Loading...
HomeMy WebLinkAbout030002_Compliance Evaluation Inspection_20201019Type of Visit: V Compliance Inspection 0 Operation Review O Structure Evaluation Q Technical Assistance Reason for Visit: Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: Arrival Time: Departure Time: County: a11� Region:\ Farm Name: Gt � Owner EEmaTil: uYVK(k Pao "M i Owner Name: _ (XVI b- hone: �^ 1 Mailing Address: CC p Physical Address: 6�j �j p �/aj L(.�,�i [ %i ((� /VCi 6�.� �j%3 Facility Contact: h+km!!�e Title: Phone: Onsite Representative: V Integrator: Certified Operator: W i l t V Voy-y-w Certification Number: Back-up Operator: Certification NumberI'd :1 Location of Farm: Latitude:Alb (� Longitude: Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? _ d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes x No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE [:]Yes ❑ No ❑ NA ❑ NE [:]Yes [:]No ❑ Yes No ❑ Yes No ❑NA ❑NE ❑ NA ❑ NE ❑NA ❑NE Page 1 of 3 21412015 Continued [Facility Number: > � - Date of Inspection: 10 1 tot irm Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ONE Structure I Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: N_ wi WSn _ X Spillway?: V Designed Freeboard (in): _ Observed Freeboard (in): 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes No ❑ NA ❑ NE waste management or closure plan? 10 If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes VNo ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes % No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require Yes ❑ No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need Yes ❑ No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. Yes ❑ No ❑ NA ❑ NE �6 Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence ofI Wind Drift Application Outside of Approved Area 12. Crop Type(s): C Sri j l� 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes] No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes D(No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check Yes ❑ No ❑ NA ❑ NE the appropriate box. ❑ WUP ❑ Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, c .ate box below. - Yes ❑ No ❑ NA ❑ NE Waste Application ❑ Weekly Freeboard ❑ Waste Analysis Soil Analysis Waste Transfers Weather Code Rainfall Stockin ❑Crop Yield u e nsp Monthly and 1" Rainfall Inspections 22. Did the face ail to install and maintain a rain gauge? ❑ Yes DO No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No NA ❑ NE Page 2 of 3 21412015 Continued Facility Number: ns- Date of Ins ection: p1161 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes No ❑ NA ❑ NE and report mortality rates that were higher than normal? 1� 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes No ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes 1� No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes X No ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes 4No ❑ NA ❑ NE T_ 01 t +a--h & 4x-a-yv�kr-nYTYX� �Y� Visip T� •b bt AN V)Cku1. n � �^Y- V-,�, �rr • lod e A01"%� � i 5 ��6�`f�- �► �s ,1`.(0,. 19 Mn*) e d h psi b ro A j l_c�,V's � s l o Pt s kUd i � 'PAL e d sa uy\- So14-& $Ik c lLP, c�( I No) cktc&red &v � . 1 /L t t h9 I j w i 6 v4 C V. rLp c6x v c 47Lto ace ny%a .� h1Ged wa�cj s6J_F,C) � (� - PJG nci 1 s5 Vv W aS V- - Same u_ Firar�-- `gyp l q Coil _ Pri �an a ;/'�� 4rM %N , S S. 6t Reviewer/Inspector Name: V,b,( [ c k (L (And 0-4al q; U.1:FT-jor `R a K-+ n arb�'nt v�SP C" TjrjVX 0a t W oui� oS4 h Yts. Ud Lor Page 3 of 3