Loading...
HomeMy WebLinkAbout20101015 Ver 1_Stormwater Info_20101206• SIEMENS GAS TURBINE MANUFACTURING FACILITY HYDRAULIC AND HYDROLOGIC CALCULATIONS PRELIMINARY CALCULATIONS Little Diversified Architectural Consulting 5815 Westpark Drive Charlotte, NC 28217 PROJECT NO. 101-7410-00 (RI Tt November 24, 2010 " F ti 0011 DEL G 6 2010 DENR-Y?R gUALITY WETLANDS AND STOR1„p,ATER BRANCH 11 Hydrologic Evaluation Siemens GT Plant OBJECTIVE: Design a detention system to mitigate increased impervious on the Siemens Property on Westinghouse Blvd. Two wet ponds will be designed to maintain pre-developed flow for the 2-year 6-hour storm, 10-year 6-hour, and 25-year 6-hour storm events. The systems will also have a 50-year 6-hour storm overflow and maintain at minimum 1-ft of freeboard, and control the 1-in, 6-hr storm. DESIGN CONSIDERATIONS: The pre-developed condition of the site has a number of very large trees, grassed area and impervious area. The required water quality and water quantity control system is being designed to meet City of Charlotte regulations. REFERENCES: 1. Charlotte Mecklenburg Stormwater Design Manual, 1993. 2. North Carolina Department of Environment and Natural Resources Erosion and Sediment Control Planning and Design Manual, 2006. 3. "Pre-Developed Drainage Map" by Little. 4. "Proposed Grading and Storm Drainage Plan," by Little. 5. HydroCAD, v8.5. 6. Web Soil Survey-Mecklenburg County GeoPortal, 2010 TERMS: PX = x-year 24-hour rainfall, (in) CN = SCS curve number A = drainage area, (acres) n = manning's coefficient S = slope, (ft/ft) v = velocity, (ft/s) cfs = cubic feet per second h = maximum head above the riser, (ft) Q = hydraulic flow rate (cfs) Cd = coefficient of contraction for the orifice La = length of rip rap apron, (ft) do = diameter of outlet pipe, (ft) dso = mean diameter of stone for outlet protection, (ft) d.. = maximum stone diameter, (ft) WQ, = water quality volume, (ft) CP„ = cannel protection volume, (ft) W = width of rip rap apron (ft) Project Number: 101.7410.00 Calctilations By: C. Roberts Checked BV: 1' a g e 1 of 1 t • Eydrologic Evaluation Siemens GT Plant GIVEN/REQUIREMENTS: Maintain pre-developed runoff rates for 2-yr 6-hr storm [Ref 1 ] Maintain pre-developed runoff rates for 10-yr 6-hr storm [Ref: 1] Maintain pre-developed runoff rates for 25-yr 6-hr storm [Ref: 1] P2 = 3.12 inches [Ref 1] Soil Hydrologic Group = C [Ref: 61 1. PRE-DEVELOPED FLOW CALCULATIONS: Calculate composite Curve Number and Time of Concentration for pre-developed conditions 1. Pond A Pre Developed Area a. Pond A Pre Developed Area = 23.62 acres 11 r? U b. Composite curve number for Pond A Pre Developed Area Soil Type Ref: 6 Land Cover Area (acres) Ref: 2 CN C Impervious 5.55 98 C Grassed 10.01 79 C Wooded 8.06 73 Pre-developed weighted CN = 81 c. Determine total pre-developed time of concentration t? = 18.1 min :: See HyrdoCAD output 2. Pond B Pre Developed Area a. Pond B Pre Developed Area = 12.10 acres b. Composite curve number for Pond B Pre Developed Area Soil Type Ref: 6 Land Cover Area (acres) Ref 2] CN C Im ervious 3.65 98 C Grassed 5.23 79 C Wooded 3.22 73 rre-developed weighted CN = 83 c. Determine total pre-developed time of concentration tc = 21.2 min :: See HydroCAD output Project Nuunber: 1,01.7410.00 Calculations By: C. Roberts Checked By: [Ref 3] [Ref: 3,5] [Ref: 3,5] [Ref. 3] [Ref: 3,5] [Ref 3,5] Page 12of'll • E llydrologic Evaluation Siemens G,r Plant II. PRE-DEVELOPED HYDROLOGIC CONDITIONS: 1. Pond A Pre Developed Area - Storm Event Peak Outflow cfs 2- 27.45 10- 62.95 25- 80.31 2. Pond B Pre Developed Area - Storm Event Peak Outflow cfs 2- 14.59 10- 32.18 25- 40.61 Prgject Number: 1.01.7410.00 Calculations By: C. Roberts Checked By: [Ref 5] [Ref: 5] Page 13ot'11 Hydrologic Evaluation Siemens GT Plant III. POST-DEVELOPED FLOW CALCULATIONS: 1. Pond A Post Developed Area a. Pond A Post Developed Area = 23.61 acres b. Composite curve number for Pond A Post Developed Area [Ref: 3] Soil Type [Ref 6] Land Cover Area (acres) [Ref: 2] CN C Grassed 5.19 79 C Impervious 18.42 98 • • Post-developed weighted CN = 94 c. Determine total post-developed time of concentration tr = 5 min :: assumed 2. Pond B Post Developed Area a. Pond B Post Developed Area = 12.11 acres b. Composite curve number for Pond B Post Developed Area Soil Type Ref: 6 Land Cover Area (acres) Ref: 2 CN C Grassed 2.23 79 C Impervious 9.88 98 Post-developed weighted CN = 95 c. Determine total post-developed time of concentration tc = 5.0 min:: assumed Project Number: 101.741.0.00 Calculations By: C. Roberts Checked By: [Ref: 3,5] [Ref: 3] [Ref: 3] [Ref: 3,5] [Ref: 3] Page 14ofl] flydrologic Evaluation Siemens GT Plant IV. POST-DEVELOPED HYDROLOGIC CONDITIONS: 1. Pond A Post Developed Area - Storm Event Peak Outflow cfs 2- 86.74 10- 136.63 25- 160.79 • is 2. Pond B Post Developed Area - Storm Event Peak Outflow (cfs 2- 46.29 10- 71.48 25- 83.76 Prgject Number: 101.7410.00 Calculations By: C. Roberts liecked By: [Ref: 5] [Ref: 5] Page jaof'll Hydrologic Evaluation Siemens G'I' Plant V. WET POND DESIGN: 3. Determine pond outlet structure sizes based on peak flow requirements. A. Pond A Wet Pond a. Compute WQv - 18.42ac = 0.78 a 23.61ac R, = 0.05 + 0.9 * Ia = 0.05 + 0.9(0.78) = 0.752 1.OR„ A _ (1.0)(0.752)(23.61ac) 3 W Qv _ 12 12 = 1.48ac - ft = 24,469 f t WQ„ = 1.0 * R„ = 1.0(0.752) = 0.752 in b. Compute Modified CN 1,000 CN,n = 10 + 5P + 10WQ, - 10(WQ2 + 1.25WQ„ P)1/2 1,000 CNm = 10 + 5(1.0) + 10(0.752) -10[(0.752)2 + 1.25(0.752)(1.0)]1/2'= 97.56 c. Compute WQ, Release Rate WQ„ * 43,560 _ (1.48ac - ft)(43,560) _ Release Rate = 99 hrs * 3,600sec/hr (99hrs)(3,600sec/hr) 0.18cfs d. Compute Pretreatment Volume (imp area) (0.2) (18.42ac)(0.2) Volume - 12 = 12 = 0.307ac - ft = 13,373ft3 e. Compute PP, WQ„_1.48ac-ft PP„ _ 0.3 0.3 = 4.93ac - ft = 214,751 f t3 PP„ (required) = 215,751 f t3 - 13,373 f t3 = 202,378 f t3 f. Compute WQ extended Detention Volume Project Number: 1.01.7410.00 Calculations By: C. Roberts Checked By: P a 9 e 16 of 11 Hydrologic Evaluation Siemens G"r Plant Extended Detention Volume is greater of CP„ and PP,,. CP,, not required because of I-1 zoning. Ext. Det. Volume = PP„ = 214,751 f t3 Provided = 226,654ft3 (See below) g. Compute Total Volume of Pond • Elevation [Ref: 2] Area [Ref: 2] Height Inc. Volume Cumulative Volume 581.75 22,985 0.25 0 0 582 23,784 1 5,846 5,846 583 25,118 1 24,451 30,297 584 26,504 1 25,811 56,108 585 27,942 1 27,223 83,331 586 29,431 1 28,687 112,018 587 30,973 1 309202 142,220 588 32,566 1 31,770 173,989 589 35,620 1 34,093 208,082 589.50 38,668 0.50 18,572 226,654 P, 590 43,583 0.50 20,563 247,217 591 48,400 1 45,992 293,208 592 662553 1 579477 350,685 593 75,850 1 71,202 421,886 h. Flow Information [Ref: 5] Storm Event Peak Inflow (cfs) Peak Outflow (cfs) Peak Elev. (ft) Storage (cu. ft. 1-in, 6-hr 39.91 0.17 590.92 62,586 2- , 6-hr 86.74 17.45 591.40 87,532 10- , 6-hr 136.63 61.15 592.08 129,430 25- , 6-hr 160.79 81.59 592.34 146,897 50- , 6-hr 179.09 99.12 592.50 158,523 L Outlet Summary [Ref: 4,5] Outlet Type Invert Elevation Size 1-in, 6-hr Circular Orifice 589.50' 0 2.4" 2- , 6-hr Rectangular Orifice 590.92' 8.0'x 1.0' 10- , 6-hr Rectangular Orifice 590.92' 8.0'x 1.0' 25- , 6-hr Broad-Crested Weir 592.10' 30' L 50- , 6-hr Broad-Crested Weir 592.10' 30'L }'reject Number: 1.0 1.741 0.00 Calculations By: C. Roberts Checked By: Pate 17 of l l Hydrologic Evaluation Siemens GI' Plant B. Pond B Wet Pond Design a. Compute WQv I _ 9.88ac = 0.816 a 12.11ac R„=0.05+0.9*IQ=0.05+0.9(0.816)=0.78 _ 1.OR„A _ (1.0)(0.78)(12.11ac) - W Qv 12 - 0.79ac - ft = 34,482 f t3 12 WQ, = 1.0 * R„ = 1.0(0.78) = 0.78 in b. Compute Modified CN 1,000 CNm = 10 + 5P + 10WQ„ -10(WQ,2, + 1.25WQ„ P)1/2 1,000 Um = 10 + 5(1.0) + 10(0.78) - 10[(0.78)2 + 1.25(0.78)(1.0)]1/2 - 97.88 10 c. Compute WQv Release Rate WQ, * 43,560 _ (0.79ac - ft)(43,560) _ Release Rate = 99 hrs * 3,600sec/hr (99hrs)(3,600sec/hr) - 0.01cfs d. Compute Pretreatment Volume (imp area) (0.2) (9.88ac)(0.2) Volume = 12 = 12 = 0.165ac - ft = 7,173ft3 e. Compute PP, WQ, _ 0.79ac - ft PP„ _ 0.3 0.3 = 2.63ac - ft = 114,708ft3 PP„ (required) = 114,708ft3 - 7,173ft3 = 107,535ft3 Project Number: 1.01.7410.00 Calculations By: C. Roberts Checked By: Pace 1 8 of'11 • Flydrologic Evaluation Siemens GT Plant L Compute WQ extended Detention Volume Extended Detention Volume is greater of CP„ and PP,,. CP,, not required because of I-1 zoning. Ext. Det. Volume = PP, = 114,708 f t3 Provided = 116,529 f t3 (See below) g. Compute Total Volume of Pond Elevation [Ref: 2] Area [Ref: 2] Height Inc. Volume Cumulative Volume 597 20,798 1 598 22,014 1 21,406 21,406 599 23,255 1 22,634 44,040 600 24,521 1 23,888 67,928 601 25,812 1 251166 93,094 602 27,128 1 26,470 119,564 603 34,303 1 30,716 150,280 603.50 30,695 0.50 16,250 166,529 PPS 604 36,582 0.50 18,819 183,349 605 41,339 1 38,961 222,309 606 43,859 1 42,599 264,908 607 44,774 1 44,316 309,224 h. Flow Information [Ref: 5] Storm Event Peak Inflow cfs Peak Outflow cfs Peak Elev. ft Storage cu. ft. 1-in, 6-hr 21.01 0.10 604.44 33,249 2- , 6-hr 46.29 8.13 604.84 49,076 10- , 6-hr 71.48 30.09 605.39 72,296 25- , 6-hr 83.76 41.26 605.61 81,341 50- , 6-hr 93.05 51.98 605.74 87,085 L Outlet Summary [Ref: 4,5] Outlet Type Invert Elevation Size 1-in, 6-hr Circular Orifice 603.50' 0 2.0" 2- , 6-hr Rectangular Orifice 604.44' 5.0'x 1.0' 10- , 6-hr Rectangular Orifice 604.44' 5.0'x 1.0' 25- , 6-hr Broad-Crested Weir 605.50' 30' L 50- , 6-hr Broad-Crested Weir 605.50' 30'L Project Number: 1.01.7410.00 Calculations By: C. Roberts Checked By: P a g e 19 of i J • • 1-Iydrologic Evaluation Siemens G'I' Plant VI. POST DEVELOPED SITE WITH POND HYDROLOGIC CONDITIONS 1. Pond A Post Developed Pond Area 'ond Area) - [Ref: 4] Compare to Pond A Pre Developed Storm Event Peak Outflow cfs 2- 17.45 10- 61.15 25- 81.59 2. Pond B Post Developed Pond Area Compare to Pond B Pre Developed Storm Event Peak Outflow cfs 2- 8.13 10- 30.09 25- 41.26 'ond Area) - Project Number: 1.01.741.0.00 Calculations By: C. Robeas Checked By: [Ref: 4] Page 10of'lI Hydrologic Evaluation Siemens GT Plant VII. SUMMARY Subbasin Pre-Developed Peak Flow (cfs) Post-Developed Peak Flow Routed Post-Developed Peak (cfs) Flow (cfs) 2-yr 10-yr 25-yr 2-yr 10-yr 25-yr 2-yr 10-yr 25-yr 1 86.74 136.63 160.79 86.74 136.63 160.79 17.45 61.15 81.59 2 46.29 71.48 83.76 46.29 71.48 83.76 8.13 30.09 41.26 Total 133.03 208.11 244.55 133.03 208.11 244.55 25.58 91.24 122.85 P__? Project Number: 101.741.0.00 Calculations By: C. Roberts Checked Fay: P a e 11 o#' 11 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1 S: Pond A Pre Dev Runoff = 27.45 cfs @ 3.34 hrs, Volume= 1.594 af, Depth= 0.81" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Area (ac) CN Description 10.010 79.00 50-75% Grass cover, Fair, HSG C 5.550 98.00 Paved parking & roofs 8.060 73.00 Woods, Fair, HSG C 23.620 81.42 Weighted Average 18.070 Pervious Area 5.550 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.3 100 0.0300 0.14 Sheet Flow, Grass: Dense n= 0.240 P2= 3.12" 0.7 117 0.0340 2.97 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 95 0.0100 6.44 11.38 Circular Channel (pipe), 4.7 755 0.0278 2.68 Diam= 18.0" Area= 1.8 sf Perim= 4.7' r- 0.38' n= 0.012 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 145 0.0350 10.43 156.47 Channel Flow, Area= 15.0 sf Perim= 20.0' r= 0.75' n= 0.022 Earth, clean $ straight 18.1 1,212 Total • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 2 Subcatchment 1 S: Pond A Pre Dev Hydrograph u 3 0 LL LI 10 20 30 40 50 60 70 an 9n ion 11n 12n 13n tan 1sin 1Rn 17 Time (hours) - Runoff 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10 yr 10 yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1 S: Pond A Pre Dev Runoff = 62.95 cfs @ 3.32 hrs, Volume= 3.780 af, Depth= 1.92" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" Area (ac) CN Description 10.010 79.00 50-75% Grass cover, Fair, HSG C 5.550 98.00 Paved parking & roofs 8.060 73.00 Woods, Fair, HSG C 23.620 81.42 Weighted Average 18.070 Pervious Area 5.550 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.3 100 0.0300 0.14 Sheet Flow, Grass: Dense n= 0.240 P2= 3.12" 0.7 117 0.0340 2.97 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 95 0.0100 6.44 11.38 Circular Channel (pipe), 4.7 755 0.0278 2.68 Diam= 18.0" Area= 1.8 sf Perim= 4.7' r- 0.38' n= 0.012 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 145 0.0350 10.43 156.47 Channel Flow, Area= 15.0 sf Perim= 20.0' r= 0.75' n= 0.022 Earth, clean & straight 18.1 1,212 Total 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10 yr 10-yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 2 Subcatchment 1S: Pond A Pre Dev Hydrograph v 3 0 LL i. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 17 Time (hours) - Runoff 0 2010-11-15 Hydrologic Analysis Charloffe 6-hr 25 yr 25-yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 © 2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 1S: Pond A Pre Dev Runoff = 80.31 cfs @ 3.32 hrs, Volume= 4.882 af, Depth= 2.48" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Area (ac) CN Description 10.010 79.00 50-75% Grass cover, Fair, HSG C 5.550 98.00 Paved parking 8 roofs 8.060 73.00 Woods, Fair, HSG C 23.620 81.42 Weighted Average 18.070 Pervious Area 5.550 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.3 100 0.0300 0.14 Sheet Flow, Grass: Dense n= 0.240 P2= 3.12" 0.7 117 0.0340 2.97 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 95 0.0100 6.44 11.38 Circular Channel (pipe), • 4.7 755 0.0278 2.68 Diam= 18.0" Area= 1.8 sf Perim= 4.7' r- 0.38' n= 0.012 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.2 145 0.0350 10.43 156.47 Channel Flow, Area= 15.0 sf Perim= 20.0' r- 0.75' n= 0.022 Earth clean & straight 18.1 1,212 Total 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HydroCAD Software Solutions LLC Page 2 Subcatchment 1S: Pond A Pre Dev Hydrograph 3 0 LL 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 • Time (hours) - Runoff 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 2S: Pond B Pre Dev • Runoff = 14.59 cfs @ 3.37 hrs, Volume= 0.908 af, Depth= 0.90" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Area (ac) CN Description 5.230 79.00 50-75% Grass cover, Fair, HSG C 3.650 98.00 Paved parking & roofs 3.220 73.00 Woods, Fair, HSG C 12.100 83.13 Weighted Average 8.450 Pervious Area 3.650 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft ) (ft/sec) (cfs) 16.2 100 0.0150 0.10 Sheet Flow, Grass: Dense n= 0.240 P2= 3.12" 1.2 225 0.0400 3.22 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.8 270 0.0560 1.18 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.2 595 Total Subcatchment 2S: Pond B Pre Dev Hydrograph 3 0 LL 1u Zu M 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) - Runoff • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 2S: Pond B Pre Dev Runoff = 32.18 cfs @ 3.37 hrs, Volume= 2.073 af, Depth= 2.06" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" Area (ac) CN Description 5.230 79.00 50-75% Grass cover, Fair, HSG C 3.650 98.00 Paved parking & roofs 3.220 73.00 Woods Fair HSG C 12.100 83.13 Weighted Average 8.450 Pervious Area 3.650 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.2 100 0.0150 0.10 Sheet Flow, Grass: Dense n= 0.240 P2= 3.12" 1.2 225 0.0400 3.22 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.8 270 0.0560 1.18 Shallow Concentrated Flow, Woodland Kv= 5.0 fps 21 2 595 Total . Subcatchment 2S: Pond B Pre Dev Hydrograph 3 0 M 32 .1 8 ds 32 3 Charlotte 6-hr 10-yr 10-yr z6 . Rainfall=3.72" z6 z4 Runoff Area=12.100 ac 22 Runoff Volume=2.073 of z0 18 . _ Runoff Depth=2.06" 16 Flow Length=595' 14 12 Tc=21-.2 min 107 CN=83.13 8 4 - 2 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 1so 17 Time (hours) -Runoff 0 . 