HomeMy WebLinkAbout20071823 Ver 1_More Info Letter_201102240
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
BEVERLY EAVES PERDUE
GOVERNOR
February 23, 2011
Mason Hemdon
NCDWQ
Fayetteville Regional Office
225 Green St. Suit 714
Fayetteville NC 28301
Mr. Herndon,
This letter is in response to your memo dated February 3, 2011.
FF6 2
?•wq ?g,?4/j
EUGENE A. CONNTTI
SECRETARY
We agree with, and will comply with your request regarding the notification to your
agency of any changes in construction methodologies that result in a change in the
calculated impact to streams and/or wetlands on future projects. We will also make
every effort in the future to coordinate with both the DWQ and the Corps of Engineers
when such issues arise. We will also comply with your request for additional monitoring
of the impacted areas on the R-2502B bridge site for what ever time period that you
prescribed.
Included with this letter is a work sheet with a more precise accounting of the impacts
that were involved in the excavation around the interior bents for the bridge at Drowning
Creek on R-2502B. As we had discussed by phone last week, the original estimate in the
December 9, 2010 letter of 0.005 acres of impact was not accurate due to a misplaced
decimal point (0.05), and some imprecise measurements of the actual excavations. We
have since gone back and checked the inspectors' notes and have obtained a more
accurate total for the 5 interior bents that were excavated within the wetland area. The
following calculations reflect the corrected total for both the north bound bridge (2
bents) and south bound bridge (3 bents) for the total of 5 bents. According to Mr. John
Olingers calculations, the total area excavated at each individual bent is 677.1 ft. square.
677.1 ft x 5 = 3385.6ft = 0.08 acres of total impacts
43560 ft
Thank you for your cooperation. Please contact me if you need additional information.
Sincerely,
Art C. King,
Division Environmental Officer
P.O. BOX 1067, ABERDEEN, NORTH CAROLINA 28315
PHONE (910) 944-2344 FAX (910) 944-5623
Highway Division 8
Cc. John R.G. Olinger, Highway Division 8
Ronnie Smith, USCOE, Wilmington District Office
Barry Harrington, NCDOT Roadside Environmental, Div. 7 & 8
David Wainwright, DWQ 401 Wetlands Group
Lelani Paugh, NEU Mitigation Unit
Sonia Carillo, NCDWQ central Office
File
NC Department of Transportation
Division of Highways
Highway Building
I S. Wilmington Street
Raleigh, NC 27601
SUBJECT-Z>, s7Z17°-? Ao?tz PROJECT 'mss Q
PREPARED BY Jrz< o DATE 4? 7I STATION
CHECKED BY DATE STR NO SHEET_OF
SD-01 DOT 4 161003399
1?..
Y , ?'rer (. (..
k '. ? '?'y `_ .. ?.