0.00 0.15 0.15 0.0 0.0 22 3 1.58E+03 298.56 0.16 0.0 0.0 1.415 0.2 0.16 0.00 0.16 0.16 0.0 0.0 23 3 1.76E+03 298.62 0.17 0.0 0.0 1.625 0.2 0.17 0.00 0.17 0.17 0.0 0.0 24 3 1.95E+03 298.67 0.17 0.0 0.0 1.849 0.2 0.17 0.00 0.17 0.17 0.0 0.0 25 4 2.15E+03 298.73 0.18 0.0 0.0 2.087 0.2 0.18 0.00 0.18 0.18 0.0 0.0 26 4 2.35E+03 298.79 0.19 0.0 0.0 2.336 0.2 0.19 0.00 0.19 0.19 0.0 0.0 27 4 2.56E+03 298.84 0.19 0.0 0.0 2.597 0.2 0.19 0.00 0.19 0.19 0.0 0.0 28 4 2.77E+03 298.90 0.20 0.0 0.0 2.866 0.2 0.20 0.00 0.20 0.20 0.0 0.0 29 4 2.98E+03 298.96 0.21 0.0 0.0 3.143 -0.2 0.21 0.00 0.21 0.21 0.0 0.0 30 4 3.20E+03 299.02 0.21 0.0 0.0 3.425 0.2 0.21 0.00 0.21 0.21 0.0 0.0 31 4 3.41E+03 299.07 0.22 0.0 0.0 3.711 0.2 0.22 0.00 0.22 0.22 0.0 0.0 32 4 3.62E+03 299.13 0.22 0.0 0.0 3.998 0.2 0.22 0.00 0.22 0.22 0.0 0.0 33 4 3.82E+03 299.18 0.23 0.0 0.0 4.285 0.2 0.23 0.00. 0.23 0.23 0.0 0.0 34 3 4.03E+03 299.23 0.23 0.0 0.0 4.568 0.2 0.23 0.00 0.23 0.23 0.0 0.0 35 3 4.22E+03 299.28 0.24 0.0 0.0 4.773 0.2 0.24 0.00 0.24 0.24 0.0 0.0 36 3 4.41E+03 299.33 0.24 0.0 0.0 4.943 0.2 0.24 0.00 0.24 0.24 0.0 0.0 37 3 4.59E+03 299.37 0.25 0.0 0.0 5.099 0.2 0.25 0.00 0.25 0.25 0.0 0.0 38 3 4.76E+03 299.41 0.25 0.0 0.0 5.243 0.2 0.25 0.00 0.25 0.25 0.0 0.0 39 3 4.92E+03 299.46 0.25 0.0 0.0 5.375 0.3 0.25 0.00 0.25 0.25 0.0 0.0 40 3 5.08E+03 299.49 0.26 0.0 0.0 5.497 0.3 0.26 0.00 0.26 0.26 0.0 0.0 41 3 5.23E+03 299.53 0.26 0.0 0.0 5.610 0.3 0.26 0.00 0.26 0.26 0.0 0.0 42 2 5.37E+03 299.56 0.26 0.0 0.0 5.715 0.3 0.26 0.00 0.26 0.26 0.0 0.0 43 2 5.50E+03 299.60 0.27 0.0 0.0 5.812 0.3 0.27 0.00 0.27 0.27 0.0 0.0 44 2 5.63E+03 299.63 0.27 0.0 0.0 5.903 0.3 0.27 0.00 0.27 0.27 0.0 0.0 45 2 5.75E+03 299.66 0.27 0.0 0.0 5.988 0.3 0.27 0.00 0.27 0.27 0.0 0.0 46 2 5.86E+03 299.68 0.27 0.0 0.0 6.067 0.3 0.27 0.00 0.27 0.27 0.0 0.0 47 2 5.97E+03 299.71 0.27 0.0 0.0 6.140 0.3 0.27 0.00 0.27 0.27 0.0 0.0 48 2 6.07E+03 299.73 0.28 0.0 0.0 6.209 0.3 0.28 0.00 0.28 0.28 0.0 0.0 49 2 6.17E+03 299.76 0.28 0.0 0.0 6.274 0.3 0.28 0.00 0.28 0.28 0.0 0.0 50 2 6.26E+03 299.78 0.28 0.0 0.0 6.334 0.3 0.28 0.00 0.28 0.28 0.0 0.0 51 2 6.35E+03 299.80 0.28 0.0 0.0 6.391 0.3 0.28 0.00 0.28 0.28 0.0 0.0 52 2 6.43E+03 299.82 0.28 0.0 0.0 6.444 0.3 0.28 0.00 0.28 0.28 0.0 0.0 53 2 6.51E+03 299.84 0.28 0.0 0.0 6.493 0.3 0.28 0.00 0.28 0.28 0.0 0.0 54 1 6.59E+03 299.85 0.29 0.0 0.0 6.540 0.3 0.29 0.00 0.29 0.29 0.0 0.0 55 1 6.66E+03 299.87 0.29 0.0 0.0 6.583 0.3 0.29 0.00 0.29 0.29 0.0 0.0 56 1 6.72E+03 299.89 0.29 0.0 0.0 6.624 0.3 0.29 0.00 0.29 0.29 0.0 0.0 57 1 6.79E+03 299.90 0.29 0.0 0.0 6.662 0.3 0.29 0.00 0.29 0.29 0.0 0.0 58 1 6.84E+03 299.91 0.29 0.0 0.0 6.698 0.3 0.29 0.00 0.29 0.29 0.0 0.0 59 1 6.90E+03 299.93 0.29 0.0 0.0 6.731 0.3 0.29 0.00 0.29 0.29 0.0 0.0 60 1 6.95E+03 299.94 0.29 0.0 0.0 6.762 0.3 0.29 0.00 0.29 0.29 0.0 0.0 61 1 7.00E+03 299.95 0.29 0.0 0.0 6.792 0.3 0.29 0.00 0.29 0.29 0.0 0.0 62 1 7.05E+03 299.96 0.29 0.0 0.0 6.819 0.3 0.29 0.00 0.29 0.29 0.0 0.0 63 1 7.09E+03 299.97 0.29 0.0 0.0 6.845 0.3 0.29 0.00 0.29 0.29 0.0 0.0 64 1 7.13E+03 299.98 0.30 0.0 0.0 6.868 0.3 0.30 0.00 0.30 0.30 0.0 0.0 65 1 7.17E+03 299.99 0.30 0.0 0.0 6.891 0.3 0.30 0.00 0.30 0.30 0.0 0.0 66 1 7.20E+03 300.00 0.30 0.0 0.0 6.911 0.3 0.30 0.00 0.30 0.30 0.0 0.0 67 1 7.24E+03 300.01 0.33 1.1 0.0 6.931 0.3 0.30 0.00 1.38 0.30 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 5 of 41 Ri Ri if ifi Riser Riser (Weir) Time Inflow Storage Stage Outflow ser (Orifice) ser (Weir) Barrel R73spwy Or ice (1st foot) Or ce (god foot) (orifice)+ orifice +orifico E mergency Weir Top of Dam (min) (efa) (cu k) (ft) (cfs) (cis) (cfs) (cfs) (cfs) (cis) (cfs) cfs cfs (cts) (cfs) 68 1 7.27E+03 300.01 0.40 1.6 0.0 6.947 0.3 0.30 0.00 1.94 0.32 0.1 0.0 69 1 7.29E+03 300.02 0.47 2.0 0.0 6.961 0.3 0.30 0.00 2.27 0.34 0.1 0.0 70 1 7.31E+03 300.02 0.53 2.2 0.1 6.970 0.4 0.30 0.00 2.48 0.36 0.2 0.0 71 1 7.32E+03 300.02 0.58 2.3 0.1 6.976 0.4 0.30 0.00 2.60 0.37 0.2 0.0 72 1 7.32E+03 300.02 0.60 2.4 0.1 6.979 0.4 0.30 0.00 2.67 0.37 0.2 0.0 73 1 7.33E+03 300.03 0.62 2.4 0.1 6.981 0.4 0.30 0.00 2.70 0.37 0.2 0.0 74 1 7.33E+03 300.03 0.62 2.4 0.1 6.981 0.4 0.30 0.00 2.71 0.37 0.2 0.0 75 1 7.32E+03 300.03 0.61 2.4 0.1 6.980 0.4 0.30 0.00 2.69 0.37 0.2 0.0 76 1 7.32E+03 300.02 0.60 2.4 0.1 6.979 0.4 0.30 0.00 2.66. 0.37 0.2 0.0 77 1 7.32E+03 300.02 0.59 2.3 0.1 6.977 0.4 0.30 0.00 2.62 0.37 0.2 0.0 78 0 7.31E+03 300.02 0.57 2.3 0.1 6.975 0.4 0.30 0.00 2.58 0.36 0.2 0.0 79 0 7.31E+03 300.02 0.55 2.2 0.1 6.972 0.4 0.30 0.00 2.53 0.36 0.2 0.0 80 0 7.31E+03 300.02 0.53 2.2 0.1 6.970 0.4 0.30 0.00 2.47 0.35 0.2 0.0 81 0 7.30E+03 300.02 0.51 2.1 0.1 6.967 0.4 0.30 0.00 2.42 0.35 0.2 0.0 82 0 7.30E+03 300.02 0.50 2.1 0.0 6.964 0.3 0.30 0.00 2.35 0.35 0.2 0.0 83 0 7.29E+03 300.02 0.48 2.0 0.0 6.961 0.3 0.30 0.00 2.29 0.34 0.1 0.0 84 0 7.29E+03 300.02 0.46 1.9 0.0 6.958 0.3 0.30 0.00 2.22 0.34 0.1 0.0 85 0 7.28E+03 300.02 0.44 1.9 0.0 6.956 0.3 0.30 0.00 2.16 0.33 0.1 0.0 86 0 7.28E+03 300.01 0.43 1.8 0.0 6.953 0.3 0.30 0.00 2.09 0.33 0.1 0.0 87 0 7.27E+08 300.01 0.41 1.7 0.0 6.950 0.3 0.30 0.00 2.01 0.33 0.1 0.0 88 0 7.27E+03 300.01 0.40 1.6 0.0 6.947 0.3 0.30 0.00 1.94 0.32 0.1 0.0 89 0 7.26E+03 300.01 0.38 1.6 0.0 6.944 0.3 0.30 0.00 1.86 0.32 0.1 0.0 90 0 7.26E+03 300.01 0.37 1.5 0.0 6.942 0.3 0.30 0.00 1.77 0.32 0.1 0.0 91 0 7.25E+03 300.01 0.36 1.4 0.0 6.939 0.3 0.30 0.00 1.68 0.31 0.0 0.0 92 0 7.25E+03 300.01 0.35 1.3 0.0 6.936 0.3 0.30 0.00 1.59 0.31 0.0 0.0 93 0 7.24E+03 300.01 0.34 1.2 0.0 6.933 0.3 0.30 0.00 1.48 0.31 0.0 0.0 94 0 7.24E+03 300.01 0.33 1.1 0.0 6.930 0.3 0.30 0.00 1.37 0.30 0.0 0.0 95 0 7.23E+03 300.00 0.32 0.9 0.0 6.928 0.3 0.30 0.00 1.24 0.30 0.0 0.0 96 0 7.23E+03 300.00 0.31 0.8 0.0 6.925 0.3 0.30 0.00 1.08 0.30 0.0 0.0 97 0 7.22E+03 300.00 0.30 0.6 0.0 6.922 0.3 0.30 0.00 0.88 0.30 0.0 0.0 98 0 7.22E+03 300.00 0.30 0.2 0.0 6.918 0.3 0.30 0.00 0.54 0.30 0.0 0.0 99 0 7.21E+03 300.00 0.30 0.0 0.0 6.915 0.3 0.30 0.00 0.30 0.30 0.0 0.0 100 0 7.21E+03 300.00 0.30 0.0 0.0 6.912 0.3 0.30 0.00 0.30 0.30 0.0 0.0 101 0 7.20E+03 300.00 0.30 0.0 0.0 6.908 0.3 0.30 0.00 0.30 0.30 0.0 0.0 102 0 7.19E+03 299.99 0.30 0.0 0.0 6.904 0.3 0.30 0.00 0.30 0.30 0.0 0.0 103 0 7.18E+03 299.99 0.30 0.0 0.0 6.899 0.3 0.30 0.00 0.30 0.30 0.0 0.0 104 0 7.18E+03 299.99 0.30 0.0 0.0 6.894 0.3 0.30 0.00 0.30 0.30 0.0 0.0 105 0 7.17E+03 299.99 0.30 0.0 0.0 6.889 0.3 0.30 0.00 0.30 0.30 0.0 0.0 106 0 7.16E+03 299.99 0.30 0.0 0.0 6.884 0.3 0.30 0.00 0.30 0.30 0.0 0.0 107 0 7.15E+03 299.98 0.30 0.0 0.0 6.879 0.3 0.30 0.00 0.30 0.30 0.0 0.0 108 0 7.14E+03 299.98 0.30 0.0 0.0 6.873 0.3 0.30 0.00 0.30 0.30 0.0 0.0 1b9 0 7.13E+03 299.98 0.30 0.0 0.0 6.867 0.3 0.30 0.00 0.30 0.30 0.0 0.0 110 0 7.12E+03 299.98 0.30 0.0 0.0 6.861 0.3 0.30 0.00 0.30 0.30 0.0 0.0 111 0 7.11E+03 299.98 0.30 0.0 0.0 6.855 0.3 0.30 0.00 0.30 0.30 0.0 0.0 112 0 7.10E+03 299.97 0.30 0.0 0.0 6.849 0.3 0.30 0.00 0.30 0.30 0.0 0.0 113 0 7.09E+03 299.97 0.29 0.0 0.0 6.842 0.3 0.29 0.00 0.29 0.29 0.0 0.0 114 0 7.07E+03 299.97 0.29 0.0 0.0 6.835 0.3 0.29 0.00 0.29 0.29 0.0 0.0 115 0 7.06E+03 299.96 0.29 0.0 0.0 6.828 0.3 0.29 0.00 0.29 0.29 0.0 0.0 116 0 7.05E+03 299.96 0.29 0.0 0.0 6.821 0.3 0.29 0.00 0.29 0.29 0.0 0.0 117 0 7.04E+03 299.96 0.29 0.0 0.0 6.814 0.3 0.29 0.00 0.29 0.29 0.0 0.0 tyr 24hr Storm - Basin B E-22 Access Road Page 6 of 41 Ri Ri O ifi O ifi Riser Riser (Weir) E ser ser r ce r ce (orifice)+ +orifice mergency Time Inflow Storage Stage Outflow (OdTice) (Weir) Barrel RBspwy (1st toot) (2nd foot) orifice Weir Top of Dam (min) (cfs) (cu ft) (fi) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 118 0 7.03E+03 299.96 0.29 0.0 0.0 6.807 0.3 0.29 0.00 0.29 0.29 0.0 0.0 119 0 7.01E+03 299.95 0.29 0.0 0.0 6.799 0.3 0.29 0.00 0.29 0.29 0.0 0.0 120 0 7.00E+03 299.95 0.29 0.0 0.0 6.792 0.3 0.29 0.00 0.29 0.29 0.0 0.0 121 0 6.99E+03 299.95 0.29 0.0 0.0 6.784 0.3 0.29 0.00 0.29 0.29 0.0 0.0 122 0 6.97E+03 299.94 0.29 0.0 0.0 6.776 0.3 0.29 0.00 0.29 0.29 0.0 0.0 123 0 6.96E+03 299.94 0.29 0.0 0.0 6.768 0.3 0.29 0.00 0.29 0.29 0.0 0.0 124 0 6.95E*03 299.94 0.29 0.0 0.0 6.760 0.3 0.29 0.00 0.29 0.29 0.0 0.0 125 0 6.93E+03 299.93 0.29 0.0 0.0 6.752 0.3 0.29 0.00 0.29 0.29 0.0 0.0 126 0 6.92E+03 299.93 0.29 0.0 0.0 6.743 0.3 0.29 0.00 0.29 0.29 0.0 0.0 127 0 6.91E+03 299.93 0.29 0.0 0.0 6.735 0.3 0.29 0.00 0.29 0.29 0.0 0.0 128 0 6.89E+03 299.92 0.29 0.0 0.0 6.726 0.3 0.29 0.00 0.29 0.29 0.0 0.0 129 0 6.88E+03 299.92 0.29 0.0 0.0 6.718 0.3 0.29 0.00 0.29 0.29 0.0 0.0 130 0 6.86E+03 299.92 0.29 0.0 0.0 6.709 0.3 0.29 0.00 0.29 0.29 0.0 0.0 131 0 6.85E+03 299.91 0.29 0.0 0.0 6.700 0.3 0.29 0.00 0.29 0.29 0.0 0.0 132 0 6.83E+03 299.91 0.29 0.0 0.0 6.697 0.3 0.29 0.00 0.29 0.29 0.0 0.0 133 0 6.82E+03 299.91 0.29 0.0 0.0 6.682 0.3 0.29 0.00 0.29 0.29 0.0 0.0 134 0 6.80E+03 299.90 0.29 0.0 0.0 6.673 0.3 0.29 0.00 0.29 0.29 0.0 0.0 135 0 6.79E+03 299.90 0.29 0.0 0.0 6.664 0.3 0.29 0.00 0.29 0.29 0.0 0.0 136 0 6.77E+03 299.90 0.29 0.0 0.0 6.655 0.3 0.29 0.00 0.29 0.29 0.0 0.0 137 0 6.76E+03 299.89 0.29 0.0 0.0 6.646 0.3 0.29 0.00 0.29 0.29 0.0 0.0 138 0 6.74E+03 299.89 0.29 0.0 0.0 6.637 0.3 0.29 0.00 0.29 0.29 0.0 0.0 139 0 6.73E+03 299.89 0.29 0.0 0.0 6.627 0.3 0.29 0.00 0.29 0.29 0.0 0.0 140 0 6.71E+03 299.88 0.29 0.0 0.0 6.618 0.3 0.29 0.00 0.29 0.29 0.0 0.0 141 0 6.70E+03 299.88 0.29 0.0 0.0 6.608 0.3 0.29 0.00 0.29 0.29 0.0 0.0 142 0 6.68E+03 299.88 0.29 0.0 0.0 6.599 0.3 0.29 0.00 0.29 0.29 0.0 0.0 143 0 6.67E+03 299.87 0.29 0.0 0.0 6.589 0.3 0.29 0.00 0.29 0.29 0.0 0.0 144 0 6.65E+03 299.87 0.29 0.0 0.0 6.579 0.3 0.29 0.00 0.29 0.29 0.0 0.0 145 0 6.64E+03 299.87 0.29 0.0 0.0 6.570 0.3 0.29 0.00 0.29 0.29 0.0 0.0 146 0 6.62E+03 299.86 0.29 0.0 0.0 6.560 0.3 0.29 0.00 0.29 0.29 0.0 0.0 147 0 6.60E+03 299.86 0.29 0.0 0.0 6.550 0.3 0.29 0.00 0.29 0.29 0.0 0.0 148 0 6.59E+03 299.85 0.29 0.0 0.0 6.540 0.3 0.29 0.00 0.29 0.29 0.0 0.0 149 0 6.57E+03 299.85 0.29 0.0 0.0 6.530 0.3 0.29 0.00 0.29 0.29 0.0 0.0 150 0 6.56E+03 299.85 0.29 0.0 0.0 6.520 0.3 0.29 0.00 0.29 0.29 0.0 0.0 151 0 6.54E+03 299.84 0.29 0.0 0.0 6.510 0.3 0.29 0.00 0.29 0.29 0.0 0.0 152 0 6.52E+03 299.84 0.28 0.0 0.0 6.500 0.3 0.28 0.00 0.28 0.28 0.0 0.0 153 0 6.51E+03 299.84 0.28 0.0 0.0 6.490 0.3 0.28 0.00 0.28 0.28 0.0 0.0 154 0 6.49E+03 299.83 0.28 0.0 0.0 6.480 0.3 0.28 0.00 0.28 0.28 0.0 0.0 155 0 6.48E+03 299.83 0.28 0.0 0.0 6.470 0.3 0.28 0.00 0.28 0.28 0.0 0.0 156 0 6.46E+03 299.82 0.28 0.0 0.0 6.460 0.3 0.28 0.00 0.28 0.28 0.0 0.0 157 0 6.44E+03 299.82 0.28 0.0 0.0 6.450 0.3 0.28 0.00 0.28 0.28 0.0 0.0 158 0 6.43E+03 299.82 0.28 0.0 0.0 6.439 0.3 0.28 0.00 0.28 0.28 0.0 0.0 159 0 6.41E+03 299.81 0.28 0.0 0.0 6.429 0.3 0.28 0.00 0.28 0.28 0.0 0.0 160 0 6.40E+03 299.81 0.28 0.0 0.0 6.419 0.3 0.28 0.00 0.28 0.28 0.0 0.0 161 0 6.38E+03 299.81 0.28 0.0 0.0 6.409 0.3 0.28 0.00 0.28 0.28 0.0 0.0 162 0 6.36E+03 299.80 0.28 0.0 0.0 6.398 0.3 0.28 0.00 0.28 0.28 0.0 0.0 163 0 6.35E+03 299.80 0.28 0.0 0.0 6.388 0.3 0.28 0.00 0.28 0.28 0.0 0.0 164 0 6.33E+03 299.79 0.28 0.0 0.0 6.377 0.3 0.28 0.00 0.28 0.28 0.0 0.0 165 0 6.31E+03 299.79 0.28 0.0 0.0 6.367 0.3 0.28 0.00 0.28 0.28 0.0 0.0 16fi 0 6.30E+03 299.79 0.28 0.0 0.0 6.356 0.3 0.28 0.00 0.28 0.28 0.0 0.0 167 0 6.28E+03 299.78 0.28 0.0 0.0 6.346 0.3 0.28 0.00 0.28 0.28 0.0 0.0 168 0 6.27E+03 299.78 0.28 0.0 0.0 6.335 0.3 0.28 0.00 0.28 0.28 0.0 0.0 169 0 6.25E+03 299.77 0.28 0.0 0.0 6.325 0.3 0.28 0.00 0.28 0.28 0.0 0.0 170 0 6.23E+03 299.77 0.28 0.0 0.0 6.314 0.3 0.28 0.00 0.28 0.28 0.0 0.0 171 0 6.22E+03 299.77 0.28 0.0 0.0 6.303 0.3 0.28 0.00 0.28 0.28 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access. Road Page 7 of 41 Riser Riser (Weir) Time Inflow Storage Stage Outflow Riser (Odflce) Riser (Weir) Barrel RBspwy Orifice (1st foot) Orifice (2nd foot) (orifice)+ orifice E + °rifice mergency Weir Top of Dam (mi°) (cfa) (cu @) (tt) (cfs) (cts) (cfs) (cfs) (cfs) (cts) (cfs) cfs cfs (cfs) (cfa) 172 0 6.20E+03 299.76 0.28 0.0 0.0 6.293 0.3 0.28 0.00 0.28 0.28 0.0 0.0 173 0 .6.18E+03 299.76 0.28 0.0 0.0 6.282 0.3 0.28 0.00 0.28 0.28 0.0 0.0 174 0 6.17E+03 299.76 0.28 0.0 0.0 6.271 0.3 0.28 0.00 0.28 0.28 0.0 0.0 175 0 6.15E+03 299.75 0.28 0.0 0.0 6.261 0.3 0.28 0.00 0.28 0.28 0.0 0.0 176 0 6.14E+03 299.75 0.28 0.0 0.0 6.250 0.3 0.28 0.00 0.28 0.28 0.0 0.0 177 0 6.12E+03 299.74 0.28 0.0 0.0 6.239 0.3 0.28 0.00 0.28 0.28 0.0 0.0 178 0 6.10E+03 299.74 0.28 0.0 0.0 6.228 0.3 0.28 0.00 0.28 0.28 0.0 0.0 179 0 6.09E+03 299.74 0.28 0.0 0.0 6.218 0.3 0.28 0.00 0.28 0.28 0.0 0.0 180 0 6.07E+03 299.73 0.28 0.0 0.0 6.207 0.3 0.28 0.00 0.28 0.28 0.0 0.0 181 0 6.05E+03 299.73 0.28 0.0 0.0 6.196 0.3 0.28 0.00 0.28 0.28 0.0 0.0 182 0 6.04E+03 299.72 0.28 0.0 0.0 6.185 0.3 0.28 0.00 0.28 0.28 0.0 0.0 183 0 6.02E+03 299.72 0.28 0.0 0.0 6.174 0.3 0.28 0.00 0.28 0.28 0.0 0.0 184 0 6.01E+03 299.72 0.28 0.0 0.0 6.163 0.3 0.28 0.00 0.28 0.28 0.0 0.0 185 0 5.99E+03 299.71 0.27 0.0 0.0 6.152 0.3 0.27 0.00 0.27 0.27 0.0 0.0 186 0 5.97E+03 299.71 0.27 0.0 0.0 6.141 0.3 0.27 0.00 0.27 0.27 0.0 0.0 187 0 5.96E+03 299.70 0.27 0.0 0.0 6.130 0.3 0.27 0.00 0.27 0.27 0.0 0.0 188 0 5.94E+03 299.70 0.27 0.0 0.0 6.119 0.3 0.27 0.00 0.27 0.27 0.0 0.0 189 0 5.92E+03 299.70 0.27 0.0 0.0 6.108 0.3 0.27 0.00 0.27 0.27 0.0 0.0 190 0 5.91E+03 299.69 0.27 0.0 0.0 6.097 0.3 0.27 0.00 0.27 0.27 0.0 0.0 191 0 5.89E+03 299.69 0.27 0.0 0.0 6.086 0.3 0.27 0.00 0.27 0.27 0.0 0.0 192 0 5.88E+03 299.69 0.27 0.0 0.0 6.075 0.3 0.27 0.00 0.27 0.27 0.0 0.0 193 0 5.86E+03 299.68 0.27 0.0 0.0 6.064 0.3 0.27 0.00 0.27 0.27 0.0 0.0 194 0 5.84E+03 299.68 0.27 0.0 0.0 6.053 0.3 0.27 0.00 0.27 0.27 0.0 0.0 195 0 5.83E+03 299.67 0.27 0.0 0.0 6.042 0.3 0.27 0.00 0.27 0.27 0.0 0.0 196 0 5.81E+03 299.67 0.27 0.0 0.0 6.031 0.3 0.27 0.00 0.27 0.27 0.0 0.0 197 0 5.79E+03 299.67 0.27 0.0 0.0 6.020 0.3 0.27 0.00 0.27 0.27 0.0 0.0 198 0 5.78E+03 299.66 0.27 0.0 0.0 6.008 0.3 0.27 0.00 0.27 0.27 0.0 0.0 199 0 5.76E+03 299.66 0.27 0.0 0.0 5.997 0.3 0.27 0.00 0.27 0.27 0.0 0.0 200 0 5.75E+03 299.65 0.27 0.0 0.0 5.986 0.3 0.27 0.00 0.27 0.27 0.0 0.0 201 0 5.73E+03 299.65 0.27 0.0 0.0 5.975 0.3 0.27 0.00 0.27 0.27 0.0 0.0 202 0 5.71E+03 299.65 0.27 0.0 0.0 5.963 0.3 0.27 0.00 0.27 0.27 0.0 0.0 203 0 5.70E+03 299.64 0.27 0.0 0.0 5.952 0.3 0.27 0.00 0.27 0.27 0.0 0.0 204 0 5.68E+03 299.64 0.27 0.0 0.0 5.941 0.3 0.27 0.00 0.27 0.27 0.0 0.0 205 0 5.67E+03 299.64 0.27 0.0 0.0 5.930 0.3 0.27 0.00 0.27 0.27 0.0 0.0 206 0 5.65E+03 299.63 0.27 0.0 0.0 5.918 0.3 0.27 0.00 0.27 0.27 0.0 0.0 207 0 5.63E+03 299.63 0.27 0.0 0.0 5.907 0.3 0.27 0.00 0.27 0.27 0.0 0.0 208 0 5.62E+03 299.62 0.27 0.0 0.0 5.896 0.3 0.27 0.00 0.27 0.27 0.0 0.0 209 0 5.60E+03 299.62 0.27 0.0 0.0 5.884 0.3 0.27 0.00 0.27 0.27 0.0 0.0 210 0 5.59E+03 299.82 0.27 0.0 0.0 5.873 0.3 0.27 0.00 0.27 0.27 0.0 0.0 211 0 5.57E+03 299.61 0.27 0.0 0.0 5.862 0.3 0.27 0.00 0.27 0.27 0.0 0.0 212 0 5.55E+03 299.61 0.27 0.0 0.0 5.850 0.3 0.27 0.00 0.27 0.27 0.0 0.0 213 0 5.54E+03 299.60 0.27 0.0 0.0 5.839 0.3 0.27 0.00 0.27 0.27 0.0 0.0 274 0 5.52E+03 299.60 0.27 0.0 0.0 5.827 0:3 0.27 0.00 0.27 0.27 0.0 0.0 215 0 5.51E+03 299.60 0.27 0.0 0.0 5.816 0.3 0.27 0.00 0.27 0.27 0.0 0.0 216 0 5.49E+03 299.59 0.27 0.0 0.0 5.804 0.3 0.27 0.00 0.27 0.27 0.0 0.0 217 0 5.47E+03 299.59 0.26 0.0 0.0 5.793 0.3 0.26 0.00 0.26 0.26 0.0 0.0 218 0 5.46E+03 299.59 0.26 0.0 0.0 5.781 0.3 0.26 0.00 0.26 0.26 0.0 0.0 219 0 5.44E+03 299.58 0.26 0.0 0.0 5.770 0.3 0.26 0.00 0.26 0.26 0.0 0.0 220 0 5.43E+03 299.58 0.26 0.0 0.0 5.758 0.3 0.26 0.00 0.26 0.26 0.0 0.0 221 0 5.41E+03 299.57 0.26 0.0 0.0 5.747 0.3 0.26 0.00 0.26 0.26 0.0 0.0 222 0 5.40E+03 299.57 0.26 0.0 0.0 5.735 0.3 0.26 0.00 0.26 0.26 0.0 0.0 223 0 5.38E+03 299.57 0.26 0.0 0.0 5.723 0.3 0.26 0.00 0.26 0.26 0.0 0.0 224 0 5.36E+03 299.56 0.26 0.0 0.0 5.712 0.3 0.26 0.00 0.26 0.26 0.0 0.0 225 0 5.35E+03 299.56 0.26 0.0 0.0 5.700 0.3 0.26 0.00 0.26 0.26 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 8 of 41 Riser Riser (Weir) Time Inflow Storage Stage Outflow Riser (Orifice) Riser (Weir) Barrel RBspwy Orifice (lstfoot) Orifice (2nd foot) (odflce)+ orifice +oriflce E mergency Weir Top of Dam (min) (cfs) (ea k) (k) (ck) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 226 0 5.33E+03 299.55 0.26 0.0 0.0 5.689 0.3 0.26 0.00 0.26 0.26 0.0 0.0 227 0 5.32E+03 299.55 0.26 0.0 0.0 5.677 0.3 0.26 0.00 0.26 0.26 0.0 0.0 228 0 5.30E+03 299.55 0.26 0.0 0.0 5.665 0.3 0.26 0.00 0.26 0.26 0.0 0.0 229 0 5.29E+03 299.54 0.26 0.0 0.0 5.654 0.3 0.26 0.00 0.26 0.26 0.0 0.0 230 0 5.27E+03 299.54 0.26 0.0 0.0 5.642 0.3 0.26 0.00 0.26 0.26 0.0 0.0 231 0 5.25E+03 299.54 0.26 0.0 0.0 5.630 0.3 0.26 0.00 0.26 0.26 0.0 0.0 232 0 5.24E+03 299.53 0.26 0.0 0.0 5.618 0.3 0.26 0.00 0.26 0.26 0.0 0.0 233 0 5.22E+03 299.53 0.26 0.0 0.0 5.607 0.3 0.26 0.00 0.26 0.26 0.0 0.0 234 0 5.21E+03 299.52 0.26 0.0 0.0 5.595 0.3 0.26 0.00 0.26 0.26 0.0 0.0 235 0 5.19E+03 299.52 0.26 0.0 0.0 5.583 0.3 0.26 0.00 0.26 0.26 0.0 0.0 236 0 5.18E+03 299.52 0.26 0.0 0.0 5.571 0.3 0.26 0.00 0.26 0.26 0.0 0.0 237 0 5.16E+03 299.51 0.26 0.0 0.0 5.559 0.3 0.26 0.00 0.26 0.26 0.0 0.0 238 0 5.15E+03 299.51 0.26 0.0 0.0 5.548 0.3 0.26 0.00 0.26 0.26 0.0 0.0 239 0 5.13E+03 299.51 0.26 0.0 0.0 5.536 0.3 0.26 0.00 0.26 0.26 0.0 0.0 240 0 5.12E+03 299.50 0.26 0.0 0.0 5.524 0.3 0.26 0.00 0.26 0.26 0.0 0.0 241 0 5.10E+03 299.50 0.26 0.0 0.0 5.512 0.3 0.26 0.00 0.26 0.26 0.0 0.0 242 0 5.08E+03 299.49 0.26 0.0 0.0 5.500 0.3 0.26 0.00 0.26 0.26 0.0 0.0 243 0 5.07E+03 299.49 0.26 0.0 0.0 5.488 0.3 0.26 0.00 0.26 0.26 0.0 0.0 244 0 5.05E+03 299.49 0.26 0.0 0.0 5.476 0.3 0.26 0.00 0.26 0.26 0.0 0.0 245 0 5.04E+03 299.48 0.26 0.0 0.0 5.464 0.3 0.26 0.00 0.26 0.26 0.0 0.0 246 0 5.02E+03 299.48 0.26 0.0 0.0 5.452 0.3 0.26 0.00 0.26 0.26 0.0 0.0 247 0 5.01E+03 299.48 0.26 0.0 0.0 5.440 0.3 0.26 0.00 0.26 0.26 0.0 0.0 248 0 4.99E+03 299.47 0.25 0.0 0.0 5.428 0.3 0.25 0.00 0.25 0.25 0.0 0.0 249 0 4.98E+03 299.47 0.25 0.0 0.0 5.416 0.3 0.25 0.00 0.25 0.25 0.0 0.0 250 0 4.96E+03 299.46 0.25 0.0 0.0 5.404 0.3 0.25 0.00 0.25 0.25 0.0 0.0 251 0 4.95E+03 299.46 0.25 0.0 0.0 5.392 0.3 0.25 0.00 0.25 0.25 0.0 0.0 252 0 4.93E+03 299.46 0.25 0.0 0.0 5.380 0.3 0.25 0.00 0.25 0.25 0.0 0.0 253 0 4.92E+03 299.45 0.25 0.0 0.0 5.368 0.3 0.25 0.00 0.25 0.25. 0.0 0.0 254 0 4.90E+03 299.45 0.25 0.0 0.0 5.356 0.3 0.25 0.00 0.25 0.25 0.0 0.0 255 0 4.89E+03 299.45 0.25 0.0 0.0 5.344 0.3 0.25 0.00 0.25 0.25 0.0 0.0 256 0 4.87E+03 299.44 0.25 0.0 0.0 5.331 0.3 0.25 0.00 0.25 0.25 0.0 0.0 257 0 4.86E+03 299.44 0.25 0.0 0.0 5.319 0.3 0.25 0.00 0.25 0.25 0.0 0.0 258 0 4.84E+03 299.43 0.25 0.0 0.0 5.307 0.3 0.25 0.00 0.25 0.25 0.0 0.0 259 0 4.83E+03 299.43 0.25 0.0 0.0 5.295 0.3 0.25 0.00 0.25 0.25 0.0 0.0 260 0 4.81E+03 299.43 0.25 0.0 0.0 5.282 0.3 0.25 0.00 0.25 0.25 0.0 0.0 261 0 4.80E+03 299.42 0.25 0.0 0.0 5.270 0.3 0.25 0.00 0.25 0.25 0.0 0.0 262 0 4.78E+03 299.42 0.25 0.0 0.0 5.258 0.3 0.25 0.00 0.25 0.25 0.0 0.0 263 0 4.77E+03 299.42 0.25 0.0 0.0 5.246 0.2 0.25 0.00 0.25 0.25 0.0 0.0 264 0 4.75E+03 299.41 0.25 0.0 0.0 5.233 0.2 0.25 0.00 0.25 0.25 0.0 0.0 265 0 4.74E+03 299.41 0.25 0.0 0.0 5.221 0.2 0.25 0.00 0.25 0.25 0.0 0.0 266 0 4.72E+03 299.40 0.25 0.0 0.0 5.209 0.2 0.25 0.00 0.25 0.25 0.0 0.0 267 0 4.71E+03 299.40 0.25 0.0 0.0 5.196 0.2 0.25 0.00 0.25 0.25 0.0 0.0 268 0 4.69E+03 299.40 0.25 0.0 0.0 5.184 0.2 0.25 0.00 0.25 0.25 0.0 0.0 269 0 4.68E+03 299.39 0.25 0.0 0.0 5.171 0.2 0.25 0.00 0.25 0.25 0.0 0.0 270 0 4.66E+03 299.39 0.25 0.0 0.0 5.159 0.2 0.25 0.00 0.25 0.25 0.0 0.0 271 0 4.65E+03 299.39 0.25 0.0 0.0 5.147 0.2 0.25 0.00 0.25 0.25 0.0 0.0 272 0 4.63E+03 299.38 0.25 0.0 0.0 5.134 0.2 0.25 0.00 0.25 0.25 0.0 0.0 273 0 4.62E+03 299.38 0.25 0.0 0.0 5.122 0.2 0.25 0.00 0.25 0.25 0.0 0.0 274 0 4.60E+03 299.37 0.25 0.0 0.0 5.109 0.2 0.25 0.00 0.25 0.25 0.0 0.0 275 0 4.59E+03 299.37 0.25 0.0 0.0 5.096 0.2 0.25 0.00 0.25 0.25 0.0 0.0 276 0 4.57E+03 299.37 0.25 0.0 0.0 5.084 0.2 0.25 0.00 0.25 0.25 0.0 0.0 277 0 4.56E+03 299.36 0.25 0.0 0.0 5.071 0.2 0.25 0.00 0.25 0.25 0.0 0.0 278 0 4.54E+03 299.36 0.25 0.0 0.0 5.059 0.2 0.25 0.00 0.25 0.25 0.0 0.0 279 0 4.53E+03 299.36 0.24 0.0 0.0 5.046 0.2 0.24 0.00 0.24 0.24 0.0 0.0 1 yr 24hr Storm -Basin f3 E-22 Access Road Page 9 of 41 Riser Riser Riser Orifice Orifice (orifice)+ Riser (Weir) Emergency Time Inflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy (1st foot) (2nd foot) orifice + orifice Weir Top of Dam (min) (cts) (cu n) (ft) (cfs) (cfs) (cfa) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (efa) 280 0 4.51E+03 299.35 0.24 0.0 0.0 5.033 0.2 0.24 0.00 0.24 0.24 0.0 0.0 281 0 4.50E+03 299.35 0.24 0.0 0.0 5.021 0.2 0.24 0.00 0.24 0.24 0.0 0.0 282 0 4.48E+03 299.35 0.24 0.0 0.0 5.008 0.2 0.24 0.00 0.24 0.24 0.0 0.0 283 0 4.47E+03 299.34 0.24 0.0 0.0 4.995 0.2 0.24 0.00 0.24 0.24 0.0 0.0 284 0 .4.45E+03 299.34 0.24 0.0 0.0 4.983 0.2 0.24 0.00 0.24 0.24 0.0 0.0 285 0 4.44E+03 299.33 0.24 0.0 0.0 4.970 0.2 0.24 0.00 0.24 .0.24 0.0 0.0 286 0 4.43E+03 299.33 0.24 0.0 0.0 4.957 0.2 0.24 0.00 0.24 0.24 0.0 0.0 287 0 4.41E+03 299.33 0.24 0.0 0.0 4.944 0.2 0.24 0.00 0.24 0.24 0.0 0.0 288 0 4.40E+03 299.32 0.24 0.0 0.0 4.931 0.2 0.24 0.00 0.24 0.24 0.0 0.0 289 0 4.38E+03 299.32 0.24 0.0 0.0 4.919 0.2 0.24 0.00 0.24 0.24 0.0 0.0 290 0 4.37E+03 299.32 0.24 0.0 0.0 4.906 0.2 0.24 0.00 0.24 0.24 0.0 0.0 291 0 4.35E+03 299.31 0.24 0.0 0.0 4.893 0.2 0.24 0.00 0.24 0.24 0.0 0.0 292 0 4.34E+03 299.31 0.24 0.0 0.0 4.880 0.2 0.24 0.00 0.24 0.24 0.0 0.0 293 0 4.32E+03 299.31 0.24 0.0 0.0 4.867 0.2 0.24 0.00 0.24 0.24 0.0 0.0 294 0 4.31E+03 299.30 0.24 0.0 0.0 4.854 0.2 0.24 0.00 0.24 0.24 0.0 0.0 295 0 4.30E+03 299.30 0.24 0.0 0.0 4.841 0.2 0.24 0.00 0.24 0.24 0.0 0.0 296 0 4.28E+03 299.29 0.24 0.0 0.0 4.828 0.2 0.24 0.00 0.24 0.24 0.0 0.0 297 0 4.27E+03 299.29 0.24 0.0 0.0 4.815 0.2 0.24 0.00 0.24. 0.24 0.0 0.0 298 0 4.25E+03 299.29 0.24 0.0 0.0 4.802 0.2 0.24 0.00 0.24 0.24 0.0 0.0 299 0 4.24E+03 299.28 0.24 0.0 0.0 4.789 0.2 0.24 0.00 0.24 0.24 0.0 0.0 300 0 4.22E+03 299.28 0.24 0.0 0.0 4.776 0.2 0.24 0.00 0.24 0.24 0.0 0.0 301 0 4.21E+03 299.28 0.24 0.0 0.0 4.762 0.2 0.24 0.00 0.24 0.24 0.0 0.0 302 0 4.19E+03 299.27 0.24 0.0 0.0 4.749 0.2 0.24 0.00 0.24 0.24 0.0 0.0 303 0 4.18E+03 299.27 0.24 0.0 0.0 4.736 0.2 0.24 0.00 0.24 0.24 0.0 0.0 304 0 4.17E+03 299.27 0.24 0.0 0.0 4.723 0.2 0.24 0.00 0.24 0.24 0.0 0.0 305 0 4.15E+03 299.26 0.24 0.0 0.0 4.710 0.2 0.24 0.00 0.24 0.24 0.0 0.0 306 0 4.14E+03 299.26 0.24 0.0 0.0 4.696 0.2 0.24 0.00 0.24 0.24 0.0 0.0 307 0 4.12E+03 299.26 0.24 0.0 0.0 4.683 0.2 0.24 0.00 0.24 0.24 0.0 0.0 308 0 4.11E+03 299.25 0.24 0.0 0.0 4.670 0.2 0.24 0.00 0.24 0.24 0.0 0.0 309 0 4.10E+03 299.25 0.23 0.0 0.0 4.668 0.2 0.23 0.00 0.23 0.23 0.0 0.0 310 0 4.08E+03 299.24 0.23 0.0 0.0 4.648 0.2 0.23 0.00 0.23 0.23 0.0 0.0 311 0 4.07E+03 299.24 0.23 0.0 0.0 4.628 0.2 0.23 0.00 0.23 0.23 0.0 0.0 312 0 4.05E+03 299.24 0.23 0.0 0.0 4.608 0.2 0.23 0.00 0.23 0.23 0.0 0.0 313 0 4.04E+03 299.23 0.23 0.0 0.0 4.588 0.2 0.23 0.00 0.23 0.23 0.0 0.0 314 0 4.03E+03 299.23 0.23 0.0 0.0 4.568 0.2 0.23 0.00 0.23 0.23 0.0 0.0 315 0 4.01E+03 299.23 0.23 0.0 0.0 4.548 0.2 0.23 0.00 0.23 0.23 0.0 0.0 316 0 4.00E+03 299.22 0.23 0.0 0.0 4.528 0.2 0.23 0.00 0.23 0.23 0.0 0.0 317 0 3.98E+03 299.22 0.23 0.0 0.0 4.509 0.2 0.23 0.00 0.23 0.23 0.0 0.0 318 0 3.97E+03 299.22 0.23 0.0 0.0 4.489 0.2 0.23 0.00 0.23 0.23 0.0 0.0 319 0 3.96E+03 299.21 0.23 0.0 0.0 4.469 0.2 0.23 0.00 0.23 0.23 0.0 0.0 320 0 3.94E+03 299.21 0.23 0.0 0.0 4.450 0.2 0.23 0.00 0.23 0.23 0.0 0.0 321 0 3.93E+03 299.21 0.23 0.0 0.0 4.430 0.2 0.23 0.00 0.23 0.23 0.0 0.0 322 0 3.91E+03 299.20 0.23 0.0 0.0 4.411 0.2 0.23 0.00 0.23 0.23 0.0 0.0 323 0 3.90E+03 299.20 0.23 0.0 0.0 4.391 0.2 0.23 0.00 0.23 0.23 0.0 0.0 324 0 3.89E+03 299.19 0.23 0.0 0.0 4.372 0.2 0.23 0.00 0.23 0.23 0.0 0.0 325 0 3.87E+03 299.19 0.23 0.0 0.0 4.353 0.2 0.23 0.00 0.23 0.23 0.0 0.0 326 0 3.86E+03 299.19 0.23 0.0 0.0 4.333 0.2 0.23 0.00 0.23 0.23 0.0 0.0 327 0 3.85E+03 299.18 0.23 0.0 0.0 4.314 0.2 0.23 0.00 0.23 0.23 0.0 0.0 328 0 3.83E+03 299.18 0.23 0.0 0.0 4.295 0.2 0.23 0.00 0.23 0.23 0.0 0.0 329 0 3.82E+03 299.18 0.23 0.0 0.0 4.276 0.2 0.23 0.00 0.23 0.23 0.0 0.0 330 0 3.80E+03 299.17 0.23 0.0 0.0 4.256 0.2 0.23 0.00 0.23 0.23 0.0 0.0 331 0 3.79E+03 299.17 0.23 0.0 0.0 4.237 0.2 0.23 0.00 0.23 0.23 0.0 0.0 332 0 3.78E+03 299.17 0.23 0.0 0.0 4.218 0.2 0.23 0.00 0.23 0.23 0.0 0.0 333 0 3.76E+03 299.16 0.23 0.0 0.0 4.199 0.2 0.23 0.00 0.23 0.23 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 10 of 41 Ri Ri ifi O ifi O Riser Byer (Weir) E Time Inflow Storage Stage Outflow ser (Odflce) ser (Weir) Bartel RBspwy r ce (lstfoot) r ce (2udfoot) (orifce)+ orifice +orifice mergency Weir TopotDam (min) jcfs) (cn ft) (fl) (cfs) (cfs) (cfs) (cfs) (cts) (cfs) (cfs) cfs cfs (cta) (eta) 334 0 3.75E+03 299.16 0.23 0.0 0.0 4.180 0.2 0.23 0.00 0.23 0.23 0.0 0.0 335 0 3.74E+03 299.16 0.23 0.0 0.0 4.162 0.2 0.23 0.00 0.23 0.23 0.0 0.0 336 0 3.72E+03 299.15 0.23 0.0 0.0 4.143 0.2 0.23 0.00 0.23 0.23 0.0 0.0 337 0 3.71E+03 299.15 0.23 0.0 0.0 4.124 0.2 0.23 0.00 0.23 0.23 0.0 0.0 338 0 3.70E+03 299.15 0.22 0.0 0.0 4.105 0.2 0.22 0.00 0.22 0.22 0.0 0.0 339 0 3.68E+03 299.14 0.22 0.0 0.0 4.086 0.2 0.22 0.00 0.22 0.22 0.0 0.0 340 0 3.67E+03 299.14 0.22 0.0 0.0 4.068 0.2 0.22 0.00 0.22 0.22 0.0 0.0 341 0 3.66E+03 299.14 0.22 0.0 0.0 4.049 0.2 0.22 0.00 0.22 0.22 0.0 0.0 342 0 3.64E+03 299.13 0.22 0.0 0.0 4.031 0.2 0.22 0.00 0.22 0.22 0.0 0.0 343 0 3.63E+03 299.13 0.22 0.0 0.0 4.012 0.2 0.22 0.00 0.22 0.22 0.0 0.0 344 0 3.61E+03 299.12 0.22 0.0 0.0 3.994 0.2 0.22 0.00 0.22 0.22 0.0 0.0 345 0 3.60E+03 299.12 0.22 0.0 0.0 3.975 0.2 0.22 0.00 0.22 0.22 0.0 0.0 346 0 3.59E+03 299.12 0.22 0.0 0.0 3.957 0.2 0.22 .0.00 0.22 0.22 0.0 0.0 347 0 3.57E+03 299.11 0.22 0.0 0.0 3.938 0.2 0.22 0.00 0.22 0.22 0.0 0.0 348 0 3.56E+03 299.11 0.22 0.0 0.0 3.920 0.2 0.22 0.00 0.22 0.22 0.0 0.0 349 0 3.55E+03 299.11 0.22 0.0 0.0 3.902 0.2 0.22 0.00 0.22 0.22 0.0 0.0 350 0 3.54E+03 299.10 0.22 0.0 0.0 3.884 0.2 0.22 0.00 0.22 0.22 0.0 0.0 351 0 3.52E+03 299.10 0.22 0.0 0.0 3.865 0.2 0.22 0.00 0.22 0.22 0.0 0.0 352 0 3.51E+03 299.10 0.22 0.0 0.0 3.847 0.2 0.22 0.00 0.22 0.22 0.0 0.0 353 0 3.50E+03 299.09 0.22 0.0 0.0 3.829 0.2 0.22 0.00 0.22 0.22 0.0 0.0 354 0 3.48E+03 299.09 0.22 0.0 0.0 3.811 0.2 0.22 .0.00 0.22 0.22 0.0 0.0 355 0 3.47E+03 299.09 0.22 0.0 0.0 3.793 0.2 0.22 0.00 0.22 0.22 0.0 0.0 356 0 3.46E+03 299.08 0.22 0.0 0.0 3.775 0.2 .0.22 0.00 0.22 0.22 0.0 0.0 357 0 3.44E+03 299.08 0.22 0.0 0.0 3.757 0.2 0.22 0.00. 0.22 0.22 0.0 0.0 358 0 3.43E+03 299.08 0.22 0.0 0.0 3.740 0.2 0.22 0.00 0.22 0.22 0.0 0.0 359 0 3.42E+03 299.07 0.22 0.0 0.0 3.722 0.2 0.22 0.00 0.22 0.22 0.0 0.0 360 0 3.40E+03 299.07 0.22 0.0 0.0 3.704 0.2 0.22 0.00 0.22 0.22 0.0 0.0 361 0 3.39E+03 299.07 0.22 0.0 0.0 3.686 0.2 0.22 0.00 0.22 0.22 0.0 0.0 362 0 3.38E+03 299.06 0.22 0.0 0.0 3.669 0.2 0.22 0.00 0.22 0.22 0.0 0.0 363 0 3.36E+03 299.06 0.22 0.0 0.0 3.651 0.2 0.22 0.00 0.22 0.22 0.0 0.0 364 0 3.35E+03 299.06 0.22 0.0 0.0 3.633 0.2 0.22 0.00 0.22 0.22 0.0 0.0 365 0 3.34E+03 299.05 0.22 0.0 0.0 3.616 0.2 0.22 0.00 0.22 0.22 0.0 0.0 366 0 3.33E+03 299.05 0.22 0.0 0.0 3.598 0.2 0.22 0.00 0.22 0.22 0.0 0.0 367 0 3.31E+03 299.05 0.21 0.0 0.0 3.581 0.2 0.21 0.00 0.21 0.21 0.0 0.0 368 0 3.30E+03 299.04 0.21 0.0 0.0 3.563 0.2 0.21 0.00 0.21 0.21 0.0 0.0 369 0 3.29E+03 299.04 0.21 0.0 0.0 3.546 0.2 0.21 0.00 0.21 0.21 0.0 0.0 370 0 3.27E+03 299.04 0.21 0.0 0.0 3.529 0.2 0.21 0.00 0.21 0.21 0.0 0.0 371 0 3.26E+03 299.03 0.21 0.0 0.0 3.512 0.2 0.21 0.00 0.21 0.21 0.0 0.0 372 0 3.25E+03 299.03 0.21 0.0 0.0 3.494 0.2 0.21 0.00 0.21 0.21 0.0 0.0 373 0 3.24E+03 299.03 0.21 0.0 0.0 3.477 0.2 0.21 0.00 0.21 0.21 0.0 0.0 374 0 3.22E+03 299.02 0.21 0.0 0.0 3.460 0.2 0.21 0.00 0.21 0.21 0.0 0.0 375 0 3.21E+03 299.02 0.21 0.0 0.0 3.443 0.2 0.21 0.00 0.21 0.21 0.0 0.0 376 0 3.20E+03 299.02 0.21 0.0 0.0 3.426 0.2 0.21 0.00 0.21 0.21 0.0 0.0 377 0 3.18E+03 299.01 0.21 0.0 0.0 3.409 0.2 0.21 0.00 0.21 0.21 0.0 0.0 378 0 3.17E+03 299.01 0.21 0.0 0.0 3.392 0.2 0.21 0.00 0.21 0.21 0.0 0.0 379 0 3.16E+03 299.01 0.21 0.0 0.0 3.375 0.2 0.21 0.00 0.21 0.21 0.0 0.0 380 0 3.15E+03 299.00 0.21 0.0 0.0 3.358 0.2 0.21 0.00 0.21 0.21 0.0 0.0 381 0 3.13E+03 299.00 0.21 0.0 0.0 3.341 0.2 0.21 0.00 0.21 0.21 0.0 0.0 382 0 3.12E+03 299.00 0.21 0.0 0.0 3.325 0.2 0.21 0.00 0.21 0.21 0.0 0.0 383 0 3.11E+03 298.99 0.21 0.0 0.0 3.308 0.2 0.21 0.00 0.21 0.21 0.0 0.0 384 0 3.10E+03 298.99 0.21 0.0 0.0 3.291 0.2 0.21 0.00 0.21 0.21 0.0 0.0 385 0 3.08E+03 298.99 0.21 0.0 0.0 3.275 0.2 0.21 0.00 0.21 0.21 0.0 0.0 386 0 3.07E+03 298.98 0.21 0.0 0.0 3.258 0.2 0.21 0.00 0.21 0.21 0.0 0.0 387 0 3.06E+03 298.98 0.21 0.0 0.0 3.241 0.2 0.21 0.00 0.21 0.21 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 11 of 41 Ri Ri if f Riser Riser (Weir) Time Inflow Store a g Ste a g Outflow ser (Orifice) ser (Weir) Barrel RBspwy Or ice (1st foot) Ori ice (2nd foot) (orifice)+ orifice E + orifice mergency Weir Top of Dam (min) (cfs) (cu fl) (tt) (cfs) (cfs) (cts) (cts) (cfs) (cfs) (cfs) efs cis (cfs) (efs) 388 0 3.05E+03 298.98 0.21 0.0 0.0 3.225 0.2 0.21 0.00 0.21 0.21 0.0 0.0 389 0 3.03E+03 298.97 0.21 0.0 0.0 3.209 0.2 0.21 0.00 0.21 0.21 0.0 0.0 390 0 3.02E+03 298.97 0.21 0.0 0.0 3.192 0.2 0.21 0.00 0.21 0.21 0.0 0.0 391 0 3.01E+03 298.97 0.21 0.0 0.0 3.176 0.2 0.21 0.00 0.21 0.21 0.0 0.0 392 0 3.00E+03 298.96 0.21 0.0 0.0 3.159 0.2 0.21 0.00 0.21 0.21 0.0 0.0 393 0 2.98E+03 298.96 0.21 0.0 0.0 3.143 0.2 0.21 0.00 0.21 0.21 0.0 0.0 394 0 2.97E+03 298.96 0.21 0.0 0.0 3.127 0.2 0.21 0.00 0.21 0.21 0.0 0.0 395 0 2.96E+03 298.95 0.21 0.0 0.0 3.111 0.2 0.21 0.00 0.21 0.21 0.0 0.0 396 0 2.95E+03 298.95 0.20 0.0 0.0 3.095 0.2 0.20 0.00 0.20 0.20 0.0 0.0 397 0 2.94E+03 298.95 0.20 0.0 0.0 3.079 0.2 0.20 0.00 0.20 0.20 0.0 0.0 398 0 2.92E+03 298.94 0.20 0.0 0.0 3.062 0.2 0.20 0.00 0.20 0.20 0.0 0.0 399 0 2.91E+03 298.94 0.20 0.0 0.0 3.046 0.2 0.20 0.00 0.20 0.20 0.0 0.0 400 0 2.90E+03 298.94 0.20 0.0 0.0 3.030 0.2 0.20 0.00 0.20 0.20 0.0 0.0 401 0 2.89E+03 298.93 0.20 0.0 0.0 3.015 0.2 0.20 0.00 0.20 0.20 0.0 0.0 402 0 2.87E+03 298.93 0.20 0.0 0.0 2.999 0.2 0.20 0.00 0.20 0.20 0.0 0.0 403 0 2.86E+03 298.93 0.20 0.0 0.0 2.983 0.2 0.20 0.00 0.20 0.20 0.0 0.0 404 0 2.85E+03 298.92 0.20 0.0 0.0 2.967 0.2 0.20 0.00 0.20 0.20 0.0 0.0 405 0 2.84E+03 298.92 0.20 0.0 0.0 2.951 0.2 0.20 0.00 0.20 0.20 0.0 0.0 406 0 2.83E+03 298.92 0.20 0.0 0.0 2.936 0.2 0.20 0.00 0.20 0.20 0.0 0.0 407 0 2.81E+03 298.91 0.20 0.0 0.0 2.920 0.2 0.20 0.00 0.20 0.20 0.0 0.0 408 0 2.80E+03 298.91 0.20 0.0 0.0 2.904 0.2 0.20 0.00 0.20 0.20 0.0 0.0 409 0 2.79E+03 298.91 .0.20 0.0 0.0 2.889 0.2 0.20 0.00 0.20 0.20 0.0 0.0 410 0 2.78E+03 .298.90 0.20 0.0 0.0 2.873 0.2 0.20 0.00 0.20 0.20 0.0 0.0 411 0 2.77E+03 298.90 0.20 0.0 0.0 2.858 0.2 0.20 0.00 0.20 0.20 0.0 0.0 412 0 2.75E+03 298.90 0.20 0.0 0.0 2.842 0.2 0.20 0.00 0.20 0.20 0.0 0.0 413 0 2.74E+03 298.89 0.20 0.0 0.0 2.827 0.2 0.20 0.00 0.20 0.20 0.0 0.0 414 0 2.73E+03 298.89 0.20 0.0 0.0 2.812 0.2 0.20 0.00 0.20 0.20 0.0 0.0 415 0 2.72E+03 298.89 0.20 0.0 0.0 2.796 0.2 0.20 0.00 0.20 0.20 0.0 0.0 416 0 2.71E+03 298.88 0.20 0.0 0.0 2.781 0.2 0.20 0.00 0.20 0.20 0.0 0.0 417 0 2.69E+03 298.88 0.20 0.0 0.0 2.766 0.2 0.20 0.00 0.20 0.20 0.0 0.0 418 0 2.68E+03 298.88 0.20 0.0 0.0 2.751 0.2 0.20 0.00 0.20 0.20 0.0 0.0 419 0 2.67E+03 298.87 0.20 0.0 0.0 2.736 0.2 0.20 0.00 0.20 0.20 0.0 0.0 420 0 2.66E+03 298.87 0.20 0.0 0.0 2.721 0.2 0.20 0.00 0.20 0.20 0.0 0.0 421 0 2.65E+03 298.87 0.20 0.0 0.0 2.706 0.2 0.20 0.00 0.20 0.20 0.0 0.0 422 0 2.64E+03 298.86 0.20 0.0 0.0 2.691 0.2 0.20 0.00 0.20 0.20 0.0 0.0 423 0 2.62E+03 298.86 0.19 0.0 0.0 2.676 0.2 0.19 0.00 0.19 0.19 0.0 0.0 424 0 2.61E+03 298.86 0.19 0.0 0.0 2.661 0.2 0.19 0.00 0.19 0.19 0.0 0.0 425 0 2.60E+03 298.85 0.19 0.0 0.0 2.646 0.2 0.19 0.00 0.19 0.19 0.0 0.0 426 0 2.59E+03 298.85 0.19 0.0 0.0 2.631 0.2 0.19 0.00 0.19 0.19 0.0 0.0 427 0 2.58E+03 298.85 0.19 0.0 0.0 2.616 0.2 0.19 0.00 0.19 0.19 0.0 0.0 428 0 2.57E+03 298.85 0.19 0.0 0.0 2.602 0.2 0.19 0.00 0.19 0.19 0.0 0.0 429 0 2.55E+03 298.84 0.19 0.0 0.0 2.587 0.2 0.19 0.00 0.19 0.19 0.0 0.0 430 0 2.54E+03 298.84 0.19 0.0 0.0 2.572 0.2 0.19 0.00 0.19 0.19 0.0 0.0 431 0 2.53E+03 298.84 0.19 0.0 0.0 2.558 0.2 0.19 0.00 0.19 0.19 0.0 0.0 432 0 2.52E+03 298.83 0.19 0.0 0.0 2.543 0.2 0.19 0.00 0.19 0.19 0.0 0.0 433 0 2.51E+03 298.83 0.19 0.0 0.0 2.529 0.2 0.19 0.00 0.19 0.19 0.0 0.0 434 0 2.50E+03 298.83 0.19 0.0 0.0 2.514 0.2 0.19 0.00 0.19 0.19 0.0 0.0 435 0 2.48E+03 298.82 0.19 0.0 0.0 2.500 0.2 0.19 0.00 0.19 0.19 0.0 0.0 436 0 2.47E+03 298.82 0.19 0.0 0.0 2.485 0.2 0.19 0.00 0.19 0.19 0.0 0.0 437 0 2.46E+03 298.82 0.19 0.0 0.0 2.471 0.2 0.19 0.00 0.19 0.19 0.0 0.0 438 0 2.45E+03 298.81 0.19 0.0 0.0 2.457 0.2 0.19 0.00 0.19 0.19 0.0 0.0 439 0 2.44E+03 298.81 0.19 0.0 0.0 2.443 0.2 0.19 0.00 0.19 0.19 0.0 0.0 440 0 2.43E+03 298.81 0.19 0.0 0.0 2.428 0.2 0.19 0.00 0.19 0.19 0.0 0.0 441 0 2.42E+03 298.80 0.19 0.0 0.0 2.414 0.2 0.19 0.00 0.19 0.19 0.0 0.0 1 yr 24hr Storm -Basin 8 E-22 Access Road Page 12 of 41 Riser Riser (Weir) Riser Riser Orifice Orifice (orifice)+ E mergency Time Inflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy (1st foot) (2nd foot) orifice + orifice Weir Top of Dam (miu) (cfs) (cu ft) (fi) (cfs) (da) (cfs) (da) . (cfs) (cfs) (ds) cfa cfs (cts) (cts) 442 0 2.40E+03 298.80 0.19 0.0 0.0 2.400 0.2 0.19 0.00 0.19 0.19. 0.0 0.0 443 0 2.39E+03 298.80 0.19 0.0 0.0 2.386 0.2 0.19 0.00 0.19 0.19 0.0 0.0 444 0 2.38E+03 298.79 0.19 0.0 0.0 2.372 0.2 0.19 0.00 0.19 0.19 0.0 0.0 445 0 2.37E+03 298.79 0.19 0.0 0.0 2.358 0.2 0.19 0.00 0.19 0.19 0.0 0.0 446 0 2.36E+03 298.79 0.19 0.0 0.0 2.344 0.2 0.19 0.00 0.19 0.19 0.0 0.0 447 0 2.35E+03 298.79 0.19 0.0 0.0 2.330 0.2 0.19 0.00 0.19 0.19 0.0 0.0 448 0 2.34E+03 298.78 0.19 0.0 0.0 2.317 0.2 0.19 0.00 0.19 0.19 0.0 0.0 449 0 2.33E+03 298.78 0.19 0.0 0.0 2.303 0.2 0.19 0.00 0.19 0.19 0.0 0.0 450 0 2.32E+03 298.78 0.19 0.0 0.0 2.289 0.2 0.19 0.00 0.19 0.19 0.0 0.0 451 0 2.30E+03 298.77 0.18 0.0 0.0 2.275 0.2 0.18 0.00 0.18 0.18 0.0 0.0 452 0 2.29E+03 298.77 0.18 0.0 0.0 2.262 0.2 0.18 0.00 0.18 0.18 0.0 0.0 453 0 2.28E+03 298.77 0.18 0.0 0.0 2.248 0.2 0.18 0.00 0.18 0.18 0.0 0.0 454 0 2.27E+03 298.76 0.18 0.0 0.0 2.234 0.2 0.18 0.00 0.18 0.18 0.0 0.0 455 0 2.26E+03 298.76 0.18 0.0 0.0 2.221 0.2 0.18 0.00 0.18 0.18 0.0 0.0 456 0 2.25E+03 298.76 0.18 0.0 0.0 2.207 0.2 0.18 0.00 0.18 0.18 0.0 0.0 457 0 2.24E+03 298.75 0.18 0.0 0.0 2.194 0.2 0.18 0.00 0.18 0.18 0.0 0.0 458 0 2.23E+03 298.75 0.18 0.0 0.0 2.181 0.2 0.18 0.00 0.18 0.18 0.0 0.0 459 0 2.22E+03 298.75 0.18 0.0 0.0 2.167 0.2 0.18 0.00 0.18 0.18 0.0 0.0 460 0 2.21E+03 298.75 0.18 0.0 0.0 2.154 0.2 0.18 0.00 0.18 0.18 0.0 0.0 461 0 2.19E+03 298.74 0.18 0.0 0.0 2.141 0.2 0.18 0.00 0.18 0.18 0.0 0.0 462 0 2.18E+03 298.74 0.18 0.0 0.0 2.127 0.2 0.18 0.00 0.18 0.18 0.0 0.0 463 0 2.17E+03 298.74 0.18 0.0 0.0 2.114 0.2 0.18 0.00 0.18 0.18 0.0 0.0 464 0 2.16E+03 298.73 0.18 0.0 0.0 2.101. 0.2 0.18 0.00 0.18 0.18 0.0 0.0 465 0 2.15E+03 298.73 0.18 0.0 0.0 2.088 0.2 0.18 0.00 0.18 0.18 0.0 0.0 466 0 2.14E+03 298.73 0.18 0.0 0.0 2.075 0.2 0.18 0.00 0.18 0.18 0.0 0.0 467 0 2.13E+03 298.72 0.18 0.0 0.0 2.062 0.2 0.18 0.00 0.18 0.18 0.0 0.0 468 0 2.12E+03 298.72 0.18 0.0 0.0 2.049 0.2 0.18 0.00 0.18 0.18 0.0 0.0 469 0 2.11E+03 298.72 0.18 0.0 0.0 2.036 0.2 0.18 0.00 0.18 0.18 0.0 0.0 470 0 2.10E+03 298.71 0.18 0.0 0.0 2.023 0.2 0.18 0.00 0.18 0.18 0.0 0.0 471 0 2.09E+03 298.71 0.18 0.0 0.0 2.010 0.2 0.18 0.00 0.18 0.18 0.0 0.0 472 0 2.08E+03 298.71 0.18 0.0 0.0 1.998 0.2 0.18 0.00 0.18 0.18 0.0 0.0 473 0 2.07E+03 298.71 0.18 0.0 0.0 1.985 0.2 0.18 0.00 0.18 0.18 0.0 0.0 474 0 2.05E+03 298.70 0.18 0.0 0.0 1.972 0.2 0.18 0.00 0.18 0.18 0.0 0.0 475 0 2.04E+03 298.70 0.18 0.0 0.0 1.959 0.2 0.18 0.00 0.18 0.18 0.0 0.0 476 0 2.03E+03 298.70 0.18 0.0 0.0 1.947 0.2 0.18 0.00 0.18 0.18 0.0 0.0 477 0 2.02E+03 298.69 0.17 0.0 0.0 1.934 0.2 0.17 0.00 0.17 0.17 0.0 0.0 478 0 2.01E+03 298.69 0.17 0.0 0.0 1.922 0.2 0.17 0.00 0.17 0.17 0.0 0.0 479 0 2.00E+03 298.69 0.17 0.0 0.0 1.909 0.2 0.17 0.00 0.17 0.17 0.0 0.0 480 0 1.99E+03 298.68 0.17 0.0 0.0 1.897 0.2 0.17 0.00 0.17 0.17 0.0 0.0 481 0 1.98E+03 298.68 0.17 0.0 0.0 1.884 0.2 0.17 0.00 0.17 0.17 0.0 0.0 482 0 1.97E+03 298.68 0.17 0.0 0.0 1.872 0.2 0.17 0.00 0.17 0.17 0.0 0.0 483 0 1.96E+03 298.68 0.17 0.0 0.0 1.860 0.2 0.17 0.00 0.17 0.17 0.0 0.0 484 0 1.95E+03 298.67 0.17 0.0 0.0 1.847 0.2 0.17 0.00 0.17 0.17 0.0 0.0 485 0 1.94E+03 298.67 0.17 0.0 0.0 1.835 0.2 0.17 0.00 0.17 0.17 0.0 0.0 486 0 1.93E+03 298.67 0.17 0.0 0.0 1.823 0.2 0.17 0.00 0.17 0.17 0.0 0.0 487 0 1.92E+03 298.66 0.17 0.0 0.0 1.811 0.2 0.17 0.00 0.17 0.17 0.0 0.0 488 0 1.91E+03 298.66 0.17 0.0 0.0 1.799 0.2 0.17 0.00 0.17 0.17 0.0 0.0 489 0 1.90E+03 298.66 0.17 0.0 0.0 1.787 0.2 0.17 0.00 0.17 0.17 0.0 0.0 490 0 1.89E+03 298.65 0.17 0.0 0.0 1.775 0.2 0.17 0.00 0.17 0.17 0.0 0.0 491 0 1.88E+03 298.65 0.17 0.0 0.0 1.763 0.2 0.17 0.00 0.17 0.17 0.0 0.0 492 0 1.87E+03 298.65 0.17 0.0 0.0 1.751 0.2 0.17 0.00 0.17 0.17 0.0 0.0 493 0 1.86E+03 298.65 0.17 0.0 0.0 1.739 0.2 0.17 0.00 0.17 0.17 0.0 0.0 494 0 1.85E+03 298.64 0.17 0.0 0.0 1.727 0.2 0.17 0.00 0.17 0.17 0.0 0.0 495 0 1.84E+03 298.64 0.17 0.0 0.0 1.715 0.2 0.17 0.00 0.17 0.17 0.0 0.0 1yr 24t1r Storm - Basin B E-22 Access Road Page 13 of 41 Ri i O Riser Riser (VVe~r) Time Inflow Storage Stage Outflow ser (Orifice) R ser (Weir) Barrel RBspwy rifice (Ist foot) Orifice (2ud foot) (orifice)+ orifice E + orifice mergency Weir Top of Dam (min) (cfs) (cu ft) (tt) .(cfs) (cfs) (tts) (cfs) (cfs) (cts) (cfs) cts cfs (cfs) (cfs) 496 0 1.83E+03 298.64 0.17 0.0 0.0 1.704 0.2 0.17 0.00 0.17 0.17 0.0 0.0 497 0 1.82E+03 298.63 0.17 0.0 0.0 1.692 0.2 0.17 0.00 0.17 0.17 0.0 0.0 498 0 1.81E+03 298.63 0.17 0.0 0.0 1.680 0.2 0.17 0.00 0.17 0.17 0.0 0.0 499 0 1.80E+03 298.63 0.17 0.0 0.0 1.669 0.2 0.17 0.00 0.17 0.17 0.0 0.0 500 0 1.79E+03 298.63 0.17 0.0 0.0 1.657 0.2 0.17 0.00 0.17 0.17 0.0 0.0 501 0 1.78E+03. 