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 2S: Pond B Pre Dev • Runoff = 40.61 cfs @ 3.37 hrs, Volume= 2.653 af, Depth= 2.63" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Area (ac) CN Description 5.230 79.00 50-75% Grass cover, Fair, HSG C 3.650 98.00 Paved parking & roofs 3.220 73.00 Woods Fair HSG C 12.100 83.13 Weighted Average 8.450 Pervious Area 3.650 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.2 100 0.0150 0.10 Sheet Flow, Grass: Dense n= 0.240 P2= 3.12" 1.2 225 0.0400 3.22 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 3.8 270 0.0560 1.18 Shallow Concentrated Flow, Woodland Kv= 5.0 fos 21.2 595 Total Subcatchment 2S: Pond B Pre Dev Hydrograph 3 0 40.61 cfs .0 16 _ - Charlotte 6-hr 25-yr.25-yr. Rainfall=4.38" 2 .o Runoff Area=12.100 ac - Runoff Volume=2.653 of `. 2 Runoff Depth=2.63" Flow Length=595' 6 Tc=21.2 min 4 2 - CN=83.13 6 4 2 0 10 20 30 40 50 60 70 80 g0 100 110 1gn inn 14n 15n 1Fn 17 Time (hours) - Runoff • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 1-in 1-in Rainfall=1.00" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 3S: Pond A Post Dev Runoff = 39.91 cfs @ 3.15 hrs, Volume= 1.480 af, Depth= 0.75" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 1-in 1-in Rainfall=1.00" Area (ac) CN Description 0.000 94.00 Post-Developed CN " 23.610 97.56 Post-Developed Modified CN 23.610 97.56 Weighted Average 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pond A Post Dev Hydrograph 3 0 U. 10 20 30 40 50 60 70 80 90 100 110 120 130 140 1sin 1fn 17 Time (hours) - Runoff / 1 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 3S: Pond A Post Dev Runoff = 86.74 cfs @ 3.15 hrs, Volume= 3.266 af, Depth= 1.66" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Area (ac) CN Description " 23.610 94.00 Post-Developed CN 0.000 97.56 Post-Developed Modified CN 23.610 94.00 Weighted Average 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pond A Post Dev Hydrograph • 3 0 U. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 17 Time (hours) - Runoff 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HydroCAD Software Solutions LLC Paste 1 Summary for Subcatchment 3S: Pond A Post Dev Runoff = 136.63 cfs @ 3.15 hrs, Volume= 6.002 af, Depth= 3.05" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" Area (ac) CN Description 23.610 94.00 Post-Developed CN 0.000 97.56 Post-Developed Modified CN 23.610 94.00 Weighted Average 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pond A Post Dev Hydrograph 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 3S: Pond A Post Dev Runoff = 160.79 cfs @ 3.15 hrs, Volume= 7.275 af, Depth= 3.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Area (ac) CN Description " 23.610 94.00 Post-Developed CN 0.000 97.56 Post-Developed Modified CN 23.610 94.00 Weighted Average 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft ) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pond A Post Dev Hydrograph 0 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 50-yr 50-yr Rainfall=4.92" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 3S: Pond A Post Dev Runoff = 179.09 cfs @ 3.15 hrs, Volume= 8.321 af, Depth= 4.23" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 50-yr 50-yr Rainfall=4.92" Area (ac) CN Description 23.610 94.00 Post-Developed CN " 0.000 97.56 Post-Developed Modified CN 23.610 94.00 Weighted Average 23.610 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 3S: Pond A Post Dev Hydrograph 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 1-in 1-in Rainfall=1.00" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 4S: Pond B Post Dev Runoff = 21.01 cfs @ 3.15 hrs, Volume= 0.787 af, Depth= 0.78" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 1-in 1-in Rainfall=1.00" Area (ac) CN Description * 0.000 95.00 Post Developed CN * 12.110 97.88 Post Developed Modified CN 12.110 97.88 Weighted Average 12.110 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (fUsec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pond B Post Dev Hydrograph • 3 0 U. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 V - Runoff Time (hours) 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2 yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HydroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 4S: Pond B Post Dev Runoff = 46.29 cfs @ 3.15 hrs, Volume= 1.767 af, Depth= 1.75" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Area (ac) CN Description 12.110 95.00 Post Developed CN " 0.000 97.88 Post Developed Modified CN 12.110 95.00 Weighted Average 12.110 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pond B Post Dev Hydrograph • 3 0 LL 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 1i Time (hours) - Runoff 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10 yr 10-yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Paae 1 Summary for Subcatchment 4S: Pond B Post Dev Runoff = 71.48 cfs @ 3.15 hrs, Volume= 3.184 af, Depth= 3.16" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" Area (ac) CN Description * 12.110 95.00 Post Developed CN * 0.000 97.88 Post Developed Modified CN 12.110 95.00 Weighted Average 12.110 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pond B Post Dev Hydrograph • 3 0 LL 30 40 50 60 70 80 90 100 110 120 130 140 150 Time (hours) - Runoff 9 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25 yr 25-yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 © 2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 4S: Pond B Post Dev Runoff = 83.76 cfs @ 3.15 hrs, Volume= 3.841 af, Depth= 3.81 Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Area (ac) CN Description 12.110 95.00 Post Developed CN 0.000 97.88 Post Developed Modified CN 12.110 95.00 Weighted Average 12.110 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pond B Post Dev Hydrograph • a a LL a3 .7 6 cfs 6 Charlotte 6-hr 25-yr 25-yr 70 Rainfall-4.38" 6 Runoff Area=12.1'10 ac 55 - Runoff Volume=3.841 of 5° Runoff Depth=3.81" 4 - 4 - Tc=5.0 min 35 3 - - - CN=95.00 2 - 20 15 1 -- 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 17 - Runoff Time (hours) 2010-11-15 Hydrologic Analysis Chadoffe 6-hr 50-yr 50-yr Rainfall=4.92" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Subcatchment 4S: Pond B Post Dev Runoff = 93.05 cfs @ 3.15 hrs, Volume= 4.380 af, Depth= 4.34" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Charlotte 6-hr 50-yr 50-yr Rainfall=4.92" Area (ac) CN Description 12.110 95.00 Post Developed CN 0.000 97.88 Post Developed Modified CN 12.110 95.00 Weighted Average 12.110 Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 4S: Pond B Post Dev LJ 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 1-in 1-in Rainfall=1.00" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 ©2007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 5P: Pond A Inflow Area = 23.610 ac, 0.00% Impervious, Inflow Depth= 0.75" for 1-in event Inflow = 39.91 cfs @ 3.15 hrs, Volume= 1.480 of Outflow = 0.17 cfs @ 6.10 hrs, Volume= 1.377 af, Atten= 100%, Lag= 177.0 min Primary = 0.17 cfs @ 6.10 hrs, Volume= 1.377 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 590.92'@6.10 hrs Surf.Area= 48,003 sf Storage= 62,586 cf Plug-Flow detention time= 3,684.1 min calculated for 1.377 of (93% of inflow) Center-of-Mass det. time= 3,675.1 min ( 3,880.0 - 204.9 ) Volume Invert Avail.Storage Storage Description #1 589.50' 195,232 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 589.50 38,668 0 0 590.00 43,583 20,563 20,563 591.00 48,400 45,992 66,554 592.00 66,553 57,477 124,031 . 593.00 75,850 71,202 195,232 Device Routing Invert Outlet Devices #1 Primary 581.75' 48.0" x 112.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 581.19' S=0.00507' Cc= 0.900 n=0.013 #2 Device 1 589.50' 2W' Vert. Orifice/Grate C= 0.600 #3 Device 1 590.92' 8.00' W x 1.00'H Vert. Orifice/Grate X2.00 C=0.600 #4 Secondary 592.10' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 rimary OutFlow Max=0.17 cfs @ 6.10 hrs HW=590.92' (Free Discharge) Culvert (Passes 0.17 cfs of 161.99 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.17 cfs @ 5.53 fps) ?3=Oriflce/Grate ( Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=589.50' (Free Discharge) Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 0 • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 1-in 1-in Rainfall=1.00" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydrOCAD Software Solutions LLC Pa4e 2 Pond 5P: Pond A Hydrograph 39.91 ds - Inflow 4 - Outflow 38 6'10 ac Inflow Area=23 - Primary -Secondary 36 . -- - 34 92.1. Peak Elev=590 . 30 Stora e=62,586 cf 28 g 26 24 0 2 18 - - 14 12 1 8 Q.t10 ds - - 0 10 20 70" 40 50 60 70 80 90 100 110 120 130 140 150 160 170 • Time (hours) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 5P: Pond A Inflow Area = 23.610 ac, 0.00% Impervious, Inflow Depth = 1.66" for 2-yr event Inflow = 86.74 cfs @ 3.15 hrs, Volume= 3.266 of Outflow = 17.45 cfs @ 3.42 hrs, Volume= 3.159 af, Atten= 80%, Lag= 16.2 min Primary = 17.45 cfs @ 3.42 hrs, Volume= 3.159 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 591.40'@ 3.42 hrs Surf.Area= 55,715 sf Storage= 87,532 cf Plug-Flow detention time= 1,690.1 min calculated for 3.158 of (97% of inflow) Center-of-Mass det. time= 1,685.9 min ( 1,892.0 - 206.1 ) Volume Invert Avail.Storage Storage Description #1 589.50' 195,232 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 589.50 38,668 0 0 590.00 43,583 20,563 20,563 591.00 48,400 45,992 66,554 592.00 66,553 57,477 124,031 593.00 75,850 71,202 195,232 Device Routing Invert Outlet Devices #1 Primary 581.75' 48.0" x 112.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 581.19' S= 0.0050'/' Cc= 0.900 n=0.013 #2 Device 1 589.50' 2.4" Vert. Orifice/Grate C= 0.600 #3 Device 1 590.92' 8.00' W x 1.00'H Vert. Orifice/Grate X 2.00 C=0.600 #4 Secondary 592.10' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=17.44 cfs @ 3.42 hrs HW=591.40' (Free Discharge) t =Culvert (Passes 17.44 cfs of 167.39 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.20 cfs @ 6.47 fps) 3 Orifice/Grate (Orifice Controls 17.24 cfs @ 2.23 fps) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=589.50' (Free Discharge) Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 0 • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HvdroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 2 1 Pond 5P: Pond A • 0 • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10-yr 10 yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 513: Pond A Inflow Area = 23.610 ac, 0.00% Impervious, Inflow Depth = 3.05" for 10-yr event Inflow = 136.63 cfs @ 3.15 hrs, Volume= 6.002 of Outflow = 61.15 cfs @ 3.29 hrs, Volume= 5.894 af, Atten= 55%, Lag= 8.8 min Primary = 61.15 cfs @ 3.29 hrs, Volume= 5.894 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 592.08'@ 3.29 hrs Surf.Area= 67,303 sf Storage= 129,430 cf Plug-Flow detention time= 921.2 min calculated for 5.894 of (98% of inflow) Center-of-Mass det. time= 918.5 min ( 1,120.2 - 201.7 ) Volume Invert Avail.Storage Storage Description #1 589.50' 195,232 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 589.50 38,668 0 0 590.00 43,583 20,563 20,563 591.00 48,400 45,992 66,554 592.00 66,553 57,477 124,031 593.00 75,850 71,202 195,232 Device Routing Invert Outlet Devices #1 Primary 581.75' 48.0" x 112.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 581.19' S= 0.00507' Cc= 0.900 n= 0.013 #2 Device 1 589.50' 2.4" Vert. Orifice/Grate C= 0.600 #3 Device 1 590.92' 8.00'W x 1.00' H Vert. Orifice/Grate X 2.00 C= 0.600 #4 Secondary 592.10' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=61.14 cfs @ 3.29 hrs HW=592.08' (Free Discharge) 't--17-Culvert (Passes 61.14 cfs of 174.64 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.24 cfs @ 7.58 fps) 3 Orifice/Grate (Orifice Controls 60.90 cfs @ 3.81 fps) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=589.50' (Free Discharge) Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" • Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydrOCAD® 8.50 s/n 005440 © 2007 HydroCAD Software Solutions LLC Page 2 Pond 5P: Pond A Hydrograph 13 663 cis - Inflow Outflow 130 Inflow Area=23.610 ac - Primary -Secondary 12 Peak EIev=692.08' 11 100. Storage=129,430 cf 90 -- o E 61 .15 do 60 - - - 50 - -- 40 30 - 20 [00 cfs " 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25 yr 25-yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 5P: Pond A Inflow Area = 23.610 ac, 0.00% Impervious, Inflow Depth = 3.70" for 25-yr event Inflow = 160.79 cfs @ 3.15 hrs, Volume= 7.275 of Outflow = 81.59 cfs @ 3.27 hrs, Volume= 7.166 af, Atten= 49%, Lag= 7.6 min Primary = 73.00 cfs @ 3.27 hrs, Volume= 7.047 of Secondary = 8.59 cfs @ 3.27 hrs, Volume= 0.120 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 592.34' @ 3.27 hrs Surf.Area= 69,674 sf Storage= 146,897 cf Plug-Flow detention time= 763.4 min calculated for 7.166 of (99% of inflow) Center-of-Mass det. time= 761.1 min ( 961.7 - 200.7 ) Volume Invert Avail.Storage Storage Description #1 589.50' 195,232 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 589.50 38,668 0 0 590.00 43,583 20,563 20,563 591.00 48,400 45,992 66,554 592.00 66,553 57,477 124,031 593.00 75,850 71,202 195,232 Device Routing Invert Outlet Devices #1 Primary 581.75' 48.0" x 112.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 581.19' S=0.0050'/' Cc= 0.900 n=0.013 #2 Device 1 589.50' 2.4" Vert. Orifice/Grate C= 0.600 #3 Device 1 590.92' 8.00' W x 1.00'H Vert. Orifice/Grate X 2.00 C=0.600 #4 Secondary 592.10' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=72.99 cfs @ 3.27 hrs HW=592.34' (Free Discharge) t =Culvert (Passes 72.99 cfs of 177.29 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.25 cfs @ 7.96 fps) 3=Orifice/Grate (Orifice Controls 72.74 cfs @ 4.55 fps) econdary OutFlow Max=8.58 cfs @ 3.27 hrs HW=592.34' (Free Discharge) Broad-Crested Rectangular Weir (Weir Controls 8.58 cfs @ 1.21 fps) C 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25 yr 25 yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HydroCAD Software Solutions LLC Page 2 Pond 5P: Pond A Hydrograph 1Rn Pi 2010-11-15 Hydrologic Analysis Charlotte 6-hr 50-yr 50-yr Rainfall=4.92" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 5P: Pond A Inflow Area = 23.610 ac, 0.00% Impervious, Inflow Depth = 4.23" for 50-yr event Inflow = 179.09 cfs @ 3.15 hrs, Volume= 8.321 of Outflow = 99.12 cfs @ 3.26 hrs, Volume= 8.213 af, Atten= 45%, Lag= 6.7 min Primary = 79.60 cfs @ 3.26 hrs, Volume= 7.880 of Secondary = 19.52 cfs @ 3.26 hrs, Volume= 0.333 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 592.50' @ 3.26 hrs Surf.Area= 71,209 sf Storage= 158,523 cf Plug-Flow detention time= 670.0 min calculated for 8.213 of (99% of inflow) Center-of-Mass det. time= 667.9 min ( 867.9 - 200.0 ) Volume Invert Avail.Storage Storage Description #1 589.50' 195,232 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 589.50 38,668 0 0 590.00 43,583 20,563 20,563 591.00 48,400 45,992 66,554 592.00 66,553 57,477 124,031 593.00 75,850 71,202 195,232 Device Routing Invert Outlet Devices #1 Primary 581.75' 48.0" x 112.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 581.19' S=0.00507' Cc= 0.900 n=0.013 #2 Device 1 589.50' 2.4" Vert. Orifice/Grate C= 0.600 #3 Device 1 590.92' 8.00' W x 1.00'H Vert. Orifice/Grate X 2.00 C=0.600 #4 Secondary 592.10' 30.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 rimary OutFlow Max=79.59 cfs @ 3.26 hrs HW=592.50' (Free Discharge) Culvert (Passes 79.59 cfs of 178.99 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.26 cfs @ 8.20 fps) 3=Orifice/Grate (Orifice Controls 79.34 cfs @ 4.96 fps) econdary OutFlow Max=19.47 cfs @ 3.26 hrs HW=592.50' (Free Discharge) Broad-Crested Rectangular Weir (Weir Controls 19.47 cfs @ 1.62 fps) 11 2010-11-15 Hydrologic Analysis Charlotte 6-hr 50 yr 50-yr Rainfall=4.92" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HydroCAD Software Solutions LLC Page 2 Pond 513: Pond A Hydrograph 1 1 3 1 0 U. 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 Time (hours) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 1-in 1-in Rainfall=1.00" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 6P: Pond B Inflow Area = 12.110 ac, 0.00% Impervious, Inflow Depth = 0.78" for 1-in event Inflow = 21.01 cfs @ 3.15 hrs, Volume= 0.787 of Outflow = 0.10 cfs @ 6.10 hrs, Volume= 0.732 af, Atten= 100%, Lag= 176.9 min Primary = 0.10 cfs @ 6.10 hrs, Volume= 0.732 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 604.44'@6.10 hrs Surf.Area= 38,659 sf Storage= 33,249 cf Plug-Flow detention time= 3,533.8 min calculated for 0.732 of (93% of inflow) Center-of-Mass det. time= 3,525.0 min ( 3,728.7 - 203.7 ) Volume Invert Avail.Storage Storage Description #1 603.50' 142,695 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 603.50 30,695 0 0 604.00 36,582 16,819 16,819 605.00 41,339 38,961 55,780 606.00 607.00 43,859 44,774 42,599 98,379 44,317 142,695 Device Routing Invert Outlet Devices #1 Primary 597.00' 36.0" x 74.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 595.00' S= 0.02707' Cc= 0.900 n= 0.012 #2 Device 1 603.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 604.44' 5.00' W x 1.00'H Vert. Orifice/Grate X 2.00 C=0.600 #4 Secondary 605.50' 30.0' long x 24.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.10 cfs @ 6.10 hrs HW=604.44' (Free Discharge) L =Culvert (Passes 0.10 cfs of 82.93 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.10 cfs @ 4.45 fps) 3=Orifice/Grate (Controls 0.00 cfs) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=603.50' (Free Discharge) Broad-Crested Rectangular Weir (Controls 0.00 cfs) LJ 2010-11-15 Hydrologic Analysis Charlotte 6-hr 1-in 1-in Rainfall=1.00" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 2 Pond 6P: Pond B Hydrograph 23 21.01 cfs - Inflow 21 - Outflow, 2 Inflow Area= 12.110 ac - Primary -Secondary ;; Peak EIev=604.44' 16 Storage=33,249 cf 14 _ ° 13 0 11 U. 10 .. 8 - 7 - - 6 5 _ -- 3 -- O.QO t fl8` ': 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 0 Time (hours) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 6P: Pond B Inflow Area = 12.110 ac, 0.00% Impervious, Inflow Depth = 1.75" for 2-yr event Inflow = 46.29 cfs @ 3.15 hrs, Volume= 1.767 of Outflow = 8.13 cfs @ 3.46 hrs, Volume= 1.708 af, Atten= 82%, Lag= 18.8 min Primary = 8.13 cfs @ 3.46 hrs, Volume= 1.708 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 604.84' @ 3.46 hrs Surf.Area= 40,560 sf Storage= 49,076 cf Plug-Flow detention time= 1,627.1 min calculated for 1.708 of (97% of inflow) Center-of-Mass det. time= 1,622.3 min ( 1,826.7 - 204.4 ) Volume Invert Avail.Storage Storage Description #1 603.50' 142,695 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 603.50 30,695 0 0 604.00 36,582 16,819 16,819 605.00 41,339 38,961 55,780 606.00 43,859 42,599 98,379 607.00 44,774 44,317 142,695 Device Routing Invert Outlet Devices #1 Primary 597.00' 36.0" x 74.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 595.00' S= 0.02707' Cc= 0.900 n= 0.012 #2 Device 1 603.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 604.44' 5.00' W x 1.00'H Vert. Orifice/Grate X 2.00 C=0.600 #4 Secondary 605.50' 30.0' long x 24.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=8.13 cfs @ 3.46 hrs HW=604.84' (Free Discharge) t =Culvert (Passes 8.13 cfs of 85.67 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.12 cfs @ 5.39 fps) 3 Orifice/Grate (Orifice Controls 8.01 cfs @ 2.02 fps) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=603.50' (Free Discharge) Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 2-yr 2-yr Rainfall=2.28" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Pa4e 2 Pond 6P: Pond B Hydrograph 46.29 cfs - Inflow - Outflow 44 110 ac Inflow Area= 12 - Primary -secondary 2 4 42 _ . 38 Peak Elev=604.84' z Storage=49 076 d , .? 3 2 , , . 0 2 24 .. {L 22 20 18 . 1 14 &1 3 ?s 8 6 4 0.00 c fa 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 0 Time (hours) • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10-yr 10-yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 1 Summary for Pond 6P: Pond B Inflow Area = 12.110 ac, 0.00% Impervious, Inflow Depth = 3.16" for 10-yr event Inflow = 71.48 cfs @ 3.15 hrs, Volume= 3.184 of Outflow = 30.09 cfs @ 3.30 hrs, Volume= 3.125 af, Atten= 58%, Lag= 9.4 min Primary = 30.09 cfs @ 3.30 hrs, Volume= 3.125 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 605.39' @ 3.30 hrs Surf.Area= 42,334 sf Storage= 72,296 cf Plug-Flow detention time= 906.8 min calculated for 3.125 of (98% of inflow) Center-of-Mass det. time= 904.4 min ( 1,104.7 - 200.3) Volume Invert Avail.Storage Storage Description #1 603.50' 142,695 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 603.50 30,695 0 0 604.00 36,582 16,819 16,819 605.00 41,339 38,961 55,780 606.00 43,859 42,599 98,379 607.00 44,774 44,317 142,695 Device Routing Invert Outlet Devices #1 Primary 597.00' 36.0" x 74.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 595.00' S= 0.02707' Cc= 0.900 n= 0.012 #2 Device 1 603.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 604.44' 5.00' W x 1.00'H Vert. Orifice/Grate X2.00 C=0.600 #4 Secondary 605.50' 30.0' long x 24.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 nmary OutFlow Max=30.08 cfs @ 3.30 hrs HW=605.39' (Free Discharge) Culvert (Passes 30.08 cfs of 89.37 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.14 cfs @ 6.48 fps) r3=Orifice/Grate (Orifice Controls 29.94 cfs @ 3.14 fps) econdary OutFlow Max=0.00 cfs @ 0.00 hrs HW=603.50' (Free Discharge) Broad-Crested Rectangular Weir (Controls 0.00 cfs) 0 . 2010-11-15 Hydrologic Analysis Charlotte 6-hr 10 yr 10-yr Rainfall=3.72" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 2 Pond 613: Pond B Hydrograph • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25-yr 25-yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 02007 HvdroCAD Software Solutions LLC Page 1 Summary for Pond 6P: Pond B Inflow Area = 12.110 ac, 0.00% Impervious, Inflow Depth = 3.81" for 25-yr event Inflow = 83.76 cfs @ 3.15 hrs, Volume= 3.841 of Outflow = 41.26 cfs @ 3.28 hrs, Volume= 3.782 af, Atten= 51 %, Lag= 7.9 min Primary = 38.43 cfs @ 3.28 hrs, Volume= 3.753 of Secondary = 2.84 cfs @ 3.28 hrs, Volume= 0.029 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 605.61' @ 3.28 hrs Surf.Area= 42,869 sf Storage= 81,341 cf Plug-Flow detention time= 756.2 min calculated for 3.782 of (98% of inflow) Center-of-Mass det. time= 753.8 min ( 953.0 - 199.3 ) Volume Invert Avail.Storage Storage Description #1 603.50' 142,695 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 603.50 30,695 0 0 604.00 36,582 16,819 16,819 605.00 41,339 38,961 55,780 606.00 43,859 42,599 98,379 607.00 44,774 44,317 142,695 Device Routing Invert Outlet Devices #1 Primary 597.00' 36.0" x 74.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 595.00' S= 0.0270'/' Cc= 0.900 n= 0.012 #2 Device 1 603.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 604.44' 5.00' W x 1.00'H Vert. Oriflce/Grate X 2.00 C=0.600 #4 Secondary 605.50' 30.0' long x 24.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=38.42 cfs @ 3.28 hrs HW=605.61' (Free Discharge) L =Culvert (Passes 38.42 cfs of 90.73 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.15 cfs @ 6.85 fps) 3-Orifice/Grate (Orifice Controls 38.27 cfs @ 3.83 fps) econdary OutFlow Max=2.81 cfs @ 3.28 hrs HW=605.61' (Free Discharge) Broad-Crested Rectangular Weir (Weir Controls 2.81 cfs @ 0.88 fps) • 2010-11-15 Hydrologic Analysis Charlotte 6-hr 25 yr 25 yr Rainfall=4.38" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 2 Pond 6P: Pond B Hydrograph L::InflEaw w ryondary 3 of a 1 F-j L' 2010-11-15 Hydrologic Analysis Charlotte 6-hr 50-yr 50-yr Rainfall=4.92" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Paae 1 Summary for Pond 6P: Pond B Inflow Area = 12.110 ac, 0.00% Impervious, Inflow Depth = 4.34" for 50-yr event Inflow = 93.05 cfs @ 3.15 hrs, Volume= 4.380 of Outflow = 51.98 cfs @ 3.26 hrs, Volume= 4.321 af, Atten= 44%, Lag= 6.6 min Primary = 42.47 cfs @ 3.26 hrs, Volume= 4.187 of Secondary = 9.50 cfs @ 3.26 hrs, Volume= 0.134 of Routing by Stor-Ind method, Time Span= 0.00-170.00 hrs, dt= 0.01 hrs Peak Elev= 605.74' @ 3.26 hrs Surf.Area= 43,205 sf Storage= 87,085 cf Plug-Flow detention time= 665.5 min calculated for 4.321 of (99% of inflow) Center-of-Mass det. time= 663.8 min ( 862.4 - 198.6 ) Volume Invert Avail.Storage Storage Description #1 603.50' 142,695 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 603.50 30,695 0 0 604.00 36,582 16,819 16,819 605.00 41,339 38,961 55,780 606.00 43,859 42,599 98,379 607.00 44,774 44,317 142,695 Device Routing Invert Outlet Devices #1 Primary 597.00' 36.0" x 74.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 595.00' S= 0.02707' Cc= 0.900 n= 0.012 #2 Device 1 603.50' 2.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 604.44' 5.00' W x 1.00'H Vert. Orifice/Grate X 2.00 C=0.600 #4 Secondary 605.50' 30.0' long x 24.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=42.47 cfs @ 3.26 hrs HW=605.74' (Free Discharge) t =Culvert (Passes 42.47 cfs of 91.58 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.15 cfs @ 7.07 fps) 3 Orifice/Grate (Orifice Controls 42.31 cfs @ 4.23 fps) econdary OutFlow Max=9.48 cfs @ 3.26 hrs HW=605.74' (Free Discharge) Broad-Crested Rectangular Weir (Weir Controls 9.48 cfs @ 1.32 fps) 0 2010-11-15 Hydrologic Analysis Charlotte 6-hr 50-yr 50-yr Rainfall=4.92" Prepared by Little Diversified Architectural Consulting Printed 11/24/2010 HydroCAD® 8.50 s/n 005440 @2007 HydroCAD Software Solutions LLC Page 2 Pond 6P: Pond B Hydrograph 1 93 .05 c(s - Inflow - - - Outflow 8 _ Inflow Area=12 1'i 0 ac Pn?ry - Secondary . W 80 Peak Elev=605 74` 75 . Storage=87,085 cf 65 u g 51.98 cfs 3 0 42.47 ds 40 35 30 - - 25 20 - - - 9 .50 cts 1 5 - 0 10 20 30 40 50 60 70 80 90 100 1 • Time (hours) 130 140 150 160 170 0