Loading...
HomeMy WebLinkAbout20060740 Ver 1_Complete File_20061211DWQ Project No.: 0 (00 9 LAD County: 14 M1Kt Applicant: N C 'D oT T e v+ g% o r, % "Tt en 0+)N.i 5 ON%n 5 o n Project Name: $Q 1y39 NoY-,,¢, CC-Ur ' i Date of Issuance of 401 Water Quality Certification: skin- aQG(? Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699- 1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Agent's Certification W F_ L C , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: Engineer's Certification Partial Final I, , as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project,for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date 9y, yl,??i S iA•. PA . T,yy C7?0? *A T QG r O `C I J _^ * AA ?o 09P, <00 sT RoU 6 Re'?b ?h APPROVAL of 401 WATER QUALITY CERTIFICATION Mr. Timothy Johnson, P.E. Division Engineer NCDOT, Division 8 P.O. Box 1067 Aberdeen, North Carolina 28315 Dear Mr. Johnson: William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality June 21, 2006 Hoke County DWQ Project No. 060740 State Project No. 813.204711 with ADDITIONAL CONDITIONS You have our approval, in accordance with the conditions listed below, for the following stream impacts for the purpose of replacing a deficient crossing pipe in Hoke County: Stream Impacts in the Cape Fear River Basin Permanent Temporary Fill Permanent Fill in Temporary Fill Total Stream Site Fill in in Perennial Stream in Stream Impacts Intermittent Intermittent (linear feet) Perennial Impact Requiring Stream Stream Stream (linear Mitigation linear feet linear feet linear feet feet L.F. Site 1 20 20 Total 20 20 Total Stream Impact for Project: 20 linear feet The project shall be constructed in accordance with your application dated May 1, 2006, received May 3, 2006, and with the minor modification received June 9, 2006. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3404. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the DWQ and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or N [ hCarolina AdurallY North Carolina Division of Water Quality 225 Green Street - Suite 714 Fayetteville, NC 28301-5043 Phone (910) 486-1541 Internet: www.ncwaterquality.org Fax (910) 486-0707 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Michael F. Easley, Governor Customer Service 1-877-623-6748 1 Mr. Timothy Johnson June 21, 2006 Page 2 if total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification. Additional Conditions: Placement of culverts and other structures in waters, streams, and wetlands shall be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested in writing by DWQ. If this condition is unable to be met due to bedrock or other limiting features encountered during construction, please contact the NC DWQ for guidance on how to proceed and to determine whether or not a permit modification will be required. If concrete is used during construction, a dry work area should be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete should not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. The dimension, pattern and profile of the stream above and below the crossing should not be modified. Disturbed floodplains and streams should be restored to natural geomorphic conditions. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. Heavy equipment may be operated within the stream channels although its usage shall be minimized. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. i Mr. Timothy Johnson June 21, 2006 Page 3 The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise authorized by this certification.. A copy of this Water Quality Certification shall be posted on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the Division Engineer and the on-site project manager. The outside buffer, wetland or water boundary located within the construction corridor approved by this authorization shall be clearly marked by highly visible fencing prior to any land disturbing activities. Impacts to areas within the fencing are prohibited unless otherwise authorized by this certification. Upon completion of the project, the NCDOT Division Engineer shall complete and return the enclosed "Certification of Completion Form" to notify DWQ when all work included in the 401 Certification has been completed. Native riparian vegetation (ex. list trees and shrubs native to your geographic region) must be reestablished within the construction limits of the project by the end of the growing season following completion of construction. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 0 Mr. Timothy Johnson June 21, 2006 Page 4 Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved by this Certification. If placement of sediment and erosion control devices in wetlands and waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. This approval will expire with the accompanying 404 federal permit. This condition supercedes condition No. 19 in General Certification No. 3404. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition that conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Ken Averitte at (910) 433-3303. Sincerely, // I `9A 'yW &I Alan W. Klimek, P.E. Attachments (General Certification and Certificate of Completion form) cc: Wilmington US Army Corp District Office Art King, Division 8 Environmental Officer Richard Spencer, US Army Corps of Engineers, Wilmington Field Office DWQ Fayetteville Regional Office Rob Ridings, 401 /Wetlands Unit, DOT Group Central Files File Copy Hoke.srl 439A.doc mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. I. Wetland Impacts Wetland Impact Site Number (indicate on map) Type of Impact* Area of Impact (acres) Located within 100-year I'loodplain** (yes/no) Distance to Nearest Stream (linear Icet) Type of Wetland*** -_-- - None - - - - - * List each impact separately and identify temporary impacts. Impacts include, but arc not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainagc, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains arc identified through the Federal Fmcrgcncy Management Agency's (FINA) Flood Insurance Rate Maps (FIRM), or FFMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://www.fcina.gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwatcr marsh, forested wetland, beaver pond, Carolina nay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number (indicate on map) Type of Impact* Length of Impact_, (lit Bart- tK Stream Name** Average Width of Stream Before Impact Perennial or Intermittent'? (please specify) Site I Perm 20 11 UT into Little Marsh I Swamp Swa 9 ft Perennial Temp 4011 * List each impact separately and identity temporary impacts. Impacts include, but arc not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet bcf'ore and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. 11'strcam relocation is proposed, plans and profiles showing the linear footprint Cor both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. 11'a stream has no name, list as U I (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1- 800-358-9616, or online at www.usgs.gov. Several interact sites also allow direct download and printing of' USGS maps (c.g., www.topozonc.com, www.mapquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: Perm:20ft Temp:40ft for construction and dewaterin€T. Rip Rap *for bank stabilization in the area of the temp impact and above the plane of normal high water. .a 51A1j o? STATE OF NORTH CAROLINA O ?V MqY o ?O!49 3 taros"R.wgr ??OF ?o$rORWA 7) DEPARTMENT OF TRANSPORTATION ?ay?y MICHAEL F. EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETr GOVERNOR SECRETARY May 1, 2006 Rob Ridings NCDWQ 401 Wetlands Unit 1650 Mail Service Center s-? Raleigh, NC 27699-1650 ( 0 Subject: Nationwide Permit #14 SR-1439 Hoke County Project # 8B.204711 (DWQ Permit Fee 5200) n j -- Mr. Ridings: O The North Carolina Department of Transportation, Highway Division 8 is requesting a 401 Water Quality Certification in association with Nationwide Permit Number 14 for project # 813.204711 on SR 1439 (Chasen Rd.) in Hoke County. The proposed project will replace an existing deficient crossing pipe as follows: Site I- Replace existing 1 lines of 72" x 50' CMP with 1 lines of 103"x 71"x 70' CMP. The total percentage of impervious surface within the project area will remain at less than 30%. All erosion control devices will be appropriate to the location and in compliance with the current version of the NCDOT Best Management Practices manual. UThere are no Wetland impacts associated with this project. This project is located on an unnamed tributary of Rockfish Creek, a class B (at this location) within the Cape Fear River basin. If dewatering is required at this site, it will be done with the use of a movable device (sheet metal piles or concrete barriers). Construction will be done under dry conditions whenever possible. There were no threatened or endangered species observed within the project area during the required minimum criteria check. Detours for this project will be done off site using local state roads. If you require any additional information, please contact me. Si rel , A7? King Division Environmental Officer Highway Division 8 cc: Tim Johnson, PE Tim Welch, PE Barry Harrington P.O. BOX 1067, ABERDEEN NORTH CAROLINA 28315 PHONE (910) 944-2344 FAX (910) 944-5623 4 j i i 3 i E I i i I I I i i i w i q? W CO) 0- D j r PAS may` ;gill NY'/ 6 ) ir 1) 1 Cork 4 1112 ?,n f ti ip? ,I TopoQi" CowritM 01!!9 Delm ue Y amouik ME 010% 8oum DAmUWA ?