HomeMy WebLinkAbout20100952 Ver 1_Mitigation Plans_20101112Martin's Creek II Mitigation Plan Prepared For r 1* Ad I ygstem 4n(I Pn-i PROGRAM EEP Project #: 92633 SCO #: 08-07251-01 Michael Baker Engineering, Inc., NC Professional Engineering License # F-1084 9/22/10 NCDENR-EEP 1652 Mail Service Center Raleigh, North Carolina 27699-1652 Phone: 919-715-0476 Fax: 919-715-2219 n 4.i This document was printed using 100% recycled paper. Cherokee County, North Carolina Martin's Creek II Mitigation Plan Cherokee County, North Carolina Report Prepared and Submitted by Michael Baker Engineering, Inc. Michael Baker Engineering, Inc. 797 Haywood Road Suite 201 Asheville, North Carolina 28806 Phone: 828.350.1408 Fax: 828.350.1409 Micky Clemmons Jake McLean, PE Office Principal & Project Manager Project Engineer MICHAEL BAKER ENGINEERING, INC. PAGE ii 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN EXECUTIVE SUMMARY Michael Baker Engineering, Inc. (Baker) proposes the restoration of 3,505 if of stream, enhancement of 2,764 If of channel and preservation 21,5301f of headwater tributaries to Martin's Creek in Cherokee County, NC (ES Figure 1.0). All restoration and enhancement reaches have been identified as jurisdictional waters. Jurisdictional wetlands on-site totaled 1.61 acres; these will be enhanced during this project. Based on the identification of relic wetland soils Baker proposes to restore 5.2 acres of wetlands resulting in approximately 6.81 acres of restored and enhanced wetlands under this project. The nearest town, Murphy, is approximately two and a half miles north of the Martin's Creek II mitigation project site. The site lies in the Hiwassee River Basin within North Carolina Division of Water Quality (NCDWQ) sub-basin 04-05-02 and local watershed unit 06020002170010. The Martin's Creek II mitigation project area lies within the focus area of the Peachtree-Martins Creek Local Watershed Plan (LWP) (http://www.nceep.net/services/lwps/pull_down/by_basin/Hiwassee_RB.html) and roughly corresponds to Restoration site # 1 & Preservation site # 1 of the LWP project atlas. Additionally, the mitigation project site watershed is identified as Hydrologic Unit Code (HUC) 06020002170010 which was identified as a Targeted Local Watershed (TLW) in EEP's 2001 and 2008 Hiwassee River Basin Restoration Priority (RBRP) Plans (http://www.nceep.net/services/lwps/pull_down/by_ basin/Hiwassee_RB .html). The Peachtree-Martins Creek LWP identified numerous point and nonpoint source pollutants present in the Peachtree-Martins Creek watershed. Water quality stressors that were located in the project watershed and the project site itself include inadequate riparian buffer cover, channel modification, excess nutrient and sediment loading, and fecal bacteria contamination. Other water quality issues in the project LWP area include increased flow velocities associated with stormwater runoff, groundwater contamination, and sediment inputs from a local quarry (only point source identified). The goals for the stream restoration project are as follows • Create geomorphically stable stream channels within the Martin's Creek II mitigation project area, • Restoration or enhancement of wetlands on- site, • Exclude livestock from accessing the project streams, wetlands, and riparian zones, • Improve and restore hydrologic connections and overall ecosystem functionality, • Improve water quality within the Martin's Creek II project area through reduction of bank erosion, improved nutrient and sediment removal, and stabilization of streambanks, • The restoration and preservation of headwater tributaries to the Peachtree-Martins Creek Watershed and the Hiwassee River, and • Improve aquatic and terrestrial habitat through improved substrate and in-stream cover, addition of woody debris, reduction of water temperature, and restoration of terrestrial habitat. To accomplish these goals, we recommend the following actions: • Make important design decisions based on geomorphic analyses of the site, from reference conditions, supporting information from hydraulic modeling and dimensionless ratios that Baker has consistently found to produce stabile conditions in order to incorporate important elements of all, • Use constructability as a guiding consideration in order to produce a realistic design that is possible to build given field constraints and construction tolerances, • Minimize disturbance to ecologically functional and physically stable areas; mimic the character of these areas and borrow materials from them where appropriate to create a more natural design, and • Structures and overall design will attempt to use native materials and minimize materials brought onsite in order to produce habitat favoring native flora and fauna, reduce compaction and site disturbance from material transport, and produce an aesthetically pleasing result. MICHAEL BAKER ENGINEERING, INC. PAGE iii 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN The project goals will directly address stressors identified in the Peachtree-Martins Creek LWP, namely lack of riparian vegetation, channel modification, excess sediment inputs, excess nutrient inputs, and bacterial contamination. Baker's natural stream channel design approach will result in a stable riparian system that will reduce sediment and nutrient loading to Martin Creek while contributing to water quality conditions that support terrestrial and aquatic species including priority species identified in the basin. Table ES.1 Martin's Creek II Mitigation Project Overview Martin's Creek II Mitigation Project--NCEEP Project #92633 Right Prong Martin's Creek (RP) Unnamed Tributaries -UTI Preservation 541 541 108 5:1 0.162 -UTI Enhancement II 399 399 159 2.5:1 .169 -UT2 Preservation 2,472 2,472 494 5:1 0.076 -UT2-1 Preservation 1,366 1,366 273 5:1 0.037 -UT3 Preservation 1,379 1,379 276 5:1 0.097 -UT3-1 Preservation 1,060 1,060 212 5:1 0.027 -UT4 Preservation 1,832 1,832 366 5:1 0.073 -UT4-1 Preservation 698 698 140 5:1 0.019 -UT5 Preservation 818 818 164 5:1 0.016 -UT6 Preservation 1,069 1,069 214 5:1 0.036 _UT7 Preservation 791 791 158 5:1 0.013 Right Prong Martin's Creek (Reach 1) Preservation 5,208 5,208 1,042 5:1 0.413 Right Prong Martin's Creek (Reach 2) Enhancement II 572 572 229 2.5:1 0.603 Martin's Creek (MC) Unnamed Tributaries C-UTI (Reach 1) Preservation 2,482 2,482 496 5:1 0.065 C-UTI (Reach 2) Restoration 1,070 1,070 1,070 1:1 0.092 C-UTI (Reach 3) Enhancement I 345 345 230 1.5:1 0.161 C-UTI (Reach 4) Restoration 332 1,149 1,149 1:1 0.176 C-UTI-1 Preservation 689 689 138 5:1 0.018 C-UTI-2 Preservation 923 923 185 5:1 0.019 C-UT1-2-1 Preservation 202 202 40 5:1 0.005 C-UTI-3 (Reach 1) Enhancement I 516 516 344 1.5:1 0.07 MC-UT 1-3 (Reach 2) Restoration 1,068 1,286 1,286 1:1 0.08 C-UT2 Enhancement II 75 75 30 2.5:1 0.385 Martin's Creek Enhancement II 857 857 343 2.5:1 6.81 TOTAL STREAM FOOTAGE BY TYPE 26,764 27,799 9,146 Stream Design Approach Restoration 2,470 3,505 3,505 1:1 Enhancement I 861 861 574 1.5:1 Stream Length/SMUs Enhancement II 1,903 1,903 761 2.5:1 Preservation 21,530 21,530 4,306 5:1 26,764 27,799 9,146 MICHAEL BAKER ENGINEERING, INC. PAGE iv 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table ES.1 Mitigation Plan Overview Martin's Creek II Mitigation Project--NCEEP Project #92633 TOTAL WETLAND ACREAGE Wetland Design Approach (Acres) Restoration - 5.2 5.2 1:1 Total Wetland Acreage Enhancement 1.61 1.61 .80 2:1 6.81 6.0 Watershed Size at Downstream End of Reach 6.81 Square Miles This document is consistent with the requirements of the federal rule for compensatory mitigation project sites as described in the Federal Register Title 33 Navigation and Navigable Waters Volume 3 Chapter 2 Section § 332.8 paragraphs (c)(2) through (c)(14). Specifically the document addresses the following requirements of the federal rule: (2) Objectives. A description of the resource type(s) and amount(s) that will be provided, the method of compensation (i.e., restoration, establishment, enhancement, and/or preservation), and the manner in which the resource functions of the compensatory mitigation project will address the needs of the watershed, ecoregion, physiographic province, or other geographic area of interest. (3) Site selection. A description of the factors considered during the site selection process. This should include consideration of watershed needs, onsite alternatives where applicable, and the practicability of accomplishing ecologically self-sustaining aquatic resource restoration, establishment, enhancement, and/or preservation at the compensatory mitigation project site. (See § 332.3(d).) (4) Site protection instrument. A description of the legal arrangements and instrument, including site ownership, that will be used to ensure the long-term protection of the compensatory mitigation project site (see § 332.7(a)). (5) Baseline information. A description of the ecological characteristics of the proposed compensatory mitigation project site and, in the case of an application for a DA permit, the impact site. This may include descriptions of historic and existing plant communities, historic and existing hydrology, soil conditions, a map showing the locations of the impact and mitigation site(s) or the geographic coordinates for those site(s), and other site characteristics appropriate to the type of resource proposed as compensation. The baseline information should also include a delineation of waters of the United States on the proposed compensatory mitigation project site. A prospective permittee planning to secure credits from an approved mitigation bank or in-lieu fee program only needs to provide baseline information about the impact site, not the mitigation bank or in-lieu fee project site. (6) Determination of credits. A description of the number of credits to be provided, including a brief explanation of the rationale for this determination. (See § 332.3(f).) (7) Mitigation work plan. Detailed written specifications and work descriptions for the compensatory mitigation project, including, but not limited to, the geographic boundaries of the project; construction methods, timing, and sequence; source(s) of water, including connections to existing waters and uplands; methods for establishing the desired plant community; plans to control invasive plant species; the proposed grading plan, including elevations and slopes of the substrate; soil management; and erosion control measures. For stream compensatory mitigation projects, the mitigation work plan may also include other relevant information, such as plan form geometry, channel form (e.g. typical channel cross sections), watershed size, design discharge, and riparian area plantings. (8) Maintenance plan. A description and schedule of maintenance requirements to ensure the continued viability of the resource once initial construction is completed. (9) Performance standards. Ecologically-based standards that will be used to determine whether the compensatory mitigation project is achieving its objectives. (See § 332.5.) MICHAEL BAKER ENGINEERING, INC. PAGE v 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN (10) Monitoring requirements. A description of parameters to be monitored in order to determine if the compensatory mitigation project is on track to meet performance standards and if adaptive management is needed. A schedule for monitoring and reporting on monitoring results to the district engineer must be included. (See § 332.6.) (11) Long-term management plan. A description of how the compensatory mitigation project will be managed after performance standards have been achieved to ensure the long-term sustainability of the resource, including long-term financing mechanisms and the parry responsible for long-term management. (See § 332.7(d).) (12) Adaptive management plan. A management strategy to address unforeseen changes in site conditions or other components of the compensatory mitigation project, including the party or parties responsible for implementing adaptive management measures. The adaptive management plan will guide decisions for revising compensatory mitigation plans and implementing measures to address both foreseeable and unforeseen circumstances that adversely affect compensatory mitigation success. (See § 332.7(c).) (13) Financial assurances. A description of financial assurances that will be provided and how they are sufficient to ensure a high level of confidence that the compensatory mitigation project will be successfully completed, in accordance with its performance standards (see § 332.3(n)). MICHAEL BAKER ENGINEERING, INC. PAGE vi 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN l _ a{? aat I ? 0 Ir` \ •, 1 `l I 1 . 1k, 1 \ 1 \ 1 G? 1 r` 9 I I .:1 / v x v\ A '?.? 1 1 I I ! / ??o ? / ? Te_ P-U \ ! 1 I Ieach "? Reach 2 / ?.__ - ' i 1 Reach 4 ?N 8 6 % Reach 3 uk t / MC-UT2 IvIC-UTI-3 119o 4? - V°o / "If v v?d / Reach $r, 4?\4{ 4'"lu % A I em?? ? LEGEND - r--_ Proposed Restoration Type ® jurisdictional Wetlands i I Proposed Easement Boundary N (Recommendation) ® proposed Wedands Project Parcel Figure ES.1 Proposed Project _ Restoration Streams E:] Parcels l° Components o Enhancement I ® Power Poles 4a o Enhancement II Powerline o Martin Creek Mitigation Project oreservation 0 150 300 600 P Feet Cherokee County, NC °e TABLE OF CONTENTS 1.0 PROJECT SITE IDENTIFICATION AND LOCATION ............................................................................. 1-1 1.1 PROJECT DESCRIPTION AND DIRECTIONS TO PROJECT SITE ...................................................... ....................... 1-1 1.2 USGS HYDROLOGIC UNIT CODE AND NCDWQ RIVER BASIN DESIGNATIONS ........................ ....................... 1-1 1.3 PROJECT COMPONENTS AND STRUCTURE ................................................................................. ....................... 1-2 2.0 W ATERSHED CHARACTERIZATION ....................................................................................................... 2-1 2.1 WATERSHED DELINEATION ...................................................................................................... ....................... 2-1 2.2 SURFACE WATER CLASSIFICATION/ WATER QUALITY ............................................................. ....................... 2-2 2.3 PHYSIOGRAPHY, GEOLOGY AND SOILS ..................................................................................... ....................... 2-2 2.4 HISTORICAL LAND USE AND DEVELOPMENT TRENDS .............................................................. ....................... 2-5 2.5 WATERSHED PLANNING ............................................................................................................ ....................... 2-6 2.6 ENDANGERED/THREATENED SPECIES ....................................................................................... ....................... 2-6 2.61 Federally Listed Endangered Species .................................................................................. ....................... 2-9 2.7 CULTURAL RESOURCES ............................................................................................................ ..................... 2-13 2.8 POTENTIAL CONSTRAINTS ........................................................................................................ ..................... 2-13 2.8.1 Property Ownership, Boundary and Site Access ................................................................. ..................... 2-13 2.8.2 Utilities ................................................................................................................................ ..................... 2-14 2.8.3 Hydrologic Trespass and Floodplain Characterization ...................................................... ..................... 2-14 2.9 POTENTIALLY HAZARDOUS ENVIRONMENTAL SITES ................................................................ ..................... 2-14 3.0 PROJECT SITE STREAMS ..................................................................................................... ....................... 3-1 3.1 EXISTING CONDITIONS SURVEY ................................................................................................ ....................... 3-1 3.2 CHANNEL CLASSIFICATION ....................................................................................................... ....................... 3-1 3.3 VALLEY CLASSIFICATION ......................................................................................................... ....................... 3-4 3.4 PROJECT REACH CHARACTERIZATION ...................................................................................... ....................... 3-7 3.4.1 Martin's Creek (Mainstem) ................................................................................................. ....................... 3-7 3.4.2 Martin's Creek UTI -1 and UTI -2 (MC- UTI -1 and MC-UTI -2) ........................................ ....................... 3-8 3.4.3 Martin's Creek UTI (MC-UTI) ........................................................................................... ....................... 3-8 3.4.4 Martin's Creek UTI -3 (MC-UTI -3) .................................................................................... ....................... 3-9 3.4.5 Martin's Creek UT2 (MC-UT2) ........................................................................................... ..................... 3-10 3.4.6 Right Prong Martin's Creek (Mainstem) ............................................................................. ..................... 3-10 3.4.7 Right Prong Martin's Creek UTI (RP-UTI) ....................................................................... ..................... 3-10 3.4.8 Other Preservation Reaches in the Right Prong Martin's Creek Drainage: RP-UT2, RP-UT2-1, RP-UT3, RP-U T3-1, RP-UT4, RP-UT4-1, and RP-UT5 .................................................................................. ..................... 