HomeMy WebLinkAboutMOUNTAIRE_SWM_REPORT_REVLETTER OF TRANSMITTAL XQ p _ 0 ? Cp AWB ENGINEERS fs ] ^L`I , 1942 NORTHWOOD DRIVE `U 9w SALISBURY, MARYLAND 21801-7824 NOV 2 2, 2010 410-742-7299 DFNR - WATER QUAUTY FAX 410-742-0273 V.'ETVNDSAND5TQR3:! ,ATERBRAN'.H CORR #: 10-JRS-1262 JOB NO.: 090802 j DATE: 11/19/2010 TO: Bill Mullin RE: J.H. Carter & Associates 515 Midland Road Mountaire VRT & Freezer Suite F Southern Pines, NC 28387 WE, ARE. SENDING YOU THE, FOLLOWING: ATTACHED- ? BLUELINE PRINTS - CHANGE ORDER - SUBMITTALS - ? SHOP DRAWINGS - COPY OF LETTER - SPECIFICATIONS - APPLICATION FOR PAYMENT - BLACKLINE PRINTS- OTHER- NO. OF COPIES DESCRIPTION 2 Sets of Drawing #s SP-1, 2, 3, 3.1, 4, 5, 6 & 7. 2 Copies of Narrative & Calculations. 1 CD Containing DWG & H droCad Files for NCDENR - DWQ Submittal. THESE TRANSMISSIONS ARE: FOR APPROVAL - ® FOR USE IN FABRICATION - FOR YOUR DISTRIBUTION - FOR ESTIMATING - FOR USE IN CONSTRUCTION - AS PER YOUR REQUEST - FOR CORRECTION - FOR YOUR INFORMATION - FOR YOUR REVIEW & COMMENT FOR YOUR USE - RET'D AFTER LOAN TO US - FOR OBTAINING PERMITS THIS TRANSMITTAL IS SENT BY: FIRST CLASS MAIL - OVERNIGHT UPS - ® GROUND UPS - I El 11 HAND DELIVERY - PICKUP - OTHER - I ail REMARKS: OF AWBENGINEERS November 18, 2010 10-DRT-1153 Rev. Mr. Joseph Gyarnfi, P.E. North Carolina Department of Environment and Natural Resources Division of Water Quality 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 RE: Mountaire Farms 2010 VRT & Freezer Storage Storm Water Management Plan Dear Mr. Gyamfi, The Mountaire VRT & Freezer Storage project is currently under construction. All approvals have been obtained from the Land Quality section. Based on a recent meeting between DWQ and AWB Engineers, we were informed that water quality treatment needs to be provided for all water discharging to a wetland area. The following describes our storm water management plan. The rooftop of the proposed addition has been sectioned off into various drainage areas (A, B, C, etc.) as shown on sheet SP-3 of the construction plans. The existing pavement between the two buildings currently drains to E-CB5. From there it flows through an existing 12-inch pipe to E-MH6. E-MH6 drains to E-LS 1 (an existing lift station) through a 12-inch pipe. The storm water travels to the wastewater treatment facility from there. We are proposing to install piping along the north and west sides of the new addition to capture all rooftop runoff and direct it to either E-LS 1 or to a newly constructed infiltration basin to be located at the south end of the new building. Catch basin E-CB5 will remain in place and connected to manhole E-MH6. The new pipe along the north wall of the new building will start in the northeast corner and run to the existing manhole (E-M116). Two catch basins will be placed evenly along this run of pipe. Rooftop areas "C" and "E" will be split into thirds with each third going to one of the new catch basins and existing manhole. Rooftop area "D" will flow into CB20. A new 24-inch pipe will exit E-MP-6 and connect to new manhole MH20. Another new manhole (MH23) will be installed in line with the existing 12-inch pipe connecting E-MH6 with E-LS 1. M1420 and MH23 will connect with a new 12-inch pipe. Runoff: from the 1-inch storm event (first-flush) for these areas will be pumped to the wastewater treatment plant. For storm events larger than the 1-inch, a 24-inch pipe, with an invert set approximately 6 inches above the 12-inch pipe going to MH23, will exit ME 2O and run along the west side of the building. Rooftop area "B" will be picked up by this pipe. MH21 will be placed near the middle of pipe run to allow better access for cleaning the pipes if necessary. This pipe will end at MH24. From here, flow for the "first flush" will be diverted to the new infiltration basin. Larger storm events will flow out of MH24 through a 24-inch pipe with an invert set at the maximum water elevation of the `'first flush". ENGINEERS/ARCHITECTS 1942 NOR HVVOOD DRIVE i SALISBURY, MARYLAND 21801-7824 PHONE (410) 742-7299 / FAX (41 Q) 742-0273 Mr. Joseph Gyamfi, P.E. I0-DRT-1153 Rev. Page 2 of 2 The infiltration basin is sized for rooftop area "A' and all of the grassed area surrounding the southeast corner of the building. An emergency spillway will be used to allow larger storm events to be safely conveyed toward the wetland area. The basin is sized for the 2-inch storm event but will also hold the 1-year storm event. The only discharge from the 1-year event will be from MH24 and the rate is slightly below the pre-development rate. The new truck dock will drain into a 12-inch concrete trench. Flow will be directed to a junction box where a I2-inch pipe will carry the water to E-LS 1. Existing and proposed runoff rates and pipe sizes were determined by using Hydrocad. We have included calculations for both the 1-inch and 2-inch storm events (using the SCS method), the i0-year event for pipe sizing (using the Rational Method), the 1-year pre-development discharge rate, and the 1-year post- development discharge rate. In conclusion, the 1-inch storm event will be captured and sent to the wastewater treatment facility or to the proposed infiltration basin. It is necessary for the bypass for the infiltration basin to be "inline" instead of the required "oflline". Due to the placement of the basin between the building and the new railroad, there is not sufficient space to provide an "offline" system. To waive the oflline requirement, as specified in Section 16.3.9 of the BMW Manual, we have designed the basin to handle 2 times the 1-inch storm event volume while using half the infiltration rate in the calculations. The deeded easement is shown around the infiltration basin and extends to security fencing (Public Area) around employee parking. A locked gate will be maintained at this point. For food plant security reasons, anyone wishing to gain access will have to approach the guard station (manned 24/7/365), submit documentation for approval and be escorted to the area desired. In addition, an access easement can not extend from the basin to North Carolina Rt. 71 due to the railroad property that lies between them. If there is additional information that you require from us, please let me know. e Daniel R Tolbert Civil Engineer Technician cc: John Wren Permit (to be provided byDW4) n`'0F wAr?R?c AFNA STORMWATER MANAGEMENT PERMIT APPLICATION FORM NCDENR 401 CERTIFICATION APPLICATION FORM L PROJECT INFORMATION Project Name Contact Person Phone Number Date Drainage Area Number u. psIGN INFORMATION _ Site Characteristics Drainage area Impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr discharge Post-development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non-SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff volume Post development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Solis Report Summary Soil type Infiltration rate SHWr elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area Form SW401-Infiftration Basin-Rev.4 INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part in) must be printed, titled out and submitted along- with all of the required information. HALLEY ONDONr'. -- 910-359-5286 18-Nov=10 .? J .31,432.00 fiz 43,637:7:12 0.48 % 2.00 in 3.30 - in 5.28 -in/hr 3.93 -ft3lsec 3.45 .. - ft3/sec -0.48 folsec :7,345.00 fi3 7,410.00 {t3 OK for non-SA waters ft3 ft3 ft3 fl3 ft3 WkB, Bp 4.00 inihr 186.00 fmsl Q.50 - days OK 3.00 :1 OK 188.00 fmsl OK 189.50 €msl .6,104.00 rig 190.50. fmsl 237.00: ft 18.00 ft 3,797.00' , , fl2 Parts I. & II. Design Summary, Page 1 of 2 Additional information Maximum runoff to each inlet to the basin? Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance from water supply well(s) Separation from impervious soil layer Naturally oceuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build-out? Bypass provided for larger storms? Pretreatment device provided Form SW401-Infiltration Basin-Rev.4 Permit (to be provided by DWQ) 0.38 ac-in OK 30.00 It OK 30.00. ft OK 625.00 ft OK 100.00. ` tt OK 2.00 .e ft OK 2.00 - ft OK Y - (Y of N) OK _ Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK PUMP TO LS-1 , . Parts L & fl. Design Summary, Page 2 of 2 Permit (to be provided by bWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete. submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Pagel Plan Initials Sheet No. 1. Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build-out, Off-site drainage (if applicable), e Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. J??T 5P- 3 • t 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: Bypass structure, Maintenance access, - Basin bottom dimensions, m Basin cross-section with benchmark for sediment cfeanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. I J P- 3 - E 3. Section view of the infiltration basin (1" = 20' or larger) showing: Pretreatment and treatment areas, and R r-? R / Inlet and outlet structures. 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. Del a 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. The results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information. LA-T -sA' G 6. A construction sequence that shows how the infittration basin will be protected from sediment until the n -? entire drainage area is stabilized. ?zt<t _._ ?• (? 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (O&M) agreement. 9. A copy of the deed restrictions (if required). Form SW401-Infiltration Basin-Rev.4 Page 1 of 1 Part III. Required items Checklist, Page 1 of 9 _ LnQ-s !a? 5l•J ?O4uu.,. .,LC(,t c/ro..J S - - ----------- - , dos+ a. 1 z=g?o 41 ?r 2, a,4c._ _.._ . . 41 z4d ? .... r. -.... - - .. - u_A.?? c.... .... _..._ - ? _-.. ._ _ ---------- --------- ------- -- -- f f - ?W1 090802_POST Lumberton,North Carolina 90--Year Durati017=5 min, lnten=8.16 in/hr Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 s/n 02300 © 2009 HydroCAO Software Solutions LLC Stage-Area-Storage for Pond 0-3. INFILTRATION BASIN Elevation Surface Storage (feet) (sq-ft) (cubic-feet) 188.00 3,797 0. 188.05 3,873 192 188.10 3,949 387 188.15 4,025 587 188.20 4,100 790 188.25 4,176 997 188.30 4,252 1,207 188.35 4,328 1,422 188.40 4,404 1,640 188.45 4,480 1,862 188.50 4,556 2,088 188.55 4,631 2,318 188.60 4,707 2,551 188.65 4,783 2,789 188.70 4,859 3,030 188.75 4,935 3,274 188.80 5,011. 3,523 188.85 5,086 3,775 188.90 5,162 4,032 188.95 5,238 4,292 189.00 5,314 4,556 189.05 5,393 4,823 189.10 5,472 5,095 189.15 5,551 5,370 189.20 5,630 5,650 189.25 5,709 5,933 189.310 5,788 6,221 189.35 5,867 6,512 189.40 5,946 6,807 189.45 6,025 7,107 189.50 6,104 7,410 189.55 6,182 7,717 189.60 6,261 8,028 189.65 6,340 8,343 189.70 6,419 8,662 189.75 6,498 8,985 189.80 6,577 9,312 189.85 6,656 9,643 189.90 6,735 9,978 189.95 6,814 10,316 190.00 6,893 10,659 190.05 6,974 11,006 190.10 7,056 11,356 190.15 7,137 11,711 190.20 7,218 12,070 190.25 7,306 12,433 190.30 7,381 12,800 190.35 7,462 13,171 190.40 7,543 13,546 190.45 7,625 13,925 190.50 7,706 14,309 r Tf -------------------- Y ? L 1 *?Seffing the Standard for Service ? . 3 ,v_ cart Materials m Environmental - October 14,, 2010 Mr. Kyle Fordharn Evans Burgers Inc. 2329 Womble-Brooks Fitt. Wilson, N.C. 27393 RE, Ira-situ Infiltration Testing -14 ountaire Farms Lumberbeidge, North Carolina ECG Project no. 33:1350 Dear Mr. Fordharri. EC has completed the infiltratrgn testing for the above referenced project.. Please see the attached boring lags for all pertinent information regarding the locations explored. If you have any sicrest rns, please contact me at your earliest convenience. Best regards, Miguel Santiago, P.E: NC P.E.. License 033082 Vice President /'Branch Manager :i? gar ; f `f 910-401-32,38 ® r: c ,: _ .0539 vw ecUl.:; tte .ccr ECS a Gwfoi r, 4? - w ;ar,-,, ,'LLC 8 ECS H€, Aflant,, UC > EGS avutheast, LEG > EC_ Texas, LLLP Infiltration Evaluation Mountalre.Farrns Luriberbridge, North Carolina FCS Project No. 33.1350 October 14, 2010 Location Depth Soil Descri tiori 0-36" Tani, Fine to Medium SAND wl Little.Silt Seasonal High Water Table was estimated to be at 24.0 inches below the existing grade elevation. Infiltration Date 10.0 inches per hour Test was conducted- at 10 inches below existing grade elevation Groundwater was encountered at 34.0 inches below the existing grade elevation. Location ?pD? Soil Descri 1i?n Tan, Grange, Fine to Medium, SAID w/ Sorne Silt Seasonal Nigh Mater Table was estimated to be at 24.0 inches below the existing grade elevation. Infiltration 'fate: 3.1inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 38.0 inches below the existing grade .elevation. Page 1 of 2 Mail Calendar Documents Slues more r dtolbert@awhangfneers.com I J I Settings I HHe I Sign pUf 'shahan@awhengmeers Com Search Mail Search the Web ' Sho search notions ..... _., _ .. Cre to atl[_r A U j. Compose Mail Inbox {1) Chats Sent Mail Drarls Spam Trash NYT Global Home - FIFA Bans Two Executives in World Cup Vole Scandal - 4 hours ago ... u Back to Search Results Pe - - -Archwe Re it spa m '. De[ate i Move to rnho.: Labels More actions i Fwd: Mountaire Infiltration Elevations tnb- x John Shahan to me Weh CIiP =Cir>I < Newer 39 of abo4it 120 Older > Follow up Misc Priodly 2 morev Conlac€s Tasks Dan Tolbert search, add, or invite shcw detaTls Oct 7 f Reply Dan, infiltration info i Thanks, John R- Shahan, P.E. AWB Engineers 410-742-7299 -- Forwarded message ---- From: Kyle Fordham 4k 19nc eyansbuiiders_com> Date: Thu, Oct 7, 2010 at 4:50 PM Subject: Mountaire Infiltration Elevations To: John Shahan <'s t@han 9wbenginea{s_.com> John, c7 1 B-1 Grade -93"F.F.-SW 10" per Hr SHWt - 24" 3a" R-2r xe-WF.F.-SE C t? - I ?t3 ?.0?-• 38" 8.1" Per Hr Contact Into Brooks(910)367-0138 ECS Carolinas Questions From Foxie 1. Need Plan view of recessed shipping dock area floor showing all embed and angle locations with dimensions as well as exact slab dimensions ASAP, fax to trailer. (910)-843-7005 2. Does IMP W Shipping dock wall sit on mud slab or final slab elevation? 