HomeMy WebLinkAbout20090668 Ver 2_Certification of Completion_20110411
Certification of Completion
DWQ Project No.: N-J)(Wn$ V Z- County: t4EW "A CA/M
Applicant: NCG W 1 Lr.>UJ G C-oM AA 14sa 1 ot4
Project Name: i' jN.1T BDIi1rTIW-T ___ ?? 1M a? ' _ 01 Date of Issuance of Wetland Permit: V>Ce,. Z009
Certif cafe of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit,
North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be
returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send
certificates from all of these.
Applicant's Certification
L . hereby
used in the observation of the construction suc
compliance and intent of the 401 Water Qualityw"T
'
and other supporting materials.
Signature:
Agent's Cert Jkadon
orr¢
APR 1 1 2011
hereby state th y - nA
at, to the best of my abilities s
used in the observation of the construction such that the construction was observed to be built within Ms
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other supporting materials.
Signature:
Date:
If this project was designed by a Certified professional
I, _maigg, T. A944,Ae1 cm: as a duly registered Professional Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, an oth supportin aterials.
Signature: Registration No. Date APIZ 1 Zo I I
the best of my abilities, due care and diligence was
was observed to be built within substantial
it
o 4 % the approved plans and specifications,
C R I S E R
TROUTMAN
T A N N E R
TRANSMITTAL LETTER
TO: FROM:
IAN MCMILLAN Mark T. Arcud, PE
COMPANY: DATE:
NC Division of Water Quality April 8, 2011
401 Oversight/ Express Permitting Unit
ADDRESS: CTT'S PROJECT NUMBER:
1650 Mail Service Center 5818 DENR Water Quality
Raleigh, NC 27699 -1650
PHONE NUMBER: CLIENT'S REFERENCE NUMBER:
919-791-4200
RE:
Federal Point Boating Access
Area Improvements
WE TRANSMrr: ? ATTACHED ? UNDER SEPARATE OMER ? HAND CARRIED BY ? UPS/FEDEX
THE FOLLOWING: ? TRACINGS ? PRINTS ? INSPECTION REPORT ? SHOPDRAWINGS ? SPECIFICATIONS ? OTHER
COPIES DATE SHEET NO. DESCRIPTION REMARKS
1 ORIG 4-8-11 CERTIFICATE OF COMPLETION
D
ZIR
U,
0»
:jjDENR-- WA A?
NOTES/COMMENTS:
If you have any questions, give me a call at 397-2929! Thanks.
Cc: CTT File
by:
CRISER TROUTMAN TANNER CONSULTING ENGINEERS
WILMINGTON, NC RALEIGH, NC
P.O. Box 3727 Wilmington, NC 28406 1 3809 Peachtree Ave. Suite 102 Wilmington, NC 28403 p 910.397.2929 t 910.397.2971 cttengineering.com