3-11 3.5 CHANNEL MORPHOLOGY, EVOLUTION AND STABILITY ASSESSMENT ...................................... ..................... 3-11 3.6 BANKFULL VERIFICATION ........................................................................................................ ..................... 3-14 3.61 Physical Field Measurement ............................................................................................... ..................... 3-14 3.62 Regional Curve Equations ................................................................................................... ..................... 3-15 3.63 Role of Hydraulic Modeling Using HEC-RAS 4.0 in Design Discharge Selection .............. ..................... 3-15 3.7 CONCLUSIONS FOR CHANNEL FORMING DISCHARGE ................................................................ .....................3-17 3.8 VEGETATION COMMUNITY AND DISTURBANCE HISTORY ......................................................... ..................... 3-18 3.8.1 Dry Mesic Oak-Hickory Forest ........................................................................................... ..................... 3-18 3.8.2 Montane Oak-Hickory Forest .............................................................................................. ..................... 3-19 3.8.3 Agricultural Area ................................................................................................................. ..................... 3-19 3.8.4 Invasive Species ................................................................................................................... ..................... 3-19 4.0 REFERENCE INDICATORS ................................................................................................... ....................... 4-1 5.0 PROJECT SITE WETLANDS (EXISTING CONDITIONS) ....................................................................... 5-1 5.1 JURISDICTIONAL WETLANDS .................................................................................................... ....................... 5-1 5.1.1 Wetland Impacts .................................................................................................................. ....................... 5-2 5.1.2 Jurisdictional Wetland Findings .......................................................................................... ....................... 5-3 MICHAEL BAKER ENGINEERING, INC. PAGE ix 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 5.1.3 Palustrine Emergent Wetlands (Low Mountain Alluvial Forest) ................................................................ 5-3 5.2 HYDROLOGICAL CHARACTERIZATION ............................................................................................................. 5-4 5.2.1 Site Hydrologv ............................................................................................................................................ 5-4 5.2.2 Climatic Conditions .................................................................................................................................... 5-7 5.3 SOIL CHARACTERIZATION ................................................................................................................................ 5-8 5.4 PLANT COMMUNITY CHARACTERIZATION ....................................................................................................... 5-9 6.0 REFERENCE WETLANDS ............................................................................................................................. 6-1 6.1 HYDROLOGICAL CHARACTERIZATION ............................................................................................................. 6-1 61.1 Gauge Data Summary ................................................................................................................................. 6-1 6.2 SOIL CHARACTERIZATION ................................................................................................................................ 6-3 7.0 PROJECT SITE MITIGATION PLAN .......................................................................................................... 7-1 7.1 MITIGATION PROJECT GOALS AND OBJECTIVES ........................................................................ ...................... 7-2 7.2 DESIGN CRITERIA SELECTION FOR STREAM RESTORATION ....................................................... ...................... 7-7 7.3 STREAM PROJECT DESIGN & JUSTIFICATION ............................................................................. ...................... 7-7 7.3.1 Sediment Transport Analysis ................................................................................................. ................... 7-12 7.3.2 HEC-RASAnalysis ................................................................................................................. ...................7-15 7.4 SITE CONSTRUCTION .................................................................................................................. .................... 7-15 7.4.1 Site Grading, Structure Installation, and Other Project Related Construction ..................... ................... 7-15 7.4.2 Natural Plant Community Restoration .................................................................................. ................... 7-19 8.0 PERFORMANCE CRITERIA ......................................................................................................................... 8-1 8.1 STREAM MONITORING ............................................................................................................... ...................... 8-1 8.1.1 Bankfull Events ...................................................................................................................... ..................... 8-1 8.1.2 Cross sections ........................................................................................................................ ..................... 8-1 8.1.3 Longitudinal Profile ............................................................................................................... ..................... 8-1 8.1.4 Bed Material Analyses ........................................................................................................... ..................... 8-2 8.1.5 Photo Reference Sites ............................................................................................................ ..................... 8-2 8.2 STORM WATER MANAGEMENT MONITORING ............................................................................ ...................... 8-2 8.3 WETLAND MONITORING ............................................................................................................ ...................... 8-2 8.4 VEGETATION MONITORING ........................................................................................................ ...................... 8-2 8.5 SCHEDULE/REPORTING .............................................................................................................. ......................8-4 9.0 SITE PROTECTION AND ADAPTIVE MANAGEMENT STRATEGY ................................................... 9-1 10.0 REFERENCES ................................................................................................................................................ 10-1 MICHAEL BAKER ENGINEERING, INC. PAGE x 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN LIST OF TABLES Table ES.I Martin's Creek II Mitigation Project Overview Table 1.0 Project Restoration Components Table 1.1 Project Attributes Table Table 2.0 Martin's Creek II Project Drainage Areas by Reach Table 2.1 Project Soil Types and Descriptions Table 2.2 Project Soil Type Characteristics Table 2.3 Martin's Creek Watershed Land Use/Land Cover Table 2.4 Species Under Federal Protection in Cherokee County Table 3.0 Representative Geomorphic Data for Martin's Creek and Unnamed Tributaries Table 3.1 Channel Morphology Features and Stability Indicators for Martin's Creek and Unnamed Tributaries Table 3.2 Rosgen Channel Stability Assessment Table 3.3 Design Discharge Summary for Martin's Creek and Unnamed Tributaries by Reach Table 4.0 Ratios from Reference Reaches used in the Design of Martin's Creek and its Tributaries Table 4.1 Reference Reach Geomorphic Parameters: Unnamed Tributariyl to Martin's Creek Table 4.2 Reference Reach Geomorphic Parameters: Unnamed Tributariyl-3 to Martin's Creek Table 5.0 Comparison of Monthly Rainfall Amounts for Project Site and Long Term Averages Table 7.0 Project Design Stream Types Table 7.1 Geomorphic Characteristics of the Proposed Martin's Creek II Mitigation Project Table 7.2 Proposed In-stream Structure Types and Locations Table 7.3 Proposed Bare-Root and Live Stake Species Table 7.4 Proposed Seed Mixture Species MICHAEL BAKER ENGINEERING, INC. PAGE A 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN List of Figures Figure ES.1 Figure 1.0 Figure 2.0 Figure 3.0 Figure 3.1 Figure 3.2 Figure 3.3 Figure 4.1 Proposed Project Components Project Location Map Project Watershed Map Project Reaches and Surveyed Cross section Locations HEC-RAS Model Views for UT1-3 Upper, Water Surface Elevations for Design Flow (10 cfs) and the Mountain Regional Curve Flow (Q=14 cfs) (LOB=Left Top of Bank, ROB=Right Top of Bank) HEC-RAS Model Views for UT1-3 Upper, Water Surface Elevations for Design Flow (10 cfs) and the Mountain Regional Curve Flow (Q=14 cfs) (LOB=Left Top of Bank, ROB=Right Top of Bank) Figure 3.3 Sample Analysis of UT1-3 Upper Design Cross section for As-built Condition (2:1 side slope) Versus "Evolved" Condition (Where is has Narrowed to a 1:1 Side Slope) at Design Flow (10 cfs) Reference Reach Location Figure 5.0 Hydrographs of the Groundwater Monitoring Wells Compared to Local Rainfall (November 2008 through November 2009) Figure 5.1 Graphical Comparison of Observed Rainfall with Long-term Average Conditions Figure 6.1 Water Table Depths Recorded in Monitoring Wells Installed within the Reference Site List of Appendices Appendix A NCDWQ Stream Identification Form Appendix B Regulatory Agency Correspondence Appendix C EDR Transaction Screen Map Report Appendix D Existing Conditions Geomorphic Data Appendix E Photo Log of Existing Conditions Appendix F Wetland Delineation Findings MICHAEL BAKER ENGINEERING, INC. PAGE xii 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 1.0 PROJECT SITE IDENTIFICATION AND LOCATION 1.1 Project Description and Directions to Project Site Baker proposes the restoration of 3,505 if of stream, enhancement of 2,7641f of channel and preservation 21,5301f of headwater tributaries to the Martin's Creek drainage in Cherokee County, NC (ES Figure 1). Delineated wetlands identified totaled 1.61 acres that will be enhanced. Based on the identification of relic wetland soils Baker proposes to restore 5.2 acres of wetlands resulting in approximately 6.81 acres of restored and enhanced wetlands under this project. The Martin's Creek II project site is located in Cherokee County in western North Carolina, just south of the town of Murphy. From Murphy, continue along U.S. Highway 64/74 across the Hiwassee River. Turn left onto Hiwassee Street at the first traffic light after crossing the river. Continue for approximately .6 miles and turn right onto Martin's Creek Road. After turning onto Martin's Creek Road, travel approximately 2.2 miles and turn right onto Crisp Road. The lower reaches of the project site are accessible by entering the field north of Crisp Road at this intersection. There is no road access to the higher elevation streams on this project site. Access can be gained from the Wildcat subdivision if permission is obtained from the developer. To reach the upper extent of the project area and the Right Prong of Martin's Creek, turn off Martin's Creek Road onto Wildcat Road. Wildcat Road is located just before Crisp Road and borders the northern boundary of the project area. Follow Wildcat Road through the subdivision and turn left onto Alto Vista Road. Once on Alto Vista Road, turn left and continue until you reach a vacant lot where the road ends. From this dead-end the property can be accessed by walking southeast, down the slope to the property at the bottom of the hill. 1.2 USGS Hydrologic Unit Code and NCDWQ River Basin Designations The Martin's Creek II project site lies in the Hiwassee River Basin, within North Carolina Division of Water Quality (NCDWQ) sub-basin 04-05-02 and United States Geologic Survey (USGS) local watershed unit 06020002170010 (Figure 1). The project will involve the Right Prong of Martin's Creek (RP) and eight unnamed tributaries (UT), five unnamed tributaries to Martin's Creek (MC) and Martin's Creek itself, which flows into the Hiwassee River. Tributaries that flow into Right Prong Martin's Creek within the project area have been identified as RP-UTI, RP-UT2, RP-UT2-1, RP-UT3, RP-UT3-1, RP-UT4, RP-UT4-1 and RP- UT5. Other tributaries upstream of the Right Prong confluence which flow into Martin's Creek are labeled as: MC-UTI, MC-UTI-I, MC-UTI-2, MC-UTI-3 and MC-UT2. Right Prong Martin's Creek, RP-UTI, RP-UT3, MC-UTI, MC-UTI-3, MC-UT2 and the mainstem of Martin's Creek are shown as solid blue-line streams throughout the site on the USGS topographic quadrangle map. The remaining tributaries do not appear on the USGS quadrangle map for this site. Martin's Creek enters and exits the project area via culverts that run under Crisp Road and Wildcat Road, respectively. Land use upstream and downstream of the project area consists of grassed lands that have been used to pasture horses and cattle. The Right Prong Martin's Creek drainage, UTI to Martin's Creek and UTI-3 to Martin's Creek enter the project area through upland forests on-site. Unnamed Tributary 2 to Martin's Creek enters the project area through a culvert under Martin's Creek Road after meandering through a residential area. After referencing USGS topographic quadrangle maps to determine stream order, a field evaluation using the North Carolina Division of Water Quality (NCDWQ) stream assessment protocol was conducted. Based on field data, RP-UT4-1, RP-UT5, MC-UTI-3, MC-UT2 and Martin's Creek are the only streams that are perennial throughout the project site. Right Prong Martin's Creek tributary UT2-1 and UT3-1 are the only streams in the project area that are intermittent. All remaining streams within the project area exhibited some combination of ephemeral, intermittent and perennial reaches. NCDWQ Stream Identification Forms completed for the project reaches are included in Appendix A. A figure denoting intermittent and perennial MICHAEL BAKER ENGINEERING, INC. PAGE 1-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN breaks on project streams is provided in Section 3 of this plan. The total current length of stream within the project is 26,816 LF. 1.3 Project Components and Structure Distinct project reaches are summarized in Table 1 below and are depicted in the Project Components figure in the Executive Summary (ES.1). A table (1.1) summari zing project component attributes is also provided. Table 1.0 Project Restoration Components Martin's Creek II Mitigation Project-NCEEP Project #92633 Project Segment or o to on ? ? Stationing Comment Reach ID 2 ono t on Right Prong Martin's Creek (RP) Unnamed Tributaries RP-UT1 541 - P 541 5:1 108 - No channel alteration Improve riparian buffer Refer to Plan by removing RP-UT1 399 LII E 399 2.5:1 159 Sheet Pg. 16 invasive/exotic vegetation; replanting with native vegetation. RP-UT2 2,472 - P 2,472 5:1 494 - No channel alteration RP-UT2-1 1,366 - P 1,366 5:1 273 - No channel alteration RP-UT3 1,379 - P 1,379 5:1 276 - No channel alteration RP-UT3-1 1,060 - P 1,060 5:1 212 - No channel alteration RP-UT4 1,832 - P 1,832 5:1 366 - No channel alteration RP-UT4-1 698 - P 698 5:1 140 - No channel alteration RP-UT5 818 - P 818 5:1 164 - No channel alteration RP-UT6 1,069 - P 1,069 5:1 214 - No channel alteration RP-UT7 791 - P 791 5:1 158 - No channel alteration Right Prong Martin's 5 208 - P 5 208 5:1 1 042 - No channel alteration Creek (Reach 1) , , , Improve riparian buffer Right Prong Martin's Refer to Plan by removing Creek Reach 2 (Reach 2) 572 LII E 572 2.5:1 229 Sheet P g. g' invasive/exotic vegetation; replanting with native vegetation. Martin's Creek (MC) Unnamed Tributaries MC-UTI (Reach 1) 2,482 - P 2,482 5:1 496 _ No channel alteration Restore natural hydrology and MC-UTI (Reach 2) 1 070 PI R 1 070 1:1 1 070 0+00-10+70 geomorphic form by , , , relocating portion of channel to the low point of the valley Improve grade control MC-UTI (Reach 3) 345 LI E 345 1.5:1 230 0+00-3+45 and bank stability where needed and adjust channel dimension Restore wetland MC-UTI (Reach 4) 332 PI R 1,149 1:1 1,149 5+48-16+97 hydrology and restore geomorphic form to MICHAEL BAKER ENGINEERING, INC. PAGE 1-2 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN channel by relocating channel within greater wetland complex and adjusting confluence of UTl and UTl-3 MC-UTI-1 689 - P 689 5:1 138 - No channel alteration MC-UTI-2 923 - P 923 5:1 185 - No channel alteration MC-UTI-2-1 202 - P 202 2.5:1 40 - No channel alteration Improve channel profile, sediment transport MC-UTI-3 (Reach 1) 516 LI E 516 1.5:1 344 0+00-5+16 function and bank stability where needed and adjust channel dimension Restore wetland hydrology and restore geomorphic form to MC-UT 1-3 (Reach 2) 1 068 PI R 1 286 1:1 1 286 5+78-18+64 channel by relocating , , , channel within greater wetland complex and adjusting confluence of tributary with UT I Improve riparian buffer Refer to Plan by removing MC-UT2 75 LII E 75 2.5:1 30 Sheet Pg. 16 invasive/exotic vegetation, replanting with native vegetation. Improve riparian buffer Refer to Plan by removing Martin's Creek 857 LII E 857 2.5:1 343 Sheet Pg. 16 invasive/exotic vegetation; replanting with native vegetation. Protection of wetland Wetland