3. Does mud slab from column line A-G match elevation for mud slab in freezer at column line 22,23? And does mud stab in shipping dock running the exterior N &S walls return to allow for panel placement? Kyle Fordham r Evans Builders Inc. Superintendent (252)315.6292 kviefr?evanshuilders corn 2329 Womble-Brooks Road Wilson, North Carolina 27893 Notice: This email message, tageth-Ith arty 2"ohr-is, contains iaforma4on ar Evans Handers In.., which may ba canAde 01, nlopnetary, capyeghtad andror legally pnvl l aged This email is intended solely for ale use of the individual ar entity named on the messageIfyoa are lot the intended roc P-t, and have reca'ved aus mrss?pe In erro,, please immadlalely return by emai€ and than delete k. Reply Forward John is not available to rhat New window Print all Tum aft hiohji hg lino ,(Back to Search Results ' Arch€ve Report seam Delete Move to Inbax :Labels '. Mare acions r Newer 39 of about 120 Older f h (ps://mall.google.com/a/aw..bongineers.com/?ui=2&vlew =bsp&ver-ohhl4rwgrnbn4 1111$12010 GLIEbi'!' Jos # BORING # SHEET Evans Builders inc. 33:1.350 B-1 1 OF I Aft PRO JECT NAME ARCHITECT-ENGD[EER !;c Naldire Farm LL P srm LocAnw -0- CAMRATED PENETROMETER C1f13 36t'b1"Id e; N.C. TONS/FT. x 1 2 3 # 5+: PLASTIC WATER. UQUE) LIB. T 2 CONTENT 7 LIMIT X _ DESCREPTION OF MATERIAL GLISH LiNITS ROCK QUAL?'['Y DESIGNATION RECOVERY T t dF CASTIdGLOSS OF CIRCULATtQN IflOc R46%-REC.X 09 CE ELEVATION A ST NDARD PENETRATION 0 10 O Tan, Fine to Medium, SAND with `Little:. R 30 40 56+ . Silt (SM) L END OF BORING ,@ 3.00 S€ WT 0 24.0 Inures Test performed of 10;0 Inches Ciround water encountered 0 34:0 Inches Infiltration. rate 10.0 inches per hour 20. 25- 30- 0 i THE STRATWICATION LINES REPRESENT THE APPR13XIMATE BOUNDARY LINES HETSIEEN SML TYPES IM-•SITtf THE TRANSITION MAY BE GRADUAL 22 PL 3 4.0 Inches WS OR 10 BONNC. STARM 08/08/90 om) YWL(A.CR). SORING COMPLETER 08/08/10 CAyE' IN DEPTH 0 N€1 . :?$r TiI6 H FOREMAN 8;1?4?p DRUI.?I+G MMOD H,6 F CLIENT 108 , BORING ' SmT Evans Builders Inc. 33:1350 8-2 pg PROJECT NAME ARCIRTE '=INGIiYEER. CS mfountQlre :Fars LLP SITE I:4C:4TI6r c?cazr?:a_?r?As -C}- CALMRATED PEnTRONE ER Lu;mberbridge, N.C. TONSIFT. & a 4 5+ PC4STiC WATER ii$£iTi? . LIB X CONU T S -? g D HTjoN MATERiA.L. ENGLIS?I M arrs e 7 ROM QUALITY DE5IGgA,TYON Be RECOVERY ? & O Loss OF CIRCULATION ; ROi --- EC ELEVATION STANDARDI &'TRATION 0 . Tara, Orange, Fire to. Mledium, SAND With 10 20 30 40 60+ . Some Silt (Sm) END OF BORING C? 4.00' SHWT 024.0 inches Test. Performed at 10.0 Inches Ground grater level at 38.0 inches Infiltration rate of &I inches per hour. 15 . 2. 1 7 25 Z n - 30 G M .• THE STRATIFICATIOW LINES REPRESENT THE APPROXIMATE BOUNDARY LINES. BETWEEN $OIL TYPES IN=SITU THE TRANSITION HAY BE GRADUAL PT- 38.0 inches WS OR 0 BORING STARTED 08/08/10 -7WL(BOP-) WL(A£R) BORING C4.T&fIsLE.TED 08/08/10 CAVE DEM '6 'NA RIG HA FOM B.V4lcll.l ARM4 NG UMOD Hid PRE-DEVELOPMENT tSubcat) Leach "Pod\ f Link 9-YR PRE-DEVELOPED 090802 PRE Prepared by AWB Engineers Printed 90/28/2010 HydroCAD@ 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area Cm Description (acres) (subcatchment numbers) 0.895 69 >75% Grass cover, Good, HSG B (9S) 9.284 .98 Paved parking, HSG B (9S) 2.099 TOTAL AREA 1-YR. PRE-DEVELOPED 090802_PRE Type III 24-hr 9-YR Rainfall=3.30- Prepared by AWB Engineers Printed .10128/2010 HydroCADO 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 3 Time span=0.00-40.00 hrs, dt=0.01 hrs, 4001 points Runoff by SCS. TR-20 method, UH=SCS Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Star-Ind method Subcatchment 1S: PRE-DEVELOPMENT Runoff Area=91,433 sf 61.19% Impervious Runoff Depth=1.77" Flow Length=100' Slope=0.0200 T Tc=8.9 min CN=84 Runoff=3.93 cfs 0.309 of Total Runoff Area= 2.099 ac Runoff Volume= 0.309 of Average Runoff Depth= 1.77" 38.81%a Pervious = 0.815 ac 61.19% Impervious= 1.284 ac 1-YR PRE-DEVELOPED 090802 PRE Type 11124-hr I-YR Rainfall=3.30" Prepared by AWS Engineers Printed 10128/2010 HydroCAD@ 9.00 stn 02300 @ 2009 H droCAD Software Solutions LLC Page 4 Summary for Subcatchment 7S: PRE-DEVELOPMENT Runoff = 3.93 cfs @ 12.13 hrs, Volume= 0.309 af, Depth= 1.77' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr i-YR Rainfall=3.30" Area (sf) CN Description 35,486 61 X75% Grass cover, Good, HSG 6 55,947 98 Paved parking, HSG B 91,433 . 84 Weighted Average 35,486 38.81% Pervious Area 55,947 61.19% Impervious Area Tc Length Slope Velocity Capacity Description . (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.0200 0.19 Sheet Flow, Grass: Short n= 0.150 P2= 3.90„ Subcatchment 1S: PRE-DEVELOPMENT Hydrograph 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) EXISTING LIFT STATION 3 /r'AVCMENT E MI)20 E-tNH6? I E GB A` ROOFTOP "B" e\ Imh M 21 132 > CE3 CE2 CE1 7 ROOFTOP "B" ROOFTOP "C" AND "P" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" MH24 INFILTRATION BASIN ROOFTOP "A& GRASSED AREA n Suhcat) Reaehi /p Link are 1-YR POST-DEVELOPED 090802_POST Prepared by AWB Engineers Printed 11/18/2010 HydroCAD® 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Pa e 2 Area Listing (all nodes) Area Cm Description (acres) (subcatchment-numbers) 1.097 61 >75% Grass cover, Good, HSG B (A) 1.942 98 (CE7, CE2, D) 0.438 98 Paved parking & roofs (1318 132) 1.413 98 Paved parking, HSG 13 (8S, A) 0.308 98 Unconnected roofs, HSG B (CE3) 4.398 TOTAL AREA 1-YR POST-DEVELOPED 090802_ POST Prepared by AWB Engineers Printed 11/18/2010 HydroCAD® 9.00 sln 02300 © 2009 Hydro CAD Software Solutions LLC Page 3 Pipe Li sting (all nodes) Line# Mode 1n-Invert Out-Invert Length Slope n DiamMidth Height Number (feet) (feet) (feet) (Rift) (inches) (inches) 1 CB20 192.43 191.47. 135.0 0.0071 .0.013 18.0 0.0 2 CE21 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 Co 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E;-CB5 193.28 189.64 140.0 0.0260 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 6 MH20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 . MH20 189.80 189.07 148.0 0.0049 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 9 MH23 189.12 187.70 328.0 0.0043 0.013 12.0 0.0 10 MH24 188.33 187.67 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.30 187.00 25.0 0.0920 0.013 24.0 0.0 1-YR POST-DEVELOPED 090802_POST Type 111 24-hr 7-YR Rainfaii-3 30" Prepared by AWB Engineers Printed 11118/2010 HydroCAD) 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-40.00 hrs, dt=0.01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Dyn-Star-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 8S• PAVEMENT Runoff Area=27,626 sf 100.00% Impervious Runoff Depth=3.07 . Flow Length=175' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=2.11 cfs 0.162 of Subcatchment A: ROOFTOP "A" & GRASSED Runoff Area=81,726 sf 41.51% Impervious Runoff Depth=1.22" Flow Length=50' Slope=0.0200 T Tc=7.4 min CN=76 Runoff=2.48 cfs 0.191 of Subcatchment 01• ROOFTOP "B" Runoff Area=9,371 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0200 T Tc=5.0 min CN=98 Runoff=0.71 cfs 0.055 of Subcatchment 132: ROOFTOP "B" Runoff Area=9,706 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0200 T Tc=5.0 min CN=98 Runoff=0.74 cfs 0.057 of Subcatchment CE1: ROOFTOP "C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.98 cfs 0.076 of Subcatchment CE2: ROOFTOP "C" AND "E" Runoff Area=26,300 sf 100.00% Impervious Runoff Depth=3.07" Flow. Length=50' Slope=0.0100 T Tc=5.0 min CM=98 Runoff=2.01 cfs 0.154 of Subcatchment CE3: ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth=3.07 Flow Length=50' Slope=0.0100 '1' Tc=5.0 min CN=98 Runoff=1.02 cfs 0.079 of Subcatchment D: ROOFTOP "D" Runoff Area=10,552 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0100 '!' Tc=5.0 min CM=98 Runoff=0.80 cfs 0.062 of Pond CB20• CB20 Peak Elev=193.52' Inflow=3.79 cfs 0.292 of . 18.0" Round Culvert n=0.013 L=135.0' S=0.0071 T Outflow=3.79 cfs 0.292 of Pond C821: CB21 Peak Elev=192.66' Inflow=4.81 cfs 0.371 of 18.0" Round Culvert n=0.013 L=66.0' S=0.0071 T Outflow=4.81 cfs 0.371 of Pond CO: CO Peak Elev=193.89' Inflow=1.79 cfs 0.138 of 15.0" Round Culvert n=0.013 L=80.0' S=0.0071 T Outflow=1.79 cfs 0.138 of Pond E-CB5: E-CB5 Peak Elev=195.00' Storage=0 cf lnflow=2.11 cfs 0.162 of Primary=2.11 cfs 0.162 of Secondary=0.00 cfs 0.000 of Outflow=2.11 cfs 0.162 of Pond E-MI6: E-MI6 Peak Elev=191.58' inflow=6.92 cis 0.833 of 24,0" Round Culvert n=0.013 L=81.0' S=0.0049 'r Outflow=6.92 cfs 0.533 of Pond MH20: MH20 Peak Elev=191.30' lnflow=7.64 cfs 0.588 of Primary=3.93 cfs 0.471 of Secondary=7.64 cfs 0.116 of Outflow=7.64 cfs 0.588 of Pond IIMH21: MH21 Peak Elev=190.59' inflow=8.38 cfs 0.173 of 24.0" Round Culvert: n=0.013 L=152.0" S=0.0049 T Outflow=8.38 cfs 0.173 of Pond MH23: MH23 Peak Elev=193.28' Inflow=3.93 cfs 0.471 of 12.0" Round Culvert n=0.013 L=328.0' S=0.0043 T Outflow=3.93 cfs 0.471 of 1-YR POST-DEVELOPED 090802_POST Type 11724-hr f-YR Rainfall=3.3o- Prepared by AWE Engineers Printed 11/18/2010 HydroCAD® 9.00 sJn 02300 © 2009 HydroCAD Software Solutions LLC page 5 Pond MH24: MH24 Peak Elev=190.08' Inflow=8.38 cfs 0.173 of Primary=4.93 cfs 0.152 of 'Secondary=3.45 cfs 0.021 of outflow=8.38 cfs 0.173 of Pond 0-3: INFILTRATION BASIN Peak. Elev=189.40' Storage=6,782 cf Inflow=7.38 cfs 0.343 of Discarded=0.85 cfs 0.343 of Primary=0.00 cfs 0.000 of Outflow=0.85 cfs 0.343 of Link E-1.51: EXISTING LIFT STATION Inflow=3.93 cfs 0.471 of Primary=3.93 cfs 0.471 of Total Runoff Area = 4.398 ac Runoff Volume = 0.838 of Average Runoff Depth = 2.28 24.95% Pervious = 1.097 ac 75.05% Impervious = 3.301 ac 1-YR POST-DEVELOPED 090802 POST Type ?f 24-hr I-YR Rainfall=3.30`° Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 s!n 02300 © 2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 8S. PAVEMENT Runoff - 2.11 cfs Q 12.07 hrs, Volume= 0.162 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1-YR Rainfall=3.30" Area (sf) CN Description 27,626 98 Paved parking, HSG B 27,626 100.00% Impervious Are a Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90„ 1.0 125 0.0100 2.03 Shallow Concentrated Flow, Paved Kv= 20.3 fps 1.8 175 Total, Increased to minimum Tc = 5.0 min Subcatchmeat 8S: PAVEMENT Hydrograph J Runoff z ?a.Crg -- ------------ -- --------- Type ill 24-hr 1--YR 2_ Rainfall=3.30'° Runoff Area 27,626 sf Runoff Volume=0.162 of Runoff Depth=3.07°° Flow Length=175 1- Slope=0.0100 T t t Tc=5.0 min a CN=98 0 0 1 2 13 ' 4 5 " 6 7 8 9 1 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-YR POST-DEVELOPED 090802_POST Type /11 24-hr I-YR RaiefaU-3.30" Prepared by AWB Engineers Printed 11118/2010 HydroCAD(09.00 sln 02300 © 2009 Hydro CAD Software Solutions LLC Page 7 Summary for Subcatchrnent A: ROOFTOP W & GRASSED AREA Runoff - 2.48 cfs @ 12.11 hrs, Volume= . 0.191 af, Depth= 1.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hm Type III 24-hr 1-YR. Rainfall=3.30" Area (st) CN Description 33,925 98 Paved parking, HSG B 47,801 61 >75% Grass cover, Good, HSG B . 81,726 76 Weighted Average 47,801 58.49% Pervious Area 33,925 41.51% Impervious Area Te Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 7,4 50 0.0200 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.90" Subcatchment A: ROOFTOP 'W'& GRASSED AREA Hydrograph D Runoff 248 s" Type 111 24-hr 1-YR Rainfall 3.30 2- Runoff Area-81 726 sf .... , Runoff Volume=0.191 of w Runoff'Depfh=1 22" ° . Flow Length-50'' 1- Slope =0.'0200 '1' r Tc=7.4 min CN=76. 0 0 1 2 3 4 5 6 7 8 9 1011 12 13 14 35 16 1718 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-YR POST-DEVELOPED 090802 POST Type H/ 24-hr I-YM Rainfal1-3.30° Prepared by AWB Engineers Printed +1111812010 HydroCAD@)9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment Bid ROOFTOP "B" Runoff = 0.71 cfs @ 12.07 hrs, Volume= 0.055 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1-YR Rainfall=3.30" Area (sf) CN Description 9,371 98 Paved parking 8. roofs 9,371 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (hift) (ft/sec) (cfs) 0.6 .50 0.0200 1.32 Sheet Plow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment Bi: ROOFTOP "B"• Hydrograph 0.8- -- - - - - - - - - - - .-. ----------- Runoff 0.75 0.7 " -7 cfs ------------- -------- - ---- -- --------- :. Type III 24-hr 1-YR _ 0.fi5 - Rainfall=3.30"' 0.6- -------- --- - ------ --- --- - ,37'I st -. Runoff Area-9- 0.5- Runoff Volume=0.055 of 0.45. p 07 " Runoff Depth=3 V 3 0.4- ri 0.35 . Flow Length=50" i Slope--0.0200 0.257 -5 0 min TC 0.2 0.15 ?' CN-98 0.05 -/a'r x ?- 7 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2122 23 24 25 26 27 28 29 30 31 :32 33 34 35 36 37 38 39 40 Time (hours) i-YR POST-DEVELOPED 090802_POST Type /1124-hr 9-YR Rainfall=3.3o- Prepared by AWB Engineers Printed 11/18/2010 HydroCAD® 9.00 s/n 02300 Q 2009 Hydro CAD Software Solutions LLC Page 9 Summary for Subcatchment B2: ROOFTOP "B" Runoff 0.74 cfs @ 12.07 hrs, Volume= 0.057 af, Depth= 3.07° Runoff by SCS TR-20 method,. UH=SCS, Time Span= 0.00-40,00 hrs, dt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3.30" Area (sf) CN Description 9,706 98 Paved parking 8 roofs 9,706 100.00% Impervious Area Tc Length Slope Velocity Capacity Description . (min) (feet) (ftlft) (ft/sec) (cfs) 0.6 50 0.0200 1.32 - Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment B2: ROOFTOP "B" Hydrograph 0.8- i? Runoff 9.75 -- --- --- 0.74 MS Type Ili 24=hr 1-YR 0.7- 0.65 - Rainfall=3.30" 0.6- Runoff Area=9 706 sf 0.55 , 0.5= Runoff Volume=4.057 of 0 0.45 - De - unoff ' De th 3 07 0 0.4 0 3s= --, p . --- -- Flow Length=50' _ 0.3 ' $lOpe=0.0200 '/' ' 0.25- -_ _ . --- -- `Tc=5.0 min 0.2 o.1s= CN=96 -------- -------- - - ----- - ----- -------- - - a.1: ------------- -- - - ------------ --- 0.05°_ 0 11 if ` 0 1 2 3 4 53 7 8 1001112131415161718192021222324252627282930313233 35363738 399 40 Time (hours) 1-YR POST-DEVELOPED 090802 POST Type N124-hr 9-YR Ra6?7fa11-3 3O"" Prepared by AWB Engineers Printed 11/1812010 H droCAD0 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CE1o ROOFTOP "C" AND "E" Runoff - 0,98 cfs @ 12.07 hrs, Volume= 0.076 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3.30" Area (sf) CM Description 12,896 98 12,896 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ft/sec) (cfs) 0.8 s0 0.0100 1.00 Sheet Flown, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE7 a ROOFTOP "C" AND "E" 1-YR POST-DEVELOPED 090802_POST Type III24-hr f-YR Rainfall 3 30" Prepared by AWB Engineers Printed 11/18/2010 HydroCAb) 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Pagel I Summary for Subcatchment CE2; ROOFTOP "C" AND ""E" Runoff = 2.01 cfs (M 12.07 hrs, Volume= 0.154 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.0040.00 firs, dt= 0.01 hrs Type Ill 24-hr 1-YR Rainfall=3.30- Area (sf) Chi Description * 26,300 98 26,300 100.00% Impervious Area Tc Length Slope . Velocity Capacity Description (min) (feet) . (ft/ft) (ftlsec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min (? Runof# 1-YR POST-DEVELOPED 090802 POST Type W 24-hr'-YR Raintaff-3 30" Prepared by AWB Engineers Printed 11118/2010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchrnent CE3: ROOFTOP "C" AND "E" Runoff = 1.02 cfs Q 12.07 hrs, Volume= 0.079 af, Depth= 3.07' Runoff by SC S TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, alt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3.30" Area (sf) CN Description 13,404 98 Unconnected roofs, HSG R 13,404 100.00% Impervious Area 13,404 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) .(feet) (ftlft) (ft/sec) (cfs) 0.8 s0 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Te = 5.0 min Subcatchment CE3. ROOFTOP "C" AND "E" 0 Runoff 1-YR POST-DEVELOPED 090802_POST Type III2¢hr 9-YR Rainfam=3.30" Prepared by AWE Engineers Printed 11/1812010 HydroCAD® 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC page 13 Summary for Subcatchment D: ROOFTOP -D" Runoff - 0.80 cfs @ 12.07 hrs, Volume= 0.062 at, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1-YR Rainfall=3.301° Area (sf) CN Description 10,552 98 10,552 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" . 0.8 50 Total, Increased to minimum Tc = 5.0 min 1-YR POST-DEVELOPED 090802 POST Type IN 24-hr 7-YR Rainfall-3-30" Prepared by AWB Engineers Printed 11/1812010 HydroCAiD® 9.00 s1n 02300 @ 2009 Hydro CAR Software Solutions LLC Page 14 Summary for Pond CB20: CB20 Inflow Area = 1.142 ac,100.00% Impervious, Inflow Depth = 3.07" for 1-YR event Inflow _ 3.79 cis @ 12.07 hrs, Volume= 0.292 of Outflow = 3.79 cfs @ 12.07 hrs, Volume= 0.292 af, Atten= 0%, Lag= 0.0 min Primary = 3.79 cfs @ 12.07 hrs, Volume= 0.292 of Routing by Dyn-Star-Ind method, Time Span= 0.00-40.00 brs, dt= 0.01 hrs Peak Elev= 193.52` @ 12.07 hrs Flood Elev= 195000' Device Routing Invert Outlet Devices #1 Primary 192.43' 18.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow M2x=3.78 cfs @ 12.07 hrs IOW=193.52' TW=192.66' (Dynamic Tailwater) Z7=Culvert (Outlet Controls 3.78 cis @ 3.83 fps) Pond CB20: CB20 N U 3 O LL Hydrograph Inflow 19 Primary 1-YR POST-DEVELOPED 090802_POST Type W 24-hr 7-YR Rainfaf/ 3.30" Prepared by AWB Engineers . Printed 1"111812010 HydroCADO 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Pa a 15 Summary for Pond CB21: CB21 Inflow Area = 1.450 ac,100.00% Impervious, Inflow Depth = 3.07" for 1-YR event Inflow = 4.81 efs @ 12.07 hrs, Volume= 0.371 of Outflow - 4.81 cfs @ 12.07 hrs, Volume= 0.371 af, Atten= 0%, Lag= 0.0 min Primary = 4.81 cfs @ 12.07 hrs, . Volume= 0.371 of Routing by Dyn-Star-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 192.66' @ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices 41 Primary 191.47'. 18.0" Round Culvert L= 66.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0.0071 '1' Cc= 0.906 n= 0.013 Corrugated PE, smooth interior ?Primary OutFlow Max=4.81 cfs @ 12.07 hrs HW=192.66' TW=191.36' (Dynamic Tailwater) ?---'1=Culvert (Barrel Controls 4.81 cfs @ 4.40 fps) ® Inftow 0 Primary 1-YR POST-DEVELOPED 090802 POST Type If? 24-hr 9-YR Rainfall=3.30- Prepared by AWB Engineers Printed 11/1812010 HydroCAD@ 9.00 stn 02300 @ 2009 HydroCAD Software Solutions LLC Pa a 16 Summary for Pond CO: CO Inflow Area = 0.538 ac,100.00% Impervious, Inflow Depth = 3.07" for 1-YR event Inflow - 1.79 cfs @ 12.07 hrs, Volume= 0.138 of Outflow = 1.79 cfs-@ 12.07 hrs, Volume= 0.138 of, Atten= 0%, Lag= 0.0 min Primary - 1.79 cfs @ 12.07 hrs, Volume= 0.138 of Routing by Dyn-Star-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 193.89` @ 12.08 hrs Flood Elev= 195.00` Device Routing Invert Outlet Devices #1 Primary 193.00' 15.0'° Round Culvert L= 80.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 192.43' S= 0.0071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=1.76 cfs @ 12.07 hrs HW=193.88' TW=193.52' (Dynamic Tailwater' t--1=Culvert (Outlet Controls 1.76 cfs @ 2.66 fps) Pond CO: CO Inflow Primary i-YR POST-DEVELOPED 090802_POST Type III 24-,hr'-YR Rainfalr=3.30 - Prepared by AWB Engineers Printed 11/18/2010 HydroCADO 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Palle 17 Summary for Pond E-CB5: E-CB5 Inflow Area = 0.634 ac,100.00% Im pervious, Inflow Depth = 3.07" for i-YR event Inflow = 2.11 cfs @ 12.07 hrs, Volume= 0.162 of Outflow = 2.11 cfs @ 12.07 hrs, Volume= 0.162 af, Atten= 0%, Lag= 0.0 min Primary = 2.11 cfs @ 12.07 hrs, Volume= 0.162 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Eiev= 19$.00- @ 12.07 hrs Surf.Area= 27,622 sf . Storage= 0 cf Flood Elev= 194.42- Surf.Area= 0 sf Storage= 0 cf . Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 0.0 min ( 754.8 - 754.8 ) Volume Invert Avail-Storage Storage Description #1 195.00' 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) : (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0 0 195.25 27,622 6,906 6,906 Device (touting Invert Outlet Devices #1 Primary 193.28' 12:0" Round Culvert L= 140.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S= 0.0260 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 194.42° 24.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 195.25" 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=4.18 cfs @ 12.07 hrs HW=195.00° TW=191.36" (Dynamic Tailwater) t--l=Culvert (Inlet Controls 4.18 cfs @5.32 fps) t-2=0rificeiGrate (Passes 4.18 cfs of 14.44 cfs potential flow) Secondary Outflow. Max=0.00 cfs @ 0.00 hrs HW=195.00` (Free Discharge) t--3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 1-YR POST-DEVELOPED 090802_POST Type III 24-hr I-YR Rainfa/I=-3.30"" Prepared by AWB Engineers Printed 11/18/2010 HydroCAD0 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 18 Pond E-CB5: E-CB5 Hydrograph 1-YR POST-DEVELOPED 090802_POST Type III 24` hr 9-YR Rainfal/-3.30- Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Pane 19 Summary for Pond E-MH6: E-MH6 Inflow Area = 2.084 ac,100.00% Impervious, Inflow Depth = 3.07" for 1-YR event Inflow - 6.92 cfs @ 12.07 hrs, Volume= 0.533 of outflow = 6.92 cfs @ 12.07 hrs, Volume= 0.533 af, Atten= 0%, Lag= 0.0 min Primary = 6.92 cfs @ 12.07 hrs, Volume= 0.533 of Routing by Dyn-Star-Ind method, Time Span= 0.0040.00 hrs, dt= 0.01 hrs Peak Elev= 191.58'@ 12.08 hrs Flood Elev= 195.14' Device Routing Invert Outlet Devices #1 Primary 189.64' 24.0" hound Culvert L= 81.0" CPR, square edge headwall, Ke= 0.500 Outlet Invert= 189.24' S= 0.0049 '1' Cc= 0.900 n= 0.013 Primary OutFlow Max=2.76 cfs @ 12.07 hrs HW=191.36' TW=191.30' (Dynamic Tailwater) t--1 =Culvert (Outlet Controls 2.76 cfs @ 1.29 fps). FU-1 IR Primary 11 0 1 2 3 4 5 6 7 8 9 1D11121314151617181920212223242 2728293D31 3233 34 353637383940 Time (hours) 1-YR POST-DEVELOPED 090802 POST Type I// 24-hr'-YR Rainfall=3- 30-Prepared by AWD Engineers Printed 1111812010. HydroCA1D@ 9.00 sln 02300 @ 2009 HydroCA1D Software Solutions LLC Pa a 20 Summary for Pond MH20: MH20 Inflow Area = 2.299 ac,100.00% Im pervious, Inflow Depth = 3.07" for 1-YR event Inflow - 7.64 cfs @ 12.07 hrs, Volume= 0.588 of Outflow = 7.64 cfs @ 12.07 hrs, Volume= 0.588 af, Atten= 0%, Lag= 0.0 min Primary = 3.93 cfs @ 12.08 hrs, Volume= 0.471 of Secondary = 7.64 cfs @ 12.07 hrs, Volume= 0.116 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 191.30'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.24' 12.0" Round Culvert L= 23.5' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 '!' Cc= 0.900 n= 0.013 #2 Secondary 189.80' 24.0" Round Culvert L= 148.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.07' S= 0.0049T Cc= 0.900 n= 0.013 (Primary OutFlow Max=0.00 cfs @ 12.08 hrs HW=190.99' TW=193.28' (Dynamic Tailwater) t--'1 Culvert (Controls 0.00 cfs) Secondary OotFlow? Max=.6.91 cfs @ 12.07 hrs HW=191.30' TW=190.59' (Dynamic Tailwater) t-2=Culvert (Outlet Controls 6.91 cfs @ 3.79 fps) Pond MH20: MH20 Hydrograph ® Inflow 7 sa ?r Outflow i,64cf, 299 ac ---- Inflow Area=2 O Primary d S - . ary econ 8= 7.6as - ----- ----- Peak-'Elev-'I-91.30°--- 7_ . '. - -- -- ----- ------ --- ------- - -------- ----- ---------- ----------- 6- ,. ^ 5- 0 4- a 2 - 1- - 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 35 38 40 Thne (hours) i-YR POST-DEVELOPED .090802-POST Type 11124-hr 7-YR Rainfall-3 3o" Prepared by AWB Engineers Printed 11/1812010 HydraCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC Page 21 Summary for Pond MH21: MH21 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 9.33". for 1-YR event Inflow - 8.38 cfs @ 12.07 hrs, Volume= 0.173 of Outflow 8.38 cfs @ 12.07 hrs, Volume= 0.173 A Atten= 0%, Lag= 0.0 min Primary = 8.38 cfs @ 12.07 hrs, Volume= 0.173 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peale Elev= 190.59` @ 12.07 hrs Flood Elev= 191.72' Device Routing Invert Outlet Devices #1 Primary 189.07' 24.0° Round Culvert L= 152.0° CPR, square edge headwall, 1[e= 0.500 Outlet invert= 188.33' S= 0.00497 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Outflow Max=5.93 cfs @ 12.07 hrs HW=190:59° TW=190.08' (Dynamic Tailwater) t1 =Culvert (Outlet Controls 5.93 cfs @ 3.20 fps) Pond MH21: MH21 Hydrograph ! Inflow g e 3es E Primary 8.38 d, - - - Inflow Area=0.223 ac. 6 Peak Elev=190'.59` 7- --------- ---- - ---- - ------- ---- - ------- ----- ------------ 24x.0 6- f ..... Round-ulrrer- U 5- 3 n=0.013 LL 4- L_ 152.0' 3 ' s=0.0049' T 2-. 0 1 2 3 4 5 6 7 8 9 1011 12 1314 15 1617 18 1921J21 222324252/ r fi 27 28 29 30 31 32 33 34 35 36 37 3839 40 Time (hours) 1-YR POST-DEVELOPED 090802 POST Type /M 24-hr I-YR Rainfall=3.347" Prepared by AWB Engineers Printed 11118/2010. HydroCAD@ 9.00 stn 02300 (P2009 HydroCAD Software Solutions LLC Page 22 Summary for Pond MH23: MH23 Inflow Area = 2.299 ac,100.00% Im pervious, Inflow Depth = 2.46" for 1-YR event Inflow = 3.93 cfs @ 12.08 hrs, Volume= 0.471 of Outflow -- 3.93 cfs @ 12.08 hrs, Volume= 0.471 of, Atten= 0%, Lag= 0.0 min Primary = 3.93 cfs @ 12.08 hrs, Volume= 0.471 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0A1 hrs Peak Elev= 193.28'@ 12.08 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.12' 12.0" Round Culvert L= 328.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' S= 0.0043'1' Cc= 0.900 n= 0.013 Primary OutFlow Max=3.93 cfs @ 12.08 hrs HW=193.28' TW=0.00" (Dynamic Tailwater) Z--1=Culvert (Darrel Controls 3.93 cfs @ 5.00 fps) ER Inflow 0 Primary 1-YR POST-DEVELOPED 090802_POST Type III 24-hr ?'-YR Rainfall=3.30" Prepared by AWB Engineers Printed 11118/2010 HydroCAD0 9.00 sin 02300 (D2009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24: MH24 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 9.33" for 1-YR event Inflow - 8.38 cfs @ 12.07 hrs, Volume= 0.173 of Outflow 8.38 cis @ 12.07 hrs, Volume= 0.173 af, Atten= 0%, Lag= 0.0 min Primary = 4.93 cfs @ 12.07 hrs, Volume= 0.152 of Secondary = 3.45 cfs @ 12.07 hrs, Volume= 0.021 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 190.08'@ 12.07 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.0049T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.30' 24.0" Round Culvert L= 25.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.00' S= 0.09207 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=4.91 cis @ 12.07 hrs HIW=190.08' TW=188.68' (Dynamic Tailwater) t-1 =Culvert (Barrel Controls 4.91 cfs @ 4.00 fps) Secondary OutFlow Marc=3.43 cfs @ 12.07 hrs HW=190.08° (Free Discharge) t--2=Culvert (inlet Controls 3.43 cfs @ 3.01 fps) Pond MH24: MH24 Hydrograph Inflow Lai Outflow Primary I Secondary 1-YR POST-DEVELOPED 090802 POST Type III 24 hr 7-YR Rainfall=3.30" Prepared by AWB Engineers Printed 1111812010 HydroCADci;? 9.00 sin 02300 @2009 HydroCAD Software Solutions LLC Page 24 Summary for Pond 0-3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72% Impervious, Inflow Depth = 1.96" for 1-YR event Inflow = 7.38 cfs @ 12.11 hrs, Volume= 0.343 of Outflow = 0.85 cfs @ 12.53 hrs, Volume= 0.343 af, Atten= 88%, Lag= 25.3 min Discarded = 0.85 cfs @ 12.53 hrs, Volume= 0.343 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 189.40'@ 12.53 hrs Surf.Area= 5,939 sf Storago= 6,782 cf Flood Elev= 190.50' Surf.Area= 7,706 sf Storage=114,3090 Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 74.6 min (876.8 - 802.1 ) Volume Invert Avall.Storage Storage Description #1 188.00' 14,309 of Custom Stage Data (Prismatic) Listed below (Recale) Elevation Su rf.Area lnc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 188.00. 3,797 0 0 189.00 5,314 4,556 4,556 190.00 6,893 6,104 10,659 190.50 7,706 3,650 14,309 Device Routing Invert Outlet Devices #1 . Primary 189.50' 8.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 186.00' Discarded OutFlow Max=0.85 cfs @ 12.53 hrs HW=189.40' (Free Discharge) t2=Exfiltration ( C ontrols 0.85 cfs) Primary OutFiow Max=0,00 cfs @ 0.00 hrs HW=188.00' (Free Discharge) t-1=Broad-Crested Rectangular Weir (Controls 0.00 cfs) 1-YR POST-DEVELOPED 090802_POST Type fff 24-hr 7-YID Rainfall-3.30„ Prepared by AWS Engineers Printed 11/18/2010 HydroCAD® 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 25 Pond 0-3. INFILTRATION BASIN Hydrograph h yU i O U- 1-YR POST-DEVELOPED 090802 POST Type 11/24=hr I-YR Rainfa11-3.30" Prepared by AWB Engineers Printed 1111812010 HydroCAD@ 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 26 Summary for Link E-1_31: EXISTING LIFT STATION Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 2.46" for 1-YR event Inflow = 3.93 cfs @ 12.08 hrs, Volume= 0.471 of Primary = 3.93 cfs @ 12.08 hrs, Volume= 0.471 af, Atten= 0%, Lag= 0.0 thin Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Link E-LS1; EXISTING LIFT STATION Hydrograph M inflow 0 Primary EXISTING LIFT 1 3 /PAVEMENT STATION n E-CB$ M?20 F-MHB? I y,, ?$ e? - BI D I ' I -= I ROOFTOP "B" C?l C 0 l4k ROOFTOP "D" 0 ,F21.... M 21 ( B2 i CE3 i CE2) ( CE1 ROOFTOP "B" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" MH24 INFILTRATION BASIN ROOFTOP "A" & GRASSED AREA ?SUbca#) Reach !F'onci?`, Link 1-INCH NORM EVENT 090802 POST Prepared by AWB Engineers Printed 11118/2010 HydroCAD@)9.00 stn 02300 O 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 1.097 61 >75% Grass cover, Good, MSG B (A) 1.142 98 (CE1, CE2, D) 0.438 98 Paved parking & roofs (B1, 82) 1.413 98 Paved parking, HSG B (8S, A) 0.308 98 unconnected roofs, HSG B (CE3) 4.358 TOTAL AREA 1-INCH STORM EVENT 090802 POST Prepared by AWE Engineers Print ed 11/1812010 HydroCAD® 9.00 sIn 02300 © 2009 HydroCAD Software Solution s LLC Page 3 Pipe list ing (all nodes) Une# Node In-invert Out-invert Length Slope n Diam/Width Height Number (feet) (feet) (feet) (ft/ft) (inches) (inches) 1 CB20 192.43 191.47 135.0 0.0071 0.013 18.0 0.0 2 C021 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 CO 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E-CB5 193.28 189.64 140.0 0.0260 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 .6 MH20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 MH20 189.80 189.07 148.0 0.0049 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 9 MH23 189.12 187.70 328.0 0.0043 0.013 12.0 010 10 MH24 188.33 187.67 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.30 187.00 25.0 0.0920 0.013 24.0 0.0 .1-INCH STORM EVENT. 