Loading...
HomeMy WebLinkAboutNCC190433_Notice of Termination_20201231Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 12/31/2020 10:16:28 AM (NOT Submittal) Approve by Georgoulias, Bethany 1/4/2021 7:21:52 AM (NOT Request Review- NCC190433) • The task was assigned to Georgoulias, Bethany. The due date is: January 5, 2021 5:00 PM 12/31 /2020 10:16 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC190433 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status PAID 2021 Annual Fee Status Nbybeblank (if not yet billed) Information associated with this permit: Project Name The Enclave at Deep River Plantation - Phase II Address 4203 River Birch Loop, High Point, NC County Guilford Latitude 36.0429 Longitude -79.9459 Permittee Listed EBSCO Enclave Phase II, LLC Legally Responsible Leslie Yeilding Individual NC Reference No. NCG01-2019-0433 E&SC Plan ID EN-19-0134 Original NOI 11529 Tracking No. Date COC Issued 6/3/2019 Prior Rescission Date populates only if OOC was already rescinded at tirre of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator will apply for a new COC) Coverage * U Mistake or Invalid Coverage r Other Ad d i o n a I Nbre information about the basis of this request, if needed. Explanation Supporting Upload Supporting Docurrentation if applicable. Documentation Mist beFDFformat Project Close-out Information: Final Close-out 12/11/2020 Inspection Approval Project Close-out Surety Release.pdf Approval Mast be FDFforrrat Documentation North Carolina General Statute 143-215.66 (1) provides that: 1.43MB Anyperson who knowinglymakes anyfalse statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; orwho falsifies, tampers with, or knowingly renders inaccurate anyrecording or monitoring deice or method required to be operated or maintained under this Article or rules ofthe Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine notto exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature fa6r' L Y441 Type Name* Leslie L. Yeilding Title * President and General Manager Organization* EBSCO Enclave Phase 11, LLC Date * 12/31 /2020 Email for lyeilding@ebsco.com Confirmation * Contact Telephone* (205) 981-5135 NOT Certification NOT Cert - Stormwater - Enclave II.pdf 435.79KB Form Mast be FDF Forrrst Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email (Optional) Original Permittee Email CCd on Notification Errails rgross@ebsco.com CCd on Notification Errails lyeilding@ebsco.com Original Site Contact CCd on Notificaiton Errails Email lyeilding@ebsco.com