Loading...
HomeMy WebLinkAboutNCC205959_ESC Approval Submitted_20201229ROY COOPER Governor MICHAEL S. REGAN Secretary BRIAN WRENN Director NORTH CAROLINA Environmental Quality November 10, 2020 LETTER OF APPROVAL WITH MODIFICATIONS Union County Attention: Gordon Vincent, Facilities Project Manager 500 North Main Street Monroe, North Carolina 28112 RE: Project Name: Union County Sheriff's Office Acres Approved: 11.71 Project ID: UNION-2021-013 County: Union, City: Wingate Address: Presson Rd. River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Marc Momsen, PE, LandDesign Date Received by LQS: October 27, 2020 Plan Type: Revised Dear Mr. Vincent: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at deq.nc.gov/NCGOI. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@nedenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be, sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: " '. )_ E 4NQIR�M C f" �)'Utl� r �_ "1"\ 9Epa1Mealt 6f EPvitOmM1enial l7uaEtty North Carolina Department of Environmental Quality i Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue. Suite 301 1 Mooresville, North Carolina 28115 704.663.1699 Letter of Approval with Modification November 10, 2020 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining. properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Sincerely, { Shannon Leonard Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval NCGO1 Fact Sheet c: Inspection Department ec: Marc Momsen, PE Letter of Approval with Modification November 10, 2020 Page 3 of 3 MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Union County Sheriffs Office Project ID: UNION-2021-013 County: Union 1. Adequately sized slope drains shall be provided into SSB-3. A minimum of five (5) 18" slope drains shall be provided. Slope drains shall be provided to convey the run-off from the temporary diversion berms into the basin. The slope drains shall outlet into the bottom of the basin. 2. The permanent storm drainage into SSB-4 shall be installed from Outfall-1 thru CB-36 before SSB-3 can be removed. This will allow the relocation of the temporary diversion berm in inset on Sheet C2-02 to be followed. The diversion berm to CB-36 (to isolate SSB-3 area), shall remain intact and functional during fill placement into SSB-3 area. Approval from DEMLR is required prior to the removal of SSB-3. 3. Upon placing fill during SSB-3 removal, a diversion berm shall be placed at the top of the fill slope at the end of each working day. Slope drains shall be provided to convey any run-off to toe of fill slope. Adequate excavated storage area (e.g. 4' W x 8' L x 2' D minimum) shall be provided in front of the stone outlets at the toe of the fill slope.