526 South Church St.
Charlotte, NC 28202
Mail Code: EC09Q
704.382.4503
Danielle.anderson@duke-energy.com
April 27, 2011 20 1 10 40 2
North Carolina Division of Water Quality
NC DWQ, 401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650 sPAIR
'
Re: Stream Bank Stabilization at Eastside No. 1 Transmission Structure A -
Cleveland County, NC
Enclosed you will find five (5) copies of the completed PCN form and sketches of
proposed work to be completed for the above project. The contact person for this
project has been Allen Johnson with the Division of Water Quality Mooresville office,
who is familiar with this project.
A check for the Minor Water Quality Application Fee in the amount of $240.00 was
mailed on 4/22/2011 from Duke Energy's Supply Chain Department, separately from
this package. Correspondence with the check details is included in this package.
Please do not hesitate to contact me at 704-382-4503 or Danielle.andersona-duke-
energy.com should questions, concerns and/or problems arise.
Sincerely,
r---- a..,L"
Danielle Anderson
Enclosures
CC: David Staggs, Duke Energy Corporation
Randy Veltri, Duke Energy Corporation
Eric Shook, Duke Energy Corporation
?D
APR 2 8 2011
?nANOS
DEW ANO STOR?? INCH
Duke
?Energy.
April 26, 2011
North Carolina Division of Water Quality
NC DWQ, 401/Wetlands Unit
1650 Mail Service Center
Raleigh, NC 27699-1650
526 South Church St.
Charlotte, NC 28202
Mail Code: EC09Q
704.382.4503
Danielle.anderson@duke-energy.com
Re: Stream Bank Stabilization at Eastside No. 1 Transmission Structure
Cleveland County, NC
Enclosed you will find five (5) copies of the completed PCN form and a sketch of proposed
work to be completed for the above project. A check for the Minor Water Quality Application
Fee in the amount of $240.00 was mailed on 4/22/2011 from Duke Energy's Supply Chain
Department, separately from this package. A ` (Evi - ?5? Ln M??
Please do not hesitate to contest me at 704-382-4503 or Daniel le.anderso 4uke-
energy.com should questions, concerns and/or problems arise.
Sincerely,
awl-L
Danielle Anderson
Enclosures
CC: David Staggs, Duke Energy Corporation
Randy Veltri, Duke Energy Corporation
Eric Shook, Duke Energy Corporation
Hines-Harris, Ramona
MMENOMM
From: Warlick, Susan A
Sent: Tuesday, April 26, 20118:20 AM
To: Hines-Harris, Ramona
Subject: FW: Attached Image
Attachments: 0768_001.pdf
Ramona - This invoice paid on 4122 and was mailed directly to the vendor.
There were no special handling instructions for check to be sent back to
you.
0002602315 NORTH 0000071957 04181124000NO 04/18/2011 240.00 PDGORH DP 20018 10073316 04/22/2011 Complete
CAROLINA
DIVISION
OF
WATER
QUALITY
Workflow Dialog -- Webpage Dialog
1CC7331c
10CCC13C54 C=;22:2011
524C.CC P
Thank you,
201 10402
CF WAr
F94G
o?
1 1 > -t
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.3 Dec 10 2008
Pre-Construction Notification (PCN) Form
A. A Hcant Information TW_
1. Processing
1 a. Type(s) of approval sought from the
Corps:
El Section 404 Permit El Section 10 Permit„
,. ;
1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number:
1c. Has the NWP or GP number been verified by the Corps? ® Yes ? No
1d. Type(s) of approval sought from the DWQ (check all that apply):
? 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit
? 401 Water Quality Certification - Express ? Riparian Buffer Authorization
le. Is this notification solely for the record
because written approval is not required? For the record only for DWQ 401
Certification:
? Yes ® No For the record only for Corps Permit:
® Yes ? No
1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation
of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu
fee program. ? Yes ® No
1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below. ? Yes ® No
1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No
2. Project Information
2a. Name of project: STREAM BANK STABILIZATION AT EASTSIDE NO 1 TRANSMISSION STRUCTURE
2b. County: CLEVELAND COUNTY
2c. Nearest municipality / town: SHELBY
2d. Subdivision name: N/A
2e. NCDOT only, T.I.P. or state
project no: N/A
3. Owner Information
3a. Name(s) on Recorded Deed: DUKE ENERGY CORPORATION (RIGHT OF WAY) ON PROPERTY OF CHAD
LAVENDER
3b. Deed Book and Page No. 1509, 501 (RIGHT OF WAY)
3c. Responsible Party (for LLC if
applicable): DUKE ENERGY CORPORATION, RANDY N. VELTRI, MGR.