pockets 08 E 08 2:1 04 Refer to Plan pockets within easement, upstream of barn . Sheet Pg. 17 minor removal of invasive vegetation Improve hydrology by removal of subsurface drains, surface roughening and Wetland pockets in field 1 53 E 1 53 2:1 765 Refer to Plan restoration of confluence adjacent to MC UT1-3 . . . Sheet Pg. 17 between MC UTI and MC UT1-3; removal of invasive plants and replant with native vegetation Expose buried hydric soil layer; restore hydrology Area of Buried Hydric Refer to Plan through removal of Soil 5.2 R 5.2 1:1 5.2 Sheet Pg. 17 subsurface drains installed, roughen surface; replant with native vegetation Mitigation Unit Summations Riparian Wetland Nonriparian Total Buffer Stream (U) (Ac) Wetland (Ac) Wetland (Ac) (Ac) Comment 9,146 6.81 NA 6.81 93.87 MICHAEL BAKER ENGINEERING, INC. PAGE 1-3 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 1.1 Project Attributes Table Martin's Creek II Mitigation Project-NCEEP Project #92633 Project County Cherokee Physiographic Region Blue Ridge Ecoregion Broad Basins Project River Basin Hiwassee USGS HUC for Project 06020002170010 NCDWQ Sub-basin for Project 04-05-02 Planning Area Peachtree-Martins Creek LWP WRC Class Cold % of Project Easement Fenced or Demarcated 100% of easement demarcated with NCEEP signs and yellow blazing in trees Beaver Activity Observed During Design Phase No Restoration Com onent Attribute Table Right Prong Martin's Cr. Martin's Creek RP RP MC UTl' MC UTI-3 MC UT2 MC UTI Mainstem (LII Enh) PI Rest (LI Enh) PI Rest Mainstem Drainage Area (square miles) .17 .60 .02-.18 .07-.08 .39 6.81 Stream Order 1st 3rd 2nd 1st 1st 3rd Restored Length (feet) 399 572 345 1,070/ 1,149 516 1,286 75 857 Perennial or Intermittent I/P I/P P P P P P P Watershed Type Rural Watershed LULC Distribution* (Cumulative acreage) Developed Open Space 3.8 Deciduous Forest 453.6 Evergreen Forest 29.4 Mixed Forest 46.1 Shrub/Scrub 4.0 Grassland/Herbaceous 4.5 Pasture/Hay 24.0 Land Use Note: Cumulative acreage limited to project subwatershed, not entire 11.6 sq.mi. drainage, which is rural and similar in nature to project area. Watershed Impervious Cover (%) <10% NCDWQ AU/Index Number 1-49 (Martin's Cree k), 1-49-3 (Right Prong Martin's Creek) NCDWQ Classification C C C C C 303d Listed No No No No No Upstream of 303d Listed Segment No No No No No Reasons for 303d Listin /Stressor N/A N/A N/A N/A N/A Easement Acreage (Cumulative) 93.87 Vegetated Acreage in Easement - - - - - MICHAEL BAKER ENGINEERING, INC. PAGE 1-4 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Planted Acreage As Part of the Restoration 17 Acres Rosgen Classification (Pre-existing) B B Eb/FbB/G Cb/G EbB OF B C Rosgen Classification of As-built (Design) B B B/C B/C B C B C Valle Type II II VIII VIII VIII Valley Slope N/A .015-.05 .007-.04 N/A N/A Valle Side Slope Range U U U U U Valley Toe Slope Range U U U U U Cowardin Classification N/A N/A N/A N/A N/A Trout Waters Designation No - - - - Species of Concern, Endangered, etc. No No No No No Dominant Soil Series and Characteristics Series Cullowhee fine sandy loam Thurmont-Dillard Complex/ Arkaqua loam Dillard loam /Arkqua loam Arkaqua loam Arkaqua loam Depth 20-40 >80/44-72 >80/44-72 44-72 44-72 Clay % 5-18 3-35/10-34 18-35/10-34 10-34 10-34 K .10-.15 .20-.32/.24-.32 .15-.28/.24-.32 .24-.32 .24-.32 T 2 5/4 5/4 4 4 Notes:' Activities on MC-UT1 are subdivided into one Level II Enhancement Reach and two Priority I Restoration Reaches. Data per reach is denoted by the "F symbol. MICHAEL BAKER ENGINEERING, INC. PAGE 1-5 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN -TN - LITTLE TE ESSEE 04-04 4 4 S j? GRAHAM J 19 Gti0. HIWASSEE CHERO EE 04-05-02 141 21/001 - GA - `J HIWASSEE 04-05-01 t C Y Martin Creek Project Site Map Inset LEGEND Figure 1. Project Location Map U em ? ?ss ` NCDWQ Sub-basin J Counties 0 USGS Hydrologic Unit Martin Creek Mitigation Project Cherokee County, NC s L L Project Hydrologic Unit Cherokee County 0 1 2 4 m Cherokee County, NC MIlBS 2.0 WATERSHED CHARACTERIZATION 2.1 Watershed Delineation The Martin's Creek II mitigation project is located in Cherokee County in the Hiwassee River Watershed. The total drainage area at the downstream end of the project area is approximately 6.8 square miles. Figure 2. provides a topographic view of the watershed drainage area for Martin's Creek by project reach. A total of 93.87 acres will be protected with a conservation easement through this project. Table 2.0 Drainage Areas By Reach Martin's Creek II Mitigation Project-NCEEP Project #92633 Right Prong Martin's Creek (RP) Unnamed Tributaries -UT1 (Reach 1) 541 0.162 RP-UT 1 (Reach 2) 399 .169 -UT2 2,472 0.076 -UT2-1 1,366 0.037 -UT3 1,379 0.097 -UT3-1 1,060 0.027 -UT4 1,832 0.073 -UT4-1 698 0.019 -UT5 818 0.016 -UT6 1,069 0.036 -UT7 791 0.013 Right Prong Martin's Creek (Reach 1) 5,208 0.413 Right Prong Martin's Creek (Reach 2) 572 0.603 Martin's Creek (MC) Unnamed Tributaries C-UTI (Reach 1) 2,482 0.065 C-UTI (Reach 2) 1,070 0.077 C-UTI (Reach 3) 345 0.092 C-UTI (Reach 4) 332 0.161 C-UTl-1 689 0.018 C-UTl-2 923 0.019 C-UT1-2-1 202 0.005 C-UTl-3 (Reach 1) 516 0.07 MC-UT 1-3 (Reach 2) 1,068 0.08 C-UT2 75 0.385 Martin's Creek 857 6.81 Total Existing Stream Length 26,764 6.81/.60 MICHAEL BAKER ENGINEERING, INC. PAGE 2-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 2.2 Surface Water Classification/ Water Quality The NCDWQ designates surface water classifications for water bodies such as streams, rivers, and lakes, which define the best uses to be protected for these waters (e.g., swimming, fishing, and drinking water supply). These classifications are associated with water quality standards designed to protect these uses. All surface waters in North Carolina must, at minimum, meet the standards for Class C (fishable/swimmable) waters. Other primary classifications provide additional levels of protection for primary water contact recreation (Class B) and drinking water supplies (WS). In addition to these primary classifications, supplemental classifications are sometimes assigned to water bodies to protect special uses or values. The NCDWQ has classified Martin's Creek as a Class C waterbody (DWQ Index No. 04-05-02) indicating that the system is considered to support aquatic life and secondary recreational uses. Restoration of the streams at the Martin's Creek II project site will reduce the amount of sediment, nutrients and bacteria being discharged from the project area, improving the water quality in the Hiwassee River Basin. 2.3 Physiography, Geology and Soils The Martin's Creek II project site is geographically located in the Broad Basins Ecoregion Level IV Boundary. The underlying geology of the project site predominantly consists of the Mineral Bluff Formation although the Murphy Marble, Andrews and Brasstown Formations are also present to a lesser extent. According to the NC Geological Survey Map for the state, the Mineral Bluff Formation is made up of dark slate, phyllite interlayered with quartzite and multiple schists including "Quartz-chlorite-sericite schist, interbedded graphitic schist, garnet- mica schist, staurolite schist, and cross-biotite schist," (Geologic Survey of North Carolina, NC Geological Survey, 1985 and 1998). The Murphy Marble and Andrews Formations within the vicinity of the project area are calcareous and dolomitic. The Brasstown Formation is made up of cross-biotite schist and includes micaeous quartzite. The US Department of Agriculture, Natural Resource Conservation Service (MRCS) Soil Data Mart website (http://soildatafnart.nres.usda.gov/Default.aspx ),was referenced in conjunction with " pdf formatted soils maps provided by Cherokee County NRCS staff to determine soil types for the project area. Soils found within the project area are primarily loamy soils and include the Cullowhee fine sandy loam, Thurmont-Dillard and Sylco- Cataska complexes, as well as the Dillard loam and Ark aqua loam soil series (NRCS, 2008). Soils of the Thurmont-Dillard and Sylco-Cataska complexes are dominant in areas adjacent to the streams in the forested area of the project. These soils are located on moderate slopes in the valley of the project, are well drained and lie above the seasonal high water table. In the lower section of the valley, project streams course through both Dillard loams, Cullowhee sandy loams and Arkaqua loams. Dillard loams are located in the project area in the transitional zone between the upland forested areas and the floodplain. This soil series is defined as being moderately well drained, rarely flooded and typically 24 to 36 inches above the water table. The Arkaqua and Cullowhee loam soils are located in the lower valley of the Martin's Creek watershed and are primarily within the floodplain for Right Prong Martin's Creek and Martin's Creek. As evidenced by the presence and location of wetlands on-site, the Arkaqua loams within the project area as well as the Cullowhee loams are somewhat poorly drained and are occasionally flooded. Whereas the depth to the water table in the upper extent of the project area ranges from 36 to 72 inches, the depth to the water table where Arkaqua and Cullowhee loams are present is approximately 18 to 24 inches; however, water is at the ground surface in some wetland areas. A summary of information on each soil type is presented in Tables 2.1 and 2.2. MICHAEL BAKER ENGINEERING, INC. PAGE 2-2 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN a ?'~?, -J '"Y'^? ? ? ? `-j. ?? ? ?? l J I ?.? Y ? 1?1 r?' f irr, ?IQ' ? ?,?d:• * pd Dr yl -AJ ? N. N 1PrL..' f J3 f( Z? -?? ?. `?:? ,ry" r •* .-4 r tom' ??'?' tl q'--°?,};?, ,, } ?: ;• ---- 4?p?i }r'.+I rim ?7`I?4?ii:{ [.?X7flti ?tji 4 A ???,t.'f ?_ ? ? '`??+ I f3. ?..3• ?? - 5 i i I i ?Y ?? Y4? •54?`.ti SAM r' f? `'1 ?_ ? x ? ?'y l7l i J ? -• y--y ?, ? '? ? Cam- ? ? ?r ? f .P! e?G.'{?i i Si J,;Y i"" * t sJ?."?J x 4'?. CO ?3Ly? ,?}-? .-•I? ?? /. ;?? 1 ?(}-# ? ?'?y/J,y'#/.r'" ...r"? ,''-? I4.,t ? ' `,.,?I'L2 ?` '? ? e 'x5 ? `' r? Sr r f+ ! V ?k 5 F ?: 1?r i'/r - t l ? Q 4 ; r y5 wry : ; }L.? f I {yv o ?' C Jul Y -may i1 f? 1 1 w P 'Y` "( 'y IF '4"4 ti I _~''1lJ e. " " 4. ri m }xti`.y 4 _-s } w; r ?° +r , v 1IF ,k,?y., ly .L SSA ? ? `? f _ 1 I.`,e l "W f" 4'a 4X `4 kya 4 'I u C ! J// I? ° x ?f e ? - ? 1§ ? vn 5} +?•.z i `` - L '4 Y rx" j I S *• ''ti ? ? ? J _? Y ?' mss`. } 6 v? :.+r??r'Y ?P Y ,??"?' _ I? ?' * 3 "•LCj` eg i? ??„? *# ?? 4?Y ?'{?y_y ?? ? S ?° ,+''° '. J-+r` p ?Ip I i t d Poorhouse d L, > ', r ! e LEGEND: Figure 2. Project Watershed Map or Project Reach Streams 0 Watershed Boundary (Murphy Quad) EZ Project Wetlands Martin Creek Mitigation Project Cherokee County, NC 1--?Icosystem 0 400 800 1,600 Feet Table 2.1 Project Soil Types and Descriptions Martin's Creek II Mitigation Project-NCEEP Project #92633 Fine-loamy, Active, Moderately permeable, deep, well Thurmont - Mesic Oxyaquic Footslopes, drained soils; developed in colluvium Dillard complex Hapludults/ colluvial fans, and alluvium from a mixture of (2-8% and Fine-loamy, mixed, benches, stream metamorphic rocks. Dillard soils are 8-15% slopes) semiactive, mesic Aquic terraces formed from Holocene-aged loamy Hapludults alluvium. Loamy-skeletal, mixed, Moderately rapid permeability, deep, active, mesic Typic Mountain very well drained soils; weathered, Sylco-Cataska Dystrndepts/ Loamy- summits side low-grade metasedimentary residuum/ complex skeletal, mixed, , Southern slopes Shallow, moderately rapid (50-95% slopes) semiactive, mesic, Appalac Appalachians ty, very well drained soils; permeabili shallow Typic weathered from low-grade Dystrndepts metasedimentary residuum. Coarse-loamy over Floodplains in Rapidly permeable somewhat poorly Cullowhee fine sandy or sandy-skeletal, upper reaches of , drained soils; developed from loamy sandy loam mixed, superactive, watersheds in alluvium over sandy and gravel (0-3% slopes) mesic Fluvaquentic Southern alluvium Dystrndepts Appalachians . Dillard loam Fine-loamy, mixed, Footslopes, colluvial fans Moderately permeable, deep, well (1-5 /o slopes) semiactive, mesic Aquic , benches stream drained soils; formed from Holocene- Hapludults , aged loamy alluvium. terraces Fine-loamy mixed Moderately permeable, somewhat Arkaqua loam , , active, mesic poorly drained soils; developed from (0-2% slopes) Fluvaquentic Floodplains loamy alluvial sediments washed Dystrndepts largely from metamorphic rock residuum. Note: NRCS, USDA. Official Soil Series Descriptions http://ortho.ftw.nrcs.usda.gov/cgi-bin/osd/osdname.cgi http://soildatamart.nrcs.usda.gov/Default.aMx Table 2.2 Project Soil Type Characteristics Martin's Creek II Mitigation Project-NCEEP Project #92633 Series Hydric Rating/Criteria Max % Clay on Erosion Erosion Drainage OM% Depth Surface Factor Factor Class (in) K T 2B3 (Poor drainage and a Thurmont -Dillard water table at a depth of 1- complex foot or less during growing 30-80/ 3-27/ .24/32 5 Well drained 0.0- (8-15% slopes) season if permeability is " 30-60 10-35 8.0/.05-5.0 less than 6 /hr in any layer within a depth of 20" Sylco-Cataska complex No -33/ 15-35/ 10- 15 2 Very well 0 5-6 0 (50-95% slopes) 10-20 12-22 . . drained . . 2B3 (Poor drainage and a Cullowhee fine sandy water table at a depth of 1- loam foot or less during growing 20-40 5-18 10- 15 2 Somewhat 0 5-12 (0-3% slopes) season if permeability is " . . poorly drained . less than 6 /hr in any layer within a depth of 20" MICHAEL BAKER ENGINEERING, INC. PAGE 2-4 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 2B3 (Poor drainage and a water table at a depth of 1- Dillard loam (1-5% foot or less during growing 30 -60 5-35 15- 28 5 Moderately 0 0-8 0 slopes) season if permeability is . . well drained . . less than 6"/hr in any layer within a depth of 20" 2B3 (Poor drainage and a water table at a depth of 1- Arkaqua loam (0-2% foot or less during growing 44 -72 10-34 24- 32 4 Somewhat 1 0-5 0 slopes) season if permeability is . . poorly drained . . less than 6"/hr in any layer within a depth of 20" Notes: 1. % Clay figured up to depth of - 50". Source: NRCS Soil Data Mart; URL: http:Hsoildataiuart.nres.usda. og v/ReportViewer.aspx?File=D:\Domains\SoilDataMart\temp\daa4f32f-e76c-4167-8743- lf4217c338a6.PDF&Name=Hydric_Soils&Wait=1 2.4 Historical Land Use and Development Trends The most recent land use within the project area consists of historic livestock pastures, open land, a residence and forested areas. However, the Martin's Creek watershed remains largely forested, with pastureland and hay production occurring in the floodplain of the Martin's Creek valley (Table 2.3). There are a few scattered residences west of the Martin's Creek II project site and a medium density residential development borders part of the northern boundary of the Right Prong Martin's Creek drainage area. Cri sp Road and Wildcat Road parallel the southern and northern property boundaries respectively; this has resulted in two culverted crossings of Martin's Creek just outside the project area. The Hiwassee River Watershed in North Carolina does not have any major population centers (less than 37,000 in Cherokee and Clay Counties in 2008). Land use within the watershed is rural in character and is unlikely to change significantly in the near future. Single-family homes are found at a medium-density and growth is expected to continue near the vicinity of the project; however, it will most likely maintain its rural nature. Potential for land use change in the area adjacent to the conservation easement is low. Martin's Creek and its tributaries have been impaired by historical and current land management practices, which include timber harvesting, pasture conversion, channelization, and livestock grazing. Stream channelization and channel dredging are evident through much of the lower project site. Over time, these practices have contributed excessive sediment and nutrient loading to Martin's Creek and ultimately to the Hiwassee River. During development of the land for agricultural use, a significant portion of stream bank vegetation was removed. Until 2009 and implementation of planning for this project, livestock had open access to portions of the Martin's Creek drainage on this property. Past dredging activities and down-cutting have disconnected Martin's Creek from its floodplain resulting in an incised channel; while in other sections of the project area, stream banks have been trampled down, creating over widened channel conditions that contribute to additional sediment and nutrient loading. The extent of incision at the project site has been largely minimized by bedrock. Management of land in the project area for agricultural purposes has induced changes to Martin's Creek and its tributaries primarily through alteration of drainage patterns, removal of vegetation in the riparian zone, and open access of cattle to the branches. Restoration of the site and removal of livestock from the stream corridors will reduce the sediment and nutrient loading to Martin's Creek and in turn improve water quality in the Hiwassee River. MICHAEL BAKER ENGINEERING, INC. PAGE 2-5 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 2.3 Martin's Creek Watershed Land Use/Land Cover Martin's Creek II Mitigation Project-NCEEP Project #92633 Land Use Category' Area (acres) Percent Area Developed Open Space 4 1 Deciduous Forest 454 80 Evergreen Forest 29 5 Mixed Forest 46 8 Shrub/Scrub 4 1 Grassland/Herbaceous 4 1 Pasture/Hay 24 4 Note: 1. Values calculated using USGS land use data from 2001. 2.5 Watershed Planning The Martins Creek mitigation project (Site) area lies within the focus area of the Peachtree-Martins Creek Local Watershed Plan (LWP) (http://www.nceep.net/services/lwps/pull_down/by_basin/Hiwassee RB.html) and roughly corresponds to Restoration site # 1 & Preservation site # 1 of the LWP project atlas This Site is also located in a Targeted Local Watershed (TLW) as identified in the 2008 Hiwassee River Basin Restoration Priorities Plan (http://www.nceep.net/services/lwps/pull_down/by_basin/Hiwassee_RB.html). Through the completion of the LWP in 2007, the Peachtree-Martins Creek Watershed was identified by the state as a watershed in the Hiwassee River Basin that presented great opportunity for stream and wetland restoration activities. The Peachtree-Martins Creek LWP included land use analysis, water quality monitoring and stakeholder input to identify problems with water quality, habitat and hydrology. Landcover in the project consists of low to medium-density residential development, forested cover and agricultural fields that are primarily located in the valleys along Martin Creek and its tributaries. The Peachtree- Martins Creek LWP identified numerous point and nonpoint source pollutants present in the Peachtree-Martins Creek watershed. Fields managed for livestock in this watershed often include open access to streams, which has led to such problems as degraded riparian buffers or a general lack of riparian buffer, stream channel and bank instability, increased sediment and nutrient loading to streams and degraded habitat conditions. In fact, a lack of riparian vegetation, channel modification, excess nutrients and sediments, and fecal bacterial contamination were listed as stressors affecting streams in the LWP for the Peachtree-Martins Creek Watershed (NCEEP, Equinox 2007). Other stressors in the project LWP area include pollutants and increased flow velocities associated with stormwater runoff, groundwater contamination, and sediment inputs from a local quarry. According to the 2007 Basinwide Management Report, the Martin Creek watershed is the most developed of those sampled by the NCDWQ in the greater Hiwassee basin (NCDWQ 2007). Single-family residential development along Right Prong Martin Creek was noted in the report and serves as an example of higher density housing development that is occurring in parts of the basin. Other land use impacts consist of agricultural operations, lower density residential development and commercial growth associated with municipalities such as the town of Murphy. Water quality and ecological monitoring performed by the NCDWQ on Martin Creek and its unnamed tributaries have shown that biological communities are in neither an excellent or poor condition, but somewhere in between (NCDWQ 2007). Aquatic organisms and water quality have been impacted by habitat degradation and elevated nutrient levels. Habitat degradation and elevated nutrient levels are evident at the project site, particularly in the lower half of the project area where past agricultural practices have included channel manipulation, draining of wetlands, clearing of riparian buffers and open access to streams by livestock. The NCEEP's local watershed plan for the Peachtree- Martins Creek watershed has identified a number of strategies that could be used to mitigate existing degradation. The restoration strategy proposed in this mitigation plan will implement many of the strategies recommended, including: revegetation of riparian areas, stream channel restoration, livestock exclusion, and stabilization of MICHAEL BAKER ENGINEERING, INC. PAGE 2-6 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN eroding stream banks. This site was highly rated within the LWP as an ideal NCEEP project site because of the potential to implement most of the recommended strategies within a subwatershed with high needs. As proposed, the recommendations incorporated in this mitigation plan should enable Baker and the NCEEP to meet the goals of the plan for this site while also contributing to meeting the TLW goals identified in the 2008 Hiwassee River Basin Restoration Priorities Plan. Restoration and enhancement goals addressed through the design approaches proposed are consistent with the NCEEP's planning efforts to improve water quality not only in the Martin Creek drainage, but also in the Hiwassee River into which Martin Creek flows. Using natural channel design principles and experience gleaned from multiple stream and wetland restoration projects, Baker is developing a stream and wetland restoration approach that will enable the NCEEP to re-establish stable riparian zones and channel morphology for streams targeted by this effort. Wetland restoration will be achieved by returning site hydrology, vegetation and noncompacted surface features to what was once a larger wetland complex. Other wetlands present will be enhanced by improving the vegetative community. Practices implemented during this project will support the State's efforts to improve habitat quality and diversity, and should result in a reduction in siltation and nutrient levels contributed to Martin Creek. The project goals for this restoration project will be accomplished by increasing bank and streambed stability as well as increasing the buffering and filtering capacity created from restored riparian zones and wetlands. Although aggradation is present, overall stream conditions present on-site reflect varying degrees of incision and continued degradation that has been mitigated by the presence of exposed bedrock. If left unchecked, bank erosion will continue contributing sediment to areas downstream of the project site. Restoration and enhancement measures will help to stabilize the channel, halt incision and significantly diminish bank erosion. Establishment of a conservation easement around the project streams and preservation of more stable segments of tributaries in the lower Martin Creek drainage will further promote improvements in terrestrial and aquatic habitat quality and water quality by ensuring development and other land disturbing activities maintain a setback away from streams and wetlands. 2.6 Endangered/Threatened Species Some populations of plants and animals are declining as a result of various natural forces including loss of habitat and competition with humans for resources. The North Carolina Natural Heritage Program (NHP) and United States Fish and Wildlife Service (USFWS) compiled a list of rare and protected animal and plant species that includes seven federally listed species known to exist in Cherokee County (USFWS, 2008 and NHP, 2009). The cornerstone of legal protection for federally listed species (Threatened (T) or Endangered (E) status), is conferred by the Endangered Species Act of 1973, as amended (16 U.S.C. 1531-1534). This act makes illegal the killing, harming, harassing, or removing of any federally listed animal species from the wild; plants are similarly protected but only on federal lands. Section 7 of this act requires federal agencies to ensure that actions they fund or authorize do not jeopardize any federally listed species. Organisms that are listed as Endangered (E), Threatened (T), or Special Concern (SC) on the NHP list of Rare Plant and Animal Species are afforded state protection under the State Endangered Species Act and the North Carolina Plant Protection and Conservation Act of 1979. Species that the NHP lists under federal protection in Cherokee County as of November 16, 2009 are shown in Table 2.4. Pedestrian surveys of the project area and adjacent lands did not result in the observation of any federally protected species listed. An October 31, 2008 search of the NCNHP database revealed several element occurrences within 2 miles of the project area. Species for which observations have been recorded with the NCNHP since 1991 include the Southern blotched chub (Erimystax insignis eristigma), sicklefin redhorse (Moxostoma sp.2), Tennessee clubshell (Pleurobema oviforme), and the Eastern small-footed myotis (Myotis leibii). An observation of the seepage salamander (Desmognathus aeneus), a species of federal concern, was last observed near the project area prior to 1967. According to information provided in the database, there are no recorded observations of federally listed species within two miles of the project area. State listed species observed within two miles of the project area include the MICHAEL BAKER ENGINEERING, INC. PAGE 2-7 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN sicklefin redhorse, Tennessee clubshell, and the mountain creekshell (Villosa vanuxensis). A brief description of the characteristics and habitat requirements of the federally protected species is included in the following section, along with a conclusion regarding potential project impacts. Cherokee County does not contain any federally designated critical habitat. Table 2.4 Species of Federal and State Status in Cherokee County Martin's Creek II Mitigation Project-NCEEP Project #92633 Family Scientific Name Common Name Federal State Habitat Status Status Present/ Biological Conclusion Vertebrate Accipitridae Hahaeetus leucocephalus Bald Eagle BGPA T No/No effect Vespertilionidae Myotis sodalist Indiana Bat E E No/No effect Emydidae Glyptemys muhlenbergii Bog Turtle T (S/A) T No/No Effect Invertebrate Unionidae Villosa trabalis Cumberland Bean (pearlymussel) E SR No/No Effect Unionidae Pegf ias bula Little-Wing Pearlymussel E E No/No Effect Unionidae Epioblasma florentina walkeri (=E. walkeri) Tan Riffleshell E EX No/No Effect Vascular Plant Small Whorled Orchidaceae Isotria medeoloides Pogonia T E No/No Effect Notes: BGPA: Bald and Golden Eagle Protection Act. As of August 8, 2007, the Bald and Golden Eagle Protection Act (Eagle Act) (16 U. S.C. 668 d) is the primary law protecting bald and golden eagles. The Eagle Act prohibits take of bald and golden eagles and provides a statutory definition of "take" that includes "disturb". E: An endangered species is one whose continued existence as a viable component of the state's flora or fauna is determined to be in jeopardy. EX: Extirpated - a species that is no longer believed to exist in the county. T: Threatened S/A: The Endangered Species Act authorizes the treatment of a species (subspecies or population segment) as threatened even though it is not otherwise listed as threatened if. (a) The species so closely resembles in appearance a threatened species that enforcement personnel would have substantial difficulty in differentiating between the listed and unlisted species; (b) the effect of this substantial difficulty is an additional threat to a threatened species; and (c) such treatment of an unlisted species will substantially facilitate the enforcement and further the policy of the Act. The bog turtle (southern population) has this designation due to similarity of appearance to bog turtles in the threatened northern population. SR: Reported from North Carolina, but without persuasive documentation for either accepting or rejecting the report. The NCWRC was notified of the project via letter on November 24, 2008. A letter was submitted to the USFWS December 3, 2008. Baker received comments from NCWRC on December 9, 2008, which indicated that Martin's Creek supports sensitive aquatic life like the sicklefin redhorse, mountain creekshell, and hiwassee crayfish. According to the NCWRC, these and several other sensitive species are found in the Hiwassee River further downstream. In addition to recommending minimization of site disturbance and implementation of effective erosion control measures, the NCWRC also anticipates requesting that stream construction be avoided from April 1St to June 15t' during the spawning season for any sicklefin redhorse populations that may exist in Martin's Creek. MICHAEL BAKER ENGINEERING, INC. PAGE 2-8 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN After discussions were held regarding impact avoidance measures to protect any Indiana bat colonies present on or near the project site, the USFWS submitted their concurrence for this project June 23, 2009. Among the avoidance measures agreed upon was the identification and avoidance of habitat favored by the Indiana bat to the extent possible, the timeframe in which vegetation removal would occur (between October 15 and April 15), and incorporation of trees favored by the Indiana bat into the planting plan for this site. Correspondence between Baker and the NCWRC and USFWS is included in Appendix B. 2.6.1 Federally Listed Endangered Species 2.6.1.1 Vertebrates Haliaeetus leucocephalus (Bald Eagle) Bald eagles are large raptors, 32 to 43 inches long, with a white head, white tail, yellow bill, yellow eyes, and yellow feet. The lower section of the leg has no feathers. Wingspread is about seven feet. The characteristic plumage of adults is dark brown to black with young birds completely dark brown. Juveniles have a dark bill, pale markings on the belly, tail, and under the wings and do not develop the white head and tail until five to six years old. According to the NHP species account, bald eagles in the Southeast frequently build their nests in the transition zone between forest and marsh or open water. Nests are cone-shaped, six to eight feet from top to bottom, and six feet or more in diameter. They are typically constructed of sticks lined with a combination of leaves, grasses, and Spanish moss. Nests are built in dominant live pines or cypress trees that provide a good view and clear flight path, usually less than 0.5 miles from open water. Winter roosts are usually in dominant trees, similar to nesting trees, but may be somewhat farther from water. In North Carolina, nest building takes place in December and January, with egg laying (clutch of one to three eggs) in February and hatching in March. Bald eagles are opportunistic feeders consuming a variety of living prey and carrion. Up to 80 percent of their diet is fish, which is self caught, scavenged, or robbed from ospreys. They may also take various small mammals and birds, especially those weakened by injury or disease. (Henson 1990, Potter et al. 1980, USFWS 1992a) Biological Conclusion: No Effect According to the NCNHP virtual workroom website, the project site is over two miles from a recorded occurrence of bald eagle habitat. With the exception of Martin's Creek, the project area consists of headwater streams with very small drainage areas. Furthermore, the Martin's Creek II project site primarily consists of pasture land. Forested sections of the project area have been impacted by livestock operations and some timber harvesting activities. Although this project site is located within the vicinity of the Hiwassee River, which supports the bald eagle, other habitat features favored by the bald eagle are not currently present at the Martin's Creek II mitigation site nor are any waters within the project area listed as trout supporting streams. Improvements made through this project will not adversely impact any bald eagle populations or habitat. Canopy improvements made to the riparian zone within the restoration and enhancement reaches of the project area could actually support bald eagles in the long term should any of the planted trees become dominant canopy trees. Stream preservation, restoration and enhancement activities will ultimately result in improved channel stability and water quality downstream through a reduction in sediment loading. Therefore, a determination was made that the proposed project will have no effect on this species. Myotis sodalis (Indiana Myotis) The Indiana bat is 3.5 inches long, with mouse-like ears, plain nose, dull, grayish fur on the back, and lighter, cinnamon-brown fur on the belly. Its "wingspread" ranges from 9.5 to 10.5 inches. From MICHAEL BAKER ENGINEERING, INC. PAGE 2-9 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN early October until late March and April, Indiana bats hibernate in large clusters of hundreds or even thousands in limestone caves and abandoned mines, usually near water. During summer, females establish maternity colonies of two dozen to several hundred under the loose bark of dead and dying trees or shaggy-barked live trees, such as the shagbark hickory. Hollows in live or dead trees are also used. Most roost trees are usually exposed to the sun and are near water. Males and non- reproductive females typically roost singly or in small groups. Roost trees can be found within riparian areas, bottomland hardwoods, and upland hardwoods (Adams 1987, USFWS 1992a). Biological Conclusion: No Effect Riparian corridors within the Martin's Creek II project area may provide suitable summer foraging habitat for the Indiana bat; however there are no loose-barked trees within the project area or other habitat suitable for maternity colonies of the bat. There are also no mines or caves within the project area for winter hibernation. Baker received correspondence from the USFWS on January 26, 2009 indicating their concern that habitat may exist within the project area. The USFWS requested that site clearing activities be conducted during mid-October to mid-April and other measures be taken to avoid adverse impacts to potential bat populations or habitat on-site. After additional site visits and a review of the project construction schedule, it was determined that this project would have no affect on the Indiana bat or its habitat. In response to the USFWS concerns, Baker submitted a letter to the USFWS outlining measures designed to minimize and avoid project impacts on the Indiana bat. These measures include performing tree and vegetation removal outside of the Indiana bat's maternity/roosting period, walking the site with the construction manager and marking any trees within the project area that may be favored by the bat. Trees that may be favored by the bat will be avoided to the extent possible. Baker has also proposed to incorporate trees favored by the Indiana bat into a planting plan for the site. Based on measures proposed, the USFWS submitted their concurrence for the project June 23, 2009. Therefore a "no effect" determination was made. Clemmys muhlenbergii (Bog Turtle) The Bog Turtle is among the smallest turtles of North America at only 3-4.5 inches in length with an average weight of 4 ounces. Its shell is light brown to ebony in color and it has a notable bright orange, yellow or red blotch on each side of its head. The bog turtle's preferred habitat in the southern Appalachians includes sphagnum bogs, slowly drained swamps, and mucky, slow moving spring-fed streams in meadows and pastures that are typically less than 4 acres in size (USFWS 1997a). Biological Conclusion: No Effect The Martin's Creek II project site does possess some potential habitat for the bog turtle in the floodplain for Martin's Creek. Although no bogs were present on-site or near the vicinity of the project area, the pasture that makes up a portion of the lower project area does contain wetlands with very shallow standing water. These pocket wetlands contain both exotic, invasive plant vegetation, as well as hydrophytic vegetation such as sedges andiuncus. Cattle had open access to these wetlands until the winder of 2009. No evidence of bog turtle habitation or observations of bog turtles were made during site visits in the spring and fall of 2008. A search of the NCNHP database did not reveal any recorded observations of the bog turtle within two miles of the project area. Correspondence was submitted to the USFWS December 2, 2008 that indicated the potential habitat present within the project area. Correspondence received from the USFWS March MICHAEL BAKER ENGINEERING, INC. PAGE 2-10 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 10, 2009 and June 23, 2009 did not indicate concern over impacts the project might have on the bog turtle. Based on the lack of bog turtle observations made during on-site visits as well as a lack of recorded species observation in the NCNHP database, it was determined that this project will not impact the bog turtle or any known populations that may occur within Cherokee County. Furthermore, nearly seven acres of wetlands will be restored or enhanced through this project. While Restoration and enhancement activities will not result in the current wetland being converted to a bog, wetland functions will be restored to the site, which may enhance some habitat conditions favored by the bog turtle as well as other wildlife and plant communities. 