HomeMy WebLinkAbout030002_Compliance Evaluation Inspection_20201019Type of Visit: V Compliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance
Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access
Date of Visit: Arrival Time: Departure Time: County: a11� Region:\
Farm Name: Gt � Owner EEmaTil:
uYVK(k Pao "M i
Owner Name: _ (XVI b- hone:
�^ 1
Mailing Address: CC p
Physical Address: 6�j �j p �/aj L(.�,�i [ %i ((� /VCi 6�.� �j%3
Facility Contact: h+km!!�e Title: Phone:
Onsite Representative: V Integrator:
Certified Operator: W i l t V Voy-y-w Certification Number:
Back-up Operator: Certification NumberI'd
:1
Location of Farm: Latitude:Alb (� Longitude:
Discharges and Stream Impacts
1. Is any discharge observed from any part of the operation?
Discharge originated at: ❑ Structure ❑ Application Field ❑ Other:
a. Was the conveyance man-made?
b. Did the discharge reach waters of the State? (If yes, notify DWR)
c. What is the estimated volume that reached waters of the State (gallons)? _
d. Does the discharge bypass the waste management system? (If yes, notify DWR)
2. Is there evidence of a past discharge from any part of the operation?
3. Were there any observable adverse impacts or potential adverse impacts to the waters
of the State other than from a discharge?
❑ Yes x No ❑ NA ❑ NE
❑ Yes ❑ No ❑ NA ❑ NE
[:]Yes ❑ No ❑ NA ❑ NE
[:]Yes [:]No
❑ Yes No
❑ Yes No
❑NA ❑NE
❑ NA ❑ NE
❑NA ❑NE
Page 1 of 3 21412015 Continued
[Facility Number: > � - Date of Inspection: 10 1 tot irm
Waste Collection & Treatment
4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE
a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ONE
Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Identifier: N_ wi WSn _ X
Spillway?: V
Designed Freeboard (in): _
Observed Freeboard (in):
5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE
(i.e., large trees, severe erosion, seepage, etc.)
6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE
waste management or closure plan? 10
If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR
7. Do any of the structures need maintenance or improvement? ❑ Yes VNo ❑ NA ❑ NE
8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes % No ❑ NA ❑ NE
(not applicable to roofed pits, dry stacks, and/or wet stacks)
9. Does any part of the waste management system other than the waste structures require Yes
❑ No
❑ NA
❑ NE
maintenance or improvement?
Waste Application
10. Are there any required buffers, setbacks, or compliance alternatives that need
Yes
❑ No
❑ NA
❑ NE
maintenance or improvement?
11. Is there evidence of incorrect land application? If yes, check the appropriate box below. Yes
❑ No
❑ NA
❑ NE
�6 Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground
❑ Heavy Metals (Cu, Zn, etc.)
❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into
Bare Soil
❑ Outside of Acceptable Crop Window ❑ Evidence ofI Wind Drift
Application Outside of Approved Area
12. Crop Type(s): C Sri j l�
13. Soil Type(s):
14. Do the receiving crops differ from those designated in the CAWMP?
❑ Yes]
No
❑ NA
❑ NE
15. Does the receiving crop and/or land application site need improvement?
❑ Yes
No
❑ NA
❑ NE
16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes
No
❑ NA
❑ NE
acres determination?
17. Does the facility lack adequate acreage for land application?
❑ Yes
No
❑ NA
❑ NE
18. Is there a lack of properly operating waste application equipment?
❑ Yes
No
❑ NA
❑ NE
Required Records & Documents
19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes D(No ❑ NA ❑ NE
20. Does the facility fail to have all components of the CAWMP readily available? If yes, check Yes ❑ No ❑ NA ❑ NE
the appropriate box.
❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other:
21. Does record keeping need improvement? If yes, c .ate box below. - Yes ❑ No ❑ NA ❑ NE
Waste Application ❑ Weekly Freeboard ❑ Waste Analysis Soil Analysis Waste Transfers Weather Code
Rainfall Stockin ❑Crop Yield u e nsp Monthly and 1" Rainfall Inspections
22. Did the face ail to install and maintain a rain gauge? ❑ Yes DO No ❑ NA ❑ NE
23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No NA ❑ NE
Page 2 of 3 21412015 Continued
Facility Number: ns- Date of Ins ection: p1161
24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE
25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No NA ❑ NE
the appropriate box(es) below.
❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels
❑ Non -compliant sludge levels in any lagoon
List structure(s) and date of first survey indicating non-compliance:
26. Did the facility fail provide documentation of an actively certified operator in charge?
❑ Yes
No ❑ NA ❑ NE
27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification?
❑ Yes
No ❑ NA ❑ NE
Other Issues
28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document
❑ Yes
No ❑ NA ❑ NE
and report mortality rates that were higher than normal?
1�
29. At the time of the inspection did the facility pose an odor or air quality concern?
❑ Yes
No ❑ NA ❑ NE
If yes, contact a regional Air Quality representative immediately.
30. Did the facility fail to notify the Regional Office of emergency situations as required by the
❑ Yes
No ❑ NA ❑ NE
permit? (i.e., discharge, freeboard problems, over -application)
31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below.
❑ Yes
1� No ❑ NA ❑ NE
❑ Application Field ❑ Lagoon/Storage Pond ❑ Other:
32. Were any additional problems noted which cause non-compliance of the permit or CAWMP?
❑ Yes
X No ❑ NA ❑ NE
33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative?
❑ Yes
No ❑ NA ❑ NE
34. Does the facility require a follow-up visit by the same agency?
❑ Yes
4No ❑ NA ❑ NE
T_ 01 t +a--h & 4x-a-yv�kr-nYTYX� �Y� Visip
T� •b bt AN V)Cku1.
n �
�^Y- V-,�, �rr • lod e A01"%� � i 5 ��6�`f�-
�► �s ,1`.(0,. 19 Mn*) e d h psi b ro A j l_c�,V's � s l o Pt s kUd i � 'PAL e d sa uy\-
So14-& $Ik c lLP, c�( I No) cktc&red &v � .
1 /L t t h9 I j w i 6 v4 C V. rLp c6x v c 47Lto ace
ny%a .�
h1Ged wa�cj s6J_F,C) � (�
- PJG
nci 1 s5 Vv
W aS V- - Same u_ Firar�-- `gyp l q
Coil _ Pri �an a ;/'�� 4rM %N , S S. 6t
Reviewer/Inspector Name: V,b,( [ c k (L (And 0-4al q;
U.1:FT-jor
`R a K-+ n
arb�'nt
v�SP
C" TjrjVX
0a t W oui�
oS4 h Yts.
Ud Lor
Page 3 of 3