Loading...
HomeMy WebLinkAbout20100632 Ver 1_Certification of Completion_20110318?l ??WWI MEMORANDUM TO: 401/Wetlands Unit, NCDWQ 1650 Mail Service Center Raleigh, NC, 27699-1650 FROM: Chris Tester, Utilities Engineer DATE: March 15, 2011 ? Q -- o tv 3 2-- Mae 1 s eon SUBJECT: 401 Water Quality Certification, DWQ Project # 10-0632 Please find the attached signed 401 Water Quality Certification for DWQ project # 10- 0632 C wok T.64ter.' PE Salisbury-Rowan Utilities (704) 216-7554 (Office) (704) 239-3471 (Cell) (704) 638-8470 (Fax) email: ctest@salisburync.gov 1 Water Street Telephone (704) 638-5205 Salisbury, NC 28144 Salisbury-Rowan Utilities Fax (704) 638-8470 Certificate of Completion DWQ Project No. County: wou-3ot-n Applicant: @1NYL? Project Name: C G hs L-,/ D I 1C) AR 1 S 2011 Date of Issuance of 401 Water Quality Certification: LM-- Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401; Wetlands Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, CHJZIS -Tt 51 hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the apprgx.,?,d plans and specif ns, and other supporting materials. ?- Date: 3-IS-11 Signature. -.?? Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, ctc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Registration No.: Date: