HomeMy WebLinkAbout20050511 Ver 2_Other Agency Comments_20050408
e..wrFo
STATE OF NORTH CAROLINA
oe
7ZgyOS?RRW O '?1
gR
AR?Sr?R
?wn,K?cry
_71*.
DEPARTMENT OF TRANSPORTATION MICHAEL F. EASLEY
GOVERNOR
April 7, 2005
United States Army Corps of Engineers
Regulatory Field Office
Post Office Box 1000
Washington, NC 27899-1000
ATTN: Mr. Bill Biddlecome
NCDOT Coordinator-Division One
LYNDO TIPPETT
SECRETARY
SUBJECT: Nationwide 6 Permit Application Addendum:
US 17 From South of SR 1149 (Price Road) to US 17 South of SR 1536
(Hamilton Beach Road), Beaufort, North Carolina; TIP Project R-251013;
Federal Aid Project No. MAF-75-3(26); State Project No..
Dear Mr. Biddlecome,
This addendum clarifies the Nationwide 6 application dated March 22, 2005.
The hand clearing involved for this project is for positioning of the boring vehicle. When
at all possible, the vehicle will be maneuvered around any trees. The amount of clearing
to be done would be difficult to quantify and there is a possibility that no trees will need
to be cut.
Spoil from the borings will be replaced back in the hole to the furthest extent possible.
The spoil that cannot be replaced in the holes will be placed in 55 gallon drums and
hauled to off-site upland area.
Thank you for your continued assistance with this issue.
MAILING ADDRESS:
NC DEPARTMENT OF TRANSPORTATION
PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS
1548 MAIL SERVICE CENTER
RALEIGH NC 27699-1548
TELEPHONE: 919-733-3141
FAX: 919-733-9794
WEBSITE: www.ncdot.org
LOCATION:
TRANSPORTATION BUILDING
1 SOUTH WILMINGTON STREET
RALEIGH NC
!r -A
If you have any questions or would like additional information, please call Mr. Chris
Underwood at (919) 715-1451. Thank you in advance for your help in this matter.
Sincerely,
GregoryThorpe, Ph.D.
Environmental Management Director
Project Development and Environmental Analysis Branch
CC: W/attachment
Mr. John Hennessy, NCDWQ (7 copies)
Mr. Travis Wilson, NCWRC
Mr. Gary Jordan, USFWS
Mr. Ron Sechler, NMFS
Mr. Michael Street, NCDMF
Mr. Cathy Brittingham, NCDCM
Mr. Bill Arrington, NCDCM
Mr. David Chang, P.E., Hydraulics
Mr. Greg Perfetti, P.E., Structure Design
Mr. Mark Staley, Roadside Environmental
Mr. Njoroge W. Wainaina, State Engineering Geologist, P.E., Geotechnical Unit
Mr. C. E. Lassiter, P.E., Division Engineer
Mr. Jay Johnson, DEO
W/o attachment
Mr. David Franklin, USACE, Wilmington (Cover Letter Only)
Mr. Jay Bennett, P.E., Roadway Design
Mr. Omar Sultan, Programming and TIP
Mr. Art McMillan, P.E., Highway Design
Mr. Brian Yamamoto, P.E., PDEA