Loading...
HomeMy WebLinkAbout20080737 Ver 3_Modification_20101108X-0002 Mod Page 1 of 2 ?a cz 3-7 r? v 3 X-0002 Mod I ndon, Mason Monday, November 08, 2010 1:20 PM - Stanton, Tyler P Smith, Ronnie D SAW [Ronnie.D.Smith@usace.army.mil]; Carrillo, Sonia ? has reviewed NCDOT's request to modify the 401 WQC for X-0002C portion of the yetteville Outer Loop, which was received on October 19, 2010. In addition to the formation requested by the USAGE, DWQ needs the following items, to be addressed as 11, before we can process the request: 1?If jack and bore of the 48" pipe at Site 8 is being proposed, are additional temporary ii'npacts required for the installation. Based upon our review of the original permit application and the modification request, it does not appear that temporary impacts for, this construction method was taken into consideration. - 2i In addition to addressing why a sill was proposed on the outlet of pipe at,Site 6, DWQ,, sequ.!est that.NCDOT provides a.detail,of the. proposed,. junction box at this-.,site;.; describes, :;, _; .•: ma af f its .easeurposre provide and this how rtinformatioect aquatic passage - p salong with theinformati on requested by the USAGE within two weeks of this correspondence. If you have any questions please .feel toy: e-mail'. men-or call me at 910-308-4021. ... Thanks ? ;..-. nllison, .. ., -- -Original Message---- From: Smith, Ronnie D SAW [mailto:Ronnie.D.Smith@usace.army.mil] Sent: Wednesday, November 03,'2010 9:53 AM To: Stanton, Tyler P Cc Herndon, Mason - - -' S-libiiect: X-0002 Mod ler On October 19, 2010 we received a request to modify the DA authorization for section - X?-0002C of the Fayetteville Outer Loop project. At this time, we need additional information in order to process the request. Please provide the - fgllowing information: 1? Please provide a detail or cross-section for the proposed 48 inch culvert at Site 8. The culvert should be buried one foot below the stream bed unless y6u can demonstrate that burying the culvert would be more environmentally daI imaging. 2l The memo that describes the alternative methods investigated by the Gti=otechnical Unit for the proposed fill at Site 8 states that the settlement of the embankment is likely to damage the drainage pipes beneath the fill and that the pipe will be installed by jack and bore after the preloading,waiting .ne.gov/owa/?ae=Item&t=IPM.Note&id=RgAAAADMSzLed9 W2TJHI4%2bmA%2f... 11/10/2010 X-0002 Mod Page 2 of 2 . Please describe the system that will be installed in the stream 1 to allow the water to flow through or around the fill area during the ding period. 3! Please explain the purpose of the proposed sill at site 6 and explain why it would not be functional. 4! Please provide details or cross-sections of the proposed culvert with the sill) and the proposed culvert with the junction box that will be placed at Site i6. The plans should depict the depth at which the culvert will be buried and the slope of the proposed culvert. Please provide the requested information within two weeks of this correspondence. Please contact me if you have any questions. Ronnie Smith Project Manager U?S. Army Corps of Engineers 6!3 Darlington Avenue Wilmington, North Carolina 28403 - ,. Office: 910-251-4829 Faux: 910-251-4025 :Websit e:°;:hGtpa /"/"www.sawiusace:.army.mil/WETLANDS,, ;.,, , ? ,;;,c ;,., ;,, ,,.,yr "• hs,,Wilmington District, is. committed to providing the highest•,level',of. support,to the public ,ohelp us ensure,. we continue to:do so,.please.., complete'Ehe Customer Satisfactioii'Survey located at our. web_si£e at •http://pert.nwp:usace.-army.mil/surveV.html'".`. - ,•i' ._. i , ://niai l.nc.gov/owa/?ae=Item&t=1 PM.Note&id=RgAAAADMSzLcd9 W2TJ H 14%2bmA%2f... 11/10/2010