2.6.1.2 Invertebrates Villosa trabalis (Cumberland Bean) The Cumberland bean is a medium-sized freshwater mussel or bivalve mollusk with an olive colored shell displaying faint wavy green lines. This mussel can be found in sand, gravel, and cobble substrates in moderate to fast-moving waters at depths less than a meter (Gordon and Layzer, 1989). As is typical with many mussels, the Cumberland bean favors clean shoal areas and silt-free riffles consisting of relatively firm rubble, gravel, and sand (USFWS, 1984). Its current range includes the Hiwasee River, Polk County, Tennessee and North Carolina (Bogan and Parmalee, 1983). Many intermittent and perennial streams within the project area that were found to contain water during field surveys also contained moderate amounts of silt and had slow to moderate currents. Some of these tributaries were also found to go subsurface for short distances as well. Historical agricultural land use practices of the project area and passage to perennial unnamed tributaries that have been affected by culvert installation and headcutting make it unlikely that any populations which may have existed prior to the conversion of the surrounding landscape would have survived. Biological Conclusion: No Effect Martin's Creek is a targeted local watershed within the Hiwassee River Basin and is known for its excessive sediment and nutrient loading problems, making it unlikely that the Cumberland bean is located on Martin's Creek which is the largest waterbody within the project site. There are no recorded observations of the Cumberland bean within two miles of the project site and none were observed during site surveys. Stormwater and erosion control best management practices will be applied during construction activities associated with stream and wetland restoration and enhancement, minimizing impacts to any potential habitat or populations of the Cumberland bean on Martin's Creek downstream of the project area. Furthermore, the project will not affect the ability of the mussel to migrate upstream or downstream of the project area on Martin's Creek. Due to a lack of suitable mussel habitat, and the application of adequate erosion control measures during project construction, this project will not impact habitat for the Cumberland bean. Pegias fibula (Little-Wing Pearlymussel) The little-wing pearlymussel is a freshwater bivalve mollusk that reaches an average length of 24- millimeters at maturity. Immature little-wing pearlymussels possess dark rays at the base of their shell. By the time the mussel reaches adulthood, its outer shell is usually eroded away. This species is found in small, cool streams at the head of riffles, although it can inhabit other areas in and below riffles in substrate consisting of sand or gravel and scattered cobbles. It has also been MICHAEL BAKER ENGINEERING, INC. PAGE 2-11 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN observed in silt-free environments underneath large rocks and is known to occupy sand pockets between rocks, cobbles and boulders (Gordon and Layzer, 1989). This mussel is most often found submerged on top or partially buried within substrate as previously described in approximately 6 to 10 inches of water (Bogan and Parmalee, 1983; Stansbery, 1976). Bogan (2002) cites the mussel as occurring in the Hiwassee and Little Tennessee River basins in North Carolina. It was formerly observed in the Valley River in Cherokee County and, in addition to Bogan, was cited by LeGrand et al. (2006) as being present in the Little Tennessee River in North Carolina. Based on state species account information provided by the NCNHP and the NC Wildlife Resource Commission's (NCWRC), state atlas of freshwater mussels, it appears this species now only inhabits a section of the Little Tennessee River basin between Swain and Macon counties. Biological Conclusion: No Effect Based on the lack of observations made during on-site visits and information provided by the NCNHP and NCWRC, the little-wing pearlymussel does not inhabit the project site or waters within at least two miles of the project. Therefore, this project will not impact habitat or known populations of the little-wing pearlymussel in western North Carolina. Epioblasma florentina walkeri (E. walkeri) (Tan Riffleshell) Like the Cumberland bean, the tan riffleshell is a medium-sized freshwater mussel that has multiple green rays and a brown to yellow colored shell. Its habitat requirement are also similar to the Cumberland bean as it is found in headwaters, riffles, and shoals made up of sand and gravel substrates (Bogan & Parmalee, 1983). While it is possible that populations of this mussel may still exist in the Hiwassee River, recorded populations of this species are located outside of the state, primarily within the Clinch River drainage in Tennessee (Jones, 2004). Based on population declines, it appears this mussel is particularly sensitive to poor water quality and habitat disturbance including the loss of glochidial hosts. Biological Conclusion: No Effect The Martin's Creek II project will not affect any tan riffleshell populations which may exist in the Hiwassee for the same factors listed in the biological conclusion for the Cumberland bean. According to the NCNHP database, there have been no recorded observations of the tan nffleshell within two miles of the project area which covers a segment of the Hiwassee River in the vicinity of the site. A review of the US Fish and Wildlife Service, Asheville Ecological Field Office website (last updated May 15, 2008) on threatened and endangered species associated with the North Carolina lists the tan riffleshell as being extirpated. 2.6.1.3 Vascular Plants Isotria medeoloides (Small-Whorled Pogonia) The small-whorled pogonia is a small, perennial member of the Orchidaceae. These plants arise from long slender roots, with hollow stems terminating in a whorl of five or six light green leaves. The single flower is approximately one inch long, with yellowish-green to white petals and three longer green sepals. This orchid blooms in late spring, from mid-May to mid-June. Populations of this plant are reported to have extended periods of dormancy and to bloom sporadically. This small spring ephemeral orchid is not observable outside of the spring growing season. When not in flower, young plants of Indian cucumber-root (Medeola virgintana) also resemble small-whorled pogonia; however, the hollow stout stem oflsotria separates it from the genus Medeola, which has a solid, more slender stem (U.S. Fish and Wildlife Service County Listing, 2008). MICHAEL BAKER ENGINEERING, INC. PAGE 2-12 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Small-whorled pogonias may occur in young as well as maturing forests, but typically grows in open, dry, deciduous woods and areas along streams with acidic soil. It also grows in rich, mesic woods in association with white pine and rhododendron. Biological Conclusion: No Effect Suitable habitat for the small-whorled pogonia as described above does not exist in the restoration and enhancement reaches of the Martin's Creek II project area. No plants were located during field assessments performed; a review of the NCNHP database did not reveal any recorded observations within two miles of the project limits. Therefore, this project will not have an impact on any small-whorled pogonia populations occurring in Cherokee County. 2.7 Cultural Resources A letter was sent to the North Carolina State Historic Preservation Office (SHPO) and Eastern Band of Cherokee Indians Tribal Historic Preservation Office (THPO) on November 21, 2008, requesting a review and comment for the potential of cultural resources in the vicinity of the Martin's Creek II project. The SHPO responded on January 8, 2009, and requested that a Phase I Archaeological Survey be completed based on the high probability that prehistoric or historic archaeological sites may be present due to the topography and hydrological features of the area. The NCEEP contracted with Robert J. Goldstein & Associates, Inc. to perform a Phase I archaeological survey which was completed in May, 2009. The archaeological consulting group did locate one site within the project area; however it was determined that the site is not eligible for listing in the National Register of Historic Places. Other findings in the archaeological report included a recommendation that no further archaeological investigations be conducted for the purposes of this project. On June 10, 2009, the SHPO submitted correspondence to Baker agreeing with the findings. As of June 30, 2009, the Tribal Historic Preservation Office has not commented with concerns. A copy of the SHPO and THPO correspondence is included in Appendix B. 2.8 Potential Constraints Baker Engineering assessed the Martin's Creek II project site with regard to potential fatal flaws and site constraints. No fatal flaws have been identified at this stage of the project. There are constraints to our restoration approach on Martin's Creek and at specific locations on some of the tributaries. Martin's Creek has been moved in the past to increase the pasture area. It now flows in a relatively straight path between Crisp Road and Wildcat Road. Martin's Creek Road parallels the creek on the east side and comes within 15 to 20 feet of the right bank at the upstream end of the project site. High-tension power lines run overhead for the length of Martin's Creek on the project property. These constraints limit the practical approach along Martin's Creek proper. While more extensive restoration could be proposed, and would be beneficial on this reach, it is likely that maintenance along the power line right-of-way would limit tree growth and thus the ability to develop a mature, forested riparian zone. There are also farm road crossings of two channels; these crossings will be removed from the easement because restoration activities would not be consistent with the crossings. Above one of these crossings, on the left bank is a barn and on the right bank is an area where household garbage appears to have been dumped in the past. These constraints will limit the ability to get a 30-foot easement and to make any adjustments to the stream. This short reach of the stream may also need to be excluded to avoid issues that these constraints create. Six other easement breaks were identified based on the existing road network in the vicinity of the project and the landowners' future plans for the property. These are the only project constraints or potential constraints observed to date. 2.8.1 Property Ownership, Boundary and Site Access Currently, the Martin's Creek II project site is owned by the trustees of George Cohen. The NCEEP has obtained a conservation easement from the current landowners for the Martin's Creek II project area. The MICHAEL BAKER ENGINEERING, INC. PAGE 2-13 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN easement is held by the State of North Carolina and has been recorded at the Cherokee County Courthouse. The easement allows Baker to proceed with the mitigation project and restricts the land use in perpetuity. The site is connected to NCDOT right of way as well as to unpaved roads that can be accessed for construction and post-restoration monitoring. 2.8.2 Utilities The Martin's Creek II project site is crossed by a 40-foot wide power line easement. In addition, several phone lines run adjacent to the project area next to Martin's Creek Road, Crisp Road and Wildcat Road. Baker contacted NC One Call to locate any underground utilities at the project site. The site was inspected by Mr. Mark Davidson of Blue Ridge EMC and his conclusion was that no underground utilities exist within the project area. The proposed restoration activities will be designed to try to avoid any permanent impacts to the power line easement area. The proposed restoration activities will be designed to try to avoid any permanent impacts to the power line easement area. 2.8.3 Hydrologic Trespass and Floodplain Characterization The Martin's Creek II mitigation project is located in both regulated and non-regulated floodplains. The upper reaches of the unnamed tributaries are not regulated and do not pose a flooding threat to any structures or other infrastructure. The lower portion of the Martin's Creek II project site, which consists of several tributaries to Martin's Creek and the mainstem of Martin's Creek and its valley, has been mapped within a Federal Emergency Management Agency (FEMA)-identified flood zone (Zone AE). This is a special flood hazard area with a designated 100-Year Base Flood Elevation (BFE) and non-encroachment areas. Modifications within the non-encroachment areas require a flood study to determine whether the proposed modifications will impact the established BFEs or non-encroachment widths. If the difference in the BFE is between 0 and -0.10' (decrease of 1/1 0th of a foot or less), this is considered "no impact". If a rise is indicated by the proposed changes, this would necessitate a Conditional Letter of Map Revision (CLOMR) and post-project Letter of Map Revision (LOMR). If a decrease of greater than 0.10' is indicated (not a valid "no impact", but a valid "no rise"), this would require a post-project LOMR as well; typically, in such a case, the flood study demonstrating no rise in the BFEs would be accepted in lieu of a CLOMR and the project could proceed upon local or state review of the study. Baker has confirmed the map designations with the NC floodplain mapping information system on-line (http://floodmaps.nc.gov/). Based on the current plans, Baker has conducted preliminary modeling and believes that the project can be permitted with a no-impact certification (i.e. there are no rises, and all decreases are less than 0.10'). Upon acceptance of the restoration plan and drawings, Baker will finalize modeling and submit a report summarizing the project and modeling results to the designated floodplain administrator for Cherokee County. Baker has discussed this project with the county and does not anticipate any other requirements that will affect the project. 2.9 Potentially Hazardous Environmental Sites An Environmental Data Resources, Inc. report that identifies and maps both previously documented or potentially hazardous environmental sites within two miles of the project area was prepared for the site on October 17, 2008. A copy of the report with an overview map is included in Appendix C. Site searches conducted under the report included but were not limited to the following queries: Superfund Database (National Priorities List, NPL) (for hazardous waste treatment, storage, or disposal facilities); the Comprehensive Environmental Response, Compensation, and Liability Act Information System (CERCLIS) Database (for suspect state hazardous waste, solid waste or landfill facilities). A search regarding prior incidents of leaking underground storage tanks in the proposed project area also yielded no results. Based on the EDR report, there are no known or potentially hazardous waste sites within or adjacent to the project area. During field data collection, there was no evidence of these sites in the proposed project vicinity, and conversations with landowners did not reveal any further knowledge of hazardous environmental sites in the area. Therefore, the overall environmental risk for this site was determined to be low. MICHAEL BAKER ENGINEERING, INC. PAGE 2-14 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 3.0 PROJECT SITE STREAMS 3.1 Existing Conditions Survey Baker conducted a detailed channel morphological survey on all of the restoration and enhancement reaches with a total station. Along with providing detailed topography, this survey included two cross sections on Martin's Creek, two or more cross sections on each unnamed tributary, and a longitudinal profile for all reaches. Baker also collected multiple substrate samples to characterize stream sediments. Figure 3.0 illustrates the locations of cross section surveys and each project reach. Surveyed cross sections and profiles are included in Appendix D. A photo log that depicts the existing conditions at the Martin's Creek II project site is provided in Appendix E. The existing conditions of designated project reaches are described below with Table 3.0 summarizing the representative geomorphic conditions currently present at the Martin's Creek mitigation site. The table also provides regional curve data for comparison based on the drainage area of each reach (Harman, 2000). The applicability of the regional curve data has been tempered against the small drainage areas and steep slopes present within restoration and enhancement areas; these extremes are not well represented in the original regional empirical data sets. As part of the interpretation of the regional curve data, Baker considered other empirical data collected in-house, and by the NRCS, as supplemental. A more detailed discussion of the analysis conducted to assess channel stability and estimate channel forming discharge for project streams is included in Sections 3.5 through 3.7. Baker assessed the stream and valley types present and considered their evolutionary stage and likely endpoint in order to develop a basis for the proposed restoration efforts. The project contains both colluvial and alluvial valleys with a wide range of slopes present. There are B, E, C, G and F-type streams found within the project reaches as a steeper valley type is present in the upper reaches, and a broad low-slope valley is present in the main valley of Martin's Creek. All streams have been altered by straightening, relocation to enlarge pastures, and livestock impacts. 3.2 Channel Classification There are multiple Preservation reaches within the project area. Most of the tributaries to the Right Prong of Martin's Creek and Martin's Creek UT1 Reach 1, Martin's Creek UT1-1, and 1-2 are all Preservation reaches. These reaches are steeper headwater streams that are entrenched with lower sinuosity's and width/depth ratios, and moderate to steep gradients. These features classify them as A, B and G-type streams. The only streams in the Right Prong to Martin's Creek watershed that are not preservation are the downstream most reach of Right Prong to Martin's Creek and the downstream most reach of one tributary (RP-UTI) that are proposed to be treated as Enhancement II reaches. These reaches have a lower gradient, moderate sinuosity and width/depth rations and have a low bank height ratio. These reaches are E or C type channels and are being impacted by extensive stands of invasive species. The mainstem of Martin's Creek and UT2 are also proposed to be restored at the Enhancement II level. These channels are C, and G -type channels respectively. These two channels could have a greater level of work done than what is proposed but because of their proximity to an existing power-line it is felt that there are notable limitations to the extent of riparian restoration that can occur given the periodic maintenance required for the utility corridor. All of the remaining Enhancement II and Preservation reaches exhibit a moderate to high level of stability, which is justification for the recommended mitigation approach. The following is a discussion of the channel classification for those reaches with higher levels of intervention (Enhancement I and Restoration). These reaches are: • Martin's Creek (MC)-UTI, Reach 2 - Restoration; • MC-UT I, Reach 3 - Enhancement I MICHAEL BAKER ENGINEERING, INC. PAGE 3-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Q.. Q Q O gym- ° ?, .j T o ? p fl ?o R a o . L ??? ? xe y ? ? xia /f ? Otiap g?. ?_ ? W t ? i F 1 ? a ??`'c t u 'G v eg v _ f LEGEND Figure 3. Project Reaches & Survey 122 Jurisdictional Wetlands E Monitoring Wells Project Parcel Cross Section Locations - - Geomorphic Survey _ Powerline 0 Parcels Martin Creek Mitigation Project NCDWQ Stream Classification Break ® Power Pole ------ Cross Sections Cherokee County, NC COSVStem i Perennial/Intermittent Intermittent/Ephemeral 0 200 400 800 v Feet MC-UT1, Reach 4 - Restoration; MC-UT1-3, Reach 1 - Enhancement I; MC-UT1-3, Reach 2 - Restoration. MC-UT1 Reach 1 begins in a forested upland section of the project area at the confluence of two smaller tributaries high in the watershed and continues downstream to the edge of a hayfield. Reach 2, MC-UT1 begins at the point where the stream enters a hayfield. Through this reach the stream is impacted by buffer removal on the left bank, channel realignment to the bottom of the right valley wall, a series of headcuts and moderate to severe incision. This reach is proposed for Restoration. Based respectively on cross sections X1 and X2, Reach 2 was classified as an Eb and Fb stream type. In the case of X1, while the channel classifies as an Eb, it is functioning as a G as demonstrated by the high bank height ratio of 1.8. The channel is incised and it can be assumed that the channel will continue to incise and eventually classify as a G. Based on the classification, X2 is also very incised, but has started to widen towards an F-type channel. However, this reflects some deposition at this cross section due to right bank sediment falling into the channel and a channel blockage just downstream of this section. Differences in local conditions may commonly result in a different stage of channel evolution. In both cases, the classification indicates that restoration is warranted. Cross section X3 is further downstream in the same reach and classifies as a B channel. However, it is obvious in X3 that the right bank is up against the valley wall. This is the case for much of the reach length. A comparison of contours for those existing segments up against the valley wall, versus the one substantial existing segment (proposed station 3+50 to 4+00) that has migrated away from the toe of the valley wall, shows that this right bank is extremely steep and that loosened soil (through stormwater flow or freeze and thaw) that makes up this slope, will cascade into the channel. At these steep locations, the valley wall starts at an abrupt slope steeper than 1:1 from the toe of the channel (some of the slopes are as steep as 0.5:1). In non- eroding areas, the valley wall slope is 1.5:1 or greater. In multiple locations, there is evidence that the stream has eroded, or is presently eroding, the toe of the slope, resulting in collapse and over steepening of the bank. The segment from 3+50 to 4+00, that was previously mentioned, may have moved away from the toe of the valley wall as a result of such a failure. This colluvial input would have forced the channel to move to the left. This, and other similar evidence of such morphologic change (such as at proposed station 5+00), is an unnatural response of the stream to channelization. The combination of incision, channel widening, and bank and slope erosion dictates that the channel be restored by moving away from the toe of slope and more to the center of the narrow valley. Below Reach 2, the stream continues through another wooded area where it leaves the project property. It comes back onto the property, as the lower segment of MC-UT1 (Reaches 3 and 4). On the plans Reach 3 starts at station 0+00 and continues to station 3+46. Reach 3 begins just below a stream crossing that is located where the stream emerges from the upstream forested section. This reach has an extensive coverage by multiflora rose that has limited the growth of other vegetation along the channel. Until recently, cattle have also used this reach for resting in hot weather and as a source of water. This has resulted in some areas of stream bank instability and erosion. This reach is represented by Cross Sections X4 and X5. The stream classified as a G-type channel at X4, and an E at X5. This represents the difference in stream quality between an area where invasive vegetation is extensive (X4) and an area where it has been eliminated and there are few cattle impacts (X5). Downcutting, local bank erosion and invasive removal are to be addressed with Enhancement I activities in this reach. The reach ends just upstream of the barn and outbuilding on the left side of the stream. Due to the close proximity of this barn to the creek and an existing culverted stream crossing, a short area of channel (station 3+46 to 5+50) was excluded from the project. Reach 4 starts below the culverted stream crossing that goes to the barn area and is the point on the stream where it transitions from the steeper channel to a flatter main valley. The valley slope broadens and MC-UT1 exhibits characteristics of a G-type stream; this is seen in X7, located in a perched and channelized portion of the reach. Based on observations in the adjoining field the existing channel was created by channelization below the culvert sometime in the past to increase the pasture area and move the channel to the property line. Levy installation and downcutting resulting from channelization have resulted in an incised channel with poor MICHAEL BAKER ENGINEERING, INC. PAGE 3-3 9/29/2010 MARTIN'S CREEK 11 MITIGATION PLAN floodplain connectivity. Currently MC-UT1 crosses under Wildcat Branch Road before entering Martin's Creek. Adjacent depressional wetlands along the old channel alignment have been impacted by this channel being moved and the hydrology being redirected away from the field and wetland areas, as well as from livestock and exotic invasive vegetation. However, we propose to route the stream back into the relic channel so that it continues on to the mainstem of Martin's Creek on the project property. UT 1-3 to Martin's Creek (MC-UT1-3) enters the project area in the southwest quadrant of the lower property parcel. This channel appears to begin within a hundred feet of where it crosses onto the project property. After crossing a property line fence it appears to straddle adjacent properties as it flow near the bottom of a forested hillslope on the right bank and along the fringe of a pasture on the left. Upon entering the project area at station 0+00, Reach 1 begins where the stream enters a forested area. Livestock have used this forested area for shade during the summer months. Cattle access has caused downcutting in some sections and aggradation in other areas. This reach also has one large headcut that has moved through much of the reach and is continuing to work upstream at the upper end of the reach. The channel classifies as an Eb and B-type stream from cross sections X8, X9 and X10. There are a number of meanders within the reach that appear to have become established before he young forest developed. Some of these meanders are cutting into steep, red clay hill slopes and these meanders will be modified so that they no longer extend as far as the slopes allowing for the development of a narrow floodplain along the outside of the meander. MC-UT1-3 Reach 2 begins where the tributary flows through a crossing in the driveway and enters into the broader valley shared with the mainstem of Martin's Creek. This reach from the driveway crossing to where it leaves the property line at the downstream end of the reach, has been channelized into a perched channel. The channel runs down slope along one side of a wetland area, then the alignment turns sharply in a northeasterly direction and runs down the field, parallel to the mainstem along the foot of a slope. It eventually crosses the property line and under Wildcat Branch Road through its own culvert, and converges with MC-UT1 just north of the road. The channelized reach has a levy on the right bank which keeps water from flowing to the low point in the valley. Unnamed Tributary 1-3 to Martin's Creek is classified as a C- type channel based on cross sections X11 and an F-type based on X12. The high width/depth ratio of both cross sections indicate the oversized channel that was dredged and the lack of stream habitat. In fact, flow through this channel is very slow and is not likely to support biological communities expected for flowing, cool or cold water streams. The channel has extensive stands of multiflora rose along both banks but few trees. 3.3 Valley Classification In addition to determining stream types present at the Martin's Creek Site, valley types were also considered. All of the upper reaches, draining the slopes in the Martin's Creek mitigation project, are located in Type II valley settings. Type II valleys typically drain moderately steep colluvial streams and have floor slopes less than 4% (Rosgen 1996). The B, G, and Fb channel types present in the upper project reaches are commonly seen in Valley Type II drainages throughout the Blue Ridge Province where channelization, dredging and other practices associated with agricultural land use activities have directly affected the channel and riparian zone, resulting in an unstable system. In the lower valley that Martin's Creek passes through, the valley type is most consistent with a Type VIII, having wide, gentle valley slopes with a well developed floodplain. Stream types commonly found in stable Type VIII valleys are E, C, and occasionally D, F or G. G-type streams are also present in the project area, owing to prior anthropogenic impacts to stream stability. MICHAEL BAKER ENGINEERING, INC. PAGE 3-4 9/29/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 3.0 Representative Geomorphic Data for Martin's Creek and Unnamed Tributaries Stream Channel Classifica tion Level II Martin's Creek II Mitigation Project-NCEEP Project #92633 Parameter Value Units Unnamed Tributary 1 to Martin's Creek (MC-UTI) MC-UT I Reach 2 MC-UTI Reach 3 MC-UT 1 Reach 4 X1 X2 X3 X4 X6 X7 Reach Length 1,070 345 332 Linear Feet Feature Type Riffle Riffle Riffle Riffle Riffle Riffle MM=mdMd Square Drainage Area 0.09 0.17 0.17 Miles NC Mountain Regional Curve 7.8 9.9 9.9 Feet (Wbkf) NC Mountain Regional Curve 0.5 0.6 0.6 Feet (Dbkf) NC Mountain Regional Curve 4.2 6.5 6.5 Feet (Abkf) Bankfull Width 6 4 7 5 14 0 5 9 9 8 7 6 Feet (Wbkf) . . . . . . Bankfull Mean Depth (dbke) 0.60 0.52 0.25 0.78 0.63 0.81 Feet Cross-Sectional Area (Abke) 3.8 3.9 3.6 4.6 6.2 6.1 Square Feet Width/Depth Ratio (W/D 10.7 14.5 55.0 7.6 15.4 9.4 ratio) Bankfull Max Depth (dmbkf) 0.97 0.62 0.65 1.09 1.06 1.11 Feet Floodprone Area Width 18.6 9 >30.8 9.4 >20.6 13.7 Feet / (Wf a) Entrenchment 2 9 1 2 >2 2 1 6 >2 1 1 8 Ratio (ER) . . . . . . Bank Height Ratio (BHR)** 1.8 2.2 1.3 1.8 1.0 4.1 Channel Materials (Particle Size Index - d50) d16 0.8 0.8 0.3 0.3 mm d35 4.4 4.4 1.1 1.1 mm d50 8.7 8.7 3.5 3.5 mm d84 28.0 28.0 12.1 12.1 mm d95 66.8 66.8 15.7 15.7 mm MICHAEL BAKER ENGINEERING, INC. PAGE 3-5 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Water Surface 0 04-0 05 0 04-0 05 0 03-0 04 0 015 Ft/Ft Slope (S) . . . . . . . Channel 1 06-1 18 -1-1 26 Q 2 Sinuosity (K)* . . . . Rosgen Stream Eb Fb B G Cb G Type * Low sinuosity channels present due to prior channelization. ** High bank height ratios should be noted, values in excess of 1.5 have little or no chance for self-recovery (Rosgen, D. L., 2001a). Also refer to Table 3.2. 1. Due to aggraded channel conditions, abundance of silt present and channel flow characteristics at the time of assessment, substrate sample not collected in this reach of MC-UTl-3. Table 3.0 Representative Geomorphic Data for Martin's Creek and Unnamed Tributaries Stream Channel Classification Level II (cont.) Martin's Creek II Mitigation Project-NCEEP Project #92633 Parameter Value Unnamed Tributary 1-3 to Martin's Creek (MC-UT1- 3) Units MC-UT1-3 Reach 1 MC-UT 1-3 Reach 2 X8 X9 X11 X12 Reach Length 516 1,068 Linear Feet Feature Type Riffle Riffle Riffle Riffle Drainage Area 0.07 0.08 Square Miles NC Mountain Regional Curve 7.1 7.5 Feet (Wbkf) NC Mountain Regional Curve 0.5 0.5 Feet (Dbkf) NC Mountain Regional Curve 3.5 3.9 Feet (Abkf) Bankfull Width (Wbkf) 5.0 6.8 11.4 6.9 Feet Bankfull Mean Depth (dbkf) 0.58 0.45 0.29 0.43 Feet Cross-Sectional 2.9 3.0 3.3 2.9 Square Feet Area (Abkf) Width/Depth Ratio 8.6 15.2 39.7 16.0 (W/D ratio) Bankfull Max Depth (dmbkf) 1.0 0.87 0.88 0.90 Feet Floodprone Area Width 13.5 11.6 26.2 10.3 Feet / (Wf a) Entrenchment Ratio (ER) 2.7 1.7 2.3 1.5 Bank Height 1.0 1.8 1.0 3.0 MICHAEL BAKER ENGINEERING, INC. PAGE 3-6 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Ratio (BHR) Channel Materials (Particle Size Index - d50) d16 0.26 Silt' mm d35 1.08 Silt' mm d50 3.49 Silt' mm d84 12.07 Silt' mm d95 15.74 Silt' mm Water Surface 0 03-0 04 0 007 Ft/Ft Slope (S) . . . Channel <1 2 <1 2 Sinuosity (K) . . Rosgen Stream Eb B C F Type * Low sinuosity channels present due to prior channelization. ** High bank height ratios should be noted, values in excess of 1.5 have little or no chance for self- recovery (Rosgen, D. L., 2001a). Also refer to Table 3.2. 1. Due to aggraded channel conditions, abundance of silt present and channel flow characteristics at the time of assessment, substrate sample not collected in this reach of MC-UTI-3. 3.4 Project Reach Characterization Martin's Creek and tributaries within the project area have been impaired by historical and current land management practices, which include pasture conversion, channelization, and livestock grazing. Riparian disturbance, livestock access to streams and channel manipulation are evident throughout much of the project site. Over time, these practices have contributed excessive siltation and nutrients to Martin's Creek and ultimately to the Hiwassee River impacting the habitat of sensitive aquatic taxa. During development of the land for livestock grazing, most of the woody stream bank vegetation was removed on at least one bank of MC-UTI and MC-UTI-3. Stream channels were relocated and straightened to maximize the pasture available for grazing. The removal of woody vegetation along Martin's Creek is also related to the power lines that run overhead, thus limiting the degree to which riparian restoration can be accomplished along the mainstem. The most common problems present along the tributaries where enhancement and restoration work is proposed include poor riparian conditions due to invasive vegetation, lack of woody vegetation, loss of connectivity to the floodplain, poor geomorphic heterogeneity and stream banks that have been trampled, forming ruts and gullies along the banks. 