HomeMy WebLinkAbout20151080 Ver 1_Scoping Comments_20110124NC®EN R ... .
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins Dee Freeman
Governor -' - Director
Secretary
January 24, 2011
MEMORANDUM
TO: Christy W. Huff, NCDOT
FROM: Belinda Henson, NCDWQ, Fayetteville Regional Office
SUBJECT: Scoping Review of NCDOT's Proposed Bridge Replacement Projects: B- 4948 and B-
5331(Columbus County),
In reply to your e-mail dated January 3, 2011 (received January 4, 2011) in which you requested
comments for the above referenced projects, the NCDWQ offers the following comments:
Project-Specific Comments
B-4948, Bridge No. 144 Over Juniper Creek (CSw), Columbus County
Juniper Creek is designated as C;Sw waters and identified by Stream Index Number 15-4-8-3.
Class C waters are protected for uses such as secondary recreation, fishing, wildlife, fish
consumption, aquatic life including propagation, survival and maintenance of biological integrity,
and agriculture. Secondary recreation includes wading, boating, and other uses involving human
body contact with water where such activities take place in an infrequent, unorganized, or
incidental manner. The Sw supplemental classification is intended to recognize those waters which
have low velocities and other natural characteristics which are different from adjacent streams.
B-5331, Bridge No. 269 Over Big Branch (CSw), Columbus County
Big Branch is designated as C;Sw waters and is identified by Stream Index Number 18-64-10.
Class C waters are protected for uses such as secondary recreation, fishing, wildlife, fish
consumption, aquatic life including propagation, survival and maintenance of biological integrity,
and agriculture. Secondary recreation includes wading, boating, and other uses involving human
body contact with water where such activities take place in an infrequent, unorganized, or
incidental manner. The Sw supplemental classification is intended to recognize those waters which
have low velocities and other natural characteristics which are different from adjacent streams.
General Comments Regarding Bridge Replacement Projects
NCDWQ is very concerned with sediment and erosion impacts that could result from this project.
NCDOT shall address these concerns by describing the potential impacts that may occur to the
aquatic environments and any mitigating factors that would reduce the impacts.
2. If foundation test borings are necessary; it shall be noted in the document. Geotechnical work is
approved under General 401 Certification Number 3687/Nationwide Permit No. 6 for Survey
Activities.
225 Green St., Suite 714, Fayetteville, NC 28301-5043
Phone: 910-433-33001 FAX: 910-486-0707
Internet: w".nmateraualitv.ore
One
No1-thCarolina
Naturally
An Equal Opportunity 1 Affirmative Action Employer- 50% Recycled 110% Post Consumer Paper
3. It' a bridge is being replaced with a hydraulic conveyance other than another bridge, NCDWQ
believes the use of a Nationwide Permit may be required. Please contact the US Army Corp of
Engineers to determine the required permit(s).
4. If the old bridge is removed, no discharge of bridge material into surface waters is allowed unless
otherwise authorized by the US ACOE. Strict adherence to the Corps of Engineers guidelines for
bridge demolition will be a condition of the 401 Water Quality Certification.
5. Whenever possible, NCDWQ prefers spanning structures. Spanning structures usually do not
require work within the stream or grubbing of the streambanks and do not require stream channel
realignment. The horizontal and vertical clearances provided by bridges shall allow for human and
wildlife passage beneath the structure. Fish passage and navigation by canoeists and boaters shall
not be blocked. Bridge supports (bents) should not be placed in the stream when possible.
6. Bridge deck drains shall not discharge directly into the stream. Stormwater shall be directed across
the bridge and pre-treated through site-appropriate means (grassed swales, pre-formed scour holes,
vegetated buffers, etc.) before entering the stream. Please refer to the most current version of
NCDWQ's Stormwater Best Management Practices.
7. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall
not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and
fish kills.
8. If temporary access roads or detours are constructed, the site shall be graded to its preconstruction
contours and elevations. Disturbed areas shall be seeded or mulched to stabilize the soil and
appropriate native woody species shall be planted. When using temporary structures the area shall
be cleared but not grubbed. Clearing the area with chain saws, mowers, bush-hogs, or other
mechanized equipment and leaving the stumps and root mat intact allows the area to re-vegetate
naturally and minimizes soil disturbance.
9. Sediment and erosion control measures sufficient to protect water resources must be implemented
and maintained in accordance with the most recent version of North Carolina Sediment and Erosion
Control Planning and Design Manual and the most recent version of NCS000250.
10. All work in or adjacent to stream waters shall be conducted in a dry work area unless otherwise
approved by NCDWQ. Approved BMP measures from the most current version of NCDOT
Construction and Maintenance Activities manual such as sandbags, rock berms, cofferdams and
other diversion structures shall be used to prevent excavation in flowing water.
11. Heavy equipment shall be operated from the bank rather than in stream channels in order to
minimize sedimentation and reduce the likelihood of introducing other pollutants into streams. This
equipment shall be inspected daily and maintained to prevent contamination of surface waters from
leaking fuels, lubricants, hydraulic fluids, or other toxic materials.
12. In most cases, the NCDWQ prefers the replacement of the existing structure at the same location
with road closure. If road closure is not feasible, a temporary detour shall be designed and located
to avoid wetland impacts, minimize the need for clearing and to avoid destabilizing stream banks.
If the structure will be on a new alignment, the old structure shall be removed and the approach fills
removed from the 100-year floodplain. Approach fills shall be removed and restored to the natural
ground elevation. The area shall be stabilized with grass and planted with native tree species. Tall
fescue shall not be used in riparian areas.
t,
13. Any impacts to waters of the state resulting from utility relocations associated with these bridge
replacement projects should be noted in the oroiect document
General Comments if Replacing the Bridge with a Culvert
Placement of culverts and other structures in waters, streams, and wetlands shall be below the
elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20
percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow
passage of water and aquatic life. Design and placement of culverts and other structures including
temporary erosion control measures shall not be conducted in a manner that may result in dis
equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down streinn of the `
above structures. The applicant is required to provide evidence that the equilibrium is being
maintained if requested in writing by NCDWQ. If this condition is unable to be met due to bedrock
or other limiting features encountered during construction, please contact the NCDWQ for guidance
on how to proceed and to determine whether or not a permit modification will be required.
If multiple pipes or barrels are required, they shall be designed to mimic natural stream cross section
as closely as possible including pipes or barrels at flood plain elevation, floodplain benches and/or
sills may be required where appropriate. Widening the stream channel shall be avoided. Stream
channel widening at the inlet or outlet end of structures typically decreases water velocity causing
sediment deposition that requires increased maintenance and disrupts aquatic life passage.
Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that
precludes aquatic life passage. Bioengineering boulders or structures shall be properly designed,
sized and installed.
']'hank you for requesting our input at this time. NCDOT is reminded that issuance of a 401 Water
Quality Certification requires that appropriate measures be instituted to ensure that water quality
standards are met and designated uses are not degraded or lost. If you have any questions or require
additional information, please contact Mason Herndon at (910) 308-4021.
cc: Mr. Ronnie Smith, US Army Corps of Engineers, Wilmington Field Office
Mr. Clarence Coleman, Federal Highway Administration
Mr. Greg Burns, PE, Division 6 Engineer
Mr. Jim Rerko, Division 6 Environmental Officer
Mr. Chris Militscher, Environmental Protection Agency (electronic copy only)
Mr. Travis Wilson, NC Wildlife Resources Commission
Ms. Sonia Carrillo, NCDWQ Central Office
Pile Copy