Loading...
HomeMy WebLinkAbout20090613 Ver 3_More Info Received_20110211~~ :: ~. f' NCDENR North Carolina Department of Environment and Division of Parks and Recreation Beverly Eaves Perdue, Governor Ms. Ian McMillan North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC. 27699-1650 Dee Freeman, Secretary February 11, 2011 RE: Riparian Buffer Authorization Request [DWQ Project #: 09-0613 V2] Mountains-To-Sea Trail: Quarry To Pleasant Green Eno River State Park Dear Mr. McMillan: Lewis Ledford, Director I have enclosed one (1) original and four (4) copies of the signature page from our PCN application per your letter to us dated February 9, 2011. Our original PCN application was hand-delivered to your office on February 9, 2011. Sincerely, c~ s~~ Amin K. Davis Environmental Review Coordinator Division of Parks and Recreation, Natural Resources Program North Carolina Department of Environment and Natural Resources (919) 715-7584 / amin.davis@ncdenr.gov 1615 Mail Service Center, Raleigh, North Carolina 27699-1615 Phone: 919-733-4181 1 FAX: 919-715-30851 Internet: www.ncparks.gov An Equal Opportunity /Affirmative Action Employer - 50 % Recycled 110 % Post Consumer Paper 3 Natural Resources Q~~~oec~p FEB 1 12011 DENR-WATER QUALITY WETLANDS AND STDRMWATER BRANCH :,,. 3 Ipq-O1o13 U~r 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ^ Yes ®No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ^ Yes ®No impacts? ^ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ^ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? GIS file provided by the NC Natural Heritage Program. 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ^ Yes ®No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? Previous related consultations with Ron Sechler (NOAA staff). 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ^ Yes ®No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? Onsite consultations with NC State Historic Preservation Office staff. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in aFEMA-designated 100-year floodplain? ®Yes ^ No 8b. If yes, explain how project meets FEMA requirements: Although small portions of the proposed trail alignment are within the 100-year floodplain, stream crossing/bridges will be located outside of the 100-year floodplain. 8c. What source(s) did you use to make the floodplain determination? GIS data provided by http://www.ncfloodmaps.com/ Amin Davis ~ ~ 2/8/11 Applicant/Agent's Printed Name Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is rovided. Q ~~~n ,~ ~"4/ D ~Nk• ~rER ~AN~SAIyASTOR~ R Page 11 of 11 BRANCH PCN Form -Version 1.3 December 10, 2008 Version