3.4.1 Martin's Creek (Mainstem) Martin's Creek appears to have been channelized in the past to maximize available pasture land. In general, the pattern and bedform diversity of Martin's Creek is lacking and the degree of floodplain connectivity is impaired by the presence of a manmade levy on the left bank. Due to the location of the power lines overhead and the corresponding utility corridor easement, our design approach on the mainstem is limited and will consist of partial levy removal, invasive plant species removal and replanting of the riparian zone to the extent possible. MICHAEL BAKER ENGINEERING, INC. PAGE 3-7 9/29/2010 MARTIN'S CREEK 11 MITIGATION PLAN Activities are intended, among other things, to reduce sediment erosion from bank instability and to filter surface runoff draining directly into Martin's Creek from adjacent pastureland. Land cover adjacent to the channel consists of pasture land and the adjacent Martin's Creek Road corridor. The overall valley slope is 0.004 ft/ft. 3.4.2 Martin's Creek UTl-1 and UTl-2 (MC-UTl-1 and MC-UT1-2) Martin's Creek (MC) UT1-1 and UT1-2 are first or second order tributaries located in the next field up the access road above the barn and on the west side of Wildcat Drive as you travel northwest from the Wildcat Drive Bridge over the mainstem of Martin's Creek. Just beyond the western edge of the field, at 689 LF in length, MC-UT1-1 is a short tributary that contributes to MC-UT1. Due to the forested riparian conditions and geomorphic features present, MC-UT 1-1 is a proposed preservation reach. Confluencing with MC-UT1 at a point where the access road enters the upper field, MC-UT1-2 is another small, drainage and is likewise slated for preservation. This 923-foot-long tributary is primarily an intermittent channel in the project area. The channel parallels the property line on the north side of the field. While surrounded by grassed areas of the field, the channel does have a riparian buffer that is forested. This buffer is variable in width, and is more narrow near the confluence of UT1-2 and MC-UT 1 near the lower end of the field. 3.4.3 Martin's Creek UTl (MC-UTI) MC-UT1 originates on the high elevation slopes above the upper field. Upstream of this cleared upper field MC-UT 1 is a first order stream and is referred to as Reach 1. At the point where the valley broadens slightly and enters the area that has been converted to pasture, it is referred to as Reach 2. Reach 1 of UT1 is a completely forested headwater tributary that is proposed to be managed as a preservation reach. The reach break has been designated at the interface of the forested stream and the reach of stream in the upper field. MC-UT1 Reach 2 has been moved against the right valley wall and flows along the edge of the pasture at the foot of the right slope. Below Reach 2, MC-UT1 continues through a wooded area as it parallels the Wildcat Acres property line and an established right-of-way-access road. Over this segment, it straddles the property boundaries and is close to the road, and therefore has not been included in the project until it enters the lower property within a livestock paddock that is attached to the barn. At the point where it flows back on the project property it first flows through a ford crossing and then enters Reach 3. This reach includes a relatively short stream segment that has been impacted by invasive multiflora rose and privet, cattle grazing and past alignment manipulation. This reach ends at a point where the barn is too close to the stream to allow for an easement or stream work. Reach 4 begins below a culvert that leads to the barn. The existing channel for this reach was channelized along the property line and then onto the adjoining Wildcat Acres where it crosses the developments access road and then connects to Martin's Creek. The first restoration reach (Reach 2) on MC-UT1 begins at a point where the stream enters the upper field and where the channel was relocated at some point in the past to the toe of the right hill slope. In multiple locations, this has resulted in past and ongoing undercutting of the toe of the valley wall, over-steepening of the lower hillside to slopes steeper than 1:1, and subsequent erosion and sedimentation into the stream by soil and colluvium from the valley wall. The cross sections surveyed depict a stream with a high bank height ratio and are trending towards continued entrenchment and then widening to an F-type channel. Through this reach the channel has developed a series of headcuts that are destabilizing the channel. This means that the reach is MICHAEL BAKER ENGINEERING, INC. PAGE 3-8 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN still in the worsening stages of channel evolution and that it can benefit considerably from restoration activities. The design approach calls for dimension, pattern and profile adjustments. Grade control has been designed to create a series of steps and pools that stabilize the existing unstable profile. This will result in a geomorphology that is typical to the setting of this moderately steep second order stream. The reach has also been moved away from the valley wall to eliminate erosion of the soil and colluviums from undercutting of the toe of the valley wall, and mass wasting from the high slope into the stream. Restoration of the channel to its natural location in the valley will coincide with the other necessary dimension and grade control improvements; the result will provide improved floodplain connectivity and conveyance. The existing banks are primarily vegetated with exotic invasive vegetation including multiflora rose and privet. This vegetation will be removed and the banks planted with native riparian woody and herbaceous species. Reach 3, of MC-UT1 is the only reach on MC-UT1 that is being restored using an Enhancement I approach. This reach has an extensive, continuous stand of multiflora rose and privet on the left bank with scattered stands on the right bank. This has prevented deeply rooted vegetation from growing along this channel resulting in several areas of bank instability. This reach has also been impacted by cattle access in the past and sediment deposition from cattle degradation to the adjoining paddock. In some areas the channel is in good shape due to low bank heights and this allowed a quick recovery after livestock were recently removed. This reach will be restored by removing the invasive species, sloping and stabilizing eroding stream banks, adding grade control structures at key locations and replanting the reach with native plant species. A second restoration reach (Reach 4) will tie MC-UT 1 into another tributary (UT1-3, Reach 2) running down the main valley of Martin's Creek and then these will enter Martin's Creek within the project area. The existing channel of MC-UT1 has been channelized from the existing culverted stream crossing straight to the property line and then onto the Wildcat Acres property. It presently functions as a ditch that was dug to redirect the stream off the property as directly as possible and under Wildcat Road. The channel survey showed that the existing G-type channel is very entrenched and has a bank height ratio of 4. 1, reflecting the prior anthropogenic impacts. The relict channel is still discernable in the adjoining pasture. A new stable E-type channel will be constructed with an alignment that utilizes the relict channel and brings the tributary down into the low part of the main valley, contributes additional hydrology to the wetlands located in the low part of the valley, and ties it into the other restored tributary and the mainstem.. 3.4.4 Martin's Creek UTl-3 (MC-UTl-3) Martin's Creek UT1-3 is located near Crisp Road and is the southernmost tributary on the project site flowing down the south side of a ridge that divides the lower parcel and then flows into the valley in which the mainstem Martin's Creek flows. It is crossed by a gravel driveway that extends to a residence located within this lower parcel. MC-UT1-3 is divided into two reaches. Reach 1 will have an Enhancement Level I approach applied from the property line where the stream enters the property downstream to the driveway. Reach 2 will be restored with a Priority 1 Restoration approach starting at the driveway and extending to a confluence with MC-UT-1. Land cover in the enhancement reach consists of forested cover on the right bank and pasture or semi-forested cover along the left bank. The channel dimension near the beginning of the enhancement reach reflects aggradation brought about by bank instability from livestock- trampled banks. Further downstream, the channel becomes incised, with bank height ratios of 1.5-1.8 reflecting the unstable nature of the channel in the past before the forest canopy developed. The incised condition continues to create unstable channel conditions such as bank erosion and headcutting. Bedform diversity is somewhat poor and consists of long riffles and irregularly spaced, shallow pools. Exotic invasive vegetation is present in extensive stands on the MICHAEL BAKER ENGINEERING, INC. PAGE 3-9 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN left bank were forest cover is minimal and in isolated areas on the right bank along the stream corridor. Downstream of the gravel drive, MC-UT1-3 flows across a pasture that was in use until the winter of 2009. Exotic invasive vegetation has developed thick stands along both banks throughout this entire reach. The existing channel was created by channelization resulting in a perched channel that is higher than the low point in the valley. The channel is over wide, has a manmade levy on the right bank from the side casting of dredged material and does not appear to be adequately transporting sediment through the stream system as evidenced by the accumulated silt. The channel has also been significantly impacted by the trampling of the streambanks and channel by livestock. The channel typically exhibits an incised condition, except for areas where bank degradation and sediment deposition has resulted from livestock access. Full restoration involving the restoration of pattern, dimension and profile are being proposed due to the severity of impacts to this tributary and in order to move the channel to the low point of the valley. In addition to channel morphology and ecological considerations, the design approach for MC- UT1-3 also takes into consideration the restoration processes needed to restore the connectivity of MC-UT 1-3 to the existing wetlands and more extensive wetlands that will be restored in this lower field. Further discussion of the approaches for restoring ecological and hydrologic functions to streams and wetlands is provided in Sections 5 and 7 of this plan. 3.4.5 Martin's Creek UT2 (MC-UT2) MC-UT2 is a tributary feeding directly into the mainstem of Martin's Creek. It is a very short reach, and due to the extent of exposed bedrock present and other site constraints such as a N.C. Department of Transportation (NCDOT) secondary road and overhead power-lines, an Enhancement II approach is being proposed. Activities will include improvements to channel dimension through bank sloping and riparian enhancement through the removal of invasive vegetation and re-establishment of a buffer consisting of woody and herbaceous vegetation native to the project area. 3.4.6 Right Prong Martin's Creek (Mainstem) The Right Prong Martin's Creek drainage can be accessed by turning off Martin's Creek Road into a small gated community on Wildcat Road. Right Prong Martin's Creek and its many tributaries are located in the forested, upland portion of the project area (large western most parcel) that has a drainage area of approximately 0.6 square miles. Right Prong Creek undergoes several changes in slope from source to valley. However, adequate grade control and pool spacing over most of the 5,208 LF of Reach 1, in addition to an well established forest canopy, have resulted in a natural channel system that will be preserved as part of this Martin's Creek II mitigation project. Reach 2 of RP-UT1 is a 572 LF reach that starts just upstream of the confluence with RP-UT1 and ends at the property boundary. This reach flows alongside an area that has been cleared for a field in the recent past. This field has been abandoned and is now in the early stages of succession, returning to a forested condition. However, nonnative, invasive plant species have taken over the area and now have a thick stand across the entire area that was cleared. The channel in this area is in good condition with only minor instability in areas where woody vegetation is minimal. Enhancement of this reach will consist of removing invasive vegetation and replanting the area with native woody and herbaceous vegetation. 3.4.7 Right Prong Martin's Creek UT1 (RP-UT1) Right Prong Martin's Creek UT1 is located near the property boundary that abuts the gated development north of the project site. Like Right Prong Martin's Creek, the upper 541 LF of RP- MICHAEL BAKER ENGINEERING, INC. PAGE 3-10 9/29/2010 MARTIN'S CREEK 11 MITIGATION PLAN UTlwill be preserved while the remaining 399 LF of tributary within the project limits will be addressed with an Enhancement II approach. Channel conditions in the enhancement reach are generally good. Like RP-UT1 this reach is located in the "old field" area and has extensive stands of invasive species. Where these stands have limited the growth of native species some bank instability has occurred; however, most of the channel has a narrow strip of native vegetation in the riparian zone and then beyond this narrow buffer zone there are thick stands of invasive species. There is one meander bend that is unstable due to the absence of woody vegetation. Exotic invasive species treatment is also prescribed for the 399 LF of this enhancement reach. 3.4.8 Other Preservation Reaches in the Right Prong Martin's Creek Drainage: RP-UT2, RP-UT2-1, RP-UT3, RP-UT3-1, RP-UT4, RP-UT4-1, and RP-UT5 These tributaries are located on moderate to very steep slopes and are intermittent or perennial. All evidence suggests that these tributaries to Right Prong Martin's Creek have been left relatively undisturbed for several decades or longer. There is evidence of some old roads within this forested area and some timber harvest may have occurred, but if this was done it appears to have been limited. The forest canopy is dominated by Oaks and Hickory species and the streams have either cascading or step-pool geomorphology with adequate grade control consisting of bedrock, boulder and log or root nickpoints. Preservation is proposed for these streams because they are in a natural state and invasives are minimal in this portion of the watershed. 3.5 Channel Morphology, Evolution and Stability Assessment Channel stability is defined here as the stream's ability to transport incoming flows and sediment loads supplied by the watershed without undergoing significant changes over a geologically short time-scale. A generalized relationship of stream stability was proposed by Lane (1955); it states that the product of sediment load and sediment size is in balance with the product of stream slope and discharge, or stream power. A change in any one of these variables induces physical adjustment of one or more of the other variables to compensate and maintain the proportionality. Longitudinally, the water and sediment flows delivered to each subsequent section are the result of the watershed and upstream or backwater (downstream) conditions. Water and sediment pass through the channel, which is defined by its shape, material, and vegetative condition. Flow and sediment are either stored or passed through at each section along the reach. The resulting physical changes are a balancing act between gravity, friction, and the sediment and water being delivered into the system (Leopold et al., 1964). Observed stream response to induced instability, as described by Simon's (1989) Channel Evolution Model, involve extensive modifications to channel form resulting in profile, cross-sectional, and plan form changes which often take decades or longer to achieve resolution. The Simon (1989) Channel Evolution Model characterizes typical evolution in six steps: 1. Pre-modified 2. Channelized 3. Degradation 4. Degradation and widening 5. Aggradation and widening 6. Quasi-equilibrium. The channel evolution process is initiated once a stable, well-vegetated stream that interacts frequently with its floodplain is disturbed. Channelization, dredging, changing land use, removal of streamside vegetation, upstream or downstream channel modifications, and/or change in other hydrologic variables result in MICHAEL BAKER ENGINEERING, INC. PAGE 3-11 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN adjustments in channel morphology to compensate for the new condition(s). Disturbance commonly results in an increase in stream power that can cause degradation, often referred to as channel incision (Lane, 1955). Incision eventually leads to over-steepening of the banks and, when critical bank heights are exceeded, the banks begin to fail and mass wasting of soil and rock leads to channel widening. Incision and widening continue moving upstream in the form of a head-cut. Eventually the mass wasting slows, and the stream begins to aggrade. A new, low-flow channel begins to form in the sediment deposits. By the end of the evolutionary process, a stable stream with dimension, pattern, and profile similar to those of undisturbed