HomeMy WebLinkAbout740021_Plan of Action_20210104PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 74 - 21 County: Pitt Facility Name: Ephraiqm Smith Certified Operator Name: Sterling Smith Operator # 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Lagoon 1 Spillway (Yes or No): Level (inches): 2. Check all applicable items 17 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. x Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Sterling Smith Phone: 252-714-0909 Facility Owner/Manager (print) Facility Owner/Manager (signature) Date: PoA Cover Page 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE gal. 1. Structure Name/Identifier (ID): 74-21 2. Current liquid volume in 25 yr/24 hr. storm storage & structural freeboard a. current liquid level according to marker 17 inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = 2 inches d. top of dike surface area according to design 51 413 (area at below structural freeboard elevation) e. line c x line d x 7.48 riallons = 64.094.9 gallons 12 ft3 ft2 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 39,763.6 ft3 h. actual waste produced = current herd # x line g = 37360 ft3 certified herd # i. volume of wash water according to structural design 0 ft3 j. excess rainfall over evaporation according to design 50 556 _ ft3 k. (lines h + i +i) x 7.48 x 30 days = 109.601.9 gallons line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated 10/03/2020 0.72 lb/1000 m. (lines e + k? x line I = 125.06 lb PAN 1000 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 1 1. structure ID: 74-21 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n. lines 1 +2+3+4+5+6 = line m = 125.06 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 125.06 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 'State current crop endina application date or next crop application haninninn riatA fnr AvaiIahIA rACAivinri rrnne during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE Ib. PAN PoA (30 Day) 2/21/00 2 w. Total PAN to be land applied (line n from section II) = 125.06 Ib. PAN x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = Ib. PAN Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21/00 3