Loading...
HomeMy WebLinkAbout20100766 Ver 1_Stormwater Info_20101116LETTER OF TRANSMITTAL AWB ENGINEERS 1942 NORTHWOOD DRIVE ae?R-WATER OUv.rrr SALISBURY, MARYLAND 21801-7824WEUwsmDsTwwATmrmcH 410-742-7299 FAX 410-742-0273 axp to ^ 07 tP to CORR 10-JRS-1156 JOB NO.: 090802 DATE: 10/29/2010 TO: Bill Mullin RE: J.H. Carter & Associates 515 Midland Road Mountaire VRT & Freezer Suite F Southern Pines, NC 28387 WE ARE SENDING YOU THE FOLLOWING: ATTACHED- ? BLUELINE PRINTS - CHANGE ORDER - SUBMITTALS - ? SHOP DRAWINGS - COPY OF LETTER - SPECIFICATIONS - APPLICATION FOR PAYMENT - BLACKLINE PRINTS- OTHER- NO. OF COPIES DESCRIPTION 2 Sets of Drawing #s SP-1, 2, 3, 3.1, 4, 5, 6 & 7. 2 Copies of Narrative & Calculations. 1 CD Containing DWG & H droCad Files for NCDENR - DWQ Submittal. THESE TRANSMISSIONS ARE: FOR APPROVAL - ? FOR USE IN FABRICATION - ? FOR YOUR DISTRIBUTION - ? FOR ESTIMATING - F-1 FOR USE IN CONSTRUCTION - AS PER YOUR REQUEST - FOR CORRECTION - F-] FOR YOUR INFORMATION - FOR YOUR REVIEW & COMMENT FOR YOUR USE - ? RET'D AFTER LOAN TO US - FOR OBTAINING PERMITS THIS TRANSMITTAL IS SENT BY: FIRST CLASS MAIL - OVERNIGHT UPS - GROUND UPS - HAND DELIVERY - PICK UP - OTHER - ? REMARKS: By earlier email, I have requested the completion of the Maintenance Agreement be forwarded to you. The proposed easement will be recorded after DWQ comments are received. Please call with an questions. SENT BY: John R. Shahan, P.E. COPY TO. John Wren - Mt. Aire (1) SIGNATURE: w 1 11 I AWBENGIN 1 1 EERS October 29, 2010 10-DRT-1153 Mr. Joseph Gyamfi, P.E. North Carolina Department of Environment and Natural Resources Division of Water Quality 2321 Crabtree Blvd., Suite 250 Raleigh, NC 27604 RE: Mountaire Farms 2010 VRT & Freezer Storage Storm Water Management Plan Dear Mr. Gyamfi, 10 The Mountaire VRT & Freezer Storage project is currently under construction. All approvals have been obtained from the Land Quality section. Based on a recent meeting between DWQ and AWB Engineers, we were informed that water quality treatment needs to be provided for all water discharging to a wetland area. The following describes our storm water management plan. ' The rooftop of the proposed addition has been sectioned off into various drainage areas (A, B, C, etc.) as shown on sheet SP-3 of the construction plans. The existing pavement between the two buildings currently drains to E-CB5. From there it flows through an existing 12-inch pipe to E-MH6. E-MH6 drains to E-LS 1 (an ' existing lift station) through a 12-inch pipe. The storm water travels to the wastewater treatment facility from there. We are proposing to install piping along the north and west sides of the new addition to capture all rooftop runoff and direct it to either E-LS 1 or to a newly constructed infiltration basin to be located at the south end of the new building. Catch basin E-CB5 will remain in place and connected to manhole E-MH6. The new pipe along the north wall of the new building will start in the northeast corner and run to the existing manhole ' (E-MH6). Two catch basins will be placed evenly along this run of pipe. Rooftop areas "C" and "E" will be split into thirds with each third going to one of the new catch basins and existing manhole. Rooftop area "D" will flow into CB20. A new 24-inch pipe will exit E-MH6 and connect to new manhole MH20. Another new ' manhole (MH23) will be installed in line with the existing 12-inch pipe connecting E-MH6 with E-LS 1. MH20 and MH23 will connect with a new 12-inch pipe. Runoff from the l -inch storm event (first-flush) for these areas will be pumped to the wastewater treatment plant. ' For storm events larger than the 1-inch, a 24-inch pipe, with an invert set approximately 6 inches above the 12-inch pipe going to MH23, will exit MH20 and run along the west side of the building. Rooftop area "B" will be picked up by this pipe. MH21 will be placed near the middle of pipe run to allow better access for ' cleaning the pipes if necessary. This pipe will end at MH24. From here, flow for the "first flush" will be diverted to the new infiltration basin. Larger storm events will flow out of MH24 trough a 24-inch pipe with an invert set at the maximum water elevation of the "first flush". UONF !4 I Q 742-%299 FAX ; 4 10) 742-0273 L ?y s o ?"•I r ?? s ' Mr. Joseph GYamfi P.E. ' 10-DRT-1153 Page 2 of 2 The infiltration basin is sized for rooftop area "A" and all of the grassed area surrounding the southeast corner of the building. An emergency spillway will be used to allow larger storm events to be safely conveyed ' toward the wetland area. The basin will hold the 1-year storm event. The only discharge for this event will be from MH24 and the rate is slightly below the pre-development rate. ' The new truck dock will drain into a 12-inch concrete trench. Flow will be directed to a junction box where a 12-inch pipe will carry the water to E-LS 1. Existing and proposed runoff rates and pipe sizes were determined by using Hydrocad. We have included calculations for both the 1-inch and 2-inch storm events (using the SCS method), the 10-year event for pipe sizing (using the Rational Method), the 1-year pre-development discharge rate, and the 1-year post- development discharge rate. ' In conclusion, the 1-inch storm event will be captured and sent to the wastewater treatment facility or to the proposed infiltration basin. It is necessary for the bypass for the infiltration basin to be "inline" instead of the required "oflFline". Due to the placement of the basin between the building and the new railroad, there is not sufficient space to provide an "offline" system. To waive the offline requirement, as specified in Section 16.3.9 of the BMP Manual, we have designed the basin to handle 2 times the 1-inch storm event volume while using ' half the infiltration rate in the calculations. The deeded easement is shown around the infiltration basin and extends to security fencing (Public Area) around employee parking. A locked gate will be maintained at this point. For food plant security reasons, anyone wishing to gain access will have to approach the guard station t (manned 24/7/365), submit documentation for approval and be escorted to the area desired. In addition, an access easement can not extend from the basin to North Carolina Rt. 71 due to the railroad property that lies between them. ' If there is additional information that you require from us, please let me know. Sincerely, Daniel R. Tolbert ohn R. Shahan, P.E. Civil Engineer Technician Principal Engineer 1 cc: John Wren Permit QFwarF 0 RQG SUM* - .L STORMWATER MANAGEMENT PERMIT APPLICATION FORM HCDENR 401 CERTIFICATION APPLICATION FORM 1. PROJECT iNl ORMA110N Project Name Contact Person Phone Number Date Drainage Area Number 11. DESIGNN INR5RMAT1pN , Site Characteristics Drainage area impervious area Percent impervious Design rainfall depth Peak Flow Calculations 1-yr, 24-hr rainfall depth 1-yr, 24-hr intensity Pre-development 1-yr, 24-hr discharge Post-development 1-yr, 24-hr discharge Pre/Post 1-yr, 24-hr peak flow control Storage Volume: Non-SA Waters Minimum design volume required Design volume provided Storage Volume: SA Waters 1.5" runoff volume Pre-development 1-yr, 24-hr runoff volume Post-development 1-yr, 24-hr runoff volume Minimum required volume Volume provided Soils Report Summary Soil type Infiltration rate SHWT elevation Basin Design Parameters Drawdown time Basin side slopes Basin bottom elevation Storage elevation Storage Surface Area Top elevation Basin Bottom Dimensions Basin length Basin width Bottom Surface Area Form SW401-Infiftration Basin-Rev.4 INFILTRATION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part 111) must be printed, filled out and submitted along with all of the required information. MOUNTAIRE FARh7S 2010 VRT & STORAGE 1 HALLEY ONDONP. 910-359-5286 29-Oct-10 1 91,432.00 ftz 43,637.75fe 0,48 % 2.00' < in 3.30 in 528; in/hr 3-93 _ ft3lsec 3.6; -ft3lsec -0.26 ft3lsec 7,345.00 ft3 7,41.0.00 ft3 ft3 ft3 'ft3 ft3 to OK for non-SA waters rUB, Bp = 4.00 in/hr ]86.00 fmsl 0.50 days 1-00 :1 188.00 fmsl 159.50 fmsl 6,104.00 ftz 190.50 fmsl 237.00 ft 18.00, . ft 3,797.00 y2 OK OK OK (to be pmvided by DWQ) Paris I. & II. Design Summary, page 1 of 2 Additional Information Maximum runoff to each inlet to the basin? Length of vegetative filter for overflow Distance to structure Distance from surface waters Distance.from water supply well(s) Separation from impervious soil layer Naturally occuring soil above shwt Bottom covered with 4-in of clean sand? Proposed drainage easement provided? Capures all runoff at ultimate build-out? Bypass provided for larger storms? Pretreatment device provided Permit .0.38 ac-in OK 30.00 ft OK OK 625.00 ft . OK 100:00 ft OK 2.00 ft OK 2.00 ft OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK Y (Y or N) OK PUMP.TO LS=4 (to be provided by r)WQ) Form SW404-Infiltration Basin-Rev,4 Parts J. & 11. Design Summary, Page 2 of 2 Permit No (to be provided by DWQ) Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been me#. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Page/ Plan Initials Sheet No. SP- 3 1. Plans (1" a 50' or larger) of the entire site showing: - Design at ultimate build-out, - Off-site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Basin dimensions, - Pretreatment system, - High flow bypass system, - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. iD -r SP 3. I 2. Partial plan (1" = 30' or larger) and details for the infiltration basin showing: - Bypass structure, - Maintenance access, - Basin bottom dimensions, - Basin cross-section with benchmark for sediment cfeanout, - Flow distribution detail for inflow, - Vegetated filter, and - Pretreatment device. t 5P- 3. 3. Section view of the infiltration basin (1" = 20' or larger) showing: - Pretreatment and treatment areas, and nn r? D k `lr R 6 - Inlet and outlet structures. 4. A table of elevations, areas, incremental volumes & accumulated volumes to verify the volume provided. DkT Q 5. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests The . results of the soils report must be verified in the field by DWQ, by completing & submitting the soils investigation request form. County soil maps are not an acceptable source of soils information Ikl ?+1" 110 , 6. A construction sequence that shows how the infitlration basin will be protected from sediment until the entire drainage area is stabilized: ??27 P. r 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). Farm SW401 -Infiltration Basin-Rev.4 Page 1 of 1 Part 111. Required Items Checklist, Page 1 of 1 090802_POST Lumberton,North Carolina 70-Year Duration=5 min, Inten=8.16 in/hr Prepared by AWE Engineers Printed 1012812010 HydroCAD® 9.00 s/n 02300 © 2909 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 0-3: INFILTRATION BASIN Elevation Surface Storage feet (sq-ft) {cubic-feet) 188.00 3,797 0 188.05 3,873 192 188.10 3,949 387 188.15 4,025 587 188.20 4,100 790 188.25 4,176 997 188.30 4,252 1,207 188.35 4,328 1,422 188.40 4,404 1,640 188.45 4,480 1,862 188.50 4,556 2,088 188.55 4,631 2,318 188.60 4,707 2,551 188.65 4,783 2,789 188.70 4,859 3,030 188.75 4,935 3,274 188.80 5,011 3,523 188.85 5,086 3,775 188.90 5,162 4,032 188.95 5,238 4,292 189.00 5,314 4,556 189.05 5,393 4,823 189.10 5,472 5,095 189.15 5,551 5,370 189.20 5,630 5,650 189.25 5,709 5,933 189.30 5,788 6,221 189.35 5,867 6,512 189.40 5,946 6,807 189.45 6,025 7,107 189.50 6,104 7,410 189.55 6,182 7,717 189.60 6,261 8,028 189.65 6,340 8,343 189.70 6,419 8,662 189.75 6,498 8,985 189.80 6,577 9,312 189.85 6,656 9,643 189.90 6,735 9,978 189.95 6,814 10,316 190.00 6,893 10,659 190.05 6,974 11,006 190.10 7,056 11,356 190.15 7,137 11,711 190.20 7,218 12,070 190.25 7,300 12,433 190.30 7,381 12,800 190.35 7,462 13,171 190.40 7,543 13,546 190.45 7,625 13,925 190.50 7,706. 14,309 TM: s _ r?36'tin the Standard for Service" 3?3 _?4y to l?r ical = _tra.i _, r?rt ivli?feriais - Environmental Fac;lities October 14, 2€10 Mr. Kyle Fordham Evans Builders fine: 2329 Womble-Brooms Rd. Wilson, N .C. 27893 IRE; In-wsitir InfUtrition Testing ? Mountalre Farms Lumberbridge, North Carolina ECS project no. 33:1360 Dear Mr. Fordham: ECS has completed the infiltration testing for the above referenced rei ect, Piease see the attached boring togs for all pertinent information regarding the iecatians explored. If you have any questions, please contact me at your earliest convenience. Best regards; dom. Miguel Santiago, RE_ No P.E. License 033082 Vice President I Branch Manager 72 T'910-401-3288 :91 323-0539 e vv w.ecs€1mfted.com E CS Cara! nas, LL€, E rar a w ECS ilii ;ss LLB' A EGS Md-A' lantie; LLC. e I`cS Southeast, LLG > EC S Texas, LLP Infiltration Evaluation Mountaire Farms Lumberbridgo, North Carolina ECS Project No. 33.1350 October 14, .2010 Loci Del2t Soil Description BA 0-36" Tarp, Fine to Medium SAID wl Little.Silt Seasonal' High Water Table was estimated to be at 24.0 inches below the existing grade elevation. .Infiltration. Rate, 1O.a inches per hour Test was conducted at 10 inches below existing grade elevation Groundwater was encountered at 34.0 inches below the existing grade elevation. Location Degth Soil Description 132 0-48,, Tan, Grange, Fine to Medium, SAND Sul Some Snit Seasonal High Water Table was estimated to be at 24.0 inches below the existing grade elevation. Infiltration bate. 8.1inches per hour Test was conducted at 10 inches below existing grade elevation. Groundwater was encountered at 38.0 inches below the existing. grade elevation, CLIENT Evans Builders Inc. PROJECT NAIiiE Mounkire Firms SM LOCAMN Lumberbridccie N C I JOB #. I BOMNG # 33:1351 8--1 ARCMTECT-ENGINEER SHEEN` OF ?. LLP a .4 s+. PLASTIC MATER. UQUI D Irwr % Car rT x LMT Z. _ DESCRIPTION OF MATERIAL. ENGLISH UNIT$ c : ROCK QUALITY MONATION & REcovEgy BOTTOM. OF CASING _ LOSS OF CIRCULATION REC.jd SURFACE SURFACE ELEVATION I 20X-40%-60%-80%-l00%- l00%- STANDARD PENETR .. ATION BMWSf . : 10 20 30 40 SRk T®n,. Fine to Medium, SArd#3 with Uffle Silt (Sm) END OF BARMG 0 3.00' SfiWT 0 24.0 inches Test performed of 10.0 Inches Ground wafer encountered 0 34.0 Inches In4iif.ration. rate 10.0 inches: per hour I I I I-- I THE STRATIFICATIIIN LIKES REPRESENT THE RPPMXIMATE BIJUN 1ARY LINES BETWEEM SML 'TYPES IN-SITU THE INNSITION MAY BE GRAW4L !9wL 34.0 Inches OR RaRMG srAIaTTRI) 08/08/10, M -TWLCaCR) TWL(AeR) 130rdmo compi?TED 10 CAVT Ira DEPTH NA 08/08/ -7WL R10 HA FOREMAN B. Wa l1 DIZI NG HQD HA CLIENT Evans Builders Inc. PROJECT NAME wouni ire Farms . SITE LOCATION JOB # BORING # 33:1350 B-2 ARCIiEOT-ENGINEER. -o- SHEET OF A[aAu?1IC WATER LI uw LMIT :7. QOMNT X ma, x DESCRIPTION OF MATERIAL ENGLISH UNITS` ROM QUAEM DESIGNATION Ea AECOVMY z BOTTOM OF CASMG - L08S OF CIRCil TI£?IV 20%: 40%-60%80%_...'100%- SITRF'ACE -ELEVATION' STANDAR D PENETRATION Wn B 10 20 30 40 6t1? Ton, Orange, Fine to Miedii? SAND with 1 7 .Some Sal (SM) .......... THE STRATIFICATION L(MES REPRESENT Td±E APPRaXINATE DGUNDq{gY LINES' BETWEEN SUIL. TYP£S IN-SITU THE TRANSITION MAY BE GRADUAL 3$. inches ws ORO H.OMNO START D 08/0$/10 . WL(BCP): WL(ACIR) Eit FLING. COMPLETED 08 ' OS . 10 end u? n?r?1 6 NA. ?;WL MG HA FORUM B.wall, DRULINc MMOD HA PRE-DEVELOPMENT 1-YR PRE-DEVELOPED O9O8O2_PRE Prepared by AWB Engineers Printed 10128/2010 H droCAD@ 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC Page 2 Area (acres) 0.815 1.284 2.099 Area Listing (all nodes) CM Description (subcatchment-numbers) 61 775% Grass cover, Good, HSG B (1S) 98 Paved parking, HSG B.(1S) TOTAL AREA 1-YR PRE-DEVELOPED 090802_PRE Type ?I2¢hr 9-YR Rainfal1-3.30" Prepared by AW13 Engineers Printed 10/28/2010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Palle 3 Time span=0.00-40.00 hrs, dt=0.01 hrs, 4001 points Runoff by SCS. TR-20 method, UH=SCS Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-Ind method Subcatchment 1S: PRE-DEVELOPMENT . Runoff Area=91,433 sf 61.19% Impervious Runoff Depth=1.77'" Flow Length=100' Slope=0.0200 '1' Tc=8.9 min CN=84 Runoff=3.93 cfs 0.309 of Total Runoff Area = 2.099 ac Runoff Volume : 0.309 of Average Runoff Depth = 1.77" 38.81% Pervious = 0.815 ac 61.19% Impervious = 1.284 ac 1-YR PRE-DEVELOPED 090802 PRE Type 1/124-hr 9-YR Rainfall=3.30" Prepared by AWB Engineers Printed 10/28/2010 HydroCAD® 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment 1 S: PRE-DEVELOPMENT Runoff = 3.93 cis @ 92.13 hrs, Volume= 0.309 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1-YR Rainfall=3.30" Area (sf) CN Description 35,486 61 >75% Grass corner, Good, HSG B . 55,947 98 Paved parking, HSG B 91,433 84 Weighted Average 35,486 38.81% Pervious Area 55,947 61.19% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 8.9 100 0.0200 0.19 Sheet Flow, Grass: Short n= 0.150 P2= 3.90" Subcatchment 1S: PRE-DEVELOPMENT Hydrograph . p Runoff ----- -------- ------------------------------------------------------ -------- -------------- [:3::.:9:3 cfs 4 24-hr .1-YR Type Ill. y Rainfall 3.30 ---------- - - - ------ Runoff Area=91,433 sf Runoff Volume 0.309 of Runoff Depth 1.77" -------------------------------- ------- ---- - ---- 2 Flow Length=100' r.r Slope=0.0200T . -,, Tc=8 0 min '. r CN=94 Q 1 2 3 4 5 6 7 6 9 16 11 12 13 14 15 16 17 18 t9 20 21 22 23 24 25 26 27 28 29 3tl 31 32 33 34 35 36 37 38 39 46 Time (hours) L LStf & - (83 EXISTING LIFT STATION 3 /PAVEMENT //E CES CB B i MI)2D E-MH6 I f I ROOFTOP "B" C 1 C p ROOFTOP "D" D 6" n,.H21,. M 21 82 CE3, ;.CE2?, CET ROOFTOP "B" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ce A MH24 INFILTRATION BASIN ROOFTOP "A" & GRASSED AREA Subcaf. ReachF Pond`, Link Drainage Diagram forOS0802 POST Prepared by AWB Engineers, Printed 10/28/2010 FHydroCAE)@ 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC 1-YR POST-DEVELOPED 090802 POST Prepared by AWE Engineers Printed 10/28/2010 HydroCAD@ 9.00 s/n 02300 Q 2009 H droCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 1.097 51 >75% Grass cover, Good, HSG B (A) 1.142 98 (CE7, CE2, D) 0.438 98 Paved parking & roofs (Bi, 132) 1.413 98 Paved parking, HSG B (8S, A) 0.308 98 Unconnected roofs, HSG B (CE3) 4.398 TOTAL AREA 1-YR POST-DEVELOPED 090802_POST Prepared by AWB Engineers HydroCAD® 9.00 sln 02300 © 2009 HydroCAD S ft S Printed 10128/2010 o war e olution s LLC Page 3 Pipe Listing (all nodes) Line# Node In-invert Out-invert Length Slope n DiamMidth Height Number (feet) (feet) (feet) ("t) (inches) (inches) 1 C820 192.43 191.47 135.0 0.0071 0.013 18.0 0.0 2 CB21 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 CO 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E-C85 193.28 189.64 140.0 0.0260 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 6 MH20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 MH20 189.80 189.07 148.0 0.0049 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 .9 MH23 189.12 187.70 328.0 0.0043 0.013 12.0 0.0 10 MH24 188.33 187.67. 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.00 187.00 25.0 0.0800 0.013 24.0 0.0 1-YR POST-DEVELOPED 090802_POST Type I// 24-hr 9-YR Rainfall-3.30" Prepared by AWB Engineers Printed 1012812010 HydroCADS 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-40.00 hrs, dt=0.01 hrs, 4001 points Runoff bySCS TR-20 method, UH=SCS Reach routing by Dyn-Stor-Ind method Pond routing by Dyn-Stor-Ind rnethod Subcatchment SS: PAVEMENT Runoff Area=27,626 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=175' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=2.11 cfs 0.162 of Subcatchment A: ROOFTOP "A" $ GRASSED Runoff Area=81,726 sf 41.51% Impervious Runoff Depth=1.22" Flow Length=50' Slope=0.0200 T Tc=7.4 min CN=76 Runoff=2.48 cfs 0.191 of Subcatchment 81: ROOFTOP "B" Runoff Area=9,371 sf 100.00% Impervious Runoff Depth=3.07- Flow Length=50' Slope=0.0200 '1' Tc=5.0 min CN=98 Runoff=0.71 cfs 0.055 of Subcatchment.62: ROOFTOP "B Runoff Area=9,706 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0200 T Tc=5.0 min CN=98 Runoff=0.74 cfs 0.057 of Subcatchment CEi: ROOFTOP "C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0100 T Tc=5.0 min CM=98 Runoff=0.98 cfs 0.076 of Subcatchment CE2: ROOFTOP "C" AND "E" Runoff Area=26,300 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0100 T Tc=5.0 min CH=98 Runoff=2.01 cfs 0.154 of Subcatchment CE3: ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff =1.02 cfs 0.079 of Subcatchment D: ROOFTOP "D.. Runoff Area=10,552 sf 100.00% Impervious Runoff Depth=3.07" Flow Length=50' Slope=0.0100 '1' Tc=5.0 min CN=98 Runoff=0.80 cfs 0.062 of Pond 0020: CB20 Pond 0821: CB21 Pond CO: CO Pond E-CBS: E-CES Pond E-MH6: E-MH6 Pond MH20: MH20 Pond MH21: MH21 Pond MH23: MH23 Peak Elev=193.52' Inflow=3.79 cfs 0.292 of 18.0" Round Culvert n=0.013 L=135.0' S=0.0071 T Outflow=3.79 cfs 0.292 of Peak Elev=192.66' Inflow=4.81 cfs 0.371 of 18.0" Round Culvert n=0.013 L=66.0' S=0.0071 T outflow=4.81 cfs 0.371 of Peak Elev=193.89' Inflow=1.79 cfs 0.138 of 15.0° Round Culvert n=0.013 L=80.0' S=0.0071 T outflow=1.79 cfs 0.138 of Peak Elev=195.00' Storage=0 cf Inflow=2.11 cfs 0.162 of Primary=2.11 cfs 0.162 of Secondary=0.00 cfs 0.000 of Outflow=2.11 cfs 0.162 of Peak Elev=191.55' Inflow=6.92 cfs 0.633 of 24.0" Round Culvert n=0,013 L=81.0' S=0.0049 '1' Outflow=6.92.cfs 0.533 of Peak Elev=191.26' Inflow=7.64 cfs 0.588 of Primary=3.89 cfs 0.471 of Secondary=7.64 cfs 0.117 of Outflow=7.64 cfs 0.588 of Peak EIev=190.55' lnflow=8.38 cfs 0.174 of 24.0" Round Culvert n=0.013 L=152.0' 3=0.0049T Outflow=8.38 cfs 0.174 of Peak EIev=193.19' Inflow=3.89 cfs 0.471 of 12.0" Round Culvert n=0.013 L=328,0' S=0.0043 'r Outflow=3.89 cfs 0.471 of 1-YR POST-DEVELOPED 090802 POST Type /if 24-hr I-YR Rainfa11-3,3o- Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Pa e 5 Pond MH24; MH24 Peak Elev=189.81' Inflow=8.38 cfs 0.1742f Primary-4.71 cfs 0.129 of Secondary=3.67 cfs 0.045 of Outflow=8.38 cfs 0.174 of Pond 0-3: INFILTRATION BASIN Peak Elev=189.26" Stor2ge=6,013 cf Inflow=7.04 cfs 0.3202f discarded=0.80 cfs 0.320 of Primary=0.00 cfs 0.000 of Outflow=0.80 cfs 0.320 of Link E-LS1. EXISTING LIFT STATION Inflow=3.89 cfs 0.471 of Primary=3.89 cfs 0.471 of Total Runoff Area = 4.398 ac Runoff Volume = 0.836 of Average Runoff Depth = 2.28" 24.95% Pervious = 1.097 ac 75.05% Impervious 3.301 ac 1-YR POST-DEVELOPED 090802 POST Type 1II24-hr l-YR Rainfall=3.30- Prepared by AWB Engineers Printed 1012812010 H droCAD8 9.00 stn 02300 O 2009 H droCAD Software Solutions LLC Pa e 6 Summary for Subcatchment $S: PAVEMENT Runoff = 2.11 cis @ 12.07 hrs, Volume= 0.162 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3.30" Area (sf) CM Description 27,626 98 Paved parking, HSG B 27,626 100.00% Impervious Are a Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (efs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 1.0 125 0.0100 2.03 Shallow Concentrated Flow, Paved Kv= 20.3 fps 1.8 175 Total, Increased to minimum Tc = 5.0 min Subcatchment 8S: PAVEMENT Hydrograph u 2.t 0 3 a ----------- 2- ---------------------- v r. j a a 0 f 0 1 2 3 4 5 6 7 8 '6"10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-YR POST-DEVELOPED 090802_POST Type III24hr I-YR Rainfall=3.30" Prepared by AWB Engineers Printed 10/28/2010 HydroCA00 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment A: ROOFTOP "A" & GRASSED AREA Runoff = 2.48 cfs @ 12.11 hrs, Volume= 0.191 af, Depth= 1.22" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1-YR Rainfall=3.30" Area (sf) CM Description 33,925 98 Paved parking, HSG B 47,801 61 >75% Grass cover, Good, HSG B 81,726 76 Weighted Average 47,801 58.49% Pervious Area 33,925 41.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 50 0.0200 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.90' Subcatchment A: ROOFTOP "A° & GRASSED AREA Hydrograph F U 9 D LL €3 Runoff 0 € 2 3 4 5 6 7 8 9 10 11 12 13 14 1 S 16 17 9 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 312021 9 40 i i m (hours) 1-YR. POST-DEVELOPED 090802 POST Type III24hr 1-YR Rainfall=3-30- Prepared by AWE Engineers Printed 1012812010 HydroCAD® 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Pa e 8 Summary for Subcatchment B7: ROOFTOP "B" Runoff 0.71 cfs a 12.07 hrs, Volume= 0.055 af, Depth= 3.07' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3.30" Area (sf) CH Description 9,371 98 Paved parking & roofs 9,371 100.000/6 Impervious Area Tc Length. Slope Velocity Capacity Description (min) (feet) (ftlft) (ftlsec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" 0.6 50 Total, Increased to minimum Tc = SA min Subcatchment B9: ROOFTOP "B" 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2122 23 24 25 26 27 28 29 30 3132 33 34 35 36 37 38 39 40 Time (hours) 1-YR POST-DEVELOPED 090802_POST Type ?I24-hr t-YR Rainfa1/=3.30" Prepared by AWE Engineers Printed 10/28/2010 HydroCAD® 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment B2: ROOFTOP "B" Runoff - 0.74 cfs @ 12.07 hrs, Volume= 0.057 af, Depth= 3.07' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0,00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3,30" Area (sf) CN Description 9,706 98 Paved parking & roofs 9,706 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (ftlsec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum 'Te = 5.0 min Subcatchment B2: ROOFTOP "B"" Hydrograph 0.$ - ---. ----- i Runoff 0.75 0.74 cf6 - 0.7 Type III 24-hr.1-YR 0.65 1 Rainfall 3.30" 0 55 Runoff Area=9 706 sf . , ------------------- 0.5 Run®ff Volume 0:057 of 0.45- ------ --------- J ---- Runoff De 0 0.4 G.35 ---------------- -- Flow- Length=50' ?- 0.3= - --- -------- SIQpe=0.0200 7 0.2s 0.2- :.. Tc= 5.0 min --- 0.,5.- --- r ' CN-98 0.1- 0 05 - . - 0 1 2 3 4 5 6 7$ 9 10 11 121314 1516 17 18 ,9202,22 213,214 215 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-YR POST-DEVELOPED 090802 POST Type llf2SFhr'-YR Rainfall-3.30" Prepared by AWE Engineers Printed 10/2812010 HydroCAD@ 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CEI: ROOFTOP "C' AND "E" Runoff - 0.98 cfs @ 12.07 hrs, Volume= 0.076 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3.30" Area (sf) CM Description * 12,896 98 12,896 100.00% Impervious Area Tc Length Slope Velocity Capacity Description - (min) (feet) (ft/ft) (ftlsec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum To = 5.0 min Subcatchment M: ROOFTOP "C" AND "E" Hydrograph 13 Runoff 1 0.98 r(5 i Type 111.24-hr 1-YR Rainfall-X3.30"' Runoff Area=12,$96 sf Runoff Volume-0.076 of Runoff Depth=3.07°` Flow Length=50 Slope=0,0100 'f r Tc=5.0 min ' CN=98 .r.. .?.... ?. ... _. _.?... ?. .. ?...? .. .. ?. .. .. .. ..... .. ?.. .i.. .. r. ..r t r r r r . . r .. r 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-YR POST-DEVELOPED 090802_POST Type III 24-hr I-YR Ralntall=3.30" Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9,00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment CE2: ROOFTOP "C" AND -E- Runoff = 2.01 cfs @ 12.07 hrs, Volume= 0.154 af, Depth= 3.07° Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type Ill 24-hr 7-YR. Rainfall=3.30" Area (sf) CM Description 26,300 98 26,300 100.00% Impervious Area Tc Length Slope Velocity Capacity Description. (min) (feet) (ft/ft) (ft/sec) (efs) 0.8 50 0.0100 1.00 Sheet Flow,. Smooth surfaces n=0.011 P2=3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE2: ROOFTOP ""C- AND "E"" Hydrograph - - - ? Runoff 2.a1 ns --- ------------- 2- Type 11124-hr 1-YR Rainfal1=130„ Runoff Area=26 300 sf Runoff Volume=0.154 of Runoff Depth 3.07" l I Flow Length-50' Slope=0.0100 '1' T'c=5.0 m i n: CN=98 t? i. 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1$ 17 18 19 20 21.22 23 24 25 26 2'7..2'8'29 30 31 32 33 34 35 36 37 38 39 40 0 k / Time (hours) 1-YR POST-DEVELOPED 090802-POST Type 11I24-hr 9-YR Rainfa/1=3.30" Prepared by AWS Engineers Printed 1012812010 HydroCAD@ 9.00 sin 02300 Q 2009 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment CE3: ROOFTOP "C" AND °E" Runoff = 1.02 cfs @ 12.07 hrs, Volume= 0.079 af, Depth= 3.07" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr i-YR Rainfall-3.30" Area (sf) CN Description 13,404 98 Unconnected roofs, HSG B 13,404 100.00% Impervious Area 13,404 100.00% Unconnected Tc Length . Slope Velocity Capacity Description (min) (feet) (ftlft) (ft/sec) (cfs) 0.8 s0 0.0100 .1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90- 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE3: ROOFTOP "C" AND "E" Hydrograph ® Runoff l ,y'.02 cfs - - ---- - - ----- Type III 24-hr I YR Rainfal1=3.30" . j Runoff /area=13,404 sf Runoff Volume=0.079 of Runoff Depth=3.07" ' o , , Flow Length=50 . Slope=0.0100 k Tc=5 0 min CN=98 i 34 35 36 37 38 39 40 00 1 2 3 4 5.6.:.7 8 9 10111213141516171819202122232425262728 29 30 31 32 33 34 Time (hours) 1-YR POST-DEVELOPED 090802 POST Type III 24-hr I-YR Rainfall-3.30" Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 stn 02300 0 2009 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment D: ROOFTOP -D" Runoff = 0.80 cfs @ 12.07 hrs, Volume= . 0.062 af, Depth= 3.07' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1-YR Rainfall=3,30" Area (sf) CN Description * 10,552 98 10,552 100.00% impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flown, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment D: ROOFTOP "D" Hydrograph 0.9- I 0.85- ------ 964 CF. - ---- ------------------- S Runoff f Type 11124- h r 1-YR 0.75 . 0.7- ------ ---- - Rainfall=3.30" - - - Oa = -- --- - - -- - Runoff Area 10 552 sf 6 , 0.55= - ?uno? Volume=0 062 - of 0.5= ---- - _ -- Runoff Depth=3 07 3 0.45 . o LL U.4 . It .: --- - - Flor?u Len th =50'_ : 6.35- .3 _. . _ -------------- fy -------------- ----- ---- ------ ------ ---- - -- -- -Slope=0.0'10 0'/,-- ----- ------ 0.25 . --- -------- Tc=5.0 min 0.2 - 0.15 -: - - - ------------ - _------ C1V-98 0.1 - ------- ---- -- ----- --- 0.05. 0 1 2 3 4 5 6 7 8 9 1011 121314151617 819 20 21 i2 232425 2 .,.. ` 26 27 28 29 30 31 32 33 34 35 36 37.38 39 40 " Time (hours) 1-YR POST-DEVELOPED 090802 POST Type III 24-hr 7-YR Rainfall=3.30- Prepared by AWB Engineers Printed 10/28/2010 HydroCADO 9.00 sfn 02300 @ 2009 HydroCAD Software Solutions LLC Pa a 14 Summary for Pond CB20: C820 Inflow Area = 1,142 ac,100.00% Impervious, Inflow Depth 3-07" for 1-YR event Inflow = 3.79 cfs @ 12.07 hrs, Volume= 0.292 of Outflow = 3.79 cfs @ 12.07 hrs, Volume= 0,292 af, Atten= 0%, Lag= 0.0 min Primary - 3.79 cfs @ 12-07 hrs, Volume= 0,292 of Routing by Dyn-Star-Ind method, Time Span= 0,00-40.00 hrs, dt= 0.01 hrs Peale Elcv= 193.52'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 . Primary 192.43' 18.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47' S= 0.00717 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=3.78 cfs @ 12,07 hrs HW=193.52' TW=192.66' (Dynamic Tailwater) t--1=Culvert (Outlet Controls 3.78 cfs @ 3.83 fps) Pond CB20: CB20 Hydrograph ® Inflow azs mary p Pri 3.79 fn flow Area=1.142 ac -' -------- - ---- - Pe Elev=' 93-.52° 3 18 Orr Round Culvert 3 n=-0.013 02 0° L =135 , - ----- -- ---- ------ ---- - - --- S-0.ft071 1 1 " 0? 1 2 .4' .6..?..8 9 101 : 1'3 1.9 2....:0 . .....:23...24 2,5 28 27 , 28 2 29 9 - 30 3 31 32 3 33 3 .., 1 12 14 15 1617 18 21 22 34 35 38 37 38 39 40 Time (hours) 1-YR POST-DEVELOPED 090802_POST Type III 24-hr I-YR Raimal1-3.30- Prepared by AWB Engineers Printed 10/28/2010 HydroCAD0 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC Pa a 15 Summary for Pond CB21.- CB21 Inflow Area = 1.450 ac,100.00% impervious, Inflow Depth= 3.07" for 1-YR event Inflow _ 4.81 cfs @ 12.07 hrs, Volume= 0.371 of Outflow = 4.81 cfs @ 12.07 hrs, Volume= 0.371 af, Atten= 0%, Lag= 0.0 thin Primary = 4.81 cfs @ 12.07 hrs, Volume= 0.371 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs. Peak Elev= 192.66'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 191.47' 18.0" Round Culvert L= 66.0' . CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=4.81 cfs @ 12.07 hrs HW=192.66' TW=191.35' (Dynamic Tail water) 'L-'1=Culvert (Barrel Controls 4.81 cfs @ 4.40 fps) Pond CB21.- CB21 1-YR POST-DEVELOPED 090802_POST Type 11124-hr I-YR Rainfall=3.30" . . Prepared by AWS Engineers Printed 10128/2010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LL,C Page 16 Summary for Pond CO: CO Inflow Area = 0.538 ac,100.00% Impervious, Inflow Depth = 3.07" for i-YR event inflow = 1.79 cfs @ 12.07 hrs, Volume= 0.138 of Outflow = 1.79 cfs @ 12.07 hrs, Volume= 0.138 af, Atten= 0%, Lag= 0.0 min Primary _ 1.79 cfs @ 12.07 hrs, Volume= 0.138 of Routing by Dyn-Stor-Ind method, Time Sp2n= 0.00-40,00 hrs, dt= 0.01 hrs Peak Elev= 193.89'@ 12.08 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 193.00' 15.0" Round Culvert L= 80.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 192.43' S= 0.0071 T Cc= 0.900 n= 0,093 Corrugated PE, smooth interior Primary OutFlow Max=1.76 cfs @ 12.07 hrs HW=193.88' TW=193.52' (Dynamic Tallwater) t°--1=Culvert (Outlet Controls 1.75 cfs @ 2.66 fps) Pond CO. CO Hydrograph 2 Inflow El Primary 1.7ecfs _ _ - Inflow Area=0.538 ac Peak EIev 193.89 15,0" Round--C - - ulver a : 3 1 n=0.013 0 L=80.0 S=0.00;71 T. ,7i1 -: ' 0 0 1 2 3 4 5 6 7 8 9 1tl11 12 1314 15 1617 18 192021 22 2324 25 2827 28 2930 31 32313 34 3536 37 3839 40 Time (hours) 1-YR POST-DEVELOPED 090802 POST Type/// 24-hr I-YR Rainfall=3.30- Prepared by AWB Engineers Printed 10/2812010 HydroCAD@ 9.00 sin 02300 O 2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond E-CBS: E-CB5 Inflow Area 0.634 ac,100.00% Impervious, Inflow Depth = 3.07" for 1-YR event Inflow - 2.11 cfs @ 12.07 hrs, Volume= 0.162 of Outflow = 2.11 cfs @ 12.07 hrs, Volume= 0.162 af, Atten= 0%, Lag= 0.0 min Primary - 2.11 cfs @ 12.07 hrs, Volume= 0.162 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 195.00'@ 12.07 hrs Surf.Area= 27,522 sf Storage= 0 cf Flood Elev= 194.42' Surf.Area= 0 sf Storage= 0 cf Plug-Flow detention time= (not calculated. outflow precedes inflow) Center-of-Mass det. time= 0.0 min ( 754.8 - 754.8 ) Volume Invert Avail.Storage Storage Description #1 195.00' 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum,Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0 0 195.25 27,622 6,906 6,906 Device Routing Invert Outlet Devices #1 Primary 193.28' 12.0" Round Culvert L= 140.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S= 0.0260T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 194.42' 24.0" x 36.0" Horiz. Orifice/Grate C= 0.600 . Limited to weir flow at low heads #3 Secondary 195.25' 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction (s) Primary Outflow Max=4.18 cfs @ 12.07 hrs HW=195.00' TW=191,35' (Dynamic Tallwater) t--1=Culvert (Inlet Controls 4.18 cfs @ 5.32 fps) t--2=Orifice/Grate (Passes 4.18 cfs of 14.44 cfs potential flow) Secondary Outflow Max=0.00 cfs @ 0.00 hrs HW=195.00' (Free Discharge) t--3=Sharp-Crested Rectangular Weir (Controls 0.00 cfs) 1-YR POST-DEVELOPED 090802 POST Type III 24-hr 9-YR Rainfall=3 30- Prepared by AWB Engineers Printed 10/2812010 . HydroCAD® 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 18 Pond E-CBS: E-CB5 Hydrograph 1-YR POST-DEVELOPED 090802 POST Type IN 24-hr f-YR Rainfaff=3.30" Prepared by AWE Engineers printed 10/2812010 HydroCAD® 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Page 19 Sutnrnary for Pond E-MH6: E-MH6 Inflow Area 2.084 ac,100.00% Impervious, Inflow Depth= 3.07" for 1-YR event Inflow = 6.92 cfs @ 12.07 hrs, Volume= 0.533 of Outflow = 6.92 cfs @ 12.07 hrs, Volume= 0.533 af, Atten= 0%, Lag= 0.0 min Primary - 6.92 cfs @ 12.07 hrs, Volume= 0.533 of Routing by Dyn-Stor--Ind method, Time Span= 0.00-40.00 firs, dt= 0.01 hrs Peak Elev= 191.55'@ 12.08 hrs Flood E1ev= 195.14' Device Routing Invert Outlet Devices #1 Primary 189.64" 24.0" Round Culvert L= 81.0' CPP, square edge headwall, Ke= 0.500 Outlet Inverts 189.24" S= 0.0049 T Cc=.0.900 n= 0.013 Primary OutFlow Max=3.44 cfs @ 12.07 hrs HW=191.35° TW=191.25' (Dynamic Tailwater) t-1=Culvert (Outlet Controls 3.44 cfs @ 1.62 fps) Pond E-MH6: E-MH6 Hydrograph 0 Inflow ID Primary 1-YR POST-DEVELOPED 090802 POST TYPe ill 24-hr I-YR Rainfall-3 30? Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Page 20 Summary for Pond MH20- MH20 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 3.07" for i-YR event Inflow = 7.64 cfs @ 12.07 hrs, Volume= 0.588 of Outflow - 7.64 cfs C 12.07 hrs, Volume= 0.588 af, Atten= 0%, Lag= 0.0 min Primary = 3.89 cfs Q 12.08 hrs, Volume= 0.471 of Secondary = 7.64 cfs @ 12.07 hrs, Volume= 0.117 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 191.26'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.24' 12,0" Round Culvert L= 23.5' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 '1' Cc= 0.900 n= 0.013 #2 Secondary 189.80' 24,0" Round Culvert L= 148.0' CPP, square edge headwall, Ke= 0.500' Outlet Invert= 189.07' S= 0.0049'1' Cc= 0.900 n= 0.013 ?Prim?ary Outflow Max=0.00 cfs Q 12.08 hrs HW=190.97' TW=193:'13' (Dynamic Tallwater) ?1=Culvert (Controls 0.00 cfs) Secondary OutFlow Max=6.60 cfs @ 12.07 hrs HW=191.26' TW=190.55' (Dynamic Tallwater) t2=Culvert (Outlet Controls 6.60 cfs @ 3.76 fps) Pond MH20: MH20 Hydrograph Inflow ?4 rfa 71 Outflow M Primary - =;64 --- --- . .. Inflow Area=2,299 ac--- ®Secondary $ . , 7.84 cfs I, ,. i . ---- 4 ----------------------- Peak- Elev-l 91-.26'--- --- ------- ------ -------------------------- -------------- ------------------ 6 - ---- ----- --- ---------------- -------------- ; ------ k 0 4 2 ? ?$ I 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) 1-YR POST-DEVELOPED 090802_POST Type IM24Fhr I-YR Rainfal1=3,30" Prepared by AWE Engineers Printed 10!2812010 HydroCAD® 9.00 s/n 02300 @2009 HydroCAD Software Solutions LLC Page 21 Summary for Pond MH21. MH21 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 9.36" for 1-YR event Inflow = 8.38 cfs @ 12.07 hrs, Volume= 0.174 of Outflow 8.38 cis @ 12.07 hrs, Volume= 0.174 af, Atten= 0%, Lag= 0.0 min Primary = 8.38 cfs @ 12.07 hrs, Volume= 0.174 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 190.55'0 12.07 hrs Flood Elev= 191.72' Device Routing Invert Outlet Devices #1 Primary 189.07' 24.0" Round Culvert L= 152.0'. CPP, square edge headwall, Ke= 0.500 Outlet Invert= 188.33' S= 0.0049 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior. Primary OutFlow Max=6.84 cfs @ 12.07 hrs HW=190.55' TW=189.81' (Dynamic Tailwater) t--1 =Culvert (Outlet Controls 6.84 cfs @ 3.83 fps) Pond MH21. MH21 Hydrograph 9 8 7 - --------- ------ -------- 6 --------------------------- N O u 4- 3- " 2- 1 " 1 2 3 4 6 6' 7 8 9 1011 1213141516171819 ; 2d 21 22 2324 25 26 27 28 29 360- 31 32 33 34 35 36 37 38 3940 0 Time (hours) M In ow 0 Primary r 1-YR POST-DEVELOPED 090802 POST Type III24r hr I-YR Rainfall=3.30" Prepared by AWB Engineers Printed 1012812010 HydroCAD0 9.00 sin 02300 0 2009 HydroCAD Software Solutions LLG Page 22 Surnmary for Pond MH23: MH23 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 2.46" for 1-YR event Inflow = 3.89 cfs @ 12.08 hrs, Volume= 0.471 of Outflow = 3.89 cfs @ 12.08 hrs, Volume= 0.471 af, Atten= 0%, Lag= 0.0 min Primary -. 3.89 cfs @ 12.08 hrs, Volume= 0.471 of Routing by Dyn-Stor-Ind method, Time Span= 0.00.40.00 hrs, dt= 0.01 hrs Peak Elev= 193.19'@ 12.08 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.12' 12.0" Round Culvert L= 328.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' S= 0.0043r Cc= 0.900 n= 0.013 Primary OutFlow Max=3.89 cfs @ 12.08 hrs HW=193.19' TW-0.00` (Dynamic Tailwater) t--1=Culvert (Barrel Controls 3.89 cfs @ 4.95 fps) Pond MH23: MH23 1-YR POST-DEVELOPED 090802_POST Type IN2SFhr I- YR. Rainfa11=3.30- Prepared by AWS Engineers Printed 1012812010 HydroCAD@ 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24: MH24 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 9.36" for i-YR event Inflow = 8.38 cfs @ 12.07 hrs, Volume= 0.174 of Outflow 8.38 cfs @ 12.07 hrs, Volume= 0.174 af, Atten= 0%, Lag= 0.0 min Primary = 4.71 cfs @ 12.07 hrs, Volume= 0.129 of Secondary= 3.67 cfs @ 12.07 hrs, Volume= 0.045 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.40 hrs, dt= 0.01 hrs Peak Elev= 189.81"@ 12.07 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0° Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.0049'/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.00' 24.0" Round Culvert. L= 25.0' CPP, square edge headwall, Ko= 0.500 Outlet Invert= 187.00' S= 0.0800'1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=4.70 cfs @ 12.07 hrs HW=189.81' TW=188.64 (Dynamic Tailwater) t--1=Culvert (Barrel Controls 4.70 cfs @ 4.09 fps) Secondary OutFlow Max=3.65 cfs @ 12.07 hrs HW=189.81' (Free Discharge) t_2=Culvert (Inlet Controls 3.65 cfs @ 3.06 fps) Inflow M Outflow 111 Primary Secondary 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) 1-YR POST-DEVELOPED 090802_POST Type 11124-hr l-YR Rainfall-3.30" Prepared by AWE Engineers Printed 1012812010 HydroCAD® 9.00 s1n 02304 @ 2009 HydroCAD Software Solutions LLC Page 24 Summary for Pond 0-3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72%o Impervious, Inflow Depth= 1.83" for 1-YR event Inflow = 7.04 cfs @ 12.09 hrs, Volume= 0.320 of Outflow = 0.80 cfs @ 12.49 hrs, Volume= 0.320 af, Atten= 89%, Lag= 24.0 min Discarded 0.80 cfs @ 12.49 hrs, Volume= 0.320 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 189.26'@ 12.49 hrs Surf.Area= 5;731 sf Storage= 6,013 cf Flood Elev= 190.50' Surf.Area= 7,706 sf Storage= 14,309 cf Plug-Flow detention' time= (not calculated: outflow.precedes inflow) Center-of-Mass det. time= 67.8 min ( 874.4 806.7 ) Volume Invert Avall.Storage Storage Description #1 188.00' 14,309 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sy-ft) (cubic-feet) (cubic-feet) 188.00 3,797 0 0 189.00 5,314 4,556 4,556 190.00 6,893 6,104 10,659 190.50 7,706 3,650 14,309 Device Routing Invert Outlet Devices #1 Primary 189.50' 8.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 186.00' Discarded OutFlow Max=0.80 cis @ 12.49 hrs HW=189.26' (Free Discharge) t--2=Exfiltration ( Controls 0.80 c€s) Primary OutFiow Max=0.00 cfs @ 0.00 hrs HW=188.00' (Free Discharge) t-1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1-YR POST-DEVELOPED 09.0802-POST Type 11124-hr f-YR Ralnfall-3.30- Prepared by AWS Engineers Printed 1012812010 HydroCA00 9.00 sln 02300 Q 2009 HydroCAD Software Solutions LLC Patio 25 Pond 0-3: INFILTRATION BASIN Hydrograph Inflow 2 Outflow 99 Discarded M Primary i 1- AM cis T , J 0 2 4 8 8 Tt) 12 14 16 18? 20 422 2 4 26 28 30 3,2 34 `36 38 4D Time (hours) 1-YR POST-DEVELOPED 090802_POST Type/// 24-hr 9-YR Rainfa/1=3.30" Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 26 Summary for Link E-LSi: EXISTING LIFT STATION Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth 2.46". for 1-YR event Inflow - 3.89 cfs @ 12.08 hrs, Volume 0.471 of Primary = .3.89 cfs @ 12.08 hrs, Volume= 0.471 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-40.00 hrs, dt 0.01 hrs Link E-LS1: EXISTING LIFT STATION CB E Liz` IL I EXISTING LIFT STATION 3 PAVEMENT ca, H2 , n, c8; MN E-CB5 MH2O E-MH6? I. ca ce, ' \ 3 ROOFTOP "B" C 1 C 0 ROOFTOP "D" Q CB M 21 B2 ? CE3'1 GE2 CE1 i ROOFTOP "E" ROOFTOP "C" AND "E" ROOFTOP 'C" AND "E" ROOFTOP "C" AND "E" B. LQ ;5\ A MH24 INFILTRATION BASIN ROOFTOP "A'& GRASSED AREA n Subcar.% Reach; Pond\, Link Drainage Diagram for 090802 POST Prepared by AWB Engineers, Printed 10/28/2010 HydroCAEM 9.00 sin 02300 © 2009 HydroCAD Software Sofuflons. LLC 1-INCH STORM EVENT 090802_POST Prepared by AWB Engineers Printed 10/2612010 HydroCAD@ 9.00 stn 02300 © 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment numbers) 1.097 61 >75% Grass cover, Good, HSG B (A) 1.142 98 (CEi, CE2, D) 0.438 98 Paved parking & roofs (BI, 112) 1.413 98 Paved parking, HSG B (8S, A) 0.308 98 Unconnected. roofs, HSG B (CE3) 4.398 TOTAL AREA 090802 POST Prepared by AWE Engineers HydroCAD0 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC 1-INCH STORM EVENT Printed 10/2812010 Pane 3 Pipe Li sting (all nodes) Une# Node In-invert Out-invert Length slope n DiamMlidth Height Number (feet) (Feet) (feet) (ftlft) (inches) (inches) 1 C820 192.43 191.47 135.0 0.0071 0.013 15.0 0.0 2 CB21 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 CO 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E-CB5 193.28 189.64 140.0 0.0260 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 6 MH20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 MH20 189.80 189.07 148.0 0.0049 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 9 MH23 189.12 187.70 328.0 0.0043 0.013 12.0 0.0 10 MH24 188.33 187.67 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.00 187.00 25.0 0.0800 0.013 24.0 0.0 I-INCH STORM EVENT 090802 POST Type I//24-hr 9.9- Rain fallm 1. 00 Prepared by AWB Engineers Printed 10128/2010 HydroCAD® 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-40.00 hrs, dt=0.01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Dyn-Stor-Ind method - Pond routing by Dyn-Stor-End method Subcatchment 8S: PAVEMENT Runoff Area=27,626 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=175' Slope=0.0100 1' Tc=5.0 min CN=98 Runoff=0.58 cfs 0.042 of Subcatchment A: ROOFTOP "A" $ GRASSED Runoff Area=81,726 sf 41.51% Impervious Runoff Depth=0.04" Flow Length=50' Slope=0.0200 T Tc=7.4 min CN=76. Runoff=0.01 cfs 0.006 of Subcatchment B1: ROOFTOP "B" Runoff Area=9,371 sf 100.00%a Impervious Runoff Depth=0.79- Flow Length=50' Slope=0.0200 T Tc=5.0 min CN=98 Runoff=0.20 cfs 0.014 of Subcatchment B2: ROOFTOP "B" Runoff Area=9,706 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0200 T Tc=5.0 min CN=98 Runoff=0.21 cfs 0.015 of Subcatchment CE1: ROOFTOP '"C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100 T Tc=5.0 min . CN=98 Runoff=0.27 cfs 0.020 of Subcatchment CE2: ROOFTOP "C" AND "E" Runoff Area=26,300 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100 '1' Tc=5.0 min CN=98 Runoff=0.56 cfs 0.040 of Subcatchment CE3: ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98. Runoff=0.28 cfs 0.020 of Subcatchment D: ROOFTOP "D" Runoff Area=10,552 sf 100.00% Impervious Runoff Depth=0.79" Flow Length=50' Slope=0.0100'1' Tc=5.0 min CN=98 Runoff=0.22 cfs 0.016 of Pond CB20: CB20 Pond C821: CB21 Pond CO: CO Pond E-CBS: E-CBS Pond E-MH6: E-MH6 Pond MH20: MH20 Pond MH21.- MH21 Pond MH23: MH23 Peak Elev=192.94' Inflow=1.05 cis 0.075 of 18.0" Round Culvert n=0.013 L=135.0' 5=0.0071 T Outflow=1.05 cfs 0.075 of Peak Elev=192.03` Inflow=1.34 cfs 0.096 of 18.0" Round Culvert n=0.013 L=66.0' 5=0.0071 T Outflow=1.34 cfs 0.096 of Peak EIev=193.39' lnflow=0.50 cfs' 0.035 of 15.0" Round Culvert n=0.013 L=80.0' 5=0.0071 T Outflow=0.50 cfs 0.035 of Peak EIev=195.00' Storage=0 cf lnflow=0.58 cfs 0.042 of Primary=0.58 cfs 0.042 of Secondary=0.00 cfs 0.000 of 0utflow=0.58 cfs 0.042 of Peak EIev=190.44' inflow=1.92 cis 0.137 of 24.0" Round Culvert n=0.013 L=81.0' S=0.0049 T Outflow=1.92 efs 0.137 of Peak EIev=190.16' Inflow=2.12 cfs ©.152 of Primary=1.57 cfs 0.145 of Secondary=0.55 cfs 0.006 of Outflow=2.12 cfs 0.152 of Peak Elev=189.49' Inflow=0.76 cfs 0.021 of 24.0" Round Culvert n=0.013 L=152.0' S=0.0049 T Outflow=0.76 cfs 0.021 of Peak Elev=189.92' Inflow-1.57 cfs 0.145 of 12.0" Round Culvert n=0.013 L=328.0' S=0.0043"/' Outflow=1.57 efs 0;145 of 1-INCH STORM EVENT 090802_POST Type 11124-hr 7.0" RainfalIzI.00" Prepared by AWB Engineers . Printed 10/2812010 Hydro CADO 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Page 5 Pored MH24 MH24 Peak Elev=188.80' Inflow=0.76 cfs 0.021 of Primary=0.76 cfs 0.021 of Secondary=0.00 cfs 0.000 of Outflow=0.76 cfs 0.021 of Pond 0-3: INFILTRATION BASIN Peak Elev=188.03' Storage=124 cf Inflow=0.76 cfs 0.027 of Discarded=0.36 cfs 0.027 of Primary=0.00 cfs 0.000 of Outflow=0.36 cfs 0.027 of Link E-LS7: EXISTING LIFT STATION Inflow=1.57 cfs 0.145 of Primary=1.57 cfs 0.145 of Total Runoff Area = 4.398 ac Runoff Volume = 0.1722 of Average Runoff Depth = 0.47" 24.95% Pervious = 1.097 ac 75.05% Impervious = 3.301 ac 1-INCH STORM EVENT 090802 POST Type III 24-hr 1.0- Rainfall-LOO" Prepared by AWE Engineers Printed 1012812010 HydroCAD® 9.00 s!n 02300 © 2009 H droCAD Software Solutions LLC Page 6 Summary for Subcatchment 8S: PAVEMENT Runoff - 0.58 cfs @ 92.07 hrs, Volume= 0.042 af, Depth= 0.79" Runoff by SCS TR-20 method, t1H=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1.0" Rainfall=1.00- Area (sf) CN Description 27,626 98 Paved parking, HSG B 27,626 100.00% Impervious Area . Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 s0 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 9.0 125 0.0100 2.03 Shallow Concentrated Flow, Paved Kv= 20.3 fps 1.8 175 Total, Increased to minimum Tc = 5.0 min Subcatchment 8S: PAVEMENT Hydrograph 0.65-: Runoff 6.58 cfc 0.6- Type 111 24-hr 1.0 0.55 , -------- ------------ _... -- ---- ----. . 0:5 a - --- --Rainfall 1?.00'? 0.45= Runoff Area=27,626 sf 0.4 Runoff Volume :0.042 of 0.35 Runoff Depth= IF -- -- -- -- ---- -- LL 0.3 Flow_ Length .175'_ ---- 1 0.25_ , SI'ope, 0.0'1.00 '1'.. 0.2- - Tc CN=9S ---- -' ---- --- ------------ --- - --- ------------- 0.05-: , .,..,, : ,,,,,,, .. , 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2930 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802_POST Type /Y24-hr L0" Rainfal/=1.00" Prepared by AWS Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Saftware Solutions LLC Pa e 7 Summary for Subcatchment A: ROOFTOP "A" & GRASSED AREA Runoff = 0.01 cfs aQ 12.51 hrs, Volume= 0.006 af, Depth= 0.04 Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40,00 hrs, dt= 0.01 hrs Type III 24-hr 1.0 Rainfall=1.00" Area (sf) CN Description 33,925 98 Paved parking, HSG B 47,801 61 '75% Grass cover, Good, HSG B 81,726 76 Weighted Average 47,801 58.49% Pervious Area 33,925 41.51% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) . {ft/sec) (cfs) 7,4 50 0.0200 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.90" Subcatchment A: ROOFTOP "A" & GRASSED AREA Hydrograph 0.013 Runoff -- --- 0.01'k - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.012 0.011 Type I 1124-h r 7.0 - ---------- ------- ------- ------- --- -Rainfall-1.0.0- _. 0.01- 0,009- Runoff Area. sf -- ------------- Runoft VoFume-0.006 a " 0.008- 0.007 Runoff Depth-0.04" 4r CD 0.006 Flow Length=50` 0.005- Slope=0.0200'1' 0.004 - -- a ---- - - - ---To*T4 mi:n 0.003 [; I ,1 - CN=76 0.002 1 0.001-' 0 0 1 2,3 4 5 6 7 8 91011121314151 6 17 18192021 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3,8 39 40 Time (hours) 1-INCH STORM EVENT 090802 POST Type I// 24-hr f.0 Rainfall= 1_00 Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 sIn 02300 a 2009 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment B9: ROOFTOP "B" Runoff - 0.20 cfs (a? 12.07 hrs, Volume= 0.014 af, Depth= 0,79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1.0" Rainfall=1.00" Area (sf) CN Description 9,371 98 Paved parking & roofs 9,371 100.00% Impervious Area . Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftfsec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0,011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment B7: ROOFTOP "B" Hydrograph ------------------------------------------ 0.22- 0.21 o.zo cts - --- --- -- - - - 1.0 T @ -111-24---hr - p 0.19 1 , J 0.18 :00" Rainfall- 0.17 : ---- -=-------- --- -'- --- ---- -- -'1 0.,6 371 sf Runoff :Area=9 0.15- , ._,.. 0.14- -- --- ---- -----Runoff Volume=0.0'14.af - 0.13 - -- -•-- - - - - 0.12- Runoff Depth-0.79" 0.11 0.1 -- ----- ----- --------- - -- - -- - ----------- ------------- ---------- ------------- -------- --------------------------- -------- - --------------------- -------- ow Length=50'_ 00.09- 0.08 - - Slope=0.0200 T -- 0.07 0.06- -- - - --- ------------ - ----- --=-,-- ---- -- -- Tc=5.0 min 0.05 . ' - - -- -.- -- _ C N-9S - - 0.04 --.r - --- ------ - 0.03 0.02 - --- 0.01 r T --?'T 1 -_r ? ,- , -•,-..?--?-;-,-- - - - •; 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30.3132 33 34 35 36 37 38 39 40 Time (hours) 10 Runoff r 1-INCH STORM EVENT 090802_POST Type 1/1 24-hr ;r.0" Rainfa//=7x00" Prepared by AWB Engineers Printed 10/2812010 HydroCADO 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC pa e 9 Summary for Subcatchment B2. ROOFTOP "B" Runoff = 0.21 cfs @ 12,07 firs, Volume= 0,015 af, Depth= 0.79"° Runoff by SCS TR-20 method, UH=SCS, Time Span= 0,00-40,00 hrs, dt= 0.01 hrs . Type III 24-hr 1.0" Rainfall=1.00 Area (sf) CN Description 9,706 98 Paved parking & roofs 9,706 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftift) (Riser-) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment 132. ROOFTOP "B" " Hydrograph 0.23 ---------------------------- ----- -- --- ---- ------------ ------------------------------------------------------ ------------- - FE I Runoff ii, 0,21' ' 0.21 cis 0.2 Type 111 24 hr 1 r: 0" 0.19- ; . -; -..._... 0.18 ------ --------------------- 5 -.. Rainfall 1.00" -- --- a.17 : - 0.16- --------- __ Runoff Area=9 7 06 sf 0.14: " , . i j Volume=0 015 of m 0.13 w U 0.12 _ . - R unoff Depth-0:7J 0.11 " .° 0.1 . Flow Len9th=50' 0.09 - fl.flB= fl7 - fl _ ------------------ -- - Slope-0:02Q0 'L' - : , : 0.06 - - TC=5 0 min fl.05 0,04 . . . r _CN 98 0.03- OM: ---------------------- i 0.01- Tom' y 0 . ? ..,...,... ".. ., - ,. 0 1 ? ? 2 3 4 5 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) 1-INCH STORM EVENT 090802 POST Type III24hr 1.0" Rainfall=1.00" Prepared by AWB Engineers printed 10/2812010 HydroCAD0 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CEi: ROOFTOP "VE AND "E"' Runoff = 0.27 cfs @ 12.07 hrs, Volume= 0.020 af, Depth 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1.0" Rainfall=1,00" Area (sf) CN Description * 12,896 98 12,896 100.00% Impervious Area Tc . Length Slope Velocity Capacity Description (min) (feet) (Rift) (ft/sec) (cfs) 0.8 s0 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 80 Total, Increased to minimum Tc = 8.0 min Subcatchment CE1: ROOFTOP "C" AND -15" Hydrograph 0.3- ®Runoff ------------------- --- . Q.28 u 27 ? - --------------------------------- - -- -- --------- 0.26 Type 111 24=hr T 0., -- ------------ --- - - --- 0.24 Rainfall .1.00" ._.. -- Q.22 -----Runoff-Area=1 2,$96,sf ---------------------------------- ---- ---------------------------- 0.2- Runoff =0 020 a1 0.18 - 0.16- Runoff Depth 0.79 0 0.14 Flow Length=50' Q.12 ? .? Slope=0.0100 'l 0.1 Tc=5.0'min- 0.08 Q.Q6 , CN=98 - 0.04 - 102 - Q 0 1 2 3 4 5 6 7 8 9 101112131415161T18 19 20 21 22 23 24 25 2627 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 1-INCH STORM EVENT 090802 POST Type /If 24-hr f, 0'" (Rainfall=1.00" Prepared by AWE Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Pa a 11 Summary for Subcatchment CE2: ROOFTOP "C AND "E"' Runoff = 0.56 cis @ 12.07 firs, Volume= 0.040 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1.0° Rainfall=1.001- Area (sf) CN Description * 26,300 98 26,300 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (f 1sec) (cis) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE2: ROOFTOP "C" AND -Ell Hydrograph Ll Runoff ---------- ------ ------ --- -- 0.55 -- -- ----- ------- Type III 24-hr '1.0"_ ------------- r --- ---- -------------- -------------- Runoff Area=26,300 sf 4 1 Runoff Volume=0.040 of uy.: 0.35- 0,3 {{ - { Runoff .Depth=0..79' --------------- - -- F_ow-Length-50' 025- ----- - ' - - - Slope-0.0400-1/ 0.2 Tc=5.0 min 0.1= CN=98 - - - ----- - --- ------- ---------- - --- ---- 0.05- r 0 1 2 3 4 5 6 7 $ 9 10 11 12 13 14 15 1 fi 17 18 19 2021 2 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time 1-INCH STORM EVENT 090802 POST Type 11124hr 7.0® Rainfaf/-7.00" Prepared by AWB Engineers Printed 10/28/2010 HydraCAD® 9.00 sln 02300 @ 2009 HydraCAD Software Solutions LLC Page 12 Summary. for Subcatchment CE& ROOFTOP "C" AND "E" Runoff = 0,28 cfs @ 12.07 hrs, Volume= 0.020 af, Depth= 0.78" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 1.0" Rainfall=1.00- Area (sf) CN Description 13,404 98 Unconnected roofs, HSG B 13,404 100.00% Impervious Area 13,404 100.00% Unconnected Te Length. Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 s0 0.0100 1.00 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" [3 Runoff 09 1 2 ..3..45 6 7 8 9 10111213141516171819202122232 4 25 26 27 28 29 30 31 32 33 34 35 36 37 36 39 40 Time (hours) 1-INCH STORM EVENT 090802_POST Type III2¢hr 1.0" Rainfall=1.0o° Prepared by AWB Engineers Printed 10/2812010 HydroCAD@ 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 13 Surnmary for Subcatchment D; ROOFTOP "D" Runoff. - 0.22 cfs @ 12.07 hrs, Volume= 0.015 af, Depth= 0.79" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 1.0" Rainfall= 1.00" Area (sf) CN Description * 10,552 98 10,552 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet). (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min €? Runoff 1-INCH STORM EVENT 090802 POST Type /I/24hr I.0" Rainfall=f.00" Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 14 Summary for Pond CB20: CB20 Inflow Area = 1.142 ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event Inflow = 1.05 cfs @ 12.07 hrs, Volume= 0.075 of Outflow = 1.05 cfs @ 12.07 hrs, Volume= 0.075 af, Atten= 0%, Lag= 0.0 min Primary _ 1.05 cfs @ 12.07 hrs, Volume= 0.075 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 192.94'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 192.43' 18.0" Round Culvert L= 135,0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #Prim?ary Outflow Max=1.05 cfs @ 12.07 hrs HW=192.93' TW=192.03' (Dynamic Tailwater) t--1 =Culvert (Outlet Controls 1.05 cfs @ 3.00 fps) Pond CB20: CB20 Hydrograph ?- - ---.--- 1?5 ds -- 1 r Ilf I r ' :• w I Y ? .k k 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) 1-INCH STORM EVENT 090802-POST Type I// 2¢6r 1_O" Rainfall=LOO" Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 sin 02300 ©2009 HydroCAD Software Solutions LLC Page 15 Summaryfor Pond CB21: C1321 Inflow Area = 1.450 ac,400.00% impervious, Inflow Depth= 0.79" for 1.0" event Inflow - 1.34 cfs @ 12.07 hrs, Volume= 0.096 of . Outflow = 1.34 cfs @ 12.07 hrs Volume= : 0.096 a#, Atten= 0%, Lag= 0.0 rain Primary - 1.34 cfs @ 12.07 hrs, Volume= 0.096 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 192.03' @ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 191.47' 18.0" Round Culvert L= 66.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Out Fiow Max=1.33 cfs @ 12.07 hrs HW=192.03' TW=190,44' (Dynamic Tailwater) L1=Culvert (Barrel Controls 1.33 cis @ 3.28 fps) Pond CB21: CB21 1-INCH STORM EVENT 090802 POST Type 1112¢hr 9.0" Rainfall-f.00" Prepared by AWB Engineers Printed 10/2812010 . HydroCAD@ 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 16 Summary for Pond CO: CO Inflow Area = 0.538 2c,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event Inflow 0.50 cfs @ 12.07 hrs, Volume= 0.035 of outflow = 0.50 cis @ 12.07 hrs, Volume= 0.035 af, Atten= 0%, Lag= 0.0 min Primary - 0.50 cis @ 12.07 hrs, Volume= 0.035 of . Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 firs, dt= 0.01 hrs Peak Elev= 193.39'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert . Outlet Devices #1 Primary 193.00' 15.0". Round Culvert L= 80.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 192.43' S= 0.0071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Outflow Max=0.49 cfs @ 12.07 firs HW=193,39' TW=192.93' (Dynamic Tallwater) 't-1=Culvert (Outlet Controls 0.49 cfs @ 2.28 fps) Pond CO: CO Hydrograph 0 55 - ------ ----- --- - ----- ------------------- Primary . ----------- - -- - 0.50 d - - :- 0.50 cfs - 53-ac--- floe -Area-0 -1 0.5 -- , ..--- . - --- 0 45- 39' PeakEle4=1-93 . - ° 0.4- ; . : -15.0":.. 035; ' (Round Culvert 0.3 i n=0.013 3 LL 0.25 it E: L-8- - - 0. --- --. 0" 0.2 - -. . S 0.0071 0.15= 0.1 G r' 0.05 77 t 0 1 2 3 4 5 6 7 8 910111213141516171819202122232425262728293031323334353637383940 Time (hours) 1-INCH STORM EVENT 090802_POST - Type /1124-hr 1.0" Rainfall=1.00" Prepared by. AWB Engineers Printed 1 0/2812 01 0 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond E-C]35: E-CB5 Inflow Area = 0.634.ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event inflow = 0.58 cfs @ 12.07 hrs, Volume= 0.042 of Outflow = 0.58 cfs @ 12.07 hrs, Volume= 0.042 at, Atten= 0%, Lag= 0.0 min Primary = 0.58 cfs @ 12.07 hrs, Volume= 0.042 of Secondary = 0.00 cfs @ 0.00 WS, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 195.00'@ 0.00 hrs Surf.Area= 27,622 sf Storage= 0 cf . Flood Elev= 194.42' Surf.Area= 0 sf Storage= 0 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of--Mass det. time= 0.0 min (786.9 - 786.9 ) Volume Invert Avall.Storage Storage Description #1 195.00' 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0 0 195.25 27,622 6,906 6,906 Device Routing Invert Outlet Devices #1 Primary 193.28' 12.0" Round Culvert L= 140.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S= 0.02607 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 194.42' 24.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads 93 Secondary 195.25" 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction (s) {P.rimary OutFow Max=0.00 cfs @ 12.07 hrs HW=195.00' TW=190.44' (Dynamic Tallwater) '-'1=Culvert (Passes 0.00 cfs of 4.18 cfs potential flow) t-2=Orifice/Grate (Passes 0.00 cfs of 14.44 cfs potential flow) Secondary Outflow Max=0.00 cfs @ 0.00 hrs HW=195.00' (Free Discharge) t--3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 1-INCH STORM EVENT 090802_POST Type IM 24-hr 1.0- Rainfall=f.00° Prepared by AWB Engineers Printed 10/28/2010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 18 Pond E-CB5: E-CB5 . Hydrograph ------------------------------------------------------------ ------------------------------------------------------------ --------- -------- -----`-- ------'- ------- ------ ----- -- - - ------------- > Inflow - - - El Outflow , - --------------------- 1?.5BM -- - -- ------- --- 63 ac--- Inflow-Area=0 M Prima 0.65 0.58 fl - . '-- S. da y R 0.6 - - - _Peak Elev=195.60 0.55 - ----- -------- - - - ----- - ----- ?, - ----------------------------- ------------------------- Storage - -- - -.-- - --- ---- - - 0-45- ------------------------ 1 ---------------- ----------------- -- --- ---------------------------- .-. - _ ? -- -- - ------------------ 0.4 0.4 {7 ? N 0.35- . ' -_-------- - .. 1.- -- --- -' ------------ ----------------------- t? ---------------- i .._ ----- - - ------------ 0.25 0.2 ------- ------------------------------ ------------ ---- ----------- ------ ---------- --- ------------------------ ------ 0.15 - y 0.1- ??. 0.05- 0 2 4 fi 8' 10 2 14 18 18 20 22 24 1 26 28 30 32 34 36 38 40 Time (hogs) 1-INCH STORM EVENT 090802_POST Type 11124-hr 9.0° Rainfa//=7.OD" Prepared by AWB Engineers Printed 10/28/2010 HydroCAD® 9.00 stn 02300 @ 2009 HydroCAD Software Solutions LLC Pa a 19 Summary for Pond E-MH6: E-MH6 Inflow Area = 2.084 ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event . Inflow = 1.92 cfs @ 12.07 hrs, Volume= 0.137 of Outflow 1.92 cfs @ 12.07 hrs, Volume= 0.137 af, Atten=.0%, Lag= 0.0 min Primary = 1.92 cfs @ 12.07 hrs, Volume= 0.137 of Routing by Dyn-Star-Ind method, Time Span 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 190.44'@ 12.08 hrs Flood Elev= 195.14' Device Routing Invert Outlet Devices #1 Primary 189.64' 24,0" Round Culvert L= 81.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.24' Sm O.0049'/' Cc= 0.900 n= 0.013 Primary OutFlow Max=1.90 cfs @ 12.07 hrs HW=190.44' TW=190.16' (Dynamic Tallwater) t--1 =Culvert (Outlet Controls 1.90 cfs @ 2.39 fps) Pond E-MH6: E-MH6 Hydrograph 2 N U o ? LL 6 i 2 3 4 6 6 7 8 M Inflow ® Primary 1-INCH STORM EVENT 090802 POST Type //121-hr 1.O" Rainfall=9.00" Prepared by AWB Engineers Printed 1012812010 HydroCAM5 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 20 Summary for Pond MH20: MH20 Inflow Area = . 2.299 ac,100.00% Impervious, Inflow Depth = 0.79" for 1.0" event Inflow = 2.12 cfs @ 12.07 hrs, Volume= 0.152 of Outflow - 2.12 cfs @ 12.07 hrs, Volume= . 0.152 af, Atten= 0%, Lag= 0.0 min Primary. = 1.57 cfs @ 12.07 hrs, Volume= 0.145 of Secondary= 0.55 cfs @ 12.07 hrs, Volume= 0.006 of Routing by Dyn-Stor-Ind method, Time Span= 0.00.40.00 hrs, dt= 0.01 hrs Peak Elev= 190.16' @ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.24' 12.0" Round Culvert L= 23.5' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 '1' Cc= 0.900 n= 0.013 #2 Secondary. 189.80' 24.0" Round Culvert t.= 148.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.07' S= 0.0049T Cc= 0.900 n= 0.013 Primary Outflow Max=1.56 cfs @ 12.07 hrs HW=190.16' TW=189.92' (Dynamic Taliwater) L1=Culvert (Outlet Controls 1.56 cfs @ 2.69 fps) Secondary Outflow Max=0.55 cfs @ 12.07 hrs HW-190.16" TW=189.49' (Dynamic Tallwater) t--2=Culvert (Outlet Controls 0.55 cfs @ 2.15 fps) Pond MH20: MH20 Hydrograph ® Inflow 2.12cr M Outflow F212,1 Inflow Area=2.299 ac 0 Prima Se ondary j Peak Elegy-190.16' 2 J57cf _.055cf I r. ?Yi 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) 7-INCH STORM EVENT 090802_POST Type 11/24-hr f.0" Rainfall=1.00" Prepared by AWE Engineers Printed 10128/2010 HydroCAD@ 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 21 Summary for Pond MH21: MH21 Inflow Area = 0,223 ac,100.000/a Impervious, Inflow Depth = 1.13" for 1.0" event Inflow = 0.76 cis @ 12.07 hrs, Volume= 0.021 of Outflow 0.76 cfs @ 12.07 hrs, Volume= 0.021 af, Atten= 0%, Lag= 0.0 rain Primary = 0.76 cfs @ 12.07 hrs, Volume= 0.021 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 189.49' @ 12.07 hrs Flood Elev= 191.72' Device Routing Invert Outlet Devices .#I Primary 189.07' 24.0" Round Culvert L= 152.0° CPP, square edge headwall, Ke= 0.500 Outlet Invert= 188.33' S= 0.0049 T Cc= 0,900 n= 0,013 Corrugated PE, smooth interior Primary OutFlow Max=0.75 cfs @ 12.07 hrs HW=189.49' TW=188.80'. (Dynamic Tailwater) t -I=C ulvert (Outlet Controls 0.75 cis @ 2.34 fps) Pond MH21: MH21 Hydrograph inflow 0.8 o.7sMg 07B ds1 . Primary 0.75 _ Inflows Area=0.223 ac 0.7 --------- -- --- ------ - ------- ------------ - Peak Elev- 89 49' 0.65 . 0.6 - 01 F ---- - ------ -------- 24 0.55- a y o.5= - Round Culvert V a.4s 0 04 ----. F - --n=0 0'13 . 0 3- L=152.0' 1 . 0.25 o?oos/1 s 0.2- 0.15- ---- 0.05 s' 1] 77 Z' . _.....: -ice/ 0 1 i ? . .. 3 4 5 6 7 6 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) 1-INCH STORM EVENT 090802_POST Type W 24-hr 1.0" Rainfall=9.00" Prepared by AWS Engineers Printed 10128/2010 HydroCAD@ 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 22 Summary for Pond MH23: MH23 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth .= 0.76" for 1.0" event Inflow - 1.57 cfs @ 12.07 hrs;. Volume= 0.145 of Outflow = 1.57 cfs @ 12.07 hrs, Volume= 0.145 af, Atten= 0%, Lag= 0.0 min Primary - 1.57 cfs @ 12.07 hrs, Volume= 0.145 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40,60 hrs, dt= 0.01 hrs Peak Elev= 189.92'@ 12.07 hrs Flood Elev= 195,00' Device Routing Invert Outlet Devices #1 Primary 189.12` 12.0" Round Culvert L= 328:0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' S= 0.0043T Cc= 0.900 n= 0.013 ?Primary OutFlow Max=1.57 cfs @ 12.07 hrs HW=189.92' TW=0.00' (Dynamic Tailwater) ?-I =Culvert (Barrel Controls 1.57 cfs @ 3.17 fps) Pond MH23:. MH23 M Inflow 0 Primary . T.?i 0 1 2 3 4 5 6 78 9 101112131415161718192021"22.2324 25 2627 28 2930 31 3233 34 3536 37 3839 40 Time (hours) 1-INCH STORM EVENT 090802 POST Type IU2¢hr f.0- Rainfall=f.00". Prepared by AWB. Engineers Printed 10128/2010 HydroCAD@ 9.00 stn 02300 @2009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24: MH24 Inflow Area = 0.223 ac,100.00% Im pervious, Inflow Depth = 1.13" for 1.0" event Inflow = 0.76 cfs @ 12.07 hrs, Volume= 0.021 of Outflow = 0.76 cfs @ 12.07 hrs, Volume= 0.021 af, Atten= 0%, . Lag= 0.0 min Primary 0.76 cfs @ 12.07 hrs, Volume= 0.021 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.0040.00 hrs, dt= 0.01 hrs Peak Elev= 188.80'@ 12.07 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.0049Y Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.00' 24.0" Round Culvert L= 25.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.00' S= 0.0800T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=0.75 cfs @ 12.07 hrs HW=188.80' TW=188.02' (Dynamic Tallwater) t--1=Culvert (Barrel Controls 0.75 cfs @ 2.66 fps) Secondary OutFiow Max=0.00 cfs @ 0.00 hrs HW=188.33' (Free Discharge) t-2=Culvert ( Controls 0.00 cfs) Pond MH24: MH24 Hydrograph Inflow Area=0 223 ac -' . --- r, 0.76 a.s- -- -------------- Pak El ev 188.80' 0.75- _ --------------- . . - O.7-: ------------ - ------- --------- -- -------------------------- -------- 0.65 - --- .. Q.s k: 0.55 - --- --------- - 0.5° 0.45- 0.4-' 0 -- - - ------- ---------------------------------------------------------------------------- 1. 0.25 ..- --- -------------------------- -------- ------ ------ ----------------- ---------- ----------- ---------- -- 0.15 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) ® Inflow o.tFlo. G Primary ? Sewndary 1-INCH STORM EVENT 090802_POST Type III2¢hr 1.0" Rainfall-1.00" Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 s!n 02300 @2009 HydroCAD Software Solutions LLC Page 24 Summary for Pond 0-3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72% Im pervious, Inflow Depth= 0.15" for 1.0" event Inflow - 0.76 cfs @ 12.07 hrs, Volume= 0.027 of Outflow = 0.36 cfs @ 12.15 hrs, Volume= 0.027 af, Atten= 52%, Lag= 4.6 min Discarded = 0.36 cfs @ 12.15 hrs, Volume= 0.027 of Primary -- 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 188.03'@ 12.15 hrs .Surf.Area= 3,846 sf Storage= 124 cf Flood Elev= 190.50' Surf.Area= 7,706 s€ Storage= 14,309 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of=Mass det. time= 1.0 min ( 824.3 - 823.3 ) Volume Invert Avail.Storage Storage Description .#1 188.00' 14,309 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 188.00 3,797 0 0 189.00 5,314 4,556 4,556 190,00 6,893 6,104 10,659 190.50 7,706 3,650 14,309 Device Routing Invert Outlet Devices #1 Primary 189.50' 8.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Exfiltration over Surface area Conductivity to Groundwater. Elevation = 186.00' Discarded OutFlow Max=0.36 cfs @ 12.15 hrs HW=188.03' (Free Discharge) t--2=Exfiltration ( Can 0.36 cfs) . Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=188.00' (Free Discharge) L°1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1-INCH STORM EVENT 090802_POST Type 11724-hr 1.Q" Rainfall=1.00- Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 s!n 02300 O 2009 HydroCAD Software Solutions LLC Page 25 Pond 0-3: INFILTRATION BASIN Hydrograph o.rs ?s M Inflow Outflow # Inflow Area= 2 099 r ar : . ac P y rimmary P 0.8 __ --- -- - ---- -------- --------- -- Peak Elev 1 8 8 0.75 ------ --- --- _ . -- 0.7 ---- _.-- ---- -- - - --- --- Stora9e-124-cf 0.65 --.. -- -- a.6_ 0.55 asF n 0.45 s-c as 0 0.4 El 0.35 0.3 0.25 --- ------.. -'--- -------------------- ---------------- ---------------------- 0.2 ? --- ------" 0.15' • -? ?.- ?. :. ?" ?--. .,r.,____ 0:1 0. CA, 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 4Q Time (hours) 1-INCH STORM EVENT 090802 POST Type/I/24-hr7.0° Rainfall=l.00" Prepared byAWB Engineers Printed 10/28/2010 HydroCAD8 9.04 sln 02300 @2009 HydraCAD Software Solutions LLC _ Page 26 Summary for Link E-LS1: EXISTING LIFT STATION Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 0.76" for 1.0" event Inflow = 1.57 cfs @ 12.07 hrs, Volume= 0.145 of Primary = 1.57. cfs @ 12.07 hrs, Volume= 0.145 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-40.00 hrs,. dt= 0.01 hrs Inflow ® Primary ? r ca EXISTING LIFT 3 /PAVEMENT STATION n H2...: ^ :k?ir E-CB5 MH20 E-MH67\ - n r _ If B] Ica; i A\ -- -- ; COQ o- -( U I ROOFTOP "B" C 1 C 0 ROOFTOP "D" o? 're\ M 21 _ B2 i CE3 CE2.' CE9i ROOFTOP "B" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ROOFTOP "C" AND "E" ca. H2_ A A MH24 INFILTRATION BASIN ROOFTOP "K& GRASSED AREA, A _ (Subcat) . Reach !PondLink' L ._. e 2-INCH STORM EVENT 090802 POST Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 1.097 fit >75% Grass cover, Good, HSG B (A) 1.142 98 (CE1, CE2, D) 0.438 98 Paved parking & roofs (131, B2) 1,413 98 Paved parking, HSG B (8S, A) 0.308 98 Unconnected roofs, HSG B (CE3) 4.398 TOTAL AREA 2-INCH STORM EVENT 090802_POST Prepared by AWB Engineers Printed 10/28/2010 HydroCAD® 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 3 Pipe Li sting (all nodes) Line# Node In-Invert Out-Invert Length Slope n DiamWidth Height Number (feet) (feet) (feet) (f IN (inches) (inches) 1 CB20 192.43 191.47 135.0 0.0071 0.013 18.0 0.0 2 C821 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 Co 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E-CBS 193.28 189.64 140.0 0.0260 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 6 MM20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 MH20 189.80 189.07 145.0 0.0049 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 9 MH23 189.12 187.70 328.0 0.0043 0.013 12.0 0.0 10 MH24 188.33 187.67 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.00 187.00 25.0 0.0800 0.013 24.0 0.0 2-INCH STORM EVENT 090802 POST Type 11124-hr2.0- Rainfall=2.00- Prepared by AWE Engineers Printed 10128/2010 HydroCAD@ 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-40.00 hrs, dt=0.01 hrs, 4001 points Runoff by SCS TR-20 method, UH=SCS Reach routing by Dyn-Star-Ind method - Pond routing by Dyn-Stor Ind method Subcatchment 8S: PAVEMENT Runoff Area=27,626 at 100.00% Impervious Runoff Depth=l.17- Flow Length=175' Slope=0.0100 T Tc=6.0 min CH=98 Runoff=1.25 cfs 0.094 of Subcatchment A: ROOFTOP "A" & GRASSED Runoff Area=81,726 sf 41.51% Impervious Runoff Depth=0.41" Flow Length=50' Slope=0.0200 'P Tc=7.4 min CH=76 Runoff=0.71 cfs 0.065 of Subcatchment B1: ROOFTOP "8" Runoff Area=9,371 sf 100.00% Impervious Runoff Depth=1.77' Flow Length=50' Slope=0.0200 '1' Tc=S.o min CN=98 Runoff=0.42 cfs 0.032 of Subcatchment B2: ROOFTOP "B" Runoff Area=9,706 sf 100.00% Impervious Runoff Depth=1.77" Flow Length=50' Slope=0.0200 "1' Tc=5.0 min CH=98 Runoff=0.44 cfs 0.033 of Subcatchment CE1: ROOFTOP "C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff Depth=1.77' Flow Length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.58 cfs 0.044 of Subcatchment CE2: ROOFTOP "C" AND "E" Runoff Area=26,300 sf 100,00% Impervious Runoff Depth=1,77" Flow Length=50' Slope=0.0100 '1' Tc=5.0 min CN=98 Runoff=1.19 cfs 0.089 of Subcatchment CEM ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth=1.77" Flow length=50' Slope=0.0100 T Tc=5.0 min CN=98 Runoff=0.61 cfs 0.045 of Subcatchment D: ROOFTOP "D" Runoff Area=10,552 sf 100.00% Impervious Runoff Depth=1.77" Flow Length=50' Slope=0.0100 7' Tc=5.0 min CN=98 Runoff=0.48 cfs 0.036 of Pond CB20: C820 Peak Elev=193.21' Inflow=2.26 c€s 0.169 of 18.0" Round Culvert n=0.013 L=135.0' S=0.0071 T Outflow=2.26 cfs 0.169 of Pond C821: C821 Peak Elev=192.33' Inflow=2.86 cfs 0.214 of 18.0" Round Culvert n=0.013 L=66.0' 5=0.0071 T Outflow=2.86 cfs 0.214 of Pond CO: CO Peak Elev=193.62' Inflow=1.06 cfs 0.080 of 15.0" Round Culvert n=0.013 L=80.0' 5=0.0071 T Outflow=1.06 cfs 0.080 of Pond E-C85: E-C85 Peak Elev=195.00' Storage=0 cf Inflow=1.25 cfs 0.094 of Primary=1.25 cfs 0.094 of Secondary=0.00 cfs 0.000 of Outflow=1.25 cfs 0.094 of Pond E-MH6: E-MH6 Peak Elev=190.89' Inflow=4.12 cfs 0.308 of 24.0" Round Culvert n=0.013 L=81.0' S=0.0049 T Outflow=4.12 eft 0.308 of Pond MH20: MH20 Peak Elev=190.56' Inflow=4.54 cfs 0.340 of Primary=2.31 cfs 0.300 of Secondary=2.24 cfs 0.040 of Outflow=4.54 cfs 0.340 of Pond MH21: MH21 Peak Elev=189.91' lnflow=2.68 cfs 0.073 of 24.0" Round Culvert n=0.013 L=152.0' S=0.0049 T Outflow=2.68 cfs 0.073 of Pond MH23: MR23 Peak Elev=190.20' Inflow=2.31 efs 0.300 of 12.0" Round Culvert n=0.013 L=328.0' S=0.0043 T Outflow=2.31 cfs 0.300 of 2-INCH STORM EVENT 090802_POST Type /if 24-hr 2 0- Rainfall=2.00" Prepared by AW13 Engineers Printed 10128/2010 HydroCAD® 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC Page 5 Pond MH24: MH24 Peak Elev=189,22' Inflow=2.68 cfs 0.073 of Primary=2.38 cfs 0.079 of Secondary=0.30 cfs 0.002 of Outflow=2.68 cfs 0.073 of Pond 0-3: INFILTRATION BASIN Peak Elev=1$8.47' Storage=1,972 cf Inflow=2.97 cfs 0.135 of Discarded=0.51 efs 0.135 of Primary=0.00 cfs 0.000 of Outflow=0.S1 cfs 0.135 of Link E-LS1: EXISTING LIFT STATION Inflow=2.31 cfs 0.300 of Primary=2.31 cfs 0.300 of Total Runoff Area = 4.398 ac Runoff Volume = 0.438 of Average Runoff Depth = 1.19" 24.95% Pervious = 1.097° ac 75.05% Impervious = 3.301 ac 2-INCH STORM EVENT 090802 POST Type U124-hr2.0° Rainfall=2.00" Prepared by AWB Engineers Printed 9012812010 HydroCAD0 9.00 s!n 02300 © 2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment SS: PAVEMENT Runoff - 1.25 cfs @ 92.07 hrs, Volume= 0.094 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt- 0.09 hrs Type III 24-hr 2.0" Rainfall=2.00- Area (sf) CN Description 27,626 98 Paved parking, HSG B 27,626 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 9.00 Sheet Flow, smooth surfaces n= 0.011 P2= 3.90" 1.0 125 0.0100 2.03 Shallow Concentrated Flow, Paved iKv= 20.3 fps 1.8 175 Total, Increased to minimum Tc = 5.0 min Subcatchment 8S: PAVEMENT 28 29 30 31 32 33 34 35 36 37 38 39 40 0 3 2 3 4 5 6 7 . 8 9 13d T'9 13 14 15 76-1,,7 1, 9 20 21 22 23 24 25'-26 27 Time (hours) 2-INCH STORM EVENT 090802?POST Type 11124hr2.0" Rainfall=2.00- Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 s!n 02300 O 2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment A: ROOFTOP "AX' & GRASSED AREA Runoff - 0.71 cfs @ . 12.13 hrs, Volume= 0.065 af, Depth= 0.41" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type 111 24-hr 2.0" Rainfall=2.00" Area (sf) CN Description 33,925 98 Paved parking, HSG B 47,801 61 X75% Grass cover, Good, HSG B 81,726 76 Weighted Average 47,801 58.496/. Pervious Area 33,925 41.51 % Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.4 50 0.0200 0.11 Sheet Flow, Grass- Dense n= 0.240 P2= 3.90" Subcatchment A: ROOFTOP "A" & GRASSED AREA Hydrograph 8 Runoff ... Type'lll 24-hr 2.0" - ----- ------- -- -- ------ -------- ---Rainfall-2-.00"--- Runoff Area. Sf Runoff Volume=0.065 of ----- -- -- -- -- ---- Runoff -Gepth-x,41 "-- - Flow Length=50° ----- - --- ---- --------------------- -------------------------------- Slope=0.0200 'I'- - --- -- Tc= 4--min --------------- --- r / 102 ..., E .3 .... .. ... E.. .. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) I 2-INCH STORM EVENT 090802 POST Type 11124-hr2.0" Rainfall-2.00- Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment B7: ROOFTOP "B" Runoff = 0.42 cfs @ 12.07 hrs, Volume= 0.032 af, Depth= 1.77' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0" Rainfall=2.00 Area (sf) CH Description . 9,371 98 Paved parkins & roofs 9,371 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment B7: ROOFTOP "B" 2-INCH STORM EVENT 090802_POST Type 11124-hr2.0" Rainfall=2.00- Prepared by AWE Engineers Printed 1012812010 HydroCAD® 9.00 stn 02300 @ 2009 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 82; ROOFTOP "B" Runoff - 0.44 cfs @ 12.07 hrs, Volume= 0.033 af, Depth= 1.77` Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2,0" Rainfall=2.00" Area (sf) CN Description 9,706 98 Paved parking & roofs 9,706 100,00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 50 0.0200 1.32 Sheet Flow, Smooth surfaces n=0.011 P2=3.90" 0.6 . 50 Total, Increased to minimum Tc = 5.0 min Subcatchment B2: ROOFTOP "B" Hydrograph 0.48_ ------------------------------------ 0.46 -- - a.44 cr -- - - ----- - - --- - - 0.42 Type tit 24-hr 2.0 0.4- ------ -- ------ f -- Ra1nfaIt 0.38 0.36 0.34 -- - - - ; -Run®ff.Area-9,-706 sf 0.3- - ------------- -------------------- Volume=.0.033--of ------------------- --- Runoff 0.28 - 0.26 ----- ------ - --- --- r ---- Runoff Depth--1.771---- 0.24- 0.24- --------- -- -- - --- ----- -- _.. --- -- - --.Flow-Length =50' 0.2 0.18: Shope 0 0200 'l' 0.16 - -- -- - . - -- --- - ----. 0.14- Tc-5 0 m i n 0.12- - - . - ----, ---- - -- --------------- CN=98 0.08- : 0.06 0.04- -ji ... 0.02-- _ 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3738 3940 Time (hours) Runoff 2-INCH STORM EVENT 090802 POST Type III24-hr2.0" Rainfz11=2.00- Prepared by AWS Engineers Printed 10/2812010 HydroCAD@ 9.00 stn 02300 @2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CEI * ROOFTOP "C'.' AND "E" Runoff = 0.58 cis @ 12.07 hrs, Volume 0.044 af, Depth= 1.77 Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0" Rainfall=2.00" Area (sf) CN Description * 12,896 98 12,896 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftlft) (fusee) (Cfs) .0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Totai, Increased to minimum Te = 5.0 min Subcatchment CE1- ROOFTOP "C" AND "E" Hydrograph 0.65 FEI ftunaff 0.6- -------- -------------- 0.58 cfs ------- ---------- ------ . --- -- --- - --. -. ------------ ---- ---------- -- ---------- ----- Type -Hl 24-hr 2-.0"--- 0.55- Rainfall=2.00„ - ------------------- Run®ff Area=12;-89F sf 0.45 0 044 of Runoff Volume=0 .4- . 0.35 C. _ Runoff Depth 117" ? 0.3 a ength=50' Flo .. ------ 0.25- -------- ---__SI_opa-0 0100 '1--- 0.2 . TC =5.0 min ' 0.15 -- '- ----------- 0.05- 1-2 3 4 5 6 1"8- 9 10 11 12 13 14 15 1 fi 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 6' Time (hours) 2-INCH STORM EVENT 090802_POST Type III2¢hr2.0" Rainfall=2.00" Prepared by AWE Engineers Printed 10/28/2010 HydroCADII 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC page 11 Summary for Subcatchment CE2: ROOFTOP "C" AND "E" Runoff = 1.19 cfs Q 12.07 hrs, Volume= 0.089 af, Depth= 1=- Runoff by SCS.TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type Ili 24-hr 2.0" Rainfall=2.00° Area (sf) CN Description 26,306 98 26,300 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE2: ROOFTOP "C" AND "E" Hydrograph D Runoff . .7179 Ms Type III 24-hr 2.0 - ---------- ----- - - ----- ---- Rainfall=2.00 -- - Runoff Area=26,300 sf Runoff Volume=0.089 of 2 Runoff Depth=1.77" Flow Length=50' Slope=0.0100. Tc=5.0 min CN=98. •r; ! ;; .?..f-- ''- -?-c-cc_ l ;i " ,ice •, , - 0 11 `..., .: l 0 1 2 3 4 5 6 7 S 9 1 12 13 14 15 1 fi 1'71'8 l9"2'0""2'1""2'2'23"242526'27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) 2-INCH STORM EVENT 090802 POST Type /V 24-hr 2.0' Ralnfall=2.00" Prepared by AWB Engineers Printed 10128120+10 HydroCAD@ 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment CE3: ROOFTOP "W"AND "E" Runoff = 0.61 cis @ 12.07 hrs, Volume= 0.045 af, Depth= 1.77" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Type III 24-hr 2.0" Rainfall=2.00" Area (sf) CN . Description 13,404 98 Unconnected roofs, HSG 8 13,404 100.00% Impervious Area 13,404 100.00% Unconnected Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50. Total, Increased to minimum Tc = 5.0 min Subcatchment CE3: ROOFTOP "C" AND "E" Hydrograph .. .. ... . ® Runoff 0.65 asp ? 0.6 -- -- . --- T ype'Ill 24-hr 2.0" - - -------------------------- , Rainfall=2.00" 0.5 - - -- - - -- --- --Runoff Area=43,404 sf 0.45- " . Runoff Volume=0.045 af- y 0.4 w 0 35 Runoff'Depth=1.77'• 03 Flow Length=50y..._ - 0.25- ' { Slope=0.0'i 00 '1' 0 2 v Tc=5.0 min 0.15 pp CN=9® 0.1 ----------- -- K __.-l' - ? --?. 0 1 2 3 4 5 6 7.8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) a 2-INCH STORM EVENT 090802_POST Type //124-hr2.0" Rainfall 2,00" Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment D: ROOFTOP "D" Runoff - 0.48 cfs Q 12.07 hrs, Volume= 0.038 af, Depth= 1.77^ Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-40.00 hrs, dt= 0.01. hrs Type III 24-hr 2A"Rainfall=2.00° Area (sf) CN Description 10,552 98 . ,...._.?s__„_.._.,. 10,552 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces. n= 0.011 P2= 3.90° 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment D: ROOFTOP "D" Hydrograph 0 Runoff 0.5- 0:48 cfs ----------------- -- ------ - -.--- - Type-III-24-hr-2-.-0" - 0.45 - -- -- --- --- ---- Rainfall=2.00"-- 0.4- ----------------- - - ---_--- --- .-.. Runoff Ar-ea='I 0,552f 0.35- Runoff Volume=0.036 of 03 i Runoff Depth-1.77" i° 0.25 Flow Len9th=50' -- ------------------ ----------------- - -- ------------ ---------------------------------------------- 1 - 42i^r%^--n ninn 110 a.2 0.1 0.1 0. 0 1 2 3 4 5 6 .7 8 9 10 11 12 13 14 15 16 17 18 19 20 2122 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Time (hours) r 2-INCH STORM EVENT 090802_POST Type III 24-hr 2.0° Ralnfaff=2.00" Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 14 Summary for Pond CB20: C820 Inflow Area = 1.142 ac,100.00% Impervious, Inflow - 2.26 cfs @ 12.07 hrs, Volume= Outflow 2.26 cfs @ 12.07 hrs, Volume= Primary = 2.26 cfs @ 12.07 hrs, Volume= Inflow Depth = 1.77" for 2.0" event 0.169 of 0.169 af, Atten= 0%, Lag= 0.0 min 0.169 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 193.21'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 192.43' 18.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior PrimaryOutFlow Max=2.25 cfs @ 12.07 hrs HW=193.21' TW=192°33' (Dynamic Tailwater) t--1=Culvert (Outlet Controls 2.25 cfs @ 3.51 fps) Pond CB20: CB20 Hydrograpt n U O LL 1 ... iI „1... i.. ., 7 32 33 34 35 36 37 38 39 40 0 1 2 3 ?? 4 b B 891011 12 13 14 15 161718 19 2021 22 23 24 25 2627 28 2930 31 Time (hours) 2-INCH STORM EVENT 090802_POST Type I//24-hr2.0- Rainfall 2 00° Prepared by AWB Engineers Printed 10/2812010 HydroCAD@ 9.00 sin 02300 02009 HydroCAD Software Solutions LLC Page 15 Summary for Pond CB21: CB21 Inflow Area = 1.450 ac,100.00% Impervious, Inflow Depth= 1.77" for 2.0" event Inflow - 2.86 cfs @ 12.07 hrs, Volume= 0.214 of Outflow - . 2.86 cfs @ 12.07 hrs, Volume= 0.214 af, Atten= 0%, Lag= 0.0 min Primary - 2.86 cfs @ 12.07 hrs, Volume= 0.214 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 192.33'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 191.47' 18.0" Round Culvert L= 66.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0.0071 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Outflow Max=2.86 cfs @ 12.07 hrs HMV=192.33' TW=190.88' (Dynamic Taliwater) 'LA=Culvert (Barrel Controls 2.86 cfs 0 3.92 fps) Pond CB21: CB21 Hydrograph w v 3 0 k Inflow El Primary 0 1 2 3 4 5 6 7 8 9 10111213141516171$ 192621 22 2324 25 2627 28 2930 31 3233 34 3536 37 38 39 40 Time (hours) 2-INCH STORM EVENT 090802_POST Type lll24-hr2.0" Rainfall=2.00- Prepared by AWE Engineers Printed 10/2812010 HydroCAD@ 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 16 Summary for Pond CO: CO Inflow Area = 0.538 ac, 100.00% Impervious, Inflow Depth= 1.77" for 2.0" event Inflow = 1.06 cfs @ 12.07 hrs, Volume= 0.080 of Outflow = 1.05 cfs @ 12.07 hrs, Volume= 0.080 af, Atten= 0%, Lag= 0.0 min Primary = 1.06 cfs @ 12.07 hrs, Volume= 0.080 of Routing by Dyn-Star-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 193.62'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 193.00' 15.0" Round Culvert L= 80:0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 192.43' S= 0.0071 't' Cc= 0.900 n=0.013 Corrugated PE, smooth interior Primary OutFlow Max=1.05 cfs @ 12.07 hrs HW=193.62' TW=193.21' (Dynamic Tailwater) 'LA =Culvert (Outlet Controls 1.05 cfs @ 2.56 fps) Pond CO: CO 2-INCH STORM EVENT 090802_POST Type IM24-hr2.0" Rainfall=2.00" Prepared by AWE Engineers Printed 10128/2010 HydroCAD® 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond E-CB5: E-CB5 Inflow Area = 0.634 ac,100.00% Impervious, Inflow Depth = 1.77" for 2.0" event Inflow - 1.25 cfs @ 12.07 hrs, Volume= 0.094 of Outflow = 1.25 cfs @ 12.07 hrs, Volume= 0.094 af, . Atten= 0%, Lag= 0.0 min Primary = 1.25 cfs @ 12.07 hrs, Volume= 0.094 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stowlnd method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peals Elev= 195.00'00.00 hrs Surf.Area= 27,622 sf Storage= 0 cf Flood Elev= 194.42' Surf.Area= 0 sf Storage= 0 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 0.0 min ( 766.5 - 766.5 ) Volume Invert Avail.Storage Storage Description #1 195.00' 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Sur€.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0 0 195.25 27,622 6,906 6,906 Device Routing Invert Outlet Devices #1 Primary 193.28' 12.0" Round Culvert L= 140.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S= 0.0260 T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 194.42' 24.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 195.25' 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction (s) Primary Outflow Max=0.00 cfs @ 12.07 hrs HW=195,00' TW=190.88' (Dynamic Tailwater) t-1=Culvert (Passes 0.00 cfs of 4.18 cfs potential flow) t-2=OrificelGrate (Passes 0.00 cfs of 14.44 cfs potential flow) Secondary Outflow Max=0.00 cfs @ 0.00 hrs HW=195.00' (Free Discharge) t--3=Sharp-Crested Rectangular Weir (Controls 0.00 cfs) 2-INCH STORM EVENT 090802_POST Type lll2• -hr 2.0" Rainfall =2, 00" Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Page 18 Pond E-CB5: E-CBS Hydrograph 1- w 3 0 iL 2-INCH STORM EVENT 090802 POST Type III24-hr2.0- Rainfall=2.00" Prepared by AWS Engineers Printed 10128/2010 HydroCAD0 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 19 Summary for Pond E-MH6; E-MH6 Inflow Area = 2.084 ac,100.00% Impervious, Inflow Depth = 1.77" for 2.0" event Inflow = 4.12 cfs @ 92.07 hrs, Volume= 0.308 of Outflow. - 4.12 cfs @ 12.07 hrs, Volume= 0.308 af, Atten= 0%, Lag= 0.0 min Primary - 4.12 cfs @ 12.07 hrs, Volume= 0.308 of . Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 190.89'@ 12.08 hrs Flood Elev= 195.14' Device Routing Invert Outlet Devices #1 Primary 189.64' 24.0" Round Culvert L= 81.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.24' . S= 0.0049 T Cc= 0.900 n=0.013 ?Primary OutFlow Max=4.04 cfs @ 12.07 hrs HW=190.88' TW=190.56' (Dynamic Tailwater) t-7=Culvert (Outlet Controls 4.04 cfs @ 2.82 fps) Pond E-MH6: E-MH6 Hydrograph Inflow a.z_rr Primary Inflow Area=2.084 ac Peak Elev=190.89' ---- --- ?. 24.Drr 3Round Culvert n- 0 .o, --- - ---- --- - ---- - ------ - s=o.a049 71--- 19 20 21 22 25 27 39 40 O 01 2 3 4 5 6 7 8 9 1011 12131415161718 2324 ? 26 28 29 30 3132 33 34 3536 37 38 ` Time (hours) 2-INCH STORM EVENT 090802_POST Type /i124-hr 2.0" Rainfall=2.00- Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 20 Summary for Pond MH20: MH20 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 1.77" for 2.0" event Inflow - 4.54 cfs @ 12.07 hrs, Volume= 0.340 of Outflow = 4.54 cfs @ 12.07 hrs, Volume= 0.340 af, Atten= 0%, Lag= 0.0 min Primary = 2.31 cfs @ 12.06 hrs, Volume= 0.300 of Secondary = 2.24 cfs @ 12.07 hrs, Volume= 0.040 of Routing by Dyn-Stor--Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 190.56'@ 12.07 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary. 189.24' 12.0 Round Culvert L= 23.5' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 T Cc= 0.900 n= 0.013 #2 Secondary 189.80' 24.0 Round Culvert L= 148.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.07' S= 0.0049 T Cc= 0.900 n= 0.013 Primary OutFlow Max=2.28 cfs @ 12.06 hrs HW=190.56' TW=190:19' (Dynamic Tailwater) t-'1=Culvert (Inlet Controls 2.28 cfs @ 2.91 fps) Secondary OutF'low Max=2.22 cfs @ 12.07 hrs HW=190.56' TW=789.91' (Dynamic Tailwater) L2=Culvert (Outlet Controls 2.22 cfs @ 2.99 fps) Pond MH20: MH20 Hydrograph mm5a tt5 . :1 34 Infl w Area=2 299 ac 5 . o j Peak Elev=190.56' ?- 3- -- - - - - _ ---- . - - ------_ 2.31 cfs 224o - O LL. 2- - ------ ti 0 ` 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (hours) Inflow El Outflow ® Primary Secondary 2-INCH STORM EVENT 090802_POST Type /II2¢hr2.0" Ra?nfal/--Z.QO"' Prepared by AWB Engineers Printed 10128/2010 HydroCAO@ 9.00 sin 02300 a 2009 HydroCAD Software Solutions LLC Pa a 21 Summary for Pond MM21: MH21 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 3.91" for 2.0" event Inflow = 2.68 cfs @ 12.07 hrs, Volume= 0.073 of Outflow - 2.68 cfs @ 12.07 hrs, Volume= 0.073 af, Atten= 0%, Lag= 0.0 thin Primary = 2.68 cfs @ 12.07 hrs, Volume= 01073 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 189.91' @ 12.07 hrs Flood Elev= 191.72' Device Routing Invert Outlet Devices #1 Primary 189.07' 24.0" Round Culvert L= 152.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 188.33' S= 0.0049 T Cc= 0.900 no 0.013 Corrugated PE, smooth interior Primary OutFlow Max=2.67 cfs @ 12.07 hrs HW=189.91' TW=189.22' (Dynamic Tallwater) *--l=Cuivert (Outlet Controls 2.67 cfs @ 3.15 fps) Pond MH21: MH21 Hydrograph 0 1 2 3 4 5 6 7 8 9 10111213141516171819202122232425262728293031323334353637383940 Time (hours) 4 2-INCH STORM EVENT 090802 POST Type/// 24-hr 2 0- Ralnfall=2-00" Prepared by AWS Engineers Printed 10128/2010 iHydroCAD0 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC Page 22 Summary for Pond MH23: MH23 Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 1.57" for 2.0" event Inflow = 2.31 cfs @ 12.06 hrs, Volume= 0.300 of Outflow = 2.31 cfs @ 12.06 hrs, Volume= 0.300 af, Atten= 0%, Lag= 0.0 min Primary 2.39 cfs @ 12.06 hrs, Volume= 0.300 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 firs, dt= 0.01 hrs Peak Elev= 190.20'@ 12.06 hrs Flood Elev= 995.00' Device Routing Invert Outlet Devices #1 Primary 189.12' 12.0" 'Round Culvert L= 328.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' 5=0.0043'Y' Cc= 0.900 n=0.013 Primary Outflow Max=2.30 cfs @ 12.06 hrs HW=190.19' TW=0.00' (Dynamic Tallwater) t-1=Culvert (Barrel Controls 2.30 cfs @.3.40 fps) Pond.MH23: MH23 Hydrograph . 131 s d 2.31 cFS -- ----- -- ---------------------- i + Y r v a - - k [ r 4 r 0 1 2 3 4 5 fi 7 8 9 1011 12 1314 15 1617 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3839 40 Time (hours) 2-INCH STORM EVENT 090802_POST Type 11/24-hr 2.D Rainfall=2.©O" Prepared by AWE Engineers Printed 10/2812010 HydroCAD@ 9.00 sln 02300 02009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24; MH24 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 3.91° for 2.0" event inflow = 2.68 cfs @ 12.07 hrs, Volume= 0.073 of Outflow = 2.68 cfs @ 12.07 hrs, Volume= 0.0.73 af, Atten= 0%0, Lag= 0.0 min Primary - 2.38 cis @ 12.07 hrs, Volume= 0.071 of Secondary= 0.30 cfs @ 12.07 hrs, Volume= 0.002 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrss dt= 0.01 hrs Peak Elev= 189.22'@ 12.07 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0° Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.0049 'C Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.00' 24.0" Round Culvert L= 25.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.00' S= 0.0800 11' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow M2x=2.38 cfs @ 12.07 hrs HW=989.22' TW-188.20' .(Dynamic Taliwater) t--I=Culvert (Barrel Controls 2.38 cfs @ 3.56 fps) Secondary OutFlow Max=0.30 cis @ 12.07 hrs HW=189.22' (Free Discharge) t-2=Culvert (inlet Controls 0.30 cis @ 1.60 fps) Pond MH24: MH24 El Inflow Outflow Primary I Secondary 2- v 3 0 iL 1- -? 1 3 ..2....4 6 B 10 12 14 1' 18 26 22 24 26 28 30 32 34 36 38 40 Time (hours) 2-INCH STORM EVENT 090802 POST Type III24~ hr2 O" Rainfall=2.00- Prepared by AWB Engineers Printed 10128/2010 HydroCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC Page 24 Summary for Pond 0-3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72% Impervious, Inflow Depth = 0.77" for 2.0" event Inflow - 2.97 cfs @ 12.08 hrs, Volume= 0.135 of Outflow - 0.51 cfs @ 12.45 hrs, Volume= 0.135 af, Atten= 83%, Lag= 22.0 min Discarded = 0.51 cfs @ 12.45 hrs, Volume= 0.135 of Primary = 0.00 cfs @ 0.00 hrs, Volume= . 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-40.00 hrs, dt= 0.01 hrs Peak Elev= 188.47'@ 12.45 hrs Surf.Area= 4,517 sf Storage= 1,972 cf Flood Elev= 190.50' Surf.Area= 7,706 sf Storage= 14,309 cf Plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 26.7 min (840.9 - 814.2 ) Volume Invert Avail.Storage Storage Description #1 188.00' 14,309 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 188.00 3,797 0 0 189.00 5,314 4,556 4,556 190.00 6,893 6,104 10,659 190.50 7,706 3,650 14,309 Device Routing Invert Outlet Devices #1 Primary 189.50' 8.0' long x 10.0' breadth.Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 186.00' Discarded OutFlow Max=0.51 cfs @ 12.45 hrs HW=188.47' (Free Discharge) t--2=Exfiltration ( Controls 0.51 cfs) Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=188.00' (Free Discharge) t....1=Broad-Crested Rectangular Weir (Controls 0.00 cfs) 2-INCH STORM EVENT 090802_POST Type l/l24-hr2.0^ Rainfall=2.00- Prepared by AWB Engineers Printed 1012812010 HydroCAD0 9.00 s/n 02300 © 2009 HydroCAD Software Solutions LLC Page 25 Pond 0-3: INFILTRATION BASIN Hydrograph N V 0 O LL 1] Inflow 23 Outflow Discarded 99 Primary 10-YR RATIONAL METHOD 090802 POST Prepared by AWE Engineers Printed 10/28/2010 HydroCAD0 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC Page 2 Area Listing (all nodes) Area C Description (acres) (subcatchment-numbers) 1.097 0.15 >75% Grass cover, Good, HSG B (A) 1.413. 0.95 Paved parking, HSG B (83, A) 1.142 1.00 (CE1, CE2, 0) 0.438 1.00 Paved parking & roofs (131, 132) 0.308 1.00 Unconnected roofs, HSG B (CE3) 4.398 TOTAL AREA 10-YR RATIONAL METHOD 090802 POST Prepared by AWB Engineers Printed 1 012 812 01 0 HydroCAD® 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Page 3 Pipe Listing (all nodes) Une# Node Number In-Invert (feet) Out-invert (feet) Length (feet) Slope (ftift) n DiamMidth (inches) Height (inches) i CB20 192.43 191.47 135.0 0.0071 0.013 18.0. 0.0 2 CB21 191.47 191.00 66.0 0.0071 0.013 18.0 0.0 3 CO 193.00 192.43 80.0 0.0071 0.013 15.0 0.0 4 E-C85 193.28 189.64 140.0 0.0260 " 0.013 12.0 0.0 5 E-MH6 189.64 189.24 81.0 0.0049 0.013 24.0 0.0 6 MH20 189.24 189.12 23.5 0.0051 0.013 12.0 0.0 7 MH20 189.80 189.07 148.0 0.0049 _ 0.013 24.0 0.0 8 MH21 189.07 188.33 152.0 0.0049 0.013 24.0 0.0 9 MH23 189.12 187.70 328.0 0.0043 0.013 12.0 0.0 10 . MH24 188.33 187.67 135.0 0.0049 0.013 15.0 0.0 11 MH24 189.00 187.00 25.0 0.0800 0.013 24.0 0.0 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 1O--Year Duration=5 min, Inten=S- 96 in/hr Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 s/n 02300 O 2009 HydroCAD Software Solutions LLC Page 4 Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points Runoff by Rational method, Rise/Fall=1.0/1.0 xTc Reach routing by Dyn-Stor-Ind method Pond routing by Dyn-Stor-Ind method Subcatchment 8S: PAVEMENT Runoff Area=27,626 sf 100.00% Impervious Runoff Depth=0.64" Flow Length=175' Slope=0.0100 'P Tc=5.0 min C=0.95 Runoff=4.78 cfs 0.034 of Subcatchment A: ROOFTOP "A" & GRASSED Runoff Area=81,726 sf 41.51% Impervious Runoff Depth=0.22' Flow Length=50' Slope=0.0200 'P Tc=7.4 min C=0.48 Runoff=4.83 cfs 0.034 of Subcatchment Bia ROOFTOP "B" Runoff Area=9,371 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0200 T Tc=5.0 min C=1.00 Runoff=9.71 cfs 0.012 of Subcatchment 132: ROOFTOP "B" Runoff Area=9,706 sf 100.00% Impervious Runoff Depth=0.68° Flow Length=50' Slope=0.0200 '1' Tc=5.0 min C=1.00 Runoff=1.77 cfs 0.013 of Subcatchment CE1: ROOFTOP "C" AND "E" Runoff Area=12,896 sf 100.00% Impervious Runoff. Depth=0.68" Flow Length=50' Slope=0.0100 '1' Tc=5.0 min C=1.00 Runoff=2.35 cfs 0.017 of Subcatchment CE2: ROOFTOP "C" AND "E" Runoff Area=26,300 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0100 '1' Tc=5.0 min C=1.00 Runoff=4.79 cfs 0.034 of Subcatchment CE3: ROOFTOP "C" AND "E" Runoff Area=13,404 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0100 T Tc=5.0 min C=1.00 Runoff=2.44 cfs 0.017 of Subcatchment D: ROOFTOP "D" Runoff Area =10,552 sf 100.00% Impervious Runoff Depth=0.68" Flow Length=50' Slope=0.0100 T Tc=5.0 min C=1.00 Runoff=1.92 cfs 0.014 of Pond CB20: CB20 Peak Elev=196.05' Inflow=9.07 cfs 0.065 of 18.0" Round Culvert n=0.013 L=135.0' S=0.0071 T Outflow=9.07 cfs 0.065 of Pond CB21: C621 Peak Elev=194.95' inflow=11.51 cfs 0.082 of 18.0" Round Culvert n=0.013 L=66.0' S=0.0071 T Outflow=11.51 cfs 0.082 of Pond CO: CO Peak Elev=196.39' Inflow=4.27 cfs 0.030 of 15.0" Round Culvert n=0.013 L=80.0' S=0.0071 T Outflow=4.27 cfs 0.030 of Pond E-CBS: E-CB5 Peak Elev=195.00' Storage=97 cf Inflow=4.78 cfs 0.034 of Primary=4.19 cfs 0.034 of Secondary=0.00 cfs 0.000 of Outflow=4.19 cfs 0.034 of Pond E-MH6: E-MH6 Peak Elev=193.55' lnflow=15.59 cfs 0.116 of 24.0" Round Culvert n=0.013 L=81.0' S=0.0049 '1' Outflow=15.59 cfs 0.116 of Pond MH20: MH20 Peak Elev=192.79' Inflow=17.29 cfs 0.128 of Primary=6.31 cfs 0.031 of Secondary=16.10 cfs' 0.097 of Outflow=17.29 cfs 0.128 of Pond MH21: MH21 Peak Elev=192.01' Inflow=17.81 cfs 0.110 of 24.0" Round Culvert n=0.013 L=152.0' S=0.0049 'P Outflow=17.81 cfs 0.110 of Pond MH23: MH23 Peak Elev=200.52' Inflow=6.31 cfs 0.031 of 12:0" Round Culvert. n=0.013 L=328.0' S=0.0043 T Outflow=6.31 cfs 0.031 of 10-YR RATIONAL .METHOD 090802_POST Lumberton North Carolina 90--Year Duration=5 min, /nten=g f61n1hr Prepared by AWB Engineers Printed 10128/2010 HydroCAD@ 9.00 sln 02300 O 2009 HydroCAD Software Solutions LLC page 5 Pond MH24: MH24 Peak Elev=190.62' Inf1ow=17.81 cfs 0.110 of Primary=5.95 cfs 0.052 of Secondary=11.85 cfs 0.058 of OutflowW 17.81 cfs 0.110 of Pond 0-3: INFILTRATION BASIN Peak Elev=188.79' Storage=3,469 cf Inflow=10.62 cfs 0,086 of Discarded=0.62 cfs 0.086 of Primary=0.00 cfs 0.000 of Outflow=0.62 cfs 0.086 of Link E-LS1; EXISTING LIFT STATION lnflow=6.31 cfs 0.031 of Primary=6.31 cfs 0.031 of Total Runoff Area = 4.398 ac Runoff Volume = 0.175 of Average Runoff Depth = 0.48" 24.95% Pervious = 1.097 ac 75.05% Impervious = 3.301 ac 10-YR RATIONAL METHOD 090802_POST Lumberton Nortlz Carolina 10--Year Duration=5 min, Inten=8.16 Whr Prepared by AWB Engineers Printed 1012812010 HydroCAD@ 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 6 Summary for Subcatchment 8S: PAVEMENT Runoff = 4.78 cfs @ 0.08 hrs, Volume= 0.034 af, Depth= 0.64" Runoff by Rational method, RiselFall=1.011.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumbertan,North Carolina 10-Year Duration=5 min, Inten=8.16 in/hr Area (sf) C Description 27,626 0.95 Paved parking, HSG 0 27,626 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 1.0 125 0.0100 2.03 Shallow Concentrated Flow, Paved Kv= 20.3 fps 1.8 175 Tatal, Increased to minimum Tc = 5.0 min Subcatchment 8S: PAVEMENT Hydrograph 1z-.6 N v- y O LL ? Runoff t 2 s Time (hours) 10-YR RATIONAL METHOD 090802_POST Lum6ert0n,North Carolina 10-Year Duration=S min, Inten=8.16 in/hr Prepared by AWE Engineers Printed 10/28/2010 HydroCAD@ 9.00 sln 02300 @2009 HydroCAD Software Solutions LLC Page 7 Summary for Subcatchment A: ROOFTOP "A" & GRASSED AREA Runoff - 4.83 cfs @ 0.08 hrs, Volume= 0.034 af, Depth= 0.22" Runoff by Rational method, Rise/Fall=1.011.0 xTc, Time Span= .0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.16 inlhr Area (sf) C Description 33,925 0.95 Paved parking, HSG B 47,801 0.95 >75% Grass cover, Good, HSG B 89,726 0.48 Weighted Average. 47,801 58.49% Pervious Area 33,925 4151% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (Wft) (ft/sec) (cfs) 7.4 50 0.0200 0.11 Sheet Flow, Grass: Dense n= 0.240 P2= 3.90.. Subcatchment A: ROOFTOP 'W& GRASSED AREA Hydrograph F93 R.T.ff 4 ?r ---- --------- w 3- ------------- i 2- 1 0 Lumberton,North Carolina 10-Year Duration=5 min, ---------- - ---------------- lnten=8-.16-in1hr - Runoff Area=81,726 sf Runoff Volume=0.034 of ---------------------------- Runoff Depth=0.22"-- Flow Length=50' Slope=0.0200 7° ------- ------- --- ----- --------Tc=7.4 min.- C=0.48 Time (hours) 10-YR RATIONAL METHOD 090802-POST Lumberfon North Carofhw 10-Year Duration-5 min, Inters=8. y6 in/hr Prepared by AWB Engineers Printed 10/2812010 HydroCAD0 9.00 sln 02300 © 2009 HydroCAD Software Solutions LLC Page 8 Summary for Subcatchment 131: ROOFTOP "B" Runoff = 1.71 cfs a@ 0.08 hrs, Volume= 0.012 af, Depth=' 0.68" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0,01 hrs Lumberton,North Carolina 10-Year Duration=5 min, lnten=8.16 in/hr Area (sf) C Description 9,371 1.00 Paved parking & roofs 9,371 100.00% Impervious Area Te Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 0.8 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Te = 5.0 min Subcatchment 61: ROOFTOP "B" Hydrograph w a LL . rf7 c is 'Lumberto.n,North Carolina 10-Year Duration=5 rain, Inters=8.16 in/hr Runoff Area=9,371 sf Runoff Volume=0.012 of Runoff Depth=0.68" -----------------------------------------------... ------------------------- ----------------- -----... r Flow Length=50' Slope=0.0200 T Tc=5.0 lain C=1.00 j - 0 3 2 Time (hours) 3 ? Runnff 10-YR RATIONAL METHOD 090802 POST LuMbOrton,North Carolina 10- Year Duration=5 min, Inten=I in/hr Prepared by AWB Engineers Printed 10/2812010 HydroCAD® 9.00 s/n 02300 0 2009 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 112: ROOFTOP "B" Runoff = 1.77 cfs @ 0.08 hrs, Volume=. . 0.013 af, Depth= 0.68 Runoff by Rational methad,.Rise/Fall=1.011.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, Inten=8,16 in/hr Area (sf) C Description 9,706 9.00 Paved parking $ roofs 9,706 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.6 . 50 0.0200 1.32 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.6 50 Total, Increased to minimum Tc = 5.0 min Subcatchment B2: ROOFTOP °B" Hydrograph Runoff U o ? LL a Lumberton,North Carolina 10-Year Duration=5 rain, Inten=8.16 in/hr Runoff Area=9,706 sf Runoff Volume=0.013 of Runoff Depth=0.68,. Ftow-Length=50'-- Slope=0.0200 '1` Tc=5.0 rain C=1.00 77 a i s Time (hours) 10-YR RATIONAL METHOD 090802 POST L.umberfon,North Carolina 1O-Year Duration=5 min, Inten=8.16 in/hr Prepared by AWS Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300 @ 2009 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment CE1: ROOFTOP "C" AND "E" Runoff = 2.35 cfs @ 0.08 hrs, Volume= 0.017 af, depth= 0.68" Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, lnten=8.16 inlhr Area (sf) C Description 12,896 1.00 12,896 100.00% Impervious Area Te Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0 min Subcatchment CE1: ROOFTOP "C" AND "E" Hydrograph 0 0 LL ;s L.umbert©n,North Carolina 10-Year Duration=6 min, ,_ I Inten=8.16 in/hr Runoff Area=12,896 sf J Runoff Volume=0.017 a€ Runoff Depth=0.68" Flow Length^50,. Slope=0.0100 7' -- -- ---- ------- - -------- - -- ---------. -- ----- ------------ --Tc=5.0 min-- ' i -? C=1.00 J Time (hours) Z v ® Runoff 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.96 in/hr Prepared by AWB Engineers Printed 10/2812010 Hydro=)0 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment CE2: ROOFTOP "C" AND "E" Runoff = 4.79 cfs @ 0.08 hrs, Volume= 0.034 af, Depth= 0.68° Runoff by Rational method, Rise/Fall=1.0/1.0 xTc, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Lumberton,North Carolina 10-Year Duration=5 min, lnten=8.16 in/hr Area (sf) C Description 26,300 1.00 26,300 100.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 0.8 50 0.0100 1.00 Sheet Flow, Smooth surfaces n= 0,011 P2= 3.90" 0.8 50 Total, Increased to minimum Tc = 5.0-min Subcatchment CE2: ROOFTOP "C" AND "E" Hydrograph L7 Runoff 5 4.n as Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.16 in/hr Runoff Area=26,300 sf Runoff Volume=0.034 at Runoff Depth=0.68" H 3- Flow Length=50' Slope=0.01007' E ------------------------- -------- Tc-&0 min-- z ,j' C=1.00 a i - ---- ------------------------------------------------------------- --- --------------- --------------------- - 0-1 L 0 1 2 3 Time (hours) 10-YR RATIONAL METHOD 090802_POST Lum6erton,Narth Carolina. 1O--Year Duration=5 nun, Inten=8.151n1hr Prepared by AWB Engineers Printed 1 012 812 0 1 0 HydroCADS 9.00 sln 02300 @ 2009.HydroCAD Software Solutions LLC Page 14 Summary for Pond CB20: C820 Inflow Area = 1.142 ac,100.00% Impervious, Inflow Depth = 0.68" for 10-Year event Inflow - 9.07 cfs @. 0.08 hrs, Volume= 0.065 of Outflow = 9.07 cfs @ 0.08 hrs, Volume= 0.065 af, Atten= 0%, Lag= 0.0 thin Primary = 9.07 cfs @ 0.08 hrs, Volume= .0.065 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 196.05' @ 0.10 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 192.43' 18.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.47' S= 0.0071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=7.43 cfs @ 0.08 hrs HW=195.53' TW=194.44' (Dynamic Tailwater) ?i =Culvert (Outlet Controls 7.43 cfs @ 4.21 fps) Pond CB20: C820 Hydrograph 10-YR RATIONAL METHOD 090802_POST LumbertoH Morth Carolina 70-Year Duration=5 min, lnten=8. f6 in/hr Prepared by AWE Engineers Printed 1012812010 HydroCAD® 9.00 s!n 02300 @ 2009 HydroCAD Software Solutions LLC Page 15 Summary for Pond CB21: CB21 Inflow Area = 1.450 ac,100,00% Impervious, Inflow Depth= . 0.68° for 10-Year event. Inflow - 11.51 cfs @ 0.08 hrs, Volume= 0.082 of Outflow = 11,51 cfs @ 0.08 hrs, Volume= 0,082 af, Atten= 0%, Lag= 0.0 min Primary = 11.51 cfs @ 0,08 hrs, Volume= 0,082 of Routing by Dyn-Star-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 194.95'0 0.09 hrs Flood Elev= 195,00` Device Routing Invert Outlet Devices #1 Primary 191.47' 18.0" Round Culvert L= 66.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 191.00' S= 0.0071 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFiow Max=9.07 cfs @ 0.08 hrs HW=194.44' TW-193.31' (Dynamic Tailwater) =Culvert (Inlet Controls 9.07 cfs @ 5.13 fps) Pond CE21: CB21 Hydrograph ----------------- -------- ------------ - 0 Inflow LCf. ' ® Primary 12 „5, Inflow Area-1.450 ac it- - --- ---- -------- - ----- ----.-- -- .....- -------- - - - --------- --------- --.-..------ Peak Elev=194.95' --------- -------- ----- -- - - ---- ------ .18 - Culvert - -- ------------------------ -- --- 7---- --- -- --------- ---------------- - 0 6 - - L=66.0"-- 4- t? 3- f is 2- - - .. ........ U 1 2 3 Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 10-Year Daration=5 min, Inten=8.16 in/hr Prepared by AWE Engineers Printed 10128/2010 HydroCAD® 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 16 Summary for Pond CO: CO Inflow Area = 0.538 ac,100.00% Impervious, Inflow Depth = 0.68" for 10-Year event Inflow = 4.27 cfs @ 0.08 hrs, Volume= 0.030 of Outflow = 4.27 cfs @ 0.08 hrs, Volume= 0.030 af, Atten= 0%, Lag= 0.0 min Primary = 4.27 cfs @ 0.08 hrs, Volume 0.030 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs; dt= 0.01 hrs Peale Elev= 196.39' @ 0.11 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 193.00' 15.0" Round Culvert L= 80.0'. CPP, square edge headwall, Ke= 0.500 Outlet Invert= 192.43' S= 0.0071 'P Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=0.00 cfs @ 0.08 hrs HW=195.45' TW=195.53' (Dynamic Tailwater) =Culvert ( Controls 0.00 cfs) Pond CO: CO Hydrograph . N o. UL 4.27 cls 4 t { 3? 2- f i 0 Time (hours) Inflow Area=0.538 ac Peak Elev=196.39° 15.0" Round Culvert n=0.013 L=80.0° S=0.0071 T i 2 3 Inflow 10 Primary : 10-YR RATIONAL METHOD 090802_POST Lumberton,IVorth Carolina 100-Year Duration=5 min, Inten=&fS in/hr Prepared by AWB Engineers Printed 10/28/2010 HydroCAD@ 9.00 sin 02300 @_2009 HydroCAD Software Solutions LLC Page 17 Summary for Pond E-CB5: E-CB5 Inflow Area = 0.634 ac,100.00% Impervious, Inflow Depth = 0.64" for 10-Year event Inflow = 4.78 cfs @ 0.08 hrs, Volume= 0.034 of Outflow 4.19 cfs @ 0.08 hrs, Volume= 0.034 af, Atten= 12%, Lag= 0.0 min Primary . = 4.19 cis @ 0.08 hrs, Volume= 0.034 of Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 195.00' @ 0.11 hrs Surf.Area= 27,622 sf Storage= 97 cf Flood Elev= 194.42' Surf.Area= 0 sf Storage= 0 cf plug-Flow detention time= (not calculated: outflow precedes inflow) Center-of-Mass det. time= 0.2 min ( 5.2 - 5.0 ) Volume Invert Avall.Storage Storage Description #1 195.00' 6,906 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 195.00 27,622 0 0 195.25 27,622 6,906 6,906 Device Routing Invert Outlet Devices #1 Primary 193.28' 12.0" Round Culvert L= 140.0' CRP, square edge headwall, Ke= 0.500 Outlet Invert= 189.64' S= 0.0260'1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Device 1 194.42' 24.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Secondary 195.25' 100.0' long Sharp-Crested Rectangular Weir 2 End Contraction(s) Primary OutFlow Max=3.72 cfs @ 0.08 hrs HW=195.00' TW=192.95' (Dynamic Tailwater) t--I=Culvert (Outlet Controls 3.72 cis @ 4.73 fps) t 2=OrificelGrate (Passes 3.72 cfs of 14.46 cfs potential flow) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=195.00' (Free Discharge) L3=Sharp-Crested Rectangular Weir ( Controls 0.00 cfs) 10-YR RATIONAL METHOD 090802_POST Lumberton North Carolina 9U-Year Duration-5 min, Inten=S. 16 in/hr Prepared by AWS Engineers Printed 1 0/281201 0 HydroCAOO 9.00 sin 02300 © 2009 HydroCAD Software Solutions LLC Page 18 Pond E-CBS: E-CB5 Hydrograph a 3 O Lt. 10-YR RATIONAL METHOD 090802_POST Lumberton, Aforth Carolina 10-Year Duration=5 min, Inten=8.16 in/hr Prepared by AWB Engineers Printed 10/2812010 HydroCAD@ 9.00 s/n 02300 @ 2009 HydroCAD Software Solutions LLC page 19 Summary for Pond E-MH6: E-MH6 Inflow Area = . 2.084 ac,100.00% Impervious, Inflow Depth = 0.67° for 10-Year event Inflow = 15.59 cfs @ 0.08 hrs, Volume= 0.116 of Outflow _ 15.59 cfs @. 0.08 hrs, Volume= 0.116 af, Atten= 0%, Lag= 0.0 min Primary = 15.59 cfs @ 0.08 hrs, Volume= 0.116 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 193.55'@ 0.10 hrs Flood Elev= 195.14` Device Routing Invert Outlet Devices #1 Primary 189.64' 24.0". Round Culvert L= 81.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.24' S= 0.0049'1' Cc= 0.900 n= 0.013 Primary OutFow Max=12.96 cfs @ 0.08 hrs. HW=193.27' TW=192.54" (Dynamic Tailwater) t--1=Culvert (inlet Controls 12.96 cfs @ 4.13 fps) El Inflow U Primary 10-YR RATIONAL METHOD 090802_POST Lumberton, North Carolina 70- Year Duration=5 min, Inten=S. f6 in/hr Prepared by AWB Engineers Printed 1012812010 HydroCAD® 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 20 Summary for Pond MH20. MH20 Inflow Area 2.299 ac,100.00% Impervious, Inflow Depth = 0.67" for 10-Year event Inflow = 17.29 cfs @ 0.08 hrs, Volume= 0.128 of Outflow = 17.29 cfs @ 0.08 hrs, Volume= 0.128 af, Atten= 0%, Lag= 0.0 min Primary - 6.31 cfs @ 0.08 hrs, Volume= 0.031 of Secondary = 16.10 cfs @ 0.09 hrs, Volume= 0.097 of Routing by Dyn-Star-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 192.79'@ 0.09 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.24' .12.0° Round Culvert L= 23.5' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.12' S= 0.0051 '1' Cc= 0.900 n= 0.013 ##2 . Secondary 189.80' 24.0" Round Culvert L= 148.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 189.07' S=0.0049'1' Cc= 0.900 n=0.013 Primary OutFlow Max=0.00 cfs @ 0.08 hrs HW =192.52' TW=200.52' (Dynamic Tailwater) t_1=Culvert (Controls 0.00 cfs) Secondary OutFlow Max=12.43 cfs @ 0.09 hrs HW=192.76' TW=191.94' (Dynamic Tailwater) t-2=Culvert (Outlet Controls 12.43 cis @ 3.96 fps) Inflow - Oukflow Ej Primary rI Secondary Time (hours) 10-YR RATIONAL METHOD 09.0802_POST Lumberton,North Carolina 90-Year Duration=5 min, Inten=8.96 in/hr Prepared by AWS Engineers Printed 10128/2010. HydroCAb® 9.00 sin 02300 @_2009 HydroCAD Software Solutions LLC Page 21 Summary for Pond MH21: MH21 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 5.90" for 10-Year event Inflow - 17.81 cfs @ 0.09 hrs, Volume=. 0.110 of Outflow = 17.81 cfs @ 0.09 hrs, Volume= 0.110 af, Atten= 0%, Lag= 0.0 min Primary = 17.81 cfs @ 0.09 hrs, Volume= 0.110 of Routing by Dyn-Star-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 192.01'@ 0.09 hrs Flood Elev= 191.72' Device Routing Invert Outlet Devices #1 Primary 189.07' .24.0" Round Culvert L= 152.0' CPP, square edge headwall, 1(e= 0.500 Outlet Invert= 188.33' S= 0.0049T Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary Outflow Max=16.01 cfs @ 0.09 hrs HW=191.94' TW=190.57' (Dynamic Tailwater) t--1 =Culvert (Outlet Controls 16.01 cfs @ 5.10 fps) Pond MH21: MH21 Hydrograph N U 3 a LL 5 4 3 i 2- . _r ]-flaw FM-1 --fl -- 10 Primary 1 2 3 Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 10-Year Duration=5 min, Inten=8.76 in/hr Prepared by AWB. Engineers Printed 1012812010 HydroCAD® 9.00 s/n 02300 02€109 HydroCAD Software Solutions LLC Page 22 Summary for Pond MH23: M.H23 Inflow Area . 2.299 ac,100.00% Impervious, Inflow Depth = 0.16" for 10-Year event Inflow = 6.31 cfs @ 0.08 hrs, Volume= 0.031 of Outflow = 6.31 cfs @ 0.08 hrs, Volume= 0.031 af, Atten= 0%, Lag= 0.0 min Primary 6.31 cfs @ 0.08 hrs, Volume= 0.031 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 200-52'@ 0.08 hrs Flood Elev= 195.00' Device Routing Invert Outlet Devices #1 Primary 189.12' 12.0° Round Culvert L= 328.0'. CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.70' S= 0.00437 Cc= 0.900 n= 0.013 Primary OutFlow Max=6.31 cfs @ 0.08 hrs HW=200.52' TW=0.00' (Dynamic Tailwater) t--1 =Culvert (Barrel Controls 6.31 cfs @ 8.03 fps) Pond MH23: MH23 Hydrog raph ------------------------------------------------------------- w 4- Y F ----------------------------------- ------------------ 0 LL 3 0 Primary Inflow Area=2.299 ac -------- Peak- Elev=20-0,52'---- 12.0" --- --------------------------------------- R®und Culvert --=---------------------- - -- - n=0.x'13 L=328.0' Inflow Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton, North Carolina 10--Year Duration=5 min, Inten=8,161n1hr Prepared by AWB Engineers Printed 10/2812010 HydroCAD@ 9.00 sin 02300 @ 2009 HydroCAD Software Solutions LLC Page 23 Summary for Pond MH24: MH24 Inflow Area = 0.223 ac,100.00% Impervious, Inflow Depth = 5.90" for 10-Year event Inflow = 17.81 cfs @ 0.09 hrs, Volume= 0.110 of Outflow W 17.81 cfs @ 0.09 hrs, Volume= 0.110 af, Atten= 0%, Lag= 0.0 min Primary = 5.95 cfs @ 0.09 hrs, Volume= 0.052 of Secondary = 11.85 cfs @ 0.09 hrs, Volume= 0.058 of Routing by Dyn-Star-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 190.62'@ 0.09 hrs Flood Elev= 193.00' Device Routing Invert Outlet Devices #1 Primary 188.33' 15.0" Round Culvert L= 135.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.67' S= 0.00497 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior #2 Secondary 189.00' 24.0" Round Culvert L= 25.0' CPP, square edge headwall, Ke= 0.500 Outlet Invert= 187.00' 5=0.0800'/' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior Primary OutFlow Max=5.89 cfs @ 0.09 hrs HW=190.58' TW=188.47' (Dynamic.Tailwater) t°-9 =Culvert (Barrel Controls 5.89 cfs @ 4.80 fps) Secondary Outflow Max=11.24 cfs @ 0.09 hrs HW=190.57' (Free Discharge) t-2=Culvert (Inlet Controls 11.24 cfs @ 4.26 fps) Pond MH24; MH24 Hydrograph ---- --- --- ---- --- ---- ---------------------------------------- 29 lr)flcw 1787 as - Outflow M Prima 1TSt ----- - - ---- --: - ---- -------Inflow- Area"-0..?L3.1C--- Se ondary 19 - .' I ,8 -- ---- - Peak Eiev 19.0.52'_ 17 . 16= -- --- ---------- ------- - ------------- 15= - - 14= 13 "11.ea rf- - ... .. ...... ......... .. . 12 11 i 10 o g 8- 7: - 6- ----- ----------------------------------- ----------- ----- ----- --------- - ------- ------- ---..--------- 5" ? 4 3 0 0 1 2 Time (hours) 10-YR RATIONAL METHOD 090802_POST Lumberton Aforth Carolina 70-Year Duratfon=5 min, lnten=8.16 in/far Prepared by AWE Engineers Printed 10/2812010 HydroCAD® 9.00 sln 02300.0 2009 HydroCAD Software Solutions LLC Page 24 Summary for Pond 0-3: INFILTRATION BASIN Inflow Area = 2.099 ac, 47.72% Impervious, Inflow Depth= 0.49" for 10-Year event Inflow _ 10.62 cfs @ 0.09 hrs, Volume= 0.086 of Outflow = 0.62 cfs @ 0.16 hrs, Volume= 0.086 af, Atten= 94%, Lag= 4.5 min Discarded 0.62 cfs @ . 0.16 hrs, Volume= 0.086 of Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Peak Elev= 188.79'@ 0.16 hrs Surf.Area= 4,994 sf Storage= 3,469 cf Flood Elev= 190.50' Surf.Area= 7,706 sf Storage= 14,309 cf Plug-Flow detention time= 55.2 min calculated for 0A86 of (100% of inflow) Center-of-Mass det. time= 55.4 min ( 60.4 - 5.0 ) Volume Invert Avall.Storage Storage Description #1 188.00' 14,309 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 188.00 3,797 0 0 189.00 5,314 4,556 4,556 190.00 6,893 6,104 10,659 190.50 7,706 3,650 14,309 Device Routing Invert Outlet Devices #1 Primary 189.50' 8.0' long x 10.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 #2 Discarded 188.00' 4.000 in/hr Exfiltration over Surface area Conductivity to Groundwater Elevation = 186.00' Discarded OutFlaw Max=0:62 cfs @ 0.16 hrs HW=188.79' (Free Discharge) t-2=Exfiltration ( Controls 0.62 cfs) Primary Outfolow Max=0.00 cfs @ 0.00 hrs HW=188.00' (Free Discharge) L1=13road-Crested Rectangular Weir ( Controls 0.00 cfs) 10-YR RATIONAL METHOD 090802_POST Lumberton,North Carolina 1O-Year Duration=5 min, Inten =8.16 in/hr Prepared by AWB Engineers Printed 10128/2010 HydroCA[f(2)9.00 sIn 02300 (D2009 HydroCAD Software Solutions LLC Page 25 Pond 0-3: INFILTRATION BASIN Hydrograph Inflow 10.62 ens - - Oufflow ---------- ---------------------------------------------- ---Inflow-Area-2.099--ec--- 11 Discarded Primary 11 - - - Peak--Eiev='! 88.79' - --------- --- Storage=3,4¢69 cf 9 8 3 6 0 LL ------- --------------------------------------------------------------- - ---------------------------------------- 4- 3 2 _ 0.62cr ? - ' (M cfs 0 1 2 3 Time (hours) 10-YR RATIONAL METHOD 090802_POST LumbertOB NOrth Carolina 10-Year Durati017=5 n71n, Ie#e17=8.16 1n1hr Prepared by AWE Engineers Printed 10/28/2010 HydroCAD® 9.00 s!n 02300 O 2009 HydroCAD Software Solutions LLC Page 26 Summary for Link E-LS1: EXISTING LIFT STATION Inflow Area = 2.299 ac,100.00% Impervious, Inflow Depth = 0.15" for 10-Year event Inflow = 5.39 cfs @ 0.08 hrs, Volume= 0.031 of Primary = 6.31 efs @ . 0.08 hrs, Volume= 0.031 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-3.00 hrs, dt= 0.01 hrs Link E-LS9: EXISTING LIFT STATION Hydrograph R Inflow 0 Primary 5 3 0 LL Time (hours) 0 1 2 3