Loading...
HomeMy WebLinkAbout20080067 Ver 3_401 Application_20110211WITHERS RAVENEL ENGINEERS I PLANNERS 1 SURVEYORS 14'10 COMMONWEALTH DRIVE, SUITE 1o1 WILMINGTON, NORTH CAROLINA, 28403 (910) 256-9277 FAX (910) 256-2584 TO: NC Division of Water Quality - 4o'1 Wetlands Unit 512 N. Salisbury Street; 9`h Floor Raleigh, NC 276o4 WE ARE SENDING YOU ? Shop Drawings ? Copy of Letter ® Attached ? Prints ? Change order the following items: ? Specifications COPIES DATE NO. DESCRIPTION 1 2/1/11 02100 .00 $570-oo Application Fee 5 2/1/11 02100 .00 Alston Pond PCN 2/1/11 02100349-00 Alston Pond Stormwater Management Report 1 2/1/11 02100 .00 CD with Electronic Co of PCN Information THESE ARE TRANSMITTED as checked below: ® For approval ? Approved as submitted ? For your use ? Approved as noted ? As requested ? Returned for corrections ? For review and comment ? ? FOR BIDS DUE 20 ? PRINTS RETURNED AFTER LOAN TO US REMARKS: Signature: I-cts U 3 2011 Date: il?7tANas In COPY TO: File ? Resubmit ? Submit ? Return - copies for approval copies for distribution corrected prints SIGNED: Troy Beasley if enclosures are not as noted, kindly notify us at once. DATE 2/2/11 JOB NO. 02100349-00 ATTENTION Mr. Ian McMillan PHONE# 919-807-6364 RE: Alston Pond Subdivision PCN Submittal ? -o u ? Under separate cover via _ ? Plans ? Samples ? Diskette ? WITHERS &RAV E N E L ENGINEERS I PLANNERS I SURVEYORS February 1, 2011 US Army Corps of Engineers Attn: Mr. James Latsinger 1333 Heritage Trade Drive, Suite 105 Wake Forest, NC 27857 NC-Division of Water Quality Attn: Mr. Ian McMillan 1650 Mail Service Center Raleigh, NC 27699-1650 Re: Alston Pond Subdivision Request for 404/401 Certification and Buffer Compliance W&R Project Number- 03100349.00 Previous Corps AID #2oo8-oo68o Previous DWQ#: o8-oo67 Dear Mr. Latsinger and Mr. McMillan: On behalf of North Broad Street, LLC, we are requesting authorization from the USACE to use NWP 29 for the construction of a residential subdivision. We are also requesting 401 Certification and Buffer Compliance from the NC-DWQ for impacts to streams, wetlands and riparian buffers. The proposed project was previously issued NWPs 3 & 29 by the USACE (AID #2oo8-oo68o) and a 401 WQC and Buffer Compliance (DWQ Project #o8-oo67) by NC-DWQ. Due to the downturn of the economy, the project was never constructed and the NWPs 3 & 29 and the 401 WQC and Buffer Authorization issued for the project expired on June 13, 2010. The applicant wishes to move forward with the project at this time, and due to revisions to the site plan, the proposed impacts have changed. The subject property is approximately 148 acres in size and is located on the east and west side of HWy 55, south of the intersection of Old Adams Road and Hwy 55 in Fuquay-Varina, Wake County, North Carolina at Latitude: 35.6262765°N and Longitude: 78.8132158°W. The site contains unnamed tributaries to Basal Creek and is located in the Neuse River Basin. The Water Quality Classification for these features is: B; NSW, the Cataloging Unit for this site is: 030202o1, and the Stream Index number is: 27-43-15-3• Project History The Alston Pond Subdivision was previously issued NWPs 3 & 29 for 147 if of permanent stream impacts and o.o6 acres of permanent wetland impacts and 49 if of temporary stream impacts by the Corps of Engineers (AID# 2oo8-oo68o). NC-DWQ issued a 401 WQC for 147 if of permanent stream impacts, 49 if of temporary stream impacts and o.o6 acres of permanent wetland impact and Buffer Authorization for 10,848 sq ft of buffer impacts associated with the Alston Pond Subdivision. Due to the downturn of the economy, the project was never constructed and the NWPs 3 & 29 and the 401 WQC and Buffer iii MacKenan Drive I Cary, NC 275111 tel.: 919.469.3340 I fax: 919.467-6oo8 I www.withersravenet.com 1410 Commonwealth Drive I Suite lol Wilmington, NC 28403 1 tel: 910.256.9277 I fax: 910.256.2584 416 D Gallimore Dairy Road Greensboro, NC 27409 1 tel: 336.993.5504 I fax: 919.467.6oo8 N.C. Engineering Board No. C-0832 WITHERS RAVENEL ENGINEERS I PLANNERS I SURVEYORS Authorization issued for the project expired on June 13, 2010. Due to the extensive cost of rehabilitating the existing dam to meet Dam Safety requirements, the applicant has decided to breach the dam and permanently drain the pond. A pipe will be installed within the base of the dam to will allow unimpeded now of water to the existing stream below the dam and the open cut in the dam will be backfilled. Until a stream channel establishes itself within the pond bed and new stream/buffer location is determined and approved by DWQ, the pond is still buffered, as exhibited in the enclosed site plans. During the previous permitting process, numerous meetings and correspondence with the USACE and NC-DWQ occurred to determine how the impacts from the proposed Hilltop Needmore Road would be permitted. Specifically, the proposed four-lane thoroughfare is part of Fuquay-Varina's future development plans and bisects the site and will stub at the property line that is adjacent to a stream and beaver impoundment. Through the review process with the USACE, NC-DWQ and the Town of Fuquay-Varina, the alignment of Hilltop Needmore Road was realigned to minimize future impacts and is now at the current location shown on the attached site plans. It was decided that the proposed subdivision could not support the need for a four-lane road at that time. Therefore, North Broad Street, LLC would apply for the stream crossing for Hilltop Needmore Road in association with the Alston Pond Subdivision and the Town of Fuquay-Varina would need to apply for future impacts associated with the extension of Hilltop Needmore Road. Please reference the previous permit application for a compilation of all correspondence associated with the Hilltop Needmore Road issue. The USACE issued a final JD for the onsite wetlands on June 13, 2008. NC-DWQ issued a Buffer Determination Letter for the subject property on March 20, 2007. Proposed Impacts The proposed impacts have changed from the original permitted impacts due to revisions to the site plan. Wetland/Stream Impacts The proposed permanent impacts consist of 147 linear feet of perennial/important stream channel for a road crossing (Impact #3), 0.03 acres of wetland impacts for installation of an energy dissipater below a culvert (Impact #8) and fill from backslopes to stabilize site fill (Impacts #9 & 12). The proposed temporary impacts consist of 27 if of impact to an intermittent stream for a sewer crossing (Impact # 15) and 0.014 acres of wetland impact from a sewer crossing (Impact #12). iii MacKenan Drive I Cary, NC 275-1-11 tel.: 919.469.3340 I fax: 919.467-6008 I www.withersravenet.com 1410 Commonwealth Drive Suite lot I Wilmington, NC 28403 I tel: 910.2569277 I fax: 910.256.2584 416 D Gallimore Dairy Road I Greensboro, NC 27409 I tel: 336993.5504 I fax: 919.467.6008 N.C. Engineering Board No. C-0832 WITHERS RAVENEL ENGINEERS I PLANNERS I SURVEYORS Buffer Impacts The proposed project will result in 13,550 sq ft of permanent impacts to Zone 1 and 19,501 sq ft of permanent impacts to Zone 2. Impact # 1 & 2 will result from a road crossing. The total buffer impacts are less than 1/3 acre for this crossing and will not require mitigation. Impact #4 will result from construction of a bypass channel. Bypass channels are an allowable activity following nitrogen treatment and mitigation is not required for this impact. Impact #5 will result in impacts from grading for the backslopes of the BMP and installation of the bypass channel. The disturbed area within Zone 2 will be vegetated with grass once grading is complete. Grading and revegetation within Zone 2 is an exempt activity and will not require mitigation. As previously bypass channels are an allowable activity and do not require mitigation. Impact #6 & 7 will result from construction of a road. Since the total buffer impacts for this crossing are less than 1/3 acre, no mitigation is required. Impact #1o will result in buffer impacts as a result of grading of the backslopes from site fill. The disturbed area within Zone 2 will be vegetated with grass once grading is complete. Grading and revegetation within Zone 2 is an exempt activity and mitigation is not required for this impact. Impact #13, 14 & 16 will result from installation of the sewer line and construction of a greenway trail. The proposed sewer easement will be 20' wide. A 10' greenway trail will be constructed within the sewer easement and will be utilized as the maintenance corridor. Sewer lines that disturb less than 40 if and have a permanent maintenance corridor of 10 if or less are an exempt activity and mitigation is not required forthis impact. Impact #17 will result from grading within Zone 2 for construction of the adjacent BMP. The disturbed area within Zone 2 will be vegetated with grass once grading is complete. Grading and revegetation within Zone 2 is an exempt activity and mitigation is not required for this impact. Impact #18 & 19 will occur from construction of a bypass channel. Bypass channels are an allowable activity following nitrogen treatment and mitigation is not required forthis impact. Impact #20 will result from grading within Zone 2 for construction of the adjacent BMP. The disturbed area within Zone 2 will be vegetated with grass once grading is complete. Grading and revegetation within Zone 2 is an exempt activity and mitigation is not required for this impact. iii MacKenan Drive I Cary, NC 275-1-11 tel.: 919.469.3340 I fax: 919.467-6008 I www.withersravenet.com 1410 Commonwealth Drive Suite lot I Wilmington, NC 28403 I tel: 910.2569277 I fax: 910.256.2584 416 D Gallimore Dairy Road I Greensboro, NC 27409 I tel: 336993.5504 I fax: 919.467.6008 N.C. Engineering Board No. C-0832 WITHERS RAVENEL ENGINEERS I PLANNERS I SURVEYORS Future Plans The Alston Pond Subdivision is a single and complete project with no additional phases proposed at this time. However, there is a thoroughfare that bisects the site. The proposed alignment was designed such that it terminates at a point that will minimize future impacts. The Town of Fuquay will be responsible for permitting any future impacts needed to complete this road. The culverts at this crossing may need to be extended to accommodate future traffic volumes. If the road should need to be widened, the Town of Fuquay Varina will be the applicant for additional impacts. Avoidance and Minimization Prior to site plan development, the applicant requested that a detailed wetland delineation be conducted so that impacts to wetlands and `waters' could be minimized. A stream channel bi-sects the property, and in order to access high ground, impacts were unavoidable. Impacts were minimized by crossing the channel at a nearly perpendicular angle, through the use of extensive headwalls at the crossing (Sheet A). A headwall was also utilized to avoid additional wetland impacts from the northern road (Sheet B). Backslopes to stabilize lot fill were designed at a 2:1 slope to minimize wetland impacts as well. The greenway trail was designed to utilized elevated pedestrian bridges at wetland and stream crossings to furtherminimize wetland impacts. The project was also designed to avoid and minimize buffer impacts by crossing streams at almost perpendicular angles. Stormwater Management Plan The proposed Stormwater Management Plan consists of 4 proposed BMP's (wet detention ponds), which provide detention of the 1-year and 1o-year storms to below pre-development levels. The BMP's are designed in accordance with the latest Stormwater Best Management Practices Manual. Level Spreaders are provided at all water quality outlet pipes from the proposed BMP's. High flow bypass pipes are channeled directly to a stream channel. At BMP's not located adjacent to Riparian Buffers, stormwater is discharged at non-erosive velocities through at least 30' of natural wetlands or a vegetated filter strip. The Stormwater Management Plan and supporting information has been provided as an Appendix. Mitigation Wetland and Stream Mitigation Because permanent impacts to streams are less than 150 linear feet and wetland impacts are less than o.1 acres, mitigation is not proposed for this project. iii MacKenan Drive I Cary, NC 275-1-11 tel.: 919.469.3340 I fax: 919.467-6008 I www.withersravenet.com 1410 Commonwealth Drive I Suite lot I Wilmington, NC 28403 I tel: 910.2569277 I fax: 910.256.2584 416 D Gallimore Dairy Road I Greensboro, NC 27409 I tel: 336993.5504 I fax: 919.467.6008 N.C. Engineering Board No. C-0832 WITHERS RAVENEL ENGINEERS I PLANNERS I SURVEYORS Buffer Mitigation Because all proposed buffer impacts are either exempt or allowable uses, the applicant is not proposing buffer mitigation. Please feel free to contact me if you have any questions or require additional information to complete your review of the application. Sincerely, Troy Beasley Environmental Scientist WITHERS & RAVENEL, INC. Attachments - 1) PCN Form 2) Agent Authorization 3) USGS Quadrangle Map 4) Wake County Soil Survey Map 5) Previously Issued NWPs 3 & 29 6) Previously Issued 401 WQC and Buffer Authorization 7) NC-DWQ Buffer Approval Letter 8) StormwaterMangementPlan Information 9) BMP Supplement Forms (DWQ PCN Only) 1o) BMP 0&M Agreements (DWQ PCN Only) 11) Impact Plans iii MacKenan Drive I Cary, NC 275-1-11 tel.: 919.469.3340 I fax: 919.467-6oo8 I www.withersravenet.com 1410 Commonwealth Drive Suite lot I Wilmington, NC 28403 I tel: 910.2569277 I fax: 910.256.2584 416 D Gallimore Dairy Road I Greensboro, NC 27409 I tel: 336993.5504 I fax: 919.467.6oo8 N.C. Engineering Board No. C-0832 o??o'Fyw?a rF9Q? oNii? -c Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: NWP 29 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ® Yes ? No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 In below. ? Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Alston Pond Subdivision 2b. County: Wake 2c. Nearest municipality / town: Fuquay-Varina 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: North Broad Street, LLC 3b. Deed Book and Page No. DB: 12671; DP:0810 3c. Responsible Party (for LLC if applicable): Tim Smith 3d. Street address: 201 Weston Parkway, Suite 203 3e. City, state, zip: Cary, NC 27513 3f. Telephone no.: 919-481-3000 3g. Fax no.: 3h. Email address: tim@prestondev.com Page I of 13 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: Troy Beasley 5b. Business name (if applicable): Withers and Ravenel 5c. Street address: 1410 Commonwealth Drive, Suite 101 5d. City, state, zip: Wilmington, NC 28403 5e. Telephone no.: 910-256-9277 5f. Fax no.: 910-256-2584 5g. Email address: tbeasley@withersravenel.com Page 2 of 13 PCN Form - Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): PIN#s 0658523920; 0658317536 1 b. Site coordinates (in decimal degrees): Latitude: 35.6262765 Longitude: - 78.8132158 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: ±148 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Basal Creek proposed project: 2b. Water Quality Classification of nearest receiving water: B;NSW (Stream Index #27-43-15-3 2c. River basin: Neuse River Basin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site is approximately 75% forested and 25% agricultural fields. A small residential community is located to the north, NC Hwy 55 is located to the west and Basal Creek borders the property to the east. 3b. List the total estimated acreage of all existing wetlands on the property: ±9.62 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: ±4,579 If 3d. Explain the purpose of the proposed project: The purpose of the proposed project is to construct a residential subdivision. 3e. Describe the overall project in detail, including the type of equipment to be used: The overall project includes the construction of a residential community. Large grading equipment will be used to install the infrastructure (i.e. roads, sewer, BMPs) and prepare the site for construction of the residential homes and apartments. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ®Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Withers and Ravenel Name (if known): Todd Preuninger Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Corps JD - 6/13/2008 (AID#200800680) DWQ Buffer Determination - March 20, 2007 (Project # NBRRO 07-028) 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. NWP 3 & 29 - issued 6/13/2008 - AID# 200800680 401 WQC and Buffer Authorization - issued 8/26/2008 - DWQ Project # 08-0067. Ver. 2 Page 3 of 13 PCN Form - Version 1.3 December 10, 2008 Version 6. Future Project Plans 6a. Is this a phased project? ® Yes ? No 6b. If yes, explain. The subdivision will be constructed in Phases. However, the impacts for the entire project are being permitted as a single project. Page 4 of 13 PCN Form - Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ® Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Permanent Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact (P) or Temporary (T) (if known) DWQ - non-404, other) (acres) Impact 8 ® P ? T Permanent / Fill Headwater Forest ® Yes ? No ® Corps ® DWQ 0.005 ac Impact 9 ® P ? T Permanent / Fill Headwater Forest ® Yes ? No ® Corps ® DWQ 0.011 ac Impact 11 ? PET Sewer Construction Headwater Forest ® Yes ? No ® Corps ® DWQ 0.014 ac Impact 12 ® P ? T Permanent / Fill Headwater Forest ® Yes ? No ® Corps ® DWQ 0.003 ac 2g. Total wetland impacts 0.033 ac 2h. Comments: Impacts to wetlands will occur from rehabilitation of an existing dam to meet dam safety requirements. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number -Permanent (PER) or (Corps - 404, 10 stream length (P) or Temporary (T) intermittent DWQ - non-404, width (linear (INT)? other) (feet) feet) Impact 2 ®P F-1 T Fill /Culvert UT to Basal Creek PER ® ? INT ® Corps ® DWQ 5' 147 If Impact 15 ? P ® T Sewer Crossing UT to Basal Creek ? PER ® INT ® Corps ® DWQ 3' 27 If 3h. Total stream and tributary impacts 150 If 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water impact Name of number - Permanent waterbody Type of impact Waterbody type Area of impact (acres) (P) or Temporary (T) (if applicable) 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts 4g. Comments: Page 5 of 13 PCN Form - Version 1.3 December 10, 2008 Version 5. Pond or Lake Construction If pond or lake construction proposed, then complete the chart below. 5a. Pond ID 5b. Proposed use or purpose of 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) number pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 K Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: Page 6 of 13 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ® Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Permanent (P) or Reason for Buffer Zone 1 impact Zone 2 impact Temporary (T) impact Stream name mitigation (square feet) (square feet) required? Impact 1 ® P ? T Road Crossing UT to Basal Creek ? Yes ® No N/A 5,338 sq ft Impact 2 ® P ? T CoRoad ss ng UT to Basal Creek ®Neos 9,045 sq ft N/A Impact 4 ® P ? T ChBypass annel UT to Basal Creek ®Neos 456 sq ft N/A Grading and ? Yes Impact 5 ® P ? T outfall UT To Basal Creek ® No N/A 1,191 sq ft structure Impact 6 ® P ? T Road Crossing UT To Basal Creek ? Yes ® No N/A 3,707 sq ft Impact 7 ® P ? T CoRoad ss ng UT To Basal Creek ®Neos 2,503 sq ft N/A Impact 10 ® PEI T Grading UT To Basal Creek ®Neos N/A 4,665 sq ft Impact 13 ® P ? T ConsSewer t ruction UT To Basal Creek ®Neos N/A 426 sq ft Impact 14 ® P ? T ConsSewer t ruction UT To Basal Creek ®Neos 1,485 sq ft N/A Impact 16 ® P ? T ConsSewer t ruction UT To Basal Creek ®Neos N/A 668 sq ft Impact 17 ® P ? T Grading UT To Basal Creek ®Neos N/A 668 sq ft Impact 18 ® P ? T ChBypass annel UT To Basal Creek ®Neos N/A 285 sq ft Impact 19 ® PEI T ChBypass annel UT To Basal Creek ®Neos 61 sq ft N/A Impact 20 ® P ? T Grading UT To Basal Creek ®Neos N/A 2,553 sq ft 6h. Total buffer impacts 13,550 sq ft 19,501 sq ft 6i. Comments: Because buffer impacts are less than 1/3 of an acre at each road crossing and grading within zone 2, sewer lines less than 40 If and stormwater conveyances are considered an allowable uses, the applicant is not proposing buffer mitigation. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Prior to site plan development, the applicant requested that a detailed wetland delineation be conducted so that impacts to wetlands and `waters' could be minimized. A stream channel bi-sects the property, and in order to access high ground, impacts were unavoidable. Impacts were minimized by crossing the channel at a nearly perpendicular angle, through the use of extensive headwalls at the crossing (Sheet A). A headwall was also utilized to avoid additional wetland impacts from the northern road (Sheet B). Backslopes to stabilize lot fill were designed at a 2:1 slope to minimize wetland impacts as well. The greenway trail was designed to utilized elevated pedestrian bridges at wetland and stream crossings to further minimize wetland impacts. Page 7 of 13 PCN Form - Version 1.3 December 10, 2008 Version 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Head walls will be used to stabilize fill at all road crossings and pedestrian bridges will be used for greenway crossings. Also, silt fencing will be installed around all disturbed areas to prevent sediment from escaping the site and entering downstream waters and wetlands. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8of13 PCN Form - Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ? Yes ® No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zone Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Because buffer impacts are less than 1/3 of an acres at each road crossing and stormwater conveyances are considered an allowable activity following nitrogen treatment, the buffer impacts do not require mitigation. Page 9 of 13 PCN Form - Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to protected riparian buffers identified ® Yes ? No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. ® Yes ? No Comments: 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? 31 % 2b . Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: The Stormwater Plan consists of 4 proposed BMP's (wet detention ponds), which provide detention of the 1-year and 10- year storms to below pre-development levels. The BMP's are designed in accordance with the latest Stormwater Best Management Practices Manual. Level Spreaders are provided at all water quality outlet pipes from the proposed BMP's. High flow bypass pipes are channeled directly to a stream channel. At BMP's not located adjacent to Riparian Buffers, stormwater is discharged at non-erosive velocities through at least 30' of natural wetlands or a vegetated filter strip. The Stormwater Management plan has been provided as an Appendix. ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ® DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? ? Phase II 3b . Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties ? HQW 4a . Which of the following state-implemented stormwater management programs apply ? ORW (check all that apply): ® Session Law 2006-246 ? Other: 4b . Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ® No 5. DWQ 401 Unit Stormwater Review 5a . Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No Page 10 of 13 PCN Form - Version 1.3 December 10, 2008 Version 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1 a. Does the project involve an expenditure of public (federal/state/local) funds or the ? Yes ® No use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ? Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ? Yes ? No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes ® No additional development, which could impact nearby downstream water quality? 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. This is a single and complete project with no additional phases proposed at this time. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discha rge) of wastewater generated from the proposed project, or available capacity of the subject facility. Page 11 of 13 PCN Form - Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a . Will this project occur in or near an area with federally protected species or ? Yes ® No habitat? 5b . Have you checked with the USFWS concerning Endangered Species Act ? Yes ® No impacts? E] Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ? Asheville 5d . What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? W&R reviewed the NC OneMap Viewer GIS website, located at http://www.nconemap.net/Default.aspx?tabid=286, to identify if any potential occurrence of endangered species on or near the proposed project. The review of the GIS database did not identify any recent occurrences of endangered species or critical habitat on the subject property or within 0.5 miles of the project. The previous issuance of NWPs 3 & 29 documents that the proposed project will not impact endangered species or critical habitat. It should also be noted that this project was previously permitted, which documents that the project will not result in impacts to Endangered Species or Critical Habitat. 6. Essential Fish Habitat (Corps Requirement) 6a . Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b . What data sources did you use to determine whether your site would impact Essential Fish Habitat? There are no waters designated as EFH in Wake County. 