Loading...
HomeMy WebLinkAbout20201519 Ver 1_ePCN Application_20210111 I I DWR Division of Water Resources Pre-Construction Notification (PCN) Form October 26,2020 Ver 3.3 Initial Review Has this project met the requirements for acceptance in to the review process?* 6 Yes ✓ No Is this project a public transportation project?* 0 Yes r No Change only if needed. BIMS#Assigned* Version#* 20201519 1 Is a payment required for this project?* ✓ No payment required Reviewing Office* 6 Fee received Winston-Salem Regional Office-(336)776- ✓ Fee needed-send electronic notification 9800 Select Project Reviewer* Dave Wanucha:eads\djwanucha Information for Initial Review 1a.Name of project: Replacement of Bridge No.960004 on SR 2418(South Windy Gap Road)over Little Hinting Creek 1a.Who is the Primary Contact?* NCDOT lb.Primary Contact Email:* 1c.Primary Contact Phone:* jhemphill@ncdot.gov (919)707-6126 Date Submitted 1/11/2021 Nearest Body of Water Little Hunting Creek Basin Yadkin-PeeDee Water Classification WS Ill Site Coordinates Latitude: Longitude: 36.10918 -80.96814 Pre-Filing Meeting Information ID# Version 20201519 1 Pre-fling Meeting or Request Date* 9/28/2020 Attach documentation of Pre-Filing Meeting Request here:* BR-0108 401 Pre-Filing Notification(Mass 12 MLL Request)2020-09-28.pdf 417.96KB A. Processing Information C^U County(or Counties)where the project is located: Wilkes Is this a NCDMS Project C- Yes f No Is this project a public transportation project?* 6 Yes r No Is this a NCDOT Project?* 6 Yes r No (NCDOT only)T.I.P.or state project number: BR-0108 WBS#(2) 49216.1.1 1a.Type(s)of approval sought from the Corps: fJ Section 404 Permit(wetlands,streams and waters,Clean Water Act) r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?* C- Yes 6' No lb.What type(s)of permit(s)do you wish to seek authorization? fJ Nationwide Permit(NWP) r Regional General Permit(RGP) r Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? (' Yes CNo Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): Id.Type(s)of approval sought from the DWR: 17 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express r Non-404 Jurisdictional General Permit r Riparian Buffer Authorization r Individual Permit le.Is this notification solely for the record because written approval is not required? * For the record only for DWR 401 Certification: C' Yes 6 No For the record only for Corps Permit: C' Yes 6 No If.Is this an after-the-fact permit application?* C- Yes f No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? (' Yes C No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? C- Yes r No Acceptance Letter Attachment BR-0108 DMS ACCEPTANCE LETTER.pdf 457.58KB 1h.Is the project located in any of NC's twenty coastal counties? C- Yes C No 1j.Is the project located in a designated trout watershed? C- Yes (- No B. Applicant Information Id.Who is applying for the permit? ✓Owner 17 Applicant(other than owner) le.Is there an Agent/Consultant for this project?* ✓ Yes (- No 2.Owner Information 2a.Name(s)on recorded deed: N/A 2b.Deed book and page no.: 2c.Responsible party: 2d.Address Street Address N/A Address Line 2 (Sty State/Province/Region N/A N/A Postal/Zip Code Country N/A N/A 2e.Telephone Number: 2f.Fax Number: (919)707-7050 2g.Email Address:* pharris@ncdot.gov 3.Applicant Information(if different from owner) 3a.Name: NCDOT 3b.Business Name: 3c.Address Street Address 1598 Mail Service Center Address Line 2 City State/Bovine/Region Raleigh NC Postal/Zip Code Country 27699-1598 N/A 3d.Telephone Number: 3e.Fax Number: (919)707-6110 3f.Email Address:* pharris@ncdot.gov C. Project Information and Prior Project History 1. Project Information lb.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Windy Gap 2. Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 (Sty State/Bovine/Region Postal/Zip Code Country 3.Surface Waters 3a.Name of the nearest body of water to proposed project:* Little Hunting Creek 3b.Water Resources Classification of nearest receiving water:* WS Ill 3c. What river basin(s)is your project located in?* Yadkin-PeeDee 3d.Please provide the 12-digit HUC in which the project is located. 030401020201 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Replacing the existing 1@40'-6"timber deck with vertical timber abutments bridge over Little Hunting Creek.The bridge was constructed in 1960 and reconstructed in 1987.The surrounding land use is agricultural,residential and fragmented forest land. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?