298.62 0.17 0.0 0.0 1.645 0.2 0.17 0.00 0.17 0.17 0.0 0.0 502 0 1.77E+03 298.62 0.17 0.0 0.0 1.634 0.2 0.17 0.00 0.17 0.17 0.0 0.0 503 0 1.76E+03 298.62 0.17 0.0 0.0 1.623 0.2 0.17 0.00 0.17 0.17 0.0 0.0 504 0 1.75E+03 298.61 0.16 0.0 0.0 1.611 0.2 0.16 0.00 0.16 0.16 0.0 0.0 505 0 1.74E+03 298.61 0.16 0.0 0.0 1.600 0.2 0.16 0.00 0.16 0.16 0.0 0.0 506 0 1.73E+03 298.61 0.16 0.0 0.0 1.588 0.2 0.16 0.00 0.16 0.16 0.0 0.0 507 0 1.72E+03 298.61 0.16 0.0 0.0 1.577 0.2 0.16 0.00 0.16 0.16 0.0 0.0 508 0 1.71E+03 298.60 0.16 0.0 0.0 1.566 0.2 0.16 0.00 0.16 0.16 0.0 0.0 509 0 1.70E+03 298.60 0.16 0.0 0.0 1.555 0.2 0.16 0.00 0.16 0.16 0.0 0.0 510 0 1.69E+03 298.60 0.16 0.0 0.0 1.544 0.2 0.16 0.00 0.16 0.16 0.0 0.0 511 0 1.68E+03 298.59 0.16 0.0 0.0 1.532 0.2 0.16 0.00 0.16 0.16 0.0 0.0 512 0 1.67E+03 298.59 0.16 0.0 0.0 1.521 0.2 0.16 0.00 0.16 0.16 0.0 0.0 513 0 1.66E+03 298.59 0.16 0.0 0.0 1.510 0.2 0.16 0.00 0.16 0.16 0.0 0.0 514 0 1.65E+03 298.59 0.16 0.0 0.0 1.499 0.2 0.76 0.00 0.16 0.16 0.0 0.0 515 0 1.64E+03 298.58 0.16 0.0 0.0 1.488 0.2 0.16 0.00 0.16 0.16 0.0 0.0 516 0 1.63E+03 298.58 0.16 0.0 0.0 1.478 0.2 0.16 0.00 0.76 0.16 0.0 0.0 517 0 1.62E+03 298.58 0.16 0.0 0.0 1.467 0.2 0.16 0.00 0. t 6 0.16 0.0 0.0 518 0 1.61E+03 298.57 0.16 0.0 0.0 1.456 0.2 0.16 0.00 0.16 0.16 0.0 0.0 519 0 1.60E+03 298.57 0.16 0.0 0.0 1.445 0.2 O.t6 0.00 O.t6 0.16 0.0 0.0 520 0 1.59E+03 298.57 0.16 0.0 0.0 1.434 0.2 0.16 0.00 0.16 0.16 0.0 0.0 521 0 t.58E+03 298.57 0.16 0.0 0.0 1.424 0.2 0.16 0.00 0.16 0.16 0.0 0.0 522 0 1.57E+03 298.56 0.16 0.0 0.0 1.413 0.2 0.16 0.00 0.16 0.16 0.0 0.0 523 0 1.56E+03 298.56 0.16 0.0 0.0 1.402 0.2 0.16 0.00 0.16 0.16 0.0 0.0 524 0 1.55E+03 298.56 0.16 0.0 0.0 1.392 0.2 0.16 0.00 0.16 0.16 0.0 0.0 525 0 1.55E+03 298.55 0.16 0.0 0.0 1.381 0.2 0.16 0.00 0.16 0.16 0.0 0.0 526 0 1.54E+03 298.55 0.16 0.0 0.0 1.371 0.2 0.16 0.00 0.16 0.16 0.0 0.0 527 0 1.53E+03 298.55 0.76 0.0 0.0 1.360 0.2 0.16 0.00 0.16 0.16 0.0 0.0 528 0 1.52E+03 298.55 0.16 0.0 0.0 1.350 0.2 0.16 0.00 0.16 0.16 0.0 0.0 529 0 1.51E+03 298.54 0.15 0.0 0.0 1.340 0.2 0.15 0.00 0.15 0.15 0.0 0.0 530 0 1.50E+03 298.54 0.15 0.0 0.0 1.329 0.2 0.15 0.00 0.15 0.15 0.0 0.0 531 0 1.49E+03 298.54 0.15 0.0 0.0 1.319 0.2 0.15 0.00 0.15 0.15 0.0 0.0 532 0 1.48E+03 298.53 0.15 0.0 0.0 7.309 0.2 0.15 0.00 0.15 0.15 0.0 0.0 533 0 1.47E+03 298.53 0.15 0.0 0.0 1.299 0.2 0.15 0.00 0.15 0.15 0.0 0.0 534 0 1.46E+03 298.53 0.15 0.0 0.0 1.289 0.2 0.15 0.00 0.15 0.15 0.0 0.0 535 0 1.45E+03 298.53 0.15 0.0 0.0 1.279 0.2 0.15 0.00 0.15 0.15 0.0 0.0 536 0 1.44E+03 298.52 0.15 0.0 0.0 1.269 0.2 0.15 0.00 0.15 0.15 0.0 0.0 537 0 1.43E+03 298.52 0.15 0.0 0.0 1.259 0.2 0.15 0.00 0.15 0.15 0.0 0.0 538 0 1.43E+03 298.52 0.15 0.0 0.0 1.249 0.2 0.15 0.00 0.15 0.15 0.0 0.0 539 0 1.42E+03 298.52 0.15 0.0 0.0 1.239 0.2 0.15 0.00 0.15 0.15 0.0 0.0 540 0 1.41E+03 298.51 0.15 0.0 0.0 1.229 0.2 0.15 0.00 0.15 0.15 0.0 0.0 541 0 7.40E+03 298.51 0.15 0.0 0.0 1.219 0.2 0.15 0.00 0.15 0.15 0.0 0.0 542 0 1.39E+03 298.51 0.15 0.0 0.0 1.209 0.1 0.15 0.00 0.15 0.15 0.0 0.0 543 0 1.38E+03 298.50 0.15 0.0 0.0 1.199 0.1 0.15 0.00 0.15 0.15 0.0 0.0 544 0 1.37E+03 298.50 0.15 0.0 0.0 1.190 0.1 0.15 0.00 0.15 0.15 0.0 0.0 545 0 1.36E+03 298.50 0.15 0.0 0.0 1.180 0.1 0.15 0.00 0.15 0.15 0.0 0.0 546 0 1.35E+03 298.50 0.15 0.0 0.0 1.170 0.1 0.15 0.00 0.15 0.15 0.0 0.0 547 0 1.34E+03 298.49 0.15 0.0 0.0 1.161 0.1 0.15 0.00 0.15 0.15 0.0 0.0 548 0 1.34E+03 298.49 0.15 0.0 0.0 1.151 0.1 0.15 0.00 0.15 O.tS 0.0 0.0 549 0 1.33E+03 298.49 0.15 0.0 0.0 1.142 0.1 0.15 0.00 0.15 0.15 0.0 0.0 t yr 24hr Storm - Basin B E-22 Access Road Page 14 of 41 Riser Riser (Weir) Riser Riser Orifice Orifice (orifice)+ Emergency Time Inflow Storage Stage Outflow (Orifce) (Weir) Barrel RBspwy (1st foot) (god toot) orifice + orifice. Weir Top of Dam (mia) (cts) (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 550 0 1.32E+03 298.49 0.15 0.0 0.0 1.132 0.1 0.15 0.00 0.15 0.15 0.0 0.0 551 0 1.31E+03 298.48 .0.15 0.0 0.0 1.123 0.1 0.15 0.00 0.15 0.15 0.0 0.0 552 0 1.30E+03 298.48 0.15 0.0 0.0 1.113 0.1 0.15 0.00 0.15 0.15 0.0 0.0 553 0 1.29E+03 298.48 0.15 0.0 0.0 1.104 0.1 0.15 0.00 0.15 0.15 0.0 0.0 554 0 1.28E+03 298.47 0.14 0.0 0.0 1.095 0.1 0.14 0.00 0.14 0.14 0.0 0.0 555 0 1.27E+03 298.47 0.14 0.0 0.0 1.086 0.1 0.14 0.00 0.14 0.14 0.0 0.0 556 0 1.27E+03 298.47 0.14 0.0 0.0 1.076 0.1 0.14 0.00 0.14 0.14 0.0 0.0 557 0 1.26E+03 298.47 0.14 0.0 0.0 1.067 0.1 0.14 0.00 0.14 0.14 0.0 0.0 558 0 1.25E+03 298.46 0.14 0.0 0.0 1.058 0.1 0.14 0.00 0.14 0.14 0.0 0.0 559 0 1.24E+03 298.46 0.14 0.0 0.0 1.049 0.1 0.14 0.00 0.14 0.14 0.0 0.0 560 0 1.23E+03 298.46 0.14 0.0 0.0 1.040 0.1 0.14 0.00 0.14 0.14 0.0 0.0 561 0 1.22E+03 298.46 0.14 0.0 0.0 1.031 0.1 0.14 0.00 0.14 0.14 0.0 0.0 562 0 1.21E+03 298.45 0.14 0.0 0.0 1.022 0.1 0.14 0.00 0.14 0.14 0.0 0.0 563 0 1.21E+03 298.45 0.14 0.0 0.0 1.013 0.1 0.14 0.00 0.14 0.14 0.0 0.0 564 0 1.20E+03 298.45 0.14 0.0 0.0 1.004 0.1 0.14 0.00 0.14 0.14 0.0 0.0 565 0 1.19E+03 298.45 0.14 0.0 0.0 0.995 0.1 0.14 0.00 0.14 0.14 0.0 0.0 566 0 1.18E+03 298.44 0.14 0.0 0.0 0.987 0.1 0.14 0.00 0.14 0.14 0.0 0.0 567 0 1.17E+03 298.44 0.14 0.0 0.0 0.978 0.1 0.14 0.00 0.14 0.14 0.0 0.0 568 0 1.16E+03 298.44 0.14 0.0 0.0 0.969 0.1 0.14 0.00 0.14 0.14 0.0 0.0 569 0 1.16E+03 298.43 0.14 0.0 0.0 0.960 0.1 0.14 0.00 0.14 0.14 0.0 0.0 570 0 1.15E+03 298.43 0.14 0.0 0.0 0.952 0.1 0.14 0.00 0.14 0.14 0.0 0.0 571 0 1.14E+03 298.43 0.14 0.0 0.0 0.943 0.1 0.14 0.00 0.14 0.14 0.0 0.0 572 0 1.13E+03 298.43 0.14 0.0 0.0 0.935 0.1 0.14 0.00 0.14 0.14 0.0 0.0 573 0 1.12E+03 298.42 0.14 0.0 0.0 0.926 0.1 0.14 0.00 0.14 0.14 0.0 0.0 574 0 1.11E+03 298.42 0.14 0.0 0.0 0.918 0.1 0.14 0.00 0.14 0.14 0.0 0.0 575 0 1.11E+03 298.42 0.14 0.0 0.0 0.909 0.1 0.14 0.00 0.14 0.14 0.0 0.0 576 0 1.10E+03 298.42 0.14 0.0 0.0 0.901 0.1 0.14 0.00 0.14 0.14 0.0 0.0 577 0 1.09E+03 298.41 0.14 0.0 0.0 0.893 0.1 0.14 0.00 0.14 0.14 0.0 0.0 578 0 1.08E+03 298.41 0.13 0.0 0.0 0.884 0.1 0.13 0.00 0.13 0.13 0.0 0.0 579 0 1.07E+03 298.41 0.13 0.0 0.0 0.876 0.1 0.13 0.00 0.13 0.13 0.0 0.0 580 0 1.07E+03 298.41 0.13 0.0 0.0 0.868 0.1 0.13 0.00 0.13 0.13 0.0 0.0 581 0 1.06E+03 298.40 0.13 0.0 0.0 0.860 0.1 0.13 0.00 0.13 0.13 0.0 0.0 582 0 1.05E+03 298.40 0.13 0.0 0.0 0.852 0.1 0.13 0.00 0.13 0.13 0.0 0.0 583 0 1.04E+03 298.40 0.13 0.0 0.0 0.843 0.1 0.13 0.00 0.13 0.13 0.0 0.0 584 0 1.03E+03 298.40 0.13 0.0 0.0 0.835 0.1 0.13 0.00 0.13 0.13 0.0 0.0 585 0 1.03E+03 298.39 0.13 0.0 0.0 0.827 0.1 0.13 0.00 0.13 0.13 0.0 0.0 586 0 1.02E+03 298.39 0.13 0.0 0.0 0.819 0.1 0.13 0.00 0.13 0.13 0.0 0.0 587 0 1.01E+03 298.39 0.13 0.0 0.0 0.812 0.1 0.13 0.00 0.13 0.13 0.0 0.0 588 0 1.00E+03 298.39 0.13 0.0 0.0 0.804 0.1 0.13 0.00 0.13 0.13 0.0 0.0 589 0 9.94E+02 298.38 0.13 0.0 0.0 0.796 0.1 0.13 0.00 0.13 0.13 0.0 0.0 590 0 9.86E+02 298.38 0.13 0.0 0.0 0.788 0.1 0.13 0.00 0.13 0.13 0.0 0.0 591 0 9.78E+02 298.38 0.13 0.0 0.0 0.780 0.1 0.13 0.00 0.13 0.13 0.0 0.0 592 0 9.70E+02 298.38 0.13 0.0 0.0 0.772 0.1 0.13 0.00 0.13 0.13 0.0 0.0 593 0 9.63E+02 298.37 0.13 0.0 0.0 0.765 0.1 0.13 0.00 0.13 0.13 0.0 0.0 594 0 9.55E+02 298.37 0.13 0.0 0.0 0.757 0.1 0.13 0.00 0.13 0.13 0.0 0.0 595 0 9.47E+02 298.37 0.13 0.0 0.0 0.750 0.1 0.13 0.00 0.13 0.13 0.0 0.0 596 0 9.40E+02 298.37 0.13 0.0 0.0 0.742 0.1 0.13 0.00 0.13 0.13 0.0 0.0 597 0 9.32E+02 298.36 0.13 0.0 0.0 0.735 0.1 0.13 0.00 0.13 0.13 0.0 0.0 598 0 9.24E+02 298.36 0.13 0.0 0.0 0.727 0.1 0.13 0.00 0.13 0.13 0.0 0.0 599 0 9.17E+02 298.36 0.13 0.0 0.0 0.720 0.1 0.13 0.00 0.13 0.13 0.0 0.0 600 0 9.09E+02 298.36 0.13 0.0 0.0 0.712 0.1 0.13 0.00 0.13 0.13 0.0 0.0 601 0 9.02E+02 298.35 0.12 0.0 0.0 0.705 0.1 0.12 0.00 0.12 0.12 0.0 0.0 602 0 8.94E+02 298.35 0.12 0.0 0.0 0.698 0.1 0.12 0.00 0.12 0.12 0.0 0.0 603 0 8.87E+02 298.35 0.12 0.0 0.0 0.690 0.1 0.12 0.00 0.12 0.12 0.0 0.0 1 yr 24hr Stonn - Basin B E-22 Access Road Page 15 of 41 Ri Ri O if Riser Riser (Weir) Time Ie0ow Storage Sage Outkow ser (Orifce) ser (Weir) Barrel RBspwy r ice (1st foot) Orifce (led toot) (orikte)+ orifice E + orifice mergency Weir Top of Dam (mip) (cfs) (cu k) (tt) (cfs) (cfs) (cfs) (cts) (cfs) (cfs) (cts) cfs cfs (cfs) (cfs) 604 0 8.79E+02 298.35 0.12 0.0 0.0 0.683 0.1 0.12 0.00 0.12 0.12 0.0 0.0 605 0 8.72E+02 298.34 0.12 0.0 0.0 0.676 0.1 0.12 0.00 0.12 0.12 0.0 0.0 606 0 8.65E+02 298.34 0.12 0.0 0.0 0.669 0.1 0.12 0.00 0.12 0.12 0.0 0.0 607 0 8.57E+02 298.34 0.12 0.0 0.0 0.662 0.1 0.12 0.00 0.12 0.12 0.0 0.0 608 0 8.50E+02 298.34 0.12 0.0 0.0 0.654 0.1 0.12 0.00 0.12 0.12 0.0 0.0 609 0 8.42E+02 298.33 0.12 0.0 0.0 0.647 0.1 0.12 0.00 0.12 0.12 0.0 0.0 610 0 8.35E+02 298.33 0.12 0.0 0.0 0.640 0.1 0.12 0.00 0.12 0.12 0.0 0.0 611 0 8.28E+02 298.33 0.12 0.0 0.0 0.634 0.1 0.12 0.00 0.12 0.12 0.0 0.0 612 0 8.21E+02 298.33 0.12 0.0 0.0 0.627 0.1 0.12 0.00 0.12 0.12 0.0 0.0 613 0 8.13E+02 298.32 0.12 0.0 0.0 0.620 0.1 0.12 0.00 0.12 0.12 0.0 0.0 614 0 8.06E+02 298.32 0.12 0.0 0.0 0.613 0.1 0.12 0.00 0.12 0.12 0.0 0.0 615 0 7.99E+02 298.32 0.12 0.0 0.0 0.606 O.t 0.12 0.00 0.12 0.12 0.0 0.0 616 0 7.92E+02 298.32 0.12 0.0 0.0 0.599 0.1 0.12 0.00 0.12 0.12 0.0 0.0 617 0 7.85E+02 298.32 0.12 0.0 0.0 0.593 0.1 0.12 0.00 0.12 0.12 0.0 0.0 618 0 7.78E+02 298.31 0.12 0.0 0.0 0.586 0.1 0.12 0.00 0.12 0.12 0.0 0.0 619 0 7.71E+02 298.31 0.12 0.0 0.0 0.579 0.1 0.12 0.00 0.12 0.12 0.0 0.0 620 0 7.64E+02 298.31 0.12 0.0 0.0 0.573 0.1 0.12 0.00 0.12 0.12 0.0 0.0 621 0 7.57E+02 298.31 0.12 0.0 0.0 0.566 0.1 0.12 0.00 0.12 0.12 0.0 0.0 622 0 7.50E+02 298.30 0.12 0.0 0.0 0.560 0.1 0.12 0.00 0.12 0.12 0.0 0.0 623 0 7.43E+02 298.30 0.12 0.0 0.0 0.553 0.1 0.12 0.00 0.12 0.12 0.0 0.0 624 0 7.36E+02 298.30 0.11 0.0 0.0 0.547 0.1 0.11 0.00 0.11 0.11 0.0 0.0 625 0 7.29E+02 298.30 0.11 0.0 0.0 0.540 0.1 0.11 0.00 0.11 0.11 0.0 0.0 626 0 7.22E+02 298.29 0.11 0.0 0.0 0.534 0.1 0.11 0.00 0.11 0.11 0.0 0.0 627 0 7.15E+02 298.29 0.11 0.0 0.0 0.528 0.1 0.11 0.00 0.11 0.11 0.0 0.0 628 0 7.09E+02 298.29 0.11 0.0 0.0 0.522 0.1 0.11 0.00 0.11 0.11 0.0 0.0 629 0 7.02E+02 298.29 0.11 0.0 0.0 0.515 0.1 0.11 0.00 0.11 0.11 0.0 0.0 630 0 6.95E+02 298.28 0.11 0.0 0.0 0.509 0.1 0.11 0.00 0.11 0.11 0.0 0.0 631 0 6.88E+02 298.28 0.11 0.0 0.0 0.503 0.1 0.11 0.00 0.11 0.11 0.0 0.0 632 0 6.82E+02 298.28 0.11 0.0 0.0 0.497 0.1 0.11 0.00 0.11 0.11 0.0 0.0 633 0 6.75E+02 298.28 0.11 0.0 0.0 0.491 0.1 0.11 0.00 0.11 0.11 0.0 0.0 634 0 6.68E+02 298.28 0.11 0.0 0.0 0.485 0.1 0.11 0.00 0.11 0.11 0.0 0.0 635 0 6.62E+02 298.27 0.11 0.0 0.0 0.479 0.1 0.11 0.00 0.11 0.11 0.0 0.0 636 0 6.55E+02 298.27 0.11 0.0 0.0 0.473 0.1 0.11 0.00 0.11 0.11 0.0 0.0 637 0 6.48E+02 298.27 0.11 0.0 0.0 0.467 0.1 0.11 0.00 0.11 0.11 0.0 0.0 638 0 6.42E+02 298.27 0.11 0.0 0.0 0.461 0.1 0.11 0.00 0.11 0.11 0.0 0.0 639 0 6.35E+02 298.26 0.11 0.0 0.0 0.455 0.1 0.11 0.00 0.11 0.11 0.0 0.0 640 0 6.29E+02 298.26 0.11 0.0 0.0 0.449 0.1 0.11 0.00 0.11 0.11 0.0 0.0 641 0 6.22E+02 298.26 0.11 0.0 0.0 0.444 0.1 0.11 0.00 0.11 0.11 0.0 0.0 842 0 6.16E+02 298.26 0.11 0.0 0.0 0.438 0.1 0.11 0.00 0.11 0.11 0.0 0.0 643 0 6.10E+02 298.26 0.11 0.0 0.0 0.432 0.1 0.11 0.00 0.11 0.11 0.0 0.0 644 0 6.03E+02 298.25 0.11 0.0 0.0 0.427 0.1 0.11 0.00 0.11 0.11 0.0 0.0 645 0 5.97E+02 298.25 0.11 0.0 0.0 0.421 0.1 0.11 0.00 0.11 0.11 0.0 0.0 646 0 5.91E+02 298.25 0.10 0.0 0.0 0.415 0.1 0.10 0.00 0.10 0.10 0.0 0.0 647 0 5.84E+02 298.25 0.10 0.0 0.0 0.410 0.1 0.10 0.00 0.10 0.10 0.0 0.0 648 0 5.78E+02 298.24 0.10 0.0 0.0 0.404 0.1 0.10 0.00 0.10 0.10 0.0 0.0 649 0 5.72E+02 298.24 0.10 0.0 0.0 0.399 0.1 0.10 0.00 0.10 0.10 0.0 0.0 650 0 5.66E+02 298.24 0.10 0.0 0.0 0.394 0.1 0.10 0.00 0.10 0.10 0.0 0.0 651 0 5.59E+02 298.24 0.10 0.0 0.0 0.388 0.1 0.10 0.00 0.10 0.10 0.0 0.0 652 0 5.53E+02 298.24 0.10 0.0 0.0 0.383 0.1 0.10 0.00 0.10 0.10 0.0 0.0 653 0 5.47E+02 298.23 0.10 0.0 0.0 0.378 0.1 0.10 0.00 0.10 0.10 0.0 0.0 654 0 5.41E+02 298.23 0.10 0.0 0.0 0.372 0.1 0.10 0.00 0.10 0.10 0.0 0.0 655 0 5.35E+02 298.23 0.10 0.0 0.0 0.367 0.1 0.10 0.00 0.10 0.10 0.0 0.0 656 0 5.29E+02 298.23 0.10 0.0 0.0 0.362 0.1 0.10 0.00 0.10 0.10 0.0 0.0 657 0 5.23E+02 298.22 0.10 0.0 0.0 0.357 0.1 0.10 0.00 0.10 0.10 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 16 of 41 Ri Ri O if O ifi Riser Riser (Weir) E Time Inflow Storage Stage Outflow ser (Orifice) ser (Weir) Barrel RBspwy r ice (1st foot) r ce (2nd foot) (orifice)+ orifice +orifice mergency Weir Top of Dam (mio) (cfs) (cn k) (k) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cts (cis) (cfs) 658 0 5.17E+02 298.22 0.10 0.0 0.0 0.352 0.1 0.10 0.00 0.10 0.10 0.0 0.0 659 0 5.11E+02 298.22 0.10 0.0 0.0 0.347 0.1 0.10 0.00 0.10 0.10 0.0 0.0 660 0 5.05E+02 298.22 0.10 0.0 0.0 0.342 0.1 0.10 0.00 .0.10 0.10 0.0 0.0 661 0 4.99E+02 298.22 0.10 0.0 0.0 0.337 0.1 0.10 0.00 0.10 0.10 0.0 0.0 662 0 4.93E+02 298.21 0.10 0.0 0.0 0.332 0.1 0.10 0.00 0.10 0.10 0.0 0.0 663 0 4.88E+02 298.21 0.10 0.0 0.0 0.327 0.1 0.10 0.00 0.10 0.10 0.0 0.0 .664 0 4.82E+02 298.21 0.10 0.0 0.0 0.322 0.1 0.10 0.00 0.10 0.10 0.0 0.0 665 0 4.76E+02 298.21 0.10 0.0 0.0 0.317 0.1 0.10 0.00 0.10 0.10 0.0 0.0 666 0 4.70E+02 298.21 0.10 0.0 0.0 0.313 0.1 0.10 0.00 0.10 0.10 0.0 0.0 667 0 4.65E+02 298.20 0.09 0.0 0.0 0.308 0.1 0.09 0.00 0.09 0.09 0.0 0.0 668 0 4.59E+02 298.20 0.09 0.0 0.0 0.303 0.1 0.09 0.00 0.09 0.09 0.0 0.0 669 0 4.53E+02 298.20 0.09 0.0 0.0 0.298 0.1 0.09 0.00 0.09 0.09 0.0 0.0 670 0 4.48E+02 298.20 0.09 0.0 0.0 0.294 0.1 0.09 0.00 0.09 0.09 0.0 0.0 671 0 4.42E+02 298.20 0.09 0.0 0.0 0.289 0.1 0.09 0.00 0.09 0.09 0.0 0.0 672 0 4.36E+02 298.19 0.09 0.0 0.0 0.285 0.1 0.09 0.00 0.09 0.09 0.0 0.0 873 0 4.31E+02 298.19 0.09 0.0 0.0 0.280 0.1 0.09 0.00 0.09 0.09 0.0 0.0 674 0 4.25E+02 298.19 0.09 0.0 0.0 0.276 0.1 0.09 0.00 0.09 0.09 0.0 0.0 675 0 4.20E+02 298.19 0.09 0.0 0.0 0.271 0.1 0.09 0.00 0.09 0.09 0.0 0.0 676 0 4.14E+02 298.19 0.09 0.0 0.0 0.267 0.1 0.09 0.00 0.09 0.09 0.0 0.0 677 0 4.09E+02 298.18 0.09 0.0 0.0 0.262 0.1 0.09 0.00 0.09 0.09 0.0 0.0 678 0 4.04E+02 298.18 0.09 0.0 0.0 0.258 0.1 0.09 0.00 0.09 0.09 0.0 0.0 679 0 3.98E+02 298.18 0.09 0.0 0.0 0.254 0.1 0.09 0.00 0.09 0.09 0.0 0.0 680 0 3.93E+02 298.18 0.09 0.0 0.0 0.250 0.1 0.09 0.00 0.09 0.09 0.0 0.0 681 0 3.88E+02 298.18 0.09 0.0 0.0 0.245 0.1 0.09 0.00 0.09 0.09 0.0 0.0 682 0 3.82E+02 298.17 0.09 0.0 0.0 0.241 0.1 0.09 0.00 0.09 0.09 0.0 0.0 683 0 3.77E+02 298.17 -0.09 0.0 0.0 0.237 0.1 0.09 0.00 0.09 0.09 0.0 0.0 684 0 3.72E+02 298.17 0.09 0.0 0.0 0.233 0.1 0.09 0.00 0.09 0.09 0.0 0.0 685 0 3.67E+02 298.17 0.09 0.0 0.0 0.229 0.1 0.09 0.00 0.09 0.09 0.0 0.0 686 0 3.61E+02 298.17 0.09 0.0 0.0 0.225 0.1 0.09 0.00 0.09 0.09 0.0 0.0 687 0 3.56E+02 298.16 0.08 0.0 0.0 0.221 0.1 0.08 0.00 0.08 0.08 0.0 0.0 688 0 3.51E+02 298.16 0.08 0.0 0.0 0.217 0.1 0.08 0.00 0.08 0.08 0.0 0.0 689 0 3.46E+02 298.16 0.08 0.0 0.0 0.213 0.1 0.08 0.00 0.08 0.08 0.0 0.0 690 0 3.41E+02 298.16 0.08 0.0 0.0 0.209 0.1 .0.08 0.00 0.08 0.08 0.0 0.0 691 0 3.36E+02 298.16 0.08 0.0 0.0 0.205 0.1 0.08 0.00 0.08 0.08 0.0 0.0 692 0 3.31E+02 298.15 0.08 0.0 0.0 0.202 0.1 0.08 0.00 0.08 0.08 0.0 0.0 693 0 3.26E+02 298.15 0.08 0.0 0.0 0.198 0.1 0.08 0.00 0.08 0.08 0.0 0.0 694 0 3.21E+02 298.15 0.08 0.0 0.0 0.194 0.1 0.08 0.00 0.08 0.08 0.0 0.0 695 0 3.16E+02 298.15 0.08 0.0 0.0 0.191 0.1 0.08 0.00 0.08 0.08 0.0 0.0 696 0 3.12E+02 298.15 0.08 0.0 0.0 0.187 0.1 0.08 0.00 0.08 0.08 0.0 0.0 697 0 3.07E+02 298.14 0.08 0.0 0.0 0.183 0.1 0.08 0.00 0.08 0.08 0.0 0.0 698 0 3.02E+02 298.14 0.08 0.0 0.0 0.180 0.1 0.08 0.00 0.08 0.08 0.0 0.0 699 0 2.97E+02 298.14 0.08 0.0 0.0 0.176 0.1 0.08 0.00 0.08 0.08 0.0 0.0 700 0 2.93E+02 298.14 0.08 0.0 0.0 0.173 0.1 0.08 0.00 0.08 0.08 0.0 0.0 701 0 2.88E+02 298.14 0.08 0.0 0.0 0.169 0.1 0.08 0.00 0.08 0.08 0.0 0.0 702 0 2.83E+02 298.13 0.08 0.0 0.0 0.166 0.1 0.08 0.00 0.08 0.08 0.0 0.0 703 0 2.79E+02 298.13 0.08 0.0 0.0 0.162 0.1 0.08 0.00 0.08 0.08 0.0 0.0 704 0 2.74E+02 298.13 0.08 0.0 0.0 0.159 0.1 0.08 0.00 0.08 0.08 0.0 0.0 705 0 2.69E+02 298.13 0.08 0.0 0.0 0.156 0.1 0.08 0.00 0.08 0.08 0.0 0.0 706 0 2.65E+02 298.13 0.08 0.0 0.0 0.153 0.1 0.08 0.00 0.08 0.08 0.0 0.0 707 0 2.60E+02 298.13 0.07 0.0 0.0 0.149 0.1 0.07 0.00 0.07 0.07 0.0 0.0 708 0 2.56E+02 298.12 0.07 0.0 0.0 0.146 0.1 0.07 0.00 0.07 0.07 0.0 0.0 709 0 2.51E+02 296.12 0.07 0.0 0.0 0.143 0.1 0.07 0.00 0.07 0.07 0.0 0.0 710 0 2.47E+02 298.12 0.07 0.0 0.0 0.140 0.1 0.07 0.00 0.07 0.07 0.0 0.0 711 0 2.43E+02 298.12 0.07 0.0 0.0 0.137 0.1 0.07 0.00 0.07 0.07 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 17 of 41 Riser Riaer(Weir) Riser Riser Orifice Orifice (orifice)+ Emergency Time Inflow Storage Stage Outiiow (Orifice) (Weir) Barrel RBspwy (1st foot) (2nd foot) orifice +orifice Weir Top of Dam (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs efs (cfs) (efs) 712 0 2.38E+02 298.12 0.07 0.0 0.0 0.134 0.1 0.07 0.00 0.07 0.07 0.0 0.0 713 0 2.34E+02 298.12 0.07 0.0 0.0 0.131 0.1 0.07 0.00 0.07 0.07 0.0 0.0 714 0 2.30E+02 298.11 0.07 0.0 0.0 0.128 0.1 0.07 0.00 0.07 0.07 0.0 0.0 715 0 2.25E+02 298.11 0.07 0.0 0.0 0.125 0.1 0.07 0.00 0.07 0.07 0.0 0.0 716 0 2.21E+02 298.11 0.07 0.0 0.0 0.122 0.1 0.07 0.00 0.07 0.07 0.0 0.0 717 0 2.17E+02 298.11 0.07 0.0 0.0 0.119 0.1 0.07 0.00 0.07 0.07 0.0 0.0 718 0 2.13E+02 298.11 0.07 0.0 0.0 0.116 0.1 0.07 0.00 0.07 0.07 0.0 0.0 719 0 2.09E+02 298.10 0.07 0.0 0.0 0.113 0.1 0.07 0.00 0.07 0.07 0.0 0.0 720 0 2.05E+02 298.10 0.07 0.0 0.0 0.111 0.1 0.07 0.00 0.07 0.07 0.0 0.0 721 0 2.01E+02 298.10 0.07 0.0 0.0 0.108 0.1 0.07 0.00 0.07 0.07 0.0 0.0 722 0 1.97E+02 298.10 0.07 0.0 0.0 0.105 0.1 0.07 0.00 0.07 0.07 0.0 0.0 723 0 1.93E+02 298.10 0.07 0.0 0.0 0.103 0.1 0.07 0.00 0.07 0.07 0.0 0.0 724 0 1.89E+02 298.10 0.07 0.0 0.0 0.100 0.1 0.07 0.00 0.07 0.07 0.0 0.0 725 0 1.85E+02 298.09 0.06 0.0 0.0 0.097 0.1 0.06 0.00 0.06 0.06 0.0 0.0 726 0 1.81E+02 298.09 0.06 0.0 0.0 0.095 0.1 0.06 0.00 0.06 0.06 0.0 0.0 727 0 1.77E+02 298.09 0.06 0.0 0.0 0.092 0.1 0.06 0.00 0.06 0.06 0.0 0.0 728 0 1.73E+02 298.09 0.06 0.0 0.0 0.090 0.1 0.06 0.00 0.06 0.06 0.0 0.0 729 0 1.70E+02 298.09 0.06 0.0 0.0 0.087 0.1 0.06 0.00 0.06 0.06 0.0 0.0 730 0 1.66E+02 298.09 0.06 0.0 0.0 0.085 0.1 0.06 0.00 0.06 0.06 0.0 0.0 731 0 1.62E+02 298.08 0.06 0.0 0.0 0.083 0.1 0.06 .0.00 0.06 0.06 0.0 0.0 732 0 1.58E+02 298.08 0.06 0.0 0.0 0.080 0.1 0.06 0.00 0.06 0.06 0.0 0.0 733 0 1.55E+02 298.08 0.06 0.0 0.0 0.078 0.1 0.06 0.00 0.06 0.06 0.0 0.0 734 0 1.51E+02 298.08 0.06 0.0 0.0 0.076 0.1 0.06 0.00 0.06 0.06 0.0 0.0 735 0 1.48E+02 298.08 0.06 0.0 0.0 0.074 0.1 0.06 0.00 0.06 0.06 0.0 0.0 736 0 1.44E+02 298.08 0.06 0.0 0.0 0.071 0.1 0.06 0.00 0.06 0.06 0.0 0.0 737 0 1.41E+02 298.08 0.06 0.0 0.0 0.069 0.1 0.06 0.00 0.06 0.06 0.0 0.0 738 0 1.37E+02 298.07 0.06 0.0 0.0 0.067 0.1 0.06 0.00 0.06 0.06 0.0 0.0 739 0 1.34E+02 298.07 0.06 0.0 0.0 0.065 0.1 0.06 0.00 0.06 0.06 0.0 0.0 740 0 1.30E+02 298.07 0.06 0.0 0.0 0.063 0.1 0.06 0.00 0.06 0.06 0.0 0.0 741 0 1.27E+02 298.07 0.06 0.0 0.0 0.061 0.1 0.06 0.00 0.06 0.06 0.0 0.0 742 0 1.24E+02 298.07 0.05 0.0 0.0 0.059 0.1 0.05 0.00 0.05 0.05 0.0 0.0 743 0 1.20E+02 298.07 0.05 0.0 0.0 0.057 0.1 0.05 0.00 0.05 0.05 0.0 0.0 744 0 1.17E+02 298.06 0.05 0.0 0.0 0.055 0.1 0.05 0.00 0.05 0.05 0.0 0.0 745 0 1.14E+02 298.06 0.05 0.0 0.0 0.053 0.1 0.05 0.00 0.05 0.05 0.0 0.0 746 0 1.11E+02 298.06 0.05 0.0 0.0 0.051 0.1 0.05 0.00 0.05 0.05 0.0 0.0 747 0 1.08E+02 298.06 0.05 0.0 0.0 0.050 0.0 0.05 0.00 0.05 0.05 0.0 0.0 748 0 1.05E+02 298.06 0.05 0.0 0.0 0.048 0.0 0.05 0.00 0.05 0.05 0.0 0.0 749 0 1.02E+02 298.06 0.05 0.0 0.0 0.046 0.0 0.05 0.00 0.05 0.05 0.0 0.0 750 0 9.91E+01 298.06 0.04 0.0 0.0 0.045 0.0 0.05 0.00 0.05 0.05 0.0 0.0 751 0 9.64E+01 298.05 0.04 0.0 0.0 0.043 0.0 0.05 0.00 0.05 0.05 0.0 0.0 752 0 9.38E+01 298.05 0.04 0.0 0.0 0.042 0.0 0.05 0.00 0.05 0.05 0.0 0.0 753 0 9.13E+01 298.05 0.04 0.0 0.0 0.040 0.0 0.05 0.00 0.05 0.05 0.0 0.0 754 0 8.89E+01 298.05 0.04 0.0 0.0 0.039 0.0 0.05 0.00 0.05 0.05 0.0 0.0 755 0 8.66E+01 298.05 0.04 0.0 0.0 0.038 0.0 0.05 0.00 0.05 0.05 0.0 0.0 756 0 8.43E+01 298.05 0.04 0.0 0.0 0.037 0.0 0.05 0.00 0.05 0.05 0.0 0.0 757 0 8.21E+01 298.05 0.04 0.0 0.0 0.035 0.0 0.05 0.00 0.05 0.05 0.0 0.0 758 0 8.00E+01 298.05 0.03 0.0 0.0 0.034 0.0 0.05 0.00 0.05 0.05 0.0 0.0 759 0 7.79E+01 298.05 0.03 0.0 0.0 0.033 0.0 0.05 0.00 0.05 0.05 0.0 0.0 760 0 7.59E+01 298.05 0.03 0.0 0.0 0.032 0.0 0.04 0.00 0.04 0.04 0.0 0.0 761 0 7.40E+01 298.04 0.03 0.0 0.0 0.031 0.0 0.04 0.00 0.04 0.04 