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a . Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b . What data sources did you use to determine whether your site would impact historic or archeological resources? There are no historic structures located on the project site. 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ? Yes ® No 8b . If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? FEMA FIRM Panel 0658J Tro Beasle y y Withers and Ravenel 2/1 /11 Applicant/Agent's Printed Name Applicant/Agent's Signature ' Date (Agent s signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 13 PCN Form - Version 1.3 December 10, 2008 Version AGENT AUTHORIZATION WITHERS &`RAVENEL ENGiNEERS I PLANNERS I SURVEYORS AUTHORITY FOR APPOINTMENT OF AGENT The undersigned owner(s) North Broad Street, LLC do(es) hereby appoint Trov Beasley / Withers & Ravenel. Inc, as his, her, or It's agent for the purpose of petitioning the appropriate local, state and federal environmental regulatory agencies (US Army Corps of Engineers, NC Division of Water Quality. NC Division of Coastal Management. eta) for. a) review and approval of the jurisdictional boundaries of onsite jurisdictional areas (wetlands, surface water, etc.) and/or: b) preparation and submittal of appropriate environmental permit application$/requests for the Alston Pond Subdivision, The owner does hereby authorize that sold agent has the authority to de the following acts on behalf of the owner: (1) To submit appropriate requests/applications and the required supplemental materials: (2) To attend meetings to give representation on behalf of the Client. (3) To authorize access to subject property for the purpose of environmental review by appropriate regulatory agencies. This authorization shall continue in effect until completion of the contracted task or termination by the property owner. Agents Name, Address & Telephone: Date. Signatu vP Owner(s): (Name - Print) (Title) III , (S n Mailing Address f rlk(m 1v C- --2i-In City State Zip 111 MacKenan Drive I Cary, NC 275111 tel.; 919,469.33401 fax: 919,467-60081 www.withefsrevanel.com I License No, C-0832 1410 Commonwealth 1]rive 1 Suite 1011 Wilmington, NC 284031 tel; 910.256.92771 fax: 910.256,2584 416 D Gallimore Dairy Road I Greensboro, NC 274091 tel: 336.993.55041 fax: 919.467.6008 USGS QUADRANGLE MAP AND WAKE COUNTY SOIL SURVEY GRAPHIC SCALE 0 200 400 1 inch - 400 ft. 4W. : n Ep- 0 N- s off- r ?? rt ALSTON POND SUBDIVISION ':. f .?. f . F. <Ir - - r - $IF 41 ¦ t ?6,? AERIAL PHOTOGRAPH-2006 i - T WITHERS &- RAVENEL ENGINEERS I FLAPPERS I SYRVEOCRS GRAPHIC SCALE 4, --???••? o Soo 1000 1 inch 1000 ft. ?. fir' i ! _ ,?• , it k • - . -?,? h I , ?' ?'? _ f _ -' t ` 447 139 Cem eM ? 'r 442 \ _ - •?- 00 %? - ' -1413 ;' .fir. ALSTON POND SUBDIVISION I Its USGS QUAD MAP- APEX AND FUQUAY VARINA QUAD ?Nv • • 4e, WITHERS &- RAVENEL ENGINEERS I FLAPPERS I SYRVEOCRS GRAPHIC SCALE 0 200 400 1 inch - 400 ft. • • • ?1? OrC2 ;f tom' .e ? .._, ? Q • N o B Cep ?1.• C CeD A913 CgC2 CgB - 3 f w wrl CeD f. CgC CeF A • ? ? C9C2 NoC '. eD AjaB V0 ALSTON POND SUBDIVISION SOILS MAP WITHERS &-RAVENEL -WAKE COUNTY SOIL SURVEY- SHEET 90 11MMIM6LMS I I-LAMMMMS I SYMY6YOMS Fu E. Wake Courh North Carolina PREVIOUSLY ISSUED NWP 3 & 29 L fr U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. 200800680 County: Wake USGS Quad: Apex GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION ref CE/V Property Owner / Authorized Agent: North Broad Street, LLC r® Address: Attn: Jeffrey Smerko oy 18 ?pdo 14600 Weston Par",ay it?)ng Cary, NC' 1°t'Ell't r?-, Telephone No.: 919-678-8800 Size and location of property (water body, road name/number, town, etc.): The Alston Pond site is approximately 148 acres of land located northeast of Broad Street 0.5 miles northwest of the intersection of Broad Street and Wade Nash U, in Fuqu`iy-Varina, Wake County, North Carolina. Description of projects area and activity: This authorization is for the permanent impact of .06 acres of wetlands and the temporary impact of 49 linear feet (lf) of stream channel, clue to construction associated with a damn ....l...l.:l:?..t..... k.1.7;4;nnoll.f fh;e norrnit antharhtie q tho Tinrrnaneat ininact of 147 if of streani channel due to the The ith the annlication and d on May 28, 2008 and in accordance with the permit conditions stated below. Applicable Law: ® Section 404 (Clean Water Act, 33 USC 1344) ? Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: Regional General Permit Number: Nationwide Permit Number: 29 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the attached conditions and your submitted plans. Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced. (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit's expiration, modification Or revocation, uzzless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Quality (telephone (919) 733-1786) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Jamie Shern. Permit Condition: A pre-construction inspection of the project site must be performed by the Army Corps of Engineers, Wilmington District (USACE), prior to beginning work within jurisdictional waters. The applicant must contact the USACE to establish a suitable date and time to conduct the pre-construction inspection. The applicant, and construction contractor who will be installing the culvert/road crossing, must be present during the pre-construction inspection. Also, the exact footprint of the proposed fill must be demarcated for the pre-construction meeting. Geographic coordinates (latitude and longitude), for the project endpoints (upstream and downstream locations) must be provided before or on the pre-construction inspection date. The coordinates roust be provided in North American Datum 1983(NII D83), decimal degree format. Page 1 of 2 The applicant must notify the USACE, in writing, no later than 30 days after completion of work within jurisdictional waters. The notification must be sent to the appropriate project r anager in the Raleigh Regulatory Field Office, U.S. Army Corps of Engineers, 3331 Heritage Trade Drive, Suite 105, Wake Forest, Vc ? Iz Carolina 27'87. Corps Regulatory Official Expiration Date of Verification: 6/13/2010 Date: 06/13/2008 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at our website at hqp://regulatoKy.usacesurvey.com/ to complete the survey online. Page 2 of 2 Determination of Jurisdiction: ? Based on preliminary information, there appear to be waters of the US including wetlands within the above described project area. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). ? There are Navigable Waters of the United States within the above described project area subject to the permit requirements of Section 10 of the Divers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ® There are waters of the U5 and/or wetlands within the above described project area subject to the permit requirements of Section 404 of the Clean Water Act (CWI+A)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. ? The jurisdictional areas within the above described project area have been identified under a previous action. Please reference jurisdictional determination issued . Action ID Basis of Jurisdictional Determination: Wetlands were detc? nthied tts n? the Corps 1987 delineation manual. Streams were identified utilizing ot-dinat`y high water marl. as ideittilied in the fwld. Appeals Information (This information applies only to approved jurisdictional determinations.) Attached to this verification is an approved jurisdictional determination. If you are not in agreement with that approved jurisdictional determination, you can make an administrative appeal under 33 CFR 331. Enclosed you will find a Non Iication of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you trust submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Division Attn: Jean Manuele, Field Office Chief, Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 In order for an 11.FA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the District Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by 8/12/2008. **It is not necessary to submit an A form to the District Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: ^ Date 06/13/2008 Expiration Date 06/13/2013 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnished: Withers & Ravenel Attn: Todd Preuninger 111 MacKenan Drive Cary, NC 27511 Page 3 of 2 PREVIOUSLY ISSUED 401 WQC & BUFFER AUTHORIZATION ?F W A rFR J f? Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources p Coleen H. Sullins, Director Division of water Quality August 26, 2008 'Pc C' D'ect # 08-0067, Ver. 2 Wake County Mr. Jeffrey Smerko th?rs 1008 North Broad Street, LLC 14600 Weston Parkway RdL Cary, NC 27513 P??of Subject Property: Alston Pond/North Broad Street Utto Basal Creek [030403, 27-43-15-3, B, NSW] Approval of 401 Water Quality Certification and Authorization Certificate per the Neuse River Buffer Protection Rules (15A NCAC 2B.0233) with Additional Conditions Dear Mr. Smerko: You have our approval, in accordance with the attached conditions and those .listed below, to place fill within or otherwise impact 0.06 acres.of 404/wetland, 196 linear feet of perennial stream (147 linear feet permanent impact and 49 linear feet temporary impact), and 10,848 square feet of Zone 1 Neuse River basin protected riparian buffers-and 8;543 square feet of Zone 2 Neuse River basin protected riparian buffers, as described in-your revised application dated July 21, 2008, and received by the Division of Water Quality (DWQ)-6mJuly 21, 2008, to construct the proposed residential demplppment -at the site. After reviewing your application, we have decided that the impacts are covered by General Water Quality Certification Number(s) 3687 and 3705 (GC3687) and (GC3705).r The Certification(s) allows you to use Nationwide Permit(s) NW3 and NW29, respectively, when issued by the US Army Corps of Engineers (USACE). In addition, you should obtain or otherwise comply with any other required federal, state or local permits before you go ahead with your project including (but not limited to) Erosion and Sediment Control, and Non-discharge regulations. Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific'and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incideptal impacts: None Carolina 401 Oversight/Express Review Permitting Unit tura!!y 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-6893 / Intemet: htty:/lh2o.enr.state.nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer - 50% Recycled/] 0% Post Consumer Paper North Broad Street, LLC Page 2 of 5 August 26, 2008 Type of Impact Amount Approved Units Plan Location or Reference 404/Wetland 0.06 (acres) PCN page 4 of 9 Stream - perennial 196 [(linear feet) 147 linear feet permanent impact and 49 linear feet temporary impact] PCN page 4 of 9 Buffers Zone 1 10,848 (square ft. PCN page 7 of 9 Buffers Zone 2 8,453 (square tt. PCN page 7 of 9 2. No Waste, Spoil, Solids, or Fill of Any Kind No waste, spoil, solids, or fill of any kind shall occur in wetlands, waters, or riparian areas beyond the footprint of the impacts depicted in the Pre-Construction Notification. All construction activities, including the design, installation, operation, and maintenance of sediment and erosion control Best Management Practices, shall be performed so that no violations of state water quality standards, statutes, or rules occur. 3. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards: a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Control Planning and Design Manual. -b,. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. C.- , 'Sufficient materials required for stabilization and/or repair of erosion control measures and stormwater routing and treatment shall be on site at all times. 4. Sediment and Erosion Contr6l-Mpasures Sediment and erosion control measures shall not be placed in wetlands. or waters without prior approval from the Division. if placement of sediment and erosion control devices in wetlands and waters is unavoidable, design and placement of temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or stream beds or banks, adjacent to or upstream and down stream of the above structures. All sediment and erosion control devices shall be removed and the natural grade restored within two (2) months of the date that the Division of Land Resources or locally delegated program has released the project; 5. Culvert Installation All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures from the most current version of NCDOT Construction and Maintenance Activities manual (httl2-'//www.nedot.org/doh/opei-ations/BMP manual/download/BMP Manual.pdf) such as sandbags, rock berths, cofferdams and other diversion structures shall be used to prevent excavation in flowing water. Culverts required for this project shall be installed in such a manner that the original stream profiles are not altered. Existing stream dimensions (including the cross section dimensions, pattern, and longitudinal profile) must be maintained above and below locations of each culvert. Culverts shall be designed and installed to allow for aquatic life movement as well as to prevent North Broad Street, LLU Page 3 of 5 August 26, 2008 head cutting of the streams. If any of the existing pipes are or become perched, the appropriate stream grade shall be re-established or, if the pipes installed in a perched manner, the pipes shall be removed and re-installed correctly. Culvert(s) shall not be installed in such a manner that will cause aggradation or erosion of the stream up or down stream of the culvert(s). Existing stream dimensions (including the cross section dimensions, pattern and longitudinal profile) shall be maintained above and below locations of each culvert. Placement of culverts and other structures in waters, streams, and wetlands must be placed below the elevation of the streambed by one foot for all culverts with a diameter greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48 inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other structures including temporary erosion control measures shall not be conducted in a manner that may result in dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and down stream of the above structures. The applicant is required to provide evidence that the equilibrium shall be maintained if requested in writing by DWQ. The establishment of native, woody vegetation and other soft stream bank stabilization techniques must be used where practicable instead of rip rap or other bank hardening methods. If rip-rap is necessary, it shall not be placed in the stream bed, unless specifically approved by the Division of Water Quality. Installation of culverts in wetlands must ensure continuity of water movement and be designed to adequately accommodate high water or flood conditions. Upon completion of the project, the Applicant shall complete and return the enclosed "Certificate of Completion" form to notify NCDWQ when all work included in the §401 Certification has been completed. The responsible party shall complete the attached form and return it to the 401/Wetlands Unit of the NC Division of Water Quality upon completion of the project. Please send photographs upstream and downstream of each culvert site to document correct installation along with the Certificate of Completion form. 6. Diffuse Flow (DWQ Reviewed Plans) All stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers and will not re-concentrate before discharging into the stream as identified within 15A NCAC 213.0233 (5) In an effort to comply with the diffuse flow provision of the Buffer Rule (15A NCAC 02B .0233(5)), you have provided the DWQ with level spreader designs received by the DWQ on July 16, 2008. The DWQ believes that if implemented, as per these plans, diffuse flow will be achieved. However, if diffuse flow as per 15A NCAC 02B ,0233(5) is not achieved, then the DWQ shall be notified and corrective actions to restore diffuse flow shall be taken if necessary to impede the formation of erosion gullies. At no time shall stormwater from the proposed development be piped directly through the buffer without prior DWQ written authorization. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural stormwater practices shall be made without written authorization from the Division of Water Quality. Stormwater easements shall be recorded for a distance of at least 10 feet on each side of all stormwater conveyances on all lots containing these structures including future access for maintenance. The stormwater easements North Broad Street, LLC Page 4 of 5 August 26, 2008 shall allow for the ability to maintain the structures, perform corrective actions as described above and shall provide protection of the structures from potential alternations by future property owners. An Operation & Maintenance (O&M) agreement signed by the current landowner must be approved by the DWQ. This O&M agreement must transfer with the sale of the land or transfer of responsibility for the stormwater facilities and the DWQ must be notified of every transfer. 7. Stormwater Management Plan (SMP) Approval Required Before the impacts specified in this Certification may occur, the applicant must meet all of the provisions set forth in the document Stormwater Management Plan (SMP) Requirements for Applicants other than the North Carolina Department of Transportation, available at: http://h2o,enr.state.ne.us/newetlands/documents/SMPRequirementsforApplicantsotherthanNCDO T.pdf. The required SMP documentation must be submitted within 60 days of the issuance of the 401 Water Quality Certification to the DWQ (401 Oversight and Express Permitting Unit, 2321 Crabtree Blvd., Suite 250, Raleigh, NC, 27604). SMP approval and implementation procedures shall be as follows: • The SMP must be approved in writing by either the 401 Oversight/Express Unit or, if the project is subject to another state stormwater program, a copy of the approval letter and approved SMP must be submitted before any impacts authorized in this certification occur. If a development is phased, then the SMP for each future phase must approved by the 401 Oversight/Express Unit or, if the project is subject to another state stormwater program, a copy of the approval letter and approved SMP must be submitted before any impacts associated with that phase may occur. • The approved SMP must be constructed and operational before any permanent building or other structure is occupied at the site. If a development is phased, then the approved SMP for each future phase must be constructed and operational before any permanent building or other structure associated with that phase is occupied. • The approved SMP as well as drainage patterns must be maintained in perpetuity. • The SMP may not be modified without prior written authorization from the SMP approval authority. If the SMP falls under another state stormwater program, then a copy of the approval letter and the modified SMP must be submitted to the 401 Oversight/Express Unit prior to the commencement of the modifications. 8. Protective Fencing The outside buffer, wetland or water boundary and along the construction corridor within these boundaries approved under this authorization shall be clearly marked with orange warning fencing (or similar high visibility material) for the areas that have been approved to infringe within the buffer, wetland or water prior to any land disturbing activities; 9. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct North Broad Street, LLL Page 5 of 5 August 26, 2008 impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification (associated with the approved wetland or stream impacts), you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. Any disputes over determinations regarding this Authorization Certificate (associated with the approved buffer impacts) shall be referred in writing to the Director for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act and the Neuse riparian buffer protection rule as described within 15A NCAC 2B .0233. If you have any questions, please telephone Cyndi Karoly or Ian McMillan at 919-733.1786. Since ly, i H. Sullins CHSlijm Enclosures: GC3687 and GC3705 Certificate of Completion cc: USACE Raleigh Regulatory Field Office Lauren Witherspoon, DWQ Raleigh Regional Office DLR Raleigh Regional Office File Copy Central Files Todd Preuninger, Withers & RaveneI, 111 MacKenan Drive, Cary, NC 27511 Filename: 080067 Ver2AIstonPondNorthBroadStreet(Wake)401 _NBR NC-DWQ BUFFER APPROVAL LETTER O? WAT§R Michael F. Easley, Governor Q William G. Ross Jr., Secretary 0 North Carolina Department of Environment and Natural Resources r Alan W. Klimek, P.E. Director Division of Water Quality ii E March 20, 2007 MAR Z I L00f Mr. Todd Preuninger Withers & Ravenel 111 MacKenan Drive Cary, NC 27511 ffi ?ke!"5 ::? azVF e NBRRO 07-028 Wake County BASIN: Neuse River X Tar-Pamlico (15A NCAC 2B .0233) (15A NCAC 213.0259) Complaint NOV Buffer Determination X Incident # ADneal Call Project Name: Adams Fuquay Tract Location/Directions: located north of the intersection of SR 1398 and NC 55, south of the Town of Holly Springs Subject Stream: Basal Creek and UT's to Basal Creek Date of Determination: 3/9/07 Feature(s) Not Subject Subject Start @ Stop@ Stream Form Pts. Soil Survey USGS Topo A X (not contested) Throughout property X X B X (not contested) Throughout property X X C X (not on maps) D X (not on maps) E X Flag E1 (origin) and Flag E (outfall of pond) X X F X X G X X H X X I X X J X Fla J X Note: A portion of feature A is a beaver impoundment. A 50-ft buffer should extend from the mean high water in this impounded area. Explanation: The feature(s) listed above has or have been located on the Soil Survey of Wake County, North Carolina or the most recent copy of the USGS Topographic map at a 1:24,000 scale. Each feature that is checked "Not Subject" has been determined not to be a stream or is not present on the property. Features that are checked "Subject" have been located on the property and possess characteristics that qualify it to be a stream. There may be No°rthCarolina Naturally North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Internet: h2o.enr.state.nc.us 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service FAX (919) 571-4718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer- 50% Recycledl10% Post Consumer Paper Adams Fuquay Tract Wake County 3/20/2007 Page 2 of 2 other streams located on your property that do not show up on the maps referenced above but, still may be considered jurisdictional according to the US Army Corps of Engineers and/or to the Division of Water Quality. This on-site determination shall expire five (5) years from the date of this letter. Landowners or affected parties that dispute a determination made by the DWQ or Delegated Local Authority that a surface water exists and that it is subject to the buffer rule may request a determination by the Director. A request for a determination by the Director shall be referred to the Director in writing c/o Cyndi Karoly, DWQ Wetlands/401 Unit, 2321 Crabtree Blvd., Raleigh, NC 27604-2260. Individuals that dispute a determination by the DWQ or Delegated Local Authority that "exempts" a surface water from the buffer rule may ask for an ad judicatory hearing. You must act within 60 days of the date that you receive this letter. Applicants are hereby notified that the 60-day statutory appeal time does not start until the affected party (including downstream and adjacent landowners) is notified of this decision. DWQ recommends that the applicant conduct this notification in order to be certain that third party appeals are made in a timely manner. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. This determination is final and binding unless you ask for a hearing within 60 days. The (owner/future owners) should notify the Division of Water Quality (including any other Local, State, and Federal Agencies) of this decision concerning any future correspondences regarding the subject property (stated above). This project may require a Section 404/401 Permit for the proposed activity. Any inquiries should be directed to the Division of Water Quality (Central Office) at (919)-733-1786, and the US Army Corp of Engineers (Raleigh Regulatory Field Office) at (919)-876-8441. Respectfully, , Lauren Cobb Environmental Specialist III CC: Wetlands/Stormwater Branch, 2321 Crabtree Blvd, Suite 250, Raleigh, NC 27604 RRO/SWP File Copy Central Files NorrhCarolina Aahtrally North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Intemet: h2o.enr.state.nc.us 1628 Mail Service Center Raleigh, NC 27699-1628 Phone (919) 791-4200 Customer Service FAX (919) 571-4718 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper m. :ro IEN t. - 1,. 3. ?„ ?i?''•? 't ..J a' af• iw,• ' ;.?, ,,.r]• °?,"13F of xC ^ttr B'SI'.` <F•?•.V?'., .f?'.fi., :: J:. j,- F, 3 _ l < O •N >\ QF<,., a ,.yr ;' •-Y? _ wy, .i' rE :•S. a •'s L> y•? ;Lgr ,iy'. • ?' S' 7 ,t. •,,..a. `f:> > .:r): .'lip S„?r•> 1%4:. ., l: ., iH ., `'•A?y *'Je. ::f;hr• :'.P . r e: i'r.'K:k:%?? `;:r L" \ st'. .s s: Y:'> R •<'f 1'? -tR rJ iE < . iw,r •ni' , 77 ..a., vt ,g Y+ ' •.?'. id ?•"v c . r< r.. \ r t x: F` /!??? J.• `¢:itis. ?F%'(,,±y< '•!f.> iti'J•: .:C-.,,,.^ ?y.'? 5c^. ':1A, , Z 'a ;z ;•X+ /? /? t-{;f ,}'.;tL---, .vv.•s.Yt.,; .y:; 2:3rt .ft' ,';1LJ:°.... ).:. ?. F.Y. +.•i' ?,s ... ?N-it,`\-„ ,a>?.•eit; ?ey? t .4ti rt;'....-::S `fif?3e ••.'i.... A 5;.. ?.t t + y t:> M ?a.. J-. l.• > ,Y W t? ?fi • Japi. 1 OCR MUM, - - - - --------- •5 _ _ Iti•: t>L, _ t J_ .h•_y: r4 1G? x?t v;r'w -'4r hn 1 °r.. _ w .j. LL.j? \a i,. 1 U i<Y': •?RH t , r ..... Moos. ri Juno omen 1 - - .v. t. ?ry •a' tr•' <: t•: `fit c f??tl AKRE l' . `jZC: r L.. i' .. ;:'.:>,';;. _. .:::. ..>•+.'°',?:....>g<<+. r. ••,-;?? ass:":{?,'` - h^. 1. w9.- r 'rL: Y? 3 F? :.7'. ill:': 'i(? ;'.,• '?f?: 1' ?y•? ?1; .U - tt{ / •3 i- r. ,.L ' '• Vii: .. qc f - ?S r .,t L , ftir++e -???5 t, ?.,t? `!•• - ,ate Z - S-.; . ` E i• •:f Y+ :-?, it T:?'s•.:>v:' leg ^:t m v:7: J' .:.::.:.: . 0 W.. „^ a > .v t? •l i n ,I f'i], ... - ?i?.'?? :,'.'• ^: > - as K;.?t; .• J+ Pilo ?4• 2 :>St ? 1:1 I l .- f~ ) - ?i ti- Z ;t. p t¢ 11 ,+ J If I -; i ti"4'! to ` .x F. ...n . I ? ; , {"I t II r J "1- SOU It L° jr . I i` 3RD ?.,,1 l I;? iI ', ' S 11533,\ _ `' .' ' "; s.'`,. +, , a L fY 7f r-,} ., t +i 4 - .} r , GGG -..-41 -?t _ 306 7 ) 1 1 1 ' ?Rt :1 4am ?4 "4,s,' - '? - ) ti} •t . '+ 1I w r^ }fit ; _' ti y :b { r . t i1` Ci,a ?r rr .J ttt . I I _ - `! _r - _4 I} '_J , of a I^$ ?r ti, # r F L ',, - ?c' 'n,. I . ) 1 _ _+ W .: \ S C I dt' yy> .. +.', .. f 4 ; „`.: +, .F.f F }h9• f _ I e 3 "?-..r,a y ... 74 % i _ ?FtaL?'awc--?- +,? {.* _ t . l y I ti" ti t I -,' : y ?l& I rI_.. , - r - }r 2;*'i-S l i `44 1t I h - n ?. . ?' .? L - 1 . ?"?? 1' Y, 3 I a A . t L m 1'? G {J aS 4S 1' : r I ', I ?? t C_ - y l 5 { S 4rt ?7 4 ` }? a - P b i _ _ F rG r j C 5 l} 4 `\ t .f , k 1 i. ,i t R I r.l- Its. ?4' 7 I- > v .1 rr'' ; Subject Property ,, f f t, { r -l w r? _ ; , P r,^-- .-'f rf '" t om , r qJ - 'S u ray:,, } 41 n I 'cl - - t- ( i6 I' 4 S, '"4. .??1 i - Ii 1. ub k4 s !r Y ; ..,iI:r, j} ? N ? v 1 JI ? yh iY; "I 1 1 J,ti I __ ,-,fl 'd4F FeatureE - - 1t ..,' { -'rf it _ + r I T .sue.' - '`'?t - Fl 1+ 1 ? I t S p ? A ?_ +?` .f -- Y 1 v 44 8 ?t? f I ?? .. ) to v!R1 FeatureMB I the ~ --;?,- r I .1,"1,.f . ? r 4 _?: .:"' ,'? ,.,, t I` 9 " . S`L _ ,,I K . _'° J ktc" -r,- !r " t" iT 1 i. - fr r 4th _'4n" nK ! in EY . ? I . r `. 1, - s? : - ?- 1? ' rr 'y,,{ry 29 _ _,. ( v FeatureA --'`? -, ' .:_.--,-. %} ! .r \\ 4 7 y `, - ^•,. 5 y` '*>< _ ,•a } { --III Q, 4I l ? fi .}&E * E} i i --' ._ +' .+ . L 4,? , ? y ?F I i1 I , k I ? 1 ? ? ?t ?. -.- f ?- w . I . . - .i 2 "7 jrxl v ! t' s_ , 4`? ? y-.:Ik; t ?; 4~5q i ,?) i? 5 .-? _• I, -/ f ,% +,4 a rilt,?, ?}1 I t3 :Ir - 1 f4 ? z 4 . 4f 1 IF• _ ??' >t x ti "' I`, "? f , _}? 7o I y ,_ + tJ] 1 -'/ s r 4 ,. 7? ? I 1 y - ? t. ?\:,, ,! 71__,_N; ,?- d'f- `?,,,.,_"`>S.r`"?- ,.+3.4 '`i , I 4 ~;a :--. __` _? _.. r rf? ?a t'r??t j,. .m• ,fi_fY GI ti j r? r . t ` . d P r __, r f .,- \ } 9 ' • t ?I 3 H I , ?. .. ,i ?Y•'?--:.-__,' . I +,. 11 L;;a t r t 1114 . I I Ij r„'...?r y.! ?' ,l? +1 '`fit° ,. ?.-', .. .riif + °a 1 a Fi? .I ?' ? -,1v ' 4. - 1 ^? f r ` '+?1 Ir 1. 111_ti . vi"n --K _ • ?- -l"? I. ,? ter{ , ?.?y"v ' ,. -'-, ± . " , d '_'`• . L I. 'rrldl l I{ . 1, JJ1 ?1v.1 _ ,._..• . f aw'A, °ti" . ,4 J_ a 1 b 1,1, I I` J !! t v 1' i rt 11 f I 5'.. r' _?t-? -i;.- ti I - sr-1+ ' lJ I , ? w o k r P I { ? 1? * .. . . . . .. . .. .. ) ? )t ." eM I Y d ? ??ry I i i d e tl 4k Z t, f ; u' ?Fe , /, ,_/ , ^}, . -rye-`N t; , 44?4 y i 7 ?S kr'fIY 1.? k y i !^k , -?7 "?.?'?t t` !'y \ } - ' .,' T {,5 3 ti{1 ¢ ?I t, E 1 t i Il I, I ~: !^ F r 4, I E 1 r, 4 ,-- . ?, I •` J ! f• ?, r °W 1 -, ?,. f , , ? , ,? ,_ !, f;. . , '? r ., , - - - ' i I` a d 1t r Fi 1 r r 412 ``'- -! r: 4 °: t i I? , 5 t + ti _ } 4 L' _ J k.*3rrars _ r? t 4 1 4` , sI( I ? 1 i . / 5 r it _:*. _s `A5 ?? i% ., i y y1,1 ft` _•?- j , j ?j ? - I -f y F vJVRic>} t ?` I . , " 1 I ? . (-I . -, . , 11 ?. 1 j ~? ) 4'`- - t .\ I `t i 16 I`-. ! ! "tj i - °'t ,y -.% ti- :+ v - f/",t _>? I ) 11, iL?d 1. I4?I?i ,4 ?1Ir•'S-1 t l fr fry 4 zl , , ? L 11 ? j.,?, r _Z 9„ 4' .: :. 94 { WITHERS L: RAVENEL ' I r. !? i? :?'.?,s.o ?? 4. 'i . - = it ? .Iti I NC.IN F. F.RS I PLANNf RG I SI.R VEYl1RS ,.rl J ' Y.,,I ?5 rte .., '1 rt+` ?, ?" t?5 • f ~ S ?1 ?. ? , -.IsSklt`f x eYYY ? !, 111 MacKe.an Drive Cary. North Carolina atir4 t tl `?, , '`? 3I ?5 i ,I -- - -y , -< - _ A telephone: 919.469.3340 vww.vhthersravenel com YI )' L ! ?• • ' + - e '- n . ?`' ti F - _ A4, dd(r)f?? . I tpa? r i, ' F a. ' { v ! t r} ?Y :4 2,000 1,000 0 2000 ,!!I ?s `r r a ', :,:?G?'., I . L cbl?: Feet '` ? r?rL, ? ; " j cA y am: m8 {, - 1 inch equals 2,000 feet - -., ?:_ r. ?? .? 11 ' ?, R -+# v 5na5na?s,-rcn_n?I?. - P,--,T-Al ICU Ill c ,, A - .11 .11 'F' ? .r= ?1_. 1 i*.'! t-' ,h. ?u?S -r_ `f?i 9 )I 'I . STORMWATER MANAGEMENT PLAN INFORMATION I 81 1 1 1 1 I 1 I I 1 g 7l t / 1 1 1 1 1 1 I 1 1 I I I 1 I I r it 'e®' / 1 I I I I . I I I I I I 1 ; Ba ?t ' 1 1 I t f 4W J?, *1 All 4kV Sr >? BMP #3 4# 1 BMP #4 (' `+ r ¢W 1 ?, '?? ? ? • ? f ti? 1.•p} 11 I it dl ? _ t ?'. ' S r'?,' ? ?' l? ? r ?r'? ,? 'r -or ? Y i ?O +P n Y v6 .?' 7 ,y?a?`' 1 "" ! P1l 1 ;\ \ ?( :.''~? w't 1 ?. , '?A f price; 12 ?',, .,? i ! ?i ?? ??- ? ? ??a? `? t?•?`v`\If;??? ????,?K? j ? '!;III ? r®A pq? ?.?? ! ?'? . ?' 1, 1?..' . 1 W?o f ra r ?? r. ?' vl \ ?( dew"?, ? i ::?: w * i\ ?. v 1-• ` ` 1 , ,i alI /? dI. Jr t v` \ vd IN?,`• Pr ,,,•,•,•?'•• k j4 I •,'i /? [ ?., !)} i?\?Nyl?"? . ' BMP #1 ?•'`' --------------- vr, 1t y 7? _ ld i` + ski GRAPHIC SCALE -1111w 11111 300 0 150 300 600 • ? b I INNER INNER ? i . s R-- ` ? .. FI ?x'?•' j t inch 300 ft. ? .• f , . B M P #2 J ?--%------------------------------ 't? If (• a ? ?'??, ? *,...rs...::;•,^a•.,?t ??r y all % , ?3 tt kd Revision No. al- D-- S.W rMEO :krl rvo. ::_ °°re ALSTON POND BMP DRAINAGE AREA MAP WITHERS RAVENEL -B, cn,vWiav id,uo. ENGINEERS 1 ?tANNER3 1 SURVEYORS WAR FU UAY-VARINA WAKE COUNTY North Carolina I III w.--onre gym. Hrnh-)-27511 1.1.5194-33eo w.wene??.e??4??m O<m 1.-- 7, wo f 00 ... ...... . X //28 29,0 ....... ... / � 286 t -284 _22 2,92 Z. .... .. "N 293 \--29z -7— ........ ... FOREBAY N . . . ...... ... RISER' ---- ------ > S �6R!tmy oe/ ... I \ // ol J7 00, 100, -YR FLOOD LINE 00, 1100-YR FLOOD LINE ENERGY DISSIPATER J WETLANDS 2 Z 44, k" k-1 GRAPHIC SCALE 50 0 25 50 100 Z, k k 1 inch = 50 ft. k No. Revision Date By W&R S"' AS NOTED BMP EXHIBIT WITHERS RAVENEL 5— ..".y zzz I.- ALSTON POND ChO,W By NoBMP #1 ENGINEERS I PLANNERS 1 SURVEYORS I FUQUAY-VARINA WAKE COUNTY North Carol I , 11 -- DO,, c, ra�,Oh —lm� —1 , .1 -- 1- --h--M.— lk x a 8 s i Y , r - , r , % .A , \m f i r I r r t , *^^ - ? _ _H , ON1 } \ ?4 _ ? ? - -B PASS PIPE ` R?SLK I v CHANN TOA r i _ STWF-_ALA 38- \ y/ ° y l s i `- t r r 1 t l ? 4 ' 'Z ?r j DIP drWATEF? f _ ?UALITY OUT6€T._` f a ERG; .. ? \ 1 S TER ? BEVEL SPRER'? y. ?? ` y GRAPHIC SCALE 50 0 25 50 100 1 inch = 50 h. P No. .vii Date B ter, -l' AS WED BMP EXHIBIT WITHERS RAVENEL Sh-N.. WIR ALSTON POND cn?,?ie?mi?n?o. tMiIN[LRf 1 PLANNERS 1 SURVEYORS ::= BMP #2 2 Np FU UAY-VARINA WAKE COUNTY North Carolina nin+ttx:?:?°a,.ao.wne?miwvsu rer.s?wes-nao ,,,Vw.wim?H,.e?rt«m u«,.?marn?z sEeP».+?wm w?=i;?N.riim wcctvo-cie3=...... woo wN .o??.+va ?e?:x+ewu. eu!1I eD yPON A1NnoDTV" VNRIVA-,kvn nA w? £ SSOA3AVaS I S33NNV11 I SS33N19M3 ?b# dW9 (INV £# dW9 aNOd NOlSI`d "' ?81?r ? co1w sv Im. 13N3AWN ? Sa3H.LIM 1191HXI dW9 ,ins wsd.a AS area u i, ^ 8 'oN b#dW8 IN, 41 41 41 m T T T / T J/4 83(Mad5j X3113 2131tY01 SaC( r, 11, 41 41 41 41 m a1S m Sl 13NN'OH 41 3d1d•"SSddkS TIM10ld?FIJIr .. 41 41 fi T p "/ i l 1 ^ r f?r / Pyy ?,r A ?'? l \i? Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Fff c ivrnct• in the Piedmont % Impervious Cover Permanent Pool Depth (feet) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP 1 - STORMWATER WET POND Land Use Area (ac) % IA Imp. Area (ac) Impervious 15.62 100 15.62 Open Space 16.88 0 0.00 Totals 32.50 15.62 Total % Impervious Surface Area = 48.1 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.00 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.649 acres 28258 sq. ft. Normal pool elevation = feet Surface area provided = 0.871 acres 37920 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious RV = 0.48 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 1.307 acre-ft 56929 cu. ft. Temporary Pool Elevation = 343.8 Water quality pool elevation= 342.00 feet Storage volume provided = 1.687 acre-ft 73486 cu. ft. Orifice Calculator Q =Cd*A*(2gh)^(1/2) Variables WQ Volume: Head: Draw down time: Orifice Area = 1.307 Acre-ft 1.80 ft 48 hrs 0.0721235 sq. ft Orifice Diameter: 3.6364262 in USE 4 INCH DIAMETER ORIFICE A 0.34906585 4 Q 2.25495459 56929.29 cf 0.9 ft 172800 s 10.38578 sq. in Constants 9 cd = 32.2 ft/sz 0.6 Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Piedmont % Impervious Cover 3.0 4.0 re1,,,a,Ic 5.0 „i , UUN .., FL 6.0 IN ..,. l 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 _ 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/D WQ Stormwater Best Manageme nt Practices, pg. 10-9, July 2007 STORMWATER BMP 2 - STORMWATER WET POND Land Use Impervious Area (ac) 18.75 % IA 100 Imp. Area (ac) 18.75 Open Space 17.75 0 0.00 Totals 36.50 18.75 Total % Impervious Surface Area = 51.4 % Surface Area of Permanent Pool: Assumed depth = 4 feet SA/DA ratio = 1.77 % From Table 1.1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = 0.646 acres 28159 sq. ft. Normal pool elevation = 4.0 feet Surface area provided = 0.577 acres 25150 sq. ft. 31.5 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv _ Runoff coefficient, in./in. I = Percent impervious Rv = 0.51 inAn. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 1.558 acre-ft 67881 cu. ft. Temporary Pool Elevation = 367.4 Water quality pool elevation= 365.00 feet Storage volume provided = 1.936 acre-ft 84332 cu. ft. Orifice Calculator Q =Cd*A*(2gh)"(1/2) Variables WQ Volume: Head: aw down time: 1.558 Acre-ft 2.40 ft 120 hrs Orifice Area= 0.0297906 sq. ft Orifice Diametf 2.3370948 in USE 2 INCH DIAMETER ORIFICE A 0.1154099 2 Q 0.86088047 67881 cf 1.2 ft 432000 s 4.289851 sq. in Constants 9= cd = 32.2 ft/s2 0.6 Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant RPmnval Fffirienrv in the Piedmont % Impervious Cover Permanent Pool Depth (feet) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP 3 - STORMWATER WET POND Land Use Area (ac) % IA Imp. Area (ac) Impervious 6.24 100 6.24 Open Space 9.76 0 0.00 Totals 16.00 6.24 Total % Impervious Surface Area = 39.0 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.69 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.271 acres 11786 sq. ft. Normal pool elevation = 4.0 feet Surface area provided = 0.255 acres 11111 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.40 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.535 acre-ft 23290 cu. ft. Temporary Pool Elevation = 382.8 Water quality pool elevation= 381.00 feet Storage volume provided = 0.638 acre-ft 27791 cu. ft. Orifice Calculator Q =Cd*A*(2gh)^(l/2) Variables WQ Volume: Head: aw dawn time: 0.535 Acre-ft 1.80 ft 48 hrs Orifice Area = 0.0295061 sq. ft Orifice Diameti 2.3259072 in USE 2 INCH DIAMETER ORIFICE A 0.08726646 2 Q 0.56373865 23290.08 cf 0.9 ft 17280.0 s 4.248878 sq. in Constants 9_ Cd = 32.2 ft/s2 0.6 Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permane nt Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. iu-`J, duly Luui STORMWATER BMP 4 - STORMWATER WET POND Land Use Area (ac) % IA Imp. Area (ac) Impervious 2.6 100 2.60 02en Space 3.4 0 0.00 Totals 6.00 2.60 Total % Impervious Surface Area = 43.3 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.84 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.110 acres 4809 sq. ft. Normal pool elevation = 344.0 feet Surface area provided = 0.142 acres 6197 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.44 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.220 acre-ft 9583 cu. ft. Temporary Pool Elevation = 344.5 Water quality pool elevation= 343.00 feet Storage volume provided = 0.227 acre-ft 9888 cu. ft. Orifice Calculator Q =CdW(2gh)^(1/2) Variables WQ Volume: Head: aw down time: 0.220 Acre-ft 1.50 ft 48 hrs Orifice Area= 0.0132997 sq. ft Orifice Diameb 1.5615557 in USE 2 INCH DIAMETER ORIFICE A 0.08726646 2 Q 0.51462062 9583.2 cf 0.75 ft 172800 s 1.915157 sq. in Constants 9= cd = 32.2 ft/S2 0.6 BMP SUPLMENT FORMS Permit N A N. NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) V AFT .- €. PROJECT INFORMATION _ Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 1,415,700 ftz Impervious area, post-development 680,407 fe % impervious 48.06 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 56,930 ft3 OK 73,486 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in (unitless) (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec -4.14 ft3/sec 343.80 fmsl 342.00 fmsl fmsl 342.50 fmsl 341.50 fmsl 338.00 fmsl 337.00 fmsl 1.00 ft n (Y or N) fmsl Form SW401-Wet Detention Basin-Rev 8-9117109 Parts I & 11 Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN INIF M_ATION _ Surface Areas Area, temporary pool 45,229 fe Area REQUIRED, permanent pool 28,314 ff SAIDA ratio 2.00 (unitless) Area PROVIDED, permanent pool, A?mjw, 34,308 ft` OK Area, bottom of 1 Oft vegetated shelf, 4.1 ahen 28,442 ft1 Area, sediment cleanout, top elevation (bottom of pond), &t-d 21,265 ft` Volumes Volume, temporary pool 73,486 ft3 OK Volume, permanent pool, \?,,_, 104,707 ft3 Volume, forebay (sum of forebays if more than one forebay) _ ft3 Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SA/DA Table Used? y (Y or N) SAIDA ratio 2.00 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, \?. _pod 104,707 W Area provided, permanent pool, Awm,?j 34,308 ft` Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, 4, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, 'P? _pwj 34,308 fe Area, bottom of 1 Oft vegetated shelf, A01 shell 28,442 ft' Area, sediment cleanout, top elevation (bottom of pond), &I-pd 21,265 ft3 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 3.50 ft Average depth calculated 3.50 ft OK Average depth used in SAIDA, 4, (Round to nearest 0.5ft) 3.0 ft Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 4.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (FL) 1.80 ft Drawdown through weir? n (Y or N) Weir type 0.3 (unitless) Coefficient of discharge (C4) 0.51 (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 15.61 ft3lsec Post-development 1-yr, 24-hr peak flow 11.47 ft3lsec Storage volume discharge rate (through discharge orifice or weir) 0.54 ft3lsec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Addkional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 4 :1 OK Length to width ratio 4.0 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 0.8 ft Insufficient freeboard, minimum of 1-ft required Vegetated filter provided? n (Y or N) Insufficient Vegetated filter required. Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build-out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump required Form SW401-Wet Detention Basin-Rev B-9/17/09 Parts I & 11 Design Summary, Page 2 of 2 Permit No AN"A' NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) c ;,2 A I,, r LID U -, G 19_ I. PROJECT: INFORMATION Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date Drainage area number 11. DESIGN INFORMATION Site Characteristics Drainage area 1,589,940 ft2 Impervious area, post-development 816,750 ft2 % impervious 51.37 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 67,881 ft3 OK Volume provided 84,332 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm, pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 10 ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec 4.14 ft3/sec 367.40 fmsl 365.00 fmsl fmsl 365.50 fmsl 364.50 fmsl 360.00 fmsl 359.00 fmsl 1.00 ft n (Y or N) fmsl Form SW401-Wet Detention Basin-Rev B-9/17/09 Parts I & 11 Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II, DESIGN INFORMATION _ Surface Areas Area, temporary pool 39,090 ff Area REQUIRED, permanent pool 28,142 fl2 SAIDA ratio 1.77 (unitless) Area PROVIDED, permanent pool, Pp°, Area, bottom of 1 Oft vegetated shelf, Area, sediment cleanout, top elevation (bottom of pond), &I.d Volumes Volume, temporary pool Volume, permanent pool, \?,,,_pw Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, V,,,_pw Area provided, permanent pool, Average depth calculated Average depth used in SAIDA, 4, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, /e?_pw Area, bottom of 1Oft vegetated shelf, !fit a,1l Area, sediment cleanout, top elevation (bottom of pond), JL-P d "Depth" (distance blw bottom of IN shelf and top of sediment) Average depth calculated Average depth used in SAIDA, cL, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cq) Driving head (Ft) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is 28,282 ft? OK 23,027 if 13,943 if 84,332 ft3 OK 94,500 ft3 ft3 85 % n (Y or N) y (Y or N) 1.77 (unitless) n (Y or N) 94,500 fe 28,282 W ft ft y (Y or N) 28,282 ff 23,027 ft` .13,943 ff 4.50 ft 4.10 ft 4.0 ft y (Y or N) 4.00 in in2 0.60 (unitless) 2.40 ft n (Y or N) (unitless) (unitiess) ft ft 15.61 ft3/sec 11.47 ft3/sec 0.63 ft3/sec 2.00 days 3 :1 10 :1 10.0 ft 3 :1 3.0 :1 y (Y or N) 0.8 ft n (Y or N) y (Y or N) y (Y or N) Gate valve Need 3 ft min. OK OK OK, draws down in 2-5 days. OK OK OK OK OK OK Insufficient freeboard, minimum of 1-ft required Insufficient. Vegetated filter required. OK OK Form SW401-Wet Detention Basin-Rev 9-9/1 7109 Parts I. & 11 Design Summary, Page 2 of 2 Permit No NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) ry ? e of fl?i.?.F ?..Jti I. PROJECT INFORMATION Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 3 II, DESIGN INFORMATION Site Characteristics Drainage area 696,960 fe Impervious area, post-development 271,814 ftz % impervious 39.00% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 23,290 ft3 OK 27,791 ft3 OK, volume provided is equal to or in excess of volume required, ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec -4.14 ft3/sec 382.80 fmsl 381.00 fmsl fmsl 381.50 fmsl 380.50 fmsl 377.00 fmsl 376.00 fmsl 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev 8-9/17109 Parts I & 11 Design Summary, Page 1 of 2 Permit No (to be provided by D WQ) 11. DESIGN INFORMATION - Surface Areas Area, temporary pool 17,329 f? Area REQUIRED, permanent pool 11,779 ft' SAIDA ratio 1.69 (unitless) Area PROVIDED, permanent pool, PI 12,414 ft OK Area, bottom of 1 Oft vegetated shelf, 4o, „ 9,710 ft Area, sediment cleanout, top elevation (bottom of pond), &,_?nd 5,979 ft Volumes Volume, temporary pool 27,791 ft3 OK Volume, permanent pool, V,.,,d 33,021 ft3 Volume, forebay (sum of forebays if more than one forebay) ft3 Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAW ratio 1.69 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, V,,,,_p.i 33,021 ft' Area provided, permanent pool, 4._pod 12,414 W Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, qv, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, P,,. j., 12,414 ft` Area, bottom of 1 Oft vegetated shelf, Aa shelf 9,710 ft Area, sediment cleanout, top elevation (bottom of pond), &lyq,d 5,979 ff "Depth" (distance blw bottom of IN shelf and top of sediment) 3.50 ft Average depth calculated 3.30 ft OK Average depth used in SAIDA, q, (Round to nearest 0.5ft) 3.0 ft Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (C)) 0.60 (unitless) Driving head (Ft) 1.80 ft Drawdown through weir? n (Y or N) Weir type (unitless) Coefficient of discharge (CN) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 15.61 ft3/sec Post-development 1-yr, 24-hr peak flow 11.47 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.14 ft lsec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 4 :1 OK Length to width ratio 5.0 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 0.5 ft Insufficient freeboard, minimum of 1-ft required Vegetated filter provided? n (Y or N) Insufficient. Vegetated filter required. Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build-out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: gate valve Form SW401-Wet Detention Basin-Rev-8-9/17/09 Parts I & 11 Design Summary, Page 2 of 2 Permit No NCQENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part HI) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) 0 61 ?UJ C )6! I. PROJECT INFORMATION Project name Alslon Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 4 14, DESIGN INFORMATION Site Characteristics Drainage area 261,360 fe Impervious area, post-development 113,256 fe % impervious 43.33 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp pool? Elevation of the top of the additional volume 9,584 ft3 OK 9,888 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 Whir OK 15.61 ft3/sec 11.47 ft3lsec A.14 ft3/sec 343.00 fmsl 344.50 fmsl Imsl 343.50 fmsl 342.50 fmsl 339.00 fmsl 338.00 fmsl 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev B-9/17/09 Parts 1811 Design Summary, Page 1 of 2 Permit No (to be provided by D WQ) 111. DESIGN' INFORMATION Surface Areas Area, temporary pool 7,756 ft? Area REQUIRED, permanent pool 4,809 fe SAIDA ratio 1.84 (unitless) Area PROVIDED, permanent pool, ?__,.I 4,897 ft' OK Area, bottom of 10ft vegetated shelf, A,,, ,heIl 3,346 ft` Area, sediment cleanout, top elevation (bottom of pond), Qol_ood 1,418 ft` Volumes Volume, temporary pool 9,888 ft3 OK Volume, permanent pool, 10,290 ft3 Volume, forebay (sum of forebays if more than one forebay) ft3 Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 1.84 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, V?m_pcd 10,290 ft' Area provided, permanent pool, A?,,,,_pw 4,897 ft Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, 4, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, P,,,,,_pd 4,897 ftL Area, bottom of 1 Oft vegetated shelf, At ,,ejl 3,346 ft` Area, sediment cleanout, top elevation (bottom of pond), Q„_p d 1,418 fl2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 3.50 ft Average depth calculated 3A0 ft OK Average depth used in SAIDA, 4, (Round to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (F6) Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: y (Y or N) 2.00 in inz 0.60 (unitless) 1.50 ft (Y or N) (unitless) (unitless) ft ?ft 15.61 ft3lsec 11.47 ft3lsec 0.13 ft3lsec 2.00 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK YT (Y or N) OK 0.5 ft Insufficient freeboard, minimum of 1-ft required n (Y or N) Insufficient Vegetated filter required- y (Y or N) OK y (Y or N) OK pump required Form SW401-Wet Detention Basin-Rev 8-9117/09 Parts I. & 11 Design Summary, Page 2 of 2 A 7-PA (}'r ifFA;itrra .. NCDENR ^? STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGE TATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. 1. PROJECT INFORMATION Project name Alston Pond Contact name Troy Beasley Phone number 919-469-3340 Date January 25, 2011 Drainage area number BMP #2 H. DESIGN INFORMATION The purpose of the LS-VFS Buffer Rule: Diffuse Flow Stormwater enters LS-VFS from A BMP Type of VFS Protected riparian buffer (slope < 5%) Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area ftZ Do not complete this section of the form. Impervious surface area ftz Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 in/hr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10-yr storm in/hr Do not complete this section of the form. Peak flow from the 10-yr storm cfs Do not complete this section of the fo+m. Design storm Pick one: Maximum amount of flow directed to the LS-VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 0.86 cfs Peak discharge from the BMP during the 10-year storm 0.86 cfs Maximum capacity of a 100-foot long LS-VFS 2 cfs Peak flow directed to the LS-VFS 0.86 cfs Is a flow bypass system going to be used? y (Y or N) Explanation of any "Other" responses above LS-VFS Design Forebay surface area sq ft Depth of forebay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 50 fvcfs Computed minimum length of the level lip needed ft Length of level lip provided ft Form SW401 - LS-VFS - 29Nov2010 - Rev 8 page 1 of 3 Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above , ft fmsl fmsl (Y or N) (Y or N) Y (Y or N) Y (Y or N) Please provide plan details of flow splitter 8, supporting calcs 2.00 ft 4.00 ft 12.00 ft 0-85 ft 1.15 ft 3,84 ft/sec Pick one: &9 W G41An1Ar_-[- N (Y or N) Y (Y or N) W N # L 1 EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. Initials Page or plan sheet number and any notes: del -S.? ZZ-2`2 -Z 600 t-OTP('t_ 15 00 s?tr Z 3 Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 2 of 3 2- Plan details (1' = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and lop of stream dank, Proposed drainage easement, and Design at ultimate build-gift. 3. Section view of (lie level spreader (3' = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downs Iope filler fabric. 4. Plan details of the flow splitling device and supporting calculations (if applicable), 5. A construction sequence Ihal shows haw the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. It a non-engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7- The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. ?t ZY I - I r Psz0"14 rk I i e_QrI Pc (--r- PR6V 1?b Form SW401 - LS-VF5 -29Nov2olo - Rev.8 page 3 of 3 BMP #2 HIGH FLOW BYPASS Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Left Side Slope Right Side Slope Bottom Width Discharge Results Normal Depth Flow Area Wetted Perimeter Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope 1/28/20119:05:13 AM Manning Formula Normal Depth Subcritical 0.069 006000 ft/ft 2.00 ft/ft (H:V) 2.00 ft/ft (H:V) 4.00 ft 18.60 Wis 0.85 ft 4.85 ft2 7.80 ft 7.40 ft 0.77 f[ 0.08793 ft/ft 3.84 ft/s 0.23 ft 1.08 ft 0.84 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft Infinity ft/s Infinity ft/s 0.85 ft 0.77 ft 0.06000 ft/ft 0.08793 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 HCDEMR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. #. PROJECT INFORMATION Project name Alston Pond Contact name Troy Beasley Phone number 919.469-3340 Date January 25, 2011 Drainage area number BMP #4 The purpose of the LS-VFS Stormwater enters LS-VFS from Type of VFS Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10-year storm Maximum capacity of a 100-foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above LS-VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Buffer Rule: Diffuse Flow A BMP Engineered filter strip (graded & sodded, slope < 8%) ft z Do not complete this section of the form. ft z Do not complete this section of the form- % Do not complete this section of the form. Do not complete this section of the form, cfs Do not complete this section of the form, min Do not complete this section of the form, in/hr De not complete this section of the form. cfs Do not complete this section of the form. Pick one: cfs Do not complete this section of the form. (Y or N) Do not complete this section of the form. Wet detentio n pond 0.5 cfs 0.5 cfs 10 cfs 0.5 cfs y (Y or N) sq ft in in 10 fucfs ft ft Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 1 of 3 Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above ft fmsl fmsl (Y or N) (Y or N) Y (Y or N) Y (Y or N) 2.00 ft 4.00 ft 12.00 ft 0.62 ft 1.38 ft 4.57 ft/sec Pick one: Please provide plan details of flow splitter & supporting calcs. N (Y or N) N (Y or N) Redesign channel so that it enters the stream at an angle Channel enters along wetland edge as stated in the above cell W EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. Initials Page or plan sheet number and any notes: C)o Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 2 of 3 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass-system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric, 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence thatshows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non-engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement e L -C' . ZY Mt_ 4 y1'1 ?•? ? ? t I QRaV'd? +? SWr^ 2ir Pof?' PROV1?r<D Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 3 of 3 BMP #4 HIGH FLOW BYPASS Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.069 Channel Slope 0.12000 ft/ft Left Side Slope 2.00 ft/ft (H:V) Right Side Slope 2.00 ft/ft (H:V) Bottom Width 4.00 ft Discharge 14.83 ft'/s Results Normal Depth 0.62 ft Flow Area 3.25 ftZ Wetted Perimeter 6.77 ft Top Width 6.48 ft Critical Depth 0.67 ft Critical Slope 0.09088 ft/ft Velocity 4.57 ft/s Velocity Head 0.32 ft Specific Energy 0.94 ft Froude Number 1.14 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output=Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.62 ft Critical Depth 0.67 ft Channel Slope 0.12000 ft/ft Critical Slope 0.09088 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster (08.01.071.00] 1/28120119:15:56 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 BMP O&M AGREEMENTS Permit Number: (to be provided by DWQ) Drainage Area Number: AIVP-?t I Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does © does not incorporate a vegetated filter at the outlet. This system (check one): ? does © does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the roblem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Pen-nit Number: (to be provided by DWQ) Drainage Area Number: g!'2/-) ;d-/ BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be proililerl by 1) JFQ) Drainage Area Number: ( BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. _ Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads t-l feet in the main pond, the sediment shall be removed. When the permanent pool depth reads I-? feet in the forebay, the sediment shall be removed. Sediment Removal Bottom Elevat BASIN DIAGRAM ill in the blanks) Q Permanent Pool Elevation L 33?f Pe manen Pool - - - - - - - - - - - - - Volume Sediment Removal Elevation -7 ft Min . j `71 ?' -------------------------------------------- Sediment Bottom Elevation 7 Storage FOREBAY MAIN POND Volume 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: 41-57-o&, Po il) BMP drainage area number: -#:- Print name: ?vLtA1 ?4wI- Title: • _ ,r?-r` Address: 2 U 1 C S %71n? ?Ale t'? ? i 2c?" r „A? y PVC 2? V 3 Phone: 97q E7 F??3dc?a ?? J Date: ( / i--si - Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of •7?, , CO«nty of do hereby certify that c.wJ personally appeared before me this clay ofT Cl t _? , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, iILI SEAL My commission expires - a I _-?L& 1 3 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: jow Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/debris is present. Remove the trash/ debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of an sediment off-site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip -sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control, Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev. 3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: ALST0AJ A),?JQ BMP drainage area number:_ _f_I. ' ' Print name: Phone: ssignakrrU- Date: W Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. t _1 , a Notary Public for the State of of do hereby certify that personally appeared before me this ZJ_ dof , and acknowledge the due execution of the forgoing Ater strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, SEAL My commission expires I -- ? 1- ?-_)b 0 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Title: 4? y Address: Z 4 L_l wGs r1? s,, , Z - c %-?o C.-V Y 'V C Z_ 7 S- 13 Permit Number: (to be provided by DWQ) Drainage Area Number: ?2 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): K does ? does not This system (check one): ? does X does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are fqund shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be prm,ielerl l) y DWQ) Drainage Area Number: I I BMP element: Potential problem: How I will rernediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale T sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the 121ants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be prnvideel ky DPYO) Drainage Area Number: _13,-Tf10- 2- BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose I of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads `) feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM fll in the blanks) Sediment Removal Bottom 0 Permanent Pool Elevation 36-5 >'C- l Pe ianen Pool - - - - - - - - - - - - - - - - - - Volume Sediment Removal Elevation 360 Volume ? =? • ' `l ---- -ft Min. ------------------------------------ ---- - - Sediment Bottom Elevation `361 1-ft 4n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: J L S 7-6/A/ POwD BMP drainage area number: 41?yo #2 Print name: .Tt • Title: +, ?s • Address: Zq ol Lti?C'?y N& a7? Phone; `!? -? 3 coo Sill Date; Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _?? .-.? "/2-1, ,._., r- , '. ) , a Notary Public for the State of w-vk O'V County of ?'J - , do hereby certify that personally appeared before me this Q_I_ ay of a1 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, gyp 2 ?I?,,? wwJJ ,Y""rltlNlf Ilill»ti?? SEAL ?y,14 My commission expires Form SW401-Wet Detention Basin O&M-Rev.4 J Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: 'eJ7'?_l .4?_ 3 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does N does not This system (check one): ? does [Rj does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem. The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: _ (to be provided by DWQ) Drai nage Area Number: _411? BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be p) -owded by UPVQ) Drainage Area Number: S, ' '?- BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. _ Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if a licable The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation Sediment Removal L . 377 YPe iane n Pool - - - - - - - - - - - - Volume Sediment Removal Elevation '77 Volinne BottomElevaiioi "j7(-, t Min. -------------------------?-----------ediment Bottom Elevation °? 7L 1-ft n Storage Sedsnier Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. ?5!'Url:" %sJJr Project name: BMP drainage area number: I-qJ/T1/F # Print name: j,//- .Title: 6?P?.r?,?_ Address. 27goi W 657Akl Aeet,.? -l Svr m ? 3 c?Qy AIC 2 r13 iJel - tiff-30a . J1,?Il Date. --?, 1-f1 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, V D-, s Q ? y a Notary Public for the State of 1 In ?_ C?8 f c ,`County of L-J , do hereby certify that personally appeared before me this da of C,,< Gr!I, and acknowledge the due execution of the forgoii et detention basin maintenance requirements. Witness my hand and official seal, My commission expires 4-_ .0-01S. Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number:_ _ (to be provided by DWQ) Drainage Area Number:, L Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/ debris is present. Remove the trash/ debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) -clogged. of an sediment off-site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if a licable . approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: 41_STa&j /' wn BMP drainage area number: Print name: Tv L` A rJ • Title: 240'1 W&',70 elI ? - y ?l - Sao V Date: ? i- < v %i€ 2a 3 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of ???- ounty of , do hereby certify that G.., c personally appeared before me this d• of and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, 'r?Jff'fjPO ' k0'!y``> .•+?TffTR7lS+•••- SEAT, J l r?- My commission expiresF ? - _x 1- -;*13 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Permit Number: (to be provided by DWQ) Drainage Area Number: /? p may Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): 0 does ? does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: _ (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be proilided by D i,VQ) Drainage Area Number:_ Y BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or _ Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. fife_plicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Sediment Removal Bottom V Permanent Pool Elevation '3q 3 ' ?q Pe ntanen Pool L volume f ---- Mi Sediment Removal Elevation --------------------- Volume - t n. Sediment Bottom Elevation '3:31f 1-ft n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: ,/- ILS7z> BMP drainage area number: f 3c' I /f Print name: JUi. A-i - k4-t,1!s • Title: Address: Z-Elul WE57u 0 ;,?,QCCVAY s'v; r? ze3 6+p ,eve ? 7 -/,? Phone: 1 qi - Jq 8 t Date: ( f /--31 -1 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County of do hereby certify that personally appeared before me this da of _ , and acknowledge the die execution of the forgoin wet detention basin maintenance requirements. Witness my hand and official cPal yyy?r4yHa??lue?yj?i r ? ?J N+rrlain?Y`? yyy SEAL My commission expires - - 13 a Notary Public for the State of Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 IMPACT MAPS MATCH LINE - _ - - ? as as m NN Ns NNc =r-r,T SHEET A 1 \ 1TR !? r I ` .? ? r' l + + }}eR tk t t \14 1 t y s \ ' / 1 R ..' ..` . ? ?.. ? ...... ?.. ++ a ++ --______________ a •RR .._._._.. . ?. P /. / .? aooo.er: e. ? . ` + + ? O ' x + ++`+ SITE DATA TABLE ' \ ++ PIN: 0658523920 DEEDBOOK: 12671 + ' + DEED PAGE: 0810 DEED DATE: 712512007 TOTAL ACREAGE: 13749 ACRES GRAPHIC SCALE :00 1 inch - 200 k S E T IMPACT # PERMANENT PERENNIAL STREAMIMPACT TEMPORARY IMERMITTENT STREAMIMPACT PERMANENT ZONE 1 BUFFER IMPACT PERMANENT ZONE 2 BUFFER IMPACT PERMANENT WETLANDS IMPACT TEMPORARY WETLANDS IMPACT #1 5,338 SF (0123 AC) #2 9,045 SF (0206 AC) A #3 147 LF 567 SF(0013 AC) #4 456 SF (0.010 AC) #5 1,191 SF (0 027 AC) #6 3,707 SF (0 B05 AC) B #7 2,503 SF (D 057 AC) #8 226 SF (0.005 AC) C 19 494 SF (0.011 AC) #10 4,665 SF(0107 AC) #11 627 SF (0.014 AC) D #12 133 SF(0003 AC) #13 426 SF (0 010 AC) 914 1,485 SF (0 034 AC) 915 23 LF 7SF (0 001 ACI #16 66B SF (0 015 AC) E E!#I!7 660 SF (0 015 AC) 285 SF (0.007 AC) #19 61 SF (0 001 AC) F #20 2,553 SF (0.059 AC) TOTALS 47 LF 567 SF(0013 AC) 23 LF 7SF(0001 AC) 13,550 SF(0311 AC) 19,501 SF (D 440 AC) 853 SF(0019 AC) 627SF(DOtq AC)) ALSTON POND WITHERB ? RAVENEL? OVERALL SITE PLAN WITH IMPACTS III SEMI N-KRA I PLAN HERS R.U.V.T.J. I + f. Sf•iF-FT B ++' r? Mal 7w WrIr 11 1 I II I 1 I ?1\\111!I?11\ \ rl\f *71+...\.\ 1 4I \ ?(q S qD I RBT?ININGWALI \ .% r? T ? I Y PRO OSED + f I j fJ ENGY DISSIPATER PR PQS?¢ y j 1 / r ?\ \ 1 ` 4 1 '"ry RE?AININO WAIL .?\ fl I /// .- k7 -7 PROPOSE IP-RAP ?F CHANNEL TO STREAM ) (HIGH FLO ?WPASS 4 1 FROM BMP1 IMPACT #1 IMPACT #2 IMPACT #3 IMPACT #4 PERMANENT ZONE 2 PERMANENTZONEI PERMANENT PERENNIAL PERMANENTZONEI BUFFERIMPACT BUFFERIMPACT STREAMIMPACT BUFFERIMPACT 5,338 SF (0.123 AC) 9,045 SF (0.208 AC) 147 LF 456 SF (0.010 AC) 567 SF (0.013 AC) r ? \ -C r r r a r t ll? ? \ IMPACT #5 PERMANENTZONE2 BUFFERIMPACT 1,191 SF (0.027 AC) SCALE: 1 inch = 40 ft. ALSTON POND SHEET A WITHERS & RAVENEL IMPACTS #1 - #5 ?ni"ets3 ' """Kxs l suev[rnks !l'i `i?•?Y L'?.$L4A 1b'.1Kf l:('",lY K,ap C.. vii e ' - - PROPOSED 50 LF ,? r - -- --- 48" RCP - 7=21 i i - r I ? f f 1 r r ? P r r r r / f J r PROPOSED RETAINING WA - w. PROPQSFw0 ti RETAININGIWALL', ` PROPOSEbENERG?DISSIPATER ?WETLANOS \ yy 1 I ?? ? \ '0 ti ` ' \ . I O \ \ 11, It, %V IMPACT #6 IMPACT #7 IMPACT #8 PERMANENT ZONE 2 PERMANENT ZONE: 1 PERMANENT WETLANDS IMPACT BUFFER IMPACT BUFFER IMPACT 226 SF (0.005 AC) 3,707 SF (0.085 AC) 2,503 SF (0.057 AC) GRAPHIC SCALE 40 0 1 inch = 40 ft. ALSTON POND SHEET B IMPACTS #6 - #8 WITHERS & RAVENEL EKSIMEF0% I P1A11NE115 i SURVEYORS 1 - +- PROPOSED _ - - ?+ \L I ENERGY i DISSIPATER Sil?s? .." ? . - N' / ? f O EXI,*ING \ I? WETLANDS \ \ v ti \ r \ \ r[7 y EXISTING POND y? ? Jr EXISTING POND IMPACT #9 IMPACT #10 PERMANENT WETLANDS IMPACT PERMANENT ZONE 2 494SF (0.011 AC) BUFFER IMPACT 4,665 SF (0.107 AC) s S ALSTON POND SHEET C IMPACT #9 & #10 WAKE COUNiv Norrh C?rnlina GRAPHIC SCALE 40 0 1 inch = 40 ft. WITHERS &- RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS irr/ ' l r I t ?r ? r?f,r r•7 ? ?r ,_ i *? IMPACT #11 \ • TEMPORARY WETLANDS ?•w„/: / 'i IMPACT / ! ? 627 SF (0.014 AC) I ROPO. i?' / ? ? GREEW Y ' / r + £OGE OF - 20' SANITARY f SEWER POND EASEMENT f'r 4? 'w f /' i ?' BOARDWALK 'd ?g(9?r err f - e i OVER ?7p f .. WETLANDS_ I 1 r ? EDGE OF • I. { `?+? e' "?.- \ POND ?r ?.: ?/ rr? '? "•,? \ j'Y•, \ X51=?? \ 10, ! x ? ? 1 r IMPACT#12 GRAPHIC SCALE PERMANENT WETLANDS IMPACT 40 1 133 SF (0.003 AC) I !I 1 inch = 40 ft. ALSTON POND SHEET D WITHERS & RAVENEL IMPACTS #11412 ENGINEERS I PLANNERS I SURVEYORS FU UAV-VARINA WAKE COUNJY North Carolina - .. .. .,, .:;.,,,., ,.. .... ... IMPACT #13 IMPACT #14 IMPACT #15 PERMANENT ZONE 2 PERMANENTZONE1 TEMPORARY INTERMITTENT BUFFERIMPACT BUFFERIMPACT STREAMIMPACT 426 SF (0.010 AC) 1,485 SF (0.034 AC) 23 LF 47 SF (0.001 AC) s i , Yr •,. //mar ?r ' rf 1' 'y r rti i' PR I@SEI7 RIP-RAP BOARUNALK -? ANWIEL TO ST .'-OVER STREAIvt tHIGI FL91N k"S (NO IMPACT) PROM BkI r i %f s ?'' .. r i i r ?` `'•: PROPQSEI] VEUTAT .i 7 41 / r 5p ?? r 60, v r / rr ,err }'/` t %?,. r ?p .10000 q 140, / Jr -? / 20' SANITARY / SEWER ? I / / EASEMENT? y 1000* w , / .v 14, •Y IMPACT #16 IMPACT #17 IMPACT #18 IMPACT #19 PERMANENT ZONE 2 PERMANENTZONE2 PERMANENTZONE2 PERMANENTZONE1 BUFFERIMPACT BUFFERIMPACT BUFFERIMPACT BUFFERIMPACT 668 SF (0.015 AC) 668 SF (0.015 AC) 285 SF (0.007 AC) 61 SF (0.001 AC) GRAPHIC SCALE 40 ! s 1 inch = 40 ft. ALSTON POND SHEET E WITHERS &- RAVENEL IMPACTS #13 - #19 1N0INK AAS I PLAIV PIERS I SURVEYORS it.DI..KT-V?KNIti.I WAKE COUMY tiny1? c „u°In? '41 \1 \bc v y" eV i` IN \ \ \ b y \ --- -.?-JOP OF BANK TOP WETLANDS lie Q/ t \ \ \ i • ? ?i? PROPOSED. ? ? ? " ? ? . i i r - v+ y. ENERGY ,, = \ s r IMPACT #20 PERMANENT ZONE 2 BUFFERIMPACT 2,553 SF (0.059 AC) GRAPHIC SCALE 40 0 1 inch = 40 ft. SHEET F #20 I W?THER8 RAVENEL II I ALSTON POND III IMPACT ENGINEERS 1 PLANNERS I SURVEYORS i 365 I i 365 PROPOSED BOARDWALK 1 360 PROPOSED GRADE 360 EXISTING GRADE i _ i EXISTING STREAM ' 355 355 GREENWAY CROSSING AT IMPACT #15 345 i 340 I PROPOSED BOARDWALKS _ ?N/?' _ EXISTING GL DE 345 40 GREENWAY CROSSING AT IMPACT #11 GRAPHIC SCALE 40 (1 1 inch = 40 ft. ALSTON POND GREENWAY CROSSING DETAILS WITHERS & RAVENEL ENGINEERS 1 PLANNERS I SURVEYORS WAKF CHANTY Noah Carolina ... . .....-..., 385_,_ !! - -.1- -- -- - - - .. 385, 1 ? ' - ? PROPOSED I u - ! ? GRADE V 380 - - !! L - . - - - 380 ! I I 1 ? f ] ? i r 375 -/? 375 i ! 1 1 f I ! EXISTING _ 370 GRADE 370 365 365 66"RC CROSSNG 360 360 I 1 355 - - ] - 1 355 UPSTREAM - 385 ] i - I 385 I _ PROPOSED { GRADE I ! I ! I i I 380 360 J ? I' - I i ! I 1 I I I I 375 375 I r I C !1 -t - ? ? /' I ' 370 ! _ cISrik6 - f - -- - -3700 ! r '• / OWE ? _ 365 y I N. 360 _ , 1 360 _ _ - Or Re - CROSS NG - - - - 355 35,9 E DOWNSTREAM 8 i s` a NOT TO SCALE CULVERT CROSS SECTION WITHERS &- RAVENEL s ALSTON POND IMPACTS #1 - #3 ENGINEERS 1 PLANNERS I SURVEYORS i Ill UAY-VARINA WAKE COUNIY N'odh Catalina - MAIN BARRELL SECONDARY BARRELL EXISTING PROPOSED EXISTING PROPOSED GRADE INVERT GRADE INVERT UPSTREAM 360.00 359.00 361.50 361.50 DOWNSTREAM 356.50 355.50 358.00 358.00 Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Fff c ivrnct• in the Piedmont % Impervious Cover Permanent Pool Depth (feet) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP 1 - STORMWATER WET POND Land Use Area (ac) % IA Imp. Area (ac) Impervious 15.62 100 15.62 Open Space 16.88 0 0.00 Totals 32.50 15.62 Total % Impervious Surface Area = 48.1 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 2.00 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.649 acres 28258 sq. ft. Normal pool elevation = feet Surface area provided = 0.871 acres 37920 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious RV = 0.48 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 1.307 acre-ft 56929 cu. ft. Temporary Pool Elevation = 343.8 Water quality pool elevation= 342.00 feet Storage volume provided = 1.687 acre-ft 73486 cu. ft. Orifice Calculator Q =Cd*A*(2gh)^(1/2) Variables WQ Volume: Head: Draw down time: Orifice Area = 1.307 Acre-ft 1.80 ft 48 hrs 0.0721235 sq. ft Orifice Diameter: 3.6364262 in USE 4 INCH DIAMETER ORIFICE A 0.34906585 4 Q 2.25495459 56929.29 cf 0.9 ft 172800 s 10.38578 sq. in Constants 9 cd = 32.2 ft/sz 0.6 Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Piedmont % Impervious Cover 3.0 4.0 re1,,,a,Ic 5.0 „i , UUN .., FL 6.0 IN ..,. l 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 _ 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/D WQ Stormwater Best Manageme nt Practices, pg. 10-9, July 2007 STORMWATER BMP 2 - STORMWATER WET POND Land Use Impervious Area (ac) 18.75 % IA 100 Imp. Area (ac) 18.75 Open Space 17.75 0 0.00 Totals 36.50 18.75 Total % Impervious Surface Area = 51.4 % Surface Area of Permanent Pool: Assumed depth = 4 feet SA/DA ratio = 1.77 % From Table 1.1 Minimum pond surface area (SA) = (DA * SA/DA ratio)/100 SA = 0.646 acres 28159 sq. ft. Normal pool elevation = 4.0 feet Surface area provided = 0.577 acres 25150 sq. ft. 31.5 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv _ Runoff coefficient, in./in. I = Percent impervious Rv = 0.51 inAn. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 1.558 acre-ft 67881 cu. ft. Temporary Pool Elevation = 367.4 Water quality pool elevation= 365.00 feet Storage volume provided = 1.936 acre-ft 84332 cu. ft. Orifice Calculator Q =Cd*A*(2gh)"(1/2) Variables WQ Volume: Head: aw down time: 1.558 Acre-ft 2.40 ft 120 hrs Orifice Area= 0.0297906 sq. ft Orifice Diametf 2.3370948 in USE 2 INCH DIAMETER ORIFICE A 0.1154099 2 Q 0.86088047 67881 cf 1.2 ft 432000 s 4.289851 sq. in Constants 9= cd = 32.2 ft/s2 0.6 Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant RPmnval Fffirienrv in the Piedmont % Impervious Cover Permanent Pool Depth (feet) 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. 10-9, July 2007 STORMWATER BMP 3 - STORMWATER WET POND Land Use Area (ac) % IA Imp. Area (ac) Impervious 6.24 100 6.24 Open Space 9.76 0 0.00 Totals 16.00 6.24 Total % Impervious Surface Area = 39.0 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.69 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.271 acres 11786 sq. ft. Normal pool elevation = 4.0 feet Surface area provided = 0.255 acres 11111 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.40 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.535 acre-ft 23290 cu. ft. Temporary Pool Elevation = 382.8 Water quality pool elevation= 381.00 feet Storage volume provided = 0.638 acre-ft 27791 cu. ft. Orifice Calculator Q =Cd*A*(2gh)^(l/2) Variables WQ Volume: Head: aw dawn time: 0.535 Acre-ft 1.80 ft 48 hrs Orifice Area = 0.0295061 sq. ft Orifice Diameti 2.3259072 in USE 2 INCH DIAMETER ORIFICE A 0.08726646 2 Q 0.56373865 23290.08 cf 0.9 ft 17280.0 s 4.248878 sq. in Constants 9_ Cd = 32.2 ft/s2 0.6 Project Name: Alston Pond City/State: Fuquay-Varina Table 1.1 Surface Area to Drainage Area Ratio for Permanent Pool Sizing for 85% Pollutant Removal Efficiency in the Piedmont % Impervious Permane nt Pool Dept h (feet) Cover 3.0 4.0 5.0 6.0 7.0 8.0 9.0 10 0.59 0.49 0.43 0.35 0.31 0.29 0.26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1.34 1.08 0.97 0.83 0.70 0.64 0.62 40 1.73 1.43 1.25 1.05 0.90 0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 0.92 60 2.40 2.03 1.71 1.51 1.29 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 2.66 2.34 2.11 1.83 1.67 Source: NCDENR/DWQ Stormwater Best Management Practices, pg. iu-`J, duly Luui STORMWATER BMP 4 - STORMWATER WET POND Land Use Area (ac) % IA Imp. Area (ac) Impervious 2.6 100 2.60 02en Space 3.4 0 0.00 Totals 6.00 2.60 Total % Impervious Surface Area = 43.3 % Surface Area of Permanent Pool: Assumed depth = 3 feet SA/DA ratio = 1.84 % From Table 1.1 Minimum pond surface area (SA) _ (DA * SA/DA ratio)/100 SA = 0.110 acres 4809 sq. ft. Normal pool elevation = 344.0 feet Surface area provided = 0.142 acres 6197 sq. ft. 1-Inch Runoff Volume Calculation Using the runoff volume calculations in the "Simple Method" as described by Schueler (1987) Rv = 0.05 + 0.009(1) where, Rv = Runoff coefficient, in./in. I = Percent impervious Rv = 0.44 in./in. Total runoff volume from 1-inch precipitation: Runoff volume, S = (Design rainfall) (Rv) (Drainage Area) S = 0.220 acre-ft 9583 cu. ft. Temporary Pool Elevation = 344.5 Water quality pool elevation= 343.00 feet Storage volume provided = 0.227 acre-ft 9888 cu. ft. Orifice Calculator Q =CdW(2gh)^(1/2) Variables WQ Volume: Head: aw down time: 0.220 Acre-ft 1.50 ft 48 hrs Orifice Area= 0.0132997 sq. ft Orifice Diameb 1.5615557 in USE 2 INCH DIAMETER ORIFICE A 0.08726646 2 Q 0.51462062 9583.2 cf 0.75 ft 172800 s 1.915157 sq. in Constants 9= cd = 32.2 ft/S2 0.6 I 1 1 I I •1 I I I I I ? ?' I i I I I I I 1 I I I 1 1 , i ?1 i 1 I '/ I 1 1 I 1 , °-' / 1 I I I I I 1 / 1 I I I I ( '? I I I 1 1 r 4e4W 41# 10 _ .. , ?" .. ?,i,r?RalC.rutrlara _ 230 231 L ?• Vii` ?? 78 221 m ?? ???z --- ??_ - - --- ------ -• --- -- -??, i Syr-- ; I 232 233 dN$ 1 ?? ?? nf1 ?. ??.212 62 f, 10 411 44 - u 79 4koF tee so 41 S, .-?a .?.. m? _ 63 40 71 -? 1 z,e ?f- -- -- I l 80 AIWA#b??L2 ' 2 23, ¦ i "?. ¦ 24IJ a 1 46 „ ?? r L s *` 17 -W 226 / 236V 211 242 5, 37 a 48 241 221 e 16 49 fir" 49 16 ? ?? BMP #3 217/ M ?I 240 67 71 218 46??1239 237 4 W 31 11 68 1: 81 21 34 14 ! ' t 70 -WNW 69 223 l?Rh, 4. 26 26'l 33 12' 1 v 'k ?,? C7 262 . ; ; I, T - P 96 1? ; -:. al 15 •LI[l(? 121 ' /? l?•'apr ?? 1 f 90 eu`ire'97 o?E 9 ?`?? BMP #4 ia1aP' ?I jl ?p , If' 1T 90 218 Ilk Y 0 09 92 261 00- 1 217 28 1 f?? 9 r ,e C? E. 17 ?MI?N s 26 0 /267 N 24 118 171 t?! 103 , 268N ?N 18, 4 4f# 'PEN 23 137 132 73 323 321 / "I HEET 10 212 ! 324 00 172 1, 2 4 ®, / J 20 211 3 71 -11 321 122 12" 4 /317 16 170 341 3 6 128 141 Z 141 19 209 116, 327 342 315 o r\?_ 1 ????? ??' , 1' ``.ti / • ?''?? 4 2n 339 43 127 _;A7 207 3- 278 192 313 14 ;;• . 16 f 344 s \k ff Y° ?? 2797, 112 341 194 V14 204 0 ;l 311 335 3.46 NEI 141 332 V1 r ff 347 3110 309 134 12 282 309 '148 163 _ {. 333 212 301 e ` ' i mow' / vuti}i. 149 37 - -- ?? a: r 'I -r --___..m .,`* 307 \+ i ` ¦ ¦ . ;Ay. 201 200 3`l43 369 301 286\ 010 `? ? 31 287 288 x - ??/ 304 "s° 1?* e? ti / p;/ 89 ? .. .....376 ?* . r------------ % 313 303 % 117 314 6 Of -, I'll 7 378 3 302 290 BMP #1 I - I I , 0 6 /4 29? _0, 364 ti ¦? c--------------- 301 3 379 316 ti:sy'. ?. 1?? / .... a GRAPHIC SCALE 38111 41. . -0 r 1, 294 300 0 150 300 600 382 361 291 N s 3 319N 297 I A 1 296 1 inch 300 ft. i BMP #2 ` Ip __ _ _ _ t_y? ?? _- ?_ . ,<• ;°8?°I 1 p t «"/, I \,•\ ° ,? .?.Q... 9 v ?..: _ - R?lr?-« ?' car' 1 7, - - - - - - - - - - - - - - - - - - - - - - - - - - - - ill ? ,4 t • b I •/• •?.? • .- . ? ) S 1 •"iv h ae? No. Revision Dale B oa;- NU sale K NORO sn , D- By ZZZ ALSTON POND BMP DRAINAGE AREA MAP WITHERS RAVENEL a--y N. ENGINEERS 1 PLANNERS I SURVIVORS FU UAY-VARINA WAKE COUNTY North Carolina N.1hC-I-27511 m1 9194-3340 wl1M1esaven I- L 17 0? r., .a 288 28 290 289 F L 2 86 2&5 -- - - 291. 284 282 2$1 I ..?83 I 292 293 a ,. 95 100, 40, FOREBAY, J % ? ? RISER - \ ? v 7-. S '0001? i FOREBAY 10, 10, ooo .01 011, -N 500-YR FLOOD LINE 10, / \ 9 \ \ r 00-YR FLOOD LINE r 1 i ENERGY DISSIPATER WETLANDS V- V ?? - --? GRAPHIC SCALE k e 50 0 25 50 100 ,'° ! fi_ k t k k k k k k 1 inch = 50 k. o. v k k k D k k k k k k k k k k k V k k k 4 No. Revision Date B ,--, ? BMP EXHIBIT ° - ALSTON POND µq WITHERS ? RAVENEL ? Gf --d By M ioeN. BMP # I ENGINEERS I PLANNERS I SURVEY 711LAY-VARINA WAKE COUNTY North Carolina N.lhC-l-27s„ mL9194-33ao .w?h--l-! 77 \ ... 381 I Q \HITG HOIN ASS PIPE \ Z RSER ANN REAM 382 11 \ b ,,?.. c ? a e,, DIP WATER QUALITY OUTLET FOREBAY 24 ENERGY ,',?` \ \ r { DISSIPATER °' ` LEVEL SPREADER / / l \ / GRAPHIC SCALE 50 0 25 50 100 • 0 1 inch = 50 k. No. Revision NJ o?..:, AS BMP EXHIBIT D- By ALSTON POND µ WITHERS & RAVENEL 2 ae-dBy iii J.bN. BMP #2 ENGINEERS I PLANNERS I SURVIVORS FU UAY-VARINA WAKE COUNTY North Carolina 111 -K- D- C- N.lhC-1-27s„ m1 9194-3340 www-M1rsmv-l- L ? • V 254 T OF BAN A I ' - W foP OF BANK OREBAY w ?. \ \ RISERS \ u 25 i BAY W W \ , \ \ FORE 1 \ A W LONERGe W 56 \ \ \ I W w DISSIPATER. POND v` ?? ?? •? A W W W WETLANDS W 2 BMP#3 / ? 2,`3U ? . ` •I GRAPHIC SCALE t A 50 0 25 50 100 ye ., `\ / / / / I I 1 inch = 50 k. k? 0 I / l ? I I 4" DIP"WATER W _ UALITY OIlTLET < ° w 41 HIGFWFL0Wv W / w BYPASSWPIPE W lk w HANNEL T9 W STR w I / NEF DISSIPATER w w W W W W '- ??/?? LEVEL SPREADER w ` w w w S ? I -41 VTGPTATED? TER / l Ww W 144, lk BMP #4 No. Revision oa,e B o??:, waR F-As? BMP EXHIBIT UZI- °`.a° ALSTON POND WITHERS RAVENEL 3 --d By joeN. BMP #3 AND BMP #4 ENGINEERS I PLANNERS I SURVIVORS MR FU UAY-VARINA WAKE COUNTY North Carolina 111 M-- D- N N.lhC-l-3,t„ 11 9194-3340 www-M1rsmv-l- oc Permit Number: (to be provided by DWQ) Drainage Area Number: AIVP-?t I Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does © does not incorporate a vegetated filter at the outlet. This system (check one): ? does © does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the roblem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Pen-nit Number: (to be provided by DWQ) Drainage Area Number: g!'2/-) ;d-/ BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be proililerl by 1) JFQ) Drainage Area Number: ( BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. _ Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads t-l feet in the main pond, the sediment shall be removed. When the permanent pool depth reads I-? feet in the forebay, the sediment shall be removed. Sediment Removal Bottom Elevat BASIN DIAGRAM ill in the blanks) Q Permanent Pool Elevation L 33?f Pe manen Pool - - - - - - - - - - - - - Volume Sediment Removal Elevation -7 ft Min . j `71 ?' -------------------------------------------- Sediment Bottom Elevation 7 Storage FOREBAY MAIN POND Volume 1-ft Storage Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: 41-57-o&, Po il) BMP drainage area number: -#:- Print name: ?vLtA1 ?4wI- Title: • _ ,r?-r` Address: 2 U 1 C S %71n? ?Ale t'? ? i 2c?" r „A? y PVC 2? V 3 Phone: 97q E7 F??3dc?a ?? J Date: ( / i--si - Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. a Notary Public for the State of •7?, , CO«nty of do hereby certify that c.wJ personally appeared before me this clay ofT Cl t _? , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, iILI SEAL My commission expires - a I _-?L& 1 3 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: jow Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/debris is present. Remove the trash/ debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) clogged. of an sediment off-site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip -sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control, Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if applicable). approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev. 3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: ALST0AJ A),?JQ BMP drainage area number:_ _f_I. ' ' Print name: Phone: ssignakrrU- Date: W Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. t _1 , a Notary Public for the State of of do hereby certify that personally appeared before me this ZJ_ dof , and acknowledge the due execution of the forgoing Ater strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, SEAL My commission expires I -- ? 1- ?-_)b 0 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Title: 4? y Address: Z 4 L_l wGs r1? s,, , Z - c %-?o C.-V Y 'V C Z_ 7 S- 13 Permit Number: (to be provided by DWQ) Drainage Area Number: ?2 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): K does ? does not This system (check one): ? does X does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are fqund shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: (to be prm,ielerl l) y DWQ) Drainage Area Number: I I BMP element: Potential problem: How I will rernediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale T sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the 121ants rather than spraying. The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be prnvideel ky DPYO) Drainage Area Number: _13,-Tf10- 2- BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose I of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads `) feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 5 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM fll in the blanks) Sediment Removal Bottom 0 Permanent Pool Elevation 36-5 >'C- l Pe ianen Pool - - - - - - - - - - - - - - - - - - Volume Sediment Removal Elevation 360 Volume ? =? • ' `l ---- -ft Min. ------------------------------------ ---- - - Sediment Bottom Elevation `361 1-ft 4n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: J L S 7-6/A/ POwD BMP drainage area number: 41?yo #2 Print name: .Tt • Title: +, ?s • Address: Zq ol Lti?C'?y N& a7? Phone; `!? -? 3 coo Sill Date; Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, _?? .-.? "/2-1, ,._., r- , '. ) , a Notary Public for the State of w-vk O'V County of ?'J - , do hereby certify that personally appeared before me this Q_I_ ay of a1 , and acknowledge the due execution of the forgoing wet detention basin maintenance requirements. Witness my hand and official seal, gyp 2 ?I?,,? wwJJ ,Y""rltlNlf Ilill»ti?? SEAL ?y,14 My commission expires Form SW401-Wet Detention Basin O&M-Rev.4 J Page 4 of 4 Permit Number: (to be provided by DWQ) Drainage Area Number: 'eJ7'?_l .4?_ 3 Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ? does N does not This system (check one): ? does [Rj does not incorporate a vegetated filter at the outlet. incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem. The entire BMP Trash/debris is resent. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. a roximatel six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: _ (to be provided by DWQ) Drai nage Area Number: _411? BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be p) -owded by UPVQ) Drainage Area Number: S, ' '?- BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. _ Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. if a licable The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) V Permanent Pool Elevation Sediment Removal L . 377 YPe iane n Pool - - - - - - - - - - - - Volume Sediment Removal Elevation '77 Volinne BottomElevaiioi "j7(-, t Min. -------------------------?-----------ediment Bottom Elevation °? 7L 1-ft n Storage Sedsnier Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. ?5!'Url:" %sJJr Project name: BMP drainage area number: I-qJ/T1/F # Print name: j,//- .Title: 6?P?.r?,?_ Address. 27goi W 657Akl Aeet,.? -l Svr m ? 3 c?Qy AIC 2 r13 iJel - tiff-30a . J1,?Il Date. --?, 1-f1 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, V D-, s Q ? y a Notary Public for the State of 1 In ?_ C?8 f c ,`County of L-J , do hereby certify that personally appeared before me this da of C,,< Gr!I, and acknowledge the due execution of the forgoii et detention basin maintenance requirements. Witness my hand and official seal, My commission expires 4-_ .0-01S. Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number:_ _ (to be provided by DWQ) Drainage Area Number:, L Filter Strip, Restored Riparian Buffer and Level Spreader Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - Immediately after the filter strip is established, any newly planted vegetation will be watered twice weekly if needed until the plants become established (commonly six weeks). - Once a year, the filter strip will be reseeded to maintain a dense growth of vegetation - Stable groundcover will be maintained in the drainage area to reduce the sediment load to the vegetation. - Two to three times a year, grass filter strips will be mowed and the clippings harvested to promote the growth of thick vegetation with optimum pollutant removal efficiency. Turf grass should not be cut shorter than 3 to 5 inches and may be allowed to grow as tall as 12 inches depending on aesthetic requirements (NIPC,1993). Forested filter strips do not require this type of maintenance. - Once a year, the soil will be aerated if necessary. - Once a year, soil pH will be tested and lime will be added if necessary. After the filter strip is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inch (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire filter strip Trash/ debris is present. Remove the trash/ debris. system The flow splitter device The flow splitter device is Unclog the conveyance and dispose (if applicable) -clogged. of an sediment off-site. The flow splitter device is Make any necessary repairs or damaged. replace if damage is too large for repair. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 1 of 3 BMP element: Potential problem: How I will remediate the problem: The swale and the level The swale is clogged with Remove the sediment and dispose lip sediment. of it off-site. The level lip is cracked, Repair or replace lip. settled, undercut, eroded or otherwise damaged. There is erosion around the Regrade the soil to create a berm end of the level spreader that that is higher than the level lip, and shows stormwater has then plant a ground cover and bypassed it. water until it is established. Provide lime and a one-time fertilizer application. Trees or shrubs have begun Remove them. to grow on the swale or just downslo e of the level lip. The bypass channel Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then reestablish proper erosion control. Turf reinforcement is Study the site to see if a larger damaged or ripap is rolling bypass channel is needed (enlarge if downhill. necessary). After this, reestablish the erosion control material. The filter strip Grass is too short or too long Maintain grass at a height of if a licable . approximately three to six inches. Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Sediment is building up on Remove the sediment and the filter strip. restabilize the soil with vegetation if necessary. Provide lime and a one- time fertilizer application. Plants are desiccated. Provide additional irrigation and fertilizer as needed. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application. Nuisance vegetation is Remove vegetation by hand if choking out desirable species. possible. If pesticide is used, do not allow it to get into the receiving water. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality local Regional Office, or the outlet. 401 Oversight Unit at 919-733-1786. Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: 41_STa&j /' wn BMP drainage area number: Print name: Tv L` A rJ • Title: 240'1 W&',70 elI ? - y ?l - Sao V Date: ? i- < v %i€ 2a 3 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, a Notary Public for the State of ???- ounty of , do hereby certify that G.., c personally appeared before me this d• of and acknowledge the due execution of the forgoing filter strip, riparian buffer, and/or level spreader maintenance requirements. Witness my hand and official seal, 'r?Jff'fjPO ' k0'!y``> .•+?TffTR7lS+•••- SEAT, J l r?- My commission expiresF ? - _x 1- -;*13 Form SWU401-Level Spreader, Filter Strip, Restored Riparian Buffer O&M-Rev.3 Page 3 of 3 Permit Number: (to be provided by DWQ) Drainage Area Number: /? p may Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): 0 does ? does not incorporate a vegetated filter at the outlet. This system (check one): ? does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established, the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year, a dam safety expert should inspect the embankment. After the wet detention pond is established, it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/ debris is resent. Remove the trash/ debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 Permit Number: _ (to be provided by DWQ) Drainage Area Number: BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than s ra in . The vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping them invasive plants cover 50% of with pesticide (do not spray). the basin surface. Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 Permit Number: (to be proilided by D i,VQ) Drainage Area Number:_ Y BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or _ Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. fife_plicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads feet in the main pond, the sediment shall be removed. When the permanent pool depth reads feet in the forebay, the sediment shall be removed. BASIN DIAGRAM ill in the blanks) Sediment Removal Bottom V Permanent Pool Elevation '3q 3 ' ?q Pe ntanen Pool L volume f ---- Mi Sediment Removal Elevation --------------------- Volume - t n. Sediment Bottom Elevation '3:31f 1-ft n. Storage Sediment Storage FOREBAY MAIN POND Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: ,/- ILS7z> BMP drainage area number: f 3c' I /f Print name: JUi. A-i - k4-t,1!s • Title: Address: Z-Elul WE57u 0 ;,?,QCCVAY s'v; r? ze3 6+p ,eve ? 7 -/,? Phone: 1 qi - Jq 8 t Date: ( f /--31 -1 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. County of do hereby certify that personally appeared before me this da of _ , and acknowledge the die execution of the forgoin wet detention basin maintenance requirements. Witness my hand and official cPal yyy?r4yHa??lue?yj?i r ? ?J N+rrlain?Y`? yyy SEAL My commission expires - - 13 a Notary Public for the State of Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit N A N. NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part lll) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) V AFT .- €. PROJECT INFORMATION _ Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 1 II. DESIGN INFORMATION Site Characteristics Drainage area 1,415,700 ftz Impervious area, post-development 680,407 fe % impervious 48.06 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 56,930 ft3 OK 73,486 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in (unitless) (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec -4.14 ft3/sec 343.80 fmsl 342.00 fmsl fmsl 342.50 fmsl 341.50 fmsl 338.00 fmsl 337.00 fmsl 1.00 ft n (Y or N) fmsl Form SW401-Wet Detention Basin-Rev 8-9117109 Parts I & 11 Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II. DESIGN INIF M_ATION _ Surface Areas Area, temporary pool 45,229 fe Area REQUIRED, permanent pool 28,314 ff SAIDA ratio 2.00 (unitless) Area PROVIDED, permanent pool, A?mjw, 34,308 ft` OK Area, bottom of 1 Oft vegetated shelf, 4.1 ahen 28,442 ft1 Area, sediment cleanout, top elevation (bottom of pond), &t-d 21,265 ft` Volumes Volume, temporary pool 73,486 ft3 OK Volume, permanent pool, \?,,_, 104,707 ft3 Volume, forebay (sum of forebays if more than one forebay) _ ft3 Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SA/DA Table Used? y (Y or N) SAIDA ratio 2.00 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, \?. _pod 104,707 W Area provided, permanent pool, Awm,?j 34,308 ft` Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, 4, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, 'P? _pwj 34,308 fe Area, bottom of 1 Oft vegetated shelf, A01 shell 28,442 ft' Area, sediment cleanout, top elevation (bottom of pond), &I-pd 21,265 ft3 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 3.50 ft Average depth calculated 3.50 ft OK Average depth used in SAIDA, 4, (Round to nearest 0.5ft) 3.0 ft Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 4.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (CD) 0.60 (unitless) Driving head (FL) 1.80 ft Drawdown through weir? n (Y or N) Weir type 0.3 (unitless) Coefficient of discharge (C4) 0.51 (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 15.61 ft3lsec Post-development 1-yr, 24-hr peak flow 11.47 ft3lsec Storage volume discharge rate (through discharge orifice or weir) 0.54 ft3lsec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Addkional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 4 :1 OK Length to width ratio 4.0 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 0.8 ft Insufficient freeboard, minimum of 1-ft required Vegetated filter provided? n (Y or N) Insufficient Vegetated filter required. Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build-out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: Pump required Form SW401-Wet Detention Basin-Rev B-9/17/09 Parts I & 11 Design Summary, Page 2 of 2 Permit No AN"A' NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) c ;,2 A I,, r LID U -, G 19_ I. PROJECT: INFORMATION Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date Drainage area number 11. DESIGN INFORMATION Site Characteristics Drainage area 1,589,940 ft2 Impervious area, post-development 816,750 ft2 % impervious 51.37 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 67,881 ft3 OK Volume provided 84,332 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm, pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 10 ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec 4.14 ft3/sec 367.40 fmsl 365.00 fmsl fmsl 365.50 fmsl 364.50 fmsl 360.00 fmsl 359.00 fmsl 1.00 ft n (Y or N) fmsl Form SW401-Wet Detention Basin-Rev B-9/17/09 Parts I & 11 Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) II, DESIGN INFORMATION _ Surface Areas Area, temporary pool 39,090 ff Area REQUIRED, permanent pool 28,142 fl2 SAIDA ratio 1.77 (unitless) Area PROVIDED, permanent pool, Pp°, Area, bottom of 1 Oft vegetated shelf, Area, sediment cleanout, top elevation (bottom of pond), &I.d Volumes Volume, temporary pool Volume, permanent pool, \?,,,_pw Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, V,,,_pw Area provided, permanent pool, Average depth calculated Average depth used in SAIDA, 4, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, /e?_pw Area, bottom of 1Oft vegetated shelf, !fit a,1l Area, sediment cleanout, top elevation (bottom of pond), JL-P d "Depth" (distance blw bottom of IN shelf and top of sediment) Average depth calculated Average depth used in SAIDA, cL, (Round to nearest 0.5ft) Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cq) Driving head (Ft) Drawdown through weir? Weir type Coefficient of discharge (C.) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is 28,282 ft? OK 23,027 if 13,943 if 84,332 ft3 OK 94,500 ft3 ft3 85 % n (Y or N) y (Y or N) 1.77 (unitless) n (Y or N) 94,500 fe 28,282 W ft ft y (Y or N) 28,282 ff 23,027 ft` .13,943 ff 4.50 ft 4.10 ft 4.0 ft y (Y or N) 4.00 in in2 0.60 (unitless) 2.40 ft n (Y or N) (unitless) (unitiess) ft ft 15.61 ft3/sec 11.47 ft3/sec 0.63 ft3/sec 2.00 days 3 :1 10 :1 10.0 ft 3 :1 3.0 :1 y (Y or N) 0.8 ft n (Y or N) y (Y or N) y (Y or N) Gate valve Need 3 ft min. OK OK OK, draws down in 2-5 days. OK OK OK OK OK OK Insufficient freeboard, minimum of 1-ft required Insufficient. Vegetated filter required. OK OK Form SW401-Wet Detention Basin-Rev 9-9/1 7109 Parts I. & 11 Design Summary, Page 2 of 2 Permit No NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) ry ? e of fl?i.?.F ?..Jti I. PROJECT INFORMATION Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 3 II, DESIGN INFORMATION Site Characteristics Drainage area 696,960 fe Impervious area, post-development 271,814 ftz % impervious 39.00% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp. pool? Elevation of the top of the additional volume 23,290 ft3 OK 27,791 ft3 OK, volume provided is equal to or in excess of volume required, ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec -4.14 ft3/sec 382.80 fmsl 381.00 fmsl fmsl 381.50 fmsl 380.50 fmsl 377.00 fmsl 376.00 fmsl 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev 8-9/17109 Parts I & 11 Design Summary, Page 1 of 2 Permit No (to be provided by D WQ) 11. DESIGN INFORMATION - Surface Areas Area, temporary pool 17,329 f? Area REQUIRED, permanent pool 11,779 ft' SAIDA ratio 1.69 (unitless) Area PROVIDED, permanent pool, PI 12,414 ft OK Area, bottom of 1 Oft vegetated shelf, 4o, „ 9,710 ft Area, sediment cleanout, top elevation (bottom of pond), &,_?nd 5,979 ft Volumes Volume, temporary pool 27,791 ft3 OK Volume, permanent pool, V,.,,d 33,021 ft3 Volume, forebay (sum of forebays if more than one forebay) ft3 Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAW ratio 1.69 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, V,,,,_p.i 33,021 ft' Area provided, permanent pool, 4._pod 12,414 W Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, qv, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, P,,. j., 12,414 ft` Area, bottom of 1 Oft vegetated shelf, Aa shelf 9,710 ft Area, sediment cleanout, top elevation (bottom of pond), &lyq,d 5,979 ff "Depth" (distance blw bottom of IN shelf and top of sediment) 3.50 ft Average depth calculated 3.30 ft OK Average depth used in SAIDA, q, (Round to nearest 0.5ft) 3.0 ft Insufficient. Check calculation. Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if-non-circular) in2 Coefficient of discharge (C)) 0.60 (unitless) Driving head (Ft) 1.80 ft Drawdown through weir? n (Y or N) Weir type (unitless) Coefficient of discharge (CN) (unitless) Length of weir (L) ft Driving head (H) ft Pre-development 1-yr, 24-hr peak flow 15.61 ft3/sec Post-development 1-yr, 24-hr peak flow 11.47 ft3/sec Storage volume discharge rate (through discharge orifice or weir) 0.14 ft lsec Storage volume drawdown time 2.00 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio 4 :1 OK Length to width ratio 5.0 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 0.5 ft Insufficient freeboard, minimum of 1-ft required Vegetated filter provided? n (Y or N) Insufficient. Vegetated filter required. Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build-out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: gate valve Form SW401-Wet Detention Basin-Rev-8-9/17/09 Parts I & 11 Design Summary, Page 2 of 2 Permit No NCQENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part HI) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) 0 61 ?UJ C )6! I. PROJECT INFORMATION Project name Alslon Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 4 14, DESIGN INFORMATION Site Characteristics Drainage area 261,360 fe Impervious area, post-development 113,256 fe % impervious 43.33 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp pool? Elevation of the top of the additional volume 9,584 ft3 OK 9,888 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 Whir OK 15.61 ft3/sec 11.47 ft3lsec A.14 ft3/sec 343.00 fmsl 344.50 fmsl Imsl 343.50 fmsl 342.50 fmsl 339.00 fmsl 338.00 fmsl 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev B-9/17/09 Parts 1811 Design Summary, Page 1 of 2 Permit No (to be provided by D WQ) 111. DESIGN' INFORMATION Surface Areas Area, temporary pool 7,756 ft? Area REQUIRED, permanent pool 4,809 fe SAIDA ratio 1.84 (unitless) Area PROVIDED, permanent pool, ?__,.I 4,897 ft' OK Area, bottom of 10ft vegetated shelf, A,,, ,heIl 3,346 ft` Area, sediment cleanout, top elevation (bottom of pond), Qol_ood 1,418 ft` Volumes Volume, temporary pool 9,888 ft3 OK Volume, permanent pool, 10,290 ft3 Volume, forebay (sum of forebays if more than one forebay) ft3 Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85 % Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 1.84 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, V?m_pcd 10,290 ft' Area provided, permanent pool, A?,,,,_pw 4,897 ft Average depth calculated ft Need 3 ft min. Average depth used in SAIDA, 4, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, P,,,,,_pd 4,897 ftL Area, bottom of 1 Oft vegetated shelf, At ,,ejl 3,346 ft` Area, sediment cleanout, top elevation (bottom of pond), Q„_p d 1,418 fl2 "Depth" (distance b/w bottom of 1 Oft shelf and top of sediment) 3.50 ft Average depth calculated 3A0 ft OK Average depth used in SAIDA, 4, (Round to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (F6) Drawdown through weir? Weir type Coefficient of discharge (C„) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: y (Y or N) 2.00 in inz 0.60 (unitless) 1.50 ft (Y or N) (unitless) (unitless) ft ?ft 15.61 ft3lsec 11.47 ft3lsec 0.13 ft3lsec 2.00 days OK, draws down in 2-5 days. 3 :1 OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK YT (Y or N) OK 0.5 ft Insufficient freeboard, minimum of 1-ft required n (Y or N) Insufficient Vegetated filter required- y (Y or N) OK y (Y or N) OK pump required Form SW401-Wet Detention Basin-Rev 8-9117/09 Parts I. & 11 Design Summary, Page 2 of 2 A 7-PA (}'r ifFA;itrra .. NCDENR ^? STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGE TATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. 