* ✓ Yes r' No r Unknown 4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR) 4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR) 4f.List the total estimated acreage of all existing wetlands on the property: 0.60 4g.List the total estimated linear feet of all existing streams on the property: 1,976 4h.Explain the purpose of the proposed project:* NCDOT Structure Management Unit(SMU)records indicate Bridge No.4 has a sufficiency rating of 48.41 out of a possible 100 for a new structure.The bridge is considered structurally deficient due to insufficient load-carrying capacity and a superstructure condition rating of 4 out of a possible 9.The posted weight restriction(23 tons for single vehicle and 29 tons for a truck/tractor/semitrailer)on Bridge No.4 prohibits large or heavy vehicles,typically used in transporting agricultural and manufactured products,from using the bridge.Vehicles above the posted weight must detour approximately 1.3 miles to avoid the bridge.Replacing the existing bridge will eliminate posted weight limits by providing a safe crossing for all legal loads and will make accommodations for broadband installation in order to support economic competitiveness. 41.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:* The North Carolina Department of Transportation(NCDOT)proposes to replace Bridge No.4 on South Windy Gap Road(S.R.2418)over Little Hunting Creek in Wilkes County.The bridge will be replaced on the existing alignment while detouring traffic offsite during construction.Bridge No.4 was originally built in 1960 and reconstructed in 1987.The existing structure is 41 feet long with a deck width of 25 feet.The structure is a timber floor on salvaged I-Beams with timber substructure.NCDOT proposes to construct a 70-foot long single span core slab bridge with a deck width of 30 feet.The new structure will include 10-foot lanes and variable width shoulders that average 3-foot,11-inches.Standard road and bridge building equipment such as trucks,dozers,and cranes will be used. 4j.Please upload project drawings for the proposed project. BR-0108 Final Permit Drawings.pdf 14.01MB BR-0108 Permit Application Cover Letter.pdf 354.82KB 5.Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* 6' Yes r No C Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* ✓ Preliminary r Approved Not Verified r Unknown r N/A Corps AID Number: 5c.If 5a is yes,who delineated the jurisdictional areas? Name(if known): Nathan Howell Agency/Consultant Company: Three Oaks Engineering Other: 5d1.Jurisdictional determination upload 6. Future Project Plans 6a.Is this a phased project?* ✓ Yes ( No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): r Wetlands fJ Streams-tributaries ❑Buffers r Open Waters r Pond Construction 3.Stream Impacts 3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact (?) Jurisdiction* length* S1 Stream Bank Stabilization Permanent Bank Stabilization Little Hunting Creek Perennial Both 23 7 Average(feet) (linear feet) 32 Stream Bank Stabilization Temporary Bank Stabilization Little Hunting Creek Perennial Both 23 10 Average(feet) (linear feet) S3 Temporary Construction Temporary Workpad/Causeway Little Hunting Creek Perennial Both 23 92 Average(feet) (linear feet) S4 Roadway fill Permanent Fill UT to Little Hunting Creek Perennial Both 3 144 Average(feet) (linear feet) S5 Roadway Fill Temporary Fill UT to Little Hunting Creek Perennial Both 3 14 Average(feet) (linear feet) S6 Stream Bank Stabilization Permanent Bank Stabilization UT to Little Hunting Creek Perennial Both 3 6 Average(feet) (linear feet) 3i.Total jurisdictional ditch impact in square feet: 0 3i.Total permanent stream impacts: 3i.Total temporary stream impacts: 157 116 3i.Total stream and ditch impacts: 273 3j.Comments: E. Impact Justification and Mitigation 1.Avoidance and Minimization 1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Temporary construction impacts will be reduced at the bridge site by utilizing an offsite detour.The new bridge will completely span the creek.Existing drainage patterns have been maintained.No direct discharge will occur in the stream. 1b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: Best Management Practices will be adhered to. 2. Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? ( Yes f No 2c.If yes,mitigation is required by(check all that apply): r DWR fJ Corps 2d.If yes,which mitigation option(s)will be used for this project? r Mitigation bank fJ Payment to in-lieu fee r Permittee Responsible program Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a.Approval letter from in-lieu fee program is attached. Yes r No 4b.Stream mitigation requested: (linear feet) 4c.If using stream mitigation,what is the stream temperature: 144 warm 4d.Buffer mitigation requested(DWR only): 4e.Riparian wetland mitigation requested: (square feet) (acres) N/A 0 4f.Non-riparian wetland mitigation requested: 4g.Coastal(tidal)wetland mitigation requested: (acres) (acres) 4h.Comments F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? ✓ Yes ( No If no,explain why: 2.Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* t Yes r No Comments: G. Supplementary Information C^U 1. Environmental Documentation 1a.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?