Loading...
HomeMy WebLinkAbout20110041 Ver 2_Approval Letter_20110318;A NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H, Sullins Dee Freeman Governor Director Secretary March 18, 2011 DWQ Project # 11-0041 Ver. 2 Wayne County Cox-Edwards Company, Inc. Mr. Scott Edwards, PE 1205 Parkway Drive Goldsboro, NC 27534 Subject Property: Phase XI Annexation Area, 12" Sanitary Sewer Stream Crossing and Sewer Force Main Open Cut Installation Neuse River Basin, Ut to Little River (NEU 06, 27-57(20.2); NSW, WS-IV) AUTHORIZATION of Neuse River Buffer Rule (15A NCAC 02B.0233) Authorization Certificate Dear Mr. Edwards: You have our authorization, in accordance with 15A NCAC 02B .0233 and any conditions listed below, to temporally impact approximately 210 ft2 of Zone I and 330 ft2 of Zone 2 of the protected riparian buffers for the purpose of open cut replacement installation of gravity sewer crossing at Station 25+56 and open cut force main sewer line installation, at toe of fill slope, at Station 30+00 within the subject annexation area as described within your application dated February 4, 2011. In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, Non-discharge regulations. This authorization is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this authorization letter and is thereby responsible for complying with all conditions. This authorization requires you to follow the conditions listed below. The Additional Conditions of the Authorization are: 1. Impacts Approved North Carolina Division of Water Quality Intemet: www.ncwaterauality org 943 Washington Square Mall Phone: 252-946-6481 Washington, NC 27889 FAX 252-946-9215 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NorthCarohna Naturally Page 2 of 2 The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Units Plan Location or Reference Stream (feet) 404/CAMA Wetlands acres Waters acres Buffers 540 (square ft.) STA 25+56, STA 30+00 2. Diffuse Flow An additional condition is that all stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 2B .0233(5). 3. Certificate of Completion Upon completion of all work approved within this authorization, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. 4. Areas of open cut construction shall be seeded and mulched or matted upon completion of construction in the open cut areas approved by this buffer authorization. Any disputes over determinations regarding this Authorization Certificate; (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This Authorization Certificate shall expire five (5) years from the date of this letter. This letter completes the review of the "No Practical Alternatives" determination under 15A NCAC 2B .0233. This letter does not authorize any impacts to either Wagers of the United States or Waters of the State. Please contact the US Army Corps of Engineers (USACE) or NC Division of Water Quality (DWQ) if any impacts are proposed to either of these waters. If you have any questions, please telephone Roberto Scheller of the Washington. Regional Office at 252- 948-3940 or Amy Chapman of the 401 Oversight/Express Unit at 919-715-6823. !Sincerel z For Coleen H. Sullins Enclosures: Certificate of Completion cc: Corps of Engineers Washington Field Office DWQ 401 Oversight/Express Unit DLR, WaRO File copy Filename: 11-0041 Ver.2