0.0 0.0 762 0 7.22E+Ot 298.04 0.03 0.0 0.0 0.030 0.0 0.04 0.00 0.04 0.04 0.0 0.0 763 0 7.04E+Ot 298.04 0.03 0.0 0.0 0.029 0.0 0.04 0.00 0.04 0.04 0.0 0.0 764 0 6.86E+01 298.04 0.03 0.0 0.0 0.028 0.0 0.04 0.00 0.04 0.04 0.0 0.0 765 0 6.69E+01 298.04 0.03 0.0 0.0 0.027 0.0 0.04 0.00 0.04 0.04 0.0 0.0 1yr 24ftr Storm -Basin 8 E-22 Access Road Page 18 of 41 if ifi Riser Riser (Weir) E Time Iaflow Storage Stage Outflow Riser (Orifice) Riser (Weir) Barrel RBspwy Or ice (1st foot) Or ce (2nd foot) (orifice)+ orifice +orifice mergency Weir Top of Dam (min) (cfs) (cu fi) (ft) (cfs) (cts) (cfs) (cfs) . (ds). (cfs) (cts) cfs cfs (cfs) (cfs) 766 0 6.53E+01 298.04 0.03 0.0 0.0 0.027 0.0 0.04 0.00 0.04 0.04 0.0 0.0 767 0 6.37E+01 298.04 0.03 0.0 0.0 0.026 0.0 0.04 0.00 0.04 0.04 0.0 0.0 768 0 6.21E+01 298.04 0.02 0.0 0.0 0.025 0.0 0.04 0.00 0.04 0.04 0.0 0.0 769 0 6.06E+01 298.04 0.02 0.0 0.0 0.024 0.0 0.04 0.00 0.04 0.04 0.0 0.0 770 0 5.92E+01 298.04 0.02 0.0 0.0 0.023 0.0 0.04 0.00 0.04 0.04 0.0 0.0 771 0 5.78E+01 298.04 0.02 0.0 0.0 0.023 0.0 0.04 0.00 0.04 0.04 0.0 0.0 772 0 5.64E+01 298.04 0.02 0.0 0.0 0.022 0.0 0.04 0.00 0.04 0.04 0.0 0.0 773 0 5.51E+01 298.03 0.02 0.0 0.0 0.021 0.0 0.04 0.00 0.04 0.04 0.0 0.0 774 0 5.38E+01 298.03 0.02 0.0 0.0 0.021 0.0 0.04 0.00 0.04 0.04 0.0 0.0 775 0 5.26E+01 298.03 0.02 0.0 0.0 0.020 0.0 0.04 0.00 0.04 0.04 0.0 0.0 776 0 5.13E+Ot 298.03 0.02 0.0 0.0 0.020 0.0 0.04 0.00 0.04 0.04 0.0 0.0 777 0 5.02E+01 298.03 0.02 0.0 0.0 0.019 0.0 0.04 0.00 0.04 0.04 0.0 0.0 778 0 4.90E+01 298.03 0.02 0.0 0.0 0.019 0.0 0.04 0.00 0.04 0.04 0.0 0.0 779 0 4.79E+01 298.03 0.02 0.0 0.0 0.018 0.0 0.04 0.00 0.04 0.04 0.0 0.0 780 0 4.68E+01 298.03 0.02 0.0 0.0 0.018 0.0 0.04 0.00 0.04 0.04 0.0 0.0 781 0 4.58E+01 298.03 0.02 0.0 0.0 .0.017 0.0 0.04 0.00 0.04 0.04 0.0 0.0 782 0 4.48E+01 298.03 0.02 0.0 0.0 0.017 0.0 0.04 0.00 0.04 0.04 0.0 0.0 783 0 4.38E+01 298.03 0.02 0.0 0.0 0.016 0.0 0.04 0.00 0.04 0.04 0.0 0.0 784 0 4.28E+01 298.03 0.02 0.0 0.0 0.016 0.0 0.04 0.00 0.04 0.04 0.0 0.0 785 0 4.19E+01 298.03 0.02 0.0 0.0 0.015 0.0 0.03 0.00 0.03 0.03 0.0 0.0 786 0 4.09E+01 298.03 0.01 0.0 0.0 0.015 0.0 0.03 0.00 0.03 0.03 0.0 0.0 787 0 4.01E+01 298.03 0.01 0.0 0.0 0.014 0.0 0.03 0.00 0.03 0.03 0.0 0.0 788 0 3.92E+01 298.03 0.01 0.0 0.0 0.014 0.0 0.03 0.00 0.03 0.03 0.0 0.0 789 0 3.83E+01 298.03 0.01 0.0 0.0 0.014 0.0 0.03 0.00 0.03 0.03 0.0 0.0 790 0 3.75E+01 298.03 0.01 0.0 0.0 0.013 0.0 0.03 0.00 0.03 0.03 0.0 0.0 791 0 3.67E+01 298.02 0.01 0.0 0.0 0.013 0.0 0.03 0.00 0.03 0.03 0.0 0.0 792 0 3.60E+01 298.02 0.01 0.0 0.0 0.013 0.0 0.03 0.00 0.03 0.03 0.0 0.0 793 0 3.52E+01 298.02 0.01 0.0 0.0 0.012 0.0 0.03 0.00 0.03 0.03 0.0 0.0 794 0 3.45E+01 298.02 0.01 0.0 0.0 0.012 0.0 0.03 0.00 0.03 0.03 0.0 0.0 795 0 3.37E+01 298.02 0.01 0.0 0.0 0.012 0.0 0.03 0.00 0.03 0.03 0.0 0.0 796 0 3.30E+01 298.02 0.01 0.0 0.0 0.011 0.0 0.03 0.00 0.03 0.03 0.0 0.0 797 0 3.24E+01 298.02 0.01 0.0 0.0 0.011 0.0 0.03 0.00 0.03 0.03 0.0 0.0 798 0 3.17E+01 298.02 0.01 0.0 0.0 0.011 0.0 .0.03 0.00 0.03 0.03 0.0 0.0 799 0 3.11E+01 298.02 0.01 0.0 0.0 0.010 0.0 0.03 0.00 0.03 0.03 0.0 0.0 800 0 3.04E+01 298.02 0.01 0.0 0.0 0.010 0.0 0.03 0.00 0.03 0.03 0.0 0.0 801 0 2.98E+01 298.02 0.01 0.0 0.0 0.010 0.0 0.03 0.00 0.03 0.03 0.0 0.0 802 0 2.92E+Ot 298.02 0.01 0.0 0.0 0.010 0.0 0.03 0.00 0.03 0.03 0.0 0.0 803 0 2.86E+Ot 298.02 0.01 0.0 0.0 0.009 0.0 0.03 0.00 0.03 0.03 0.0 0.0 804 0 2.81E+Ot 298.02 0.01 0.0 0.0 0.009 0.0 0.03 0.00 0.03 0.03 0.0 0.0 805 0 2.75E+Ot 298.02 0.01 0.0 0.0 0.009 0.0 0.03 0.00 0.03 0.03 0.0 0.0 806 0 2.70E+01 298.02 0.01 0.0 0.0 0.009 0.0 0.03 0.00 0.03 0.03 0.0 0.0 807 0 2.64E+Ot 298.02. 0.01 0.0 0.0 0.009 0.0 0.03 0.00 0.03 0.03 0.0 0.0 808 0 2.59E+01 298.02 0.01 0.0 0.0 0.008 0.0 0.03 0.00 0.03 0.03 0.0 0.0 809 0 2.54E+01 298.02 0.01 0.0 0.0 0.008 0.0 0.03 0.00 0.03 0.03 0.0 0.0 810 0 2.49E+01 298.02 0.01 0.0 0.0 0.008 0.0 0.03 0.00 0.03 0.03 0.0 0.0 811 0 2.45E+01 298.02 0.01 0.0 0.0 0.008 0.0 0.03 0.00 0.03 0.03 0.0 0.0 812 0 2.40E+01 298.02 0.01 0.0 0.0 0.008 0.0 0.03 0.00 0.03 0.03 0.0 0.0 813 0 2.35E+01 298.02 0.01 0.0 0.0 0.007 0.0 0.03 0.00 0.03 0.03 0.0 0.0 814 0 2.31E+01 298.02 0.01 0.0 0.0 0.007 0.0 0.03 0.00 0.03 0.03 0.0 0.0 815 0 2.27E+01 298.02 0.01 0.0 0.0 0.007 0.0 0.03 0.00 0.03 0.03 0.0 0.0 816 0 2.22E+01 298.02 0.01 0.0 0.0 0.007 0.0 0.03 0.00 0.03 0.03 0.0 0.0 817 0 2.18E+01 298.02 0.01 0.0 0.0 0.007 0.0 0.03 0.00 0.03 0.03 0.0 0.0 818 0 2.14E+Ot 298.02 0.01 0.0 0.0 0.007 0.0 0.03 0.00 0.03 0.03 0.0 0.0 819 0 2.10E+01 298.02 0.01 0.0 0.0 0.006 0.0 0.03 0.00 0.03 0.03 0.0 0.0 1 yr 24hr Storm - Basin B E-22 Access Road Page 19 of 41 O ' fi Riser Riser (Weir) E Time [ofiow Storage Stage Outflow Riser (Orifice) Riser (Weir) Barrel RBspwy rit ice (1st foot) Ori ce (2nd foot) (orifice)+ orifice +orifice mergency Weir Top of Dam (min) (cfs) (ca fi) (k) (cfs) (cfs) (.cfs) (cfs) (cfs) (cfs) (cfs) cta cfs (cfs) (cfs) 820 0 2.06E+01 298.02 0.01 0.0 0.0 0.006 0.0 0.03 0.00 0.03 0.03 0.0 0.0 821 0 .2.03E+01 298.01 0.01 0.0 0.0 0.006 0.0 0.03 0.00 0.03 0.03 0.0 0.0 822 0 1.99E+01 298.01 0.01 0.0 0.0 0.006 0.0 0.03 0.00 0.03 0.03 0.0 0.0 823 0 1.95E+01 298.01 0.01 0.0 0.0 0.006 0.0 0.03 0.00 0.03 0.03 0.0 0.0 824 0 1.92E+01 298.01 0.01 0.0 0.0 0.006 0.0 0.03 0.00 0.03 0.03 0.0 0.0 825 0 1.88E+01 298.01 0.01 0.0 0.0 0.006 0.0 0.02 0.00 0.02 0.02 0.0 0.0 826 0 1.85E+01 298.01 0.01 0.0 0.0 0.005 0.0 0.02 0.00 0.02 0.02 0.0 0.0 827 0 1.82E+01 298.01 0.01 0.0 0.0 0.005 0.0 0.02 0.00 0.02 0.02 0.0 0.0 828 0 1.78E+01 298.01 0.01 0.0 0.0 0.005 0.0 0.02 0.00 0.02 0.02 0.0 0.0 829 0 1.75E+01 298.01 0.01 0.0 0.0 0.005 0.0 0.02 0.00 0.02 0.02 0.0 0.0 830 0 1.72E+01 298.01 0.01 0.0 0.0 0.005 0.0 0.02 0.00 0.02 0.02 0.0 0.0 831 0 1.69E+01 298.01 0.00 0.0 0.0 0.005 0.0 0.02 0.00 0.02 0.02 0.0 0.0 1 yr 24hr Storm - Basiri B E-22 Access Road Page 20 of 41 1yr 24hr Routing -Basin B 4.0 3.5 3.0 2.5 w 3 2.0 0 1.5 1.0 0.5 0.0 Time (min) - - - - - -- - -•-Inflow Hydrograph -~- Outflow Hydrograph 0 200 400 600 800 1000 1200 1400 E-22 School Access Road Basin B 100 yr-Storm Results Norm surf area= N/A ac Mat surf area= 0.10 ac Required SA = N/A ac Peak stage= 300.09 fl Peak outflow= 2.5 cfs Rise= 2.09 ft Pre-Development Freeboard Plow N/A fs max ge). 0.9 R In vts _ Stage SEerage Iiydregraph Inputs Ks= rt 3139 t]p= 5 ~i cfs b= L20 Tp= 'd min Zo= 298 dT= 1 min Initial Water heed Zi= 293 R Outflow Devices RiserBarrel Spillway N= 1 Number of Risers Orifice #1 Driser= 24 in Riser Diameter N= Cw= i.00 Riser Weir Coen 0= Cd= 0.6 Riser Orifice Coen Cd= Zcr-- 300 ft Riser Crest Elev Inv= Db= 15 in Barrel Diameter Cd= 0.6 Barrel orifice coeft Orifice #2 2inv= 298 R Elev invert barrel N= D= Emergency Weir: Cd= L= 20 R Inv= Zcr- 300 R Cw= 3 Top of Dam L= 500 R Zcr- ?Oi ft Cw= 3 2 2 in U.6 298 ft 0 3 in U.6 Oft Orifice Orifice Riser Riser Riser (1st ft of (2nd ft of (orifice) + Rrser (Weir) E mergency Time Inflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice +orifice Weir Top of Dam (min) (cfs) (cu ft) (ft) (cfs), (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 0 0 0.00E+Op 298.00 0.00 0.0 0.0 0.000 0.0 0.000 0.000 0.000 0.000 0.0 0.0 1 0 0.00E+00 298.00 0.00 0.0 0.0 0.000 0.0 0.000 0.000 0.000 0.000 0.0 0.0 2 0 1.50E+00 298.00 0.00 0.0 0.0 0.000 0.0 0.009 0.000 0.009 0.009 0.0 0.0 3 0 7.44E+00 298.01 0.00 0.0 0.0 0.002 0.0 0.017 0.000 0.017 0.017 0.0 0.0 4 0 2.06E+01 298.02 0.01 0.0 0.0 0.006 0.0 0.026 0.000 0.026 0.026 0.0 0.0 5 1 4.37E+01 298.03 0.02 0.0 0.0 0.016 0.0 0.035 0.000 0.035 0.035 0.0 0.0 6 1 7.88E+01 298.05 0.03 0.0 0.0 0.034 0.0 0.045 0.000 0.045 0.045 0.0 0.0 7 1 1.28E+02 298.07 0.06 0.0 0.0 0.061 0.1 0.055 0.000 0.055 0.055 0.0 0.0 8 1 1.93E+02 298.10 0.07 0.0 0.0 0.103 0.1 0.066 0.000 0.066 0.066 0.0 0.0 9 2 2.76E+02 298.13 0.08 0.0 0.0 0.161 0.1 0.076 0.000 0.076 0.076 0.0 0.0 10 2 3.79E+02 298.17 0.09 0.0 0.0 0.239 0.1 0.087 0.000 0.087 0.087 0.0 0.0 11 3 5.03E+02 298.22 0.10 0.0 0.0 0.340 0.1 0.098 0.000 0.098 0.098 0.0 0.0 12 3 6.48E+02 298.27 0.11 0.0 0.0 0.466 0.1 0.109 0.000 0.109 0.109 0.0 0.0 13 3 8.15E+02 298.33 0.12 0.0 0.0 0.621 0.1 0.120 0.000 0.120 0.120 0.0 0.0 10yr 24hr Stonn - Basin B E-22 Access Road Page 22 of 41 Orifice Orifice Riser Riser Riser (1st ft of (2nd ft of (orifice)+ Riser (Weir) Emergency Time Inflow Storage Sbge Outflow (Orifice) (Weir) Barrel RBspwy height) height) odfite + orifice Weir Top of Dam (min) (cfs) (cu ft) (ft) (cfi) (cfs) (cfs) (cfs) (cfs) (cfs) (cts) cfs cts (cfs) (cfs) 14 4 1.00E+03 298.39 0.13 0.0 0.0 0.806 0.1 0.131 0.000 0.131 0.131 0.0 0.0 15 4 1.21E+03 298.45 0.14 0.0 0.0 1.022 0.1 0.141 0.000 0.141 0.141 0.0 0.0 16 4 1.44E+03 298.52 0.15 0.0 0.0 1.270 0.2 0.152 0.000 0.152 0.152 0.0 0.0 17 5 1.69E+03 298.60 0.16 0.0 0.0 1.549 0.2 0.163 0.000 0.163 0.163 0.0 0.0 18 5 1.96E+03 298.68 0.17 0.0 0.0 1.861 0.2 0.173 0.000 0.173 0.173 0.0 0.0 19 5 2.24E+03 298.76 0.18 0.0 0.0 2.202 0.2 0.183 0.000 0.183 0.183 0.0 0.0 20 5 2.54E+03 298.84 0.19 0.0 0.0 2.571 0.2 0.192 0.000 0.192 0.192 0.0 0.0 21 5 2.85E+03 298.92 0.20 0.0 0.0 2.966 0.2 0.202 0.000 0.202 0.202 0.0 0.0 22 6 3.17E+03 299.01 0.21 0.0 0.0 3.383 0.2 0.211 0.000 0.211 0.211 0.0 0.0 23 6 3.49E+03 299.09 0.22 0.0 0.0 3.818 0.2 0.219 0.000 0.219 0.219 0.0 0.0 24 6 3.81E+03 299.18 0.23 0.0 0.0 4.267 0.2 0.228 0.000 0.228 0.228 0.0 0.0 25 6 4.14E+03 299.26 0.24 0.0 0.0 4.695 0.2 0.236 0.000 0.236 0.236 0.0 0.0 26 6 4.46E+03 299.34 0.24 0.0 0.0 4.986 0.2 0.243 0.000 0.243 0.243 0.0 0.0 27 5 4.77E+03 299.42 0.25 0.0 0.0 5.252 0.3 0.250 0.000 0.250 0.250 0.0 0.0 28 5 5.08E+03 299.49 0.26 0.0 0.0 5.497 0.3 0.257 0.000 0.257 0.257 0.0 0.0 29 5 5.37E+03 299.56 0.26 0.0 0.0 5.720 0.3 0.263 0.000 0.263 0.263 0.0 0.0 30 5 5.66E+03 299.63 0.27 0.0 0.0 5.923 0.3 0.268 0.000 0.268 0.268 0.0 0.0 31 4 5.92E+03 299.70 0.27 0.0 0.0 6.107 0.3 0.274 0.000 0.274 0.274 0.0 0.0 32 4 6.17E+03 299.76 0.28 0.0 0.0 6.274 0.3 0.278 0.000 0.278 0.278 0.0 0.0 33 4 6.41E+03 299:81 0.28 0.0 0.0 6.426 0.3 0.283 0.000 0.283. 0.283 0.0 0.0 34 4 6.63E+03 299.86 0.29 0.0 0.0 6.566 0.3 0.287 0.000 0.287 0.287 0.0 0.0 35 4 6.84E+03 299.91 .0.29 0.0 0.0 6.694 0.3 0.291 0.000 0.291 0.291 0.0 0.0 36 3 7.03E+03 299.96 0.29 0.0 0.0 6.811 0.3 0.294 0.000 0.294 0.294 0.0 0.0 37 3 7.22E+03 300.00 0.30 0.4 0.0 6.920 0.3 0.297 0.000 0.722 0.298 0.0 0.0 38 3 7.39E+03 300.04 0.95 3.1 0.2 7.020 0.5 0.300 0.000 3.355 0.455 0.5 0.0 39 3 7.52E+03 300.07 1.74 4.0 0.3 7.090 0.6 0.302 0.000 4.285 0.646 1.1 0.0 40 3 7.58E+03 300.08 2.25 4.4 0.5 7.128 0.8 0.303 0.000 4.706 0.768 1.5 0.0 41 3 7.61E+03 300.09 2.47 4.6 0.5 7.143 0.8 0.304 0.000 4.867 0.821 1.6 0.0 42 2 7.62E+03 300.09 2.51 4.6 0.5 7.146 0.8 0.304 0.000 4.899 0.832 1.7 0.0 43 2 7.61E+03 300.09 2.47 4.6 0.5 7.143 0.8 0.304 0.000 4.868 0.822 1.6 0.0 44 2 7.60E+03 300.09 2.38 4.5 0.5 7.137 0.8 0.304 0.000 4.807 0.801 1.6 0.0 45 2 7.59E+03 300.09 2.28 4.4 0.5 7.130 0.8 0.303 0.000 4.732 0.777 1.5 0.0 46 2 7.58E+03 300.08 2.18 4.3 0.4 7.123 0.8 0.303 0.000 4.651 0.751 1.4 0.0 47 2 7.56E+03 300.08 2.07 4.3 0.4 7.115 0.7 0.303 0.000 4.567 0.725 1.3 0.0 48 2 7.55E+03 300.08 1.97 4.2 0.4 7.107 0.7 0.303 0.000 4.482 0.700 1.3 0.0 49 2 7.53E+03 300.07 1.87 4.1 0.4 7.100 0.7 0.303 0.000 4.397 0.676 1.2 0.0 50 2 7.52E+03 300.07 1.77 4.0 0.4 7.092 0.7 0.302 0.000 4.312 0.653 1.1 0.0 51 1 7.51E+03 300.07 1.68 3.9 0.3 7.085 0.6 0.302 0.000 4.229 0.632 1.0 0.0 52 1 7.50E+03 300.06 1.60 3.8 0.3 7.078 0.6 0.302 0.000 4.146 0.611 1.0 0.0 53 1 7.48E+03 300.06 1.51 3.8 0.3 7.072 0.6 0.302 0.000 4.064 0.592 0.9 0.0 54 1 7.47E+03 300.06 1.44 3.7 0.3 7.065 0.6 0.301 0.000 3.983 0.573 0.9 0.0 55 1 7:46E+03 300.06 1.36 3.6 0.3 7.059 0:6 0.301 0.000 3.902 0.556 0.8 0.0 56 1 7.45E+03 300.05 1.30 3.5 0.2 7.053 0.5 0.301 0:000 3.823 0.539 0.8 0.0 57 1 7.44E+03 300.05 1.23 3.4 0.2 7.047 0.5 0.301 0.000 3.744 0.523 0.7 0.0 58 1 7.43E+03 300.05 1.17. 3.4 0.2 7.041 0.5 0.301 0.000 3.665 0.508 0.7 0.0 59 1 7.42E+03 300.05 1.11 3.3 0.2 7.036 0.5 0.301 0.000 3.588 0.494 0.6 0.0 60 1 7.41E+03 300.05 1.05 3.2 0.2 7.030 0.5 0.300 0.000 3.510 0.481 0.6 0.0 61 1 7.40E+03 300.04 1.00 3.1 0.2 7.025 0.5 0.300 0.000 3.434 0.468 0.5 0.0 62 1 7.39E+03 300.04 0.95 3.1 0.2 7.020 0.5 0.300 _ 0.000 3.358 0.456 0.5 0.0 63 1 7.38E+03 300.04 0.90 3.0 0.1 7.015 0.4 0.300 0.000 3.282 0.444 0.5 0.0 64 1 7.38E+03 300.04 0.86 2.9 0.1 7.010 0.4 0.300 0.000 3.206 0.434 0.4 0.0 65 1 7.37E+03 300.04 0.82 2.8 0.1 7.005 0.4 0.300 0.000 3.131 0.423 0.4 0.0 66 1 7.36E+03 300.03 0.78 2.8 0.1 7.001 0.4 0.300 0.000 3.055 0.414 0.4 0.0 67 1 7.35E+03 300.03 0.74 2.7 0.1 6.996 0.4 0.299 0.000 2.980 0.404 0.3 0.0 10yr 24hr Storm - Basin B E-22 Access Road Page 23 of 41 Orifice Orifice Riser Riser Riser (1st tt of (led fi of (orifice) + Riser (Weir) E mergency Time Iafiow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy 6eig6t) 6eig6t) orifice + orifice Weir Top of Dam (mia) (cfs) (ca ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 68 1 7.34E+03 300.03 0.70 2.6 .0.1 6.992 0.4 0.299 0.000 2.905 0.396 0.3 0.0 69 1 7.34E+03 300.03 0.67 2.5 0.1 6.988 0.4 0.299 0.000 2.829 0.387 0.3 0.0 70 1 7.33E+03 300.03 0.64 2.5 0.1 6.984 0.4 0.299 0.000 2.753 0.380 0.3 0.0 71 0 7.32E+03 300.02 0.61 2.4 0.1 6.980 0.4 0.299 0.000 2.677 0.372 0.2 0.0 72 0 7.32E+03 300.02 0.58 2.3 0.1 6.976 0.4 0.299 0.000 2.599 0.365 0.2 0.0 73 0 7.31E+03 300.02 0.55 2.2 0.1 6.972 0.4 0.299 0.000 2.522 0.359 0.2 0.0 74 0 7.30E+03 300.02 0.52 2.1 0.1 6.968 0.4 0.299 0.000 2.443 0.352 A.2 0.0 75 0 7.30E+03 300.02 0.50 2.1 0.0 6.964 0.3 0.298 0.000 2.362 0.346 0.2 0.0 76 0 7.29E+03 300.02 0.48 2.0 0.0 6.961 0.3 0.298 0.000 2.280 0.341 0.1 0.0 77 0 7.28E+03 300.02 0.45 1.9 0.0 6.957 0.3 0.298 0.000 2.197 0.336 0.1 0.0 78 0 7.28E+03 300.01 0.43 1.8 0.0 6.954 0.3 0.298 0.000 2.110 0.331 0.1 0.0 79 0 7.27E+03 300.01 0.41 1.7 0.0 6.950 0.3 0.298 0.000 2.021 0.326 0.1 0.0 80 0 7.27E+03 300.01 0.40 1.6 0.0 6.947 0.3 0.298 0.000 1.928 0.322 0.1 0.0 81 0 7.26E+03 300.01 0.38 1.5 0.0 6.944 0.3 0.298 0.000 1.831 0.317 0.1 0.0 82 0 7.25E+03 300.01 0.36 1.4 0.0 6.940 0.3 0.298 0.000 1.727 0.314 0.1 0.0 83 0 7.25E+03 300.01 0.35 1.3 0.0 .6.937 0.3 0.298 0.000 1.616 0.310 0.0 0.0 84 0 7.24E+03 300.01 0.34 1.2 0.0 6.934 0.3 0.298 0.000 1.495 0.307 0.0 0.0 85 0 7.24E+03 300.00 0.32 1.1 0.0 6.930 0.3 0.297 0.000 1.360 0.304 0.0 0.0 86 0 7.23E+03 300.00 0.31 0.9 0.0 6.927 0.3 0.297 0.000 1.202 0.301 0.0 0.0 87 0 7.23E+03 300.00 0.31 0.7 0.0 6.923 0.3 0.297 0.000 1.008 0.299 0.0 0.0 88 0 7.22E+03 300.00 0.30 0.4 0.0 6.920 0.3 0.297 0.000 0.724 0.298 0.0 0.0 89 0 7.21E+03 300.00 0.30 0.0 0.0 6.916 0.3 0.297 0.000 0.297 0.297 0.0 0.0 90 0 7.21E+03 300.00 0.30 0.0 0.0 6:912 0.3 0.297 0.000 0.297 0.297 0.0 0.0 91 0 7.20E+03 300.00 0.30 0.0 0.0 6.908 0.3 0.297 0.000 0.297 0.297 0.0 0.0 92 0 7.19E+03 299.99 0.30 0.0 0.0 6.903 0.3 0.297 0.000 0.297 0.297 0.0 0.0 93 0 7.18E+03 299.99 0.30 0.0 0.0 6.898 0.3 0.297 0.000 0.297 0.297 0.0 0.0 94 0 7.17E+03 299.99 0.30 0.0 0.0 6.893 0.3 0.296 0.000 0.296 0.296 0.0 0:0 95 0 7.16E+03 299.99 0.30 0.0 0.0 6.887 0.3 0.296 0.000 0.296 0.296 0.0 0.0 96 0 7.15E+03 299.99 0.30 0.0 0.0 6.882 0.3 0.296 0.000 0.296 0.296 0.0 0.0 97 0 7.14E+03 299.98 0.30 0.0 0.0 6.876 0.3 0.296 0.000 0.296 0.296 0.0 0.0 98 0 7.13E+03 299.98 0.30 0.0 0.0 6.869 0.3 0.296 0.000 0.296 0.296 0.0 0.0 99 0 7.12E+03 299.98 0.30 0.0 0.0 6.863 0.3 0.295 0.000 O.Z95 0.295 0.0 0.0 100 0 7.11E+03 299.98 0.30 0.0 0.0 6.856 0.3 0.295 0.000 0.295 0.295 0.0 0.0 101 0 7.10E+03 299.97 0.30 0.0 0.0 6.849 0.3 0.295 0.000 0.295 0.295 0.0 0.0 102 0 7.09E+03 299.97 0.29 0.0 0.0 6.842 0.3 0.295 0.000 0.295 0.295 0.0 0.0 103 0 7.07E+03 299.97 0.29 0.0 0.0 6.835 0.3 0.295 0.000 0.295 '0.295 0.0 0.0 104 0 7.06E+03 299.96 0.29 0.0 0.0 6.827 0.3 0.294 0.000 0.294 0.294 0.0 0.0 105 0 7.05E+p3 299,96 0.29 0.0 0.0 6.820 0.3 0.294 0.000 0.294 0.294 0.0 0.0 106 0 7.04E+03 299.96 0.29 0.0 0.0 6.812 0.3 0.294 0.000 0.294 0.294 0.0 0.0 107 0 7.02E+03 299.96 0.29 0.0 0.0 6.804 0.3 0.294 0.000 0.294 0.294 0.0 0.0 108 0 7.01E+03 299.95 0.29 0.0 0.0 6.796 0.3 0.294 0.000 0.294 0.294 0.0 0.0 709 0 6.99E+03 299.95 0.29 0.0 0.0 6.788 0.3 0.293 0.000 0.293 0.293 0.0 0.0 110 0 6.98E+03 299.95 0.29 0.0 0.0 6.779 0.3 0.293 0.000 0.293 0.293 0.0 0.0 111 0 6.97E+03 299.94 0.29 0.0 0.0 6.771 0.3 0.293 0.000 0.293 0.293 0.0 0.0 112 0 6.95E+03 299.94 0.29 0.0 0.0 6.763 0:3 0.293 0.000 0.293 0.293 0.0 0.0 113 0 6.94E+03 299.94 0.29 0.0 0.0 6.754 0.3 0.292 0.000 0.292 0.292 0.0 0.0 114 0 6.92E+03 299.93 0.29 0.0 0.0 6.745 0.3 0.292 0.000 0.292 0.292 0.0 0.0 115 0 6.91E+03 299.93 0.29 0.0 0.0 6.736 0.3 0.292 0.000 0.292 0.292 0.0 0.0 116 0 6.89E+03 299.93 0.29 0.0 0.0 6.727 0.3 0.292 0.000 0.292 0.292 0.0 0.0 117 0 6.88E+03 299.92 0.29 0.0 0.0 6.718 0.3 0.291 0.000 0.291 0.291 0.0 0.0 118 0 6.86E+03 299.92 0.29 0.0 0.0 6.709 0.3 0.291 0.000 0.291 0.291 0.0 0.0 119 0 6.85E+03 299.91 0.29 0.0 0.0 6.700 0.3 0.291 0.000 0.291 0.291 0.0 0.0 120 0 6.83E+03 299.91 0.29 0.0 0.0 6.691 0.3 0.290 0.000 0.290 0.290 0.0 0.0 121 0 6.82E+03 299.91 0.29 0.0 0.0 6.681 0.3 0.290 0.000 0.290 0.290 0.0 0.0 t0yr 24hr Storm - Basin B E-22 Access Road Page 24 of 41 Orifice Orifice Riser Riser (Weir) Riser Riser (1st ft of (2nd ft of (oriflte) + Emergency Time Inflow Stora a S Sta a B Outflow (Orifice ) Weir ( ) Barrel RBs w P Y hei ht S) hei ht) 8 orifice +orifice Weir To of Dam P (min) (cfs) (cu ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) tfs cfs (cfs) (cfs) 122 0 6.80E+03 299.90 0.29 0.0 0.0 6.672 0.3 0.290 0.000 0.290 0.290 0.0 0.0 123 0 .6.79E+03 299.90 0.29 0.0 0.0 6.662 0.3 0.290 0.000 0.290 0.290 0.0 0.0 124 0 6.77E+03 299.90 0.29 0.0 0.0 6.653 0.3 0.289 0.000 0.289 0.289 0.0 0.0 125 0 6.75E+03 299.89 0.29 0.0 0.0 6.643 0.3 0.289 0.000 0.289 0.289 0.0 0.0 126 0 6.74E+03 299.89 0.29 0.0 0.0 6.633 0.3 0.289 0.000 0.289 0.289 0.0 0.0 127 0 6.72E+03 299.89 0.29 0.0 0.0 6.624 0.3 0.288 0.000 0.288 0.288 0.0 0.0 128 0 6.71E+03 299.88 0.29 0.0 0.0 6.614 0.3 0.288 0.000 0.288 0.288 0.0 0.0 129 0 6.69E+03 299.88 0.29 0.0 0.0 6.604 0.3 0.288 0.000 0.288 0.288 0.0 0.0 130 0 6.67E+03 299.87 0.29 0.0 0.0 6.594 0.3 0.288 0.000 0.288 0.288 0.0 0.0 131 0 fi.66E+03 299.87 0.29 0.0 0.0 6.584 0.3 0.287 0.000 0.287 0.287 0.0 0.0 132 0 6.64E+03 299.87 0.29 0.0 0.0 6.574 0.3 0.287 0.000 0.287 0.287 0.0 0.0 133 0 6.63E+03 299.86 0.29 0.0 0.0 6.564 0.3 0.287 0.000 0.287 0.287 0.0 0.0 134 0 6.61E+03 299.86 0.29 0.0 0.0 6.554 0.3 0.286 0.000 0.286 0.286 0.0 0.0 135 0 6.59E+03 299.86 0.29 0.0 0.0 6.544 0.3 0.286 0.000 0.286 0.286 0.0 0.0 136 0 6.58E+03 299.85 0.29 0.0 0.0 6.534 0.3 0.286 0.000 0.286 0.286 0.0 0.0 137 0 6.56E+03 299.85 0.29 0.0 0.0 6.524 0.3 0.286 0.000 0.286 0.286 0.0 0.0 138 0 6.54E+03 299.84 0.29 0.0 0.0 6.513 0.3 0.285 0.000 0.285 0.285 0.0 0.0 139 0 6.53E+03 299.84 0.28 0.0 0.0 6.503 0.3 0.285 0.000 0.285 0.285 0.0 0.0 140 0 6.51E+03 299.84 0.28 0.0 0.0 6.493 0.3 0.285 0.000 0.285 0.285 0.0 0.0 141 0 6.50E+03 299.83 0.28 0.0 0.0 6.482 0.3 0.284 0.000 0.284 0.284 0.0 0.0 142 0 6.48E+03 299.83 0.28 0.0 0.0 6.472 0.3 0.284 0.000 0.284 0.284 0.0 0.0 143 0 6.46E+03 299.82 0.28 0.0 0.0 6.462 0.3 0.284 0.000 .0.284 0.284 0.0 0.0 144 0 6.45E+03 299.82 0.28 0.0 0.0 6.451 0.3 0.283 0.000 0.283 0.283 0.0 0.0 145 0 6.43E+03 299.82 0.28 0.0 0.0 6.441 0.3 0.283 0.000 0.283 0.283 0.0 0.0 146 0 6.41E+03 299.81 0.28 0.0 0.0 6.430 0.3 0.283 0.000 0.283 0.283 0.0 0.0 147 0 6.40E+03 299.81 0.28 0.0 0.0 6.420 0.3 0.283 0.000 0.283 0.283 0.0 0.0 148 0 6.38E+03 299.81 0.28 0.0 0.0 6.409 0.3 0.282 0.000 0.282 0.282 0.0 0.0 149 0 6.36E+03 299.80 0.28 0.0 0.0 6.399 0.3 0.282 0.000 0.282 0.282 0.0 0.0 150 0 6.35E+03 299.80 0.28 0.0 0.0 6.388 0.3 0.282 0.000 0.282 0.282 0.0 0.0 151 0 6.33E+03 299.79 0.28 0.0 0.0 6.377 0.3 0.281 0.000 .0.281 0.281 0.0 0.0 152 0 6.31E+03 299.79 0.28 0.0 0.0 6.367 0.3 0.281 0.000 0.281 0.281 0.0 0.0 153 0 6.30E+03 299.79 0.28 0.0 0.0 6.356 0.3 0.281 0.000 0.281 0.281 0.0 0.0 154 0 6.28E+03 299.78 0.28 0.0 0.0 6.345 0.3 0.280 0.000 0.280 0.280 0.0 0.0 155 0 6.26E+03 299.78 0.28 0.0 0.0 6.335 0.3 0.280 0.000 0.280 0.280 0.0 0.0 156 0 6.25E+03 299.77 0.28 0.0 0.0 6.324 0.3 0.280 0.000 0.280 0.280 0.0 0.0 157 0 6.23E+03 299.77 0.28 0.0 0.0 6.313 0.3 0.280 0.000 0.280 0.280 0.0 0.0 158 0 6.22E+03 299.77 0.28 0.0 0.0 6.302 0.3 0.279 0.000 0.279 0.279 0.0 0.0 159 0 6.20E+03 299.76 0.28 0.0 0.0 6.292 0.3 0.279 0.000 0.279 0.279 0.0 0.0 160 0 6.18E+03 299.76 0.28 0.0 0.0 6.281 0.3 0.279 0.000 0.279 0.279 0.0 0.0 161 0 6.17E+03 299.75 0.28 0.0 0.0 6.270 0.3 0.278 0.000 0.278 0.278 0.0 0.0 162 0 6.15E+03 299.75 0.28 0.0 0.0 6.259 0.3 0.278 0.000 0.278 0.278 0.0 0.0 163 0 6.13E+03 299.75 0.28 0.0 0.0 6.248 0.3 0.278 0.000 0.278 0.278 0.0 0.0 164 0 6.12E+03 299.74 0.28 0.0 0.0 6.237 0.3 0.277 0.000 0.277 0.277 0.0 0.0 165 0 6.10E+03 299.74 0.28 0.0 0.0 6.226 0.3 0.277 0.000 0.27T 0.277 0.0 0.0 166 0 6.08E+03 299.73 0.28 0.0 0.0 6.215 0.3 0.277 0.000 0.277 0.277 0.0 0.0 167 0 6.07E+03 299.73 0.28 0.0 0.0 6.204 0.3 0.276 0.000 0.276 0.276 0.0 0.0 168 0 6.05E+03 299.73 0.28 0.0 0.0 6.193 0.3 0.276 0.000 0.276 0.276 0.0 0.0 169 0 6.03E+03 299.72 0.28 0.0 0.0 6.182 0.3 0.276 0.000 0.276 0.276 0.0 0.0 170 0 8.02E+03 299.72 0.28 0.0 0.0 6.171 0.3 0.275 0,000 0.275 0.275 0.0 0.0 171 0 6.00E+03 299.72 0.28 0.0 0.0 6.160 0.3 0.275 0.000 0.275 0.275 0.0 0.0 172 0 5.98E+03 299.71 0.27 0.0 0.0 6.149 0.3 0.275 0.000 0.275 0.275 0.0 0.0 173 0 5.97E+03 299.71 0.27 0.0 0.0 6.138 0.3 0.275 0.000 0.275 0.275 0.0 0.0 174 0 5.95E+03 299.70 0.27 0.0 0.0 6.127 0.3 0.274 0.000 0.274 0.274 0.0 0.0 175 0 5.94E+03 299.70 0.27 0.0 0.0 6.116 0.3 0.274 0.000 0.274 0.274. 