090802 POST Type lll24-hr'.O" Rainfall=Y.OO" Prepared by AWB Engineers Printed 1111812010 HydroCAD® 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-40X0 hrs, dt=0.01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Dyn-Star-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment BS: PAVEMENT Runoff Area=27,626 sf 100.00% Impervious Runoff Depth=0.79- Flow Length=175' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.58 cfs 0.042 of Subcatchment A. ROOFTOP 'W& GRASSED Runoff Area=81,726 sf 41.51% Impervious Runoff Depth=0.04" Flow Length=50' Slope=0.0200 T Tc=7.4 min CN=76 Runoff=0.01 cfs 0.006 of Subcatchment B1: ROOFTOP "B" Runoff Area=9,371 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0200 T Tc=5.0 min CN=98 Runoff=0.20 cfs 0.014 of Subcatchment 82: ROOFTOP "B" Runoff Area=9,706 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0200 '1' Tc=5.0 min CH=98 Runoff=0.21 cfs 0.015 of Subcatchment CE'I: ROOFTOP "C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100 '1' Tc=5.0 min CN=98 Runoff=0.27 cfs 0.020 of Subcatchment CE2: ROOFTOP "C" AND "E" Runoff Area=26,300 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100 'P Tc=5.0 min CN=98 Runoff=0.56 cfs. 0.040 of Subcatchment CE3: ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.28 cfs 0.020 of Subcatchment D: ROOFTOP "D" Runoff Area=10,552 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.22 cfs 0.016 of Pond CB20: CB20 Peak Elev=192.94' Inflow=1.05 cfs 0.075 at 18.0" Round Culvert n=0.013 L=135.0' S=0.0071 "1' Outflow=1.05 cfs 0.075 of Pond CB21: CB21 Peak Elev=192.03' Inflow=1.34 cfs 0.096 of 18.0" Round Culvert n=0.013 L=66.0' S=0.0071 "f Outflow=1.34 cfs 0.096 of Pond CO: CO Peak Elev=193.39' lnflow=0.50 cfs 0.035 of 15.0" Round Culvert n=0.013 L=80.0' S=0.0071 '1' Outflow=0.50 cfs 0.035 of Pond E-CBS: E-CB5 Peak Elev=195.00' Storage=0 cf lnflow=0.58 cfs 0.042 of Primary=0.58 cfs 0.042 of Secondary=0.00 cfs 0.000 of 0utflow=0.58 cfs 0.042 of Pond E-MI6: E-MH6 Peak Elev=190.44' Inflow=1.92 cfs 0.137 of 24.0" Round Culvert n=0.013 L=81.0' S=0.0049 T Outflow=1.92 cfs 0.137 of Pond MH20: MH20 Peak Elev=1.90.16' lnflow=2.12 cfs 0.152 of Primary=1.57 cfs 0.145 of Secondary=0.55 cfs 0.006 of outflow=2.12 cfs 0.152 of Pond MH21: MH21 Peak Elev=189.49" lnflow=0.76 cfs 0.021 of 24.0" Round Culvert n=0.013 L=152.0' S=0.0049 T Outflow=0.76 cfs 0.021 of Pond MH23. MH23 Peak EIev=189.92' Inflow=1.57 cfs 0.145 of 12.0" Round Culvert n=0.013 L:=328.0' S=0.0043 T Outflow=1.57 cfs 0.145 of 1-INCH STORM EVENT 090802_POST TYPe 1112¢hr f.0" Rainfall=1,00- Prepared by AWB Engineers Printed 11/18/2010 HydroCA00 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC page 5 Pond MH24: MH24 Peak Elev=188.80° lnflow=0.76 cfs 0.021 of Primary=0.76 cfs 0.021 of Secondary=0.00 cfs 0.000 of Outflow=0.76 cfs 0.021 of Pond 0-3: INFILTRATION BASIN Peak Elev=188.03° Storage=124 cf lnflow=0.76 cfs 0.027 of D1scarded=0.36 cfs 0.027 of Primary=0.00 cfs 0.000 of Outflow=0.36 cfs 0.027 of Link E-LS1: EXISTING LIFT STATION Inflow=1.57 cfs 0.145 of Primary=1.57 cfs 0.145 of Total Runoff Area = 4.398 ac Runoff Volume = 0.172 of Average Runoff Depth = 0.47' 24.95% Pervious = 1.097 ac 75.05% Impervious = 3.301 ac I-INCH STORM EVENT 090802 POST Type I1124-hr ?.0 " Rainfall=1.00- Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 s!n 02300 © 2009 HydroCAD Software Solutions LLC Pa e 6 Summary for Subcatchment 8S: P"EMENIT Runoff = 0.58 cfs Cm 12.07 hrs, Volume= 0.042 af, Depth= 0.79°` Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1.0" Rainfall=1.00" Area (sf) CN Description 27,626 98 Paved parking, HSG 8 27,626 100.00% Impervious Area Te Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 1.0 125 0.0100 2.03 Shallow Concentrated Flow, Paved Kv= 20.3 fps 1.8 175 Total, Increased to minimum Tc = 5.0 min Subcatchment BS: P"EMEN T Hydrograph 0.65: RD Runoff 06 ------------ --- -- 0.58 cfs I - - - -- _ - -- TYpe;III 24 hr 1.07 0.55- ------ -------- -- - ----------------- - Rainfall- Runoff Area= 27,626 sf 0.45 0.4- - Runoff Volume-0.042 of 0:35: . Runoff Depth=0.79x' 0.3 -- - Len th='175° Flow_ 0.25 _ SIope=0.0100 "Ix 0.2 " -------------------- ------- -- -- min 0.15= !CN=98' - - - 0.05 - -- ------ -------- ----- --- --- ------- is-,,?• •• - 1 Z' , 0 1 P 3 4 5 6 7 8 9 1011 12131415 52&27 28 29 30 31 32 33 34 35 36 37 38 39 40 161718 E92021222324 Time (hours) 1-INCH STORM EVENT' 090802_POST Type/11 24-hr 1.0- Rainfall=1.00- Prepared by AWB Engineers Printed 11/18/2010 HydroCAD® 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment A: ROOFTOP "A" & GRASSED AREA Runoff - 0.01 cfs @ 12.51 hrs, Volume= 0.006 af, Depth= 0.04" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 711 24-hr 1.0" Rainfall=1,00" Area (sf) CM Description 33,925 98 . Parted parking, HSG B 47,801 61 a75% Grass cover, Good, HSG B 81,726 76 Weighted Average 47,801 58.49% Pervious Area 33,925 41.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 50 0.0200 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.90" Subcatchment A: ROOFTOP "A"' & GRASSED AREA Hydrograph 0.013- p Runoff 0.012 - ---------- --------- ------------- Lim" - ---------- Type III 24.hr 1.0" 0.011 ?r -- :-- Rainfall=1.00'--- 0.01- C " RunofArea=81726 sf 0.00s --- ___ Runoff-Volume O.-006 of--- 0.008 N 0.007 r. Runoff Depth=0004' U, 0.006 - Flow Length=50' ---------- --- ------- -- a.oos. --- - - S1ope=0.0200 '1' 0.004 Tc f 4 r p: ------- ------ ------------- 0.003 _ CN=76 0.002- 0.001- 11 0- / - / :.. /(l;ii' ,,_ ,. ,/,? iii. '.??!??% ?? /4 ' " " 0 1 2 3 4 5 6 7 8 B 10 11 12 16 Y4 3 14 15Y71 7 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802 POST Type 11124-hr 1.0" Rainfall=7.00"' Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 s1n 02300 @2009 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment B1: ROOFTOP "B" Runoff - 0.20 cfs @ 12.07 hrs, Volume= 0.014 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type Ili 24-hr 1.0" Rainfall=1.00- Area (sf) CN Description 9,371 98 Paved parking & roofs 9,371 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Sabcatchment 131: ROOFTOP "B" Hydrograph 0.22 - _ - - - ----- FF1 Runoff 0.21- 0.2 0 cfs " ' ` 0.2 -- - - 1.® r Type 111 24?h 019 " 8 00 Rainfall-1 0.1 - - ------- ------------- ----- . ----- - ------------ --- ----------- 0.16, 371 sf Runoff Area=9 0.15 , a.14 --- Runoff-Volume=0.014 of ^. a.3 --- ------- --- ------- ------- ----------- -- 0.12: Runoff Depth=0.79 o.,, a-? . ----------- ----------- - -------- --- -- i --- ------------ - ------------- ---- - - -- -l=low Length:=JO°--- 0.09: 0.08" 1 Slope-0 0200 0.07 ------ 0 ruin Tc=5 0.06. 1 . 0.05 " - L GN=90- - 0.04- - - - - --- ,. ? --- 0.03 j > 0.02 0.01 t 6"i Y- -4 32 33 34 35 36 37 38 39 40 3 5 6 7 8 9 10111213141 516171 a 19 20 21 22 23 24 25 26 27 28 29 30 31 Time (hours) 1-INCH STORM EVENT 090802_POST Type 11124-hr 9.0" Rainfall=1.00" Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC page 9 Summary for Subcatchment B2: ROOFTOP "B" Runoff - 0.21 cfs @ 12.07 hrs, Volume= 0.015 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0,00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1.0" Rainfall=1.00" Area (sf) CN Description 9,706 98 Paved parking 8" roofs 9,706 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft} (ft/sec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" 0.6 50 Total, Increased to minimum Te = 5.0 min Subcatchment B2: ROOFTOP "B" Hydrograph 0.23 O 22z -------------------------- - ---------- -- -- I Runa€f - 0 21 o.21 cr5 0.2- Type 'lll-nr 1.0'f 0.19= 0:18. --- _ Rainfall-1=.00 0.17- .. Runoff Area- 9,706 sf . 0.14 Runoff Volume.0.015 af W 0.13 v 0.12- - --------------- -------- ----- -- Runoff .Depth•=G.79'? - Flow Length=50' ?J? G.08: _ ----- ---- -- -------------------------- _ =slope=0.0200 s'.__ f - --- 0.07- - 0.06' - Tc=5.0 : min. 0.05 I CN=98 0.04- 0.03 -- -- -- --- -- ------ 0.02° 0.01- i 0 1 2 3 4 5 6 7 8 9 101112131415161718192a21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802 POST Type 11124-hr 1.0" Rainfall=1.00- Prepared by AWB Engineers Printed 11118/2010 HydroCAD0 9.00 stn 02300 @ 2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CE1,. ROOFTOP "C" AND "E" Runoff - 0.27 cfs @ 12.07 hrs, Volume= 0.020 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type Ili 24-hr 1.0" Rainfall=1,00" Area (sf) CN Description 12,896 98 12,896 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90`° 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CEI a ROOFTOP "C" AND "E" Hydrograph 17 Runoff 0.3 . ------ ------ ---- 028 - 0.vds ,Type `NI 24 hr'1 0'"-- 0.26- --------- ---. . ----- --- 0.24- Rainfall=1.00' O.ZZ° R1[noff Area 12,$9fi sf 0.2 - - -- Runoff-Volume=0 020 of 0A8_ 0. 96° Runoff Depth 0.79" 0 0.14 i . Flow Length'=50' ti 0.12 Slope= 0.0100 `I' 0.1 0.08 I } Tc-5.0 m in 0.06: t' CN=9V: 0.04 0.02 1 -0, 3$ 39 40 00 1 2 3 4 5 6 7-8 1911101112131415961718192021122232425262728293031323334353637 Time (hours) 1-INCH STORM EVENT 090802_POST Type II124-hr 1.0° Rainfall=1,00- Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 s/n 02300 @2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment CE2. ROOFTOP "C" AND "E" Runoff - 0.56 cfs @ 12.07 hrs, Volume= 0.040 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1.0" Rainfall=1.00" Area (sf) CN Description * 26,300 98 261300 100.00% Impervious Area Tc. Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Te = 5.0 min o Runoff 1-INCH STORM EVENT 090802 POST Type NI 24-hr -1.0- Rainfall=1:00" Prepared by AWB Engineers Printed 11118/2010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment CE3. ROOFTOP "C" AND "E" Runoff - 0.28 cfs @ 12.07 Iirs, Volume= 0.020 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1.0" Rainfall=1.00" Area (sf) CN Description 13,404 98 Unconnected roofs, HSG B 13,404 100.00% Impervious Area 13,404 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ftift) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE3- ROOFTOP "C" AND "E" 0. w 0.18- 0.16- ii 0.14- 0.12- 0.1= i OOS. .. 0.06= " - ------------ 0:04 0.02 Hydrograph -_i.. -__ N Runoff 0 1 2 3 4 5 6 7 8 9 101112131415161718 E9 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802_POST Type 11124-hr 9.0- Ralnfall 1,00" Prepared by AWB Engineers Printed 11118/2010 HydroCAD@ 9.00 stn 02300 @2009 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchrnent D: ROOFTOP "D" Runoff = 0.22 cfs @ 12.07 hrs, Volume= 0.016 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1.0" Rainfall=1.00" Area (sf) CN Description * 10,552 98 10,552 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment D: ROOFTOP "D" Hydrograph 0. 0. 0.21 0.19 0.18 0.17 0.16 0.15 0.14 v 0.13 3 0.12 0 ,L 0.11 0.1 0.09 0.08 0.07 0.06 0.05 0.04 0 Runoff 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32,33 34 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802 POST Type/// 24-hr fX" Rainfall-1.00" Prepared by AWB Engineers Printed 1111812010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAd Software Solutions LLC Page 14 Summary for Pond CB20: CB20 Inflow Area = 1.142 ac,100.00% Impervious, Inflow Depth= 0,79" for 1.0' event Inflow 1.05 cfs @ 12.07 hrs, Volume= 0.075 of Outflow = 1.05 cfs @ 12.07 hrs, Volume= 0.075 af, Atten= 0%, Lag= 0,0 min Primary - COS cfs @ 12.07 hrs, Volume= 0,075 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev 192-94'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1. Primary 192,43' 18.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=1.05 cfs @ 12,07 hrs HW=192,93' TW=192.03' (Dynamic Tailwater) Z--1=Culvert (Outlet. Controls 1,05 cfs @u 3.00 fps) Pond CB20: CB20 1-INCH STORM EVENT 090802_POST Type 11124-hr 7.0" Rainfall=7,00- Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 sln 02300 D 2009 HydroCAD Software Solutions LLC Page 15 Summary for Pond CB21: CB21 Inflow Area = 1.450 ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event Inflow _ 1.34 cfs @ 12.07 hrs, Volume= 0.096 of Outflow. = 1.34 cfs @ 12.07 hrs, Volume= 0.096 af, Atten= 0%, Lag= 0.0 min Primary = 1.34 cfs @ 12.07 hrs, Volume= 0.096 of Routing by Dyn-Star Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 192.03'@ 12.07 hrs Flood Elev= 195.00, Device Routing Invert Outlet Devices #1 Primary 191.47' 18.0" Round Culvert L= 66.0' CPP, -square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0.0071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=1.33 cfs @ 12.07 hrs HW=192.03° TW=190.44' (Dynamic Tallwater) t-1=Culvert (Barrel Controls 1,33 cfs @ 3,28 fps) Pond CB21: CB21 Hydragraph E w LEI Primary 1-INCH STORM EVENT 090802 POST Type 11124-hr'.0" Rainfall=1.00- Prepared by AWB Engineers Printed 1111812010 HydroCAD@ 9.00 sin 02300 @2009 HydroCAD Software Solutions LLC Pa a 15 Summary for Pond CO: CO Inflow Area = 0.538 ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event Inflow = 0.50 cfs @ 12.07 hrs, Volume= 0.035 of Outflow 0.50 cfs @ 12.07 hrs, Volume= 0.035 of, Atten= 0%, Lag= 0.0 min Primary - 0.50 cfs @ 12.07 hrs, Volume= 0.035 of Routing by Dyn-Stor-End method, Time Span= 0.00-40.06 hrs, dt= 0.01 hrs Peak Elev= 193.39'@ 12.07 hrs Flood Elev= 195.06' Device Routing Invert Outlet Devices #1 Primary 193.00' 15.0" Round Culvert L= 80.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 192.43' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=0.49 cfs @ 12.07 hrs HW=193.39' TW=192.93' (Dynamic Tailwater) t1=Culvert (Outlet Controls 0.49 cfs @ 2.28 fps) Pond CO: CO Hydrograph 0 55 '- - -- --... --- -- -- 0 Inflow 0 Primary . a5ocfs , 0.50?? .? ac Ar a 0.538 1nf l®w - .- - e 0.45 Peak Efev 193.39"... 0.4- ?r 15.0 0.35 Round Culver 0.3 n=0.O13 2 0.25 -- -- - - L=80 0' . 0.2 S-0.0071 7' 0.15 f?- 0.1- : 0 1 2 3 4 5 6 7 8 9 10 1112 13 14 15 16 1718 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802_P0ST Type /if 24 hr 7.0'" Rainfall »-I.00" Prepared by AWB Engineers Printed 11/181201.0 HydroCA130 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond E-CBS: E-CBS Inflow Area = 0.634 ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event Inflow 0.58 cfs @ 12.07 hrs, Volume= 0.042 of Outflow 0.58 cfs @ 12.07 hrs, Volume= 0.042 af, Atten= 0%, Lag= 0.0 min Primary = 0.58 cfs @ 12.07 hrs, Volume= 0.042 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 195.00' @ 0.00 hrs Surf.Area= 27,622 sf . Storage= 0 cf Flood Elev= 194.42' Surf.Area= 0 sf Storage= 0 c€ Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass dot. time= 0.0 min (786.9 - 786.9 ) Volume Invert Avail.Storage Storage Description #1 195.00' 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store .(feet) (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0 0 195.25 27,622 6,906 6,906 Device Routing Invert Outlet Devices #1 Primary 193.28' 12.0" Round Culvert L= 140.