HomeMy WebLinkAbout20110302 Ver 1_Email_20110413r;dJ
Anaog'semm
nt
t
PROGRAM
April 8, 2011
Mr. Jerry Parker
Division 7 Environmental Officer
NCDOT - Division 7 Office
1584 Yanceyville Street
P. O. Box 14996
Greensboro, NC 27415
Dear Mr. Parker:
Subject: EEP Mitigation Acceptance Letter:
SR 2755, Replace Bridge Rock Creek on Carmen Road, Guilford County
l?-?3oa
The purpose of this letter is to notify you that the Ecosystem Enhancement Program (EEP) will provide the
buffer mitigation for the subject project. Based on the information supplied by you on April 6, 2011, the impacts are
located in CU 03030002 of the Cape Fear River Basin in the Central Piedmont (CP) Eco-Region, and are as follows:
Cape Fear
03030002 Stream Wetlands Buffer -- Jordan Lake Buffer Rules
Haw River Arm Watershed
CP Cold Cool Warm RW NRW CM Zonel 3:1) Zone2 1.5:1
Impacts (feet/acres) 0 0 0 0 0 0 168 0
Mitigation Units 0 0 0 0 0 0 504 0
All buffer mitigation requests and approvals are administrated through the Riparian Restoration Buffer
Fund. The NCDOT will be responsible to ensure that appropriate compensation for the buffer mitigation will be
provided in the agreed upon method of fund transfer. Upon receipt of the NCDWQ's Buffer Authorization
Certification, EEP will transfer funds from MOA Fund into the Riparian Restoration Buffer Fund. Upon completion
of transfer payment, NCDOT will have completed its riparian buffer mitigation. responsibility for this project. EEP
commits to implementing sufficient buffer mitigation credits to offset the impacts associated with this project in
accordance with the N.C. Department of Environment and Natural Resources' Ecosystem Enhancement Program In-
Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation
acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from EEP.
1929.
If you have any questions or need additional information, please contact Ms. Beth Harmon at 919-715-
Sincerely,
Willa D. Gilmore, P.E. u
EEP rector
Cc: Ms. Amy Euliss, NC Division of Water Quality
Ms. Linda Fitzpatrick, NCDOT PDEA
File: SR 2755 - Division 7
Rt stori?ty... EKka"... prot" ow Stag
ee?n
IRUMR
North Carolina Ecosystem Enhancement Program, 1652 Mail Service Center, Raleigh, NC 27699-1652 / 919-715-0476 /www.nceep.net
Page 1 of 1
Sonia,
Can you add this to the file for 20110302? Thanks.
Amy
From: Parker, Jerry A
Sent: Friday, April 15, 20118:40 AM
To: Euliss, Amy
Subject: FW: Revised Acceptance Letter - SR 2755
Amy,
Attached is the EEP letter for Carmen Road.
Jerry
From: Harmon, Beth
Sent: Wednesday, April 13, 20119:54 AM
To: Parker, Jerry A
Cc: Fitzpatrick, Linda F
Subject: Revised Acceptance Letter - SR 2755
Jerry -- Sorry for the delay. My son was sick and I was out of the office. Please see the attached revised
mitigation acceptance letter for your project. Please let me know if you need anything else. Hope you have a
great day!
Beth.
Seth f-tarwtow
NCDOT Coordiwator
DEN-- EcosUsteva. Ewhatn,centewt Program
919) 715-2929
1652 Mail servioe amter
RAleigh, Na 27699-1652
W WW. wcee?. Ktt
Please "te that vKU e-vv oU address has chAwged to Sett7. Farw owCv cdewr.gov
E-mail correspondence to and from this address may be subject to.the North Carolina Public Records
Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
https:Hmail.nc.gov/owa/?ae=Item&a=Open&t=IPM.Note&id=RgAAAADMSzLcd9 W2TJH... 6/6/2011
FW: Carmen Road Additional Info
FW: Carmen Road Additional Info
Euliss, Amy
Sent: Wednesday, April 13, 20119:26 AM
To: Carrillo, Sonia
Attachments: Carmon Rd PCN Additional I-1.doc (477 KB)
Page 1 of 1
Please add to 2011-0302. Thanks.
-----Original Message-----
From: Parker, Jerry A
Sent: Tuesday, April 12, 2011 10:38 AM
To: Euliss, Amy
Subject: Carmen Road Additional Info
Amy,
Attached is the updated application showing the adjusted impacts that are mitigable.
Jerry Parker
Email correspondence to and from this sender is subject to the N.C. Public Records
Law and may be disclosed to third parties.
https://mail.nc.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLcd9 W2TJHI4°/`2bm... 6/6/2011
A OF W AiFROG
> y
O
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification PCN Form
A. Applicant Information
1. Processing
1 a. Type(s) of approval sought from the
Corps: ? Section 404 Permit ? Section 10 Permit
1 b. Specify Nationwide Permit (NWP) number: 3 or General Permit (GP) number: NWP 3
1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No
1d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ® Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
® Yes ? No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below. ? Yes ®No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes N No
2. Project Information
2a. Name of project: Carmon Road (SR 2755)
2b. County: Guilford
2c. Nearest municipality / town: McCleansville
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state
project no: 7B.204114.18
3. Owner Information
3a. Name(s) on Recorded Deed:
3b. Deed Book and Page No.
3c. Responsible Party (for LLC if
applicable):
3d. Street address:
3e. City, state, zip:
3f. Telephone no.:
3g. Fax no.:
3h. Email address:
Page 1 of 10
PCN Form -Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ® Agent ? Other, specify:
4b. Name: J. M. Mills
4c. Business name
(if applicable): Division Engineer NCDOT Division Seven
4d. Street address: P.O. Box 14996
4e. City, state, zip: Greensboro, NC 27415
4f. Telephone no.: 336 334-3297
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name: Jerry Parker
5b. Business name
(if applicable): Division Environmental Supervisor
5c. Street address: P.O. Box 14996
5d. City, state, zip: Greensboro, NC 27415
5e. Telephone no.: 336 256-2063
5f. Fax no..
5g. Email address:
Page 2 of 10
PCN Form -Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): N/A
1b. Site coordinates (in decimal degrees): Latitude: 36.1112093 N Longitude: -
79.6027171 W
(DD.DDDDDD) (-DD.DDDDDD)
1c. Property size: N/A acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to
proposed project: Rock Creek
21b. Water Quality Classification of nearest receiving water: WS-IV; NSW
2c. River basin: Cape Fear
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
Rural wooded area adjacent to rural residences and farmland
3b. List the total estimated acreage of all existing wetlands on the property:
0
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
60
3d. Explain the purpose of the proposed project:
Replace deficient bridge with a new bridge
3e. Describe the overall project in detail, including the type of equipment to be used:
Replace bridge in same alignment. Bridge replacement will be high ground to high ground with no bents in the stream. No
wetlands are located on the site.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
Comments:
®Yes ? No ? Unknown
4b. If the Corps made the jurisdictional determination, what type
of determination was made? ® Preliminary ? Final
4c. If yes, who delineated the jurisdictional areas?
Name (if known): Andy Williams Agency/Consultant Company:
Other:
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
5. Project History
5a. Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past? ? Yes ® No ? Unknown
51b. If yes, explain in detail according to "help file" instructions.
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
61b. If yes, explain.
