HomeMy WebLinkAboutNCC191904_NOT Closeout Documents_20210112North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910)433-3300
Sampson County Water Main
County: Sampson Project: Extensions River basin: Cape Fear
Person financially responsible: Sampson County - Edwin W Causey, Manager Project #: SAMPS-2019-009
NCC 191904
Address: 406 County Complex Road, Clinton, NC 28328
1. Project Location: See Plans, Dismal Twsp
Pictures: No
2. Weather and soil conditions: Dry, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: December 16, 2020
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance with the SPCA and
released. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities should be requested by the permittee via a Notice of Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: December 15, 2020 Time arriving on site: 11:25 AM Time leaving site: 1:15 PM
cc: David Ross, Matthew West (via email)