DEPARTMENT OF THE AIR FORCE
4TH FIGHTER WING (ACC)
SEYMOUR JOHNSON AIR FORCE BASE NC
MAY 0 9 2011
Mr. Dennis G. Goodson
Deputy Base Civil Engineer
4th Civil Engineer Squadron
1095 Peterson Avenue
Seymour Johnson AFB NC 27531-2355
Ms Coleen H. Sullins
NCDENR, Division of Water Quality Section
401 Oversight/Express Review Permitting Unit
1650 Mail Service Center
Raleigh NC 27699-1650
Ref: Project Name: Repair Drainage on East End Runway
Project DWQ#: 20080987
Location: SJAFB - Goldsboro, Wayne County
Drainage Basin: Neuse River/03020202
Submitted on Behalf of. Department of the Air Force
Dear Ms. Sullins
Enclosed please find the Certificate of Completion as required by the subject permit. Work concerning
the filling of the wetlands is now complete. If there are any questions/comments please feel free to call
my Point of Contact, Mr. Robert Bero, P.E. at (919) 722-5579.
Thank you for your cooperation.
Attachment:
Certificate of Completion
Sincerely
L' h L
DENNIS G. GOODSON, P. .
Deputy Base Civil Engineer
(j&o6d bwff fiorAmerka
D
MAY I 0 2011
y
DE" .
ep $ ?? U4
Certification of Completion
DWQ Project No.: 20080987 County: Wayne
Applicant: Mr. Michael W. Smith, P.E., Seymour Johnson AFB
Project Name: Seymour Johnson AFB East End Runway Project
Date of Issuance of Wetland Permit: February 2, 2009
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification, and any subsequent modifications,
the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit, North Carolina Division of
Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the
applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's Certification
I, Michael W. Smith, hereby state that, to the best of my abilities, due care and diligence was used in the observation of
the construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification, the approved plans and specifications, and other supporting materials.