-- 1000 R Bak 1: 25.080 DeWk 134 Dsbm: WGM J Office Use Only: Form Version October 2001 2 0 0 60 7 4 0 USACE Action ID No. DWQ No. If any particular item is not applicable to this project, please enter "Not Applicable" or "N/A" rather than leaving the space blank. 1. Processing 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Section 10 Permit ® 401 Water Quality Certification ? Riparian or Watershed Buffer Rules 2. Nationwide, Regional or General Permit Number(s) Requested: NWP 14 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: ? 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of unpacts (see section VIII - Mitigation), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: North Carolina Department of Transportation Mailing Address: Timothy Johnson, P.E., Division Engineer North Carolina Department of Transportation Division 8 P.O. Box 1067 Aberdeen, North Carolina 28315 Telephone Number: (910) 944-2344 Fax Number: (910) 944-5623 E-mail Address: TJohnsonndot.state. nc.us 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: T. F. Welch, PE Company Affiliation:_ NC Department of Transportation Mailing Address: PO Box 289 Siler City, NC 27344 Telephone Number: (919) 742-5649 Fax Number: _ (919) 663-0214 E-mail Address:_ twelch(2dot.state. nc.us -5- M. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Nlap and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project SR 1439 Hoke County 2. T.I.P. Project Number or State Project Number (NCDOT Only): 8B.204711 3. Property Identification Number (Tax PIN): N/A 4. Location County : Hoke Nearest Town: Raeford Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From Raeford follow SR 1003 South for approx. 6 miles to Sandy Grove turn right on SR 1439. Site is approx. 1/2 mile. 5. Site coordinates, if available (UTM or Lat/Long): N 34* 56.56' W 79* 5.12' (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Describe the existing land use or condition of the site at the time of this application: Rural 7. Property size (acres): N/A 8. Nearest body of water (stream/river/sound/ocean/lake): Rockfish Creek 9. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at hap://h2o.enr.state. nc.usiadmill /maps:'.) -6- 10. Describe the purpose of the proposed work: Replace existing 1 line of 72"x 50' CNIP with 1 line of 103"x 71"x 70' CMP. 11. List the type of equipment to be used to construct the project: Excavator 12. Describe the land use in the vicinity of this project: Rural/Residential IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application: N/A VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream -7- mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Wetland Impacts Wetland Impact Site Number indicate on ma Type of Impact* Area of Impact acres Located within 100-year Floodplain** es/no) Distance to Nearest Stream feet Type of Wetland*** None * List each impact separately and identity temporary impacts. Impacts include, but are not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at Ltit? *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) List the total acreage (estimated) of existing wetlands on the property: Total area of wetland impact proposed: 2. Stream Impacts, including all intermittent and perennial streams Stream Impact Site Number indicate on ma Type of Impact* Length of Impact linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? leasespecify) Site 1 Perm 70 ft UT into Little Marsh Swamp 9 ft Perennial Temp 40ft * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and afler, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at use,L0\. Several intemet sites also allow direct download and printing of USGS maps (e.g., a??w t ltayoutecrm, %x \N mnuuest aun, etc.). Cumulative impacts (linear distance in feet) to all streams on site: Perm:70ft Temp:40ft for construction and dewatering. Rip Rap *for bank stabilization in the area of the temp impact and above the plane of normal high water. -8- 3. Open Water Impacts, including Lakes, Ponds, Estuaries, Sounds, Atlantic Ocean and any other Water of the U.S. Open Water Impact Site Number indicate on ma Type of Impact* Area of Impact acres Name of Wat) (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. None * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 4. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): N/A Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. VIII. Mitigation DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. -9- USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at htt??: %I??o.enr state.nc.us'nc??etlandsistrm?,ide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP) with the NCWRP's written agreement. Check the box indicating that you would like to pay into the NCWRP. Please note that payment into the NCWRP must be reviewed and approved before it can be used to satisfy mitigation requirements. Applicants will be notified early in the review process by the 401/Wetlands Unit if payment into the NCWRP is available as an option. For additional information regarding the application process for the NCWRP, check the NCWRP website at hup:/Ji2o cnr.st:ite.nc.ns'«,p1lidex.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): Amount of buffer mitigation requested (square feet): Amount of Riparian wetland mitigation requested (acres): Amount of Non-riparian wetland mitigation requested (acres): Amount of Coastal wetland mitigation requested (acres): -10- IX. Environmental Documentation (DWQ Only) Does the project involve an expenditure of public funds or the use of public (federal/state/local) land? Yes ® No ? If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (DWQ Only) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 2B .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify )? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact (square feet Multiplier Required Mitigation 1 3 2 1.5 Total Lone I extends out JU tect perpendicular irom near banK of Cnannel; Lone L extends an additional 20 feet from the edge of Zone 1. If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A XI. Stormwater (DWQ Only) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. Neither the current impervious cover (asphalt pavement) nor the new proposed impervious cover (asphalt pavement) will exceed 30% of the total site area. Erosion control devices apRropriate to the site will be utilized on this project which may include silt fences, check dams, and storm water retaining basins. XII. Sewage Disposal (DWQ Only) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. XIII. Violations (DWQ Only) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). s-/.moo Applicant/Agent's Si'gnatuie ' Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) -12- 37 . awn / , 1411, 8 8 ?f? r 1 e09 1409 1417 ?' o-,7 ' ? 1 119 TR2Hf':IM? 1 I 1 1203 . .OF 110T?y./ 114 , a lrfl I 111 P 11 r. A E S O N Al J O G F BRID, NORTH CAF ICLUDES ONLY STATE MAINTAINED ROADS ?b ROADS. ' ORTANT no N_' YST17 KEY TO COUNTY ROAD NUMBERS suown tis uc SEPTEMBER n, zoo. ALSO NUMBERS 1001 T003 k I I s I I a raa f-O O FAYETTEW-b- - Is /?i141 F IIIO / 0 O G 2 4 7 341ST _ Cam, ? - con- 1 i , ` r Q ' ? \ \ ?• • } ?1 te ,- ?? ?. ? ? ?J ../ `\ Y; ; '.,` ?-? i 1111 1437 X555 The cpobov? 1!! u 3-D TopoQusdsCop ritU C 1499 DeLorst Yuumxlt, N[E "096 s=u DjtLL'SGS 1 1000 rt scak 1: ZUW DctriL 13-0 Diu= WGsu Tree to be removed N (1' diao) i t X LO i xi x i i of x? Q w N 5R l y 3 q NoK? C o UT ?A. /- hoke1439.dgn 04/18/2006 10:30:29 AM i. Te?•,por a?y lJ- per, c e S '»s?'allea as necesso??, i i ? odd ? c o., dd hC d d c 0 d O 0c 1cocc i dd i r O C± d0 ` f rd00 ?G 00dd 1 ! ;dnv I oa ';oa?? ; .Y=. I o?o c. c? ono l0 3" i I Iron I ' ? O?C d?0? a - o a - \? Oddd? ?^ddd ,r v?d°?, i f OvC_C ? _ Vc" ? ?- er??Qorp,'?'V-?:I"?" 'F2nces in s?'alleb s ?e ?e.ssGr y O io3„? -W, x r7 l 4- LA- 1? 3? I II x ---------- i T TEMPORARY DIVERSION DESIGN CONCRETE ?ARRIER OR I I STEEL SHEET PUNG I I I I I I I ? I I ? I I '1 I 5i; BAC ?- Ililil!i11111',1 4 I I 0 I K I I ? I I Iii %lL r ENERGY DISSIPATER NOT TO SCALE /o3'x 7/ " NOTES: 1.) LVSTALL TEifPORARY BERtifS, DIVERT STREAM FLOW BY PUAfPING WATER AROUND WORK AREA. 2) PUMP CONTAlNED AREA TO SILT BAG AhD REifOVE E.YISTING PIPE & LMWWALLS. 3.) LYSTALL PIPE AND BACAUUL 4.) REWO VE TEMPORARY DIVERSION DEVICES CONCRETE BARRIER OR I STEEL S?E?T PILING I IMPERVIOUS FABRIC LrzWFly PLWM. mmllm01 Y .W Alm. ?? X03 71 x 70 ' 117