* ( Yes r No lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* ( Yes ( No 1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?* ( Yes r No NEPA or SEPA Final Approval Letter BR-0108 CE 01.22.20_Final-Signed.pdf 304.4KB 2.Violations(DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* ✓ Yes ( No 3. Cumulative Impacts(DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality?* r Yes ( No 3b.If you answered"no,"provide a short narrative description. The project will not alter travel patterns,reduce travel time,affect access to properties in the area,or open areas for development or redevelopment. Due to its minimal transportation impact-causing activities,this project will neither influence nearby land uses nor stimulate growth.Therefore,a detailed indirect and cumulative effects study will not be necessary. 4.Sewage Disposal(DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* ✓ Yes ( No r N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat?* (' Yes ( No 5b.Have you checked with the USFWS concerning Endangered Species Act impacts?* (' Yes 6. No 5d.Is another Federal agency involved?* (' Yes r No r Unknown 5e.Is this a DOT project located within Division's 1-8? ✓ Yes tz No 5f.Will you cut any trees in order to conduct the work in waters of the U.S.? R Yes r No 5g.Does this project involve bridge maintenance or removal? 6 Yes r No 5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.? ✓ Yes r No If you answered"Yes"to 5g(1),did you discover any signs of bat use? ✓ Yes G No r Unknown 5h.Does this project involve the construction/installation of a wind turbine(s)?* ✓ Yes allo Si.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.? 6 Yes r No If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property. 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS Website This project was evaluated on August 13,2019.NCDOT biologists assessed Bridge No.04 for potential northern long-eared bat habitat.No shallow vertical top sealed crevices or deep vertical unsealed crevices suitable for roosting were present on the structure.No evidence(bats,staining,and guano)of bats was observed.Based on the type of bridge and lack of evidence of bats on the bridge,NCDOT recommends a biological conclusion of No Effect for the northern long-eared bat. On January 9,2020,NCDOT biologists assessed the bridge project footprint for potential MYGR habitat.No evidence of bats(bats,staining or guano) was observed on this small,timber deck and steel beam bridge.No shallow vertical top sealed crevices or deep vertical unsealed crevices suitable for roosting were present on the structure.No caves or mines are located within the project footprint or within line of sight of the bridge.Therefore,no suitable roosting habitat for MYGR is present.Based on the lack of evidence of bats during the recent bridge inspection and the prior August 13 field visit,the type of bridge(timber and steel)and lack of caves or mines in the project vicinity,the proposed project will have a biological conclusion of No Effect for gray bats. Consultation Documentation Upload BR-0108 NLEB 4(d)MYGR Wilkes.pdf 270.26KB 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat?* ✓ yes GNo 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* Review of on-line mapping sources 7. Historic or Prehistoric Cultural Resources(Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* ✓ Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* Tribal coordination letters were distributed on December 16,2019 to the Eastern Band of Cherokee Indians(EBCI),the Catawba Indian Nation,the Cherokee Nation,and the United Keetoowah Band of Cherokee.Comments on the proposed project were requested by January 17,2020.NCDOT received responses from the Cherokee Nation and the United Keetoowah Band of Cherokee;however,neither response indicated the presence of any previously unknown resources. 7c.Historic or Prehistoric Information Upload BR-0108 HIST ARCH NoSurvey.pdf 5.17MB BR-0108 ARCHAEOLOGY Wilkes 4 No Survey form(1).pdf 5.17MB 8. Flood Zone Designation(Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-yearfloodplain?* 6 Yes rNo 8b.If yes,explain how project meets FEMA requirements: The Hydraulics Unit will coordinate with the NC Floodplain Mapping Program(FMP)to determine status of the project with regard to applicability of NCDOT's Memorandum of Agreement,or approval of a Conditional Letter of Map Revision(CLOMR)and subsequent final Letter of Map Revision(LOMR). 8c.What source(s)did you use to make the floodplain determination?* FEMA Floodmaps Miscellaneous Comments Approximately 0.03 acre of trees will be removed in the project footprint for construction purposes. Miscellaneous attachments not previously requested. Signature U 17 By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: Michael Anthony Turchy Signature gdae(Txtedi5 Date 1/11/2021