Loading...
HomeMy WebLinkAbout20110106 Ver 1_More Info Letter_20110207ALE.-A ?Mja NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Coleen H. Sullins Director February 7, 2011 Mr. Timothy J. Morris KCI Technologies, Inc. 4601 Six Forks Rd., Ste. 220 Raleigh, NC 27609 Dear Mr. Morris: Subject: Buffalo Flats Restoration Site DWQ #11-0106 Cabarrus County, NC Dee Freeman Secretary On January 31, 2011, your 401 Water Quality Certification application was received by the Division of Water Quality (DWQ). Your application has been reviewed along with your responses to the EEP regarding the hydrology and monitoring period. There is still concern by DWQ and the Army Corp of Engineers that the proposed hydro period of 5% is not sufficient, nor the proposed 5 year monitoring period for the wetland. Until this can be resolved, this project will be placed on hold. Be advised that a site visit is scheduled on February 16th. Following that visit more information may be requested. Pursuant to 15A NCAC 2H .0507(h), please be advised that this project will be placed on hold until all the necessary information is provided. Failure to submit the requested information may result in the application being withdrawn from consideration. You may reapply, but a new fee and application will be required. In addition, this office is requesting that the Army Corps of Engineers place a hold on processing the application. If you have any questions, please contact me at (704) 663-1699. Sincerely, Alan D. ohn,s9 Surface Water Protection Sr. Env. Specialist CC: Steve Chapin, Asheville, COE Todd Tugwell, Ian McMillan, Wetlands Unit Mooresville Regional Office Location: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748 Internet: www.ncwaterguality.org NorthCarolina ;Vaturallty An Eaual ODoortunlty/Affirmative Action Emolover - 50% Recvcled/10% Post Consumer Paper