Loading...
HomeMy WebLinkAboutNCC191758_MODIFICATION Supporting Documents_20210111From: Georgoulias, Bethany<bethany.eeoreoulias@ncdenr.eov> Sent: Friday, January 8, 2021 1:08 PM To: Tony Eason <TEason@pdemc.com> Cc: Selkane, Aziza <aziza.selkane@ncdenr.eov>; Briana D. Eddy <EddvBD@booth-assoc.com>; Morman, Alaina <alaina.morman@ncdenr.gov> Subject: RE: [External] RE: Notice of Deficiency: Unpaid Permit Fee for NCC192121 The original permit would have no longer been applicable if you submitted a Notice of Termination for it. We never received that, and so both permits are still active. The original one has been renewed with payment of the fee. If you want that previous one you renewed to remain active and also cover this amendment (I am understanding it is the same site), you can submit a modification request for NCC191758 (https://edocs.deg.nc.gov/Forms/NCG01-Modification) and indicate that it will include everything originally submitted for the later NCC192121. I process those Modification requests and can record the correspondence about this. I will link the two files so the records can be viewed together. Then be sure to submit a Notice of Termination request for this permit (NCC192121) and choose "Other" as the reason. In the Additional explanation box, please explain that NCC191758 has been modified to include this work for the same site. Once we approve the NOT, we can resolve the Notice of Deficiency and waive the fee. I hope this helps, Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.georgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Tony Eason [mailto:TEason@pdemc.com] Sent: Friday, January 8, 2021 12:51 PM To: Georgoulias, Bethany<bethany.eeoreoulias@ncdenr.eov> Cc: Selkane, Aziza <aziza.selkane@ncdenr.gov>; Briana D. Eddy <EddyBD@booth-assoc.com> Subject: RE: [External] RE: Notice of Deficiency: Unpaid Permit Fee for NCC192121 Thank you for the quick response Bethany. These are both for the same project (electrical substation). The original scope was modified slightly after the permit was already in place and an amendment was generated in an abundance of caution to replace the original. As I understood it, the original permit was no longer applicable as the amendment replaced it in full. I have copied Briana (Booth & Associates engineering firm representing our interest in this project) to assist with correcting this issue, given my limited experience in this area. Just to recap for Briana, I paid the first fee that crossed my desk (original DEQ) via credit card and ignored the other request (amended DEQ) just thinking that there was a lapse in time in recognizing the payment. It turns out that both requests were given independent reference numbers for the same project. I also kept the attachments that Bethany referenced if it helps. It may be a mute -point which permit is actually applicable at this time, as long as I have one that covers us. The only scope of work remaining is to repair one driveway and pave the entrances to both which may have been covered in the original scope of work. Alternatively, I have no issue with paying a second fee if it keeps me in the good graces of NCDENR. Thanks for any assistance that you can provide as I navigate these unknown waters. O Tony Eason VP of Engineering and Operations Pee Dee Electric 575 US Hwy 52 South Wadesboro, NC 28170 Direct: 910-997-8941 www.pdemc.com From: Georgoulias, Bethany<bethany.eeoreoulias@ncdenr.eov> Sent: Friday, January 8, 2021 12:34 PM To: Tony Eason <TEason@pdemc.com> Cc: Selkane, Aziza <aziza.selkane@ncdenr.eov> Subject: RE: [External] RE: Notice of Deficiency: Unpaid Permit Fee for NCC192121 Tony, That payment was for a different construction permit annual fee, and it was applied to the attached invoice. Please see the confirmation email about that. This Notice of Deficiency is for another permit COC. If there were not supposed to be two different COCs for this, then this one needs to be terminated (submit an NOT). I am not sure what is different about the "AMENDMENT" site. Bethany Bethany Georgoulias Environmental Engineer Stormwater Program, Division of Energy, Mineral, and Land Resources N.C. Department of Environmental Quality 919 707 3641 office bethany.ueorgoulias@ncdenr.gov 512 N. Salisbury Street, Raleigh, NC 27604 (location) 1612 Mail Service Center, Raleigh, NC 27699-1612 (mailing) Website: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater DEQ Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. From: Tony Eason [mailto:TEason@pdemc.com] Sent: Friday, January 8, 2021 12:28 PM To: laserfiche@ncdenr.gov Cc: Selkane, Aziza <aziza.selkane@ncdenr.eov>; Georgoulias, Bethany <bethany.georgoulias@ncdenr.gov> Subject: [External] RE: Notice of Deficiency: Unpaid Permit Fee for NCC192121 The snapshot below is from an automated email that I received for a credit card payment for our DEQ permit for the Burnsville substation. It appears as though the payment captured in the snapshot below is for the original DEQ permit fee, which I feel was sent to us in error. Can this be rectified by applying the payment for the original DEQ permit to the amended NCC192121 permit? Thanks, DoNotReplyCnc.gov â– Tony Eason Payment Confirmation O You forwa rd ed th is message on 12J1812020 3:36 AM We removed extra line breaksfrom this message. Bing Maps CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Thank you for your recent payment to NC DEQ Stormwater. Payment Application: NC DEQStormwaterePayment Payment Status: Payment completed successfully. Confirmation Number: 20121819C29502 Payment Date: 12/18/2D20 Billing Address: Anthony E. Eason 575 Hwy 52 South Wadesboro, INC 28170 9109979941 Card Type: VISA Card Number: x5506 Payment Amount: 100.00 US Convenience Fee: 2.65 USD Total Amount: 102.65 USD Reference Information: NCC191758-202D,NCC191758,Burnsville Substation,Pee Dee Electric Membership Corp o ration,$100.00 DO NOT REPLY DIRECTLY TO THIS EMAIL Tony Eason VP of Engineering and Operations Pee Dee Electric 575 US Hwy 52 South Wadesboro, NC 28170 Direct: 910-997-8941 www.pdemc.com From: laserfiche@ncdenr.eov <laserfiche@ncdenr.eov> Sent: Friday, January 8, 2021 12:16 PM To: Tony Eason <TEason@pdemc.com> Cc: aziza.selkane@ncdenr.gov; bethany.georgoulias@ncdenr.gov; Tony Eason <TEason@pdemc.com> Subject: Notice of Deficiency: Unpaid Permit Fee for NCC192121 This email is to convey a Notice of Deficiency for failure to pay the annual permit fee per the requirements of NC General Statute 143-215.3D(a)(4). Your Certificate of Coverage (COC) under the Construction Stormwater NPDES General Permit was not renewed because the annual fee payment (Invoice No. NCC192121-2020) was not received. The payment is 15 day(s) overdue. A Notice of Deficiency is attached. Please contact The Stormwater Program Billing Specialist for more information at (919) 707- 3710. Please reference: COC no. NCC192121 This COC is for Burnsville Substation (AMENDMENT) in Anson County, issued to Pee Dee Electric Membership Corporation. If you have any questions, please contact the Stormwater Program at (919) 707-3710, or visit https://deg.nc.gov/NCG01. The INC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh, NC 27699-1612 This email was automatically generated by Laserfiche. Please do not respond to this email address, as responses are not monitored.