3d. Street address: 526 SOUTH CHURCH STREET
3e. City, state, zip: CHARLOTTE, NC 28202
3f. Telephone no.: 704-382-2741 2011
3g. Fax no.: 704-382-6542 D? t- WATER QUALITY
3h. Email address: randy.veltri@duke-energy.com AT P8PA CH
t
s^;
Page I of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Applicant Information (if different from owner)
4a. Applicant is: ? Agent ? Other, specify:
4b. Name:
4c. Business name
(if applicable):
4d. Street address:.
4e. City; state; zip:
4f. Telephone no.:
4g. Fax no.:
4h. Email address:
5. Agent/Consultant Information (if applicable)
5a. Name:
5b. Business name
(if applicable):
5c. Street address:
5d. City, state, zip:
5e. Telephone no.:
5f. Fax no.:
5g. Email address:
Page 2 of 11
PCN Form - Version 1.3 December 10, 2008 Version
B. Project Information and Prior Project History
1. Property Identification
1a. Property identification no. (tax PIN or parcel ID): 21029
1 b. Site coordinates (in decimal degrees): Latitude: 35.2859 Longitude: - 81.5240
(DD.DDDDDD) (-DD.DDDDDD)
1 c. Property size: 0.70 acres
2. Surface Waters
2a. Name of nearest body of water (stream, river, etc.) to HICKORY CREEK
proposed project:
2b. Water Quality Classification of nearest receiving water: C
2c. River basin: BROAD
3. Project Description
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application:
SINGLE FAMILY DETACHED PROPERTY. HICKORY CREEK RUNS ALONG THE BACK OF THE PROPERTY. THERE
IS EXISTING DUKE ENERGY R/W AND A TRANSMISSION STRUCTURE ON THE PROPERTY. THE BANK OF
HICKORY CREEK IS WASHING OUT, CAUSING A POTENTIAL SAFETY HAZARD NEAR THE STRUCTURE.
3b. List the total estimated acreage of all existing wetlands on the property:
N/A
3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
100'
3d. Explain the purpose of the proposed project:
TO USE GABION BASKETS TO STABILIZE HICKORY CREEK'S BANK, PREVENTING FURTHER WASHOUT,
MINIMIZING THE SAFETY HAZARD THAT IS CURRENTLY PRESENT DUE TO THE WASHOUT NEAR THE
TRANSMISSION STRUCTURE.
3e. Describe the overall project in detail, including the type of equipment to be used:
GABION BASKETS FILLED WITH ROCK WILL BE PLACED TO STABILIZE THE CREEK'S BANK. A TRACK HOE
WITH FRONT END BUCKET WILL BE USED. EXTREME CAUTION WILL BE TAKEN TO MINIMIZE IMPACTS TO THE
CREEK.
4. Jurisdictional Determinations
4a. Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / ? Yes ® No
? Unknown
project (including all prior phases) in the past?
Comments: NONE REQUESTED TO DATE
4b. If the Corps made the jurisdictional determination, what type
? Preliminary E] Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company:
Name (if known): N/A Other.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
N/A
5. Project History
5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
N/A
Page 3 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Future Project Plans
6a. Is this a phased project? ? Yes ® No
6b. If yes, explain.
N/A
Page 4 of 11
PCN Form - Version 1.3 December 10, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were completed below for your project (check all that apply):
? Wetlands ® Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? T ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments: N/A
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404 width (linear
Temporary (T) (INT)? ,
other) (feet) feet)
S1 ®P ? T STABILIZATION
WITH GABIONS HICKORY CREEK ® PER
? INT ? Corps
® DWQ 18 100
S2 ? P ? T ? PER ? Corps
? INT ? DWQ
S3 ? P ? T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ? DWQ
S6 ? P ? T ? PER ? Corps
? INT ? DWQ
3h. Total stream and tributary impacts 100LF
3i. Comments:
Page 5 of 11
PCN Form - Version 1.3 December 10, 2008 Version
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U.S. then individually list all open water impacts below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waterbody
impact number- (if applicable) Type of impact Waterbody type Area of impact (acres)
Permanent (P) or
Temporary T
01 ?P?T
02 ?P?T
03 ?P?T
04 ?P?T
4f. Total open water impacts
4g. Comments: N/A
5. Pond or Lake Construction
If and or lake construction proposed, then complete the chart below.
5a. 5b. 5c. 5d. 5e.
Wetland Impacts (acres) Stream Impacts (feet) Upland
Pond ID Proposed use or purpose (acres)
number of pond
Flooded
Filled
Excavated
Flooded
Filled
Excavated
Flooded
P1
P2
5f. Total
5g. Comments: N/A
5h. Is a dam high hazard permit required?
? Yes ®No If yes, permit ID no:
5i. Expected pond surface area (acres):
5j. Size of pond watershed (acres):
5k. Method of construction:
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts
below. If an impacts require mitigation, then you MUST fill out Section D of this form.
6a.
? Neuse ?Tar-Pamlico ? Other:
Project is in which protected basin? ? Catawba ? Randleman
6b. 6c. 6d. 6e. 6f. 6g.
Buffer impact
number -
Reason
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or for Stream name mitigation (square feet) (square feet)
Temporary T im act required?
?Yes
61 ?P?T ? No
?Yes
B2 ?P?T ? No
?Yes
133 ?P?T ? No
6h. Total buffer impacts
6i. Comments: N/A
Page 6 of 11
PCN Form - Version 1.3 December 10, 2008 Version
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
PLAN TO ONLY DISTURB AREAS NEEDED TO INSTALL ADEQUATE BANK STABILIZATION. MINIMIZE CLEARING.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
USE EXISTING ACCESS ONTO SITE TO LIMIT DISTURBANCE. STABILIZE DISTURBED AREAS TO PREVENT
EROSION. MINIMIZE CLEARING.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? ? Yes ® No
2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps
2c. If yes, which mitigation option will be used for this
project? ? Mitigation bank
? Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments: N/A
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. ? Yes
4b. Stream mitigation requested: linear feet
4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
4h. Comments: N/A
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
N/A
Page 7 of 11
PCN Form - Version 1.3 December 10, 2008 Version
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ® No
buffer mitigation?
6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the
amount of mitigation required.
6c. 6d. 6e.
Zone Reason for impact Total impact Multiplier Required mitigation
(square feet) (square feet)
Zone 1 3 (2 for Catawba)
Zone 2 1.5
6f. Total buffer mitigation required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund).
N/A
6h. Comments: N/A
Page 8 of 11
PCN Form - Version 1.3 December 10, 2008 Version
E. Stormwater Management and Diffuse Flow Plan (required by DWQ)
1. Diffuse Flow Plan
1a. Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No
within one of the NC Riparian Buffer Protection Rules?
1 b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: N/A ? Yes ? No
2. Stormwater Management Plan
2a. What is the overall percent imperviousness of this project? 0%
2b. Does this project require a Stormwater Management Plan? ? Yes ® No
2c. If this project DOES NOT require a Stormwater Management Plan, explain why: NO NEW IMPERVIOUS AREAS
2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan:
N/A
? Certified Local Government
2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program
? DWQ 401 Unit
3. Certified Local Government Stormwater Review
3a. In which local government's jurisdiction is this project? DENR - MOORESVILLE
® Phase II
3b. Which of the following locally-implemented stormwater management programs ? NSW
apply (check all that apply): ? USMP
? Water Supply Watershed
? Other:
3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ® No
attached?
4. DWQ Stormwater Program Review
? Coastal counties
4a. Which of the following state-implemented stormwater management programs apply ? HQW
? ORW
(check all that apply): ? Session Law 2006-246
? Other:
4b. Has the approved Stormwater Management Plan with proof of approval been
attached? ? Yes ? No
5. DWQ 401 Unit Stormwater Review
5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No
5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No
Page 9 of 11
PCN Form - Version 1.3 December 10, 2008 Version
F. Supplementary Information
1. Environmental Documentation (DWQ Requirement)
1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No
use of public (federal/state) land?
1 b. If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State ? Yes ? No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c. If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
? Yes ? No
letter.)
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated
Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No
or Riparian Buffer Rules (15A NCAC 2B .0200)?
2b. Is this an after-the-fact permit application? ? Yes ® No
2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): N/A
3. Cumulative Impacts (DWQ Requirement)
3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No
additional development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy. If you answered "no," provide a short narrative description.
N/A
4. Sewage Disposal (DWQ Requirement)
4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility.
N/A
Page 10 of 11
PCN Form - Version 1.3 December 10, 2008 Version
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes No
®
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act ® ? Yes No
impacts?
5c. If yes, indicate the USFWS Field Office you have contacted. F1 Raleigh
? Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
THERE WILL BE NO IMPACT TO ENDANGERED SPECIES OR CRITICAL HABITAT. http://www.fws.gov
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
http://ocean.floridamadne.org
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
NC STATE HISTORIC PRESERVATION OFFICE http://www.hpo.ncdcr.gov/ndist.htm
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No
8b. If yes, explain how project meets FEMA requirements: NO NEW IMPERVIOUS AREA WILL BE DEVELOPED WITHIN
THE FLOODPLAIN AREA. EXISTING ACCESS WILL BE USED TO ENTER THE SITE.
