Loading...
HomeMy WebLinkAbout20070503 Ver 1_Worksheets_20070416Project Name: E-22 Access Rc Project No. DWQ 07-0503 W/L 2 SUBMITTED DESIGN: elevations Permanent Pool (ft) Temporary Pool (ft) areas Permanent Pool SA (sq ft) 5 Drainage Area (ac) ,,;~'`~ 1.67 Impervious Area (ac) ,~ 0.85 Forebay (ft2) '? 750 High Marsh (ft2) 68 Low Marsh (ft2) 1969 Micropool (ft2) 773 volumes Temporary Pool (cu ft) 9879 other parameters SA/DA 2.06 Orifice Diameter (in) 1 Design Rainfall (in) 1 Linear Interpolation of Correct SA/DA Im ervious Next Lowest 50 Project Impervious 50.9 Next Highest 60 290 291.13 ,. ~ ~, ~ h ~ ~ ~ w REQUIRED DESIGN: 3 1.13 ft. depth ok 1521 sq. ft. ok 50.9 % - 13.992537 % ok 34.9 % ok 36.7 % ok 14.421642 % ok 100 3080 cu. ft. ok 2.09 - 0.02 cfs drawdown - 5.8 day drawdown check drawc 3 ft. Permanent Pool Depth SA/DA from Table 2.06 2.09 2.4 o~o~ (,~ ~. I Vw ~.~{/~-- E'~~~~ni /1 Oil ~, ~/' • ~C. ~ . ../ " "~"'~1 Irv w`~ Project Name: E-22 Access Rc Project No. DWQ 07-0503 SUBMITTED DESIGN: REQUIRED DESIGN: elevations Permanent Pool (ft) 283 3 Temporary Pool (ft) 284.5 1.5 ft. depth ok ~~-- areas ~°~" `" Permanent Pool SA (sq ft) 13070 6187 sq. ft. ok Drainage Area (ac) 6.59 Impervious Area (ac) 3.48 52.8 % - Forebay(ft2) 1670 12.777353 % checkforebc High Marsh (ft2) 5112 39.1 % check marsh Low Marsh (ft2) 4420 33.8 % ok Micropool (ft2) 1868 14.292272 % ok 100 volumes Temporary Pool (cu ft) 34528 12565 cu. ft. ok other parameters SA/DA 2.16 2.16 - Orifice Diameter (in) 2 0.09 cfs drawdown - Design Rainfall (in) 1 4.4 day drawdown ok Linear Interpolation of Corr ect SA/DA 3 ft. Permanent Pool Depth Im ervious SA/DA from Table Next Lowest 50 2.06 Project Impervious 52.8 2.16 Next Highest 60 2.4 G>~ cs -- t r,r „» /y( ~~ y . {.i'~~pF .v.. i" ,,.,. p^~l~ W~+" P ; ~ ; r~. ~n I ~ ~(.ev~. .co,e.u.aA ..