Wanucha, Dave
From:Euliss, Amy
Sent:Wednesday, January 13, 2021 8:26 AM
To:Wanucha, Dave
Subject:U-2579DEF - Permit Site 20 DWR
Thanks Dave!
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Wednesday, January 13, 2021 8:14 AM
To: Euliss, Amy <aeuliss@ncdot.gov>
Subject: Re: \[External\] Mod 05 RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112.
That’s fine, you may proceed. I’ll send you the field mod today or tomorrow for signature.
Dave Wanucha
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27105
Email correspondence to and from this address is subject to the
North Carolina Public Records Law and may be disclosed to third parties.
On Jan 13, 2021, at 7:39 AM, Euliss, Amy <aeuliss@ncdot.gov> wrote:
We got Eric’s permit mod back. Can we proceed with the work while you work on the infield
mod? Thanks!
Amy
From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>
Sent: Tuesday, January 12, 2021 4:44 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Subject: \[External\] Mod 05 RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112.
1
Amy
From: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Sent: Friday, January 8, 2021 2:57 PM
To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Euliss, Amy
<aeuliss@ncdot.gov>
Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K
<mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R
<zrmclaughlin@ncdot.gov>
Subject: RE: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112.
Amy,
My previous email allowing the changes as described still stands. If you need anything more,
let me know. Thanks.
Dave W.
Division of Water Resources
401 & Buffer Transportation Permitting
NC Department of Environmental Quality
336-776-9703 office
336-403-5655 mobile
Dave.Wanucha@ncdenr.gov
NC DEQ Winston Salem Regional Office
450 West Hanes Mill Road, Suite 300
Winston Salem, NC 27106
Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental
Quality has adjusted operations to protect the health and safety of the staff and public. Many
employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all
DEQ office locations are limiting public access to appointments only. Please check with the appropriate
staff before visiting our offices, as we may be able to handle your requests by phone or email. We
appreciate your patience as we continue to serve the public during this challenging time.
From: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>
Sent: Friday, January 8, 2021 10:58 AM
To: Euliss, Amy <aeuliss@ncdot.gov>; Wanucha, Dave <dave.wanucha@ncdenr.gov>
Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K
<mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R
<zrmclaughlin@ncdot.gov>
Subject: \[External\] RE: U-2579DEF - Permit Site 20 (Mill Creek); DA# 2017-02112.
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Amy: Unfortunately, I cannot authorize this without a mod, particularly since it is for a different purpose
than the other temp impacts. However, I can modify it fairly easily, and maybe quickly, if you will
provide me with the square footage of temporary impact from the 65’ of impacts.
3
Dave: let us know if this changes your response.
There are options for how to deal with the WQC. If Dave can confirm that no formal WQC change is
needed (in-field mod?), then I can go ahead with a mod for site 20.
I would prefer to combine this mod and the U-2579AB mod (since they are under the same IP and DA#),
if the U-2579AB mod WQC will be done soon. This would especially work well if Dave does need a
formal WQC mod for Site 20, and the U-2789AB mod; and a combined mod, or 2 separate mods, would
be done soon.
I don’t want to make it more complicated than it has to be. If you have any questions, please give me a
call.
Thanks!
Please reply or call if you have any questions or if I may serve you in any other way.
The Wilmington District is committed to providing the highest level of support to the public. To help us
ensure we continue to do so, please complete the Customer Satisfaction Survey located at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
Eric
Eric Alsmeyer
Work Cell: 919.817.1570
Project Manager
Regulatory Division Office
US Army Corps of Engineers, Wilmington District
3331 Heritage Trade Drive, Suite 105, Wake Forest, NC 27587
Office Tel: (919) 554-4884, x23 (I am working out of the office, but I try to check my voicemails daily)
Regulatory Homepage: http://www.saw.usace.army.mil/Missions/RegulatoryPermitProgram.aspx
From: Euliss, Amy <aeuliss@ncdot.gov>
Sent: Friday, January 8, 2021 8:13 AM
To: Alsmeyer, Eric C CIV USARMY CESAW (USA) <Eric.C.Alsmeyer@usace.army.mil>; Wanucha, Dave
<dave.wanucha@ncdenr.gov>
Cc: Miller, Vickie M (Vickie.Miller@hdrinc.com) <Vickie.Miller@hdrinc.com>; Kiser, Marcus K
<mkkiser@ncdot.gov>; Wyrick, Scott D <sdwyrick@ncdot.gov>; McLaughlin, Zachery R
<zrmclaughlin@ncdot.gov>
Subject: \[Non-DoD Source\] FW: \[External\] U-2579DEF - Permit Site 20 (Mill Creek)
Dave and Eric,
Below is an email from Vickie Miller with HDR. They are the Design team on the U-2579DEF
project. The contractor needs to install a temporary crossing to bring a crane to the site. After your
review, let me know if you do or do not have any objections to us proceeding. We no longer need to do
the previously permitted work pad (site 20C-165’), but instead need 60’ of temporary impacts at the
same site but at a different location on the stream. The pdf labelled “RW-21_L-STA+50 Rev.3 markup” is
shows the location of the proposed site, and the pdf labelled “Site 20 Permit Sheet U2579DEF” shows
the site as it was permitted.
4
Give me a call if we need to discuss.
Amy
336-671-2886
From: Miller, Vickie M. (Raleigh) <Vickie.Miller@hdrinc.com>
Sent: Thursday, January 7, 2021 6:39 PM
To: Euliss, Amy <aeuliss@ncdot.gov>
Cc: Yelverton, Wyatt <Wyatt.Yelverton@hdrinc.com>
Subject: \[External\] U-2579DEF - Permit Site 20 (Mill Creek)
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an
attachment to Report Spam.
Hi Amy,
I have attached the permit plan sheet, the summary impact table, and a marked up sheet of the location
that Flatiron would like to put a temporary crossing at Mill Creek. You will notice they are not showing
the need for a temporary workpad in the channel but instead a 60’ long pipe in Mill Creek for a crossing
to move cranes, etc. The original permitted length of impact for the temporary work pad (Site 20C) was
165 ft. This would be less impact from that standpoint. The proposed location for the temporary pipe is
in an area where we will have impacts from a ditch tie in (Site 20A). Site 20 A currently is permitted for
16 lf of permanent impact and 21 lf of temporary impact. We would need to increase the temporary
impact by approximately 44 lf to cover the length requested as well as making sure we have temporary
impacts for dewatering/installation of the pipe (assumed 10 ft downstream and the 11 ft upstream
which was previously permitted).
Please let me know if you have any questions or comments. Thank you for checking on what will be
needed for this one.
Thanks,
Vickie
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.
<Mod05_Site20A_U-2579DEF_W-S N. Beltway_Forsyth.pdf>
<21-01-08__PD_SITE20A & Impact Summary_U2579DEF_WS N.Beltway_Forsyth.pdf>
5