Page 3 of 10
PCN Form -Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1a. Which sections were completed below for your project (check all that apply):
? Wetlands ? Streams - tributaries ® Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
if there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
? Yes ? Corps
W1 ? P ? T ? No ? DWQ
? Yes ? Corps
W2 ? P ? T ? No ? DWQ
? Yes ? Corps
W3 ? P ? T ? No ? DWQ
? Yes ? Corps
W4 ? P ? T ? No ? DWQ
W5 ? P ? T ? Yes
? No ? Corps
? DWQ
? Yes ? Corps
W6 ? P ? T ? No ?DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
? PER ® Corps
S1 ? P ? T ? INT ? DWQ
? PER ? Corps
S2 ? P ? T ? INT ? DWQ
? PER ? Corps
S3 ? P ? T ? INT ? DWQ
? PER ? Corps
S4 ? P ? T ? INT ? DWQ
? PER ? Corps
S5 ? P ? T ? INT ? DWQ
? PER ? Corps
S6 ? P ? T ? INT ? DWQ
3h. Total stream and tributary impacts
3i. Comments:
Page 4 of 10
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water
impact number - Name of waterbody
(if applicable)
Type of impact
Waterbody type
Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments:
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 51b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond Proposed use purpose (acres)
number r of pond d
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments:
5h. Is a dam high hazard permit required?
? Yes ? No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ?Tar-Pamlico ®Other: Jordan
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number- Reason Buffer Zone 1 impact Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T impact required?
B1 ®P ? T Bridge Rock Creek ® Nees 95 sf 0
B2 ®P ? T Parallel Rock Creek 0 Nos 168 sf 0
B3 ®P ? T R
ad Rock Creek
I
® Nos `
86 sf
0
Fi
6h. Total buffer impacts 349 sf 0
6i. Comments:
Page 5 of 10
PCN Form -Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
Impacts will be minimized by utilization of Best Management Practices
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Best Management Practices will be utilized during construction. Existing ditchline will not be increased in size nor altered.
Pre-construction meeting with Environmental Superevisor will take place prior to commencing construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ®No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
Page 6 of 10
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ® Yes ? No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Parallel impacts
Zone 1 associated with bridge 168 sf 3 (2 for Catawba) 504 sf
construction
Zone 2 N/A 0 1.5 0
6f. Total buffer mitigation required:
6g. If buffer mitigation is required,. discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
NCDOT requests to do buffer mitigation through EEP.
6h. Comments:
Page 7 of 10
PCN Form -Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diff use flow plan included? If no, explain why.
Comments: Stormwater flow will be to existing drainage ditches, roadside ditches
and stormwater conveyances. Existing ditchlines will not be increased in size or ? Yes N No
altered. Flows resulting from less than one inch per hour of precipitation should not
alter or result in the need to alter the conveyance and will be managed to minimize
the sediment, nutrients and other pollution that convey to water bodies.
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? N/A %
2b. Does this project require a Stormwater Management Plan? ? Yes N No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Stormwater flow will be to existing
drainage ditches, roadside ditches and stormwater conveyances. Existing ditchlines will not be increased in size or
altered. Flows resulting from less than one inch per hour of precipitation should not a lter or result in the need to alter the
conveyance and will be managed to minimize the sediment, nutrients and other pollution that convey to water bodies.
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan:
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
N DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project?
? Phase II
? NSW
3b. Which of the following locally-implemented stormwater management programs El USMP
apply (check all that apply): ? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
? HQW
4a. Which of the following state-implemented stormwater management programs apply ? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
? Yes ? No
attached?
5. DWQ 401 Unit Stormwater Review
Page 8 of 10
PCN Form - Version 1.3 December 10, 2008 Version
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
51b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No
use of public (federal/state) land?
1b. If you answered "yes" to the above, does the project require preparation of an
t
t
® No
? Y
a
e
environmental document pursuant to the requirements of the National or S es
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes ? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s):
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
31b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 9 of 10
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No
impacts?
® Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
? Asheville
5d . What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
US Fish and Wildlife Web Site
6. Essential Fish Habitat (Corps Requirement)
6a . Will this project occur in or near an area designated as essential fish habitat? ? Yes ®No
6b . What data sources did you use to determine whether your site would impact Essential Fish Habitat?
N/A
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a . Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ®No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b . What data sources did you use to determine whether your site would impact historic or archeological resources?
National Historic Register Web Site
8. Flood Zone Designation (Corps Requirement)
Sa . Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No
8b . If yes, explain how project meets FEMA requirements:
8c. What source(s) did you use to make the floodplain determination? NC Floodplain Mapping Information System
J.M. Mills
Applicant/Agent's Printed Name Applicant/Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is provided.)
Page 10 of 10
PCN Form - Version 1.3 December 10, 2008 Version
x
v
i
Y
t
? Arv?8$'^g a ? o
8
w Pww`aY?so
s?ia??oaa
m
e?NwwwE W?o
cF
aaammmaaa o=a
r
a
m
8
8
Bw ? $3 ?s
J
? q? 9TJg ?
p ^
•? •
8
9 ' Ce cmS 'Y
Y
3
G
w
Qt
t
?a
z
x
2
N
dea ? g? e
?
_?.••
¢ ° ¢
o ?
z ? -?Bo?:a
2 s Besas _
d Ili
-°
0
E HIM
- z666e6
Will! 1 H!
0
o
988®888 N •°?j?\\
4 Aa@YR1+3AYAA?xA=:38c€. \ \ o ?,., 1..:. ,\.
? YAa 3?AA Aa ??s?=? \ \ Mo?,....• 10
5aaaasasaaaeeaae6aa5e \ 1
aR Yaeg+°s9 a3°°g5gAg .,9ggAgAgg3. \ 1 a-?, jr z
?5?as?59593A?9?5?3355R \I 1 „ ? 'z
¢ if
d I? Ili ? I _ "I r 4
1
AAAx95ggsgg.=fi®5®Y9 A€98sa 3„I °,,=1? c ¢
z ???????II6IIe6a?aes?sa66 q,°, I - ? ;-P1
a a xaae?`aaeae ?giggtggsg?g;i?x I - •?:•..?ol o
U fi / ! y -
I
? ' 3A^?A99aA?A39?1e9 s?2!`$ 3 '??'.'.. . `~? I ?-
?
???E95?????AAA??99???? ^, •.°.: r\k w c
c
c A o?z aa$6 Rc59A I k s a w ,n ?
??e@elc?i@?e I /,. o o c o 3
aaaaaaaaa aaasaaa n a z s
i 1, if 1~: I o ?'0 5 F w c
-III 2 a a
-??65)P??aA???s9$?a?8$66 l a ?' o \ w? 3 N o j
C Ni?"III I %w 3aii 0 00 m
o I -? " i i z 'o w
U U U
° I^ = a J d h U R 0 0 0 W VI
~ I I e ?l a a c w c c c?'
I I co 0 o z??? v°
I I ! = I ?
ofg 99 % eN' a
603 35 Sul ? .% ` S G U
? o
\
\
\ a
\ a
w u
\ ?
W N
o?¢ o N 3 0 `
\ in > a u z
o - w
\ \ m \ w a a a a o 0 o'c m
\ ? N VI VI j VI
\ a? P \ ?0 oz ?N
¢ = 3
a e
0
r
a
0
H
z
0
a
J
¢
z
0
_U
O
N
f8 QvN
z sga Pg?x ?. pFB?dEd3YkvggE
s -aka aeaa,?ca va?al-
I? HIM 4e¢@
s@iffe35
U ¢ie av _ I
? ? c
N
?1 .
71
3 3
a
H
a
0
Z
a
J
a
z
0
U
0
Vl
K
k€R 6HE:d
eeB eae§a
?? m S
',?SSSSE54?
? Sara
E(A) N e b
}N'
1 I
I I O
I I
I I
.a`Ali `s'37a6 RAAxs i3 3 I ?
__II I I I All 1 i is I I I
8
r
Gy"a?"a?§sE9E8 s?9 ?a?E I I I a - N
EaaEgEa sa99&a9aa?2.a? I I 8 `f_o• ., ?
