Loading...
HomeMy WebLinkAbout20030147 Ver 2_WRC Comments_20110104North Carolina Wildlife Resources Commission Gordon S. Myers, Executive Director January 4, 2011 Mr. Ken Kennedy Manager, Hydro Operations Progress Energy 179 Tillery Dam Road Mount Gilead, NC 27306 Subject: Review of Installation of an Oxygen Diffuser System in Lake Tillery Yadkin - Pee Dee Hydropower Project, FERC Project No. 2206 Dear Mr. Kennedy: Submitted are comments in response to your December 21, 2010 letter requesting comments of the North Carolina Wildlife Resources Commission (NCWRC) on the subject project. Progress Energy proposes to use the oxygen diffuser system, in conjunction with draft tube vents on several turbine units, to meet conditions of the 401 Water Quality Certificate for waters discharged from the Tillery development. The system is designed to provide dissolved oxygen levels of 5 mg/l in the reservoir at the intake area during periods of reservoir water stratification. The land-based facilities will be located on approximately 0.21 acres of property owned by Progress Energy. The oxygen distribution lines will be placed in the deeper portions of the reservoir and anchored such that they remain about 10 feet above the reservoir bottom. The diffuser area will be marked with buoys to warn boaters not to anchor in the area, but will not otherwise restrict boater and angler use of this portion of the reservoir. Progress Energy will apply for the necessary 404/401 permits before installing the diffuser system. Per the Water Quality Certificate, Progress Energy will continuously monitor temperature and dissolved oxygen downstream of the Tillery Dam. The December 21, 2010 letter states that Progress Energy will also periodically monitor dissolved oxygen concentrations in the reservoir. In addition to improving water quality in the Pee Dee River downstream of the dam, Progress Energy believes the proposed system will enhance water quality conditions in Tillery Reservoir that will benefit multiple fish species. Mailing Address: 645 Fish Hatchery Road • Marion, NC 27652 Telephone: (828) 652-4360 • Fax: (828) 652-3279 Tillery Oxygen Diffuser Page 2 January 4, 2011 The NCWRC supports the use of the proposed oxygen diffuser system as described. We recommend that the periodic monitoring of dissolved oxygen concentrations in the reservoir be conducted at least monthly from May through October. After several years of experience it may be appropriate to adjust the frequency and duration of the reservoir monitoring requirement. We expect to provide more detailed comments on the 404/401 application regarding land disturbing activities and erosion controls. Finally, we request that you work with our Division of Engineering Services regarding the process for placing navigation buoys in the reservoir. If you have any questions concerning these comments, please call me at 828-652-4360 ext. 223. Sincerely, Christopher Goudreau Hydropower Licensing Coordinator