Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20140090 Ver 7_USACE and DWR site review notes U-2579B_20210112
Strickland, Bev From: Euliss, Amy Sent: Tuesday, January 12, 2021 9:40 AM To: Alsmeyer, Eric C CIV USARMY CESAW (USA) Cc: Suggs, Phillip H; Wanucha, Dave; Nifong, Johnny R; Michael Hartness (NCDOT - KCI) Subject: RE: USACE and DWR site review notes U-2579B Attachments: site 2 outlet photo 2.jpg; Site 2 outlet photo 1.jpg Eric, At your request excess 57 stone and class B have been removed from the stream bed at the pipe outlet of site 2. That has been completed. Pictures are attached. Amy From: Euliss, Amy Sent: Thursday, November 5, 2020 2:22 PM To: Nifong, Johnny R <jnifong@ncdot.gov>; Michael Hartness (NCDOT - KCI) <michael.hartness@kci.com> Cc: Suggs, Phillip H <psuggs@ncdot.gov>; Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave <dave.wanucha@ncdenr.gov> Subject: USACE and DWR site review notes U-2579B Johnnie and Mike, Here are the notes that I took today. Let me know if you need me on site for the floodplain excavation at site 18/19. Also, let me and Phil know when all of the PSH are repaired per Mike's list (attached). Site 2: remove excess 57 and class B from stream bed that is in the flow line at pipe outlet. Fill around sewer manhole. Take a picture when done so I can send to Eric. Site 4 outlet: finish stabilizing raw area to right of pipe outlet. Remove old silt fence. Site 5 outlet: remove silt fence/orange fence. Site 31: install the energy dissipator Site 11: check to see if rip rap ditch is supposed to tie into stream Site 12 and 11a: no comments Site 18/19:: slope rills on slope and sediment around drop inlet. Remove wash stone at wetland. Fix right bank at inlet adjacent to low flow barrel where it is eroded. Cut willow that is directly at high flow inlet. Remove material at floodplain pipes to elevation of wetland as discussed several years ago. At outlet, exposed ditch currently waiting for seeding. Add temporary silt fence and wattles to protect stream. site 9 inlet: no comments Western Brooke culvert channel relocation: no comments i If anyone has anything additional, let me know. Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss©ncdot.gov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. ce