Ma 1????? E ad's E? I I i "g/?...l
p ?^_ as a7a a?a3aa aaa I ? .
t I '' I I I / i? E "o
I !? i I I ?? a
I 1 I I '?; •;•o
a aRd_G0@9RRAE:e AE ®u /
d AS^ R aBa R.._ xaa I I I j
?C??????;E????S??????E?? ? to/.°•N o
a $a g?g$$$q$q.G ki3xsa e: A?gEg AF I I I 3
as aaaa aaaaaa a a I I I=I?.
I I
.1 71.1
a . 1 ,`f o _ a?6
z R3sa:eExBaFaa E11 a r7 E? c I I &
MIGyaxgRgA8Cgag gg 88Xgg FF g I I
W?88a®88??1la Q>1?88?????® I `?° a -1 .m o
sa s§aagg pps aR?4RS a$ I I _ ? j . o '.? ? o rv
77IF7` l i I 3
? ? I. " g 8g` ? I ao 3
ga as szd!e ffiEggEaa ?3EE3@"a"s I I.? AXE' oo °'Im"
axR x A ? aR R Fx^a? I ?I rI _
a a.=SaRF FF _?R888 ? ???•••I6 ? N Y
pla aEaS?EaaEAS3S3ESEE??? I ?? :; im ? I w
I Q N
"IP IBo1¢ 9111€-,:E?k€EE I I 1 6 1 O K 3
L' a
§RaC9 ask-m illog I U.': •. 1 ? 3 a w o 0 o s
3a 6?5 o' u u u 5
aaaaaaaaa$$aas 8F8 a //!
aaa g: a xa xcx a coa 1 °a °a i a o 0 o w N
ag'aGE£ec•"sda-aQ.a em I 11 v o z>? v .°n
?3aaaa3aa?s E a a
a?a33?"¢ I 1
??s
88ag ^'aa I .e^e Fad 11 1 +• I N I O
??kkkRkkkkk kk Ckkkkk-•?? 1 1 - m
E?,?k i 11
I
I 1 1
1 1
I 1 \
1 \
ra caN 1 \
PnkE L?4)JL- IIL lH-e-2.'
a
\ I
\ i o
0
- \ n
,\ I o -
w
\ I a
- ol.''1 n c - I
V
E _ - a
a
.?
? ° ? p v ¢ o ? a
- ?
• JJJ ? o a z E 3
?
/ F Y S
Qi L
V
( .
?
?
G
O F
- 1 a?
? ou?3v?o LL
-
??
O ? w
m
3 0 '-
_ z z z
w
°
°
3 w
0 0 0 5
r a
z
'
?
° U
W z
o
w
O O Q K U U U??
i
? ? a a z a o 0 o j in
?
N U Z - C
W ? u o z
?
v°
3 -
, - -
o i• I l 0
I
r
a
a
0
z
0
a
a
z
0
U
N
K
9 OVN
wOa ?O oN
A,4
i
/> ?I !-?1 SP OtlN I. I o
I O
I ? U
II
nj ? o
U
CARMON ROAD i
a
a
a
c
0
a
a
z
0
c
w
? N
? rc
z w w
c o rc o a
o ¢ z 3 3
° 5 n w w
o w ? 3 v? o ?-
3 z z z
w a w o 0 0 s
z
w a? z a o 0 o w?
U J O Z -=i ? -Ui U?
3
e
---
-------------
°?' •x.4,1 •\
? ?. •
r
I a o?
o
\•
j
M
•\
I
I
I
I
I ^
? o
I
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I o-
I
I
I 3 ^\
I
I
I
I
I
I
I
I'
n
3
` re
R'g
E(A)
.•s.•. off, o •?
a w
gi:: ? a o
Q n tt o ti 3
°I ?:•?N J Q -G ? II
a? ? 5 4 w
Q /, . ? o P Q ?- 7 K a ? w
1? aw 3No
IW Z 1 Z
/ N
o, o,
,:.IaP <?: + . 0 1 0
o?s - ?-
:;:;:
3 ^ ^ wm
? a ?aa Fa ??? n aa? 'EABR&a E33?Ea s a'??4aRa'?aa xE6E
' ?a$E RaAE§E ab x RER'Sa9asaEa3 EE?s aarix _Aaa#aa aaR.
