Loading...
HomeMy WebLinkAbout20110375 Ver 1_Approval Letter_20110523~~~ ~~~~~ NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Coleen H. Sullins Director Dee Freeman Secretary Mr. Allen Stowe 101 Nichols Drive Greenville, NC 27834 May 23, 2011 DWQ Project # 11-0375 Pitt County Subject Property: Lot #32 Located off Nichols Drive in Greenville Tar-Pamlico River Basin, Ut to Meeting House Branch (TAR O5, 28, 97, 1; NSW, C) Approval of 401 Water Quality Certification and Authorization Certificate per the Tar- Pamlico River Buffer Protection Rules (15A NCAC 2B .0259) with Additional Conditions Dear Mr. Stowe: You have our approval, in accordance with the attached conditions and those listed below, to place fill within or otherwise impact 125 linear feet of streams and 2,500 square feet (ft2) of protected riparian buffers for the purpose of stream bank stabilization and buffer restoration at the subject property, as described within your application dated April, 15, 2011 and received by the N.C. Division of Water Quality (DWQ) on April 19, 2011. The impacts described in your application are covered by General Water Quality Certification Number(s) 3689 (GC3689). The Certification(s) allows you to use Nationwide Permit(s) 13 when issued by the US Army Corps of Engineers (USAGE). This letter shall also act as your approved Authorization Certificate for impacts to the protected riparian buffers per 15A NCAC 2B .0259. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. North Cazolina Division of Water Quality Internet: www.ncwater uality.org 943 Washington Square Mall Phone: 252-946-6481 One Washington, NC 27889 FAX 252-946-9215 NorthCay~ro/l/ina An Equal OppoRunitylAfrirmative Action Employer - 50% Recycled110% Post Consumer Paper ~~~~{ ~L`~ Page 2 of 4 The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount A roved (Units Plan Location or Reference Stream 125 (feet) ri ra fill Plan Sheet 1 404/CAMA Wetlands acres Waters acres Buffers 2,500 (s uare ft.) Plan Sheet 1 2. Erosion & Sediment Control Practices Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 3. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 4. No Sediment & Erosion Control Measures w/n Wetlands or Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources has released the project. Page 3 of 4 5. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699- 1650. 6. Diffuse Flow All constructed stormwater conveyance outlets shall be directed and maintained as diffuse flow at non-erosive velocities through the protected stream buffers such that it will not re- concentrate before discharging into a stream as identified within 15A NCAC 2B .0259 (5). 7. Buffer Replanting Replanting of vegetation within disturbed areas located within 30 feet of edge of stream associated with stream bank stabilization must be done in an "in kind" manner immediately following construction. (Example: Disturbed areas with pre-existing grassed lawns must be replanted with grass. Disturbed areas with pre-existing trees or woody vegetation must be replanted with trees and woody vegetation. Disturbed areas with pre-existing forest vegetation must be replanted with forest vegetation including at least two different native hardwood tree species at a density sufficient to provide 320 trees per acre at maturity. 8. No Sediment and Erosion Control Measures in Wetlands and Waters Sediment and erosion control measures shall not be placed in wetlands or waters to the maximum extent practicable. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored within six months of the date that the Division of Land Resources or locally delegated program has released the project. 9. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. 10. No Impacts Beyond those in Application No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts Page 4 of 4 or to conduct impacts to waters as depicted in your application and as authorized by this Certification shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Tar-Pamlico riparian buffer protection rule as described within 15A NCAC 2B .0259. If you have any questions, please telephone Roberto Scheller of the Washington Regional Office at 252-948-3940 or Ian McMillan of the 401 Oversight/Express Unit at 919-715-4631. Fir Enclosures: Certificate of Completion GC 3689 cc: Lisa Kirby, City of Greenville Emily Jernigan, Corps of Engineers, Washington Field Office ~/ISWQ 401 OversightlExpress Unit DLR, WaRO File copy