0.0 0.0 10yr 24hr Stortn - Basin B E-22 Access Road Page 25 of 41 Orifice Orifice Riser Riser Riser (Ist ft of (2ud ft of (orifice) + Riser (Weir) Emergeuey Time Iufiow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice + orifice Weir Top ofI>am (miu) (cfs) (ca ft) (ft) (cfa) (cts) (cfs) (cfs) (cfs) (cfs) (cfs) cts cts (cfs) (cfs) 176 0 5.92E+03 299.70 0.27 0.0 0.0 6.105 0.3 0.274 0.000 0.274 0.274 0.0 0.0 177 0 5.90E+03 299.69 0.27 0.0 0.0 6.094 0.3 0.273 0.000 0.273 0.273 0.0 0.0 178 0 5.89E+03 299.69 0.27 0.0 0.0 6.083 0.3 0.273 0.000 0.273 0.273 0.0 0.0 179 0 5.87E+03 299.88 0.27 0.0 0.0 6.072 0.3 0.273 0.000 0.273 0.273 0.0 0.0 180 0 5.85E+03 299.68 0.27 0.0 0.0 6.061 0.3 0.272 0.000 0.272 0.272 0.0 0.0 181 0 5.84E+03 299.68 0.27 0.0 0.0 6.049 0.3 0.272 0.000 0.272 0.272 0.0 0.0 182 0 5.82E+03 299.67 0.27 0.0 0.0 6.038 0.3 0.272 0.000 0.272 0.272 0.0 0.0 183 0 5.81E+03 299.67 0.27 0.0 0.0 6.027 0.3 0.271 0.000 0.271 0.271 0.0 0.0 184 0 5.79E+03 299.66 0.27 0.0 0.0 6.016 0.3 0.271 0.000 0.271 0.271 0.0 0.0 185 0 5.77E+03 299.66 0.27 0.0 0.0 6.005 0.3 0.271 0.000 0.271 0.271 0.0 0.0 186 0 5.76E+03 299.66 0.27 0.0 0.0 5.993 0.3 0.270 0.000 0.270 0.270 0.0 0.0 187 0 5.74E+03 299.65 0.27 0.0 0.0 5.982 0.3 0.270 0.000 0.270 0.270. 0.0 0.0 188 0 5.72E+03 299.65 0.27 0.0 0.0 5.971 0.3 0.270 0.000 0.270 0.270 0.0 0.0 189 0 5.71E+03 299.65 0.27 0.0 0.0 5.959 0.3 0.269 0.000 0.269 0.269 0.0 0.0 190 0 5.69E+03 299.64 0.27 0.0 0.0 5.948 0.3 0.269 0.000 0.269 0.269 0.0 0.0 191 0 5.68E+03 299.64 0.27 0.0 0.0 5.937 0.3 0.269 0.000 0.269 0.269 0.0 0.0 192 0 5.66E+03 299.83 0.27 0.0 0.0 5.925 0.3 0.269 0.000 0.269 0.269 0.0 0.0 193 0 5.64E+03 299.63 0.27 0.0 0.0 5.914 0.3 0.268. 0.000 0.268 0.268 0.0 0.0 194 0 5.63E+03 299.63 0.27 0.0 0.0 5.903 0.3 0.268 0.000 0.268 0.268 0.0 0.0 195 0 5.61E+03 299.62 0.27 0.0 0.0 5.891 0.3 0.268 0.000 0.268 0.268 0.0 0.0 196 0 5.60E+03 299.62 0.27 0.0 0.0 5.880 0.3 0.267 0.000 0.267 0.267 0.0 0.0 197 0 5.58E+03 299.61 0.27 0.0 0.0 5.868 0.3 0.267 0.000 0.267 0.267 0.0 0.0 198 0 5.56E+03 299.61 0.27 0.0 0.0 5.857 0.3 0.267 0.000 0.267 0.267 0.0 0.0 199 0 5.55E+03 299.61 0.27 0.0 0.0 5.846 0.3 0.266 0.000 0.266 0.266 0.0 0.0 200 0 5.53E+03 299.60 0.27 0.0 0.0 5.834 0.3 0.266 0.000 0.266 0.266 0.0 0.0 201 0 5.52E+03 299.60 0.27 0.0 0.0 5.823 0.3 0.266 0.000 0.266 0.266 0.0 0.0 202 0 5.50E+03 299.60 0.27 0.0 0.0 5.811 0.3 0.265 0.000 0.265 0.265 0.0 0.0 203 0 5.48E+03 299.59 0.27 0.0 0.0 5.800 0.3 0.265 0.000 0.265 0.265 0.0 0.0 204 0 5.47E+03 299.59 0.26 0.0 0.0 5.788 0.3 0.265 0.000 0.265 0.265 0.0 0.0 205 0 5.45E+03 299.58 0.26 0.0 0.0 5.777 0.3 0.264 0.000 0.264 0.264 0.0 0.0 206 0 5.44E+03 299.58 0.26 0.0 0.0 5.765 0.3. 0.264 0.000 0.264 0.264 0.0 0.0 207 0 5.42E+03 299.58 0.26 0.0 0.0 5.753 0.3 0.264 0.000 0.264 0.264 0.0 0.0 208 0 5.40E+03 299.57 0.26 0.0 0.0 5.742 0.3 0.263 0.000 0.263 0.263 0.0 0.0 209 0 5.39E+03 299.57 0.26 0.0 0.0 5.730 0.3 0.263 0.000 0.263 0.263 0.0 0.0 210 0 5.37E+03 299.56 0.26 0.0 0.0 5.719 0.3 0.263 0.000 0.263 0.263 0.0 0.0 211 0 5.36E+03 299.56 0.26 0.0 0.0 5.707 0.3 0.262 0.000 0.262 -0.262 0.0 0.0 212 0 5.34E+03 299.56 0.26 0.0 0.0 5.695 0.3 0.262 0.000 0.262 0.262 0.0 0.0 213 0 5.33E+03 299.55 0.26 0.0 0.0 5.684 0.3 0.262 0.000 0.262 0.262 0.0 0.0 214 0 5.31E+03 299.55 0.26 0.0 0.0 5.672 0.3 0.262 0.000 0.262 0.262 0.0 0.0 215 0 5.29E+03 299.55 0.26 0.0 0.0 5.660 0.3 0.261 0.000 0.261 0.261 0.0 0.0 216 0 5.28E+03 299.54 0.26 0.0 0.0 5.648 0.3 0.261 0.000 0.261 0.261 0.0 0.0 217 0 5.26E+03 299.54 0.26 0.0 0.0 5.637 0.3 0.261 0.000 0.261 0.261 0.0 0.0 218 0 5.25E+03 299.53 0.26 0.0 0.0 5.625 0.3 0.260 0.000 0.260 0.260 0.0 0.0 219 0 5.23E+03 299.53 0.26 0.0 0.0 5.613 0.3 0.260 0.000 0.260 0.260 0.0 0.0 220 0 5.22E+03 299.53 0.26 0.0 0.0 5.601 0.3 0.260 0.000 0.260 0.260 0.0 0.0 221 0 5.20E+03 299.52 0.26 0.0 0.0 5.590 0.3 0.259 0.000 0.259 0.259 0.0 0.0 222 0 5.19E+03 299.52 0.26 0.0 0.0 5.578 0.3 0.259 0.000 0.259 0.259 0.0 0.0 223 0 5.17E+03 299.52 0.26 0.0 0.0 5.566 0.3 0.259 0.000 0.259 0.259 0.0 0.0 224 0 5.15E+03 299.51 0.26 0.0 0.0 5.554 0.3 0.258 0.000 0.258 0.258 0.0 0.0 225 0 5.14E+03 299.51 0.26 0.0 0.0 5.542 0.3 0.258 0.000 0.258 0.258 0.0 0.0 226 0 5.12E+03 299.50 0.26 0.0 0.0 5.530 0.3 0.258 0.000 0.258 0.258 0.0 0.0 227 0 5.11E+03 299.50 0.26 0.0 0.0 5.519 0.3 0.257 0.000 0.257 0.257 0.0 0.0 228 0 5.09E+03 299.50 0.26 0.0 0.0 5.507 0.3 0.257 0.000 0.257 0.257 0.0 0.0 229 0 5.08E+03 299.49 0.26 0.0 0.0 5.495 0.3 0.257 0.000 0.257 0.257 0.0 0.0 10yr 24hr Stonn - Basin B E-22 Access Road Page 26 of 41 Orifice Orifice Riser Riser Riser (lat ft of (2nd ft of (orifice)+ R'aer (Weir) Emergency Time Inflow Storage Stage Ontfiow (Orifice) (Weir) Barrel RBspwy height) height) orifice + orifice Weir Top of Dam (min) (cfs) (cn ft) (ft) (cfs) (cfs) (cfs) (cfs) (cfa) (da) (cfs) cfs cfs (cfs) (tfa) 230 0 5.06E+03 299.49 0.26 0.0 0.0 5.483 0.3 0.256 0.000 0.256 0.256 0.0 0.0 231 0 5.05E+03 299.48 0.26 0.0 0.0 5.471 0.3 0.256 0.000 0.256 0.256 0.0 0.0 232 0 5.03E+03 299.48 0.26 0.0 0.0 5.459. 0.3 0.256 0.000 0.256 0.256 0.0 0.0 233 0 5.02E+03 299.48 0.26 0.0 0.0 5.447 0.3 0.255 0.000 0.255 0.255 0.0 0.0 234 0 5.00E+03 299.47 0.26 0.0 0.0 5.435 0.3 0.255 0.000 0.255 0.255 0.0 0.0 235 0 4.99E+03 299.47 0.25 0.0 0.0 5.423 0.3 0.255 0.000 0.255 0.255 0.0 0.0 236 0 4.97E+03 299.47 0.25 0.0 0.0 5.411 0.3 0.254 0.000 0.254 0.254 0.0 0.0 237 0 4.95E+03 299.46 0.25 0.0 0.0 5.399 0.3 0.254 0.000 0.254 0.254 0.0 0.0 238 0 4.94E+03 299.46 0.25 0.0 0.0 5.386 0.3 0.254 0.000 0.254 0.254 0.0 0.0 239 0 4.92E+03 299.45 0.25 0.0 0.0 5.374 0.3 0.253 0.000 0.253 0.253 0.0 0.0 240 0 4.91E+03 299.45 0.25 0.0 0.0 5.362 0.3 0.253 0.000 0.253 0.253 0.0 0.0 241 0 4.89E+03 299.45 0.25 0.0 0.0 5.350 0.3 0.253 0.000 0.253 0.253 0.0 0.0 242 0 4.88E+03 299.44 0.25 0.0 0.0 5.338 0.3 0.252 0.000 0.252 0.252 0.0 0.0 243 0 4.86E+03 299.44 0.25 0.0 0.0 5.326 0.3 0.252 0.000 0.252 0.252 0.0 0.0 244 0 4.85E+03 299.44 0.25 0.0 0.0 5.314 0.3 0.252 0.000 0.252 .0.252 0.0 0.0 245 0 4.83E+03 299.43 0.25 0.0 0.0 5.301 0.3 0.251 0.000 0.251 0.251 0.0 0.0 246 0 4.82E+03 299.43 0.25 0.0 0.0 5.289 0.3 0.251 0.000 0.251 0.251 0.0 0.0 247 0 4.80E+03 299.43 0.25 0.0 0.0 5.277 0.3 0.251 0.000 0.251 0.251 0.0 0.0 248 0 4.79E+03 299.42 0.25 0.0 0.0 5.265 0.3 0.250 0.000 0.250 0.250 0.0 0.0 249 0 4.77E+03 299.42 0.25 0.0 0.0 5.252 0.3 0.250 0.000 0.250 0.250 0.0 0.0 250 0 4.76E+03 299.41 0.25 0.0 0.0 5.240 0.2 0.250 0.000 0.250 0.250 0.0 0.0 251 0 4.74E+03 299.41 0.25 0.0 0.0 5.228 0.2 0.249 0.000 0.249 0.249 0.0 0.0 252 0 4.73E+03 299.41 0.25 0.0 0.0 5.215 0.2 0.249 0.000 0.249 0.249 0.0 0.0 253 0 4.71E+03 299.40 0.25 0.0 0.0 5.203 0.2 0.249 0.000 0.249 0.249 0.0 0.0 254 0 4.70E+03 299.40 0.25 0.0 0.0 5.190 0.2 0.249 0.000 0.249 0.249 0.0 0.0 255 0 4.68E+03 299.40 0.25 0.0 0.0 5.178 0.2 0.248 0.000 0.248 0.248 0.0 0.0 256 0 4.67E+03 299.39 0.25 0.0 0.0 5.166 0.2 0.248 0.000 0.248 0.248 0.0 0.0 257 0 4.65E+03 299.39 0.25 0.0 0.0 5.153 0.2 0.248 0.000 0.248 0.248 0.0 0.0 258 0 4.64E+03 299.38 0.25 0.0 0.0 5.141 0.2 0.247 0.000 0.247 0.247 0.0 0.0 259 0 4.62E+03 299.38 0.25 0.0 0.0 5.128 0.2 0.247 0.000 .0.247 0.247 0.0 0.0 260 0 4.61E+03 299.38 0.25 0.0 0.0 5.116 0.2 0.247 0.000 0.247 0.247 0.0 0.0 261 0 4.59E+03 299.37 0.25 0.0 0.0 5.103 0.2 0.246 0.000 0.246 0.246 0.0 0.0 262 0 4.58E+03 299.37 0.25 0.0 0.0 5.091 0.2 0.246 0.000 0.246 0.246 0.0 0.0 263 0 4.56E+03 299.37 0.25 0.0 0.0 5.078 0.2 0.246 0.000 0.246 0.246 0.0 0.0 264 0 4.55E+03 299.36 0.25 0.0 0.0 5.065 0.2 0.245 0.000 0.245 0.245 0.0 0.0 265 0 4.54E+03 299.36 0.24 0.0 0.0 5.053 0.2 0.245 0.000 0.245 0.245 0.0 0.0 266 0 4.52E+03 299.35 0.24 0.0 0.0 5.040 0.2 0.245 0.00 0.245 0.245 0.0 0.0 267 0 4.51E+03 299.35 0.24 0.0 0.0 5.027 0.2 0.244 0.000 0.244 0.244 0.0 0.0 268 0 4.49E+03 299.35 0.24 0.0 0.0 5.015 0.2 0.244 0.000 0.244 0.244 0.0 0.0 269 0 4.48E+03 299.34 0.24 0.0 0.0 5.002 0.2 0.244 0.000 0.244 0.244 0.0 0.0 270 0 4.46E+03 299.34 0.24 0.0 0.0 4.989 0.2 0.243 0.000 0.243 0.243 0.0 0.0 271 0 4.45E+03 299.34 0.24 0.0 0.0 4.977 0.2 0.243 0.000 0.243 0.243 0.0 0.0 272 0 4.43E+03 299.33 0.24 0.0 0.0 4.964 0.2 0.243 0.000 0.243 0.243 0.0 0.0 273 0 4.42E+03 299.33 0.24 0.0 0.0 4.95'1 0.2 0.242 0.000 0.242 0.242 0.0 0.0 274 0 4.40E+03 299.33 0.24 0.0 0.0 4.938 0.2 0.242 0.000 0.242 0.242 0.0 0.0 275 0 4.39E+03 299.32 0.24 0.0 0.0 4.925 0.2 0.242 0.000 0.242 0.242 0.0 0.0 276 0 4.37E+03 299.32 0.24 0.0 0.0 4.913 0.2 0.241 0.000 0.241 0.241 0.0 0.0 277 0 4.36E+03 299.31 0.24 0.0 0.0 4.900 0.2 0.241 0.000 0.241 0.241 0.0 0.0 278 0 4.35E+03 299.31 0.24 0.0 0.0 4.887 0.2 0.241 0.000 0.241 0.241 0.0 0.0 279 0 4.33E+03 299.31 0.24 0.0 0.0 4.874 0.2 0.240 0.000 0.240 0.240 0.0 0.0 280 0 4.32E+03 299.30 0.24 0.0 0.0 4.861 0.2 0.240 0.000 0.240 0.240 0.0 0.0 281 0 4.30E+03 299.30 0.24 0.0 0.0 4.848 0.2 0.240 0.000 0.240 0.240 0.0 0.0 282 0 4.29E+03 299.30 0.24 0.0 0.0 4.835 0.2 0.239 0.000 0.239 0.239 0.0 0.0 283 0 4.27E+03 299.29 0.24 0.0 0.0 4.822 0.2 0.239 0.000 0.239 0.239 0.0 0.0 10yr 24hr Stonn - Basin B E-22 Access Road Page 27 of 41 Orifice Orifice Riser Riser Riser (1st tt of (Ind ft of (orifice)+ Riser (Weir) Emergency Time Iafiow Storage Sgge Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice +orifice Weir Top of Dam (m1a) (cfS) (CU fi) (fi) (Cf8) (Cf8) (cf8) (CfS) (ef8) (Cfs) (Cf5) cfs efS (Cf8) (Cf8) 284 0 4.26E+03 299.29 0.24 0.0 0.0 4.809 0.2 0.239 0.000 0.239 0.239 0.0 0.0 285 0 4.25E+03 299.29 0.24 0.0 0.0 4.796 0.2 0.238 0.000 0.238 0.238 0.0 0.0 286 0 4.23E+03 299.28 0.24 0.0 0.0 4.783 0.2 0.238 0.000 0.238 0.238 0.0 0.0 287 0 4.22E+03 299.28 0.24 0.0 0.0 4.769 0.2 0.238 - 0.000 0.238 0.238 0.0 0.0 288 0 4.20E+03 299.27 0.24 0.0 0.0 4.756 0.2 0.237 0.000 0.237 0.237 0.0 0.0 289 0 4.19E+03 299.27 0.24 0.0 0.0 4.743 0.2 0.237 0.000 0:237 0.237 0.0 0.0 290 0 4.17E+03 299.27 0.24 0.0 0.0 4.730 0.2 0.237 0.000 0.237 0.237 0.0 0.0 291 0 4.16E+03 299.26 0.24 0.0 0.0 4.717 0.2 0.236 0.000 0.236 0.236 0.0 0.0 292 0 4.15E+03 299.26 0.24 0.0 0.0 4.703 0.2 0.236 0.000 0.236 0.236 0.0 0.0 293 0 4.13E+03 299.26 0.24 0.0 0.0 4.690 0.2 0.236 0.000 0.236 0.236 0.0 0.0 294 0 4.12E+03 299.25 0.24 0.0 0.0 4.677 0.2 0.235 0.000 0.235 0.235 0.0 0.0 295 0 4.10E+03 299.25 0.23 0.0 0.0 4.678 0.2 0.235 0.000 0.235 0.235 0.0 0.0 296 0 4.09E+03 299.25 0.23 0.0 0.0 4.658 0.2 0.235 0.000 0.235 0.235 0.0 0.0 297 0 4.08E+03 299.24 0.23 0.0 0.0 4.638 0.2 0.234 0.000 0.234 0.234 0.0 0.0 298 0 4.06E+03 299.24 0.23 0.0 0.0 4.618 0.2 0.234 0.000 0.234 0.234 0.0 0.0 299 0 4.05E+03 299.24 0.23 0.0 0.0 4.598 0.2 0.234 0.000 0.234 0.234 0.0 0.0 300 0 4.03E+03 299.23 0.23 0.0 0.0 4.578 0.2 0.233 0.000 0.233 0.233 0.0 0.0 301 0 4.02E+03 299.23 0.23 0.0 0.0 4.559 0.2 0.233. 0.000 0.233 0.233 0.0 0.0 302 0 4.00E+03 299.22 0.23 0.0 0.0 4.539 0.2 0.233 0.000 0.233 0.233 0.0 0.0 303 0 3.99E+03 299.22 0.23 0.0 0.0 4.519 0.2 0.232 0.000 0.232 0.232 0.0 0.0 304 0 3.98E+03 299.22 0.23 0.0 0.0 4.499 0.2 0.232 0.000 0.232 0.232 0.0 0.0 305 0 3.96E+03 299.21 0.23 0.0 0.0 4.480 0.2 0.232 0.000 0.232 0.232 0.0 0.0 306 0 3.95E+03 299.21 0.23 0.0 0.0 4.460 0.2 0.231 0.000 0.231 0.231 0.0 0.0 307 0 3.94E+03 299.21 0.23 0.0 0.0 4.441 0.2 0.231 0.000 0.231 0.231 0.0 0.0 308 0 3.92E+03 299.20 0.23 0.0 0.0 4.421 0.2 0.230 0.000 0.230 0.230 0.0 0.0 309 0 3.91E+03 299.20 0.23 0.0 0.0 4.402 0.2 0.230 0.000 0.230 0.230 0.0 0.0 310 0 3.89E+03 299.20 0.23 0.0 0.0 4.382 0.2 0.230 0.000 0.230 0.230 0.0 0.0 311 0 3.88E+03 299.19 0.23 0.0 0.0 4.363 0.2 0.229 0.000 0.229 0.229 0.0 0.0 312 0 3.87E+03 299.19 0.23 0.0 0.0 4.343 0.2 0.229 0.000 0.229 0.229 0.0 0.0 313 0 3.85E+03 299.19 0.23 0.0 0.0 4.324 0.2 0.229 0.000 0.229 0.229 0.0 0.0 314 0 3.84E+03 299.18 0.23 0.0 0.0 4.305 0.2 0.228 0.000 0.228 0.228 0.0 0.0 315 0 3.83E+03 299.18 0.23 0.0 0.0 4.286 0.2 0.228 0.000 0.228 0.228 0.0 0.0 316 0 3.81E+03 299.18 0.23 0.0 0.0 4.267 0.2 0.228 0.000 0.228 0.228 0.0 0.0 317 0 3.80E+03 299.17 0.23 0.0 0.0 4.247 0.2 0.227 0.000 0.227 0.227 0.0 0.0 318 0 3.78E+03 299.17 0.23 0.0 0.0 4.228 0.2 0.227 0.000 0.227 0.227 0.0 0.0 319 0 3.77E+03 299.16 0.23 0.0 0.0 4.209 0.2 0.227 0.000 0.227 0.227 0.0 0.0 320 0 3.76E+03 299.16 0.23 0.0 0.0 4.190 0.2 0.226 0.000 0.226 0.226 0.0 0.0 321 0 3.74E+03 299.16 0.23 0.0 0.0 4.172 0.2 0.226 0.000 0.226 0.226 0.0 0.0 322 0 3.73E+03 299.15 0.23 0.0 0.0 4.153 0.2 0.226 0.000 0.226 0.226 0.0 0.0 323 0 3.72E+03 299.15 0.23 0.0 0.0 4.134 0.2 0.225 0.000 0.225 0.225 0.0 0.0 324 0 3.70E+03 299.15 0.23 0.0 0.0 4.115 0.2 0.225 0.000 0.225 0.225 0.0 0.0 325 0 3.69E+03 299.14 0.22 0.0 0.0 4.096 0.2 0.225 0.000 0.225 0.225 0.0 0.0 326 0 3.68E+03 299.14 0.22 0.0 0.0 4.078 0.2 0.224 0.000 0.224 0.224 0.0 0.0 327 0 3.66E+03 299.14 0.22 0.0 0.0 4.059 0.2 0.224 0.000 0.224 0.224 0.0 0.0 328 0 3.65E+03 299.13 0.22 0.0 0.0 4.040 0.2 0.224 0.000 0.224 0.224 0.0 0.0 329 0 3.64E+03 299.13 0.22 0.0 0.0 4.022 0.2 0.223 0.000 0.223 0.223 0.0 0.0 330 0 3.62E+03 299.13 0.22 0.0 0.0 4.003 0.2 0.223 0.000 0.223 0.223 0.0 0.0 331 0 3.61E+03 299.12 0.22 0.0 0.0 3.985 0.2 0.223 0.000 0.223 0.223 0.0 0.0 332 0 3.60E+03 299.12 0.22 0.0 0.0 3.966 0.2 0.222 0.000 0.222 0.222 0.0 0.0 333 0 3.58E+03 299.12 0.22 0.0 0.0 3.948 0.2 0.222 0.000 0.222 0.222 0.0 0.0 334 0 3.57E+03 299.11 0.22 0.0 0.0 3.930 0.2 0.222 0.000 0.222 0.222 0.0 0.0 335 0 3.56E+03 299.11 0.22 0.0 0.0 3.911 0.2 0.221 0.000 0.221 0.221 0.0 0.0 336 0 3.54E+03 299.11 0.22 0.0 0.0 3.893 0.2 0.221 0.000 0.221 0.221 0.0 0.0 337 0 3.53E+03 299.10 0.22 0.0 0.0 3.875 0.2 0.221 0.000 0.221 0.221 0.0 0.0 10yr 24hr Storm - Basin B E-22 Access Road Page 28 of 41 Orifice Orifice Riser Riser Riser (1st ft of (2nd ft of (orifice) + Riser (Weir) Emergency Time Inflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice +°rifice Weir Top of Dam (min) (cfs) (ca ft) (ft) (cfs) (cfs) (efs) (cfs) (cts) (cfs) (cfs) cfs cfs (cfs) (cfs) 338 0 3.52E+03 299.10 0.22 0.0 0.0 3.857 0.2 0.220 0.000 0.220 0.220 0.0 0.0 339 0 3.50E+03 299.10 0.22 0.0 0.0 3.839 0.2 0.220 0.000 0.220 0.220 0.0 0.0 340 0 3.49E+03 299.09 0.22 0.0 0.0 3.821 0.2 0.220 0.000 0.220 0.220 0.0 0.0 341 0 3.48E+03 299.09 0.22 0.0 0.0 3.803 0.2 0.219 0.000 0.219 0.219 0.0 0.0 342 0 3.46E+03 299.09 0.22 0.0 0.0 3.785 0.2 0.219 b.000 0.219 0.219 0.0 0.0 343 0 3.45E+03 299.08 0.22 0.0 0.0 3.767 0.2 0.219 0.000 0.219 0.219 0.0 0.0 344 0 3.44E+03 299.08 0.22 0.0 0.0 3.749 0.2 0.218 0.000 0.218 0.218 0.0 0.0 345 0 3.42E+03 299.07 0.22 0.0 0.0 3.731 0.2 0.218 0.000 0.218 0.218 0.0 0.0 346 0 3.41E+03 299.07 0.22 0.0 0.0 3.713 0.2 0.217 0.000 0.217 0.217 0.0 0.0 347 0 3.40E+03 299.07 0.22 0.0 0.0 3.696 0.2 0.217 0.000 0.217 0.217 0.0 0.0 348 0 3.38E+03 299.06 0.22 0.0 0.0 3.678 0.2 0.217 0.000 0.217 0.217 0.0 0.0 349 0 3.37E+03 299.06 0.22 0.0 0.0 3.660 0.2 0.216 0.000 0.216 0.216 0.0 0.0 350 0 3.36E+03 299.06 0.22 0.0 0.0 3.643 0.2 0.216 0.000 0.216 0.216 0.0 0.0 351 0 3.35E+03 299.05 0.22 0.0 0.0 3.625 0.2 0.216 0.000 0.216 0.216 0.0 0.0 352 0 3.33E+03 299.05 0.22 0.0 0.0 3.608 0.2 0.215 0.000 0.215 0.215 0.0 0.0 353 0 3.32E+03 299.05 0.22 0.0 0.0 3.590 0.2 0.215 0.000 0.215 0.215 0.0 0.0 354 0 3.31E+03 299.04 0.21 0.0 0.0 3.573 0.2 0.215 0.000 0.215 0.215 0.0 0.0 355 0 3.29E+03 299.04 0.21 0.0 0.0 3.555 0.2 0.214 0.000 0.214 0.214 0.0 0.0 356 0 3.28E+03 299.04 0.21 0.0 0.0 3.538 0.2 0.214 0.000 0.214 0.214 0.0 0.0 357 0 3.27E+03 299.03 0.21 0.0 0.0 3.521 0.2 0.214 0.000 0.214 0.214 0.0 0.0 358 0 3.26E+03 299.03 0.21 0.0 0.0 3.503 0.2 0.213 0.000 0.213 0.213 0.0 0.0 359 0 3.24E+03 299.03 0.21 0.0 0.0 3.486 0.2 0.213 0.000 0.213 0.213 0.0 0.0 360 0 3.23E+03 299.02 0.21 0.0 0.0 3.469 0.2 0.213 0.000 0.213 0.213 0.0 0.0 361 0 3.22E+03 299.02 0.21 0.0 0.0 3.452 0.2 0.212 0.000 0.212 0.212 0.0 0.0 362 0 3.20E+03 299.02 0.21 0.0 0.0 3.435 0.2 0.212 0.000 0.212 0.212 0.0 0.0 363 0 3.19E+03 299.01 0.21 0.0 0.0 3.418 0.2 0.272 0.000 0.212 0.212 0.0 0.0 364 0 3.18E+03 299.01 0.21 0.0 0.0 3.401 0.2 0.211 0.000 0.211 0.211 0.0 0.0 365 0 3.17E+03 299.01 0.21 0.0 0.0 3.384 0.2 0.211 0.000 0.211 0.211 0.0 0.0 366 0 3.15E+03 299.00 0.21 0.0 0.0 3.367 0.2 0.210 0.000 0.210 0.210 0.0 0.0 367 0 3.14E+03 299.00 0.21 0.0 0.0 3.350 0.2 0.210 0.000 0.210 0.210 0.0 0.0 368 0 3.13E+03 299.00 0.21 0.0 0.0 3.333 0.2 0.210 0.000 0.210 0.210 0.0 0.0 369 0 3.12E+03 298.99 0.21 0.0 0.0 3.317 0.2 0.209 0.000 0.209 0.209 0.0 0.0 370 0 3.10E+03 298.99 0.21 0.0 0.0 3.300 0.2 0.209 0.000 0.209 0.209 0.0 0.0 371 0 3.09E+03 298.99 0.21 0.0 0.0 3.283 0.2 0.209 0.000 0.209 0.209 0.0 0.0 372 0 3.08E+03 298.98 0.21 0.0 0.0 3.267 0.2 0.208 0.000 0.208 0.208 0.0 0.0 373 0 3.07E+03 298.98 0.21 0.0 0.0 3.250 0.2 0.208 0.000 0.208 0.208 0.0 0.0 374 0 3.05E+03 298.98 0.21 0.0 0.0 3.234 0.2 0.208 0.000 0.208 0.208 0.0 0.0 375 0 3.04E+03 298.97 0.21 0.0 0.0 3.217 0.2 0.207 0.000 0.207 0.207 0.0 0.0 376 0 .3.03E+03 298.97 0.21 0.0 0.0 3.201 0.2 0.207 0.000 0.207 0.207 0.0 0.0 377 0 3.02E+03 298.97 0.21 0.0 0.0 3.184 0.2 0.207 0.000 0.207 0.207 0.0 0.0 378 0 3.00E+03 298.96 0.21 0.0 0.0 3.168 0.2 0.206 0.000 0.206 0.206 0.0 0.0 379 0 2.99E+03 298.96 0.21 0.0 0.0 3.152 0.2 0.206 0.000 0.206 0.206 0.0 0.0 380 0 2.98E+03 298.96 0.21 0.0 0.0 3.135 0.2 0.206 0.000 0.206 0.206 0.0 0.0 381 0 2.97E+03 298.95 0.21 0.0 0.0 3.119 0.2 0.205 0.000 0.205 0.205 0.0 0.0 382 0 2.95E+03 298.95 0.20 0.0 0.0 3.103 0.2 0.205 0.000 0.205 0.205 0.0 0.0 10yr 24hr Storrn - Basin B E-22 Access Road Page 29 of 41 Orifice Orifice Riser Riser Riser (lat fl of (2nd fl of (orifice) + Riser (Weir) Emergency Time Inflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy height) height) odflce + orifice Weir Top of Dam (min) (cfs) (cu ft) (fi) (cts) (cfs) (efs) (cfs) (cts) (cfs) (cfs) cfa cta (cfs) (efs) 383 0 2.94E+03 298.95 0.20 0.0 0.0 3.087 0.2 0.204 0.000 0.204 0.204 0.0 0.0 384 0 2.93E+03 298.94 0.20 0.0 0.0 3.071 0.2 0.204 0.000 0.204 0.204 0.0 0.0 385 0 2.92E+03 298.94 0.20 0.0 0.0 3.055 0.2 0.204 0.000 0.204. 