._ Exas?`a?E3a afi?EE? 3i ERE sII? 3&ascR Ra^F?a°ca Easa Ra 5az
Ilitll l
Exfe5 a 3zmRE48?E @s EEaY EEa9a iR as srE R a sE esr?
? s a s as ^c 'axa#R@Ea E @da aAaa9?-# a9ka a.
E R^R afl&aa E41,5 BaaEaa Ea ERFI REEa9RaM vi sg..
as ge ... 98 8® saReaa a c? A r•^pRnx?EE a^x
? ?ae?S?E3?&??Raaz?s&s?v,??s,?y??s?s?????$YYggqss§sppssgsss.•
rb? I
bk? I t I'
t
1
I
S rE ax RaeaB..§isE R $ aaai§R 3Raxa 3 aR§x a eRES.
a g-xs g R we yaa WR ra xaaa a?EB oa agggg a as
ce avrv a?3E????3????e ?9 r333????
$E ca aaR 9E a $R? E3e'?°9kR°#E.?R saa a;Rx a"a 9xa a3
sa xR R aesaE RR HE M- a sr
?a??R$aaa$$??4349fbabab Hip
3k.•
/
/ O
/
/ a O
// ¢ m II
w
/ 3 p
/ Q p K ? N 3
/ F a Z ? w
a a
/ n O ? 3 v` O
w
3 0 0 0 Z0 E
G Z
W O O ¢ U - ¢
J (l. h Z d q 5 E N
U U O Z>>> U 0
??.?.T - •. 10
A A3aaRR pap AgR358?s qAq gpa asa 5??a 8p=aA=qq??_p6p R5R aFa qE4
i ,\ 'n ?6ibE @R8R8 R?'N?CAF2SI?@ Nf?P?FCpR
----------------------------------
\, '\ ? '<' ?9c's E4SE5$?Ei?Ca@5'sA=A$u?k3?fc'saz
\ ?\Y44444??i??49444444494.tii34Y
4 '\ ¢ a kl II I'
asa999s@$a@$$R @ a an@F $secRx
----------- --------
-------------------
\ r•;.?.•••m m s q acs-- gggg?= gg@@E F?$
_ Z ia'?gTgggrla !r'Trr+-rIT'tT'^-` ,
?\ \?? ? O ??? 3£???????????444444Y44YY444444
?\ 4 J o $db?daid! S$.9 `66Ras 3 '9?$R?A$6R 8
\ ?? F yaRG-----------------
- U RJR?? ?C pRF ?.p RI1_
aee
ss Mm- '11H
ii 11 1 ITT T5, j
i
\
\ l t
\ t
\ \ 1
\ ? 1
to ae? vt i
\t t ,,R
. E4) I I
- vii _U
?jl
I 5 of _ ??.o• '?: :j:?< N
i ..:...:.:.:.:..:.:.:.:.? °
I i l a
I ? ? o
I I ? 3 ? a
I i ? I
I
1 1 1 I
I ' j F I
-_-I I I o 1
i ] ? Fa?xroaa R?xaa a?fro@i3 ?s£ a8s?®:@9??is
---------------
I1 ? °- yya®@d ?xg85??? ^a?gg9 ?'a$8 #i?aa?a 5?ro'a a
I I o §?4?i?x?Y???'Y1?????a?a4??4c$$.I.:a.sc
I ? I
I I
l i I
i 1
i I I
i J I
w
i 1 0 o c 3
a z z s
f 1 ?
a a
0 I ? a in ° w e w `w
I, O ? ?\ Qp U? 3 in O j
3 w Z Z Z m
d O O O 2
z (? Z Z O w
O .? \? W d d Z R ? ? ? K K
` a i ? w ¢ c rc ? ?
