HomeMy WebLinkAbout20100527 Ver 1_Inspection_20101207P"i
NCDENR
IID - o.S' 1
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue
Governor
Coleen H. Sullins
Director
December 7, 2010
Mr. Shannon Miller
Lake Norman Dredging
P.O. Box 3156
Mooresville, NC 28117-3156
Dear Mr. Miller:
Subject: Catawba Riparian Buffer Rule
4561 Slanting Bridge Rd.
Catawba County, NC
Dee Freeman
Secretary
On November 29, 2010, a follow-up inspection was conducted to determine if the site was in
compliance with your restoration plan submitted to this office. Based on the inspection no further work is
required. In addition, the office received the receipt of payment to the EEP for the approved buffer impact. All
requirements have been met, thus the requested hold will be rescinded and the case considered closed .
Be advised any trees that have been planted that fail to thrive this coming growing season will need to be
replaced. It is also recommended that a silt fence be installed to clearly define the buffer boundary and prevent
sediment from entering the buffer area and lake. If you have any questions feel free to give me a call at 704-663-
1699.
Sincerely,
Alan D Johnson
Env. Sr. Specialist
Surface Water Protection
cc: Amy Chapman, Wetlands Unit
Duke Power Lake Management
Mooresville Regional Office
Location: 610 East Center Avenue, Suite 301. Mooresville, NC 28115
Phone: (704) 663-1699\Fax: (704) 663-6040\ Customer Service: 1-877-623-6748
Internet: www.ncwaterguality.org
NorthCarolina
,Alatumllry
An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper