Loading...
HomeMy WebLinkAboutNCC190501_NOT Closeout Documents_20201229SEDIMENTATION INSPECTION REPORT (City of Winston-Salem/Forsyth County) Winston-Salem Traffic Field Operations Department Permit #: EN1900079 Erosion Control Division P.O. Box 2511 Date: 5/6/2020 Winston-Salem, NC 27102 Report by: WesleyWilliams Revised 7-1-19 Phone: 1 (336) 727-2487 Project: I Albohn Property Location: 9361 Benefit Church Road 1. Pictures: ("x" One) Yes: No: X 2. Potential for NPDES Violation: ("x7' One) Yes: No: X Describe: 3. Weather and soil conditions: Sun/Wet Initial inspection: ("x" One) Yes: No: X 4. Is site currently under notice of violation? ("x7' One) Yes: No: X 5. Is the site in compliance with S.P.C.A. and rules? ("x" One) Yes: X No: If no, check violations below: 6. Violations: ("X" all applicable sections) ( )--- No approved plan, [UDO Sec. 5-7 (G) ; & G.S. 113A-57 (4) and 15A N.C.A.C4B.0107(c)] ( )--- Failure to follow approved plan, [UDO sees-20.1; & G.S. 113A-61.1] ( )--- Failure to submit revised plan, [UDO See. 5-18.2; & G.S. 113A-54.1(b) and 15A N.C.A.C. 413.0118(a)] ( )--- Failure to provide adequate groundcover, [UDO See. 5-7 (D)(1); & G.S. 113A-57(3); & 15A N.C.A.C. 413.0007(b) or 15A N.C.A.C. 413.0124(e)] ( )--- Insufficient measures to retain sediment on site, [UDO Sec. 5-7 (D)(1); & G.S. 113A-57(3)] ( )--- Failure to take all reasonable measures, [UDO Sec. 5-5.2; & 15A N.C.A.C.4130105] ( )--- Inadequate buffer zone, [UDO See. 5-7 (A); & G.S. 113A-57(1)] ( )--- Graded slopes and fills too steep, [UDO See. 5-7 (B); & G.S. 113A-57(2) or 15A N.C.A.C. 413.0124(d)] Unprotected exposed slopes, [ UDO See. 5-7 (D)(2); & G.S. 113A-57(2)] Failure to install and maintain erosion control measures, [UDO See. 5-13; & 15A N.C.A.C. 413.0113] Failure to keep current self -inspection records, [G.S. 113A-54.1 & 15A NCAC 0413. 0131] Other (describe): 7. Contact made with (name): Samuel Evans Title General Contractor 8. Contact Method: phone # (X) email (x) fax # O letter O person ( ) Corrective actions needed: No corrective actions needed at the time of inspection. 10. Comments: ( ) No devices in place ( ) Additional devices needed ( ) Devices need maintenance (x) Devices in & functioning ( ) No seeding noted ( ) Partially seeded (X) Areas seeded (NO) Off -site sedimentation (YES ) Project in compliance The site is in stable condition and complete per the approved plan. Please submit the e-NOT and provide documentation. 11. Others present: Office use only: Cityworks (x) Final ( ) [white notebook] Excel ( ) Financially responsible contact ( ) ARCGIS ()