0.204 0.0 0.0 386 0 2.90E+03 298.94 0.20 0.0 0.0 3.039 0.2 0.203 0.000 0.203 0.203 0.0 0.0 387 0 2.89E+03 298.93 0.20 0.0 0.0 3.023 0.2 0.203 0.000 0.203 0.203 0.0 0.0 388 0 2.88E+03 298.93 0.20 0.0 0.0 3.007 0.2 0.203 0.000 0.203 0.203 0.0 0.0 389 0 2.87E+03 298.93 0.20 0.0 0.0 2.991 0.2 0.202 0.000 0.202 0.202 0.0 0.0 390 0 2.86E+03 298.92 0.20 0.0 0.0 2.975 0.2 0.202 0.000 0.202 0.202 0.0 0.0 391 0 2.84E+03 298.92 0.20 0.0 0.0 2.960 0.2 0.202 0.000 0.202 0.202 0.0 0.0 392 0 2.83E+03 298.92 0.20 0.0 0.0 2.944 0.2 0.201 0.000 0.201 0.201 0.0 0.0 393 0 2.82E+03 298.91 0.20 0.0 0.0 2.928 0.2 0.201 0.000 0.201 0.201 0.0 0.0 394 0 2.81E+03 298.91 0.20 0.0 0.0 2.913 0.2 0.201 0.000 0.201 0.201 0.0 0.0 395 0 2.80E+03 298.91 0.20 0.0 0.0 2.897 0.2 0.200 0.000 0.200 0.200 0.0 0.0 396 0 2.78E+03 298.90 0.20 0.0 0.0 2.881 0.2 0.200 0.000 0.200 0.200 0.0 0.0 397 0 2.77E+03 298.90 0.20 0.0 0.0 2.866 0.2 0.199 0.000 0.199 0.199 0.0 0.0 398 0 2.76E+03 298.90 0.20 0.0 0.0 .2.851 0.2 0.199 0.000 0.199 0.199 0.0 0.0 399 0 2.75E+03 298.90 0.20 0.0 0.0 2.835 0.2 0.199 0.000 0.199 0.199 0.0 0.0 400 0 2.74E+03 298.89 0.20 0.0 0.0 2.820 0.2 0.798. 0.000 0.198 0.198 0.0 0.0 401 0 2.72E+03 298.89 0.20 0.0 0.0 2.804 0.2 0.198 0.000 0.198 0.198 0.0 0.0 402 0 2.71E+03 298.89 0.20 0.0 0.0 2.789 0.2 0.198 0.000 0.198 0.198 0.0 0.0 403 0 2.70E+03 298.88 0.20 0.0 0.0 2.774 0.2 0.197 0.000 0.197 0.197 0.0 0.0 404 0 2.69E+03 298.88 0.20 0.0 0.0 2.759 0.2 0.197 0.000 0.197 0.197 0.0 0.0 405 0 2.68E+03 298.88 0.20 0.0 0.0 2.744 0.2 0.197 0.000 0.197 0.197 0.0 0.0 406 0 2.66E+03 298.87 0.20 0.0 0.0 2.729 0.2 0.196 0.000 0.196 0.196 0.0 0.0 407 0 2.65E+03 298.87 0.20 0.0 0.0 2.713 0.2 0.196 0.000 0.196 0.196 0.0 0.0 408 0 2.64E+03 298.87 0.20 0.0 0.0 2.698 0.2 0.196 0.000 0.196 0.196 0.0 0.0 409 0 2.63E+03 298.86 0.20 0.0 0.0 .2.684 0.2 0.195 0.000 0.195 0.195 0.0 0.0 410 0 2.62E+03 298.86 0.19 0.0 0.0 2.669 0.2 0.195 0.000 0.195 0.195 0.0 0.0 411 0 2.61E+03 298.86 0.19 0.0 0.0 2.654 0.2 0.194 0.000. 0.194 0.194 0.0 0.0 412 0 2.59E+03 298.85 0.19 0.0 0.0 2.639 0.2 0.194 0.000 0.194 0.194 0.0 0.0 413 0 2.58E+03 298.85 0.19 0.0 0.0 2.624 0.2 0.194 0.000 0.194 0.194 0.0 0.0 414 0 2.57E+03 298.85 0.19 0.0 0.0 2.609 0.2 0.193 0.000 0.193 0.193 0.0 0.0 415 0 2.56E+03 298.84 0.19 0.0 0.0 2.595 0.2 .0.193 0.000. 0.193 0.193 0.0 0.0 416 0 2.55E+03 298.84 0.19 0.0 0.0 2.580 0.2 0.193 0.000 0.193 0.193 0.0 0.0 417 0 2.54E+03 298.84 0.19 0.0 0.0 2.565 0.2 0.192 0.000 0.192 0.192 0.0 0.0 418 0 2.53E+03 298.83 0.19 0.0 0.0 2.551 0.2 0.192 0.000 0.192 -0.192 0.0 0.0 419 0 2.51E+03 298.83 0.19 0.0 0.0 2.536 0.2 0.192 0.000 0.192 0.192 0.0 0.0 420 0 2.50E+03 298.83 0.19 0.0 0.0 2.522 0.2 0,191 0.000 0.191 0.191 0.0 0.0 421 0 2.49E+03 298.82 0.19 0.0 0.0 2.507 0.2 0.191 0.000 0.191 0.191 0.0 0.0 422 0 2.48E+03 298.82 0.19 0.0 0.0 2.493 0.2 0.190 0.000 0.190 0.190 0.0 0.0 423 0 2.47E+03 298.82 0.19 0.0 0.0 2.479 0.2 0.190 0.000 0.190 0.190 0.0 0.0 424 0 2.46E+03 298.82 0.19 0.0 0.0 2.464 0.2 0.190 0.000 0.190 0.190 0.0 0.0 425 0 2.44E+03 298.81 0.19 0.0 0.0 2.450 0.2 0.189 0.000 0.189 0.189 0.0 0.0 426 0 2.43E+03 298.81 0.19 0.0 0.0 2.436 0.2 0.189 0.000 0.189 0.189 0.0 0.0 427 0 2.42E+03 298.81 0.19 0.0 0.0 2.422 0.2 0.189 0.000 0.189 0.189 0.0 0.0 428 0 2.41E+03 298.80 0.19 0.0 0.0 2.408 0.2 0.188 0.000 0.188 0.188 0.0 0.0 429 0 2.40E+03 298.80 0.19 0.0 0.0 2.394 0.2 0.188 0.000 0.188 0.188 0.0 0.0 430 0 2.39E+03 298.80 0.19 0.0 0.0 2.380 0.2 0.187 0.000 .0.187 0.187 0.0 0.0 431 0 2.38E+03 298.79 0.19 0.0 0.0 2.366 0.2 0.187 0.000 0.187 0.187 0.0 0.0 432 0 2.37E+03 298.79 0.19 0.0 0.0 2.352 0.2 0.187 0.000 0.187 0.187 0.0 0.0 433 0 2.35E+03 298.79 0.19 0.0 0.0' 2.338 0.2 0.186 0.000 0.186 0.186 0.0 0.0 434 0 2.34E+03 298.78 0.19 0.0 0.0 2.324 0.2 0.186 0.000 0.186 0:186 0.0 0.0 435 0 2.33E+03 298.78 0.19 0.0 0.0 2.310 0.2 0.186 0.000 0.186 0.186 0.0 0.0 436 0 2.32E+03 298.78 0.19 0.0 0.0 2.296 0.2 0.185 0.000 0.185 0.185 0.0 0.0 10yr 24hr Storrs - Basin B E-22 Access Road Page 30 of 41 10yr 24 hr Routing -Basin B 6 5 4 w 3 3 0 2 0 Time (min) -~-Inflow Hydrograph -#-Outflow Hydrograph 0 100 200 300 400 500 600 700 E-22 School Access Road Basio B 100 yr-Storm Resolts Noun surf area= N/A ac Max surf area= 0.10 ac Required SA = N/A ac Peak stage= 300.19 ft Peak outflow= 6.6 cfs Rises 2.1 9 R Pre-TJevelopment Freeboard Flow N/A cfs (max stage) 0.8 ft la ats Stage Storage Hydregtaph Iuputa ICs= 3139 ~_, 7 cfs b= 1.20 Tp=' 3 i min Zo= 298 dT~ 1 min laidal Water Level Z1= 298 ft Outflow Devices Riser/Bsrrel Spillway N= 1 Number of Risers Orifice #1 Driser- 24 in Riser Diameter N= 2 Cw= 3.00 Riser Weir Cceff D= 2 in Cd= 0.6 Riser Orftce Ccefr Cd= 0.6 Zcr- 300 ft Riser Crest Elev Inr- 298 R Db= IS in Barrel Diameter Cd= O.ti Barrel orifice coat( Orifice #2 Zinv= '98 ft Elev invert barrel N= 0 D= 3 in Emergency Weir: Cd= 0.6 L= 20 ft Inv= 0 ft Zcr= 300 ft Cw= 3 Top of Dam L= SOU ft Zcr= 301 ft Cw= 3 Orifice Orifice Riser Riser Riser (1st ft of (2ud fl of (orifice)+ Riser (Weir) Emergency Time Inflow Storage Stage Oat}low (Orifice) (Weir) Barrel RBspwy height) height) orifice +orifice Weir Top of Dam (min) (cis) (cu fi) (ft) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (Ms) 0 0 0.00E+00 298.00 0.00 0.0 0.0 0.000 0.0 0.000 0.000 0.000 0.000 0.0 0.0 1 0 0.00E+00 298.00 0.00 0.0 0.0 0.000 0.0 0.000 0.000 0.000 0.000 0.0 0.0 2 0 8.67E-01 298.00 0.00 0.0 0.0 0.000 0.0 0.007 0.000 0.007 0.007 0.0 0.0 3 0 4.32E+00 298.00 0.00 0.0 0.0 0.001 0.0 0.014 0.000 0.014 0.014 0.0 0.0 4 0 1.20E+01 298.01 0.00 0.0 0.0 0.003 0.0 0.021 0.000 0.021 0.021 0.0 0.0 5 0 2.56E+01 298.02 0.01 0.0 0.0 0.008 0.0 0.028 0.000 0.028 0.028 0.0 0.0 6 1 4.64E+01 298.03 0.02 0.0 0.0 0.017 0.0 0.036 0.000 0.036 0.036 0.0 0.0 7 1 7.58E+Ot .298.05 0.03 0.0 0.0 0.032 0.0 0.045 0.000 0.045 0.045 0.0 0.0 8 1 1.15E+02 298.06 0.05 0.0 0.0 0.054 0.1 0.053 0.000 0.053 0.053 0.0 0.0 9 1 1.65E+02 298.09 0.06 0.0 0.0 0.084 0.1 0.062 0.000 0.062 0.062 0.0 0.0 10 1 2.28E+02 298.11 0.07 0.0 0.0 0.126 0.1 0.070 0.000 0.070 0.070 0.0 0.0 11 2 3.04E+02 298.14 0.08 0.0 0.0 0.181 0.1 0.080 0.000 0.080 0.080 0.0 0.0 12 2 3.96E+02 298.18 0.09 0.0 0.0 0.252 0.1 0.089 0.000 .0.089 0.089 0.0 0.0 13 2 5.04E+02 298.22 0.10 0.0 0.0 0.341 0.1 0.098 0.000 0.098 0.098 0.0 0.0 100yr 24hr Storm -Basin 8 E-22 Access Road Page 32 of 41 Orifice Orifice Riser Riser Riser (1st ft of (2ud ft of (odflce) + Riser (Weir) Emergency Time Inflow Storage Sbge Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice + orifice Weir Top otDam (miu) (cts) (cu fl) (k) (cfs) (cfs) (cfa) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 14 2 6.28E+02 298.26 0.11 0.0 0.0 0.449 0.1 0.108 0.000 0.108 0.108 0.0 0.0 15 3 .7.70E+02 298.31 0.12 0.0 0.0 0.579 0.1 0.117 0.000 0.117 0.117 0.0 0.0 16 3 9.30E+02 298.36 0.13 0.0 0.0 0.732 0.1 0.127 0.000 0.127 0.127 0.0 0.0 17 3 1.11E+03 298.42 0.14 0.0 0.0 0.911 0.1 0.136 0.000 0.136 0.136 0.0 0.0 18 4 1.30E+03 298.48 0.15 0.0 0.0 1.117 0.1 0.146 0.000 0.146 0.146 0.0 0.0 19 4 1.52E+03 298.55 0.16 0.0 0.0 1.352 0.2 0.155 0.000 0.155 0.155 0.0 0.0 20 4 1.75E+03 298.62 0.16 0.0 0.0 1.616 0.2 0.165 0.000 0.165 0.165 0.0 0.0 21 5 2.00E+03 298.69 0.17 0.0 0.0 1.910 0.2 0.174 0.000 0.174 0.174 0.0 0.0 22 5 2.27E+03 298.76 0.18 0.0 0.0 2.236 0.2 0.184 0.000 0.184 0.184 0.0 0.0 23 5 2.56E+03 298.84 0.19 0.0 0.0 2.592 0.2 0.193 0.000 0.193 0.193 0.0 0.0 24 5 2.86E+03 298.93 0.20 0.0 0.0 2.981 0.2 0.202 0.000 0.202 0.202 0.0 0.0 25 6 3.18E+03 299.01 0.21 0.0 0.0 3.400 0.2 0.211 0.000 0.211 0.211 0.0 0.0 26 6 3.51E+03 299.10 0.22 0.0 0.0 3.850 0.2 0.220 0.000 0.220 0.220. 0.0 0.0 27 6 3.86E+03 299.19 0.23 0.0 0.0 4.329 0.2 0.229 0.000 0.229 0.229 0.0 0.0 28 6 4.21E+03 299.28 0.24 0.0 0.0 4.767 0.2 0.237 0.000 0.237 0.237 0.0 0.0 29 7 4.58E+03 299.37 0.25 0.0 0.0 5.093 0.2 0.246 0.000 0.246 0.246 0.0 0.0 30 7 4.96E+03 299.46 0.25 0.0 0.0 5.403 0.3 0.254 0.000 0.254 0.254 0.0 0.0 31 7 5.35E+03 299.56 0.26 0.0 0.0 5.699 0.3 0.262 0.000 0.262 0.262 0.0 0.0 32 7 5.74E+03 299.65 0.27 0.0 0.0 5.981 0.3 0.270 0.000 0.270 0.270 0.0 0.0 33 7 6.14E+03 299.75 0.28 0.0 0.0 6.250 0.3 0.278 0.000 0.278 0.278 0.0 0.0 34 7 6.54E+03 299.84 0.29 0.0 0.0 6.508 0.3 0.285 0.000 0.285 0.285 0.0 0.0 35 7 6.94E+03 299.94 0.29 0.0 0.0 6.753 0.3 0.292 0.000 0.292 0.292 0.0 0.0 36 7 7.34E+03 300.03 0.67 2.5 0.1 6.988 0.4 0.299 0.000 2.836 0.388 0.3 0.0 37 7 7.71E+03 300.11 3.36 5.1 0.7 7.200 1.0 0.305 0.000 5.421 1.035 2.3 0.0 38 7 7.93E+03 300.16 5.48 6.1 1.2 7.315 1.5 0.309 0.000 6.409 1.545 3.9 0.0 39 7 8.01E+03 300.18 6.36 6.4 1.4 7.358 1.8 0.310 0.000 6.739 1.757 4.6 0.0 40 7 8.02E+03 300.19 6.59 6.5 1.5 7.369 1.8 0.311 0.000 6.817 1.811 4.8 0.0 41 6 8.02E+03 300.18 6.56 6.5 1.5 7.367 1.8 0.311 0.000 6.808 1.804 4.8 0.0 42 6 8.01E+03 300.18 6.44 6.5 1.5 7.362 1.8 0.310 0.000 6.765 1.775 4.7 0.0 43 6 8.00E+03 300.18 6.27 6.4 1.4 7.354 1.7 0.310 0.000 .6.706 1.735 4.5 0.0 44 6 7.98E+03 300.17 6.08 6.3 1.4 7.344 1.7 0.310 0.000 6.635 1.688 4.4 0.0 45 6 7.96E+03 300.17 5.87 6.2 1.3 7.335 1.6 0.310 0.000 6.559 1.639 4.2 0.0 46 5 7.94E+03 300.17 5.66 6.2 1.3 7.324 1.6 0.309 0.000 6.480 1.589 4.1 0.0 47 5 7.92E+03 300.16 5.46 6.1 1.2 7.314 1.5 0.309 0.000 6.400 1.540 3.9 0.0 48 5 7.91E+03 300.16 5.26 6.0 1.2 7.304 1.5 0.309 0.000 6.321 1.492 3.8 0.0 49 5 7.89E+03 300.15 5.07 5.9 1.1 7.295 1.4 0.308 0.000 6.243 1.447 3.6 0.0 50 5 7.87E+03 300.15 4.89 5.9 1.1 7.285 1.4 0.308 0.000 6.165 1.402 3.5 0.0 51 4 7.85E+03 300.15 4.71 5.8 1.1 7.276 1.4 0.308 0.000 6.089 1.360 3.3 0.0 52 4 7.84E+03 300.14 4.54 5.7 1.0 7.267 1.3 0.308 0.000 6.013 1.319 3.2 0.0 53 4 7.82E+03 300.14 4.37 5.6 1.0 7.258 1.3 0.307 0.000 5.938 1.279 3.1 0.0 54 4 7.80E+03 300.13 4.22 5.6 0.9 7.249 1.2 0.307 0.000 5.864 1.241 3.0 0.0 55 4 7.79E+03 300.13 4.06 5.5 0.9 7.241 1.2 0.307 0.000 5.790 1.205 2.9 0.0 56 4 7.77E+03 300.13 3.92 5.4 0.9 7.233 1.2 0.306 0.000 5.718 1.169 2.7 0.0 57 4 7.76E+03 300.12 3.77 5.3 0.8 7.224 1.1 0.306 0.000 5.646 1.135 2.6 0.0 58 3 7.74E+03 300.12 3.64 5.3 0.8 7.217 1.1 0.306 0.000 5.575 1.103 2.5 0.0 59 3 7.73E+03 300.12 3.51 5.2 0.8 7.209 1.1 0.306 0.000 5.505 1.071 2.4 0.0 60 3 7.72E+03 300.11 3.38 5.1 0.7 7.201 1.0 0.306 0.000 5.435 1.041 2.3 0.0 61 3 7.70E+03 300.11 3.26 5.1 0.7 7.194 1.0 0.305 0.000 5.366 1.011 2.2 0.0 62 3 7.69E+03 300.11 3.14 5.0 0.7 7.187 1.0 0.305 0.000 5.298 0.983 2.2 0.0 63 3 7.68E+03 300.11 3.03 4.9 0.7 7.180 1.0 0.305 0.000 5.230 0.956 2.1 0.0 64 3 7.67E+03 300.10 2.92 4.9 0.6 7.173 0.9 0.305 0.000 5.164 0.929 2.0 0.0 65 3 7.65E+03 300.10 2.81 4.8 0.6 7.166 0.9 0.304 0.000 5.097 0.904 1.9 0.0 66 3 7.64E+03 300.10 2.71 4.7 0.6 7.159 0.9 0.304 0.000 5.032 . 0.880 1.8 0.0 67 2 7.63E+03 300.10 2.61 4.7 0.6 7.153 0.9 0.304 0.000 4.967 0.856. 1.8 0.0 100yr 24hr Storm - Basin B E-22 Access Road Page 33 of 41 Orifice Orifice Riser Riser Riser (Ist ft of (god ft of (orifice)+ Riaer (Weir) E mergency Time Inflow Storage Stage Oattlow (Orifice) (Weir) Barrel RBspwy height) height) orifice +ortfice Weir Top of Dam (mlo) (cfs) (ca ft) (ft) (cfs) (cfs) (cis) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 68 2 7.62E+03 300.09 2.52 4.6 0.5 7.147 0.8 0.304 0.000 4.903 0.834 1.7 0.0 69 2 7.61E+03 300.09 2.43 4.5 0.5 7.140 0.8 0.304 0.000 4.839 0.812 1.6 0.0 70 2 7.60E+03 300.09 2.34 4.5 0.5 7.134 0.8 0.304 0.000 .4.776 0.791 1.6 0.0 71 2 7.59E+03 300.09 2.26 4.4 0.5 7.128 0.8 0.303 0.000 4.714 0.771 1.5 0.0 72 2 7.58E+03 300.08 2.18 4.3 0.4 7.123 0.8 0.303 0.000 4.652 0.751 1.4 0.0 73 2 7.57E+03 300.08 2.10 4.3 0.4 7.117 0.7 0.303 0.000 4.591 0.732 1.4 0.0 74 2 7.56E+03 300.08 2.02 4.2 0.4 7.111 0.7 0.303 0.000 4.530 0.714 1.3 0.0 75 2 7.55E+03 300.08 1.95 4.2 0.4 7.106 0.7 0.303 0.000 4.469 0.697 1.3 0.0 76 2 7.54E+03 300.07 1.88 4.1 0.4 7.101 0.7 0.303 0.000 4.410 0.680 1.2 0.0 77 2 7.53E+03 300.07 1.81 4.0 0.4 7.096 0.7 0.302 0.000 4.350 0.664 1.1 0.0 78 2 7.52E+03 300.07 1.75 4.0 0.3 7.091 0.6 0.302 0.000 4.292 0.648 1.1 0.0 79 2 7.51E+03 300.07 1.69 3.9 0.3 7.086 0.6 0.302 0.000 4.233 0.633 1.1 0.0 80 1 7.50E+03 300.07 1.63 3.9 0.3 7.081 0.6 0.302 0.000 4.175 0.618 1.0 0.0 81 1 7.49E+03 300.06 1.57 3.8 0.3 7.076 0.6 0.302 0.000 4.118 0.604 1.0 0.0 82 1 7.48E+03 300.06 1.51 3.8 0.3 7.071 0.6 0.302 0.000 4.061 0.591 0.9 0.0 83 1 7.48E+03 300.06 1.46 3.7 0.3 7.067 0.6 0.302 0.000 4.004 0.578 0.9 0.0 84 1 7.47E+03 300.06 1.41 3.6 0.3 7.062 0.6 0.301 0.000 3.948 0.565 0.8 0.0 85 1 7.46E+03 300.06 1.36 3.6 0.3 7.058 0.6 0.301 0.000 3.892 0.553 0.8 0.0 86 1 7.45E+03 300.05 1.31 3.5 0.2 7.054 0.5 0.301 0.000 3.837 0.542 0.8 0.0 87 1 7.45E+03 300.05 1.26 3.5 0.2 7.050 0.5 0.301 0.000. 3.781 0.531 0.7 0.0 88 1 7.44E+03 300.05 1.22 3.4 0.2 7.046 0.5 0.301 0.000 3.726 0.520 0.7 0.0 89 1 7.43E+03 300.05 1.17 3.4 0.2 7.042 0.5 0.301 0.000 3.672 0.509 0.7 0.0 90 1 7.42E+03 300.05 1.13 3.3 0.2 7.038 0.5 0.301 0.000 3.617 0.499 0.6 0.0 91 1 7.42E+03 300.05 1.09 3.3 0.2 7.034 0.5 0.301 0.000 3.563 0.490 0.6 0.0 92 1 7.41E+03 300.05 1.05 3.2 0.2 7.030 0.5 0.300 0.000 3.510 0.480 0.6 0.0 93 1 7.40E+03 300.04 1.02 3.2 0.2 7.026 0.5 0.300 0.000 3.456 0.471 0.5 0.0 94 1 7.40E+03 300.04 0.98 3.1 0.2 7.023 0.5 0.300 0.000 3.403 0.463 0.5 0.0 95 1 7.39E+03 300.04 0.95 3.0 0.2 7.019 0.5 0.300 0.000 3.349 0.454. 0.5 0.0 96 1 7.39E+03 300.04 0.91 3.0 0.1 7.016 0.4 0.300 0.000 3.296 0.446 0.5 0.0 97 1 7.38E+03 300.04 0.88 2.9 0.1 7.012 0.4 0.300 0.000 3.243 0.439 0.4 0.0 98 1 7.37E+03 300.04 0.85 2.9 0.1 7.009 0.4 0.300 0.000 3.190 0.431 0.4 0.0 99 1 7.37E+03 300.04 0.82 2.8 0.1 7.006 0.4 0.300 0.000 3.137 0.424 0.4 0.0 100 1 7.36E+03 300.03 0.79 2.8 0.1 7.003 0.4 -0.300 0.000 3.084 0.417 0.4 0.0 101 1 7.36E+03 300.03 0.76 2.7 0.1 6.999 0.4 0.300 0.000 3.031 0.411 0.4 0.0 102 1 7.35E+03 300.03 0.74 2.7 0.1 6.996 0.4 0.299 0.000 2.978 0.404 0.3 0.0 103 1 7.35E+03 300.03 0.71 2.6 0.1 6.993 0.4 0.299 0.000 2.925 0.398 0.3 0.0 104 1 7.34E+03 300.03 0.69 2.6 0.1 6.990 0.4 0.299 0.000 2.872 0.392 0.3 _ 0.0 105 1 7.34E+03 300.03 0.66 2.5 0.1 6.987 0.4 0.299 0.000 2.819 0.386 0.3 0.0 108 1 7.33E+03 300.03 0.64 2.5 0.1 6.984 0.4 0.299 0.000 2.765 0.381 0.3 0.0 107 1 7.33E+03 300.03 0.62 2.4 0.1 6.981 0.4 0.299 0.000 2.712 0.375 0.2 0.0 108 1 7.32E+03 300.02 0.60 2.4 0.1 6.979 0.4 0.299 0.000 2.657 0.370 0.2 0.0 109 0 7.32E+03 300.02 0.58 2.3 0.1 6.976 0.4 0.299 0.000 2.603 0.365 0.2 0.0 110 0 7.31E+03 300.02 0.56 2.2 0.1 6.973 0.4 0.299 0.000 2.548 0.361 0.2 0.0 111 0 7.31E+03 300.02 0.54 2.2 0.1 6.970 0.4 0.299 0.000 2.492 0.356 0.2 0.0 112 0 7.30E+03 300.02 0.52 2.1 0.1 6.968 0.4 0.299 0.000 2.436 0.352 0.2 0.0 113 0 7.30E+03 300.02 0.50 2.1 0.0 6.965 0.3 0.299 0.000 2.379 0.348 0.2 0.0 114 0 7.29E+03 300.02 0.49 2.0 0.0 6.963 0.3 0.298 0.000 2.321 0.343 0.1 0.0 115 0 7.29E+03 300.02 0.47 2.0 0.0 6.960 0.3 0.298 0.000 2.262 0.340 0.1 0.0 116 0 7.28E+03 300.02 0.46 1.9 0.0 6.957 0.3 0.298 0.000 2.202 0.336 0.1 0.0 117 0 7.28E+03 300.01 0.44 1.8 0.0 6.955 0.3 0.298 0.000 2.140 0.332 0.1 0.0 118 0 7.28E+03 300.01 0.43 1.8 0.0 6.952 0.3 0.298 0.000 2.077 0.329 0.1 0.0 119 0 7.27E+03 300.01 0.4,1 1.7 0.0 6.950 0.3 0.298 0.000 2.012 0.326 0.1 0.0 120 0 7.27E+03 300.01 0.40 1.6 0.0 6.948 0.3 0.298 0.000 1.945 0.322 0.1 0.0 121 0 7.26E+03 300.01 0.39 1.6 0.0 6.945 0.3 0.298 0.000 1.876 0.319 0.1 0.0 100yr 24hr Storm -Basin 8 E-22 Access Road Page 34 of 41 Oriflce Oriflce Riser Riser Riser (Istftof (2odkof (orifice)+ Rrser(Weir) Emergency Time Inflow Storage Stage Outflow (OriTice) (Weir) Barrel RBspwy height) height) orifice + orifice Weir Top of Dam (mio) (cfs) (cu fi) (fi) (cfs) (cfa) (cta) (cis) (cfs) (cts) (cfs) cts cfs (cta) (cfa) 122 0 7.26E+03 300.01 0.38 1.5 0.0 6.943 0.3 0.298 0.000 1.804 0.316 0.1 0.0 123 0 7.25E+03 300.01 0.36 1.4 0.0 6.940 0.3 0.298 0.000 1.728 0.314 0.1 0.0 124 0 7.25E+03 300.01 0.35 1.3 0.0 6.938 0.3 0.298 0.000 1.647 0.311 0.0 0.0 125 0 7.25E+03 300.01 0.34 1.3 0.0 6.935 0.3 0.298 0.000 1.562 0.309 0.0 0.0 126 0 7.24E+03 300.01 0.33 1.2 0.0 6.933 0.3 0.298 0.000 1.469 0.306 0.0 0.0 127 0 7.24E+03 300.01 0.33 1.1 0.0 6.930 0.3 0.297 0.000 1.368 0.304 0.0 0.0 128 0 7.23E+03 300.00 0.32 1.0 0.0 6.928 0.3 0.297 0.000 1.255 0.302 0.0 0.0 129 0 7.23E+03 300.00 0.31 0.8 0.0 6.925 0.3 0.297 0.000 1.123 0.300 0.0 0.0 130 0 7.22E+03 300.00 0.30 0.7 0.0 6.923 0.3 0.297 0.000 0.962 0.299 0.0 0.0 131 0 7.22E+03 300.00 0.30 0.4 0.0 6.920 0.3 0.297 0.000 0.738 0.298 0.0 0.0 132 0 7.21E+03 300.00 0.30 0.0 0.0 6.917 0.3 0.297 0.000 0.297 0.297 0.0 0.0 133 0 7.21E+03 300.00 0.30 0.0 0.0 6.914 0.3 0.297 0.000 0.297 0.297 0.0 0.0 134 0 7.20E+03 300.00 0.30 0.0 0.0 6.911 0.3 0.297 0.000 0.297 0.297 0.0 0.0 135 0 7.20E+03 300.00 0.30 0.0 0.0 6.907 0.3 0.297 0.000 0.297 0.297 0.0 0.0 136 0 7.19E+03 299.99 0.30 0.0 0.0 6.903 0.3 0.297 0.000 0.297 0.297 0.0 0.0 137 0 7.18E+03 299.99 0.30 0.0 0.0 6.899 0.3 0.297 0.000 0.297 0.297 0.0 0.0 138 0 7.18E+03 299.99 0.30 0.0 0.0 6.895 0.3 0.296 0.000 0.296 0.296 0.0 0.0 139 0 7.17E+03 299.99 0.30 0.0 0.0 6.890 0.3 0.296 0.000 0.296 0.296 0.0 0.0 140 0 7.16E+03 299.99 0.30 0.0 0.0 6.886 0.3 0.296 0.000 0.296 0.296 0.0 0.0 141 0 7.15E+03 299.99 0.30 0.0 0.0 6.881 0.3 0.296 0.000 0.296 0.296 0.0 0.0 142 0 7.14E+03 299.98 0.30 0.0 0.0 6.876 0.3 0.296 0.000 0.296 0.296 0.0 0.0 143 0 7.13E+03 299.98 0.30 0.0 0.0 6.870 0.3 0.296 0.000 0.296 0.296 0.0 0.0 144 0 7.12E+03 299.98 0.30 0.0 0.0 6.865 0.3 0.296 0.000 0.296 0.296 0.0 0.0 145 0 7.12E+03 299.98 0.30 0.0 0.0 6.859 0.3 0.295 0.000 0.295 0.295 0.0 0.0 146 0 7.10E+03 299.97 0.30 0.0 0.0 6.853 0.3 0.295 0.000 0.295 0.295 0.0 0.0 147 0 7.09E+03 299.97 0.30 0.0 0.0 6.847 0.3 0.295 0.000 0.295 0.295 0.0 0.0 148 0 7.08E+03 299.97 0.29 0.0 0.0 6.841 0.3 0.295 0.000 0.295 0.295 0.0 0.0 149 0 7.07E+03 299.97 0.29 0.0 0.0 6.834 0.3 0.295 0.000 0.295 0.295 0.0 0.0 150 0 7.06E+03 299.96 0.29 0.0 0.0 6.828 0.3 0.294 0.000 0.294 0.294 0.0 0.0 151 0 7.05E+03 299.96 0.29 0.0 0.0 6.821 0.3 0.294 0.000 .0.294 0.294 0.0 0.0 152 0 7.04E+03 299.96 0.29 0.0 0.0 6.814 0.3 0.294 0.000 0.294 0.294 0.0 0.0 153 0 7.03E+03 299.96 0.29 0.0 0.0 6.807 0.3 0.294 0.000 0.294 0.294 0.0 0.0 154 0 7.02E+03 299.95 0.29 0.0 0.0 6.800 0.3 0.294 0.000 0.294 0.294 0.0 0.0 155 0 7.00E+03 299.95 0.29 0.0 0.0 6.793 0.3 0.293 0.000 0.293 0.293 0.0 0.0 156 0 6.99E+03 299.95 0.29 0.0 0.0 6.786 0.3 0.293 0.000 0.293 0.293 0.0 0.0 157 0 6.98E+03 299.95 0.29 0.0 0.0 6.778 0.3 0.293 0.000 0.293 0.293 0.0 0.0 158 0 6.97E+03 299.94 0.29 0.0 0.0 6.771 0.3 0.293 0.000 0.293 0.293 0.0 0.0 159 0 6.95E+03 299.94 0.29 0.0 0.0 6.763 0.3 0.293 0.000 0.293 0.293 0.0 0.0 160 0 6.94E+03 299.94 0.29 0.0 0.0 6.755 0.3 0.292 0.000 0.292 0.292 0.0 0.0 161 0 6.93E+03 299.93 0.29 0.0 0.0 6.747 0.3 0.292 0.000 0.292 0.292 0.0 0.0 162 0 6.91E+03 299.93 0.29 0.0 0.0 6.739 0.3 0.292 0.000 0.292 0.292 0.0 0.0 163 0 6.90E+03 299.93 0.29 0.0 0.0 6.731 0.3 0.292 0.000 0.292 0.292 0.0 0.0 164 0 6.89E+03 299.92 0.29 0.0 0.0 6.723 0.3 0.291 0.000 0.291 0.291 0.0 0.0 165 0 6.87E+03 299.92 0.29 0.0 0.0 6.715 0.3 0.291 0.000 0.291 0.291 0.0 0.0 166 0 6.86E+03 299.92 0.29 0.0 0.0 6.707 b.3 0.291 0.000 0.291 0.291 0.0 0.0 167 0 6.85E+03 299.91 0.29 0.0 0.0 6.698 0.3 0.291 0.000 0.291 0.291 0.0 0.0 168 0 6.83E+03 299.91 0.29 0.0 0.0 6.690 0.3 0.290 0.000 0.290 0.290 0.0 0.0 169 0 6.82E+03 299.91 0.29 0.0 0.0 6.681 0.3 0.290 0.000 0.290 0.290 0.0 0.0 170 0 6.80E+03 299.90 0.29 0.0 0.0 6.672 0.3 0.290 0.000 0.290 0.290 0.0 0.0 171 0 6.79E+03 299.90 0.29 0.0 0.0 6.664 0.3 0.290 0.000 0.290 0.290 0.0 0.0 172 0 6.77E+03 299.90 0.29. 