1. PROJECT INFORMATION Project name Alston Pond Contact name Troy Beasley Phone number 919-469-3340 Date January 25, 2011 Drainage area number BMP #2 H. DESIGN INFORMATION The purpose of the LS-VFS Buffer Rule: Diffuse Flow Stormwater enters LS-VFS from A BMP Type of VFS Protected riparian buffer (slope < 5%) Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area ftZ Do not complete this section of the form. Impervious surface area ftz Do not complete this section of the form. Percent impervious % Do not complete this section of the form. Rational C coefficient Do not complete this section of the form. Peak flow from the 1 in/hr storm cfs Do not complete this section of the form. Time of concentration min Do not complete this section of the form. Rainfall intensity, 10-yr storm in/hr Do not complete this section of the form. Peak flow from the 10-yr storm cfs Do not complete this section of the fo+m. Design storm Pick one: Maximum amount of flow directed to the LS-VFS cfs Do not complete this section of the form. Is a flow bypass system going to be used? (Y or N) Do not complete this section of the form. Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Wet detention pond Peak discharge from the BMP during the design storm 0.86 cfs Peak discharge from the BMP during the 10-year storm 0.86 cfs Maximum capacity of a 100-foot long LS-VFS 2 cfs Peak flow directed to the LS-VFS 0.86 cfs Is a flow bypass system going to be used? y (Y or N) Explanation of any "Other" responses above LS-VFS Design Forebay surface area sq ft Depth of forebay at stormwater entry point in Depth of forebay at stormwater exit point in Feet of level lip needed per cfs 50 fvcfs Computed minimum length of the level lip needed ft Length of level lip provided ft Form SW401 - LS-VFS - 29Nov2010 - Rev 8 page 1 of 3 Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above , ft fmsl fmsl (Y or N) (Y or N) Y (Y or N) Y (Y or N) Please provide plan details of flow splitter 8, supporting calcs 2.00 ft 4.00 ft 12.00 ft 0-85 ft 1.15 ft 3,84 ft/sec Pick one: &9 W G41An1Ar_-[- N (Y or N) Y (Y or N) W N # L 1 EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, Off-site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Forebay (if applicable), High flow bypass system, Maintenance access, Proposed drainage easement and public right of way (ROW), and Boundaries of drainage easement. Initials Page or plan sheet number and any notes: del -S.? ZZ-2`2 -Z 600 t-OTP('t_ 15 00 s?tr Z 3 Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 2 of 3 2- Plan details (1' = 30' or larger) for the level spreader showing: Forebay (if applicable), High flow bypass system, One foot topo lines between the level lip and lop of stream dank, Proposed drainage easement, and Design at ultimate build-gift. 3. Section view of (lie level spreader (3' = 20' or larger) showing: - Underdrain system (if applicable), Level lip, Upslope channel, and Downs Iope filler fabric. 4. Plan details of the flow splitling device and supporting calculations (if applicable), 5. A construction sequence Ihal shows haw the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. It a non-engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7- The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. ?t ZY I - I r Psz0"14 rk I i e_QrI Pc (--r- PR6V 1?b Form SW401 - LS-VF5 -29Nov2olo - Rev.8 page 3 of 3 BMP #2 HIGH FLOW BYPASS Project Description Friction Method Solve For Input Data Roughness Coefficient Channel Slope Left Side Slope Right Side Slope Bottom Width Discharge Results Normal Depth Flow Area Wetted Perimeter Top Width Critical Depth Critical Slope Velocity Velocity Head Specific Energy Froude Number Flow Type GVF Input Data Downstream Depth Length Number Of Steps GVF Output Data Upstream Depth Profile Description Profile Headloss Downstream Velocity Upstream Velocity Normal Depth Critical Depth Channel Slope Critical Slope 1/28/20119:05:13 AM Manning Formula Normal Depth Subcritical 0.069 006000 ft/ft 2.00 ft/ft (H:V) 2.00 ft/ft (H:V) 4.00 ft 18.60 Wis 0.85 ft 4.85 ft2 7.80 ft 7.40 ft 0.77 f[ 0.08793 ft/ft 3.84 ft/s 0.23 ft 1.08 ft 0.84 0.00 ft 0.00 ft 0 0.00 ft 0.00 ft Infinity ft/s Infinity ft/s 0.85 ft 0.77 ft 0.06000 ft/ft 0.08793 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster [08.01.071.00] 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 HCDEMR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM LEVEL SPREADER - VEGETATED FILTER STRIP (LS-VFS) SUPPLEMENT This form must be completely filled out, printed, initialed, and submitted. #. PROJECT INFORMATION Project name Alston Pond Contact name Troy Beasley Phone number 919.469-3340 Date January 25, 2011 Drainage area number BMP #4 The purpose of the LS-VFS Stormwater enters LS-VFS from Type of VFS Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from the Drainage Area Drainage area Impervious surface area Percent impervious Rational C coefficient Peak flow from the 1 in/hr storm Time of concentration Rainfall intensity, 10-yr storm Peak flow from the 10-yr storm Design storm Maximum amount of flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above If Stormwater Enters the LS-VFS from a BMP Type of BMP Peak discharge from the BMP during the design storm Peak discharge from the BMP during the 10-year storm Maximum capacity of a 100-foot long LS-VFS Peak flow directed to the LS-VFS Is a flow bypass system going to be used? Explanation of any "Other" responses above LS-VFS Design Forebay surface area Depth of forebay at stormwater entry point Depth of forebay at stormwater exit point Feet of level lip needed per cfs Computed minimum length of the level lip needed Length of level lip provided Buffer Rule: Diffuse Flow A BMP Engineered filter strip (graded & sodded, slope < 8%) ft z Do not complete this section of the form. ft z Do not complete this section of the form- % Do not complete this section of the form. Do not complete this section of the form, cfs Do not complete this section of the form, min Do not complete this section of the form, in/hr De not complete this section of the form. cfs Do not complete this section of the form. Pick one: cfs Do not complete this section of the form. (Y or N) Do not complete this section of the form. Wet detentio n pond 0.5 cfs 0.5 cfs 10 cfs 0.5 cfs y (Y or N) sq ft in in 10 fucfs ft ft Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 1 of 3 Width of VFS Elevation at downslope base of level lip Elevation at the end of the VFS that is farthest from the LS Slope (from level lip to the end of the VFS) Are any draws present in the VFS? Is there a collector swale at the end of the VFS? Bypass System Design (if applicable) Is a bypass system provided? Is there an engineered flow splitting device? Dimensions of the channel (see diagram below): M B W y (flow depth for 10-year storm) freeboard (during the 10-year storm) Peak velocity in the channel during the 10-yr storm Channel lining material Does the bypass discharge through a wetland? Does the channel enter the stream at an angle? Explanation of any "Other" responses above ft fmsl fmsl (Y or N) (Y or N) Y (Y or N) Y (Y or N) 2.00 ft 4.00 ft 12.00 ft 0.62 ft 1.38 ft 4.57 ft/sec Pick one: Please provide plan details of flow splitter & supporting calcs. N (Y or N) N (Y or N) Redesign channel so that it enters the stream at an angle Channel enters along wetland edge as stated in the above cell W EDIT Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Requried Item: 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Forebay (if applicable), - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), and - Boundaries of drainage easement. Initials Page or plan sheet number and any notes: C)o Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 2 of 3 2. Plan details (1" = 30' or larger) for the level spreader showing: - Forebay (if applicable), - High flow bypass-system, - One foot topo lines between the level lip and top of stream bank, - Proposed drainage easement, and - Design at ultimate build-out. 3. Section view of the level spreader (1" = 20' or larger) showing: - Underdrain system (if applicable), - Level lip, - Upslope channel, and - Downslope filter fabric, 4. Plan details of the flow splitting device and supporting calculations (if applicable). 5. A construction sequence thatshows how the level spreader will be protected from sediment until the entire drainage area is stabilized. 6. If a non-engineered VFS is being used, then provide a photograph of the VFS showing that no draws are present. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement e L -C' . ZY Mt_ 4 y1'1 ?•? ? ? t I QRaV'd? +? SWr^ 2ir Pof?' PROV1?r<D Form SW401 - LS-VFS - 29Nov2010 - Rev.8 page 3 of 3 BMP #4 HIGH FLOW BYPASS Project Description Friction Method Manning Formula Solve For Normal Depth Input Data Roughness Coefficient 0.069 Channel Slope 0.12000 ft/ft Left Side Slope 2.00 ft/ft (H:V) Right Side Slope 2.00 ft/ft (H:V) Bottom Width 4.00 ft Discharge 14.83 ft'/s Results Normal Depth 0.62 ft Flow Area 3.25 ftZ Wetted Perimeter 6.77 ft Top Width 6.48 ft Critical Depth 0.67 ft Critical Slope 0.09088 ft/ft Velocity 4.57 ft/s Velocity Head 0.32 ft Specific Energy 0.94 ft Froude Number 1.14 Flow Type Supercritical GVF Input Data Downstream Depth 0.00 ft Length 0.00 ft Number Of Steps 0 GVF Output=Data Upstream Depth 0.00 ft Profile Description Profile Headloss 0.00 ft Downstream Velocity Infinity ft/s Upstream Velocity Infinity ft/s Normal Depth 0.62 ft Critical Depth 0.67 ft Channel Slope 0.12000 ft/ft Critical Slope 0.09088 ft/ft Bentley Systems, Inc. Haestad Methods Solution Center Bentley FlowMaster (08.01.071.00] 1/28120119:15:56 AM 27 Siemons Company Drive Suite 200 W Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 1 WITHERS & RAVENEL Alston Pond Stormwater Management Plan Fuquay-Varina, North Carolina Prepared For: North Broad Street, LLC 2401 Weston Parkway, Suite 203 Cary, NC 27513 Prepared By: WITHERS & RAVENEL, INC 111 MacKenan [give Cary, North Carolina 27511 January 2011 W&R Project No. 02100349 i ALWY V. SMITH III, P.E. INTRODUCTION The purpose of this study is to document pre- and post-development peak stormwater discharges for the 1-year and io-year design storm events as well as study the loo-year water surface elevations in the stormwater BMPs. The goal is to provide adequate stormwater detention devices to safely maintain a discharge less than or equal to the pre-development peak discharges after the site has been developed as well as to provide storage for the post-development volume in excess of the pre- development runoff volume. Wet detention basins are proposed for this development to meet all town and DWQ criteria for peak attenuation and water quality. METHODOLOGY The stormwater study was conducted using the natural drainage features as depicted by field survey data and proposed development within the drainage areas. The drainage areas of each pond were entered into the model as a single drainage area based on natural and proposed drainage patterns, to evaluate post development peak discharge rates and runoff volumes. There are four stormwater devices proposed for the site to meet peak attenuation, water quality and storage requirements. Stormwater is collected in catch basins and conveyed via storm sewer to the wet detention basins. The scope of work included the following analyses: Hydrolo?y ? Estimation of the s.o" runoff volume and the i-year 24 hour runoff volume ? Estimation of the time of concentration for the pre- and post-development conditions ? Simulation of the 1-year, io-year and soo-year rainfall events for the Fuquay-Varina area ? Formulation of the 1-year, to-year and ioo-year flood hydrographs for the pre- and post- development drainage areas Hydraulic ? Routing the 1-year, 1o-year and loo-year flood hydrographs for post development runoff through the proposed infiltration system. Culvert Sizing ? There are 3 culvert crossings on site, sized for the 25-year storm and to not overtop the road in the soo-year storm The results of the hydrology calculations are used in the hydraulic analyses. The hydraulic design requires the development of stage-storage and stage-discharge functions for the wet ponds. The rainfall/runoff hydrographs, stage-storage and stage-discharge functions have been compiled to create a routing computer simulation model using Bentley PondPack vso.o software. This PondPack model was then used to assess the impact of the peak discharges for the design rainfall events. The PondPack modeling results are provided as appendices to this report. SITE DESCRIPTION The proposed residential development is located on a 138 acre parcel, which is anticipated to be approximately 31% impervious. The existing site is generally gently sloping, draining to the northeast. Existing land use is approximately 75% forested and 25% agricultural fields Wetlands and streams on site are within the Neuse River basin and are tributaries to Basal Creek (Stream Index #27- 43-15-3, Classification B;NSW), which is on the eastern boundary of the property. HYDROLOGY The SCS Method was used to develop runoff hydrographs for the Type II, 24-hour duration, 1-year storm and NOAA Atlas 14 rainfall data was used for the 1o-year and loo-year storm events for the Fuquay-Varina area. This method requires three basic parameters: a curve number (CN), time of concentration (Q, and drainage area. Curve numbers were based on soil type and land use. Soil types were delineated from the Soil Survey of Wake County, North Carolina. Land use for existing conditions was based on the most recent Wake County aerial photographs. Post development land use is residential based on the proposed site plan. Time of concentration was calculated using methods described in the SCS publication "Urban Hydrology for Small Watersheds, TR-55" and the flow time through the storm sewer, as calculated by our Storm CAD Model for each drainage area, in conjunction with field survey data. Drainage areas were delineated from the proposed grading plans for post development conditions. A summary of data used to formulate hydrographs and peak discharges are included in the appendices of this report. HYD RAU ?Z'S Computer simulated reservoir routing of the 1-year, 1o-year and loo-year design storms utilized stage-storage and stage-discharge functions. Stage-storage functions were derived from the proposed contours for each pond. A non-linear regression relation for surface area versus elevation was derived for each pond. This relation estimates the incremental volume of the basin to the stage or elevation of the basin. Stage-discharge functions were developed to size the outlet structure for each pond. CONCLUSIONS Based on the routing study, the post development peak discharge from the entire site is less than the pre-development peak for the 1-year, and 1o-year design storms. All BMPs provide at least 6" of freeboard in the loo-year storm. Additionally, the ponds discharge at non-erosive velocities through at least 30' of natural wetlands in place of a constructed vegetated filter strip. The table below summarizes the peak attenuation results. TABLE 1. PRE DEVELOPMENT RUNOFF SUMMARY 1 Outflow -year Q eak 10-year Qpeak loo-year Qpeak p Outflow Outflow Pre Development Runoff 15.61 cfs 117.62 cfs 256.79 cfs TABLE 2. PEAK ATTENUATION SUMMARY FOR THE 1-YEAR DESIGN STORM 1-year Qpeaklnflow 1-year Qpeak Outflow BMP 1 50.63 3.92 BMP 2 62.72 3.87 BMP 3 22.76 1.47 BMP 4 13.06 4.58 Untreated 2.55 y? Post Development Runoff 11.47 cfs TABLE 3. PEAK ATTENUATION SUMMARY FOR THE 10-YEAR DESIGN STORM 1o-year Qpeak Inflow 1o-year Qpeak Outflow BMP 1 111.20 34.61 BMP 2 137.77 18.60 BMP 3 62.23 31.19 BMP 4 31.11 14.83 Untreated 30.86 Post Development Runoff A 115 .60 cfs WET DETENTION POND OUTLET SUMMARY BMP1 • 6'x6' Inlet Box with slab top - Crest = 345.20 (6'x 6' I.D.) • 4" diameter drawdown orifice - Invert @ 342.00 • 3x 4' wide x 6" high peak attenuation orifices @ 343.80 • 54" dia. RCP outlet barrel - INV UP = 340.33, INV DN = 340.00 • Top of Berm = 347.00 • loo-year freeboard = 0.8' BMW2 • 6'x6' Inlet Box with slab top - Crest = 370.00 (6'x 6' I.D.) • 2.3" diameter drawdown orifice - Invert @ 365.00 • 4' wide x 6" high peak attenuation orifice @ 367.4 • 42" dia. RCP outlet barrel - INV UP = 359.00, INV DN = 358.58 • Top of Berm = 372.00 • soo-year freeboard = 0.8' BMW 3 • 5'x5' Inlet Box with slab top - Crest = 384.25 (5'x 5' I.D.) • 2" diameter drawdown orifice - Invert @ 381.00 • 2.5' wide x 12" high peak attenuation orifice @ 382.80 • 36" dia. RCP outlet barrel - INV UP = 376.00, INV DN = 372.00 • 33' Emergency Spillway @ 383.80 • Top of Berm = 385.00 • loo-year freeboard = 0.5' BMP 4 • 4'x4' Inlet Box with slab top - Crest = 346.00 W x 4' I.D.) • 2" diameter drawdown orifice - Invert @ 343.00 • 2.5' wide x 12" high peak attenuation orifice @ 344.50 • 24" dia. RCP outlet barrel - INV UP = 338.00, INV DN = 337.00 • Top of Berm = 347.00 0 loo-year freeboard = 0.5' STQRMWATER CALCULATIONS Job File: K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ALSTON POND BMPS.PPW Rain Dir: K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ JOB TITLE ----------------- Project Date: 12/3/2010 Project Engineer: asmith Project Title: Alston Pond Project Comments : S/N: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Table of Contents i Table of Contents ********************** MASTER SUMMARY ********************** Watershed....... Master Network Summary ............. 1.01 ****************** DESIGN STORMS SUMMARY ******************* RDU NOAA 14 Desi Design Storms ...................... 2.01 RDU NOAA 14 Desi 10 Design Storms ...................... 2.02 ********************** TC CALCULATIONS ******************** DA 1............ Tc Calcs ........................... 3.01 DA 2............ Tc Calcs ........................... 3.03 DA 3............ Tc Calcs ........................... 3.05 DA 4............ Tc Calcs ........................... 3.07 PRE-DEV AREA.... Tc Calcs ........................... 3.09 UNTREATED....... Tc Calcs ........................... 3.11 ********************** CN CALCULATIONS ********************* DA 1............ Runoff CN-Area ..................... 4.01 DA 2............ Runoff CN-Area ..................... 4.02 DA 3............ Runoff CN-Area ..................... 4.03 S/N: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Table of Contents ii Table of Contents (continued) DA 4............ Runoff CN-Area ..................... 4.04 PRE-DEV AREA.... Runoff CN-Area ..................... 4.05 UNTREATED....... Runoff CN-Area ..................... 4.06 *********************** POND VOLUMES ******************** BMP 1........... Vol: Elev-Area ..................... 5.01 BMP 2........... Vol: Elev-Area ..................... 5.02 BMP 3........... Vol: Elev-Area ..................... 5.03 BMP 4........... Vol: Elev-Area ..................... 5.04 ********************** POND ROUTING ******************** BMP 1........... Pond E-V-Q Table ................... 6.01 BMP 2........... Pond E-V-Q Table ................... 6.04 BMP 3........... Pond E-V-Q Table ................... 6.08 BMP 4........... Pond E-V-Q Table ................... 6.11 SIN: Bentley PondPack (10.00.027.00) Bentley Systems, Inc. 2:28 PM 12/21/2010 Type.... Master Network-Summary Page 1.01 Name.... Watershed File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: RDU NOAA 14 Desi Total Depth Rainfall Return Event in Type RNF ID - -- ------------ 10 ------ 4.9800 ---------------- Time-Depth Curve ----------- -- RDU NOAA 10yr 100 7.3700 Time-Depth Curve RDU NOAA 100yr 1 3.0000 Synthetic Curve TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Max Retur3i HYG Vol Qpeak Qpeak Max WSEL Pond Storage Node 1D Type Event ac-ft Trun hrs cfs ft ac-ft --------- ----- BMP ------ I ------ IN ---- POND ------ 10 ---------- 7.541 -- -------- 12.1500 -------- 111.20 -------- --- BMP I IN POND 100 13.336 12.1500 161.24 F3MP 1 IN POND 1 3.219 12.0000 50.63 BMP 1 OUT POND 10 7.456 R 12.4500 34.61 345.18 3.201 BMP 1 OUT POND 100 13.248 R 12.3500 98.76 346.17 4.381 BMP 1 OUT POND 1 3.139 R 13.1500 3.92 343.88 1.766 BMP 2 IN POND 10 9.747 1.2.1500 137,77 BMP 2 IN POND 100 15.322 12.1500 196.85 BMP 2 IN POND 1 3.802 12.0000 62.72 f3MP 2 OUT POND 10 8.681 R 12.6000 18.60 370.08 4.535 BMP 2 OUT POND 100 15.253 R 12.3000 119.49 371.25 5.790 BMP 2 OUT POND 1 3.741 R 13.4000 3.87 367.64 2.143 BMP 3 IN POND 10 3.244 12.1000 62.23 EMP 3 IN POND 100 5.970 12.1000 93.45 !3tii 3 IN POND 1 1.281 11.9500 22.76 5/N: Bentley Pond Pack (10.00.027.00) 2:28 Pig] Bentley Systems, Inc. 12121,12010 Type.... Master Network Summary Page 1.02 Name.... Watershed File.... K:\10\10-0340\100349-Pre3ton - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (True= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event ac-ft Trun ------------ BMP 3 ----- OUT ---- POND ------ 10 ---------- 3.199 -- R BMP 3 OUT POND 100 5.920 R BMP 3 OUT POND 1 1.241 R BMP 4 IN POND 10 1.632 BMP 4 IN POND 100 2.833 BMP 4 IN POND 1 .722 BMP 4 OUT POND 10 1.630 BMP 4 OUT POND 100 2.830 BMP 4 OUT POND 1 .719 DA 1 AREA 10 7.541 DA 1 AREA 100 13.336 DA 1 AREA 1 3.219 DA 2 AREA 10 8.747 DA 2 AREA 100 15.322 DA 2 AREA 1 3.802 DA 3 AREA 10 3.244 DA 3 AREA 100 5.970 DA 3 AREA 1 1.281 DA 4 AREA 10 1.632 DA 4 AREA 100 2.833 DA 4 AREA 1 .722 *POST-DEV JCT 10 24.684 R *POST-DEV JCT 100 46.307 R "POST-DEV JCT 1 9.587 R 'PRE-DEW JCT 10 13.314 *PRE-DEV JCT 100 30.634 'PRE-DEV JCT 1 3.149 Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft ac-ft --------- 12.2500 -------- 31.19 -------- 384.11 ------------ 1.180 12.1500 82.47 384.50 1.352 13.2500 1.47 382.91. A79 12.1000 31.11 12.1000 43.55 11.9500 13.06 12.2500 14.83 345.98 .517 12.2000 29.49 346.47 .627 12.1000 4.58 344.87 .291 12.1500 111.20 12.1500 161.24 12.0000 50.63 12.1500 137.77 12.1500 196.85 12.0000 62.72 12.1000 62.23 12.1000 93.45 11.9500 22.76 12.1000 31.11 12.1000 43.55 11.9500 13.06 12.3000 115.60 12.3000 354.18 13.1000 11.47 12.4000 117.62 12.3500 256.79 12.3000 15.61 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type.... Master Network Summary Page 1.03 Name.... Watershed File.... K:\10\10-0340\100349-Preston - Alston Fond\H-H\Pondpak\Alston Pond BMPs.ppw MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Trun cation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Qpeak Qpeak Node ID Type Event ac-ft Trun hrs cfs -------- --------------- PRE-DEV AREA -- ---- AREA ------ 10 ---------- 13.314 -- -------- 12.4000 - 117.62 PRE-DEV AREA AREA 100 30.634 12.3500 256.79 PRE-DEV AREA AREA 1 3.149 12.3000 15.61 UNTREATED AREA 10 3.718 12.4000 30.86 UNTREATED AREA 100 9.056 12.4000 74.44 UNTREATED AREA 1 .747 12.3500 2.55 WN: Bentley PondPack (10.00.027.010) 2:28 I'M Max Max WSEL Pond Storage ft ac-ft -------- ------------ Bentley Systems, Inc. 12/21/2010 Type.... Design Storms Name.... RDU NOAA 14 Desi Page 2.01 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw Title... Project Date: 12/3/2010 Project Engineer: asmith Project Title: Alston Pond Project Comments: DESIGN STORMS SUMMARY Design Storm File,ID = RDU NOAA 14 Desi Storm Tag Name = 10 Data Type, File, ID = Time-Depth Curve RDU NOAA 10yr Storm Frequency = 10 yr Total Rainfall Depth= 4.9800 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 100 Data Type, File, ID = Time-Depth Curve RDU NOAA 100yr Storm Frequency = 100 yr Total Rainfall Depth= 7.3700 in Duration Multiplier = 1 Resulting Duration = 23.9990 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9990 hrs Storm Tag Name = 1 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Design Storms Page 2.02 Name.... RDU NOAA 14 Desi Event: 10 yr File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw Storm... RDU NOAA 10yr Tag: 10 DESIGN STORMS SUMMARY Design Storm File,ID = RDU NOAA 14 Desi Storm Tag Name = 10 Data Type, File, ID = Time-Depth Curve RDU NOAA 10yr Storm Frequency = 10 yr Total Rainfall Depth= 4.9800 in Duration Multiplier = 1 Resulting Duration = 23.9904 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9904 hrs Storm Tag Name = 100 Data Type, File, ID = Time-Depth Curve RDU NOAA 100yr Storm Frequency = 100 yr Total Rainfall Depth= 7.3700 in Duration Multiplier = 1 Resulting Duration = 23.9990 hrs Resulting Start Time= .0000 hrs Step= .0833 hrs End= 23.9990 hrs Storm Tag Name = 1 Data Type, File, ID = Synthetic Storm TypeII 24hr Storm Frequency = 1 yr Total Rainfall Depth= 3.0000 in Duration Multiplier = 1 Resulting Duration = 24.0000 hrs Resulting Start Time= .0000 hrs Step= .1000 hrs End= 24.0000 hrs SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Tc Calcs Name.... DA 1 Page 3.01 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: User Defined Segment #1 Time: .0812 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Sheet Mannings n .2000 Hydraulic Length 50.00 ft 2yr, 24hr P 3.4400 in Slope. .025000 ft/ft Avg.Velocity .13 ft/sec Segment #2 Time: .1041 hrs -----------_--------------------------------------------_-----------------_ Total Tc: .1853 hrs SIN: Bentley Systems, Inc. BenL.l.ey Pond Pack (10.00.02'1.00) 2:23 PM 1.212112010 Type.... Tc Calcs Name.... DA 1 Page 3.02 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------- -_== User Defined Tc = Value entered by user Where: Tc = Time of concentration _=== SCS TR-55 Sheet Flow _______________ Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, % SIN: Bentley Systems, Inc. Bentley Fond Pack (10.00.027.00) 2:23 PM 12/21/2010 Tv;:ye .... Tc Ca 1 cs tvanie.... DA 2 Page 3.03 F'ile.