HomeMy WebLinkAbout20201576 Ver 2_ePCN Application_20210108 I I DWR
Division of Water Resources
Pre-Construction Notification (PCN) Form
October 26,2020 Ver 3.3
Initial Review
Has this project met the requirements for acceptance in to the review process?*
6 Yes
✓ No
Is this project a public transportation project?*
0 Yes r No
Change only if needed.
BIMS#Assigned* Version#*
20201576 2
Is a payment required for this project?*
✓ No payment required
6 Fee received Reviewing Office*
✓ Fee needed-send electronic notification Asheville Regional Office-(828)296-4500
Select Project Reviewer*
Kevin Mitchell:eads\rkmitchell
Information for Initial Review
1a.Name of project:
Macon County-Bridge 79
1a.Who is the Primary Contact?*
Patrick J.Breedlove
lb.Primary Contact Email:* 1c.Primary Contact Phone:*
pjbreedlove@ncdot.gov (828)508-7397
Date Submitted
1/8/2021
Nearest Body of Water
Tellico Creek
Basin
Little Tennessee
Water Classification
Class C;Tr.
Site Coordinates
Latitude: Longitude:
35.275905 -83.508399
Pre-Filing Meeting Information
ID# Version
Pre-fling Meeting or Request Date*
2/8/2021
Attach documentation of Pre-Filing Meeting Request here:*
Macon County-B79-DWR Pre-Filing Meeting Request Form.pdf 54.79KB
Macon County-B79-Pre Filing.pdf 47.38KB
A. Processing Information
County(or Counties)where the project is located:
Macon
Is this a NCDMS Project
✓ Yes r No
Is this project a public transportation project?*
r Yes r No
Is this a NCDOT Project?*
✓ Yes r No
(NCDOT only)T.I.P.or state project number:
WBS#(7)
17BP.14.R.211
1a.Type(s)of approval sought from the Corps:
17 Section 404 Permit(wetlands,streams and waters,Clean Water Act)
r Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act)
Has this PCN previously been submitted?*
✓ Yes
No
lb.What type(s)of permit(s)do you wish to seek authorization?
17 Nationwide Permit(NWP)
I—Regional General Permit(RGP)
I—Standard(IP)
1c.Has the NWP or GP number been verified by the Corps?
✓ Yes r No
Nationwide Permit(NWP)Number: 03-Maintenance
NWP Numbers(for multiple NWPS):
Id.Type(s)of approval sought from the DWR:
I7 401 Water Quality Certification-Regular r 401 Water Quality Certification-Express
I—Non-404 Jurisdictional General Permit r Riparian Buffer Authorization
I— Individual Permit
1e.Is this notification solely for the record because written approval is not required? *
For the record only for DWR 401 Certification: r Yes r No
For the record only for Corps Permit: r Yes r No
If.Is this an after-the-fact permit application?*
✓ Yes ( No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes ( No
1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts?
✓ Yes rNo
Acceptance Letter Attachment
Ih.Is the project located in any of NC's twenty coastal counties?
✓ Yes ( No
1j.Is the project located in a designated trout watershed?
✓ Yes r No
B. Applicant Information
Id.Who is applying for the permit?
17 Owner r Applicant(other than owner)
1e.Is there an Agent/Consultant for this project?*
✓ Yes r No
2.Owner Information
2a.Name(s)on recorded deed:
NCDOT-Division 14
2b.Deed book and page no.:
2c.Responsible party:
2d.Address
Street Address
253 Webster Road
Address Line 2
City State/Bovine/Region
Sylva North Carolina
Rutal/Zip Code Country
28779 United States
2e.Telephone Number: 2f.Fax Number:
(828)586-2141
2g.Email Address:*
pjbreedlove@ncdot.gov
C. Project Information and Prior Project History C^U
1. Project Information
1b.Subdivision name:
(if appropriate)
1c.Nearest municipality/town:
Franklin
2. Project Identification
2a.Property Identification Number: 2b.Property size:
2c.Project Address
Street Address
Address Line 2
(Sty State/Roviree/Region
Rztal/Zip Code Country
3.Surface Waters
3a.Name of the nearest body of water to proposed project:*
Tellico Creek
3b.Water Resources Classification of nearest receiving water:*
Class C;Tr.
3c. What river basin(s)is your project located in?*
Little Tennessee
3d.Please provide the 12-digit HUC in which the project is located.
060102020404
4. Project Description and History
4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
Existing land use is a timber deck on steel I-Beam bridge on a two lane secondary road.Project site is located in a rural residential area with mowed lawns adjacent to project area with
agriculture fields nearby.
4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past?*
r Yes r No r Unknown
4d.Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site.(for DWR)
Macon County-B79-USGS Topo Map.pdf 172.5KB
4e.Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site.(for DWR)
Macon County-B79-NRCS Soil Survey.pdf 491.35KB
4f.List the total estimated acreage of all existing wetlands on the property:
0.00
4g.List the total estimated linear feet of all existing streams on the property:
150
4h.Explain the purpose of the proposed project:*
Project is to replace an obsolete and deteriorating timber floor on steel I-Beam bridge with a steel girder bridge unit in the existing disturbed bridge footprint.
4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used:*
NCDOT contractor will install erosion and sediment control measures.NCDOT contractor will install diversion during the removal of existing bridge end bents and for the installation of
rip-rap on stream banks.An on-site detour will be utilized with staged bridge demolition and construction.Bank stabilization materials will be permanently installed once final grading
allows.Diversion/dewatering structure will be removed and temporary impacts will be restored.The proposed bridge will be constructed utilizing the following equipment:crane,
excavator,dump trucks,paving equipment,pumps and hand tools.
4j.Please upload project drawings for the proposed project.
Macon County-B79-Permit Plans.pdf 3.23MB
5.Jurisdictional Determinations
5a.Have the wetlands or streams been delineated on the property or proposed impact areas?*
✓ Yes 6 No G Unknown
Comments:
5b.If the Corps made a jurisdictional determination,what type of determination was made?*
✓ Preliminary r Approved r Not Verified a Unknown r N/A
Corps AID Number:
5c.If 5a is yes,who delineated the jurisdictional areas?
Name(if known):
Agency/Consultant Company:
Other:
5d1.Jurisdictional determination upload
Macon County-B79-JD(Signed).pdf 252.59KB
6. Future Project Plans
6a.Is this a phased project?*
✓ Yes a No
Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la.Where are the impacts associated with your project?(check all that apply):
r Wetlands 17 Streams-tributaries r Buffers
r Open Waters r Pond Construction
3.Stream Impacts
3a.Reason for impact(?) 3b.Impact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type* 3f.Type of 3g.S.width* 3h.Impact
(?) Jurisdiction* length*
S1 Rip-Rap Permanent Bank Stabilization Tellico Creek Perennial Both 20 40
Average(feet) (linear feet)
32 End Bent Removal Temporary Dewatering Tellico Creek Perennial Both 20 75
Average(feet) (linear feet)
3i.Total jurisdictional ditch impact in square feet:
0
3i.Total permanent stream impacts: 3i.Total temporary stream impacts:
40 75
3i.Total stream and ditch impacts:
115
3j.Comments:
E. Impact Justification and Mitigation
1.Avoidance and Minimization
1a.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
The existing bridge is being replaced with a structure that is adequate for the traffic needs in the same disturbed location.The bridge structure was
designed for the minimum size criteria to ensure conveyance of traffic on the secondary road.The staged bridge demolition and construction will
reduce temporary impacts.
lb.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
The on-site stream(Tellico Creek)will be temporary diverted/dewatered while the existing bridge end bents are removed and rip-rap is installed.
Erosion and sedimentation control measures will be installed prior to ground disturbance.Both of these measures will aid in the prevention of sediment
into downstream habitats.
2.Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State?
✓ Yes ( No
2b.If this project DOES NOT require Compensatory Mitigation,explain why:
Bridge will be replaced with a bridge.Compensatory mitigation is not required.
F. Stormwater Management and Diffuse Flow Plan (required by DWR) )
1. Diffuse Flow Plan
1a.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
✓ Yes ( No
If no,explain why:
Project is not located within a N.C.Riparian Buffer Protection Area.