0.0 0.0 6.655 0.3 0.289 0.000 0.289 0.289 0.0 0.0 173 0 6.76E+03 299.89 0.29 0.0 0.0 6.646 0.3 0.289 0.000 0.289 0.289 0.0 0.0 174 0 6.74E+03 299.89 0.29 0.0 0.0 6.637 0.3 0.289 0.000 0.289 0.289 0.0 0.0 175 0 6.73E+03 299.89 0.29 0.0 0.0 6.628 0.3 0.289 0.000 0.289 0.289 0.0 0.0 100yr 24hr Storrs - Basin B E-22 Access Road Page 35 of 41 Orifice Orifiee Riser Riser Riser (1st ft of (2nd k of (orifice) + Riser (Weir) E mergency Time Ieflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice +orifice Weir Top of Dam (min) (cfs) (cu k) (k) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 176 0 6.71E+03 299.88 0.29 0.0 0.0 6.619 0.3 0.288 0.000 0.288 0.288 0.0 0.0 177 0 6.70E+03 299.88 0.29 0.0 0.0 6.610 0.3 0.288 0.000 0.288 0.288 0.0 0.0 178 0 6.69E+03 299.88 0.29 0.0 0.0 6.600 0.3 0.288 0.000 .0.288 0.288 0.0 0.0 179 0 6.67E+03 299.87 0.29 0.0 0.0 6.591 0.3 0.288 0.000 0.288 0.288 0.0 0.0 180 0 6.65E+03 299.87 0.29 0.0 0.0 6.582 0.3 0.287 0.000 0.287 0.287 0.0 0.0 181 0 6.64E+03 299.87 0.29 0.0 0.0 6.572 0.3 0.287 0.000 0.287 0.287 0.0 0.0 .182 0 6.62E+03 299.86 0.29 0.0 0.0 6.563 0.3 0.287 0.000 0.287 0.287 0.0 0.0 183 0 6.61E+03 299.86 0.29 0.0 0.0 6.553 0.3 0.286 0.000 0.286 0.286 0.0 0.0 184 0 6.59E+03 299.86 0.29 0.0 0.0 6.544 0.3 0.286 0.000 0.286 0.286 0.0 0.0 185 0 6.58E+03 299.85 0.29 0.0 0.0 6.534 0.3 0.286 0.000 0.286 0.286 0.0 0.0 186 0 6.56E+03 299.85 0.29 0.0 0.0 6.525 0.3 0.286 0.000 0.286 0.286 0.0 0.0 187 0 6.55E+03 299.84 0.29 0.0 0.0 6.515 0.3 0.285 0.000 0.285 0.285. 0.0 0.0 188 0 6.53E+03 299.84 0.29 0.0 0.0 6.505 0.3 0.285 0.000 0.285 0.285 0.0 0.0 189 0 6.52E+03 299.84 0.28 0.0 0.0 6.495 0.3 0.285 0.000 0.285 0.285 0.0 0.0 190 0 6.50E+03 299.83 0.28 0.0 0.0 6.486 0.3 0.284 0.000 0.284 0.284 0.0 0.0 191 0 6.49E+03 299.83 0.28 0.0 0.0 6.476 0.3 0.284 0.000 0.284 0.284 0.0 0.0 192 0 6.47E+03 299.83 0.28 0.0 0.0 6.466 0.3 0.284 0.000 0.284 0.284 0.0 0.0 193 0 6.45E+03 299.82 0.28 0.0 0.0 6.456 0.3 0.284. 0.000 0.284 0.284 0.0 0.0 194 0 6.44E+03 299.82 0.28 0.0 0.0 6.446 0.3 0.283 0.000 0.283 0.283 0.0 0.0 195 0 6.42E+03 299.82 0.28 0.0 0.0 6.436 0.3 0.283 0.000. 0.283 0.283 0.0 0.0 196 0 6.41E+03 299.81 0.28 0.0 0.0 6.426 0.3 0.283 0.000 0.283 0.283 0.0 0.0 197 0 6.39E+03 299.81 0.28 0.0 0.0 6.416 0.3 0.282. 0.000 0.282 0.282 0.0 0.0 .198 0 6.37E+03 299.80 0.28 0.0 0.0 6.405 0.3 0.282 0.000 0.282. 0.282 0.0 0.0 199 0 6.36E+03 299.80 0.28 0.0 0.0 6.395 0.3 0.282 0.000 0.282 0.282 0.0 0.0 200 0 6.34E+03 299.80 0.28 0.0 0.0 6.385 0.3 0.282 0.000 0.282 0.282 0.0 0.0 201 0 6.33E+03 299.79 0.28 0.0 0.0 6.375 0.3 0.281 0.000 0.281 0.281 0.0 0.0 202 0 6.31E+03 299.79 0.28 0.0 0.0 6.364 0.3 0.281 0.000 0.281 0.281 0.0 0.0 203 0 6.30E+03 299.79 0.28 0.0 0.0 6.354 0.3 0.281 0.000 0.281 0.281 0.0 0.0 -204 0 6.28E+03 299.78 0.28 0.0 0.0 6.344 0.3 0.280 0.000 0.280 0.280 0.0 0.0 205 0 6.26E+03 299.78 0.28 0.0 0.0 6.333 0.3 0.280 0.000 0.280. 0.280 0.0 0.0 206 0 6.25E+03 299.77 0.28 0.0 0.0 6.323 0.3 0.280 0.000 0.280 0.280 0.0 0.0 207 0 6.23E+03 299.77 0.28 0.0 0.0 6.313 0.3 0.280 0.000 0.280 0.280 0.0 0.0 208 0 6.22E+03 299.77 0.28 0.0 0.0 6.302 0.3 0.279 0.000 0.279 0.279 0.0 0.0 209 0 6.20E+03 299.76 0.28 0.0 0.0 6.292 0.3 0.279 0.000 0.279 0.279 0.0 0.0 210 0 6.18E+03 299.76 0.28 0.0 0.0 6.281 0.3 0.279 0.000 0.279 0.279 0.0 0.0 211 0 6.17E+03 299.75 0.28 0.0 0.0 6.271 0.3 0.278 0.000 0.278 0.278 0.0 0.0 212 0 6.15E+03 299.75 0.28 0.0 0.0 6.260 0.3 0.278 0.000 0.278 0.278 0.0 0.0 213 0 6.13E+03 299.75 0.28 0.0 0.0 6.249 0.3 0.278 0.000 0.278 0.278 0.0 0.0 214 0 6.12E+03 299.74 0.28 0.0 0.0 6.239 0.3 0.277 0.000 0.277 0.277 0.0 0.0 215 0 6.10E+03 299.74 0.28 0.0 0.0 6.228 0.3 0.277 0.000 0.277 0.277 0.0 0.0 216 0 6.09E+03 299.74 0.28 0.0 0.0 6.217 0.3 0.277 0.000 0.277 0.277 0.0 0.0 217 0 6.07E+03 299.73 0.28 0.0 0.0 6.207 0.3 0.276 0.000 0.276 0.276 0.0 0.0 218 0 6.05E+03 299.73 0.28 0.0 0.0 6.196 0.3 0.276 0.000 0.276 0.276 0.0 0.0 219 0 6.04E+03 299.72 0.28 0.0 0.0 6.185 0.3 0.276 0.000 0.276 0.276 0.0 0.0 220 0 6.02E+03 299.72 0.28 0.0 0.0 6.175 0.3 0.276 0.000 0.276 0.276 0.0 0.0 221 0 6.01E+03 299.72 0.28 0.0 0.0 6.164 0.3 0.275 0.000 0.275 0.275 0.0 0.0 222 0 5.99E+03 299.71 0.27 0.0 0.0 6.153 0.3 0.275 0.000 0.275 0.275 0.0 0.0 '223 0 5.97E+03 299.71 0.27 0.0 0.0 6.142 0.3 0.275 0.000 0.275 0.275 0.0 0.0 224 0 5.96E+03 299.71 0.27 0.0 0.0 6.131 0.3 0.274 0.000 0.274 0.274 0.0 0.0 225 0 5.94E+03 299.70 0.27 0.0 0.0 6.120 0.3 0.274 0'.000 0.274 0.274 0.0 0.0 226 0 5.93E+03 299.70 0.27 0.0 0.0 6.109 0.3 0.274 0.000 0.274 0.274 0.0 0.0 227 0 5.91E+03 299.69 0.27 0.0 0.0 6.099 0.3 0.273 0.000 0.273 0.273 0.0 0.0 228 0 5.89E+03 299.69 0.27 0.0 0.0 6.088 0.3 0.273 0.000 0.273 0.273 0.0 0.0 229 0 5.88E+03 299.69 0.27 0.0 0.0 6.077 0.3 0.273 0.000 0.273 0.273 0.0 0.0 t00yr 24hr Storm - Basin B E-22 Access Road Page 36 of 41 Orifice Orifice Miser Riser Riser (1st ft of (2nd ft of (oriflce)+ R~aer (Weir) Emergency Time Inflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice + orifice Weir Top of Dam (min) (CTS) (Cn ft) (ft) (CfE) (Cfa) (CfS) (Cfa) (CfS) (Cf3) (CfS) CfE CfS (Cf&) (CfS) 230 0 5.86E+03 299.68 0.27 0.0 0.0 6.066 0.3 0.272 0.000 0.272 0.272 0.0 0.0 231 0 .5.85E+03 299.68 0.27 0.0 0.0 6.055 0.3 0.272 0.000 0.272 0.272 0.0 0.0 232 0 5.83E+03 299.67 0.27 0.0 0.0 6.044 0.3 0.272 0.000 0.272 0.272 0.0 0.0 233 0 5.81E+03 299.67 0.27 0.0 0.0 6.033 0.3 0.272 0.000 0.272 0.272 0.0 0.0 234 0 5.80E+03 299.67 0.27 0.0 0.0 6.021 0.3 0.271 0.000 0.271 0.271 0.0 0.0 235 0 5.78E+03 299.66 0.27 0.0 0.0 6.010 0.3 0.271 0.000 0.271 0.271 15.0 0.0 236 0 5.77E+03 299.66 0.27 0.0 0.0 5.999 0.3 0.271 0.000 0.271 0.271 0.0 0.0 237 0 5.75E+03 299.66 0.27 0.0 0.0 5.988 0.3 0.270 0.000 0.270 0.270 0.0 0.0 238 0 5.73E+03 299.65 0.27 0.0 0.0 5.977 0.3 0.270 0.000 0.270 0.270 0.0 0.0 239 0 5.72E+03 299.65 0.27 0.0 0.0 5.966 0.3 0.270 0.000 0.270 0.270 0.0 0.0 240 0 5.70E+03 299.64 0.27 0.0 0.0 5.955 0.3 0.269 0.000 0.269 0.269 0.0 0.0 241 0 5.69E+03 299.64 0.27 0.0 0.0 5.943 0.3 0.269 0.000 0.269 0.269 0.0 0.0 242 0 5.67E+03 299.64 0.27 0.0 0.0 5.932 0.3 0.269 0.000 0.269 0.269 0.0 0.0 243 0 5.65E+03 299.63 0.27 0.0 0.0 5.921 0.3 0.268 0.000 0.268 0.268 0.0 0.0 244 0 5.64E+03 299.63 0.27 0.0 0.0 5.910 0.3 0.268 0.000 0.268 0.268 0.0 0.0 245 0 5.62E+03 299.62 0.27 0.0 0.0 5.898 0.3 0.268 0.000 0.268 0.268 0.0 0.0 246 0 5.61E+03 299.62 0.27 0.0 0.0 5.887 0.3 0.267 0.000 0.267 0.267 0.0 0.0 247 0 5.59E+03 299.62 0.27 0.0 0.0 5.876 0.3 0.267 0.000 0.267 0.267 0.0 0.0 248 0 5.57E+03 299.61 0.27 0.0 0.0 5.865 0.3 0.267 0.000 0.267 0.267 0.0 0.0 249 0 5.56E+03 299.61 0.27 0.0 0.0 5.853 0.3 0.267 0.000 0.267 0.267 0.0 0.0 250 0 5.54E+03 299.61 0.27 0.0 0.0 5.842 0.3 0.266 0.000 0.266 0.266 0.0 0.0 251 0 5.53E+03 299.60 0.27 0.0 0.0 5.830 0.3 0.266 0.000 .0.266 0.266 0.0 0.0 252 0 5.51E+03 299.60 0.27 0.0 0.0 5.819 0.3 0.266 0.000 0.266 0.266 0.0 0.0 253 0 5.50E+03 299.59 0.27 0.0 0.0 5.808 0.3 0.265 0.000 0.265 0.265 0.0 0.0 254 0 5.48E+03 299.59 0.26 0.0 0.0 5.796 0.3 0.265 0.000 0.265 0.265 0.0 0.0 255 0 5.46E+03 299.59 0.26 0.0 0.0 5.785 0.3 0.265 0.000 0.265 0.265 0.0 0.0 256 0 5.45E+03 299.58 0.26 0.0 0.0 5.773 0.3 0.264 0.000 0.264 0.264. 0.0 0.0 257 0 5.43E+03 299.58 0.26 0.0 0.0 5.762 0.3 0.264 0.000 0.264 0.264 0.0 0.0 258 0 5.42E+03 299.58 0.26 0.0 0.0 5.750 0.3 0.264 0.000 0.264 0.264 0.0 0.0 259 0 5.40E+03 299.57 0.26 0.0 0.0 5.739 0.3 0.263 0.000 .0.263 0.263 0.0 0.0 260 0 5.39E+03 299.57 0.26 0.0 0.0 5.727 0.3 0.263 0.000 0.263 0.263 0.0 0.0 261 0 5.37E+03 299.56 0.26 0.0 0.0 5.716 0.3 0.263 0.000 0.263 0.263 0.0 0.0 262 0 5.35E+03 299.56 0.26 0.0 0.0 5.704 0.3 0.262 0.000 0.262 0.262 0.0 0.0 263 0 5.34E+03 299.56 0.26 0.0 0.0 5.692 0.3 0.262 0.000 0.262 0.262 0.0 0.0 264 0 5.32E+03 299.55 0.26 0.0 0.0 5.681 0.3 0.262 0.000 0.262 0.262 0.0 0.0 265 0 5.31E+03 299.55 0.26 0.0 0.0 5.669 0.3 0.261 0.000 0.261 0.261 0.0 0.0 266 0 5.29E+03 299.54 0.26 0.0 0.0 5.658 0.3 0.261 0.000 0.261 0.261 0.0 0.0 267 0 5.28E+03 299.54 0.26 0.0 0.0 5.646 0.3 0.261 0.000 0.261 0.261 0.0 0.0 268 0 5.26E+03 299.54 0.26 0.0 0.0 5.634 0.3 0.260 0.000 0.260 0.260 0.0 0.0 269 0 5.24E+03 299.53 0.26 0.0 0.0 5.622 0.3 0.260 0.000 0.260 0.260 0.0 0.0 270 0 5.23E+03 299.53 0.26 0.0 0.0 5.611 0.3 0.260 0.000 0.260 0.260 0.0 0.0 271 0 5.21E+03 299.53 0.26 0.0 0.0 5.599 0.3 0.260 0.000 0.260 0.260 0.0 0.0 272 0 5.20E+03 299.52 0.26 0.0 0.0 5.587 0.3 0.259 0.000 0.259 0.259 0.0 0.0 273 0 5.18E+03 299.52 0.26 0.0 0.0 5.575 0.3 0.259 0.000 0.259 0.259 0.0 0.0 274 0 5.17E+03 299.51 0.26 0.0 0.0 5.564 0.3 0.259 0.000 0.259 0.259 0.0 0.0 275 0 5.15E+03 299.51 0.26 0.0 0.0 5.552 0.3 0.258 0.000 0.258 0.258 0.0 0.0 276 0 5.14E+03 299.51 0.26 0.0 0.0 5.540 0.3 0.258 0.000 0.258 0.258 0.0 0.0 277 0 5.12E+03 299.50 0.26 0.0 0.0 5.528 0.3 0.258 0.000 0.258 0.258 0.0 0.0 278 0 5.11E+03 299.50 0.26 0.0 0.0 5.516 0.3 0.257 0.000 0.257 0.257 0.0 0.0 279 0 5.09E+03 299.50 0.26 0.0 0.0 5.504 0.3 0.257 0.000 0.257 0.257 0.0 0.0 280 0 5.07E+03 299.49 0.26 0.0 0.0 5.493 0.3 0.257 0.000 0.257 0.257 0.0 0.0 281 0 5.06E+03 299.49 0.26 0.0 0.0 5.481 0.3 0.256 0.000 0.256 0.256 0.0 0.0 282 0 5.04E+03 299.48 0.26 0.0 0.0 5.469 0.3 0.256 0.000 0.256 0.256 0.0 0.0 283 0 5.03E+03 299.48 0.26 0.0 0.0 5.457 0.3 0.256 0.000 0.256 0.256 0.0 0.0 100yr 24hr Storm - Basin B E-22 Access Road Page 37 of 41 Orifice Orifice Riser Riser Riser (1st fl of (tad fl of (oriflce)+ Miser (Weir) Emergency Time laflow Storage Shge Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice +orifice Weir Top of Dam (min) (cts) (cu fl) (ft) (cfs) (efs) (cfs) (cfs) (cfs) (cfs) (cfs) cfs cfs (cfs) (cfs) 284 0 5.01E+03 299.48 0.26. 0.0 0.0 5.445 0.3 0.255 0.000 0.255 0.255 0.0 0.0 285 0 5.00E+03 299.47 0.25 0.0 0.0 5.433 0.3 0.255 0.000 0.255 0.255 0.0 0.0 286 0 4.98E+03 299.47 0.25 0.0 0.0 5.421 0.3 0.255 0.000 .0.255 0.255 0.0 0.0 287 0 4.97E+03 299.47 0.25 0.0 0.0 5.409 0.3 0.254 0.000 0.254 0.254 0.0 0.0 288 0 4.95E+03 299.46 0.25 0.0 0.0 5.397 0.3 0.254 0.000 0.254 0.254 0.0 0.0 289 0 4.94E+03 299.46 0.25 0.0 0.0 5.385 0.3 0.254 0.000 0.254 0.254 0.0 0.0 290 0 4.92E+03 299.45 0.25 0.0 0.0 5.372 0.3 0.253 0.000 0.253 0.253 0.0 0.0 291 0 4.91E+03 299.45 0.25 0.0 0.0 5.360 0.3 0.253 0.000 0.253 0.253 0.0 0.0 292 0 4.89E+03 299.45 0.25 0.0 0.0 5.348 0.3 0.253 0.000 0.253 0.253 0.0 0.0 293 0 4.88E+03 299.44 0.25 0.0 0.0 5.336 0.3 0.252 0.000 0.252 0.252 0.0 0.0 294 0 4.86E+03 299.44 0.25 0.0 0.0 5.324 0.3 0.252 0.000 0.252 0.252 0.0 0.0 295 0 4.85E+03 299.44 0.25 0.0 0.0 5.312 0.3 0.252 0.000 0.252 0.252. 0.0 0.0 296 0 4.83E+03 299.43 0.25 0.0 0.0 5.300 0.3 0.251 0.000 0.251 0.251 0.0 0.0 297 0 4.82E+03 299.43 0.25 0.0 0.0 5.287 0.3 0.251 0.000 0.251 0.251 0.0 0.0 298 0 4.80E+03 299.42 0.25 0.0 0.0 5.275 0.3 0.251 0.000 0.251 0.251 0.0 0.0 299 0 4.79E+03 299.42 0.25 0.0 0.0 5.263 0.3 0.250 0.000 0.250 0.250 0.0 0.0 300 0 4.77E+03 299.42 0.25 0.0 0.0 5.251 0.3 0.250 0.000 0.250 0.250 0.0 0.0 301 0 4.76E+03 299.41 0.25 0.0 0.0 5.238 0.2 0.250 0.000 0.250 .0.250 0.0 0.0 302 0 4.74E+03 299.41 0.25 0.0 0.0 5.226 0.2 0.249 0.000 0.249 0.249 0.0 0.0 303 0 4.73E+03 299.41 0.25 0.0 0.0 5.214 0.2 0.249 0.000. 0.249 0.249 0.0 0.0 304 0 4.71E+03 299.40 0.25 0.0 0.0 5.201 0.2 0.249 0.000 0.249 0.249 0.0 0.0 305 0 4.70E+03 299.40 0.25 0.0 0.0 5.189 0.2 0.248 0.000 0.248 0.248 0.0 0.0 306 0 4.68E+03 299.39 0.25 0.0 0.0 5.176 0.2 0.248 0.000 0.248 0.248 0.0 0.0 307 0 4.67E+03 299.39 0.25 0.0 0.0 5.164 0.2 0.248 0.000 0.248 0.248 0.0 0.0 308 0 4.65E+03 299.39 0.25 0.0 0.0 5.152 0.2 0.247 0.000 0.247 0.247 0.0 0.0 309 0 4.64E+03 299.38 0.25 0.0 0.0 5.139 0.2 0.247 0.000 0.247 0.247 0.0 0.0 310 0 4.62E+03 299.38 0.25 0.0 0.0 5.127 0.2 0.247 0.000 0.247 0.247 0.0 0.0 311 0 4.61E+03 299.38 0.25 0.0 0.0 5.114 0.2 0.246 0.000 0.246 0.246 0.0 0.0 312 0 4.59E+03 299.37 0.25 0.0 0.0 5.102 0.2 0.246 0.000 0.246 0.246 0.0 0.0 313 0 .4.58E+03 299.37 0.25 0.0 0.0 5.089 0.2 0.246 0.000 0.246 0.246 0.0 0.0 314 0 4.56E+03 299.37 0.25 0.0 0.0 5.076 0.2 0.245 0.000 0.245 0.245 0.0 0.0 315 0 4.55E+03 299.36 0.25 0.0 0.0 5.064 0.2 0.245 0.000 0.245 0.245 0.0 0.0 316 0 4.53E+03 299.36 0.24 0.0 0.0 5.051 0.2 0.245 0.000 0.245 0.245 0.0 0.0 317 0 4.52E+03 299.35 0.24 0.0 0.0 5.039 0.2 0.245 0.000 0.245 0.245 0.0 0.0 318 0 4.50E+03 299.35 0.24 0.0 0.0 5.026 0.2 0.244 0.000 0.244 0.244 - 0.0 0.0 319 0 4.49E+03 299.35 0.24 0.0 0.0 5.013 0.2 0.244 0.000 0.244 0.244 0.0 0.0 320 0 4.47E+03 299.34 0.24 0.0 0.0 5.001 0.2 0.244 0.000 0.244 0.244 0.0 0.0 321 0 4.46E+03 299.34 0.24 0.0 0.0 4.988 0.2 0.243 0.000 0.243 0.243 0.0 0.0 322 0 4.45E+03 299.34 0.24 0.0 0.0 4.975 0.2 0.243 0.000 0.243 0.243 0.0 0.0 323 0 4.43E+03 299.33 0.24 0.0 0.0 4.962 0.2 0.243 0.000 0.243 0.243 0.0 0.0 324 0 4.42E+03 299.33 0.24 0.0 0.0 4.950 0.2 0.242 0.000 0.242 0.242 0.0 0.0 325 0 4.40E+03 299.33 0.24 0.0 0.0 4.937 0.2 0.242 0.000 0.242 0.242 0.0 0.0 326 0 4.39E+03 299.32 0.24 0.0 0.0 4.924 0.2 0.242 0.000 0.242 0.242 0.0 0.0 327 0 4.37E+03 299.32 0.24 0.0 0.0 4.911 0.2 0.241 0.000 0.241 0.241 0.0 0.0 328 0 4.36E+03 299.31 0.24 0.0 0.0 4.898 0.2 0.241 0.000 0.241 0.241 0.0 0.0 329 0 4.34E+03 299.31 0.24 0.0 0.0 4.885 0.2 0.241 0.000 0.241 0.241 0.0 0.0 330 0 4.33E+03 299.31 0.24 0.0 0.0 4.872 0.2 0.240 0.000 0.240 0.240 0.0 0.0 331 0 4.32E+03 299.30 0.24 0.0 0.0 4.859 0.2 0.240 0.000 0.240 0.240 0.0 0.0 332 0 4.30E+03 299.30 0.24 0.0 0.0 4.846 0.2 0.240 0.000 0.240 0.240 0.0 0.0 333 0 4.29E+03 299.30 0.24 0.0 0.0 4.833 0.2 0.239 0.000 0.239 0.239 0.0 0.0 334 0 4.27E+03 299.29 0.24 0.0 0.0 4.820 0.2 0.239 0.000 0.239 0.239 0.0 0.0 335 0 4.26E+03 299.29 0.24 0.0 0.0 4.807 0.2 0.239 0.000 0.239 0.239 0.0 0.0 336 0 4.24E+03 299.29 0.24 0.0 0.0 4.794 0.2 0.238 0.000 0.238 0.238 0.0 0.0 337 0 4.23E+03 299.28 0.24 0.0 0.0 4.781 0.2 0.238 0.000 0.238 0.238 0.0 0.0 100yr 24hr Stonn - Basin B E-22 Access Road Page 38 of 41 Orifice Orifice Riser Riser Riser (1st ft of (2nd ft of (orifice) + Riser (Weir) Emergency Time Inflow Storage Stage OnMow (Orifice) (Weir) Barrel RBspwy height) height) orifice + orffice Weir Top of Dam (min) (cta) (cn ft) (ft) (cfs) (cfs) (cfs) (cfs) (cis) (cfs) (cfs) efs cts '(cfs) (cfa) 338 0 4.22E+03 299.28 0.24 0.0 0.0 4.768 0.2 0.238 0.000 0.238 0.238 0.0 0.0 339 0 4.20E+03 299.27 0.24 0.0 0.0 4.755 0.2 0.237 0.000 0.237 0.237 0.0 0.0 340 0 4.19E+03 299.27 0.24 0.0 0.0 4.742 0.2 0.237 0.000 0.237 0.237 0.0 0.0 341 0 4.17E+03 299.27 0.24 0.0 0.0 4.728 0.2 0.237 0.000 0.237 0.237 0.0 0.0 342 0 4.16E+03 299.26 0.24 0.0 0.0 4.715 0.2 0.236 0.000 0.236 0.236 0.0 0.0 343 0 4.14E+03 299.26 0.24 0.0 0.0 4.702 0.2 0.236 0.000 0.236 0.236 0.0 0.0 344 0 4.13E+03 299.26 0.24 0.0 0.0 4.689 0.2 0.236 0.000 0.236 0.236 0.0 0.0 345 0 4.12E+03 299.25 0.24 0.0 0.0 4.675 0.2 0.235 0.000 0.235 0.235 0.0 0.0 346 0 4.10E+03 299.25 0.23 0.0 0.0 4.676 0.2 0.235 0.000 0.235 0.235 0.0 0.0 347 0 4.09E+03 299.25 0.23 0.0 0.0 4.656 0.2 0.235 0.000 0.235 0.235 0.0 0.0 348 0 4.07E+03 299.24 0.23 0.0 0.0 4.636 0.2 0.234 0.000 0.234 0.234 0.0 0.0 349 0 4.06E+03 299.24 0.23 0.0 0.0 4.616 0.2 0.234 0.000 0.234 0.234 0.0 0.0 350 0 4.05E+03 299.24 0.23 0.0 0.0 4.596 0.2 0.233 0.000 0.233 0.233 0.0 0.0 351 0 4.03E+03 299.23 0.23 0.0 0.0 4.576 0.2 0.233 0.000 0.233 0.233 0.0 0.0 352 0 4.02E+03 299.23 0.23 0.0 0.0 4.556 0.2 0.233 0.000 0.233 0.233 0.0 0.0 353 0 4.00E+03 299.22 0.23 0.0 0.0 4.537 0.2 0.232 0.000 0.232 0.232 0.0 0.0 354 0 3.99E+03 299.22 0.23 0.0 0.0 4.517 0.2 0.232 0.000 0.232 0.232 0.0 0.0 355 0 3.98E+03 299.22 0.23 0.0 0.0 4.497 0.2 0.232 0.000 0.232 0.232 0.0 0.0 356 0 3.96E+03 299.21 0.23 0.0 0.0 4.478 0.2 0.231 0.000 0.231 0.231 0.0 0.0 357 0 3.95E+03 299.21 0.23 0.0 0.0 4.458 0.2 0.231 0.000 0.231 0.231 0.0 0.0 358 0 3.93E+03 299.21 0.23 0.0 0.0 4.438 0.2 0.231 0.000 0.231 0.231 0.0 0.0 359 0 3.92E+03 299.20 .0.23 0.0 0.0 4.419 0.2 0.230 0.000 0.230 0.230 0.0 0.0 360 0 3.91E+03 299.20 0.23 0.0 0.0 4.400 0.2 0.230 0.000 0.230 0.230 0.0 0.0 361 0 3.89E+03 299.20 0.23 0.0 0.0 4.380 0.2 0.230 0.000 0.230 0.230 0.0 0.0 362 0 3.88E+03 299.19 0.23 0.0 0.0 4.361 0.2 0.229 0.000 0.229 0.229 0.0 0.0 363 0 3.86E+03 299.19 0.23 0.0 0.0 4.341 0.2 0.229 0.000 0.229 0.229 0.0 0.0 364 0 3.85E+03 299.19 0.23 0.0 0.0 4.322 0.2 0.229 0.000 0.229 0.229 0.0 0.0 365 0 3.84E+03 299.18 0.23 0.0 0.0 4.303 0.2 0.228 0.000 0.228 0.228 0.0 0.0 366 0 3.82E+03 299.18 0.23 0.0 0.0 4.284 0.2 0.228 0.000 0.228 0.228 0.0 0.0 367 0 3.81E+03 299.18 0.23 0.0 0.0 4.265 0.2 0.228 0.000 0.228 0.228 0.0 0.0 368 0 3.80E+03 299.17 0.23 0.0 0.0 4.245 0.2 0.227 0.000 0.227 0.227 0.0 0.0 369 0 3.78E+03 299.17 0.23 0.0 0.0 4.226 0.2 0.227 0.000 0.227 0.227 0.0 0.0 370 0 3.77E+03 299.16 0.23 0.0 0.0 4.207 0.2 0.227 0.000 0.227 0.227 0.0 0.0 371 0 3.76E+03 299.16 0.23 0.0 0.0 4.188 0.2 0.226 0.000 0.226 0.226 0.0 0.0 372 0 3.74E+03 299.16 0.23 0.0 0.0 4.170 0.2 0.226 0.000 0.226 0.226 0.0 0.0 373 0 3.73E+03 299.15 0.23 0.0 0.0 4.151 0.2 0.226 0.000 0.226 0.226 0.0 0.0 374 0 3.71E+03 299.15 0.23 0.0 0.0 4.132 0.2 0.225 0.000 0.225 0.225 0.0 0.0 375 0 3.70E+03 299.15 0.23 0.0 0.0 4.113 0.2 0.225 0.000 0.225 0.225 0.0 0.0 376 0 3.69E+03 299.14 0.22 0.0 0.0 4.094 0.2 0.225 0.000 0.225 0.225 0.0 0.0 377 0 3.67E+03 299.14 0.22 0.0 0.0 4.076 0.2 0.224 0.000 0.224 0.224 0.0 0.0 378 0 3.66E+03 299.14 0.22 0.0 0.0 4.057 0.2 0.224 0.000 0.224 0.224 0.0 0.0 379 0 3.65E+03 299.13 0.22 0.0 0.0 4.038 0.2 0.224 0.000 0.224 0.224 0.0 0.0 380 0 3.63E+03 299.13 0.22 0.0 0.0 4.020 0.2 0.223 0.000 0.223 0.223 0.0 0.0 381 0 3.62E+03 299.13 0.22 0.0 0.0 4.001 0.2 0.223 0.000 0.223 0.223 0.0 0.0 382 0 3.61E+03 299.12 0.22 0.0 0.0 3.983 0.2 0.223 0.000 0.223 0.223 0.0 0.0 100yr 24hr Storm - Basin B E-22 Access Road Page 39 of 41 Orifice Orifice Riser Riser Riser (1st ft of (led ft of (orifice) + Riser (Weir) Emergency Time [aflow Storage Stage Outflow (Orifice) (Weir) Barrel RBspwy height) height) orifice +orifice Weir Top of Dam (min) (cfs) (w ft) (ft) (cfs) (cfs) (cfs) (cfs) (cts) (cfs) (cfs) cfs cfs (cfs) (cfs) 383 0 3.59E+03 299.12 0.22 0.0 0.0 3.965 0.2 0.222 0.000 0.222 0.222 0.0 0.0 384 0 3.58E+03 299.12 0.22 0.0 0.0 3.946 0.2 0.222 0.000 0.222 0.222 0.0 0.0 385 0 3.57E+03 299.11 0.22 0.0 0.0 3.928 0.2 0.222 0.000 0.222 0.222 0.0 0.0 386 0 3.55E+03 299.11 0.22 0.0 0.0 3.910 0.2 0.221 0.000 0.221 0.221 0.0 0.0 387 0 3.54E+03 299.11 0.22 0.0 0.0 3.891 0.2 0.221 0.000 0.221 0.221 0.0 0.0 388 0 3.53E+03 299.10 0.22 0.0 0.0 3.873 0.2 0.221 0.000 0.221 0.221 0.0 0.0 389 0 3.51E+03 299.10 0.22 0.0 0.0 3.855 0.2 0.220 0.000 0.220 0.220 0.0 0.0 390 0 3.50E+03 299.10 0.22 0.0 0.0 3.837 0.2 0.220 0.000 0.220 0.220 0.0 0.0 391 0 3.49E+03 299.09 0.22 0.0 0.0 3.819 0.2 0.220 0.000 0.220 0.220 0.0 0.0 392 0 3.47E+03 299.09 0.22 0.0 0.0 3.801 0.2 0.219 0.000 0.219 0.219 0.0 0.0 393 0 3.46E+03 299.08 0.22 0.0 0.0 3.783 0.2 0.219 0.000 0.219 0.219 0.0 0.0 394 0 3.45E+03 299.08 0.22 0.0 0.0 3.765 0.2 0.218 0.000 0.218 0.218 0.0 0.0 395 0 3.44E+03 299.08 0.22 0.0 0.0 3.747 0.2 0.218 0.000 0.218 0.218 0.0 0.0 396 0 3.42E+03 299.07 0.22 0.0 0.0 3.729 0.2 0.218 0.000 0.218 0.218 0.0 0.0 397 0 3.41E+03 299.07 0.22 0.0 0.0 3.712 0.2 0.217 0.000 0.217 0.217 0.0 0.0 398 0 3.40E+03 299.07 0.22 0.0 0.0 .3.694 0.2 0.217 0.000 0.217 0.217 0.0 0.0 399 0 3.38E+03 299.06 0.22 0.0 0.0 3.676 0.2 0.217 0.000 0.217 0.217 0.0 0.0 400 0 3.37E+03 299.06 0.22 0.0 0.0 3.658 0.2 0.216. 