Loading...
HomeMy WebLinkAboutNCC192702_NOT Closeout Documents_20210114Project: SP-2018-12 EC Permit No: EC-2018-19 Site Plan/Subdivision No: River basin: Disturbed Acreage: 1.89 ac Permit Issue Date: 10/21/2019 Permit Expiration Date: 10/21/2021 Person financially responsible: David Sears Phone: 919.557.4501 Email: davidsears(a)bobbarker.com Address: 7925 Purfoy Road FuQuay-Varina NC 27526 Contractor/Other: Lee Smith Phone: 919.291.6448 Email: lee(@wynnsitedev.com 1. Pictures: No: ® Yes: ❑ Video: ❑ Digital: ❑ 2. Weather and soil conditions: Sunny, dry, Workable First inspection: Yes: ❑ No: 3. Is site currently under notice of violation? Yes: ❑ No: 4. Is the site in compliance with S.P.C.A. and rules? Yes: ® No: ❑ If no, check violations below: ❑ a. No approved plan, G.S. 113A-57 (4) and 15A N.C.A.0 413.0107(c) LIDO §9-1407(a)(4)(D) ❑ b. Failure to follow approved plan, G.S. 113A-57(5) LDO §9-1407 (b)(1)(H) ❑ c. Failure to submit revised plan, G.S. 113A-54.1(b) and 15A N.C.A.C. 413.0118(a) LDO §9-1407 (c)(9) ❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3) and 15A N.C.A.C. 4B.0107(b) or 15A N.C.A.C. 4B.0124(e) LDO §9-1407(b)(1)(G) ❑ e. Insufficient measures to retain sediment on site, G.S. 113A-57(3) LDO §9-1407 ❑ f. Failure to take all reasonable measures, 15A N.C.A.C. 4B.0105 LDO §9-1407 ❑ g. Inadequate buffer zone, G.S 113A-57(1) LDO §9-1407 (b)(1)(C) ❑ h. Graded slopes and fills too steep G.S. 113A-57(2) or 15A N.C.A.C. 4B.0124(d) LDO §9-1407 (b)(1)(E) ❑ i. Unprotected exposed slopes, G.S. 113A-57(2) LDO §9-1407 (b)(1)(G) ❑ j. Failure to maintain measures, 15A N.C.A.C. 413.0113 LDO §9-1407 ❑ k. Failure to self -inspect G.S. 113A-54.1(e) and 15A N.C.A.C. 413.0131 LDO §9-1407 (e)(1) ❑ I. Potential NPDES violation. NCG 010000 and LDO §9-1407 (e)(1) 5. Has sedimentation damage occurred since last inspection or at 1st inspection? Yes: ❑ If yes, where? (check all that apply) No: Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: ❑ Description: Stormwater Discharge Outfall with sediment loss: Degree of damage: slight: ❑ moderate: ❑ severe: ❑ 6. Contact made with (name): Title: Inspection report given:❑ or sent: ® to person financially responsible. Date given/sent: 8/27/2020 7. Comments: Final Inspection. Erosion permit is closed. Last Updated 4/30/19 8. Corrective actions needed for S.P.C.A. and rules: ❑ Submit an approvable sedimentation and erosion control plan, including appropriate review fee, covering all areas disturbed or to be disturbed. ❑ Install all sedimentation and erosion control measures as shown on the approved plan. ❑ Submit a revised sedimentation and erosion control plan. ❑ Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the approved plan. ❑ Install erosion and sediment control devices sufficient to retain sediment on the tract. ❑ Install temporary sediment traps or basins and associated diversions as shown on the approved plan. ❑ Install adequate drop inlet protection as shown on the approved plan. ❑ Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25% of the buffer nearer the land disturbance using natural or artificial means. ❑ Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established. ❑ For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes where rough or fine grading has been completed for 21 calendar days. ❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation damage. 9. Additional Corrective Actions: 10. For Final Inspections Only: M Permanent around cover sufficient to restrain erosion has been established. No additional self-monitorina or self - inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via a Notice of Termination. Deadline for Compliance is Report by: Charles Phillips Others present: Date of inspection: 7/23/2020 Estimated Time on site: 15 minutes 2 1 P a g e Last Updated 4/30/19