HomeMy WebLinkAbout20110106 Ver 1_More Info Letter_20110207ALE.-A
?Mja
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue
Governor
Coleen H. Sullins
Director
February 7, 2011
Mr. Timothy J. Morris
KCI Technologies, Inc.
4601 Six Forks Rd., Ste. 220
Raleigh, NC 27609
Dear Mr. Morris:
Subject: Buffalo Flats Restoration Site
DWQ #11-0106
Cabarrus County, NC
Dee Freeman
Secretary
On January 31, 2011, your 401 Water Quality Certification application was received by the Division of Water
Quality (DWQ). Your application has been reviewed along with your responses to the EEP regarding the hydrology and
monitoring period. There is still concern by DWQ and the Army Corp of Engineers that the proposed hydro period of 5%
is not sufficient, nor the proposed 5 year monitoring period for the wetland. Until this can be resolved, this project will be
placed on hold. Be advised that a site visit is scheduled on February 16th. Following that visit more information may be
requested.
Pursuant to 15A NCAC 2H .0507(h), please be advised that this project will be placed on hold until all the
necessary information is provided. Failure to submit the requested information may result in the application being
withdrawn from consideration. You may reapply, but a new fee and application will be required. In addition, this office is
requesting that the Army Corps of Engineers place a hold on processing the application.
If you have any questions, please contact me at (704) 663-1699.
Sincerely,
Alan D. ohn,s9
Surface Water Protection
Sr. Env. Specialist
CC: Steve Chapin, Asheville, COE
Todd Tugwell,
Ian McMillan, Wetlands Unit
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: www.ncwaterguality.org
NorthCarolina
;Vaturallty
An Eaual ODoortunlty/Affirmative Action Emolover - 50% Recvcled/10% Post Consumer Paper