2.Stormwater Management Plan
2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
s Yes r No
Comments:
G. Supplementary Information
1. Environmental Documentation
la.Does the project involve an expenditure of public(federal/state/local)funds or the use of public(federal/state)land?*
( Yes C No
lb.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina)
Environmental Policy Act(NEPA ISEPA)?*
6 Yes rNo
1c.If you answered"yes"to the above,has the document review been finalized by the State Clearing House?*
✓ Yes f• No
Comments:*
NCDOT MCDC Attached.
2.Violations(DWR Requirement)
2a.Is the site in violation of DWR Water Quality Certification Rules(15ANCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules(15A NCAC 2B.0200)?*
r Yes f•No
3. Cumulative Impacts(DWR Requirement)
3a.Will this project result in additional development,which could impact nearby downstream water quality?*
(' Yes (' No
3b.If you answered"no,"provide a short narrative description.
The project is only to replace the existing subject bridge and does not increase the capacity of roads in the area.The proposed project is not a road
widening or improvement project.
4.Sewage Disposal(DWR Requirement)
4a.Is sewage disposal required by DWR for this project?*
✓ Yes R No r N/A
5. Endangered Species and Designated Critical Habitat(Corps Requirement)
5a.Will this project occur in or near an area with federally protected species or habitat?*
r: Yes r No
5b.Have you checked with the USFWS concerning Endangered Species Act impacts?*
r: Yes r No
5c.If yes,indicate the USFWS Field Office you have contacted.
Asheville
5d.Is another Federal agency involved?*
✓ Yes 0- No r Unknown
5e.Is this a DOT project located within Division's 1-8?
✓ Yes G No
5f.Will you cut any trees in order to conduct the work in waters of the U.S.?
G Yes r No
5g.Does this project involve bridge maintenance or removal?
6 Yes r No
5g(1).If yes,have you inspected the bridge for signs of bat use such as staining,guano,bats,etc.?
F. Yes r No
If you answered"Yes"to 5g(1),did you discover any signs of bat use?
✓ Yes G No r Unknown
5h.Does this project involve the construction/installation of a wind turbine(s)?*
✓ Yes r No
5i.Does this project involve(1)blasting,and/or(2)other percussive activities that will be conducted by machines,such as jackhammers,mechanized pile drivers,etc.?
6 Yes r No
If yes,please provide details to include type of percussive activity,purpose,duration,and specific location of this activity on the property.
Macon County-B79-NWP 3 Cover Letter(Final).pdf 407.82KB
5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
U.S.Fish&Wildlife-ECOS-Online Mapper
Consultation Documentation Upload
6. Essential Fish Habitat(Corps Requirement)
6a.Will this project occur in or near an area designated as an Essential Fish Habitat?*
✓ Yes r: No
6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA-Essential Fish Habitat
7. Historic or Prehistoric Cultural Resources(Corps Requirement)
7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?*
✓ Yes r No
7b.What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCDOT Cultural Resources Specialist.
7c.Historic or Prehistoric Information Upload
Macon County-B79-Archaeology.pdf 3.23MB
Macon County-B79-Historic Archictecture.pdf 3MB
8. Flood Zone Designation(Corps Requirement)
8a.Will this project occur in a FEMA-designated 100-yearfloodplain?*
(7 Yes r No
8b.If yes,explain how project meets FEMArequirements:
NCDOT Programmatic Agreement.
8c.What source(s)did you use to make the floodplain determination?*
N.C.Flood Maps-Flood Risk Information System.
Miscellaneous
Comments
Miscellaneous attachments not previously requested.
Macon County-B79-MCDC(Signed).pdf 162.54KB
Macon County-B79-NC Hertiage Program.pdf 1.61MB
Macon County-B79-Hydro Report.pdf 2.84MB
Macon County-B79-SMP(Final).pdf 3.49MB
Macon County-B79-GIS Map.pdf 182.52KB
Macon County-B79-Site Photos.pdf 908.14KB
Macon County-B79-Bat Assessment Form.pdf 36.69KB
Signature
17 By checking the box and signing below,I certify that:
• The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief;and
• The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time.
• I have given true,accurate,and complete information on this form;
• I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Patrick Jeremy Breedlove
Signature
c rr�a%Gr.Aay err
Date
1/8/2021