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S= 0.0260T Cc= 0.900 n=0.013 Corrugated PE, smooth interior #2 Device 1 194.42' 24.0" x 36.0" Horiz. OrificelGrate C= 0.600 Limited to weir flow at low heads #3 Secondary 195.25' 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) PrimaryOutFlow Max=0.00 cfs @ 12.07 hrs HW=195.00' TW=190.44' (Dynamic Tailwater) t-I=Culvert (Passes 0.00 cfs of 4.18 cfs potential flow) t-2=0rificelGrate (Passes 0.00 cfs of 14.44 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=195.00' (Free Discharge) t--3=Sharp-Crested Rectangular Weir (Controls 0.00 cfs) i-INCH STORM EVENT 090802 PAST Tvpe 11124-hr 1.0`` Rainfall=f.00- Prepared by AWB Engineers Printed 11/18/2010 HydroCADO 9.00 stn 02300 © 2009 HydroCAD Software Solutions LLC Pa a 18 Pond E-CBS: E-CB5 Hydrograph Inflow 12? Outflow [3 Primary 93 Secondary i-INCH STORM EVENT 090802_POST Type /I/24-hr 1.0" Rainfall=1.00" Prepared by AWB Engineers Printed 11/18/2010 HydroCAD® 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 19 Summary for Pond E-MH6: E-MH6 Inflow Area = 2.084 ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0° event Inflow - 1.92 cfs @ 12.07 hrs, Volume= 0.137 of Outflow - 1.92 cfs @ 12.07 hrs, Volume= 0.137 af, Atten= 0%, Lag= 0.0 min Primary = 1.92 cfs @ 12.07 hrs, Volume= 0.137 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40,00 hrs, dt= 0.01 hrs Peak Elev= 190.44'@ 12.08 hrs Flood Elev= 195.14' Device Routing Invert Outlet Devices #1 Primary 189.64' 24.0" Round Culvert L= 81.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.24' S= 0.0049T Cc= 0.900 n= 0.013 Primary AutFlow Max=1.90 cfs @ 12.07 hrs HW='190.44' TW=190.'[6' (Dynamic Tailwater) ?l--I=Culvert (Outlet Controls 1.90 cfs @ 2.39 fps) Pond E-MH6: E-MH6 Hydrograph N' U 0 1 ® hHow 0 Primary •• i ? v.,. ,? ?? ? ,? ,?r?.r..?rrt.y+rvr?srn? 411 , 0 1 2 3 4 5 8 7 8 9 1 11"Y2-16'' 4 5 1617 18 192021 22232425 2627 28 2930 31323334 3536 37 383940 Time (hours) I-INCH STORM EVENT 090802 POST Type 111224hr 980" Rainfall=1.00" Prepared by AWB Engineers Printed 11118/2010 HydroCAD@ 9.00 sln 02300 @2009 HydroCAD Software Solutions I-LC Pane 20 Summary for Pond MH20: MH20 Inflow Area = 2.299 ac,100.00% Im pervious, Inflow Depth = 0.79" for 1.0" event Inflow = 2.12 cfs @ 12.07 hrs, Volume= 0.152 of Outflow -- 2.12 cfs @ 12.07 hrs, Volume= 0.152 af, Atten= 0%, Lag= 0.0 min Primary = 1.57 cfs @ 12.07 hrs, Volume= 0.145 of Secondary = 0.55 cfs @ 12.07 hrs, Volume= 0.006 of Routing by Dyn-Stor.lnd method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peale Elev= 190.16'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.24' 12.0" Round Culvert L= 23.5' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 'P Cc= 0.900 n= 0.013 #2 Secondary 189.80' 24.0". Round Culvert L= 148.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.07' S= 0.0049T Cc= 0.900 n= 0.013 Primary OutFlow Max=1.56 cfs @ 12.07 hrs HW=190.161 TW=189.92' (Dynamic Tailwater) L1 =Culvert (Outlet Controls 1.56 cfs (b 2.69 fps) Secondary Outflow Max=0.55 cfs @ 12.07 hrs HW=190.16' TW=189.49' (Dynamic Tailwater) t°2=Culvert (Outlet Controls 0.55 cfs @ 2.15 fps) Pond MH20: MH20 Hydrograph w U O o_ss ?f. a 14 16 18 20 22 24 26 28 38 32 34 36 38 49 Time (hours) Inflow Outflow ® Primary Secondary 1-INCH S'T'ORM EVENT 090802_POST Type I/124-hr ;1.011 Ralnfal1=7.00" Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC Page 21 Summary for Pond MH21: MH21 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 1.13" for 1.0" event fnflow _ 0.76 cfs @ 12.07 hrs, Volume= 0.021 of Outflow = 0.76 cfs @ 12.07 hrs, Volume= 0:021 af, Atten= 0%, Lag= 0.0 min Primary = 0.76 cfs @ 12.07 hrs, Volume= 0,021 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peale Elev= 189.49° @ 12.07 hrs Flood Elev= 191.72' Device Routing Invert Outlet Devices #1 Primary 189.07' 24.0" Round Culvert L= 152,0' CPP, square edge headwall, Ke= 0.500 Outlet Invert 188.33' S= 0.0049 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=0.75 cfs @ 12.07 hrs HW=189.49' TW=188.80' (Dynamic Tailwater) t-1=Culvert (Outlet Controls 0.75 cfs @ 2.34 fps) Pond MH21: MH21 Hydrograph - ®Inflow D.&= 0.76 cis 0 Primary 7611 0.75- - Inflow-Area=0:223 ac --- -------- ----- -- 0.7_ Peak Elev=l89.49' 0.65= o.s- 24.®". - ----- ------ --- - ------- ------ - ----- - 0.5= ! F?oun.d Culvert..._. N 0.45. - - n=0.013 L='152,0' 0.3- ------ ---- -------- ---- 0.25-. U.o049 'T ' 0.2 0.15 f I ?t 0.1- 0.05 0- - - 0 1 2 3 4 5 6 7 8 9 1fl 11 12 13 14 15 16 17 1ia 1920 2122 23 2425 26'2'7'2'B' 3031 3233 3 ? '' ' 4 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802 POST Type I//24-hr 7.O"" Rainfall=1.00 " Prepared by AWB Engineers Printed 11/18/2010 HydroCADO 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 22 Summary for Pond MH23: MH23 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 0.76" for 1.0" event Inflow - 1.57 cfs @ 12.07 hrs, Volume 0.145 of Outflow - 1.57 cfs @ 12.07 hrs, Volume= 0.145 af, Atten= 0%, Lag= 0.0 min Primary = 1.57 cfs cr 12.07 hrs, Volume= 0.145 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 189.92'@ 12.07 hrs Flood Elev-_ 195.00' Device Routing Invert Outlet Devices #1 Primary 189.12' .12.0" Round Culvert L= 328.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' S= 0.0043 T Cc= 0.900 n= 0.013 Primary OutFlow Max=1.57 cfs @ 12.07 hrs HW=189.92' TW= 0.00" (Dynamic Tailwater) t-1=Culvert (Barrel Controls 1.57 cfs @ 3.17 fps) Pond MH23: MH23 Inflow 0 Primary 1-INCH STORM EVENT 090802_POST 7?rpe 11124-hr 9.0'° Rainfall=1.00- Prepared by AWS Engineers Printed 11118/2040 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24: MH24 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 1.13" for 1.0" event Inflow = 0.76 cfs @ 12.07 hrs, Volume= 0.021 of Outflow 0.76 cfs @ 12.07 hrs, Volume= 0.021 af, Atten= 0%, Lag= 0.0 min Primary - 0.76 cfs r@ 12.07 hrs, Volume= 0.021 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 188.80'@ 12.07 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.0049'1 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.30' 24.0" Round Culvert L= 25.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.00' S= 0.0920T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary ButFlow Max=0.75 cfs @ 12.07 hrs HW=188.80' TW=188.02° (Dynamic Tailwater) t-i=Culvert (Barrel Controls 0.75 cfs @ 2.66 fps) Secondary.;OutFlow Max=0.00 cfs @ 0.00 hrs HW=188.33` {Free Discharge) t-2=Culvert ( Controls 0.00 cfs) Pond MH24: MH24 Hydrograph 0.7 0. w F V. : N ?S 0.45 0 0.4 L- 0.35= 0.3- 0.1 0. Inflow I=I Outflow M Primary ® Secondary 1-INCH STORM EVENT 090802 POST Type ?ii24-iir 1.0" Rainfall='.00- Prepared by AWB Engineers Printed 11/1812010 HydroCAD@ 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Pa a 24 Summary for Pond 0»3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72% Impervious, Inflow Depth= 0.15" for 1.0" event Inflow = 0.76 cfs @ 12.07 hrs, Volume= 0.027 aff Outflow - 0.36 cfs @ 12.15 hrs, Volume= 0.027 af, Atten= 52%, Lag= 4.6 min Discarded = 0.36 cfs @ 12.15 hrs, Volume= 0.027 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 188.03' @ 12.15 hrs Surf.Area= 3,846 sf Storage= 124 of Flood Elev= 190.50' Surf.Area= 7,706 sf Storage= 14,309 cf Plug-Flow detention time= (not calculated, outflow precedes inflow) Center-of-Mass det. tithe= 1.0 min ( 824.3 - 823.3 ) Volume Invert Avail.Storage Storage Description #1 188.00' . 14,309 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area 1nc.Store Cum.Store (feet) (sy-ft) (cubic-feet) (cubic-feet) 188.00 3,797 0 0 189.00 5,314 4,556 4,556 190.00 6,893 6,104 10,659 190.50 7,706 3,650 14,309 Device Routing Invert Outlet Devices #1 Primary 189.50' 8.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Exfiitration over Surface area Conductivity to Groundwater Elevation = 186.00' Discarded OutFlow Max=0.36 cfs @ 12.15 hrs HW=188.03' (Free Discharge) Z-2=Exfiltration ( Controls 0.36 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=188.00' (Free Discharge) 't-1=Broad-Crested Rectangular Weir (Controls 0.00 cfs) I-RICH STORM EVENT 090802_POST Type Ill' 24-hr 9.0" Rainfall=7.00- Prepared by AWB Engineers Printed 11118120'10 HydroCAD® 9.00 sln 02300 @_2009 HydroCAD Software Solutions LLC Page 25 Inflow nl Outflow Discarded 93 Primary Time (hours) 1-INCH STORM EVENT 090802 POST Type ff? 24-hr 'f-0- Rainfall=Y-00- Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Page 26 Summary for Link E-LS9: EXISTING LIFT STATION Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 0,76" for 1.0" event Inflow = 1,57 cfs @ 12.07 hrs, Volume= 0.145 of Primary - 1.57 cfs.@ 12.07 hrs, Volume= 0.145 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs r ' ,- ca [C L.°11 .--H2 gS EXISTING LIFT M 3 STATION /PAVEMENT LE-c2 •, ca. ca. E-GB5 MI420 E-MH6? I I C& Ca. E\ B1 D i I ROOFTOP "8" C 1 C 0 ROOFTOP "D" 7 ca. H21 M?21 B2 CEII CF2 CE-1 ROOFTOP "B" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ROOFTOP "G" AND "E" ca. H2,_ A MH24 INFILTRATION BASIN ROOFTOP "R'& GRASSED ARFA n f Subcat1 lReaciJ. Z./Por7d'•, :Link, 2-INCH STORM EVENT 090802_POST Prepared by AWS Engineers Printed 11/18/2010 HydroCAD® 9.00 sln 02300 O 2009 HydroCAD Software Solutions L.LC Page 2 Area Listing (all nodes) Area (acres) CH Description (subcatchment-numbers) 1.097 61 X75% Grass cover, Good, HSG B (A) 1.142 98 (CE7, CE2, D) 0.438 98 Paved parking & roofs (B1, B2) 1.413 98 Paved parking, HSG B (83, A) 0.308 98 Unconnected roofs, HSG B (CE3) 4.398 TOTAL AREA 2-INCH STORM EVENT 090802 POST Prepared by AWB Engineers Print ed 11118/2010, HydroCADQ 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 3 Pipe Li sting (all nodes) Line# Node In-Invert Cut-Invert Length Slope n DiamlWidth Height Number (feet) (feet) (feet) (Rift) (inches) (inches) 1 CB20 192.43 191.47 135.0 0.0071 0.013 18.0 0.0 2 C821 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 CO 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E-CB5 193.28 189.64 140.0 0.0260 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 6 MH20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 MH20 189.80 189.07 148.0 0.0049 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 9 MH23 189.12 187.70 32&0 0.0043 0.013 12.0 0.0 10 MH24 188.33 187.67 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.30 187.00 25.0 0.0920 0.013 24.0 0.0 2-INCH STORM EVENT 090802 POST Type/// 24-hr 2.0" Rainfall =2. 00° Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 sln 02300 P2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-40.00 hrs, dt=0.01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 8S: PAVEMENT Runoff Area=27,626 sf 100.00% Impervious Runoff Depth=1,77° Flow Length=175' Slope=0.0100 '1' Tc=5.0 min CN=98 Runoff=1.25 cfs 0.094 of Subcatchment A: ROOFTOP "X'& GRASSED Runoff Area=81,726 sf 41.51% Impervious Runoff Depth=0.41'° Flow Length=50' Slope=0.0200 '1' Tc=7.4 min CN=76 Runoff=0.71 cfs 0.065 of Subcatchment 81: ROOFTOP "B" Runoff Area=9,371 sf 100.00% Impervious Runoff Depth=7.77". Flow Length=50' Slope=0.0200 'C Tc=5.0 min CN=98 Runoff=0.42 cfs 0.032 of Subcatchment 132: ROOFTOP "B" Runoff Area=9,706 sf 100.00% Impervious Runoff Depth=1.77- Flow Length=50' Slope=0.0200 T Tc=5.0 min CN=98 Runoff=0.44 cfs 0.033 of Subcatchment CE1: ROOFTOP "C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff Depth=1.77" Flow Length=50' Slope=0.0100 'r Tc=5.0 min CN=98 Runoff=0.58 cfs 0.044 of Subcatchment CE2: ROOFTOP "C" AND "E" Runoff Area=26,300 sf 100.00% Impervious Runoff Depth=1.77" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=1.19 cfs 0.089 of Subcatchment CE3: ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth =1.77" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.61 cfs 0.045 of Subcatchment D: ROOFTOP "D" Runoff Area=10,552 sf 100.00% Impervious Runoff Depth=7.77" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.48 cfs 0.036 of Pond C820: CB20 Peak Elev=193.21' lnflow=2.26 cfs 0.169 of 18.0" Round Culvert n=0.013 L=135.0' S=0.0071 T outflow=2.26 cfs 0.169 at Pond C1321: CB21 Peak Elev=192.33' Inflow=2.86 cfs 0.214 of 18.0" hound Culvert n=0.013 L=66.0' S=0.0071 T Outflow=2.86 cfs .0.214 of Fond CO: CO Peak Elev=793.62' Inflow=1.06 cfs 0.080 of 15.0" Round Culvert n=0.013 L=80.0' S=0.0071 T Outflow=1.06 cfs 0.080 of Pond E-CBS; E-CBS Peak Elev=195.00' Storage=0 cf Inflow=1.25 cfs 0.094 of Primary=7.25 cfs 0.094 of Secondary=0.00 cfs 0.000 of Outflow=1.25 cfs 0.094 of Pond E-MH6- E-MH6 Peak Elev=190.89' lnflow=4.12 cfs 0.308 at 24.0" Round Culvert n=0.013 L=81.0' S=0.0049 T Outflow=4.12 cfs 0.308 of Pond MH20: MH20 Peak EIev=790.57' Inflow=4.54 cfs 0.340 of Primary=2.31 cfs 0.300 of Secondary=2.24 cfs 0.040 of Outflow=4.54 cfs 0.340 of Pond MH21: MH21 Peak Elev=189.93' Inflow=2.68 cfs 0.073 of 24.0" Round Culvert n=0.013 L=152.0' S=0.0049 '1' Outflowm2.68 cfs 0.073 of Pond MH23:.MH23 Peak EIev=190.20' lnflow=2.31 cfs 0.300 of 12.0" Round Culvert n=0.013 L=328.0' S=0.0043 T Outflow=2.31 cfs 0.300 of 2-INCH STORM EVENT 090802_POST Type 11/24-6r2.0" Rainfall 2.00" Prepared by AWS Engineers Printed 11/18/2010 . HydroCADB 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Page 5 Pond MH24: MH24 Peals Elev=189.29" Inflow=2.68 cfs 0.073 of Primary=2.64 cfs 0.073 of Secondary=0.00 cfs 0.000 of Outflow=2.68 cfs 0.073 of Pond 0-3: INFILTRATION BASIN. Peak Elev=188.49' Storage=2,044 cf Inflow=3.26 cfs 0.137 of Discarded=0.51 cfs 0.137 of Primary=0.00 cfs 0.000 of Outflow=0.51 cfs 0.137 of Link E-LS1: EXISTING LIFT STATION Inflow=2.31 cfs 0,300 of Primary=2.31 cfs 0.300 of Total Runoff Area = 4.398 ac Runoff Volume = 0.438 of Average Runoff Depth = 1.19" 24.95% Pervious = 1.097 ac 75.05% Impervious = 3.301 ac 2-INCH STORM EVENT 090802 POST Type 11124-hr2.0" Rainfall=2.00- Prepared by AWS Engineers Printed 11/1812010 HydroCAO@ 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment SS: P"EMENT Runoff - 1.25 cfs @ 12.07 hrs, Volume= 0.094 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0'" Rainfall=2.00" Area (sf) CN Description 27,626 98 Paved parking, HSO B 27,626 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) . (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 1.0 125 0.0100 2.03 Shallow Concentrated Flaw, Paved . Kv= 20.3 fps - 1.8 175 Total, Increased to minimum Te = 5.0 min Subcatchment 8S: P"EMENT Hydrograph 0 Runoff 2-INCH STORM EVENT 090802_POST Type III 24-hr 2 0- Rainfall=2.00- Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 sln 02300 @..2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment A: ROOFTOP 'W& GRASSED AREA Runoff . 0.71 cfs @ 12.13 hrs, Volume= 0.065 af, Depth= 0.41" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0" Rainfall=2.00" Area (sf) CN Description 33,925 98 Paved parking, HSG B 47,801 61 X75% Grass cover, Good, HSG B 81;726 76 Weighted Average 47,801 58.49% Pervious Area. 33,925 41.51% Impervious Area Tc Length Slope Velocity Capacity Description (min' (feet) (ft/ft) (ft/sec) (cfs) 7.4 50 0.0200 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.90°' Subcatchment A- ROOFTOP "A" & GRASSED AREA Hydrograph 0.75. Q Runnff 0.7 cfs ' Type III 24-h:r.2.0' 0.65 - ----- -- Rainfall=2:00"' 0.6 0.55= Runoff Area 81,726 sf Runoff Volume=0 065 of u 0.45 F 0 4- . -- Runoff Depth-0.41 . 0.35 k' Flow Len9th=50' . 0200 ° p e=0 0.25= . 0.2- ---- ------ ----- ----- - ------ ------ .. .:_ 1-c =7 4 min r 0.15- - -- >,^ CN =7f 0.1 : ' ? ? 0.05 _ " " 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 2'3 2'4 25 26 27 28 29 30 31 32'33 3'4.'3 536 373 8 394 0 Time (hours) 2-INCH STORM EVENT 090802 POST Type 11124-hr2.0- Rainfa11-2.00- Prepared by AWB Engineers Printed 11/18/2010 HydroCAD® 9.00 s!n 02300 @2009 HydroCAD Software Solutions LLC Pa 0e 8 Summary for Subcatchment 81: ROOFTOP "B" Runoff - 0.42 cfs aQ 12.07 hrs, Volume= 0.032 af, Depth= 1.77' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0A0-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0" Rainfall=2.00" Area (sf) CN description 9,371 98 Paved parking & roofs 9,371 100.00% Impervious Area Tc Length Slope Velocity C2p2c°sty Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0,0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment B'1: ROOFTOP "B" Hydrograph 0.46 +------ - ----- - --------- ------ ---- --------- ---------- ------------- --! --- 0.44 0.42 ":. 0.4 25 Type 111 24-h .r 2.0" Q.4 0,38 -- --- ---Rainfall 2.00" 0.36 0.34 -- sf Runoff Area=9,371 0.32- 0.3" " --- -- . 032 of Runoff Volume=0. w 0.28 U 0.26 Runoff Depth 1-:77 3 0.24 . 0 0.22: u' 0.2- -- -- _ i 4 { Flow-Length=50' 0.18' - # dope=O-0200 l 0.16 ----- Q.14. { °Tc= 5.0-rain - 0.12 0.1 - - # -- - -- : 0.08 ----------------- - - ---------------- 0.46 - - 0.04 0.02 - r? 37 38 39 40 00 1 2 3 4 5l6 7 8 9 1011121311415161718192021222324252627282930313233343536 . Time (hours) 0 Runoff 2-INCH STORM EVENT 090802_POST Type III24-hr2.0" Rainfall=2.00- Prepared by AWB Engineers Printed 11/113/2010 HydroCADV 9.00 sln 02300 © 2009 IHydroCAD Software Solutions LLC Page 9' Summary for Subcatchment B2: ROOFTOP "B" Runoff = . 0.44 cfs Q 12.07 hrs, Volume= 0.033 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 2.0" Rainfall=2.00" Area (sf) CN Description 9,706 98 . Paved parking & roofs 9,706 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 'total, Increased to minimum Tc = 5.0 mm 2-INCH STORM EVENT 090802 POST Type III 24-hr 2.0- Rainfa/I »2.00" Prepared by AWB Engineers Printed 11118/2010 HydroCADB 9.00 s/"02300 @ 2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CE1: ROOFTOP "C" AND "E" Runoff = 0.58 cfs Q 12.07 hrs, Volume= 0.044 af, Depth= 1.77' Runoff by SCS TR-20 method, UH=SCS9 Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 2.0" Rainfall=2.00" Area (sf) CN Description * 12,896 98 92,896 100.00% impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ftlsec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE1„ ROOFTOP "C" AND "E" Hydrograph 0.65- ------- - Q1 I Runoff 0.$ _..----- Y! 9.58 cfs e i 1124 ! it 0.55 Rainfall ' 2.00" -- - p a-12 Run®ff /-ire s[?96-sf 0.45 af Runoff Volume=0.044 0.4 0.35 ^ Runoff Depth=1.77"' L Flow Length=50' L 0.25: ' Slope=0.0100 '1' TC=5.0 min' 1 ---- ---'-- CN-90 - - --------- ------- 1 0.05 9 1 37383940 2 3 4 5 6 7 8 9 1Q 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 Time (hours) 2-INCH STORM EVENT 090802_POST Type I// 24-hr 2. 0 - Rainfafl 2. D0" Prepared by AWB Engineers Printed 11/18/2010 HydroCAD® 9.00 sIn 02300 © 2009 HydroCAD Software Solutions LLC Page 11 Summary for.Subcatchment CE2: ROOFTOP "C" AND "E"" Runoff - 1.19 cfs c@ 12.07 hrs, Volume= 0.089 af, Depth= 1.77" Runoff by SCS TR-20 method, .UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2-0" Rainfall=2.00" Area (sf) CN Description * 26,300 98 26,300 100.00% Impervious Area . To Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" 0.8 50 Total, Increased to minimum To = 5.0 min Subcatchment CE2: ROOFTOP "C" AND "E" Hydrograph p Runoff 1.19 c(s. .f Type' 11124 hr 2.0 i Rainfall=2.00" 1° J Runoff.Area=28,300 Sf { Runoff Volume=0.089 of v Runoff Depth=1.77 Flow Length=50' s Slope=0.0100 f Tc=5.0 rein CN=98'. „r o- 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 2'5"'2"6 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 2-INCH STORM EVENT 090802 POST Type 11124-hr2 f1" Rainfall 2.00" Prepared by AWB Engineers Printed 1[11812010 HydroCAD@ 9.00 sin 02300 @ 2009 HydroCAV Software Solutions LLC page 12 Summary for Subcatchment CE3: ROOFTOP "C"° AND "E" Runoff - 0.61 cis @ 12.07 hrs, Volume= 0.045 af, Depth= 9.77- Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0" Rainfall= 2.00° Area (sf) CN Description 13,404 98 Unconnected roofs, HSG B 13,404 100.00% Impervious Area 13,404 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ftlsec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE3: ROOFTOP "C" AND "E" Hydrograph 0.65- E] Runoff 0.61 rtc Type_II 24 hr_2.0°° -------------- - --------- ----- 0.55. Rainfall=2.00". 0.5 Runoff-Area=1-3404 sf-- 0.45 _ M5- Runoff Volume=0.045 of 0.4- Runoff Depth=1'.77° 3 a: 0.3. Flow Length=50' 0.25r®p?=o o 00 9r 1 --------------- a.2- Tc=5..a0p?mi?np 0.15: ' CN=98 I ? 0.1 0.05 0 00 1/2 3 4 5 6 7 8 9 M 11 12 13 14 15 16 17 18 19 20 2122 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 9 40 Time (hours) 2-INCH STORM EVENT 090802_POST Type x24-hr2.o- Rainfali=2.00" Prepared by AW6 Engineers Printed 1111812010 HydroCAD@ 9.00 sln 02300 © 2409 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment D: ROOFTOP ""D" Runoff = 0.48 cfs @ 12,07 hrs, Volume= 0.036 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0'" Rainfall=2.00- Area (sf) CN Description } 10,552 98 10,552 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0,0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90"° 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment D: ROOFTOP Hydrograph 0.5 p Runoff O.AB LAS - - ?]/pG;II1 24 hr 2.0" 0.45 - ------------ I Rainfall=2.00" 0.4- ------------ -Runoff Area-10,552 sf.-- 0.35 C 1 Runoff Volume=0.036 of 03 Runoff Depth 1.771e 0.25= Flow Len th=50' ---------------- --------- - - - ----------- ----------------- - 0.2- 510 'pe-0 0100 11" 0.15 0 min T.c -- j . 0.1= CN=98 0.05 T0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) 2-INCH STORM EVENT" 090802 POST Type //124-hrZ.O" Rainfa11=2.00- Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions L1LC Page 14 Summary for Pond CB20. CB20 Inflow Area = 1.142 ac,100.00% Impervious, Inflow Depth = 1.77" for 2.0" event Inflow = 2.26 cfs a+ 12.07. hrs, Volume= 0.169 of Outflow = 2.26 cfs @ 12.07 hrs, Volume= 0.169 af, Atten= 0%, Lag= 0.0 min Primary - 2.26 cfs @ 12.07 hrs, Volume= 0.169 of Routing by Dyn-Star-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 193.21'@ 12.07 hrs Flood Elev= 195.00° Device Routing Invert Outlet Devices #1 Primary 192.43' 18.0" Round Culvert LW 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47' S= 0.0071 '/' Cc= 0.900 on= 0.013 Corrugated PE, smooth interior Primary Outflow Max=2.25 cfs @ 12.07 hrs HW=193.21` TW=192.33' (Dynamic Tallwater) '?-1=Culvert (Outlet Controls 2.25 cfs @ 3.51 fps) Pond CB20: CB20 Hydrograph ? Enflow aPrimary 2-INCH STORM EVENT 090802_POST Type N124-hr2.0- Rainfall=2,00" Prepared by AWB Engineers Printed 1111812010 HydroCA1309.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 15 Summary for Pond CB21: CB21 Inflow Area = 1.450 ac,100.00% Impervious, Inflow Depth = 1.77" for 2.0" event Inflow = 2.86 cfs @ 12.07 hrs, Volume= 0.214 of Outflow = 2.86 cfs @ 12.07 hrs, Volume= 0.214 of, Atten= 0%, Lag= 0.0 min Primary = 2.86 cfs a@ 12.07 hrs, Volume= 0.214 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 192.33'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 191.47` 18.0" Round Culvert L= 66.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0X071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Outflow Max=2.86 cfs @ 12.07 hrs HW=192.33' TW=190.88' (Dynamic Tailwater) t--1=Calvert (Barrel Controls 2.86 cfs @ 3.92 fps) Pond CB21: CB21 Hydrograph tlf w U O EL 1 6 i 2-INCH STORM EVENT 090802 POST Type //124-hr2.0- RainfaN=2.00" Prepared by AWB Engineers Printed 11118/2010 HydroCAD@ 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 16 Summary for Pond CO: CO Inflow Area = 0.538 ac,100.00% lmpervious, Inflow Depth = 1.77" for 2.W' event Inflow = 1.06 cfs @ 12.07 hrs, Volume= 0.080 of Outflow 1.06 cfs @ 12.07 hrs, Volume= 0.080 af, Atten= 0%, Lag= 0.0 min Primary = 1.06 cfs @ 12.07 hrs, Volume= 0.080 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 tars, dt= 0.01 hrs Peak Elev= 193.62' @ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 193.00' 15.0'° Round Culvert L= 80.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 192.43' S= 0.0071 '!' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFow Max=1.05 cfs @ 12.07 tars HW=193.62' TW=193.21' (Dynamic Tailwater) t--1=Culvert (Outlet Controls 1.05 cfs @ 2.56 fps) Pond CO: CO Hydrograph Inflow E3 Primary 2-INCH STORM EVENT 090802_POST Type /1124-hr2.0- Rainfa11-2.00- Prepared by AWB Engineers Printed 11118/2010 HydroCAD0 9.00 stn 02300 @ 2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond E-CB5: E-CB5 Inflow Area = 0.634 ac,100.00% Impervious, Inflow Depth = 1.77" for 2.0" event Inflow = 1.25 cfs @ 12.07 hrs, Volume= 0.094 of Outflow = 1.25 efs @ 12.07 hrs, Volume= 0.094 af, Atten= 0%, Lag= 0.0 min Primary = 1.25 cfs @ 12.07 hrs, Volume= 0.094 of Secondary = 0.00 cfs @ 0.00 hrs', Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 195.00'@ 0.00 hrs Surf.Area= 27,622 sf Storage= 0 cf Flood Elev= 194.42' Surf.Area= 0 sf Storage= 0 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 0.0 min ( 766.5 - 766.5 ) Volume Invert Avail.Storage Storage Description #1 195.00, 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0,..,...- 0 1.95.25 27,622 6,906 6,906 Device Routing Invert Outlet Devices #1 Primary 193.28' 12.0" Round Culvert L= 140.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S= 0.0260T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 194.42' 24.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 195.25' 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=0.00 cfs @ 12.07 hrs HW=195.00' TW=190.88' (Dynamic Tallwater) t-1=Culvert (Passes 0.00 cfs of 4.18 cfs potential flow) t--2=Orifice/Grate (Passes 0.00 cfs of 14.44 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=195.00' (Free Discharge) t--3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 2-INCH STORM EVENT 090802 POST Type 1?? 24-hr Z D" Rainfall-2. 00" Prepared by AWB Engineers Printed 11/1812010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 18 Pond E-CB5. E-CB5 Hydrograph Inflow Ul Outflow ® Primary Secondary 2-INCH STORM EVENT . 090802_POST Type 1112¢hr2.0- Ralnfa11--2.00- Prepared by AWB Engineers Printed 11/1812010 HydroCA00 9.00 stn 02300 @ 2009 HydroCAD Software Solutions LLC Page 19 Summary for Pond E-MH6: E-MH6 Inflow Area = 2.084 ac,100.00% Impervious, Inflow Depth = 1.77" . for 2.0" event Inflow = 4.12 cfs @ 12.07 hrs, Volume= 0.308 of Outflow - 4.12 cfs @ 12.07 hrs, Volume= 0.308 a€, Atten= 0%, Lag= 0.0 min Primary = 4.12 cfs @ 12.07 hrs, Volume= 0.308 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 190.89'0 12.08 hrs (Flood Elev= 195.14' Device Routing Invert Outlet Devices #1 Primary 189.64' 2x4.0" Round Culvert L= 81.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.24' S= 0.0049 T Cc= 0.900 n= 0.013 Primary Outflow Max=4.04 cfs @ 12.07 hrs HW=190.88' TW=190.57' (Dynamic Tallwater) t--I=Culvert (Outlet Controls 4.04 cfs @ 2.81 fps' Pond E-MH6: E-MH6 Hydrograph Inflow 0 Primary 2-INCH STORM EVENT 090802 POST Type IH24-hr2.0- Rainfall=2.00- Prepared by AWB Engineers Printed 1111812010 HydroCAD@ 9.00 sln 02300 @ 2009 HydroCAU Software Solutions LLC Page 20 Summary for Pond MH20: MH20 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 1.77" for 2.0" event Inflow - 4.54 cfs @ 12.07 hrs, Volume= 0.340 of Outflow = 4.54 cfs @ 12.07 hrs, Volume= 0.340 af, Atten= 0%, Lag= 0.0 min Primary = 2.31 cfs @ 12.07 hrs, Volume= 0.300 of Secondary = 2.24 cfs @ 12.07 hrs, Volume= 0.040 of Routing by Dyn-Stor Ind method, Time Span= 0,00-40.00 hrs, dt= 0.01 hrs Peak Elev= 190.57'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.24' 12,0° Round Culvert L= 23.55' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 T Cc= 0.900 n= 0.013 #2 Secondary 189.80' 24.0° Round Culvert L= 148.0° CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.07' S= 0.0049'1' Cc= 0,900 n= 0.013 Primary OutFlow Max=2.29 cfs @ 12,07 hrs HW=190.56" TW=190.20' (Dynamic Tailwater) t--1=Culvert (inlet Controls 2.29 cfs @ 2.91 fps) Secondary Outflow Max=2.21 cfs @ 12-07 Itrs HW=190.57" TW=189.93' (Dynamic Tallwater) t--2=Culvert (Outlet Controls 2.21 cfs @ 2,96 fps) Pond MH20: MH20 O M Hydrograph 93 Inflow asacf Il oufflow 299 ac Intl®w Area-2 El Primary 5 I . Secondary Peak Elev=190"57" 4- ' --- - - ------_ --- - ----- -------------- 3- - - ----- - - -----.... _ 237r i 2.24 r - ----------- ------ --- ------ -- - ---------------------- - 1 r 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) 2-INCH STORM EVENT 090802 POST Type it/ 24-hr 2.0- Rainfall =2. 00- Prepared by AWB Engineers Printed 11118/2010 HydroCADO 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 21 Summary for Pond MH21. MH21 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 3.91" for 2.0" event Inflow - 2.68 cfs @ 12.07 hrs, Volume= 0.073 of Outflow = 2.68 cfs @ 12.07 hrs, Volume= 0.073 af, Atten= 0%, Lag= 0.0 min Primary = 2.68 cfs @ 12.07 hrs, Volume= 0.073 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 189-93'@ 12.07 hrs Flood Elev= 191.72' Device Routing Invert Outlet Devices #1 Primary 189.07' 24.0" Round Culvert L= 152.0' CPP, square edge headwall, Ke=.0.500 Outlet Invert= 188.33' S= 0.0049T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Outflow Max=2.65 cfs @ 12.07 hrs HW=189.93' TW=189.29' (Dynamic Tallwater) L1 =Culvert (Outlet Controls 2.65 cfs @ 3.05 fps) ® tn€low 0 Primary 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) 2-INCH STORM EVENT 090802 POST Type I// 24-hr 2.0" Rainfall=2.00" Prepared by AWB Engineers Printed 11118/2010 HydroCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC Page 22 Summary for Pont) MH23: MH23 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 1.57 for 2.0" event inflow = 2.31 cfs 0 12.07 hrs, Volume= 0.300 of Outflow = 2.31 cfs @ 12.07 hrs, Volume= 0.300 af, Atten= 0%, Lag= 0.0 min Primary - 2.31 cfs @ 12.07 hrs, Volume= 0.300 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peale Elev= 190.20'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.12' 12.0" Round Culvert L-- 328.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' S= 0-0043 '1' Cc= 0.900 n= 0.013 Primary OutFlow Max=2.31 cfs @'12.07 hrs HW=190.20' TW=0.00' (Dynamic Tailwater) t-1=Culvert (Barrel Controls 2.31 cfs @ 3.40 fps) Pond MH23: MH23 Hydrograph ® Inflow 0 Primary 2-INCH STORM EVENT 090802 POST Type 1/124-hr2.0- Rainfall=2.00- Prepared by AWS Engineers Printed 11/1812010 HydroCAD® 9.00 s/n 02300 02009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24: MH24 Inflow Area = 0.223 ac,100.00% Im pervious, Inflow Depth = 3.91" for 2.0" event Inflow = 2.68 cfs @ 12.07 his, Volume= 0.073 of Outflow - 2.68 cfs @ . 12.07 his, Volume= 0.073 af, Atten= 0%, Lag= 0.0 min Primary - 2.68 cfs @ 12.07 hrs, Volume= 0.073 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 firs, dt= 0.01 hrs Peak Elev= 189.29' @ 12.07 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0" Round Culvert L= 135.0' CRP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.0049T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.30' 24.0" Round Culvert L= 25.0' CPR, square edge headwall, Ke= 0.500 Outlet Invert= 187.00" S= 0.0920T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=2.67 cfs @ 12.07 hrs HW--189.29° TW=188.20' (Dynamic Tailwater) ? '-'l=Culvert (Barrel Controls 2.677 cfs @ 3.66 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs sFlW=188.33" (Free Discharge) t2=Culvert ( Controls 0.00 cfs) Pond MH24: MH24 2-INCH STORM EVENT 090802_POST Type 1// 24-hr 2.0" Rainfall-2 00 Prepared by AWB Engineers Printed 11/18/2010 HydroCAD0 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 24 Summary for Pond 0-3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72% Impervious, Inflow Depth = .0.78" for 2.0" event Inflow - 3.26 cis @ 12.08 hrs, Volume= 0.137 of Outflow = 0.59 cfs @ 12.44 hrs, Volume= 0.137 af, Atten= 84%, Lag= 22.1 min Discarded = 0.51 cis @ 12.44 hrs, Volume= 0.137 of Primary . 0.00 cis @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 188.49'0 92.44 hrs' Surf.Area= 4,541 at Storage= 2,044 cf Flood Elev= 190.50' Surf.Area= 7,706 sf Storage= 14,309 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass dot. time= 27.7 min ( 840.7 - 813.0 ) Volume Invert Avail.Storage Storage Description #1 988.00' 14,309 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area lnc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 188.00 3,797 0 0 189.00 5,314 4,556 4,556 990.00 6,893 6,104 90,659 190.50 7,706 3,650 94,309 Device . Routing Invert Outlet Devices #1 Primary 989.50' 8.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 9.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 186.00' Discarded OutFlow Max=0.51 cfs @ 12.44 hrs HW=188.49' (Free Discharge) t-2=Exfutration ( Controls 0.51 cfs) Primary OutFlow Max=0.00 cfs r@ 0.00 hrs HW=788.00' (Free Discharge) Z--1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 2-INCH STORM EVENT 090802_POST Type 11124 -hr 2.0" Rainfall=2.00- Prepared by AWB Engineers Printed 11/1812010 HydroCADB 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC Page 25 Pond 0-3: INFILTRATION BASIN Hydrograph Inflow Outflow Discarded M Primary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) 2-INCH STORM EVENT 090802 POST Type 1/124-hr 2 0- Rainfall=2.00" Prepared by AWB Engineers printed 1717812090 HydroCAD@ 9.00 s!n 02300 @ 2009 HydroCAD Software Solutions LLC Page 26 Summary for Link E-LS1.- EXISTING LIFT STATION Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 7.57° for 2.0" event Inflow = 2.31 cfs @ 12.07 hrs, Volume= 0.300 of Primary 2.31 cfs @ 12.07 firs, Volume= 0.300 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt= 0.09 hrs Link E-LS1: EXISTING LIFT STATION Hydrograph w U O LL 91 Inflow 9 Primary CB , E USt v ...?: (8S) EXISTING LIFT 3 STATION /PAVEMENT Z _,CB E-CB5 M1-?20 E-MH6? -- A ROOFTOP "B" C?1 C 6 ROOFTOP "D" 1121 . .. M 21 • B2 CE3> CE2: CEI ROOFTOP "B" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ea, MH24 INFILTRATION BASIN ROOFTOP "A" & GRASSED AREA Reach /pon?`. !Suk?cat LInk- 10-YR RATIONAL METHOD 090802 POST Prepared by AWB Engineers Printed 11/18/2010 HydroCADOD9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area C Description (acres) (subcatchment-numbers) 1.097 0.15 a75% Grass cover, Good, HSG 8 (A) 1.413 0.95 Paved parking, HSG B (8S5 A) 1.142 1.00 (CE1, CE2, D) 0.438 1.00 Paved parking & roofs (131, B2) 0.308 1.00 Unconnected roots, HSG B (CE3) 4.398 TOTAL AREA 090802 POST Prepared by AWB Engineers HydroCA130 9.00 sIn 02300 © 2009 HydroCAD Software Solutions LLC 10-YR RATIONAL METHOD Printed 11118/2010 Page 3 Pipe Listing (all nodes) Line# Node In-invert Out-invert Length Slope n DiamlWidth Height Number (feet) {feet) (feet) (ftlft) (inches) (inches) 1 CB20 192.43 191.47 135.0 0.0071 0.013 18.0 0.0 2 CB21 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 CO 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E-CBS 193.28 189.64 140.0 0.0260 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 6 MH20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 MH20 189.80 189.07 148.0 0.0049. 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 9 MH23 189.12 187.70 328.0 0.0043 0.013 12.0 0.0 10 MH24 188.33 187.67 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.30 187.00 25.0 0.0920 0.013 24.0 0.0 10-YR RATIONAL METHOD 090802 POST Lumberton,North Carolina jo--Year Duration=5 min, Inten=8.16 in/hr Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 sIn 02300 © 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 Points Runoff by Rational method, RlselFall=1.011.0 xTc Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment SS: PAVEMENT Runoff Area=27,626 sf 100.00% Impervious Runoff bepth=0.64" Flow Length=175' Slope=0.0100 T Tc=5.0 min C=0.95 Runoff=4.78 cfs 0.034 of Subcatchment A: ROOFTOP "X'& GRASSED Runoff Area=81,726 sf 41.51 % Impervious Runoff Depth=0.22" Flow Length=50' Slope=0.0200 '1' Tc=7.4 min C=0.48 Runoff=4.83 cfs 0.034 of Subcatchment B1: ROOFTOP "B" Runoff Area=9,371 sf 100.00% Impervious Runoff Depth=0.68". Flow Length=50' Slope=0.0200 '1' Tc=5.0 min C=1.00 Runoff=1.71 cfs 0.012 of Subcatchment B2: ROOFTOP "B" Runoff Area=9,706 sf 100.00%o Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0200 T Tc=5.0 min C=1.00 Runoff=1.77 cfs 0.013 of Subcatchment CE1: ROOFTOP "C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0100 T Tc=5.0 min C=1.00 Runoff=2.35 cfs 0.017 of Subcatchment CE2: ROOFTOP "C" AND .'E" Runoff Area=26,300 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0100 T Tc=5.0 min C=1.00 Runoff-4.79 cfs 0.034 of Subcatchment CE3: ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0100 '1' Tc=5.0 min C=1.00 Runoff=2.44 cfs 0.017 of Subcatchment D: ROOFTOP "D" Runoff Area=10,552 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0100 T Tc=5.0 min C=1.00 Runoff=1.92 cfs 0.014 of Pond C620: CB20 Peak Elev=196.14' inflow=9.07 cfs 0.065 of - 18.0" Round Culvert n=0.013 L=135.0' S=0.0071 T Outflow=9.07 cfs 0.065 of Pond C1321: CB21 Peak EIev=195.04' Inflow=11.51 cfs 0.082 of 18.0" Round Culvert n=0.013 L=66.0' S=0.0071 T 0utflow=11.51 cfs 0.082 of Pond CO' CO Peak Elev=196.48' Inflow=4.27 cfs 0.030 of 15.0" Round Culvert n=0.013 L=80.0' S=0.0071 '1' Outflow=4.27 cfs 0.030 of Pond E-0135, E-CB5 Peak Elev=195.00' Storage=104 cf lnflow=4.78 cfs 0.034 of Primary=4.19 cfs 0.034 of Secondary=0.00 cfs 0.000 of Outflow=4.19 cfs 0.034 of Pond E-MH6; E-MH6 Peak Elev=193.71' lnflow=15.57 cfs 0.116 of 24.0" Round Culvert n=0.013 L=81A' S=0.0049'1' Outflow=15.57 cfs 0.116 of Pond MH20: MH20 Peak Elev=192.97' Inflow=17.27 cfs 0.129 of Primary=6.31 cfs 0.032 of Secondary=16.02 cfs 0.096 of Outflow=17.27 cfs 0.129 of Pond MH21: MH21 Peak Elev=192.14' Inflow=17.72 cfs 0.109 of 24.0" Round Culvert n=0.013 L=152.0' S=0.0049 '1' Outflow=17.72 cfs 0.109 of Pond MH23• MH23 Peak Elev=200.52' Inflow=6.31 cfs 0.032 of 12.0" Round Culvert n=0.013 L=328.0' S=0.0043'1" Outflow=6.31 cfs 0.032 of 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 70-Fear Duration-5 min, fnten-8.78 in/hr Prepared by AWB Engineers Printed 11118/2010 HydroCAD® 9.00 stn 02300 @2009 HydroCAD Software Solutions LLC Page 5 Pond MH24: MH24 Peak Elev=190.88' Inflow=17.72 cfs 0.109 of Primary=6.39 cfs 0.057 of secondary=11.33 cfs 0.052 of Outflow=17.72 cfs 0.109 of Pond 0-3: INFILTRATION BASIN Peak Elev=188.83' Storage=3,695 cf Inflow=11.08 cfs 0.091 of Discarded=0,64 cfs 0.091 of Primary=0.00 cfs 0.000 of . Outflow=0.64 cfs 0.091 of Link E-LS1: EXISTING LIFT STATION lnflow=6.31 cfs 0.032 of Primary=6.31 cfs 0.032 of Total Runoff Area = 4.398 ac Runoff Volume = 0.175 of Average Runoff Depth = 0.48 24.95% Pervious = 1.097 ac 75.05% Impervious = 3.301 ac 90-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina '0 Year Duration=5 min, Inten,=8.Y6 in/hr Prepared by AWB Engineers Printed 11/1812010. HydroCAa0 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Pa g2 6 Summary for 5ubcatchment 8S: PAVEMENT Runoff -- 4.78 cfs Q 0.08 hrs, Volume= 0.034 af, Depth= 0.64° Runoff by Rational method, Rise/Fall=1.011.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.16 in/hr Area (sf) C Description 27,626 0.95 Pawed parking, HSG B 27,626 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 1.0 125 0.0100 2.03 Shallow Concentrated Flow, Paved Kv= 20.3 fps 1.8 175 Total, Increased to minimum Te = 55.0 min Subcatchrnent SS: PAVEMENT Hydrograph 5- 4.78 cfs- j ------------------ 4 -------------- w 3- " 0 i z- 1 i ?.,II i? 0 0 ----- -------- - ------------- - Lumberton,North Carolina 10-Year Duration=5 min, ----- Inten=6.16-inllir- Runoff Area=27,626 sf Runoff Volume=0.034 of Runoff Depth=0:64"- Flow Length=175° Slope=0.0100 T Tc=5.0 min C=0.95 2 Time (hours) 3 p Runoff 10-YR RATIONAL METHOD 090802_POST Lumberton, North Carolina 1O-Year. Duration=5 min, Inten=8.16 in/hr Prepared by AWB Engineers Printed 7 119 8/201 0 - HydroCAD® 9.00 s/n 02300 © 2009 H droCAD Software Solutions LLC Page 7 Summary for Subcatchment A: ROOFTOP "A" & GRASSED AREA Runoff = 4.83 cfs @ 0.08 hrs, Volume= 0.034 af, Depth= 0.22" Runoff by Rational method, RiselFall=1.011.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Dur2tion=5 rain, Inten=8.16 in/hr Area (sf) C Description 33,925 0.95 Paved parking, HSG B 47,801 0.15 X75% Grass cover, Good, MSG B 81,726 0.48 Weighted Average 47,801 58.49% Pervious Area 33,925 41.51% Impervious Area Te Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 50 0.0200 0.91 Sheet Flow, Grass: Dense n= 0.240 P2= 3.90" Subcatchment A: ROOFTOP "'A" & GRASSED AREA Hydrograph a - - .. ... .....- ----- ------------------- j 4153 ds i - ----- - - - 4- -1 -------------------..-.... - - ---------------------------------------------- ,_ a; I l-' I .F --------------------------------------------------- - --------- Lumberton,North Carolina 10-Year Duration=5 min, lnten=8:76-inlhr Runoff Area=87,726 sf Runoff Volume=0.034 of -- ----- ------- ------Runoff Depth=0.22"-- Flow Length=50' Slope=0.0200 T ---------------- ---- ---------- ------Tc=7.4 min-- C=0.48 EI Runoff 0 i 2 3 Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina ft? year Duration=5 mih, Inten=8. a6 in/hr Prepared by AWB Engineers . Printed 11/1812010 HydroCAD® 9.00 s1n 02300 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Sulbcatchment B1; ROOFTOP "B" Runoff 1.71 cfs Q 0.08 hrs, Volume= 0.012 af, Depth= 0.68° Runoff by Rational method, Rise/Fall=l..0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.16 in/hr Area (sf) C Description 9,371 1.00 Paved parking & roofs 9,371 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ft/sec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment BI: ROOFTOP "B" Hydrograph 1 O i? _ a I . --------- r [ JAI i -----------------------z I D 1 Lumberton,North Carolina 10-Year Duration=5 min, lnten=8.16 in/hr Runoff Area=9,371 sf Runoff Volume=0.012 of Runoff Depth=0.68' ---------- ------- - - --- ---------.- Flow Length=50" Slope=0.0200 T Tc=5.0 min. C=1.00 2 Time (hours) 3 F Runoff 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.16 /n/hr Prepared by AWB Engineers Printed 11118/2010 HydroCAD® 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 62: ROOFTOP °"B" Runoff = 1.77 cfs Q 0.08 hrs, Volume= 0.013 af, Depth= 0.68" Runoff by Rational method, Rise/Fall=1.011.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, Inten=8,16 in/hr Area (sf) C Description 9,706 1.00 Paved parking $ roofs . 9,706. 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90`° 0.6 50 . Total, Increased to minimum Tc = 5.0 min Subcatchment B2: ROOFTOP "B" Hydrograph r ?J 0 LL 0 l; Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.15 in/hr Runoff Area=9,706 sf Runoff Volume=0.013 of Runoff Depth=0.68" - --- ---- ..... Flow Length=50°-- Slope=0.0200 T Tc =5.0 min C=1.00 2 Time (hours) Y 3 i1 Runoff 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 90--fear Duration=5 min, Inten=8.96 in/hr Prepared by AWB Engineers Printed 11118120'10 HydroCAD0 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CE1e ROOFTOP "C" AND "E" Runoff = 2.35 cfs Q 0.08 hrs, Volume= 0.017 af, Depth= 0.68" Runoff by Rational method, Rise/Pall=1.011.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.16 in/hr Area (sf) C Description 12,896 1.00 . 1.2,896 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftift) (ft/sec) (cfs) 0.8 .50 0.0100 1100 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90- 0.8 50 Total, Increased to minimum Te = 5.0 min Subcatchment CE'I: ROOFTOP "C" AND "E" Hydrograph 3 0 . LL ?1I ?{ I i a, I I I? I a 1 Time (hours) Lumberton,North Carolina 10-Year Duration=5 min, lnten=8.75 in/hr. Runoff Area=12,896 sf Runoff Volume=0.017 of Runoff Depth=0.68" Flow Length=50' Mope=0.0100 1' .-... Tc=5.0 min- C=1.00 2 :S 0 Runoff 10-YR RATIONAL METHOD 090802 POST Lumberton,North Carolina 1O--Year Duration=5 min, inten=8.76 in/hr Prepared by AWD Engineers Printed 11/18/2010 HydroCAD® 9.00 s/n 02300 @2009 HydroCAD Software Solutions LLC Pane 11 Summary for Subcatchment CE2: ROOFTOP "C" AND "E" Runoff - 4.79 cfs @ 0.08 hrs, Volume= 0.034 af, Depth= 0.68" Runoff by Rational method, Rise/Fall=1.0/10 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton, North Carolina 10-Year Duration=5 min, lnten=8.16 in/hr Area (sf) C Description 26,300 1,00 26,300 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE2: ROOFTOP "C" AND "E" Hydrograph F 0 Ll.. i 2- I_I Lumberton,North Carolina 10-Year Duration=5 min, lnten=8.16 in/hr Runoff Area=26,300 sf Runoff Volume=0.034 of Runoff Depth=0.68" Flow Length=50' Slope=0.0100 '/' -. ----- - --------- - --- ..---..---. Tc=S»O min C=1.00 - ------------- -- ------------ ----- - E9 Runoff 3 2 3 Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton,Nortir Carolina 70--Year Duration=5 min, Inten= 8.76 in/hr Prepared by AWR Engineers Printed 11/18/2010 HydroCAD@ 9.00 s!n 02300 @ 2009 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment CE3: ROOFTOP "C" AND "E" Runoff 2.44 cfs @ 0.08 hrs, Volume= 0.017 at, Depth= 0.68" Runoff by Rational method, RiselFall=1.011.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 rain, Inten=8.16 in/hr Area (sf) C Description 13,404 1.00 Unconnected roofs, HSO B 13,404 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0,011 P2= 3.90- 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE3a ROOFTOP "C" AND "E" Hydrograph 2 V 0 ?i 0 0 Lumberton,North Carolina 10-Year Duration=5 min, lnten=8.16 in/hr Runoff Area=13,404 sf Runoff Volume=0.017 of Runoff Depth=0.68" Flow Length=50` Slope=0.0100 T Tc=5.0 min C=1.00 y 2 3 Time (hours) El Runoff 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 7D--Year Duration =5 min, Inten=8.96 in/hr ` Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 s1n 02300 @ 2009 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment D: ROOFTOP "D" Runoff _ 1.92 efs @ 0.08 hrs, Volume= 0.014 af, Depth= 0.68" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duratlon=5 min, lntenm8.18 inlhr Area (sf) C Description 10,552 1.00 .10,552 100.00% Impervious Area Tc Length Slope Velocity . Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment D: ROOFTOP "D" Hydrograph r. ? II I,. i I I I I ?? I r t- 1 I I II 0- 0 Lumberton,North Carolina 10-Year Duration=5 min, lnten=8,18 in/hr Runoff Area=10,552 sf Runoff Volume=0.014 of Runoff Depth=0.68" Flow Length=50' Slope=0.0100 7 TC=5A min C=1.00 2 p Runoff Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton,NorthCarolina 10-year Duration=5 min, Inten=8.f6Whr Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions I.L,C Page 14 Summary for Pond CB20: C820 Inflow Area = 1.142 ac,100.00% Impervious, Inflow Depth = 0.68" for 10-Year event Inflow = 9.07 cfs @ 0.08 hrs, Volume= 0.065 of Outflow - 9.07 cfs @ 0.08 hrs, Volume= 0.065 af, Atten= 0%, Lag= 0.0 min Primary - 9.07 cfs @ 0.08 hrs, Volume= 0.065 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 196.14' @ 0.10 hrs Flood Elev= 195.00" Device Routing Invert Outlet Devices #1 Primary 192.43' 18.0' Round Culvert L= 135.0" CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47° S= 0.0071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary 0utFlow Max=7.32 cfs @ 0.08 hrs HW=195.54' TW=194.48' (Dynamic Tallwater) t--1=Culvert (Outlet Controls 7.32 cfs @ 4.14 fps) Pond C820: CB20 Hydrograph Inflow Area=.1,142 ac Peak Elev-196.14' . ------------- - Round Culvert n=®.013 ---------- -------- - L.=135.0' 2 3 FEB Iriflow El Primary 10-YR RATIONAL METHOD 090802 POST Lumberton, North Carolina fO Year Duration=5 min, ?nten=8.16 in/hr. Prepared by AWB Engineers Printed 1111812010 HydroCADV 8.00 sln 02300 @ 2009 HydroCAD Software-Solutions LLC Page 15 Summary for Pond CB21: CB21 Inflow Area = 1.450 ac,100.00% Impervious, Inflow Depth = . 0.68" for 10-Year event Inflow _ 11.51 cfs @ 0.08 hrs, Volume= 0.082 of Outflow = 11.51 cfs @ 0.08 hrs, Volume= 0.082 al", Atten= 0%, Lag= 0.0 min Primary = 11.51 cfs @ 0.08 hrs, Volume= 0.082 of Routing by. Dyn-Star-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 195.04'@ 0.09 hrs Flood Elev= 195.00' Device Routing .Invert Outlet Devices #1 Primary 191.47' 18.0" Round Culvert L= 66.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0.0071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Outflow Max=8.95 cfs @ 0.08 hrs HW=194.48' TW=193.37' (Dynamic Tallwater) t-1=Culvert (Inlet Controls 8.95 cfs @ 5.07 fps) Pond CB21: CB21 Hydrocgraph 0 Inflow 11.151 cfs E Primary 12 ,15=```' I fl A =1 450 n ow rea . ac Peak Elev=195.04' 9-. ------------ - --------- +? Q ------- 8. ' Round Culvert - ---------------------- { -- . n= 0.0'I 3 ` Q 6- l LL : __ . - -L=66.0' E, ` 5=0.0071 T 3: '/1 1 2- t 9 1 2 Time (hours) 10-YR RATIONAL METHOD 090802 POST Lumberton,North Carolina 11? Year Duration=5 min, Inten=8 16 in/hr Prepared by AWB Engineers Printed 11118/2010 HydroCAD® 9.00 sln 02300 @2009 HydroCAU Software Solutions LLC Page 16 Summary for Pond CO., CO Inflow Area = 0.538 ac,100.00% Impervious, Inflow Depth = 0.68" for 10-Year event Inflow = 4.27 cfs @ 0.08 hrs, Volume= 0.030 of Outflow 4.27 cfs @ 0.08 hrs, Volume= 0.030 af, Atten= 0%, Lag= 0.0 min Primary = 4.27 cfs @ 0.08 hrs, Volume= 0.030 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Eiev= 196.48' @ 0.11 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 193.00' 15.0" Round Culvert L= 80.0` CPP, square edge headwall, Ke 0.500 Outlet Invert= 192.43' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=0.00 cfs @ 0.08 hrs HW=195.45' TW=195.54' (Dynamic Tailwater) L1=Culvert (Controls 0.000s) Pond CO: CO Hydrograph 10-YR RATIONAL METHOD . 090802_POST Lumberton,North Carolina 1O-Year Duration=5 min, lnten=8.16 in/hr Prepared by AWB Engineers Printed 1111812010 Hyd roCAD09.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond E-CB5: E-CB5 Inflow Area = 0.634 ac,100.00% Impervious, Inflow Depth = 0:64" for 10-Year event Inflow = 4.78 cfs @ 0.08 hrs, Volume= 0.034 of Outflow - 4.19 cfs @ 0.08hrs, Volume= 0.034 af, Atten= 12%, Lag= 0.0 min Primary = 4.19 cfs @ 0.08 hrs, Volume= 0.034 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 195.00'@0.11 hrs Surf.Area= 27,622 sf Storage= 104 cf Flood Elev= 194.42' Surf.Area= 0 sf Storage= 0 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 0.2 min ( 5.2 - 5.0 ) Volume Invert Avail.Storage Storage Description #1 195.00' 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0 0 ..195.25 27,622 6,906 6,906 Device Routing Invert Outlet Devices #1 Primary 193.28' 12.0" Round Culvert L= 140.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S=0.0260'1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 194.42' 24.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 195.25' 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=3.68 cfs @ 0.08 hrs HW=195.00' TW=192.99' (Dynamic Tailwater) ?mil=Culvert (Outlet Controls 3.68 cfs @ 4.69 fps) t 2=Orlflce1Grate (Passes 3.68 cfs of 14.46 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=195.00' (Free Discharge) t--3=Sharp-Crested Rectangular Weir (Controls 0.00 cfs) 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 90-Year l]uration=5 min, Inten=8 16 in/hr Prepared by AWB Engineers Printed 111'1812070 HydroCAD0 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 18 Pond E-CB5: E-CB5 Hydrograph ------------------ - --------------- - ----------------- ------------------..__ Inflow 4x.78 rr? ` Outflow Fq P i 634 ac Inflow Area=0 . r mary S d i . econ ary g --------------------------- 4;g? -------------- -------------- - Peak- Elev= 1 95.00® 4 79ds i= Storage=104 cf 4- a, 3 t,{ I - 3 1 ` ; I 0 4 2 - r _ 0.c c ~ 0- _W.. 0 t 2 3 Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumherton,North Carolina 90-Year Durati017=5 min, 1'nten=8.16 in/hr Prepared by AWB Engineers Printed 11118/2010 HydroCAD® 9.00 sln 02300 p 2009 HydroCAD Software Solutions LLC Page 19 Summary for Pond E-MH6: E-MH6 Inflow Area = 2.084 ac,100.00% Impervious, Inflow Depth = 0.67" for 10-Year event Inflow - 15.57 cfs @ 0.08 hrs, Volume= 0.116 of Outflow = 15.57 cfs @ 0.08 hrs, Volume= 0.116 af, Atten= 0%, Lag= 0.0 min Primary = 15.57 cfs @ 0.08 hrs, Volume= 0.116 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 193.71'@ 0.10 hrs Flood Elegy= 195.14' Device Routing Invert Outlet Devices #1 Primary 189.64' 24.0" Round Culvert L= 81.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.24' S= 0.0049 'P Cc= 0.900 n=0.013 Primary OutFlow Max=13.67 cfs @ 0.08 hrs HW=193.36' TW=192.54' (Dynamic Tailwater) t-I=Culvert (Inlet Controls 13.57 cfs @ 4.35 fps) ® Inflow ® Primary Time (hours) 10-YR RATIONAL METHOD 090802 POST Lumberton,North Carolina 1,0 Year Duration=5 min, Inten-8 16 in/hr Prepared by AWB Engineers Printed 11/18/2010 HydroCA00 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC Page 20 Summary for Pond MH20: MH20 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth= 0.67" for 10-Year event Inflow = 17.27 cfs @ 0.08 hrs, Volume= 0.129 of Outflow = 17.27 cfs @ 0.08 hrs, Volume= 0.129 af, Atten= 0%, Lag= O.O min Primary = 6.31 cfs @ 0.08 hrs, Volume= 0.032 of Secondary = 16.02 cis @ 0.09 hrs, Volume= 0.096 of Routing by Dyn-Star-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 192.97'@ 0.09 hrs Flood Elev= 195.00' Device Routing. Invert Outlet Devices #1 Primary 189.24' 12.0" Round Culvert L= 23.5' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 '/' Cc= 0.900 n= 0.013 #2 Secondary 189.80' 24.0" Round Culvert L= 148.0' CPP, square. edge headwall, Ke= 0.500 Outlet Invert= 189.07' S= 0.0049/' Cc= 0.900 n= 0.013 Primary OutFlow Max=0.00 cfs @ 0.08 hrs HW=192.52' TW=200.52' (Dynamic Tailwater) t--1=Culvert ( Controls 0.00 cfs) Secondary OutFlow Max=12.70 cfs @ 0.09 hrs HW=192.92' TW=192.07' (Dynamic Tailwater) t2=Culvert (Outlet Controls 12.70 cfs @ 4.04 fps) Pond MH20- MH20 Hydrograph - - -------------- - ---------------- Inflow Ou[flow I I 0 Primary Secondary Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.161W1hr Prepared by AWB Engineers Printed 1111812010 HydroCAD® 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 21 Summary for Pond MH21: MH21 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 5.87" for 10-Year event Inflow = . 17.72 cfs @ 0.09 hrs, Volume= 0.109 of Outflow = 17.72 cfs @ 0.09 hrs, Volume= 0.109 af, Atten= 0%, Lag= 0.0 min Primary - 17.72 cfs @ 0.09 hrs, Volume= 0.109 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 192.14'@ 0.09 hrs (Flood Elev= 191.72` Device Routing Invert Outlet Devices #1 Primary 189.07' 24.0" Round Culvert L= 152.0` CPP, square edge headwall, Ke= 0.500 Outlet Invert= 188.33' S= 0.0049T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=15.30 cfs @ 0.09 hrs HW=192.07' TW=190.82' (Dynamic Tallwater' t--1=Culvert (Outlet Controls 15.30 cfs @ 4.87 fps) Pond MH21: MH21 Hydrograph ? Inflow F1 Primary Time (hours) 10-YR RATIONAL METHOD 090802 POST Lumberton,Morth Carolina 70-Year Duration=5 min, Inten=8. yG in/hr Prepared by AWS Engineers Printed 11/18/2010 HydroCAD® 9.00 stn 02300 @ 2009 Hydro CAD Software Solutions LLC Page 22 Summary for Pond MH23: MH23 Inflow Area 2.299 ac,100.00% Impervious, Inflow Depth = 0.17" for 10-Year event Inflow = 6.31 cfs @ 0.08 hrs, Volume= 0.032 of Outflow - . 6.31 cfs @ 0.08 hrs, Volume= 0.032 af, Atten= 0%, Lag= 0.0 min Primary - 6.31 cfs @ 0.08 hrs, Volume= 0.032 of Routing by Dyn-Star-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 200-52'@ 0.08 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.12' 12.0" Round Culvert L= 328.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' S= 0.00437 Cc= 0.900 n= 0.013 Primary OutFlow Max=6.31 cfs @ 0.08 hrs HW=200.52' TW=0.00' (Dynamic Tallwater) t--1=Culver! (Barrel Controls 6.31 cfs a 8.03 fps) Pond MH23-. MH23 Hydrograph 7 yU i LL 2'. li 0 Inflow ® Primary 10-YR RATIONAL METHOD 090802_POST Lumberion,North Carolina 10-Year Duration=5 min, ?'nten=8.1s in/hr Prepared by AWB Engineers Printed 11/1812016 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24: MH24 Inflow Area 0.223 ac,100.00% Im pervious, Inflow Depth = 5.87" for 10-Year event Inflow = 17.72 cfs c@ lr 0.09 hrs, Volume= 0.109 of Outflow = 17.72 cfs @ 0.09 hrs, Volume= 0.109 af, Atten= 0%, Lag= 0.0 min Primary - 6.39 cfs 0 0.09 firs, Volume= 0.057 of Secondary = 11.33 cfs @ 0.09 hrs, Volume= 0.052 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 his Peak Elev= 190.88'@ 0.09 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.0049T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.30'. 24.0" Round Culvert L= 25,0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.00' S= 0-0920T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=6.28 cfs @ 0.09 hrs HW=190.81' TW=188.49' (Dynamic Tailwater) t--?=Culvert (Barrel Controls 6.28 cfs @ 5.12 fps) Inflow Vol Outflow 0 Primary [2 Secondary 10-YR RATIONAL METHOD 090802 POST Lumberton,North Carolina 10--Year Duration=5 min, I17ten=8. f6 in/hr Prepared by AWS Engineers Printed 1111812010 HydroCAD& 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Pane 24 Summary for Pond 0-3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72% Impervious, Inflow Depth= 0.52" for 70-Year event Inflow = 11.08 cfs @ 0.09 hrs, Volume= 0.091 of Outflow -- 0.64 cts @ 0.16 hrs, Volume= 0.091 af, Atten= 94%, Lag= 4.6 min Discarded = 0.64 cfs @ 0.16 hrs, Volume= 0.091 of Primary. = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= .188.83' @ 0.16 hrs Surf.Area= 5,062 sf Storage= 3,695 cf Flood Elev= 190.50' Surf.Area= 7,706 sf Storage= 140309 cf Plug-Flow detention time= 57.7 min calculated for 0.091 of (100% of inflow) Center-of-Mass det. time= 57.9 min ( 62.9 - 5.0 ) Volume Invert Avail.Storage Storage Description #1 188.00' 14,309 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 188.00 3,797 0 0 189.00 5,314 4,556 4,556 190.00 6,893 6,104 10,659 190.50 7,706 3,650 14,309 Device Routing Invert Outlet Devices #1 Primary 189.50' 8.0' long x 10.0` breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Extiltration over Surface area Conductivity to Groundwater (Elevation = 186.00' Discarded OutFlow Max=0.64.cfs @ 0.16 hrs HW=188.83' (Free Discharge) t2=Exfiltration ( Controls 0.64 cfs) Primary OutFlow M2X=0.00 cfs @ 0.00 hrs HW=188.00' (Free Discharge) Z7-Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina YO Year Duration=5 min, Inten=8.96 in/hr Prepared by AWB Engineers Printed 1111812010 HydroCAD0 9.00 stn 02300 @2009 HydroCAD Software Solutions LLC Page 25 Pond 0-3: INFILTRATION BASIN Hydrograph Inflow Outflow _ Discarded Ej Primary Time (hours) 10-YR RATIONAL. METHOD 090802_POST Lumbe?ton,North Carolina 1O--Year Duration=5 min, Inten=8.16 in/hr Prepared by AWB Engineers Printed 11/18/2010 HydroCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions I.LC Page 26 Summary for Link E-LS1: EXISTING LIFT STATION Inflow Area = 2.299 ac,100.00% impervious, Inflow Depth = 0.17" for 10-Year event Inflow 6.31 cfs @ 0.08 hrs, Volume= 0.032 of Primary = 6.31 cfs @ 0.08 hrs, Volume= 0.032 af, Atten= 0%, L.ag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Link E-LS1- EXISTING LIFT STATION Hydrograph - ----------- ................... ----------- ------------ -------------- [nflow 6.3s ds El Primary 5.31 cFS -------------------------- ---------------- Inflow Area-2.299 ac 5- ! < - 4 v u. 3 2- o- 0 1 2 3 Time (hours)