8c. What source(s) did you use to make the floodplain determination? http://www.ncfloodmaps.com
?°trtc?? N • ?e?'c-1 ? • ZCo• l1
Applicant/Agent's Printed Name Applican Agent's Signature Date
(Agent's signature is valid only if an authorization letter from the applicant
is rovided.
Page 11 of 11
PCN Form - Version 1.3 December 10, 2008 Version
W
O
? O a? W
LLJ L)
?! J Z
i 2 LL LL. W
a 0
° ZWL) WO
w F?f° ON 9
Q ° Q °
Z W QQ U Z § 3Q L~aJ Z
LLI
. L`? m z= JWW Yp
V U) LL
Q 0 N F,,
W J ° LL. m W Q O W LL- U
U = U 20 W W W? WILL N m= '
F- 2 m s"
_j Z J F-j F-F-J X OFD
N Ow MQ 0
uF Q ?- ?- w LL a Q v) uF ip N
W X
U Z 0 e,Z Mme. N NQ cn WD N Q O ?r+
LL. 0 -. - a? M -:g C9 Q 0? v ct W (n O U
F- cr W Li
z UW 0v
a o J0 0° °
3
J w
X +WLLJ aNa Uo zo V) z LL. ? a Q !+
a ° zQ UOz N Q a w °°Q3 W F a m ? J ?
0 o^°JCn ?M J W -1 ° O Qr z( o m W o
LLI
LI
I?>:? -WW°ma oQzF- J JQ mM z o
oQ(n 3 mQM MQ Wa Qx 0 0o aoZ
W QQ x 0 W J Q QF- W O k) z
CI%
-j 0 mrM ?J Om2W?WW °X
° U zU
? = N J m zz W< W OW Q W Z ??
m V) ?? Jm W M Q O N MJOU
W O' W= O O W
U
ZOW m-aWW -j Mn°ZNFF- JW > >:
0°-j Q°.2in P< - ?ZZam?GO0 m E} p
D 0 M Z (f) LL- F= Q LW W° F- V ? Z Z
0LL WFao}?a?aoM"xQWZ ZQ? W
LL. 3°W OJmz=v)NaMOFN-aWQ - NUW
w ?
W v< < CL ZFQ-O- oorno MV) <<Qm 5?° ?
Z [sill,
U F- az°aXa ?'°QN? WJW
N W-=OWO=z-zmQQWWj?Jm @
UWZ im: m jONQL. Wm? ?/Wa?U a l ??a
W U?U V Q No o W OQZZ°mFZ L?Nm NZ
O
ozWiE Q ° F- W waooN NRORW ZU
F-z pw° N JU
Z
W 00 * W zj m N °?Q?zgozJQ - W
FF-ZO w QQ Q WWQOD° QO OQW QR?
UJo?cnL` M00WwcnzQ WoFa::
Z ?QVO<Q<WW=QOJnO-J M ILL. QYWDOJI-U
O NF-° X S' (Wi Z WQO°UQ?QQ ?J
( J U J Y J J
?J3 0-
F- o zQa?WQ W W O Q WJNW WN W?
V
D CL U?Z?N Q ?Z U a 30OZNlWi1-ZZpt4.Z OO W Z W M M WW i WN Li U N
=JunomU?Z5WNJ( MoWWWQmUo W ° L? M F- U F- U Q m
JWJW< -iF - QQaJJ?g NDMO=Q z z N 0 0 LL W
Z HaJ W 3c>Qio~~??azzW za 0 Z O
O cnaZOJJZO?QWXF-ZZWWh0p OW U 3 Q V)
WQ-?i-iU-d(nJ°Wln--E?U)0V) L) I 3
1 1 1 1 1 1 1 I I I I i l l l l l I I z0
I
z Z
O
z
0
z
M
W
03
M0
F-
Jl°
N °
W
m
Q
W
N
z
W
W
m
U
N
F-
J
N
W W
N
O Z
F- 0
LL
C9
Q J
WQ
L- W
O? -EL
U N
kk
kk
'O.d60.Da\ZJB>IZljd7Pw!\\ 'Wb' 5.:84:6 -OZ/6,/t, '6Mp•I!oaa0-sFa$soguo!goO\w?80 Agla4S\OS sF!wJad a!nu3 - sau!l-\:d