HomeMy WebLinkAboutWI0400098_BIMS Report for UIC Permit Renewal (without modification)_20210107Compliance Inspection Report
Permit: W10400098 Effective: 04/01/16 Expiration: 03/31/21 Owner: Abb Inc
SOC: Effective: Expiration: Facility: Former Flakt Products Site
County: Forsyth 2000 Lowery St
Region: Winston-Salem
Winston Salem NC 27101
Contact Person: R Keith Knauerhase Title: Chief Counsel Phone: 860-285-9694
Directions to Facility:
from WSRO take Old Lexington Rd. to Junia Ave. Turn LT at Martin Luther King Drive, then RT at S. Dunleith Ave. turns into Lowery St.
System Classifications:
Primary ORC: Certification: Phone:
Secondary ORC(s):
On -Site Representative(s):
Related Permits:
NC0085871 Flakt Products Inc - Flakt Products remediation site
Inspection Date: 12/31/2020 Entry Time 10:05AM Exit Time: 11:15AM
Primary Inspector: Jim J Gonsiewski Phone: 336-776-9704
Secondary Inspector(s):
Reason for Inspection: Routine Inspection Type: Reconnaissance
Permit Inspection Type: Injection In situ Groundwater Remediation Well
Facility Status: Compliant ❑ Not Compliant
Question Areas:
Wells System Operations
(See attachment summary)
Page 1 of 3
Permit: W10400098 Owner - Facility:Abb Inc
Inspection Date: 12/31/2020 Inspection Type : Reconnaissance Reason for Visit: Routine
Inspection Summary:
WSRO personnel conducted a site visit on December 31, 2020. The site was well maintained and in good condition. No
concerns were observed at either the monitoring wells or the injection wells. Based on the apparent stability of the
contaminant plume, the remediation system was shut down on July 27, 2017. Currently fourteen onsite monitoring wells
along with two offsite monitoring wells are sampled annually. The building that houses the remediation equipment was also
inspected. The equipment, consisting of a compressor, stabilization tank, and an air -stripper, appear to be in good
condition.
Page 2 of 3
Permit: W10400098 Owner - Facility:Abb Inc
Inspection Date: 12/31/2020 Inspection Type : Reconnaissance
System Operation
Is same well used as source well and injection well?
Is same well used as source well and injection well?
Is injection well capable of assimilating injected fluid?
Is injection well capable of assimilating injected fluid?
Reason for Visit: Routine
Injection flow rate at time of inspection (gpm)
Has system owner/operator noticed any abnormalities (turbidity, air in system, poor heating/cooling, etc) in
system operation?
Has system owner/operator noticed any abnormalities (turbidity, air in system, poor heating/cooling, etc) in
system operation?
Comment on system operation
Comment on system operation
Is system operation and construction consistent with that described in application?
Is system operation and construction consistent with that described in application?
Describe inconsistencies between application and observed operation/construction
The remediation system was shut down on July 27, 2017 and has not operated since.
Comment:
Yes No NA NE
❑❑■❑
❑❑❑■
Page 3 of 3