0.000 0.216 0.216 0.0 0.0 401 0 3.36E+03 299.06 0.22 0.0 0.0 3.641 0.2 0.216 0.000 0.216 0.216 0.0 0.0 402 0 3.34E+03 299.05 0.22 0.0 0.0 3.623 0.2 0.216 0.000 0.216 0.216 0.0 0.0 403 0 3.33E+03 299.05 0.22 0.0 0.0 3.606 0.2 0.215 0.000 0.215 0.215 0.0 0.0 404 0 3.32E+03 299.05 0.22 0.0 0.0 3.588 0.2 0.215 0.000 0.215 0.215 0.0 0.0 405 0 3.31E+03 299.04 0.21 0.0 0.0 3.571 0.2 0.215 0.000 0.215 0.215 0.0 0.0 406 0 3.29E+03 299.04 0.21 0.0 0.0 3.554 0.2 0.214 0.000 0.214 0.214 0.0 0.0 407 0 3.28E+03 299.04 0.21 0.0 0.0 3.536 0.2 0.214 0.000 0.214 0.214 0.0 0.0 408 0 3.27E+03 299.03 0.21 0.0 0.0 3.519 0.2 0.214 0.000 0.214 0.214 0.0 0.0 409 0 3.25E+03 299.03 0.21 0.0 0.0 3.502 0.2 0.213 0.000 0.213 0.213 0.0 0.0 410 0 3.24E+03 299.03 0.21 0.0 0.0 3.485 0.2 0.213 0.000 0.213 0.213 0.0 0.0 411 0 3.23E+03 299.02 0.21 0.0 0.0 3.467 0.2 0.213 0.000. 0.213 0.213 0.0 0.0 41.2 0 3.22E+03 299.02 0.21 0.0 0.0 3.450 0.2 0.212 0.000 0.212 0.212 0.0 0.0 413 0 3.20E+03 299.02 0.21 0.0 0.0 3.433 0.2 0.212 0.000 0.212 0.212 0.0 0.0 414 0 3.19E+03 299.01 0.21 0.0 0.0 3.416 0.2 0.212 0.000 0.212 0.212 0.0 0.0 415 0 3.18E+03 299.01 0.21 0.0 0.0 3.399 0.2 0.211 0.000 0.211 0.211 0.0 0.0 416 0 3.16E+03 299.01 0.21 0.0 0.0 3.382 0.2 0.211 0.000 0.211 0.211 0.0 0.0 417 0 3.15E+03 299.00 0.21 0.0 0.0 3.365 0.2 0.210 0.000 0.210 0.210 0.0 0.0 418 0 3.14E+03 299.00 0.21 0.0 0.0 3.349 0.2 0.210 0.000 0.210 0.210 0.0 0.0 419 0 3.13E+03 299.00 0.21 0.0 0.0 3.332 0.2 0.210 0.000 0.210 0.210 0.0 0.0 420 0 3.11E+03 298.99 0.21 0.0 0.0 3.315 0.2 0.209 0.000 0.209 0.209 0.0 0.0 421 0 3.10E+03 298.99 0.21 0.0 0.0 3.298 0.2 0.209 0.000 0.209 0.209 0.0 0.0 422 0 3.09E+03 298.99 0.21 0.0 0.0 3.282 0.2 0.209 0.000 0.209 0.209 0.0 0.0 423 0 3.08E+03 298.98 0.21 0.0 0.0 3.265 0.2 0.208 0.000 0.208 0.208 0.0 0.0 424 0 3.06E+03 298.98 0.21 0.0 0.0 3.249 0.2 0.208 0.000 0.208 0.208 0.0 0.0 425 0 3.05E+03 298.98 0.21 0.0 0.0 3.232 0.2 0.208 0.000 0.208 0.208 0.0 0.0 426 0 3.04E+03 298.97 0.21 0.0 0.0 3.216 0.2 0.207 0.000 0.207 0.207 0.0 0.0 427 0 3.03E+03 298.97 0.21 0.0 0.0 3.199 0.2 0.207 0.000 0.207 0.207 0.0 0.0 428 0 3.01E+03 298.97 0.21 0.0 0.0 3.183 0.2 0.207 0.000 0.207 0.207 0.0 0.0 429 0 3.00E+03 298.96 0.21 0.0 0.0 3.166 0.2 0.206 0.000 0.206 0.206 0.0 0.0 430 0 2.99E+03 298.96 0.21 0.0 0.0 3.150 0.2 0.206 0.000 0.206 0.206 0.0 0.0 431 0 2.98E+03 298.96 0.21 0.0 0.0 3.134 0.2 0.206 0.000 0.206 0.206 0.0 0.0 432 0 2.97E+03 298.95 0.21 0.0 0.0 3.118 0.2 0.205 0.000 0.205 0.205 0.0 0.0 433 0 2.95E+03 298.95 0.20 0.0 0.0 3.101 0.2 0.205 0.000 0.205 0.205 0.0 0.0 434 0 2.94E+03 298.95 0.20 0.0 0.0 3.085 0.2 0.204 0.000 0.204 0.204 0.0 0.0 435 0 2.93E+03 298.94 0.20 0.0 0.0 3.069 0.2 0.204 0.000 0.204 0.204 0.0 0.0 436 0 2.92E+03 298.94 0.20 0.0 0.0 3.053 0.2 0.204 0.000 0.204 0.204 0.0 0.0 100yr 24hr Storrs - Basin B E-22 Access Road Page 40 of 41 100yr 24 hr Routing -Basin B 8 7 6 5 w 3 4 0 LL 3 2 1 0 Time (min) -. ~ Inflow Hydrograph -~- OutFlow Hydrograph 0 50 100 150 200 250 300 350 400 450 500 DWQ Project No. ~ W Q ~ P X-+o 07- D~3 DNISION OF WATER QUALITY • BIORETENTION AREA WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name : t -LZ ~ L,ErH6r-IT~j~ Sc-rJ-~o L- Contact Person: 'Tr~+~co a., ~ ~ ,-,r _c _ ~ Phone Number: (,~) SofS - 0~~ For projects with multiple basins, speci which basin this worksheet applies to: ro - (,?~,~ ~ i ba-~,~j 1_ Permanent Pool Elevation 305 ~ 00 ft. Temporary Pool Elevation 3- f • ~ D ft. Bioretention Surface Area Zo , o 3`7 sq. ft. Drainage Area 14. 3 Z ac. Impervious Area S• L7 ac. Rational C Coefficient 0. 59 Size % .5 Inlet Velocity (D~ ~ fps Inlet flow depth ~ Co in Depth to Ground Water ~ ft. Planting Soil Infiltration Rate 1 ~ Z in./hr. In-Situ Soil Infiltration Rate D~ ~ in./hr. (elevation of the orifice invert out) (elevation of the outlet structure invert in) (oh-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (either 5% in w/sand under drain or 7% in w/o) (the soil layer down to 4 feet) (the soil layer below 4 feet or below the sand bed) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials ~ D No vertical sand bed is proposed I~-w~D The bioretention area is at least 40 feet by 15 feet. W'~-..D Sheet flow is provided at inlet. D Water table depth is greater than 6 feet. rvtr~ Minimum of 6" ponding is provided. ~ ~ The ponded area will draw down in less than 4 days. jiC-MD Planting soil infiltration rate is greater than 0.52 in/hr. I~n~17 The in-situ soil infiltration rate is greater than 0.2 in/hr. tCstitD A planting plan with species and densities is provided. I~ D Mulch layer is specified in plans. <<-'~ D Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) K-l~~ Plan details for the bioretention area provided. t~ ~ Plan details for the inlet and outlet are provided. YHD An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains o GC~~~ D Ar ~ ~ ~ 2007 ,~~g a'~!D 3'f ~!+~'dATER BRAI•ICH DWQ Project No. ~ W Q ~P X-+o 07- 053 DIVISION OF WATER QUALITY - BIORETENTION AREA WORKSHEET I. PROJECT INFORMATION (please complete the following information): Project Name: _ 1:-LZ ~LE~•r,~~r-f-T-,~ 9lLy ~rf-~oC_-- Contact Person: `Ti _ , ~ E, i w~oT, _c - ~ Phone Number: (9,°r) SoS - gozf p, T For projects with multiple basins, speafy which basin this worksheet applies to: R,o. 2e1-~ .~~,..~_(3,gs„~,i z Permanent Pool Elevation 3-7, o o ft. (elevation of the orifice invert out) Temporary Pool Elevation 3 z3, ~ ft (elevation of the outlet structure invert in) Bioretention Surface Area -1, 3910 sq. ft. Drainage Area - ~ ~ 9S ac. (on-site and off-site drainage to the basin) Impervious Area 1 i 9 I ac. (on-site and off-site drainage to the basin) Rational C Coefficient p . X03 Size % S" % (either 5% in w/sand under drain or 7% in w/o) Inlet Velocity S, Z fps Inlet flow depth G (o in Depth to Ground Water Z S ft. Planting Soil Infiltration Rate I ~ Z- in./hr. (the soil layer down to 4 feet) In-Situ Soil Infiltration Rate O, ~ in./hr. (the soil layer below 4 feet or below the sand bed) REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, aftach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet sfructure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project. Applicants Initials I C w+ D No vertical sand bed is proposed ILm A The bioretention area is at least 40 feet by 15 feet. ~Lw~. 0 Sheet flow is provided at inlet. l~n D Water table depth is greater than 6 feet. 14M D Minimum of 6° ponding is provided. IfM ~ The ponded area will draw down in less than 4 days. 1~ ~ Planting soil infiltration rate is greater than 0.52 in/hr. t4~+ D The in-situ soil infiltration rate is greater than 0.2 in/hr. i~r'-~~ A planting plan with species and densities is provided. 1~~ Mulch layer is specified in plans. 'KM D Planting soil meets minimum soil specifications (NCDENR Stormwater Best Management Practices Manual, April 1999) ISO Plan details for the bioretention area provided. I~M~ Plan details for the inlet and outlet are provided. hn/- ~ An operation and maintenance agreement signed and notarized by the responsible party is provided. Please note that underdrains beneath the planting soil are acceptable in the Piedmont and Mountains State of North Carolina Department of Environment and Natural Resources Division of Water Quality 401/ Wetlands Unit EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM This form maybe photocopied for use as an original I. GENERAL INFORMATION 1. Applicant's name (specify the name of the corpo~rat~ion, individual, etc. who owns the project): wA.K.~ G.o~~ p,L1-~ ~ia tat a ~-- -xrJ-~Z S 2. Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Owner Mailing Address for person listed in item 2 above: Ciry:~~;~~}f~ State:. J~C.. Zip: Z7(olfl Phone Number: (~j19 Z5U$- ~/~ Fax Number: (QI ~ ) ~~C' L9l ~ Email Address: -r~A~,koE~. P yc~~055.J~-~~)" 4. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): ~'Z Z E1.EJ'7r.~~41/Ly ~pL.-.. 5. Location of Project (street address): City: ~~y County: bc..~iA~L~_ 6. Directions to project (from nearest major intersection): l'l~o ~!' ~'' 7•i~E ~ /L~~ Ec~-f~!vr~ t~ Ly,P~1rJ ~I~L. 7n ~iel~i4'~*'~ ~ ~ o ~ o 7. Latitude: 35. $! 1~ Longitude: 78.9d ~ of project 8. Contact person who can answer questions about the project: Name: ~1j E,~rl~ 'Qour~ ~~ 4 .L_r4 Telephone Number: (91~f ) 78b- 9 ~ 77 Fax Number : ~l ~ - 7 SZ 5~ $~j Email Address : )~iC.~Th~ e ~t~,;-E1,Y t1~51 ~S"J~E S. t~iv+ II. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal Modification 9/2004 Version 1.0 Page 1 of 4 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number and its issue date (if known) 3. Specify the type of project (check one): Low Density ~ High Density Redevelopment General Permit Other 4. Additional Project Requirements (check applicable blanks): CAMA Major Sedimentation/Erosion Control X404/401 Permit ~NPDES Stormwater -Other Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION 1. In the space provided below, summarize how Stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the project . Two ~z~ p~~,~,.a~-.~_t3 r~,,.1s~~ ~s. ~~.r ~ ~-~.~-r- ~.u~.A~~ F Glows z-t1,~ ~.'Z2. ~l~wi~/~~[~~-r~cjC. S~-r~.• - - - ~oIUT O1~( Oj= 7~f'E' ~r~' • G~~ ~ River basin. 2. St rmwater runoff from this project drains to the 3. Total Project Area: ~ 53.7 acres 4. Project Built Upon Area: 1 ~ • ~ ~i~ 5. How many drainage areas does the project have? 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Infunnati~n T~raina~e Area 1 Drainage E\rea 2 Receiving Stream Name ~ ~ ~ K Receiving Stream Class W S _ IV t•1 Svc/ Drainage Area .~ ~ Z ~~ Existing Impervious" Area D ,~ Proposed Impervious*Area Z7~{, O 1 ~ =' fo ~ ~ Impervious* Area (total) ~I ~ 7 ~/o lmper~ i~~us~ Surface>Are<, Drainage Area 1 Draina~~;e Area 2 On-site Buildings ~' • ~ ~ ~ 3 ~_ On-site Streets On-site Parking Qr, SL+~S 3 • $ On-site Sidewalks ~ ~ p--) Other on-site ~ Off-site Total: ~ 31 Total: ' * Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. 9/2004 Version 1.0 Page 2 of 4 7. How was the off-site impervious area listed above derived? l~j~ IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state riparian buffer authorization or General Cert~cation numbers as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than sguare feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, bricl~ stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a mod~ed water quality certification prior to construction. S. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified for this project. The forms are located on the 401/wetlands unit website. Bioretention Worksheet Dry Detention Worksheet Level Spreader Worksheet Grassed Swale Worksheet Extended Detention Wetland /Pocket Wetland Worksheet Wet Detention Worksheet 9/2004 Version 1.0 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Central Office. Please indicate that you have provided the following required information by initialing in the space provided next to each item. Initals • Original and two copies of the Express Review Stormwater Management Application • Signed and notarized Operation and Maintenance Agreement • Three copies of the applicable Supplement Form(s) for each BMP • Application processing fee (payable to NCDENR) • Detailed narrative description of stormwater treatmenbmanagement • Three copies of plans and specifications, including: - Development/Project name - Engineer and firm -Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands and streams delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm); 'Sot IMc...1-~~[.a. 1~v,~ / Mailing Address: ,~ " City: 1~t't.~c. j~. State: t-~L.. Zip: Z~ ~ 1 Z.. Phone: ( `J7 ~t ) 78 Z - ~'~ y Fax: ( `Yl ~f ) 7$Z ' Sy}~°/ VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) 77MoT+~Y A~!~scoGL certify that the information included on this application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000 Signature: ~~ Date:__ ~~27~ 7 9/2004 Version 1.0 Page 4 of 4 ti... PR06RAM April lb, 2007 Timothy Driscoll Wake County Public School System 1551 Rock Quaay Road Raleigh, NC 27610 Project: E-22 Elementary Access Road ~x,p o ~ - o So 3 County: Wake This letter replaces one previously issued dated Apri14, 2007. The purpose of this letter is to notify you that the North Carolina Ecosystem Enhancement Program {NCEEP) is willing to accept payment for impacts associated with the above referenced project. Please note that this decision does not assure that the payment will be approved by the permit issuing agencies as mitigation for project impacts. It is the responsibility of the applicant to contact these agencies to determine if payment to the NCEEP will be approved. This acceptance is valid for six months from the date of this letter and is not transferable. If we have not received a copy of the issued 404 l'ermlt/401 Certification/CAMA permit within this time f5rame, this acceptance will expire. It is the applicant's responsibility to send copies of the permits to NCEEP. Once NCEEP receives a copy of the permit(s) an invoice will be issued based on the required mitigation in that permit and payment must be made prior to conducting the authoriz~,d work. The amount of the In Lieu Fee to be paid to NCEEP by an applicant is calculated based upon the Fee Schedule and policies Listed at www.nceep.net. Based on the information supplied by you the impacts that may require compensatory mitigation aze summarized in the following table. Cape Fear 03030002 Stream (feet) Wetlands (acres) Buffer I (Sq. Ft.) Buffer II (Sq. Ft.) Cold Cool Warm Ri arian Non-Ri arian Coastal Marsh Impacts 0 0 259 0.491 0 0 0 0 Credits 0 0 518 1.0 0 0 0 0 Upon receipt of payment, EEP will take responsibility for providing the compensatory mitigation. If the regulatory agencies require mitigation credits greater than indicated above, and the applicant wants NCEEP to be responsible for the additional mitigation, the applicant will need to submit a mitigation request to NCEEP for approval prior to permit issuance. The mitigation will be performed in accordance with the Memorandum of Understanding between the N. C. Department of Environment and Natural Resources and the U. S. Army Corps of Engineers dated November 4, 1998. If you have any questions or need additional information, please contact Kelly Williams at (919) 716-1921. Sincerely, ~ f~ ~"p' Wi D. Gilmore, Director ~~ PE cc: Cyndi Kazoly, Wetlands/401 Unit Jamie Shern, USACE-Raleigh Cynthia Van Der Weile, DWQ-Raleigh Christopher Burkhazdt, agent File RPSt-oYltL9... ~ PYDt~~~ OGGY Statf; ~~ North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 / www.ncee .net P SAND FILTER &PRE-TREATMENT BASIN OPERATION AND MAINTENANCE AGREEMENT Basin B The sand filter and pre-treatment basin system is defined as the pre-treatment basin, including riser/barrel and emergency spillway, sand filter, and the level spreader. Maintenance activities shall be performed as follows: Pre-Treatment Basin. 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the pre-treatment basin for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. b. Check and clear the riser barrel and orifices of any obstructions: 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover. 3. The pre-treatment basin shall be mowed at least twice annually, maintaining grass height to a minimum of 6". 4. Inspect the pre-treatment basin twice annually for woody plant species. Any seedlings or planting with woody root systems (trees, bush, etc) within the pre-treatment basin or located on the basin berms shall be removed at the earliest opportunity and the disturbed areas shall be stabilized properly. 5. Inspect twice annual for root voids and animal burrows. Root voids and animal burrows shall be plugged with material similar to the surrounding materials, and capped just below grade with stone, concrete, or other material. If plugging the burrows does not discourage burrowing animals from returning, further measures shall be taken to remove the animal population or to make critical areas of the facility unattractive to them. 6. Inspect and repair the collection system (i.e. catch basins, piping, riprap, etc.) quarterly to maintain proper functioning. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 7. The riser/barrel system and orifices of the pre-treatment basin shall be cleaned or repaired when drawdown times within the pre-treatment basin exceeds 24 hours. Inspection of the riser/barrel system shall occur quarterly, at a minimum. Sand Filter and Sediment Chamber Structure 1. After every significant runoff producing rainfall event and at least monthly: a. Inspect the sand filter system for sediment accumulation, erosion, trash accumulation, vegetated cover, and general condition. , b. Check and clear the underdrain outfall pipes of any obstructions. 2. Repair eroded areas immediately, re-seed as necessary to maintain good vegetative cover, mow grass cover around sand filter area to maintain a maximum height of six inches, and remove trash as needed. 3. Inspect and repair the collection system (i.e. catch basins, piping, riprap, etc.) quarterly to maintain proper fiznctioning. Trash and debris will be cleared away from grates, curb cuts, velocity reduction devices and piping. 4. The sand filter shall be cleaned or repaired when drawdown times within the sand filter chamber exceed 24 hours. Trash and debris should be removed as necessary. Sediment should be cleaned out of the sedimentation chamber when it accumulates to a depth of more than 6 inches. S. When the filtering capacity of the filter diminishes substantially (e.g. when water ponds on the surface of the filter bed for more than 14 hours), the topsoil and underlying 3 inches of filter material Sand Filter &Pre-Treatment Basin Supplement Form Page 1 of 2 shall be removed and replaced with fresh material. The removed sediments shall be tested and disposed of in an acceptable manner (e.g. landfill). Siltlsediment should be removed from the filter bed when the accumulation exceeds 1 inch. 6. Level spreaders or other structures that provide diffuse flow shall be maintained every six months. All accumulated sediment and debris shall be removed from the structure, and a level elevation shall be maintained across the entire flow spreading structure. Any down gradient erosion must be repaired and/or replanted as necessary. 7. All components of the sand filter system shall be maintained in good working order. I acknowledge and agree by my signature below that I am responsible for the performance of the seven maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print name: Title: Address: Phone: Signature:_ Date: Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, , a Notary Public for the State of , County of do hereby certify that personally appeared before me this ~ day of ,and acknowledge the due execution of the forgoing sand filter system maintenance requirements. Witness my hand and official seal, SEAL My commission expires Sand Filter &Pre-Treatment Basin Supplement Form Page 2 of 2