Loading...
HomeMy WebLinkAbout20021276 Ver 1_Approval Letter_20040216WA 0 TF9QG r Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P. E. Director Division of Water Quality Coleen H. Sullins, Deputy Director Division of Water Quality WATER QUALITY SECTION February 12, 2004 'NETLADS / 401 GROUP Project Manager Speedway Motorsports, Inc. P.O. Box 600 Concord, NC 28026 FEB 1 6 2004 YVA'1E..4 ")i'JAtoaIY SECTION Subject: 401 Water Quality Certification Z-Max Industrial Park Cabarrus County, NC Dear Sir or Madam: This Office has received information from the Cabarrus County Soil and Water Conservation District that you may be planning to disturb jurisdictional wetlands and/or 150+ linear feet of stream channel during construction of the subject development Please be advised that pursuant to Army Corps of Engineers (ACOE) and North Carolina Division of Water Quality (the Division) requirements prior approval is needed before initiating any activity that would disturb more than 150 linear feet of stream channel and/or 0.1 acre of wetlands. It should also be noted that it is the responsibility of the ACOE to determine whether or not any channel being impacted is indeed a stream for which they may claim jurisdiction. For jurisdictional channel impacts, compensatory mitigation may be required to replace unavoidable lost or degraded aquatic life uses of these streams through in stream measures and/or riparian techniques, such as buffer establishment or vegetative planting for temperature control (typically referred to as stream bioengineering). In determining whether stream mitigation will be necessary, the Division will need to ascertain whether the stream supports aquatic activity. In order to obtain the Division's approval for any proposed stream and /or wetland impacts, seven (7) copies of the Pre-construction Notification Application (PCN), along with supporting maps and documentation, should be completed and returned to the addresses listed in the application. Please make sure that all maps submitted with the application are of suitable scale (e.g. 1" =100') and delineate all impacted streams, ponds, and/or wetlands on the project site. Downloadable copies of the Division's General Certifications as well as the PCN can be accessed at the Division's Wetland web page: htty://h2o.ehnr.state.nc.us/ncwetiands/ One K ?6 fth Carolina ,/vRtlllY (11V N. C. Division of Water Quality, LVMW. AVA g ENR Mooresville Regional Office, 919 North Mam Street, Mooresville NC 28115 (704) 663-1699 Customer Service 1-877-623-6748 Page 2 If you do not have access to this web page, please contact this Office at the phone number listed below and a copy of the PCN will be forwarded to you. If you have already filed for the 401 certification, please disregard this notice. You should also note that issuance of a ACOE 404 Permit or receipt of a written ACOE delineation verification does not relieve you of your responsibility of determining the need for a 401 Water Quality Certification prior to proceeding with any channel or wetland impacts. If you have questions regarding this matter, please contact Mr. Alan Johnson or me at (704) 663- 1699. Sincerely', D. Rex G Z:P.E. Water Quality Regional Supervisor Attachment Cc: Dennis Testerman, Cabarrus SWCD John Domey, DWQ Steve Chapin, USACOE