Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20110375 Ver 1_401 Application_20110411
201 10375 O,? W A T F9?G O? > Z; o ? Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: El Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Alene Stowe 2b. County: Pitt 2c. Nearest municipality / town: Greenville " h 2d. Subdivision name: Eastwood PR 2e. NCDOT only, T.I.P. or state project no: L WIPE NR _ GVq 3. Owner Information $oor 3a. Name(s) on Recorded Deed: Alene Stowe 3b. Deed Book and Page No. Map Book 73 Page 14 3c. Responsible Party (for LLC if applicable): Alene Stowe 3d. Street address: 101 Nichols Drive 3e. City, state, zip: Greenvillle, NC 27834 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form -Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ® Agent ? Other, specify: 4b. Name: Lisa Kirby 4c. Business name (if applicable): City of Greenville 4d. Street address: 1500 Beatty Street 4e. City, state, zip: Greenville, NC 27834 4f. Telephone no.: 252-329-4467 4g. Fax no.: 252-329-4535 4h. Email address: Ikirby@greenvillenc.gov 5. Agent/Consultant Information (if applicable) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 79880 1 b. Site coordinates (in decimal degrees): Latitude: 35.59362 Longitude: - 77.33711 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 1.49 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Meetinghouse Branch proposed project: 2b. Water Quality Classification of nearest receiving water: C;NSW 2c. River basin: Tar-Pamlico 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Land use is residential. The stream has some erosion and the banks have started to undercut. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 135' 3d. Explain the purpose of the proposed project: The project is intended to stop the erosion and the undercutting of the stream banks 3e. Describe the overall project in detail, including the type of equipment to be used: The project will include regrading approximately 135' of stream bank at a 3:1 slope. A 2'x 2' trench will be excavated at the toe of the bank, lined with filter fabric and filled with Class- B rip-rap.The banks will be seeded and replanted with woody vegetation. The grading work will be preformed with an ecavator. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ? Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: NCDENR Name (if known): Roberto Scheller Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. Page 3 of 10 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T W1 ? P ? T ? Yes ? Corps ? No ? DWQ W2 ? P ? T ? Yes ? Corps ? No ? DWQ W3 ? P ? T ? Yes ? Corps ? No ? DWQ W4 ? P ? T ? Yes ? Corps ? No ? DWQ W5 ? P ? T ? Yes ? Corps ? No ? DWQ W6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ - non-404, width (linear Temporary (T) (INT)? other) (feet) feet) S1 ®P ? T Stabilization UT ? PER ® INT ? Corps ® DWQ g' 125' S2 ? P ? T ? PER ? Corps ? INT ? DWQ S3 ? P ? T ? PER ? Corps ? INT ? DWQ S4 ? P ? T ? PER ? Corps ? INT ? DWQ S5 ? P ? T ? PER ? Corps ? INT ? DWQ S6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 125 3i. Comments: Page 4 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number - (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 ? P HT Access UT ®Nos 2500 B2 ?P?T ?Yes ? No B3 ?P?T ?Yes No El 6h. Total buffer impacts 2500 6i. Comments: Page 5 of 10 PCN Form -Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6of10 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Currently maintained as grass up to the top of bank. Page 7 of 10 PCN Form -Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. ? Yes [Z No Comments: 2. Stormwater Management Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ? Yes ® No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Disturbed area does not meet the requirements. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, na rrative description of the plan: ? Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? City of Greenville ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties El HQW 4a. Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ? Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ? Yes ? No Page 8 of 10 PCN Form -Version 1.3 December 10, 2008 Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ? Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 9of10 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ? Yes ® No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts? ? Yes ® No 5c. If yes, indicate the USFWS Field Office you have contacted. ? Raleigh ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? ? Yes ® No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? 7 ? Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? C-)C,a- ????? y a ?L ??s ?? ? Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Date Page 10 of 10 PCN Form - Version 1.3 December 10, 2008 Version z, r? V J D -0 Q Q Q ? D n dQ rD :3 Q TI 3 h 7 ro p T1 3 p O s Q ro n 4 0 z n C to ro I< n N cn 70 rrl p -) -0 0 D 0-0 rF :3 0 3 O p r0 C+ 3- (D V) c+ m'3 In p 3 bd (0 Q Ln V) V) 00 -u -0 ro ro to D M =-9Dr ?D rD MZ7?ONrZ ?zZ:-'?ZVj ZUIO V ' I ` E-3 D z -9 T>Nr moC td? 70 D 3 r- £ ? D M f IV _('l =T1Mcl-z t7 13 V) mZ> mo r1 r ? Z omrM TI Z i ?M M r? W ?u ro (D Z p Q Q p p N MC-) riz?v) Z -o -j _ M D M N n V) m 'N^n = £ m =or ??bd a o M z V) 0 -I 3 m D D m o -Itd r- -i m m Z ty ?0 D mDz <Ztd Mtn ? o < N z m I z M omm ztjty 0 bd D bd Z O "O n o N U1 M O O -0 Ln N O 3 3 p cF c+ (D wo> M= 93>7 oro arc m ;;a Tm? VI 1? r Din zr= ZMD G)ty-< m 070 zo f'l? 0 0'a r(r) o13 -or - m V) D z H z^I IJ 1 z r? V I OPIS Print Page 1 of 1 Pitt County Government Greenville, North Carolina ? w F-4 www.pittcountync.gov 38066 38071 38068 :f 70 05954 - s;- e,- r--? ?.. 06138 Ile 79880 12086 14524 1 09090 Parcel Physical Address Owner Name OwnerAddress 1 OwnerAddress2 OwnerAddress3 City / State / Zip NC PIN Subdivision / Section / Phase Prior Legal Description Block / Lot Tract Building Number / Unit Acres Current Owner Deed/Document Map Book Deed / Document Date Deed / Document Sales Price Building Type / Use Number of Buildings Year Built Heated Square Feet Building Value Extra Features Value Land Value Total Current Market Value Total 2007 Market Value Revaluation Year Municipality Township Fire Tax District Census Tract Neighborhood Elementary School Middle School High School 79880 101 NICHOLS DR STOWE ALENE N 1986 IVY RD GREENVILLE NC 27858 4697454097 2 EAST W OOD 7-12 1.49 000113 00840 MB73-14 01/1987 $0 SFR CONST(SFR) 1 1965 1663 $91,728 $2,540 $37,250 $131,518 $0 2008 GREENVILLE GREENVILLE GREENVILLE 3 004026 EASTERN ELEMENTARY C. M.EPPES MIDDLE J H ROSE HIGH Uisclaimer: I his tax record is prepared for the inventory of real property within Pitt County 0 23 46 92 138 1 and is compiled from recorded deeds, plats, tax maps, surveys, and other public records. Users of this data are hereby notified that the aforementioned public primary information sources should be consulted for verification. Pitt County assumes no legal responsibility for the information contained herein. PLEASE NOTE: Copyright ©2011, Pitt County, North Carolina. Parcel ownership information updated nightly. Map printed 4/15/2011. http://gis2.pittcountync.gov/opis/print.aspx?resetSession=true&x 1=2493923.5&y 1=67472... 4/15/2011 VX3 d 4 I'I I \ I i --?-__ 4.?100b81SV3 i I o ot7 c c I i C1 9?N\ SO, ?? i ? i I