19 November 2020
LETTER OF APPROVAL WITH MODIFICATION
Whitnel Pentecostal Holiness Church of Lenoir
ATTN: Mr. Keith Gilliam
1890 Connelly Springs Rd
Lenoir, NC 28645
RE: Project Name: Worship Center & Children's Building Living Hope Church
Acres Approved: 7.6
Project ID: CALDW-2021-001
County: Caldwell
City: Cajah's Mountain
Address: Connelly Springs Road
River Basin: Catawba
Stream Classification: Gunpowder Creek - C
Submitted By: Mr. Todd Poteet, P.E.
Date Originally Received by LQS: July 30, 2020
Date Current Revision Received by LQS: November 4, 2020
Plan Type: Institutional
Dear Mr. Gilliam,
This office has reviewed the subject revised erosion and sedimentation control plan and
hereby issues this Letter of Approval with Modification. The modification is attached. This
plan approval shall expire three (3) years following the date of approval, if no land -
disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. Should
the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1)(b).
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eN01) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
QNorth� Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
EAsheville Regional Office 12090 U.S. Highway 70 j Swannanoa, North Carolina 28778
NCftTFE CAAdJNR �
oeoadmant of Emlronmenul M14 828.296.4500
Letter of Approval with Modification
Whitnel Pentecostal Holiness Church of Lenoir
ATTN: Mr. Keith Gilliam
November 19, 2020
Page 2 of 3
deq.nc.gov/NCG01. Please direct questions about the eNOI form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. If the owner/operator
of this project changes in the future, the new responsible party is required to apply for
his/her own COC.
Title 1SA NCAC 413.0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions
to the plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances
or rules may also apply to this land -disturbing activity. This approval does not supersede
any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved
acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
l
Mic ael Smith
Assi ant Regional Engineer
Division of Energy, Mineral, and Land Resources
Letter of Approval with Modification
Whitnel Pentecostal Holiness Church of Lenoir
ATTN: Mr. Keith Gilliam
November 19, 2020
Page 3 of 3
Enclosures: Modifications
ec: Mr. Todd Poteet, P.E. tpoteet@west-consultants.com
cc: Regional Office file
MODIFICATION REQUIRED FOR APPROVAL
Project Name: Worship Center & Children's Building Living Hope Church
ProjectID: CALDW-2021-001
Ccunty: Caldwell
For final plan approval, on or before Tuesday, December 4, 2020, please provide to this
office the requested documents listed below.
1. Because this measure has been removed from the plans, please review or revise the
reference title " CONSTRUCTION SEQUENCE FOR TSB#3" near the top of the sheet on plan
sheet C6 (Phase 2 Grading and Erosion Control Plan). Please provide to this office a copy
of the plan sheet. {G.S. 113A-57 (3)1.
Ref: GS.113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities