Loading...
HomeMy WebLinkAbout20201284 Ver 1_Shoreline Stabilization_20210104State of North Carolina nio Department of Environment and Natural Resources Division of Water Resources Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization ENVIRONMENTAL QUALITY FORM: SSGP 02-2017 Please approximately sketch the fallowing information on this plan and provide dimensions far each item: a. All proposed vegetation clearing b. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation c. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation d. Location of any proposed structures such as buildings, retaining walls, docks, etc. e. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation Lake (At Full Pond/ Normal Water Level) ��R 410? fXf- s Full Pond/ Normal Water Shoreline IZofee,+ Plan View oer Pee-- r FORM: SSGP 02-2017 Page 1 of 3 ,q� p Rip o4R ?oI NT' a' s' a� J �000 gro,de Lake oda (At Full Pond/ Normal water Level) po as a alb o 000 0 cn Side View C LL. Lake (At Full Pond/ Normal Water Level) Existing Dock 30ftx7ft 3ftx 150ft Full Pond/ Normal Water Level Below full pond/ NWL .� r. aaa �hore�ne aaa50 4ftxlsoft Ri ra Riprap Above full pond/NWL 2 ft. x 150 ft. additional clearing '" B necessary E�'KAMPLE Plan View FORM: SSGP 02-2017 Page 2 of 3 50 0 50 100 150 PHYSICAL SURVEY AS i curve RAPID, angth i ROOM CHIPS 0111. FOR UNREWRDM WHEN OF run v ennvm AP I NET UNIFORM cRRPwc KCAL@ — F6:6'1' 11 A ul AN 11 1JEFE g SUSAN REGARDLESS ALONE TO a. PEANNISM MONTEDISONm' VANDYKE - A FRESH PERCEPTION OF ALL SARAWAK MIT MR �� LU ,.• u,.ENT xmOf LASSFOR� �n aE � x o. x.. — L4 PAW CREEK REPRESENT, MECAUMURG WINES, AS IS SCALE ISO / ME 28-803 IN DEDMONSURVEYS 321LIS FLAT 6762 / 11 37"1 IT II AM AY�n6 NORTH \ O BOX PFORRo ME10}I99o8x6a3) wrmi wu ME w�m mm / o )E414 ICH \ 920 AL 70, ` LEGEND MB 2&803 OOFnq 2,157 AC LEE %� ACRE \y n WN ISC IN 3 TOTAL AGE 0 ANSI CREEK ALKALI am ME I RMER, I DECIDE DERTIFY MET ME PLAT AM IREESER 1 LOOKS THAT MIS RAI 'A' THEIR' � � r ITTES r n�a oawrvx uxr. - �63 �ue��\ APPAREL ��./ �..�STAN \\NEE pQm er..0 x.w uruo u '. HE mcwrts RO P 319 I \ OVERLOO 4 ME 28-803 - MTN. DRBANANAS �., LEFT ME 9 FELL PAR �WO NET SEEN �1 —-9_ A, �xMB THE NNE A OTHER NAMESEEMENUT THE AN THE LIMA AND ARE I A ISO I.��.. «o �..�,AT_.EII 28-803 RE MAKERS x.HE IN WHEN MINE PLAIN11e 318 Project: Rio Rao on MIL ooint -80.957 M5 9 3W i i i i i i i J +i J approximate 120feet of -- I rip rap project location in red`' r� °E *1215,)qp rive Four treesand a stump to be removed �. f ����� � �, a :_:sue n� +�-' 3� a � {, 4' �`a i� f of .iui��� ate,do I �1,;� - ,r y _ � per► � __. . These oaks are already in the water on the shoreline near the project area. If approved, efforts will be made to place the removed pines into the water with [hese trees to increase structure for wildlife. .`` --O � Project: Rio Rao on MIL ooint -80.957 M5 9 3W i i i i i i i J +i J approximate 120feet of -- I rip rap project location in red`' r� °E *1215,)qp rive Four treesand a stump to be removed �. f ID#* 20201284 Version* 1 Regional Office* Mooresville Regional Office - (704) 663-1699 Reviewer List* Alan Johnson Pre -Filing Meeting Request submitted 9/24/2020 Contact Name * Contact Email Address* Project Name* Project Owner* Project County* Owner Address: Jeff Van Dyke unipresser@hotmail.com rip rap on MIL point Jeff Van Dyke Mecklenburg Street Address 12757 Overlook Mountain Drive Address Line 2 aty Charlotte Rbstal / Zip Code 28216 Is this a transportation project?* r Yes r No State / Frovince / Region NC Country USA Type(s) of approval sought from the DWR: r- 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification W Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? no Please give a brief project description below. This project affects 120 feet of shoreline on a point of Mountain Island Lake that is being eroded and undermined by waves. The contractor, Lyfe Marine, will will remove debris, several stumps and two damaged pine trees; shape the bank, install Geo-technical fabric and install Class "B" rip rap. Please give a couple of dates you are available for a meeting. 10/15/2020 Please attach the documentation you would like to have the meeting about. pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 9/24/2020 Reviewer Meeting Request Decision Is a meeting Required?* r Yes r No Strickland, Bev From: laserfiche@ncdenr.gov Sent: Sunday, October 25, 2020 12:00 AM To: unipresser@hotmail.com Cc: Johnson, Alan Subject: Pre -Filing Meeting is not needed for rip rap on MIL point - 20201284 Ver 1 The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for rip rap on MIL point that you submitted on 9/24/2020 5:51 PM. The ID number for that project is 20201284, Version It has been decided that no meeting is needed for this project. Project file link: https:Hedocs.deq.nc.gov/WaterResources/Browse.aspx?dbid=0&startid=1299767 When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: 20201284meetingnotneeded.pdf 739.59KB meetingisnotneeded.pdf 358.35KB Pre -fling Meeting or Request Date 9/24/2020 ID# 20201284 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * Owner Information: Name: * Email:* Phone Number:* Mailing Address:* jvd@bellsouth.net Rease provide an enail address for payment and requests for more infornation here. Jeff Van Dyke jvd@bellsouth.net (919)961-1500 (xxx)xxx-xxxx Street Address 12757 Overlook Mountain Drive Address Line 2 City Charlotte Rbstal / Zip Code NC State / R-ovince / Region NC Country 28216 Is there an agent working on the f Yes project?* r No Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* rip rap on MIL Point If your project has a formal name please use this. If your project does not have a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. r Upload File r Lookup address Property Address Lookup:* Latitude:* 35.348430 Street Address 12757 Overlook Mountain Drive Address Line 2 City Charlotte Fbstal / Zip Code 28216 State / Province / Region NC Country usa Longitude:*-80.956150 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* sketchofplan.pdf 1.27MB surveyofl2757.jpg 274.74KB projectonArcGisMap.jpg 332.78KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* IMG 5081.jpg 184.62KB IMG 5082 (1).jpg 170.44KB 4. Location of the property (where work is to be conducted) Nearest Town:* Charlotte County: * Mecklenburg Lake/ river/ ocean adjacent to Mountain Island Lake property: Subdivisions name or site address:* Phase III Overlook on Mountain Island Lake/02329424 Include phasellot nunter Directions to site:* Take 485 to the Highway 16 exit. Go north on Highway 16 and turn right on Mount Holly-Huntersville Road. At second light, turn left on Overlook Mountain Drive. At the end of the 1.7 mile road, 12757 Overlook Mountain drive directly ahead in the cul de sac. Rease include road nacres and nunbers, landrrerks etc. 5. Describe the existing land use or condition of the site at the time of this application:* This is a residential lot Fbsidential, undeveloped, etc. 6. Property Size 2.15 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): This project affects 120 feet of shoreline on a point of Mountain Island Lake where Nance Cove meets the main lake that is being eroded and undermined by wave action from boats and wind from two directions. The shoreline of opposing banks is hardened. Of the 120 feet, 77 feet us classified as "future residential" with the remaining classified as "impact minimization zone." The contractor, Lyfe Marine, will remove debris, a large stump and four pine trees that have been undermined by erosion; shape the bank, install Geo-technical fabric and install Class `B" rip 8. How will the work be done? * PF From Land r From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* (including all clearing, backfill, excavation, rip rap, retaining walls, etc.) 1080 square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 120 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) The vegetation in the project zone is grasses, honeysuckle, briers and a few small oaks and sweetgum trees. The project will displace four mature pine trees that have been undermined by the wave action. The trees are marked in the attached photographs. Note: several mature white oak trees have fallen in the water near the project area. If approved, efforts will be made to place the pines removed by this project in the water with the white oaks to increase structure for wildlife. Sketch: photoof four trees and stump to be 482.44KB removed. jpg closeupoftreesland2andstump.jpg 471.88KB closeupof3and4trees.jpg 722.19KB Trees aready in the water.jpg 1.58MB projectonArcGisMap.jpg 332.78KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): 0 $240.00 for impacts to lake (below normal water level) of less than 1 acre 0 $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* Jeff Van Dyke Signature: 0*� Initial Review Is this accepted into the review process?* Project Number:* 20201284 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00