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw TIME OF CONCENTRATION CALCULATOR ........................................................................ Segment #1: Tc: TR-55 Sheet Mannings n Hydraulic Length 2yr, 24hr P Slope Avg.Velocity .2000 50.00 ft 3.4400 in 025000 ft/ft 13 ft/sec Segment #1 Time: .1041 hrs ------------------------------------------------------------------------ Segment #2: Tc: TR-55 Channel Flow Area Wetted Perimeter Hydraulic Radius Slope Mannings n Hydraulic Length 1.2300 sq.ft 3.93 ft .31 ft .039000 ft/ft .0130 2073.00 ft Avg.Velocity 10.43 ft/sec Segment #2 Time: .0552 hrs ------------------------------------------------------------------------ Total. Tc: .1593 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type.... Tc Calcs Name.... DA 2 Page 3.04 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==== SCS TR-55 Sheet Flow ___ __ Tc = (.007 * ((n * Lf)**0.8)) / ((P**.5) * (Sf**.4)) Where: Tc = Time of concentration, hrs n = Mannings n Lf = Flow length, ft P = 2yr, 24hr Rain depth, inches Sf = Slope, o ==_= SCS Channel Flow R = Aq / Wp V = (1.49 * (R**(2/3)) * (Sf**-0.5)) / n Tc = (Lf / V) / (3600sec/hr) Where: R Aq Wp V Sf n Tc Lf Hydraulic radius Flow area, sq.ft. Wetted perimeter, ft Velocity, ft/sec Slope, ft/ft Mannings n Time of concentration, hrs Flow length, ft SIN: Bentley PondPack (10.00.021.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Tc Calcs Name.... DA 3 Page _x.05 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ ------------------------------------------------------------------------ Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ Total Tc: .0833 hrs Calculated TC < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type.... Tc Calcs Name.... DA 3 Page 3.06 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ---------------------------------------------- ------------------------- Tc Equations used... ----------- ------------------------------------------------------------- User Defined ====- Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Tc Calcs Name.... DA 4 Page 3.07 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ................................... TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: User Defined Segment #1 Time: .0833 hrs ------------------------------------------------------------------------ Total Tc: .0833 hrs Calculated Tc < Min.Tc: Use Minimum Tc... Use Tc = .0833 hrs S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type.... Tc Calcs Name.... DA 4 Page 3.08 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ------------------------------------------------------------------------- Tc Equations used... ------------------------------------------------------------------------ User Defined ================-=----___---°-- Tc = Value entered by user Where: Tc = Time of concentration S/N: Bentley PondPack (10.00.02V.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Tc Calcs Name.... PRE-?EV AREA Page 3.09 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw TIME OF CONCENTRATION CALCULATOR Segment #1: Tc: Kirpich (TN) Hydraulic Length 5597.00 ft Slope .019700 ft/ft Multiplier 1.000 (Tc Adjustment) Avg.Velocity 3.43 ft/sec Segment #1 Time: .4534 hrs ------------------------------------------------------------------------ Total Tc: .4534 hrs ----------- S /N: Bentley PondPack (10.00.027.00) 2.28 1+1 Bentley Systems, liic- 12/21./20LO Page .3. 10 File.... K:110\10-0340\100343-Pre.st=ori - Alston Pond1H-H\Pondpak\A1ston Pond BMPs.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ ==== Kirpich (TN) Tc = 0.00013 * (Lf**0.77) * (Sf**-0.385) * Mt Where: Tc = Time of concentration, hrs Lf = Flow length, ft Sf = Slope, ft/ft Mt = Tc Multiplier (Tc adjustment) SIN: Bentley Systems, Inc. :Beni ;ey Pond Pack 110.00.027.00) 2:28 PM 1712:1.12010 Type.... Tc Calcs Name.... UNTREATED Pane 3.11 file,... Ii:\10\10-0390\100349-Preston - Alston Pond\H-H\Pondpak\Alston Fond BMPs.ppw ........................................................................ ........................................................................ TIME OF CONCENTRATION CALCULATOR ........................................................................ ........................................................................ Segment #1: Tc: Kirpich (TN) Hydraulic Length 5597.00 ft Slope .019700 ft/ft Multiplier 1.Q00 (Tc Adjustment) Avg.Velocity 3.43 ft/sec Segment #1 Time: .4534 hrs ------------------------------------------------------------------------ Total Tc: .4534 hrs SIN: Bentley Sy;sterns, Inc:. Bentley PondPack (10.00.027.00) 2:28 PM 1.2/21/2010 Type.... Tc Calcs Name.... UNTREATED Page 3.12 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw ------------------------------------------------------------------------ Tc Equations used... ------------------------------------------------------------------------ Kirpich (TN) _____----- __________________ Tc = 0.00013 * (Lf**0.77) * (Sf**-0.385) * Mt Where: Tc = Time of concentration, hrs Lf = Flow length, ft Sf = Slope, ft/ft Mt = Tc Multiplier (Tc adjustment) SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Runoff CN-Area Name.... DA 1 Page 4.01 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN -------------------------------- ---- --------- ----- ----- ------ Impervious Areas - Paved parking to 98 15.620 98.00 Open space (Lawns,parks etc.) - Goo 61 16.880 61.00 COMPOSITE AREA & WEIGHTED CN ---> 32.500 78.78 (79) ........................................................................... ........................................................................... S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type.... Runoff CN-Area Name.... DA 2 Page 4.02 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ------ Impervious 98 18.750 98.00 Open Space 61 17.750 61.00 COMPOSITE AREA & WEIGHTED CN ---> 36.500 80.01 (80) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 7:28 PM 12/21/2010 Type.... Runoff CN-Area Name.... DA 3 Sage 4 .03 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- ------ Impervious 98 6.240 98.00 Open Space 61 9.760 61.00 COMPOSITE AREA & WEIGHTED CN ---> 16.000 75.43 (75) ........................................................................... ........................................................................... SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Runoff CN-Area Name.... DA 4 Page 4.04 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN -------------------------------- ---- --------- ----- ----- Impervious 98 3.600 98.00 Open Space 61 3.000 61.00 COMPOSITE AREA & WEIGHTED CN ---> 6.600 81.18 (81) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type.... Runoff CN-Area Name.... PRE-DEV AREA Page 4.05 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres oC oUC CN -------------------------------- ---- --------- ----- ----- ------ Woods - grass combination - good 58 138.000 58.00 COMPOSITE AREA & WEIGHTED CN -- 138.000 58.00 (58) SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Runoff CN-Area Name.... UNTREATED Pack 4.06 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw RUNOFF CURVE NUMBER DATA .......................................................................... .......................................................................... Impervious Area Adjustment Adjusted Soil/Surface Description CN acres %C %UC CN ----------------------- ---------- ---- --------- ------ Woods - goon 55 46.000 55.00 COMPOSITE AREA & WEIGHTED CN ---> 46.000 55.00 (55) ........................................................................... ........................................................................... SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 1212112010 Type.... Vol: Elev-Area Name.... BMP 1 Page 5.01 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) (ac-ft) ---- (ac-ft) ------------- ------------ 342.00 --------------------- --°-- 34307 ---------------- 0 ------- .000 .000 343.00 °---- 42222 114588 .677 .87'7 344.QO ----- 45931 132264 1.012 1..'989 345.00 ----- 49805 143641 1.099 2.988 346.00 ----- 53691 155208 1.188 4.176 347.00 ----- 57637 166957 1.278 5.453 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 T''ypi.... Vol: Flev-area Namr.... BMP 2 Page 5.02 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw Elevation Planimeter Area Al+A2+sgr(A1*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) (ac-ft) - ----- (ac-ft) ------------- ------------ 365.00 --------------------- ----- 28282 ---------------- 0 --- - .000 .000 366.00 ----- 35498 95465 .731 .731. 367.00 °- - 38109 11.0387 .845 1.575 368.00 ----- 40561 117986 .903 2.478 369.00 ----- 42917 125200 .958 3.436 370.00 ----- 45270 132265 1.012 4.448 371.00 ----- 47736 139493 1.067 5.516 372.00 ----- 49967 146542 1.121 6.637 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Area1*Area2)) where: EL1, EL2 - Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley :`ystems, inc. Bentley PondPack (10.00.027.00) 2:28 PM 1212112010 Type.... Vol: Elev-Area Name.... BMP 3 Page 5.03 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) (ac-ft) - --- (ac-ft) ------------- ------------ 38]..00 --------------------- ----- 12414 ---------------- 0 ----- - .000 .000 382.00 ----- 16187 42777 .327 .327 383.00 ----- 17614 50686 .388 .715 384.00 ----- 18753 54542 .417 1.133 385.00 ----- 1991.9 57999 .444 1.576 386.00 ----- 20043 59943 .459 2.035 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Areal + sq.rt.(Area1*Area2)) where: ELI, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for ELI, EL2, respectively Volume = Incremental volume between ELI and EL2 SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Tyrir- Vol: Elev-Area Name. . . . [3111I1 4 Page 5.04 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPS.ppw Elevation Planimeter Area Al+A2+sgr(Al*A2) Volume Volume Sum (ft) (sq.in) (sq.ft) (sq.ft) (ac-ft) - - - (ac-ft) ------------- ------------ 343.00 --------------------- ----- 4897 ----------------- 0 -- -- - - .000 .000 344.00 ----- 7179 18005 .138 .138 345.00 ----- 8334 23248 .1.78 .316 346.00 ------ 9550 26805 .205 .521 347.00 ----- 10822 30533 .234 .754 POND VOLUME EQUATIONS * Incremental volume computed by the Conic Method for Reservoir Volumes. Volume = (1/3) * (EL2-EL1) * (Areal + Area2 + sq.rt.(Areal*Area2)) where: EL1, EL2 = Lower and upper elevations of the increment Areal,Area2 = Areas computed for EL1, EL2, respectively Volume = Incremental volume between EL1 and EL2 S/N: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Pond E-V-Q Table Page 6.01 taarne.... BMP 1 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work_pad.hyg - BMP 1 IN 10 Outflow HYG file = work pad.hyg - BMP 1 OUT 10 Pond Node Data = BMP 1 Pond Volume Data = BMP 1 Pond Outlet Data = BMP1 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 342.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 r_fs Time Increment = .0500 hrs Elevation Outflow Storage Area lnfilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs - --- cfs ------------ cfs ---------- ------------- 342.00 ----------- .00 --------- .000 ------------ 34307 ------ - .00 .00 .00 342.10 .02 .080 35062 .00 .02 38.56 342.20 .07 .161 35824 .00 .07 77.99 342.30 .14 .244 36595 .00 .14 118.28 342.40 .20 .329 37374 .00 .20 159.44 342.50 .24 .416 38162 .00 .24 201.45 342.60 .28 .504 38958 .00 .28 244.33 342.70 .31 .595 39761 .00 .31 288.09 342.80 .33 .687 40573 .00 .33 332.74 342.90 .36 .781 41394 .00 .36 378.30 343.00 .38 .877 42222 .00 .38 424.78 343.10 .41 .974 42591 .00 .41 471.93 343.20 .43 1.072 42961 .00 .43 519.48 343.30 .4• 1.171 43333 .00 .45 567.43 343.40 1? 1.271 43706 .00 .47 615.81 343.50 .48 1.372 44081 .00 .48 664.60 343.60 .5O 1.474 44458 .00 .50 713.81 343.70 J2 1.576 44837 .00 .52 763.43 343.80 .54 1.680 45216 .00 .54 813.47 343.90 4.64 1.784 45598 .00 4.64 868.03 SIN: Bentley PondPack (10.00.027.00) 2:2F3 PM Bentley Systems, Inc. 12/21/2010 Type ta,3 rn?:... . Pond E-V-Q Table BMP 1 Page 6.02 K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work pad.hyg - BMP 1 IN 10 Outflow HYG file = work pad.hyg - BMP 1 OUT 10 Pond Node Data = BMP I Pond Volume Data = BMP 1 Pond Outlet Data = BMP1 Outlets No Infiltration INITIAL CONDITIONS -------- Starting ------------- WS Elev = -------- 342.00 ---- ft - Starting Volume = .000 ac- ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storaqe Area Infiit. Q Total 2S/t + 0 ft cfs ar:-ft sq. ft cfs cfs - - cfs ---------- ----- ------ 344.00 ------------- 8.73 -------- 1.889 ---- -------- 45981 ----------- .00 --------- - 8.73 923.00 344.10 12.84 1.995 46357 .00 12.84 978.41 344.20 1.6.94 2.1.02 46734 .00 16.94 1034.23 344.30 21.01 2.210 47112 .00 21.01 1090.43 344.40 22.94 2.318 47492 .00 22.94 1144.92 344.50 29.76 2.428 47874 .00 24.76 1199.72 344.60 26.42 2.538 48257 .00 26.42 1254.79 344.70 27.98 2.649 48642 .00 27.98 1310.19 344.80 29.50 2.761 49028 .00 29.50 1365.96 344.90 30.88 2.874 49416 .00 30.88 1422.02 345.00 32.23 2.988 49805 .00 32.23 1478.50 345.10 33.55 3.103 50187 .00 33.55 1535.38 345.20 34.80 3.219 50571 .00 34.80 1592.61 345.30 38.26 3.335 50955 .00 38.26 1652.45 345.40 43.54 3.453 51342 .00 43.54 171.4.57 345.50 50.03 3.571 51730 .00 50.03 1778.32 345.60 57.55 3.690 52119 .00 57.55 1843.54 345.70 63.88 3.810 52510 .00 63,88 1908.01 345.80 70.52 3.931 52902 .00 70.52 1973.20 345.90 `17.66 4.053 53296 .00 77.66 2039.34 SIN: Bentley PondPack (10.00.027.00) 2:28 PH Bentley Systems, Inc. 12/21/2010 Type.... Pond E-V-Q Table Page 6.03 Name.... BMP 1 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work pad.hyg - BMP 1 IN 10 Outflow HYG file = work-pad.hyg - BMP 1 OUT 10 Pond Node Data = BMP 1 Pond Volume Data = BMP 1 Pond Outlet Data = BMPI Olztlets No Infiltration INITIAL CONDITIONS Starting W6 Elev = 342.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t t 0 ft cfs ac-ft sq.ft cfs cfs cfs -- ------------- 346.00 ----------- 85.38 --------- 4.176 ------------ 53691 ----------- .00 ------------ 85.38 -------- 2106.49 346.10 93.39 4.300 54079 .00 93.39 2174.38 346.20 101.64 4.424 54469 .00 101.64 2242.94 346.30 110.18 4.550 54860 .00 110.18 2312.20 346.40 118.85 4.676 55253 .00 118.85 2382.05 346.50 127.47 4.803 55647 .00 127.47 2452.28 346.60 135.82 4.932 56042 .00 135.82 2522.69 346.70 143.03 5.061 56439 .00 143.03 2592.39 346.80 148.09 5.191 56837 .00 148.09 2660.36 346.90 150.44 5.322 57236 .00 150.44 2726.09 347.00 152.54 5.453 5763) .00 152.54 2']92.02 5/N: Bentley €1ond€'ack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type..... Name... File.... Pond E-V-Q Table BMP 2 Page 6.04 K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work __pad.hyg - BMP 2 IN 10 Outflow HYG file = work pad.hyg - BMP 2 OUT 10 Pond Node Data = BMP 2 Pond Volume Data = BMP 2 Pond Outlet Data = BMP2 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 365.00 It Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .Ora cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 25/t + 0 ft cfs ac-ft sq.ft CIS cfs --------- CIS ---------- ------------ 365.00 ------------ .00 --------- .000 ------------ 28282 ----------- .00 --- .00 .00 365.10 .02 .066 28967 .00 .02 31.83 365.20 .07 .133 29660 .00 .07 64.45 365.30 .14 .202 30361 .00 .14 97.85 365.40 .20 .272 31070 .00 .20 132.05 365.50 .24 .345 31788 .00 .24 167.01 365.60 .28 .418 32513 .00 .28 202.77 365.70 .30 .494 33247 .00 .30 239.33 365.80 .33 .571 33989 .00 .33 276.70 365.90 .36 .650 34740 .00 .36 314.91 365.00 .38 .731 35498 .00 .38 353.96 366.10 .41 .812 35755 .00 .41 393.57 366.20 .43 .895 36013 .00 .43 433.46 366.30 .45 .978 36272 .00 .45 473.63 366.40 .46 1.061 36531 .00 .46 514.10 366.50 .49 1.145 36792 .00 .49 554.86 366.60 .50 1.230 37054 .00 .50 595.90 366.70 .52 1.316 37316 .00 .52 637.24 366.80 .53 1.401 37579 .00 .53 678.85 366.90 .55 1.488 37844 .00 .55 720.77 S/N: Bentley Pond Pack (10.00.02-1.00) 2:25 PM Bentley Systems, Inc. 12/21/2010 Type.... Pond E-V-Q Table Name.... BMP 2 Page 6.05 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work pad.hyg - BMP 2 IN 10 Outflow HYG file = work pad.hyg - BMP 2 OUT 10 Pond Node Data = BMP 2 Pond Volume Data = BMP 2 Pond Outlet Data = BMP2 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 365.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs ac-ft sq.ft cfs ---------- cfs ------------ cfs ---------- ------------ 367.00 ------------ .57 ---------- 1.575 ----------- 38109 - .00 .57 762.99 367.10 .58 1.663 38351 .00 .58 805.48 367.20 .60 1.751 38593 .00 .60 848.25 367.30 .61 1.840 38837 .00 .61 891.26 367.40 .63 1.930 39081 .00 .63 934.57 367.50 2.00 2.020 39325 .00 2.00 979.51 357.60 3.37 2.110 39571 .00 3.37 1024.71 367,70 4.75 2.201 39817 .00 4.75 1070.19 367.80 5.12 2.293 40064 .00 6.12 1115.94 367.90 7.51 2.385 40312 .00 7.51 1161.98 368.00 8.17 2.478 40561 .00 8.17 1207.57 368.10 8.77 2.571 40794 .00 8.77 1253.37 368.20 9.34 2.665 41027 .00 9.34 1299.40 368.30 9.88 2.760 41261 .00 9.88 1345.64 368.40 10.37 2.855 41495 .00 10.37 1392.12 358.50 10.86 2.950 41731 .00 10.86 1438.84 368.60 11.32 3.046 41967 .00 11.32 1485.81 368.70 11.77 3.143 42203 .00 11.77 1533.02 368.80 12.20 3.240 42440 .00 12.20 1580.46 368.90 12.60 3.338 42678 .00 12.60 1628.16 S/N: Bentley PondPack (10.00.027.00) 1:28 PM Bentley Systems, Inc. 12/21/2010 Type .... Pond E-V-Q Table Name. ... BMP 2 Page 6.06 'il.e.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir - K:\10\10-0340\100349-Pre3ton - Alston Pond\H-H\Pondpak\ Inflow HYG file = work-.Pad.hyg - BMP 2 IN 10 Outflow HYG file = work pad.hyg - BMP 2 OUT 10 Pond Node Data = BMP 2 Pond Volume Data = BMP 2 Pond Outlet Data - BMP2 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 365.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs cfs - --------- cfs ---------- ------------- 369.00 ----------- 13.00 --------- 3.436 ------------ 42917 ----------- .00 - - 13.00 1676.11 369.10 13.39 3.535 43149 .00 13.39 1724.31 369.20 13.76 3.634 43383 .00 13.76 1772.77 369.30 14.11 3.734 43616 .00 14.11 1821.43 369.40 14.47 3.835 43851 .00 14.47 1870.39 369.50 14.82 3.935 44086 .00 14.82 1919.59 369.60 15.15 4.037 44321 .00 15.15 1969.04 369.70 15.50 4.139 44558 .00 15.50 2018.77 369.80 15.81 4.242 44794 .00 15.81 2068.71 369.90 16.14 4.345 45032 .00 16.14 2118.94 370.00 16.45 4.448 45270 .00 16.45 2169.42 370.10 19.02 4.553 45514 .00 19.02 2222.44 370.20 23.49 4.657 45758 .00 23.49 2277.62 370.30 29.17 4.763 46003 .00 29.17 2334.26 370.40 35.84 4.868 46249 .00 35.84 2392.18 370.50 43.37 4.975 46495 .00 43.37 2451.25 370.60 51.64 5.082 46742 .00 51.64 2511.31 370.70 60.64 5.190 46989 .00 60.64 2572.39 370.80 70.26 5.298 47238 .00 70.26 2634.35 370.90 80.49 5.406 47486 .00 80.49 2697.20 S/N: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 "P +]3?7i .... Pond E-V-Q Table Cs?iiti+n .... BMP 2 Page 6.07 rile.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work pad.hyg - BMP 2 IN 10 Outflow HYG file = work-pad.hyg - BMP 2 OUT 10 Pond Node Data = BMP 2 Pond Volume Data = BMP 2 Pond Outlet Data = BMP2 Outlets No Infiltration INITIAL CONDITIONS --------- Starting ------------ WS Elev = --------- 365.00 ---- ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs - cfs ------------ cfs ---------- -------------- 371.00 ------------ 91.27 --------- 5.516 ----------- 47736 -- -------- .00 91.27 2760.88 371.10 102.54 5.626 47957 .00 102.54 2825.33 371.20 114.28 5.736 48178 .00 114.28 2890.47 371.30 124.85 5.847 48400 .00 124.85 2954.69 371.40 134.46 5.958 48622 .00 134.46 3018.20 371.50 143.66 6.070 48845 .00 143.66 3081.55 371.60 151.75 6.182 49069 .00 151.75 3144.04 371.70 155.28 6.295 49292 .00 155.28 3202.22 371.80 156.02 6.409 49517 .00 156.02 3257.84 371.90 156.76 6.523 49742 .00 156.76 3313.73 372.00 157.50 6.637 49967 .00 157.50 3369.86 S/N: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 Type.... Pond E-V-Q Table Page 6.08 Name.... BMP 3 File-.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work_pad.hyg - BMP 3 IN 10 Outflow HYG file = work pad.hyg - BMP 3 OUT 10 Pond Node Data = BMP 3 Pond Volume Data = BMP 3 Pond Outlet Data = BMP3 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 381.00 ft Starting Volume = _000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total ft cfs ac-ft sq.ft cfs cfs - ----_-------- 381.00 ------------ .00 -------- .000 ------------ 12414 ----------- .00 ---- ----- .00 381.10 .01 .029 12769 .00 .01 381.20 .04 .059 13129 .00 .04 381.30 .05 .089 13493 .00 .05 381.40 .06 .121 13863 .00 .06 381.50 .07 .153 14238 .00 .07 381.60 .08 .186 14618 .00 .08 381.70 .08 .220 15003 .00 .08 381.80 .09 .255 15392 .00 .09 381.90 .09 .291 15787 .00 .09 382.00 .10 .327 16167 .00 .10 382.10 .11 .365 16327 .00 .11 382.20 .11 .402 16468 .00 .11 382.30 .12 .440 16609 .00 .12 382.40 .12 .479 16751 .00 .12 382.50 .12 .517 16893 .00 .12 382.60 .13 .556 17036 .00 .13 382.70 .13 .595 17180 .00 .13 382.80 .14 .635 17324 .00 .14 382.90 1.35 .675 17469 .00 1.35 2S/t + 0 cfs .00 14.00 28.41 43.21 58.42 74.04 90.08 106.55 123.43 140.76 158.53 176.60 194.83 213.20 231.74 250.44 269.29 288.31 307.48 328.01 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type .... Pond E-V-Q Table Name .... BMP 3 Page 6.09 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work_pad.hyg - BMP 3 IN 10 Outflow HYG file = work pad.hyg - BMP 3 OUT 10 Pond Node Data = BMP 3 Pond Volume Data = BMP 3 Pond Outlet Data = BMP3 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 381.00 ft Starting Volume = .000 ac- ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs -- cfs ------------ cfs ---------- ------------ 383.00 ------------- 2.55 -------- .715 ---- -------- 17614 --------- .00 2.55 348.71 383.10 3.76 .756 17726 .00 3.76 369.56 383.20 4.97 .797 17839 .00 4.97 390.52 383.30 6.17 .838 17952 .00 6.17 411.60 383.40 7.38 .879 18065 .00 7.38 432.82 383.50 8.58 .921 18179 _00 8.58 454.16 383.60 9.79 .962 18293 .00 9.79 475.64 383.70 10.99 1.005 18408 .00 10.99 497.22 383.80 12.21 1.047 18522 .00 12.21 518.96 383.90 15.93 1.090 18637 .00 15.93 543.32 384.00 22.21 1.133 18753 .00 22.21 570.38 384.10 30.17 1.176 18868 .00 30.17 599.24 384.20 39.48 1.219 18983 .00 39.48 629.57 384.25 44.56 1.241 19041 .00 44.56 645.22 384.30 50.66 1.263 19099 .00 50.66 661.90 384.40 65.24 1.307 19215 .00 65.24 697.78 384.50 82.12 1.351 19332 .00 82.12 736.08 384.60 100.86 1.396 19448 .00 100.86 776.35 384.70 121.24 1.440 19566 .00 121.24 818.41 384.80 143.13 1.485 19683 .00 143.13 862.10 SIN: Bentley PondPack (10.00.027.00) Bentley Systems, Inc. 2:28 PM 12/21/2010 Type.... Pond E-V-Q Table Page 6.10 Name.... BMP 3 Fa.le.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work_pad.hyg - BMP 3 IN 10 Outflow HYG file = work pad.hyg - BMP 3 OUT 10 Pond Node Data = BMP 3 Pond Volume Data = BMP 3 Pond Outlet Data = BMP3 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev - 381.00 ft Starting Volume - .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 23/t- + 0 ft cfs ac-ft sq.ft efs cfs --- cfs ---------- ------------ 384.90 ------------- 166.44 -------- 1.531 ------------ 19801 ----------- .00 --------- 166.44 907.34 385.00 191.01 1.576 19919 .00 191.01 953.99 385.10 216.89 1.622 19931 .00 216.89 1002.00 385.20 243.22 1.668 19944 .00 243.22 1050.50 385.30 267.61 1.714 19956 .00 267.61 1097.04 385.40 292.12 1.760 19969 .00 292.12 1143.73 385.50 315.94 1.805 19981 .00 315.94 1189.75 385.60 337.03 1.851 19993 .00 337.03 1233.05 385.70 357.86 1.897 20006 .00 357.86 1276.10 385.80 379.23 1.943 20018 .00 379.23 1319.71 385.90 401.13 1.989 20031 .00 401.13 1363.85 386.00 423.52 2.035 20043 .00 423.52 1408.51 S/N: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Typp .. . Name.... Film.... Pond E-V-Q Table BMP 4 Page 6.11 K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work_pad.hyg - BMP 4 IN 10 Outflow HYG file = work pad.hyg - BMP 4 OUT 10 Pond Node Data = BMP 4 Pond Volume Data = BMP 4 Pond Outlet Data = BMP4 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 343.00 ft Starting Volume = .000 ac- ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs - - cfs - ---------- cfs ---------- ------------- 343.00 ------------ .00 -------- .000 ---- -------- 4897 -------- - .00 - .00 .00 343.10 .01 .011 5106 .00 .01 5.57 343.20 .04 .023 5319 .00 .04 11.38 343.30 .05 .036 5536 .00 .05 17.43 343.40 .06 .049 5758 .00 .06 23.71 343.50 .07 .062 5984 .00 .07 30.24 343.60 .07 .076 6214 .00 .07 37.02 343.70 .08 .091 6449 .00 .08 44.07 343.80 .09 .106 6688 .00 .09 51.37 343.90 .10 .122 6931 .00 .10 58.94 344.00 .10 .138 7179 .00 .10 66.79 344.10 .11 .154 7291 .00 .11 74.83 344.20 .11 .171 7403 .00 .11 83.00 344.30 .12 .188 7516 .00 .12 91.29 344.40 .12 .206 7631 .00 .12 99.71 344.50 .13 .223 7746 .00 .13 108.26 344.60 1.33 .241 7862 .00 1.33 116.14 344.70 2.54 .260 7978 .00 2.54 128.14 344.80 3.75 .278 8096 .00 3.75 138.28 344.90 4.96 .297 8215 .00 4.96 148.5E SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Type.... Pond E-V-Q Table Page 6.12 Name.... BMP 4 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work_pad.hyg - BMP 4 IN 10 Outflow HYG file = work pad.hyg - BMP 4 OUT 10 Pond Node Data = BMP 4 Pond Volume Data = BMP 4 Pond Outlet Data = BMP4 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 343.00 ft Starting Volume = .000 ac- ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + O ft cfs ac-ft sq.ft cfs cfs ----------- cfs ---------- ------------- 345.00 ----------- 6.16 --------- .316 ---- -------- 8334 ----------- .00 - 6.16 158.95 345.10 7.37 .335 8452 .00 7.37 169.48 345.20 8.57 .354 8571 .00 8.57 180.14 345.30 9.78 .374 8690 .00 9.78 190.94 345.40 10.99 .394 8810 .00 10.99 201.87 345.50 12.20 .415 8932 .00 12.20 212.94 345.60 12.79 .435 9054 .00 12.79 223.53 345.70 13.35 .456 9177 .00 13.35 234.22 345.80 13.89 .478 9300 .00 13.89 245.02 345.90 14.41 .499 9425 .00 14.41 255.94 346.00 14.91 .521 9550 .00 14.91 266.98 346.10 16.91 .543 9674 .00 16.91 279.66 346.20 20.15 .565 9798 .00 20.15 293.71 346.30 24.18 .588 9923 .00 24.18 308.70 346.40 27.73 .611 10049 .00 27.73 323.35 346.50 30.17 .634 10176 .00 30.17 337.03 346.60 32.47 .658 10304 .00 32.47 350.70 346.70 34.44 .681 10432 .00 34.44 364.19 346.80 35.71 .705 10561 .00 35.71 377.12 346.90 36.10 .730 10691 .00 36.10 389.32 Bentley Systems, Inc. 12/21/2010 SIN: Bentley PondPack (10.00.027.00) 2:28 PM Type.... Pond E-V-Q Table Page 6.13 Name.... BMP 4 File.... K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\Alston Pond BMPs.ppw LEVEL POOL ROUTING DATA HYG Dir = K:\10\10-0340\100349-Preston - Alston Pond\H-H\Pondpak\ Inflow HYG file = work_pad.hyg - BMP 4 IN 10 Outflow HYG file = work pad.hyg - BMP 4 OUT 10 Pond Node Data = BMP 4 Pond Volume Data = BMP 4 Pond Outlet Data = BMP4 Outlets No Infiltration INITIAL CONDITIONS Starting WS Elev = 343.00 ft Starting Volume = .000 ac-ft Starting Outflow = .00 cfs Starting Infiltr. _ .00 cfs Starting Total Qout= .00 cfs Time Increment = .0500 hrs Elevation Outflow Storage Area Infilt. Q Total 2S/t + 0 ft cfs ac-ft sq.ft cfs cfs cfs ---------------------- -------------- 347.00 ----------- 36.44 --------- .754 ----------------------- 10822 .00 36.44 401.61 SIN: Bentley Systems, Inc. Bentley PondPack (10.00.027.00) 2:28 PM 12/21/2010 Appendix A Index of Starting Page Numbers for ID Names A-1 ---- - B ----- BMP 1... 5.01, 6.01 BMP 2... 5.02, 6.04 BMP 3... 5.03, 6.08 BMP 4... 5.04, 6.11 ----- D ----- DA 1... 3.01, 4.01 DA 2... 3.03, 4.02 DA 3... 3.05, 4.03 DA 4... 3.07, 4.04 ----- P ----- PRE-DEV AREA... 3.09, 4.05 ----- R ----- RDU NOAA 14 Desi... 2.01, 2.02 ----- U ----- UNTREATED... 3.11, 4.06 ----- W ----- Watershed... 1.01 SIN: Bentley PondPack (10.00.027.00) 2:28 PM Bentley Systems, Inc. 12/21/2010 DWQ Supplements Permit A7A. NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) t?t7 .'1A' A r?-.%Yq P bwGLt C! !. PROJECT INFORMATION Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 1 Ill. DESIGN INFORMATION Site Characteristics Drainage area 1,415,700 ftz Impervious area, post-development 680,407 fe % impervious 48.06 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the l yr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1 Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp pool? Elevation of the top of the additional volume 56,930 ft3 OK 73,486 ff3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in (unitless) (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec 4.14 ft3/sec 343.80 fmsl 342.00 fmsl fmsl 342.50 fmsl 341.50 fmsl 338.00 fmsl 337.00 fmsl 1.00 ft n (Y or N) fmsl Form SW401-Wet Detention Basin-Rev 8-9/17/09 Parts I & 11 Design Summary, Page 1 of 2 Permit (to be provided by DWQ) It. DESIGN INFORMATION_ _ Surface Areas Area, temporary pool 45,229 fe Area REQUIRED, permanent pool 28,314 ff SAIDA ratio 2.00 (unitiess) Area PROVIDED, permanent pool, ?,,,, ,cd 34,308 le OK _ Area, bottom of 10ft vegetated shelf, " 28,442 if Area, sediment cleanout, top elevation (bottom of pond), 21,265 ff Volumes Volume, temporary pool 73,486 If OK Volume, permanent pool,l 104,707 ft' Volume, forebay (sum of forebays if more than one forebay) fe Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal Coastal SAIDA Table Used? Mountain/Piedmont SAIDA Table Used? SAIDA ratio Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool, Area provided, permanent pool, 1e,, d Average depth calculated Average depth used in SAIDA, (L, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, Pwm_,d Area, bottom of 1 Oft vegetated shelf, kI "nor 85% n (Y or N) y (Y or N) 2.00 (unifless) n (Y or N) 104,707 ft' 34.308 fe ft ft y (Y or N) 34,308 It' 28.442 ft` Area, sediment cleanout, top elevation (bottom of pond), &_Po d 21,265 fe "Depth" (distance blw bottom of 10ft shelf and top of sediment) 3.50 ft Average depth calculated 3,50 ft Average depth used in SAIDA, ¢,,, (Round to nearest 0.5ft) 3.0 it Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cc) Driving head (K) Drawdown through weir? Weir type Coefficient of discharge (CN) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: y (Y or N) 4.00 in in' 0.60 (unitiess) 1.80 ft n (Y or N) 0.3 (unitiess) 0.51 (unitiess) ft ft 15.61 fe/sec 11.47 W/sec 0.54 felsec 2.00 days Need 3 It min. OK Insufficient. Check calculation. OK, draws down in 2-5 days 3 :1 OK 10 :1 OK 10.0 ft OK 4 :1 OK 4.0 :1 OK y (Y or N) OK 0.8 It Insufficient freeboard, minimum of 1-ft required n (Y or N) Insufficient. Vegetated filter required. y (Y or N) OK y (Y or N) OK Pump required Form SW401-Wet Detention Basin-Rev.e-9117/09 Parts I & II. Design Summary, Page 2 of 2 Permit No. (to be provided by DWQ) A WA 615? NCDEMR' STORMWATER MANAGEMENT PERMIT APPLICATION FORM %' "ter 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. I. PROJECT INFORMATION Project name Alston Pond Contact person Alwyn V. Smith III, RE Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 2 II, DESIGN INFORMATION Site Characteristics Drainage area 1,589,940 fe Impervious area, post-development 816,750 ftz % impervious 51.37 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp pool? Elevation of the top of the additional volume 67,881 ft3 OK 84,332 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec -4.14 ft3/sec 367.40 fmsl 365.00 fmsl fmsl 365.50 fmsl 364.50 fmsl 360.00 fmsl 359.00 fmsl 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev B-9/17109 Parts I & 11 Design Summary, Page 1 of 2 Permit No. (to be provided by DWQ) I!. DESIGN INFORMATIM Surface Areas Area, temporary pool Area REQUIRED, permanent pool SAIDA ratio Area PROVIDED, permanent pool, A?,m_,w Area, bottom of 1 Oft vegetated shelf, Ac(_"[ Area, sediment cleanout, top elevation (bottom of pond), Qb, d Volumes Volume, temporary pool Volume, permanent pool,l6,,,,_,w Volume, forebay (sum of forebays if more than one forebay) Forebay % of permanent pool volume SAIDA Table Data Design TSS removal Coastal SA/DA Table Used? Mountain/Piedmont SAIDA Table Used? SA/DA ratio Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) Volume, permanent pool,1E,,,,,_pw Area provided, permanent pool, Aw,,,_pw Average depth calculated Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) Calculation option 2 used? (See Figure 10-2b) Area provided, permanent pool, {e,,,,,I Area, bottom of 1 Oft vegetated shelf, /mod, Area, sediment cleanout, top elevation (bottom of pond), " 39,090 f? 28,142 fiz 1.77 (unilless) 28,282 W OK 23,027 If 13,943 fr 84,332 ft' 94,500 It' ft3 85 % n (Y or N) y (Y or N) 1.77 (unitless) n (Y or N) 94,500 ft' 28,282 ft' ft ft y (Y or N) 28,282 23.027 ft 13,943 fe "Depth' (distance b/w bottom of 1Oftshelf and top of sediment) 4.50 It Average depth calculated 4.10 ft Average depth used in SAIDA, d,,, (Round to nearest 0.5ft) 4.0 ft Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (C)) Driving head (K) Drawdown through weir? Weir type Coefficient of discharge (CN) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 4.00 in in' 0.60 (unitless) 2.40 ft n (Y or N) (unilless) (unilless) ft ft 15.61 ft'Isec 11.47 It'isec 0.63 ft'Isec 2.00 days 3 :1 10A 10.0 fl 3 :1 3.0 :1 y - (Y or N) OT 9 n (Y or N) y (Y or N) y (Y or N) Gate valve OK Need 3 It min. OK OK OK, draws down in 2-5 days. OK OK OK OK OK OK Insufficient freeboard, minimum of 1-ft required Insufficient, Vegetated filter required. OK OK Form SW401-Wet Detention Basin-Rev.8-9/17/09 Parisi & II. Design Summary, Page 2 of 2 Permit No ARA 14CDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. (to be provided by DWQ) !. PROJECT INFORMATION Project name Alston Pond Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 Drainage area number 3 II. DESIGN INFORMATION Site Characteristics Drainage area 696,960 fe Impervious area, post-development 271,814 fe % impervious 39.00 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp pool? Elevation of the top of the additional volume 23,290 ft3 OK 27,791 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec A.14 ft3/sec 382.80 fmsl 381.00 fmsl fmsl 381.50 fmsl 380.50 fmsl 377.00 fmsl 376.00 fmsl 1 00 ft n (Y or N) imsl Form SW401-Wet Detention Basin-Rev 6-9/17/09 Parts 18 11 Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 17,329 fe Area REQUIRED, permanent pool 11,779 fe SAIDA ratio 1.69 (unitless) Area PROVIDED, permanent pool,, 12,414 Area, bottom of 1 Oft vegetated shelf," 9,710 ? Area, sediment cleanout, top elevation (bottom of pond), &_,)nd 5,979 ft` Volumes Volume, temporary pool 27,791 fe Volume, permanent pool, l? 33,021 fts Volume, forebay (sum of forebays if more than one forebay) fe Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85% Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 1.69 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) in (Y or N) Volume, permanent pool, l(" 33.021 W Area provided, permanent pool, P,,,,_pw 12,414 e Average depth calculated ft Average depth used in SAIDA, 4,,, (Round to nearest 0.5ft) it Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, P,,,,,_pw 12,414 ft` Area, bottom of 10ft vegetated shelf, kI.,men 9,710 ft` Area, sediment cleanout, top elevation (bottom of pond), kixnd 5,979 fly "Depth" (distance b/w bottom of 1Oft shelf and top of sediment) 3.50 ft Average depth calculated 3.30 ft Average depth used in SAIDA, rb,,, (Round to nearest 0.5ft) 3.0 it Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (CD) Driving head (K) Drawdown through weir? Weir type Coefficient of discharge (C? ) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice or weir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: y (Y or N) 2.00 in in2 0.60 (unitless) 1.80 ft in (Y or N) (ulliiless) (unitless) it it 15.61 fOlsec 11.47 fOlsec 0.14 ft3lsec 2.00 days 3 .1 10 1 10.0 It 4 :1 5.0 1 Y (Y or N) 0.5 It n (Y or N) y (Y or N) y (Y or N) gate valve OK OK Need 3 It min. OK Insufficient. Check calculation, OK, draws down in 2-5 days. OK OK OK OK OK OK Insufficient freeboard, minimum of 1-ft required Insufficient Vegetated filter required. OK OK Form SW401-Wet Detention Basin-Rev 8.9117109 Parts I & 11 Design Summary. Page 2 of 2 Permit No. (to be provided by DWQ) ?. f NCDENR r STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. 1, PROJECT INFORMATION Project name Atsso i Pcno Contact person Alwyn V. Smith III, P.E. Phone number 919) 469-3340 Date 22-Dec-10 _ Drainage area number 4 11. DESIGN INFORMATION Site Characteristics Drainage area 261,360 fe Impervious area, post-development 113,256 fe % impervious 43.33% Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required Volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff Post-development 1-yr, 24-hr runoff Minimum volume required Volume provided Peak Flow Calculations Is the pre/post control of the lyr 24hr storm peak flow required? 1-yr, 24-hr rainfall depth Rational C, pre-development Rational C, post-development Rainfall intensity: 1-yr, 24-hr storm Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Pre/Post 1-yr, 24-hr peak flow control Elevations Temporary pool elevation Permanent pool elevation SHWT elevation (approx. at the perm. pool elevation) Top of 1Oft vegetated shelf elevation Bottom of 1 Oft vegetated shelf elevation Sediment cleanout, top elevation (bottom of pond) Sediment cleanout, bottom elevation Sediment storage provided Is there additional volume stored above the state-required temp pool? Elevation of the top of the additional volume 9,584 ft3 OK 9,888 ft3 OK, volume provided is equal to or in excess of volume required. ft3 ft3 ft3 ft3 ft3 y (Y or N) 3.0 in 0.30 (unitless) 0.51 (unitless) 0.13 in/hr OK 15.61 ft3/sec 11.47 ft3/sec -4.14 ft3/sec 343.00 fmsl 344.50 fmsl fmsl 343.50 fmsl 342.50 fmsl 339.00 fmsl 338.00 fmsl 1.00 ft (Y or N) fmsl Form SW401-Wet Detention Basin-Rev e-9/17109 Parts I & 11 Design Summary, Page 1 of 2 Permit No (to be provided by DWQ) IL DESIGN INFORMATION Surface Areas Area, temporary pool 7,756 fe Area REQUIRED, permanent pool 4,809 fig SAIDA ratio 1.84 (unitless) Area PROVIDED, permanent pool, / ,,m_pw 4,897 fe OK Area, bottom of 1 Oft vegetated shelf, / I 3,346 It' Area, sediment cleanout, top elevation (bottom of pond), &tyooa 1,418 fl` Volumes Volume, temporary pool 9,888 fe OK Volume, permanent pool, \?,,,,_pw 10,290 ft3 Volume, forebay (sum of forebays if more than one forebay) fe Forebay % of permanent pool volume % SAIDA Table Data Design TSS removal 85% Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 1.84 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, l?,r,_pw 10.290 fl' Area provided, permanent pool, /o,,,,_pw 4,897 fr Average depth calculated it Need 3 It min. Average depth used in SAIDA, ¢,,, (Round to nearest 0.5ft) ft Calculation option 2 used? (See Figure 10-2b) Y (Y or N) Area provided, permanent pool, 4.897 ft' Area, bottom of 1Oft vegetated shelf, / dw 3,346 fl° Area, sediment cleanout, top elevation (bottom of pond), 1,418 W "Depth' (distance blw bottom of 1Oftshelf and top of sediment) 3.50 it Average depth calculated 3.00 ft OK Average depth used in SAIDA, C (Round to nearest 0.5ft) 3.0 ft OK Drawdown Calculations Drawdown through orifice? Diameter of orifice (if circular) Area of orifice (if-non-circular) Coefficient of discharge (Cc) Driving head (F6) Drawdown through weir? Weir type Coefficient of discharge (t4 ) Length of weir (L) Driving head (H) Pre-development 1-yr, 24-hr peak flow Post-development 1-yr, 24-hr peak flow Storage volume discharge rate (through discharge orifice orweir) Storage volume drawdown time Additional Information Vegetated side slopes Vegetated shelf slope Vegetated shelf width Length of flowpath to width ratio Length to width ratio Trash rack for overflow & orifice? Freeboard provided Vegetated filter provided? Recorded drainage easement provided? Capures all runoff at ultimate build-out? Drain mechanism for maintenance or emergencies is: Y (Y or N) 2.00 in in1 HD (unilles5) 1.50 ft n (Y or N) (unities) (unitless) it ft 15.61 fOlsec 11.47 fe/sec 0.13 fP/sec 2.00 days OK, draws down in 2-5 days. 3 A OK 10 :1 OK 10.0 ft OK 3 :1 OK 3.0 :1 OK Y (Y or N) OK 0.5 ft Insufficient freeboard, minimum of 1-ft required n (Y or N) Insufficient. Vegetated filter required. y (Y or N) OK y (Y or N) OK pump required Form SW401-Wet Detention Basin-Rev.e-9/17109 Parts I. & II. Design Summary, Page2 of 2 Culvert Calculations Culvert Designer/Analyzer Report Crossing 1 - (HW1) Analysis Component Storm Event Design Discharge r 73.43 cfs Peak Discharge Method: Rational Design Return Period 25 year Check Return Period 100 year Design Peak Discharge 73.43 cfs Check Peak Discharge 90.49 cfs Total Area 85.50 acres Time of Concentration 60.00 min Rational Coefficient 0.30 Intensity 3.50 in/hr Area Subwatershed(acres) C 1 85.50 0.30 Tailwater Conditions: Constant Tailwater Tailwater Elevation N/A ft Name Description Discharge HW Elev. Velocity Culvert-1 1-66 inch Circular 56.40 cfs 363.19 ft 14.79 ft/s Culvert-2 1-66 inch Circular 17.05 cfs 363.19 ft 10.59 ft/s Weir Roadway (Constant E levatioi%00 cfs 363.19 ft N/A Total - 73.45 cfs 363.19 ft N/A Title: Alston Pond Project Engineer: asmith k:\. \h-h\culvert master\alston pond culverts cvm Withers & Ravenel Engineering CulvertMaster v3.1 [03 01 010 001 12/22/10 09:03:46Odntley Systems, Inc Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of4 Culvert Designer/Analyzer Report Crossing 1 - (HW1) Component:Culvert-1 Culvert Summary Computed Headwater Elevi Inlet Control HW Elev. Outlet Control HW Elev. Headwater Depth/Height 363.19 ft 362.78 ft 363.19 ft 0.58 Discharge 56.40 cfs Tailwater Elevation N/A ft Control Type Entrance Control Grades Upstream Invert Length 360.00 ft 126.00 ft Downstream Invert Constructed Slope 356.00 ft 0.031746 ft/ft Hydraulic Profile Profile S2 Slope Type Steep Flow Regime Supercritical Velocity Downstream 14.79 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 1.20 ft 1.14 ft 2.05 ft 0.003223 ft/ft Section Section Shape Section Material Section Size Number Sections Circular Concrete 66 inch 1 Mannings Coefficient Span Rise 0.013 5.50 ft 5.50 ft Outlet Control Properties Outlet Control HW Elev. Ke 363.19 ft 0.50 Upstream Velocity Head Entrance Loss 0.76 ft 0.38 ft Inlet Control Properties Inlet Control HW Elev. 362.78 ft Inlet Type Square edge w/headwall K 0.00980 M 2.00000 C 0.03980 Y 0.67000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form Unsubmerged 23.8 ft2 1 1 1 Title: Alston Pond Project Engineer: asmith k:\.. \h-h\culvert master\alston pond culverts.cvm Withers & Ravenel Engineering CulvertMaster v3 1 [03.01 010 00] 12/22/10 09:03:46UUdntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 4 Culvert Designer/Analyzer Report Crossing 1 - (HW1) Component:Culvert-2 Culvert Summary Computed Headwater Elev< 363.19 ft Discharge 17.05 cfs Inlet Control HW Elev. 362.92 ft Tailwater Elevation N/A ft Outlet Control HW Elev. 363.19 ft Control Type Entrance Control Headwater Depth/Height 0.31 Grades Upstream Invert Length 361.50 ft 126.00 ft Downstream Invert Constructed Slope 358.00 ft 0.027778 ft/ft Hydraulic Profile Profile Slope Type Flow Regime Velocity Downstream S2 Steep Supercritical 10.59 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 0.66 ft 0.66 ft 1.11 ft 0.003270 ft/ft Section Section Shape Section Material Section Size Number Sections Circular Concrete 66 inch 1 Mannings Coefficient Span Rise 0.013 5.50 ft 5.50 ft Outlet Control Properties Outlet Control HW Elev. Ke 363.19 ft 0.50 Upstream Velocity Head Entrance Loss 0.39 ft 0.19 ft Inlet Control Properties Inlet Control HW Elev. 362.92 ft Inlet Type Square edge w/headwall K 0.00980 M 200000 C 0.03980 Y 0.67000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form Unsubmerged 23.8 ft2 1 1 1 Title: Alston Pond Project Engineer: asmith k:\...\h-h\culvert master\alston pond culverts.cvm Withers & Ravenel Engineering CulvertMaster v3.1 [03.01 010 00] 12/22/10 09:03:46cAB6ntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 3 of 4 Culvert Designer/Analyzer Report Crossing 1 - (HW1) Component:Weir Hydraulic Component(s): Roadway (Constant Elevation) Discharge 0.00 cfs Allowable HW Elevation 363.19 ft Roadway Width 80.00 ft Overtopping Coefficient 2.90 US Length 100.00 ft Crest Elevation 385.00 ft Headwater Elevation N/A ft Discharge Coefficient (Cr) 2.90 Submergence Factor (Kt) 1.00 Sta (ft) Elev. (ft) 0.00 385.00 100.00 385.00 Title: Alston Pond Project Engineer: asmith k:\.. \h-h\culvert master\alston pond culverts.cvm Withers & Ravenel Engineering CulvertMaster v3.1 [03.01.010 00] 12122110 09:03:46cWntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 4 of 4 Culvert Designer/Analyzer Report Crossing 2 (HW3) Analysis Component Storm Event Design Discharge 16.46 cfs Peak Discharge Method: Rational Design Return Period 25 year Check Return Period 25 year Design Peak Discharge 16.46 cfs Check Peak Discharge 16.46 cfs Total Area 14.80 acres Time of Concentration 43.00 min Rational Coefficient 0.30 Intensity 3.68 in/hr Area Subwatershed(acres) C 1 14.80 0.30 Tailwater Conditions: Constant Tailwater Tailwater Elevation NIA ft Name Description Discharge HW Elev. Velocity Culvert-1 1-48 inch Circular 16.47 cfs 391.20 ft 12.91 ft/s Weir Roadway (Constant Elevatiolq00 cfs 391.20 ft NIA Total 16.47 cfs 391.20 ft NIA Title: Alston Pond Project Engineer: asmith k:\ . \h-h\culvert master\alston pond culverts.cvm Withers & Ravenel Engineering CulvertMaster v3.1 [03.01 010 00] 12/22/10 09:10:09oUdntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 3 Culvert Designer/Analyzer Report Crossing 2 (HW3) Component:Culvert-1 Culvert Summary Computed Headwater Elevi 391.21 ft Discharge 16 47 cfs Inlet Control HW Elev. 391.01 ft Tailwater Elevation N/A ft Outlet Control HW Elev. 391.21 ft Control Type Entrance Control Headwater Depth/Height 0.43 Grades Upstream Invert 389.50 ft Downstream Invert 386.50 ft Length 50.00 ft Constructed Slope 0.060000 ft/ft Hydraulic Profile Profile S2 Depth, Downstream 0.63 ft Slope Type Steep Normal Depth 0.59 ft Flow Regime Supercritical Critical Depth 1.19 ft Velocity Downstream 12.91 ft/s Critical Slope 0.003537 ft/ft Section Section Shape Circular Mannings Coefficient 0.013 Section Material Concrete Span 4.00 ft Section Size 48 inch Rise 4.00 ft Number Sections 1 Outlet Control Properties Outlet Control HW Elev. 391.21 ft Upstream Velocity Head 0.43 ft Ke 0.20 Entrance Loss 0.09 ft Inlet Control Properties Inlet Control HW Elev 391.01 ft Flow Control N/A Inlet Type Groove end projecting Area Full 12.6 ft2 K 0.00450 HDS 5 Chart 1 M 2.00000 HDS 5 Scale 3 C 0.03170 Equation Form 1 Y 069000 Title: Alston Pond Project Engineer: asmith k:\. \h-h\culvert master\alston pond culverts cvm Withers & Ravenel Engineering CulvertMaster v3 1 [03 01 010 00] 12/22/10 09:10:09cWntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 3 Culvert Designer/Analyzer Report Crossing 2 (HW3) Component:Weir Hydraulic Component(s): Roadway (Constant Elevation) Discharge 0.00 cfs Allowable HW Elevation 391.20 ft Roadway Width 40.00 ft Overtopping Coefficient 2.90 US Length 100.00 ft Crest Elevation 396.00 ft Headwater Elevation N/A ft Discharge Coefficient (Cr) 2.90 Submergence Factor (Kt) 1.00 Sta (ft) Elev. (ft) 0.00 396.00 100.00 396.00 Title: Alston Pond Project Engineer: asmith k:\...\h-h\culvert master\alston pond culverts cvm Withers & Ravenel Engineering CulvertMaster v3.1 [03.01 010 00] 12/22/10 09:10:09c?Wntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 3 of 3 Culvert Designer/Analyzer Report Crossing 3 - (FES601) Analysis Component Storm Event Design Discharge 8.43 cfs Peak Discharge Method: Rational Design Return Period 25 year Check Return Period 25 year Design Peak Discharge 8.43 cfs Check Peak Discharge 8.43 cfs Total Area 6.60 acres Time of Concentration 32.00 min Rational Coefficient 0.30 Intensity 4.22 in/hr Area Subwatershed(acres) C 1 6.60 0.30 Tailwater Conditions: Constant Tailwater Tailwater Elevation N/A ft Name Description Discharge HW Elev. Velocity Culvert-1 1-18 inch Circular 6.69 cfs 386.03 ft 11.03 ft/s Weir Roadway (Constant Elevatiort)77 cfs 386.03 ft N/A Total -- -- 8.47 cfs 386.03 ft N/A Title: Alston Pond Project Engineer: asmith k:\...\h-h\culvert master\aston pond culverts.cvm Withers & Ravenel Engineering CulvertMaster v3.1 [03 01.010.00] 12/22/10 09:10:27c/1Mntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 3 Culvert Designer/Analyzer Report Crossing 3 - (FES601) Component: Culvert-1 Culvert Summary Computed Headwater Elev, 386.03 ft Inlet Control HW Elev. 385.96 ft Outlet Control HW Elev. 386.03 ft Headwater Depth/Height 1.02 Discharge 6.69 cfs Tailwater Elevation N/A ft Control Type Entrance Control Grades Upstream Invert Length 384.50 ft 366.00 It Downstream Invert Constructed Slope 368.00 ft 0.045082 ft/ft Hydraulic Profile Profile Slope Type Flow Regime Velocity Downstream S2 Steep Supercritical 11.03 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 0.56 ft 0.56 ft 1.00 ft 0.006591 ft/ft Section Section Shape Section Material Section Size Number Sections Circular Concrete 18 inch 1 Mannings Coefficient Span Rise 0.013 1.50 ft 1.50 ft Outlet Control Properties Outlet Control HW Elev. Ke 386.03 ft 0.20 Upstream Velocity Head Entrance Loss 0.44 ft 0.09 ft Inlet Control Properties Inlet Control HW Elev. 385.96 ft Inlet Type Beveled ring, 45° bevels K 0.00180 M 2.50000 C 0.03000 Y 0.74000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form N/A 1.8 ft2 3 A 1 Title: Alston Pond Project Engineer: asmith k:\ ..\h-h\culvert master\alston pond culverts cvm Withers & Ravenel Engineering CulvertMaster v3 1 [03.01 010.00] 12/22/10 09:10:27c Mntley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 3 Culvert Designer/Analyzer Report Crossing 3 - (FES601) Component:Weir Hydraulic Component(s): Roadway (Constant Elevation) Discharge 1.77 cfs Allowable HW Elevation 386.03 ft Roadway Width 40.00 ft Overtopping Coefficient 2.91 US Length 100.00 ft Crest Elevation 386.00 ft Headwater Elevation 386.03 ft Discharge Coefficient (Cr) 2.91 Submergence Factor (Kt) 1.00 Sta (ft) Elev. (ft) 0.00 386.00 100.00 386.00 Title: Alston Pond Project Engineer: asmith k:\.. \h-h\culvert master\aston pond culverts.cvm Withers & Ravenel Engineering CulvertMaster v3 1 [03.01.010.00] 12/22/10 09:10:27c/Mntley Systems, Inc. Haestad Methods Solution Center Watertown. CT 06795 USA +1-203-755-1666 Page 3 of 3