I ? ? U U O G i>> U u]
1N0
r ?
i `
i `
i .\
i \
??? l??p? Cfl OtlN I \\
1P? i ? \
o
0
- - - - - - - - - - - - - - - -
/ o
?_ I II
I o
I °
i
I
I
Q
a
o
nm r
j Z ,? o, Io ti
o :w m;?;m;m m
Z IoNmi?S?
v Id a;-0 -01 ?o
0 3
o ? a ? w
o?
? to < r ? 3 m o
O U ?
? Q 3 w ?
p a a < o
z
a w o 0 0 ?
U O D U U- W
J R d Z 6. O N O V1
In v? ?? 3 rc ¢ c ?.
loo
U n U' 0 O w>>> o
U G
a l° +• ? ? LJ I? O
ooj
?='?r? ? fH avN l a
NAp tl5 ??--
- ? C
01N1a11°"
• 4 1 ?i I' ?:: t F o
g c p A a F° N N I' 66655d?88fl8888d?dS558d?,,5e a8????, 65d5855d??88??8''???'??°ea??,. n
-?i ^?' o 0 o v z v r l III I § I ' p
i o 0 o m ? ? ? to ktlDQ kR9E EZ9 tlBE9 §S+?k RkEEtl tl k L3FH Rk3 S §EEQd4 p@tlSffQ k k=.
z z z n p G !I II- I) Iil -;- '
m ern-???\ 0.1 II__I 1 1 ??? ___ + -p
? ?n §§pppp®® ®?gg 8p®® gkkk Q9kkk9Rkk R9 Q®®Q5®p kkgpp qqggqq gg8p 8
.? o in E -? y o fi@9d? 9? 46%@XTFSEC01IEk"se Herne tl ax §a'ek k?$&§pe¢e, d.?Pk R)?$k ffi= -
"o ? m ? ti QYYE6FG7R82flCEs'n E4a Rk4i 4 kka4k?3idtl QtlkQC&R kYF9_9QYtl YEa'nk'a. Z
p Z D D O
Z n C
> O A A
'^ n y z >
a n
?Ow
Nd''
I
d ?
I I?
I I
I I I \
I 1 0
I fl Ifl? IR° o??NB ? \
I I? 10 ?N ? m o \\
= I ° o
I I n i I. °° - \
a I I I ? 1 I ti"
f C7 I I o a ° a
I
m o I I I ? j 1
f I l i D I I
o I l i p i I
I + I
I j i I
o j I Ir i ?
?o ?? ??i qy gg :v=:3
e
83
01 m 1 0 1 I T
o c c` `c c A ? tc'II o, '?,e \\
z ai u f c?
?n < 'n vl ?n
z z n Z I.I `II \-L
N m
z' S K c rn i \
n w? s cn\\
4 \\
\ V\
SHEET 3E \\
m =1 = 1'I
m ? ? m ?=_s" II m II
51' ? II
f ? gIT; ? ? - "li w i1
a F w n EI o II
?????? o `I ?I II =1i
SHEET 3H s I, m l 1,
r- ?
T T"1 1 m Ij \\
sssssssssssss '
e?ssaa a s ?I??I?`?ss?s? '- I 5 m I ?I i
c taa ... a$ A?.tlYgs? I ` _
p a e c a1 eaal ea yC sy o ? I
(I( I III ?.i9?affi? 7 °'
silae$ $3°- s? s'gxlg°° °I5 III " ? ?I
6??8 I I bsueasl a ° la ?°°s' i??°?`w?I
I I' I I - - . 1?1
IPPaIn
m'
D
li
T I I gg
"o Eiff I II I xxsff s.f ss?E1 m
II I ! iii; N D
I ? I f ?
e.. au xssayef"zaea s i3;i ri
d 9laL',. ~
g?$a8$$iYi°.88 B$ ab F$?9 LE „88 ?'?$ai
o
$0
. x ano
ISO