channels forms in the deposited alluvium. The new channel is at a lower elevation than its original form, with a new floodplain constructed of alluvial material (FISRWG, 1998). Channels within the project area are mostly perennial, have experienced prior channelization or other kinds of watershed disturbance, and are currently impacted by grazing. Channel stability was assessed with one or more of the following methods: qualitative and quantitative site observations, site-specific hydraulic modeling using detailed topographic data collected for the project, and sediment transport modeling. Conclusions reached from these methods were used to define site stability and determine appropriate restoration approaches for each sub-reach. The project area consists of channels that are primarily in a degradational phase of the channel evolutionary sequence, with some of the reaches experiencing widening or aggradation (typically aggradation is a result of local widening due to livestock impacts or channelization). As a result, these streams are prime candidates for restoration and enhancement. Enhancement I and Restoration reaches are discussed, related to the Simon Channel Evolution Model, below. Stream restoration techniques act to minimize the erosion and geomorphic disturbance required to achieve a new stable state naturally. Restoration activities proposed at the Martin's Creek Site will recreate channel types that are appropriate to the valley types and slopes present. In addition to the installation of grade control structures, restoration efforts will involve the alteration of channel dimension, pattern and profile. This resets the evolutionary cycle; the structures and measures installed, in conjunction with the protective buffer, should ensure the continued stability of the streams within the project area, barring major disturbance in the unprotected areas of the greater watershed. Martin's Creek has been channelized in the past and its riparian buffer undergoes periodic manipulation as overhead powerlines run nearly parallel with the stream. This channel is at Step 5 (aggradation and widening of the Simon Channel Evolution Model. The width needed was most likely achieved through degradational processes as bedrock makes up a considerable portion of channel substrate in the project reach. Evidence of inner berms was sporadically located along the right bank of Martin's Creek. Due to constraints posed by the overhead utilities and the proximity of Martin's Creek Road, no pattern adjustments are proposed. Reach 2 of MC-UT1 is proposed for Restoration. This reach exhibits characteristics of a stream at steps 3 and 4, with downcutting and widening as the two active evolutionary drivers in the present channel. These are the likely result of prior channelization, during which the channel was moved against the valley wall and straightened to maximize pasture land. Reach 3 of MC-UT1 is proposed for Enhancement L This reach intermittently exhibits characteristics of a stream at step 3. It has been impacted from land use and land cover impacts. As a result, some of the cross sections exhibit high bank height ratios, which indicate a downcutting trend. Lateral stabilization and dimension adjustments are necessary to create permanent stability that will be supported by the reforestation of the riparian buffer. In the absence of this treatment, it is at a high risk for continued lateral erosion and the propagation of head cutting. In addition, invasive plant species will continue to inhibit the establishment of native species which can better stabilize the stream banks. Reach 4 of MC-UT1 is proposed for Restoration. This reach exhibits characteristics of a stream at step 3. It was channelized and levied and is experiencing downcutting. The levying of the stream is particularly detrimental and will serve to accelerate the downcutting process; the bank height ratio is 4.1 so floodplain connectivity is non-existent. This proposal will reestablish this channel in its original alignment. MICHAEL BAKER ENGINEERING, INC. PAGE 3-12 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN MC-UT1-3 Reach 1 is proposed for Enhancement I. This reach has been impacted by livestock access and past land use when the property was cleared. During this time the channel downcut and meandered. As woody vegetation matured this channel form became more stable. However, the incised condition continues to cause channel instability. Some of the reach is experiencing downcutting (headcuts) and there are areas where the bank height ratio exceeds 1.5. Now parts of the channel exhibit characteristics of a stabile B channel at Simon's Stage 6, but other areas are at Stage 4 with degradation and widening. This is particularly problematic at the back of meander bends where erosion is occurring into steep clay banks. MC-UT1-3 Reach 2 is proposed for Restoration. This reach exhibits characteristics of a stream at step 4 to 5. It was previously channelized and dredged material was cast on the right bank, creating a significant levy. Much of this channel is aggrading due to the channel being made over wide when it was dredged. The channel is perched on the hillside and does not have a normal hydrology or the floodplain access that it should. The entrenchment ratio for this stream should be much higher, but the levy on the right bank and the hill slope on the left confine the channel. These factors will not allow the stream to be fully functional, and furthermore impact the hydrology of wetlands in the lowest part of the valley. Restoration will put this channel in the low part of the valley, which will restore hydrology to adjacent riparian wetlands, and create a channel that is connected to its floodplain with all the benefits that this provides. Tables 3. land 3.2 summarize existing channel morphology in the project area for the Enhancement I and Restoration reaches on tributaries UT1 and UT1-3 to Martin's Creek. Data was taken from surveyed cross sections distributed across the project area. Table 3.3 summarizes research findings by Rosgen (2001) concerning bank height ratios as an indicator of channel stability. Table 3.1 Channel Morphology Features and Stability Indicators for Martin's Creek and Unnamed Tributaries to Martin's Creek Martin's Creek II Mitigation Project-NCEEP Project #92633 Parameter Martin's Creek Tributaries UT1 Reach 2 UTI Reaches 3-4 UTI-3 Reach 1 UT1-3 Reach 2 (XI-X3) (X4-X7) (X8-X9) (X11-X12) Stream Type Eb*/FbB G/Cb/G EbB C/F *functioning like G Riparian Vegetation Pasture on LB and Grazed pasture on Pasture on LB and Grazed pasture on forested, steep both sides of stream. forested area on both sides of slope on RB of Vegetation on both RB of stream. stream. stream. banks within 25 feet Vegetation on RB Vegetation on Vegetation on of channel is within 25 feet of both banks within both banks within primarily invasive, channel is 25 feet of channel 25 feet of channel nonnative. primarily is primarily is primarily invasive, invasive, invasive, nonnative, LB is nonnative or nonnative. young hardwoods. grasses. Channel Dimension Bankfull Area (SF) 3.8, 3.9, 3.6 4.6, 6.2, 6.1 2.9, 3.0 3.3, 2.9 Width/Depth Ratio 10.7, 14.4, 55.0 7.6, 15.4, 9.4 8.6, 15.2 39.7, 16.0 Channel Pattern Meander Width Ratio N/A 4.7, N/A (Reach 4) 4.3 N/A MICHAEL BAKER ENGINEERING, INC. PAGE 3-13 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Sinuosity 1 1 1.2, N/A 1 3 ?1.0 . (Reach 4) . Vertical Stability Bank Height Ratio (BHR) 1.8, 2.2, 1.3 1.8, 1.0, 4.1 1.0, 1.0 1.0, 3.0 Entrenchment Ratio (ER) 2.9, 1.2, >2.2 1.6, >2.1, 1.8 2.7, 1.7 2.3, 1.5 Evolution Scenario Eb-G-Fb-B, Cb-G-F-C Eb-G-Fb-B, C-G-F-C (I-II-III ... ) B-G-Fb-B B-G-Fb-B Existing Evolution Stage Degradation/ Degradation, Degradation Aggradation and Aggradation and Widening Widening Widening Notes: 1. N/A: Meander Width Ratio not measured because channel has been straightened. 2. Simon Channel Evolution Model. Table 3.2 Rosgen Channel Stability Assessment Martin's Creek II Mitigation Project-NCEEP Project #92633 Stability Rating Bank Height Ratio (BHR) Stable (low risk of degradation) 1.0-1.1 Moderately unstable 1.1-1.3 Unstable (high risk of degradation) 1.3-1.5 Highly unstable >1.5 Notes: Rosgen, D. L. (2001) A stream channel stability assessment methodology. Proceedings of the Federal Interagency Sediment Conference. Reno, NV. March, 2001. 3.6 Bankfull Verification Baker engaged physical, analytical, and empirical methods to verify the bankfull stage and discharge of the project reaches of Martin's Creek and its tributaries. These methods were each given weight, with physical field measurements and analytical data having a slightly higher weight due to their site-specific nature. Subsequent methods were used to interpret and sometimes adjust field observations. In summary, the following steps were taken: 1. Identified and surveyed representative cross sections with physical bankfull indicators. 2. Compared surveyed cross sections with each other to ensure consistency. 3. Compared values to regional empirical data (regional curves). 4. Used Manning's equation to estimate design discharge through cross sections. 5. Built and ran a HEC-RAS existing conditions model with estimated flows. 6. Finally, considered all results and determined dimensions and flows that correspond to bankfull. 3.6.1 Physical Field Measurement Physical bankfull indicators surveyed during the existing conditions analysis were typically depositional bars, defined breaks in slope at a consistent elevation relative to the water surface or transitions in bank vegetation. Upon completion of the field survey, data was plotted to check for consistency and correlation with region-specific empirical equations and regional reference data. This data was analyzed to determine the most likely bankfull stages on all project reaches. Once bankfull stage was determined using these MICHAEL BAKER ENGINEERING, INC. PAGE 3-14 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN methods, a secondary check was performed using HEC-RAS hydraulic models to assess whether a particular flow rate (regional curve flow was used as a first estimate) would produce the bankfull stage at successive cross sections. These verification methods are described below. 3.6.2 Regional Curve Equations Publicly available and in-house bankfull regional curves are available for a range of stream types and physiographic provinces. The North Carolina Mountain Regional Curve (Harman et al., 2000) was used for comparison to other more site-specific means of estimating bankfull discharge. The tributaries on the site are small headwater streams; streams of this size are poorly represented on the regional curve. It has been found that the Mountain Regional Curve Equations typically returns high values in terms of discharge and channel dimension for smaller streams, such as those present at this site. Baker has conducted numerous projects in small drainages in WNC, and has produced mini-curves specific to these projects. The growing number of data points on our small streams curve provides supporting evidence for the selection of bankfull indicators that produce smaller dimensions and flow rates than the published regional data. Additionally, values considered for design were also compared to unpublished Mountain Regional Curve data being developed by the Natural Resources Conservation Service (A. Walker private communication). 3.6.3 Role of Hydraulic Modeling Using HEC-RAS 4.0 in Design Discharge Selection On each tributary and the mainstem, a number of existing conditions cross sections were surveyed. These cross sections were input into simple HEC-RAS models to assess the channel filling discharge. Each stream was analyzed individually using a range of flows determined from USGS data and from the NC Mountain Regional Curve for discharge. The USGS Region of Influence (ROI) method and USGS Regional Regression Equations (RRE) were considered. The ROI results are based on a subset of gages in adjacent watersheds, rather than depicting results based on data for the whole Blue Ridge region as the RRE method does. The ROI method suggested that the Site has lower flows than the region does on the whole. This would typically indicate the presence of some difference in rainfall, soil type, slope or other hydrologic influence that would result in lower flows. The phenomenon is fairly typical for the Blue Ridge which has widely varying hydrologic characteristics. USGS ROI and NC Mountain Regional Curve flows were input into the model to assess the resulting hydraulics for the Bankfull Flow (Qbkf), 2-Year Flow (Q2), Q5, Q10, etc. Since the HEC-RAS models did not include more than two distinct cross sections, primarily cross sectional channel data (Figure 3.2) was scrutinized against water surface profiles to assess consistence of the top of bank, benches, slope breaks, and other depositional features throughout reaches of constant drainage area. Bankfull indicators were selected based on significant benches, breaks in slope, back of bench in pool sections, and other recognized physical features. For these sites, the regional curve flows (Qbkf) produced stages that were generally consistent with physical indicators of bankfull. The HEC-RAS model, therefore, supports the bankfull features identified in the field indicating that the design flow should be fairly comparable to the regional curve flow. This is contrary to the USGS ROI data and also previous data collected on small streams in the region. Field data is given more weight than empirical data when choosing design ratios and dimensions, however, empirical data was considered in decision making. A high width to depth ratio has been chosen in most cases so that the channel may easily narrow based on typical evolution of newly built restoration channels and the likelihood that dense wetland vegetation is likely to become well established in most of these channels. The design cross section was checked to ensure that a desirable stage-discharge relationship was achieved, but the first cut at producing the design cross section was based on existing conditions data and reference geomorphic ratios that have produced successful (stable) channels in past projects. To MICHAEL BAKER ENGINEERING, INC. PAGE 3-15 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN close the loop, the design cross section was input into HEC-RAS and assessed to see whether the flow that filled the design channel was comparable to the design flow selected during the hydraulic analysis. In most cases, the exercise confirmed that a flow close to or equal to the design flow would fill the channel, or that it would take a slightly higher flow at first (upon completion of construction), but that with one or two growing seasons, the channel would vegetate and narrow slightly to a point where it would overtop at a lower flow (see a visualization of this in Figure 3.3). Figures 3.1 and 3.2 HEC-RAS Model Views for UT1-3 Upper, Water Surface Elevations for Design Flow (10 cfs) and the Mountain Regional Curve Flow (Q=14 cfs) (LOB=Left Top of Bank, ROB=Right Top of Bank) UT1-UPR Plan: X8X9 mixed 1/4/2010 G- XaX9 Rim Qusgsrc-4pct 327794 L.9-d - N6 QdQ-regcrv 0 UVS Ql#-guess M Q2 Grand Balk&l Grand -2 MICHAEL BAKER ENGINEERING, INC. PAGE 3-16 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Figure 3.3 Sample Analysis of UT1-3 Upper Design Cross section for As-built Condition (2:1 side slope) Versus "Evolved" Condition (Where is has Narrowed to a 1:1 Side Slope) at Design Flow (10 cfs) 3.7 Conclusions for Channel Forming Discharge Using multiple sources of data increased our confidence in our ultimate conclusion. Baker used detailed cross sections with field-identified bankfull indicators, validation and interpretation of data with hydraulic modeling, research of empirical (USGS and Regional Curve) hydrologic and hydraulic data, and prior project information (i.e. mini-project curves) for small WNC Mountain drainages to conduct the analysis. All sources of data suggest that the bankfull discharge for the project tributaries should be lower than the published NC Mountain Regional Curve values. Soils in this watershed are predominantly deep and well-drained. This is physical hydrologic evidence that supports a high degree of infiltration, and hence a lower direct runoff to drainage features. Furthermore, the average annual rainfall in this location is 55-60 inches/year. The region on the whole has a highly variable average annual rainfall varying from 40 to 80+ inches/yr, so the site is in the middle of the range. The specific ecoregion is known as the "Broad Basins"; as the name implies, its drainages and watersheds have less slope and wider valleys than many of the steeper drainages on the Blue Ridge - another contributing factor to smaller discharges. Table 3.3 provides a discharge analyses based on the regional curve flows for the drainage area being considered and the design discharge calculated based on the proposed design cross sections for each reach of the Martin's Creek mitigation project site. MICHAEL BAKER ENGINEERING, INC. PAGE 3-17 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 3.3 Design Discharge Summary for Martin's Creek and Tributaries by Reach Martin's Creek II Mitigation Project-NCEEP Project #92633 Upper 0.09 16 16 UT I Lower 0.17 26 25 Upper 0.07 13 14 UTl-3 Lower 0.08 15 12 s z Not Applicable Mainstem - 6.81 649 (Enhancement 11) * Estimate of design Q is based on HEC-RAS flow that fills the channel that develops over time (side slopes narrow and Manning's "n" roughness increases to 0.045 for main channel) 2 The USGS extrapolated 1.5-Year flow is 495 cfs (Weaver et al., 2006) s Bankfall Q is lower in this reach than in the upstream reach because of the affect of slope in computing Q using Manning's equation. The slope in UT1-3 upper is --0.04, in the lower reach, it is 0.008 3.8 Vegetation Community and Disturbance History Habitat within and adjacent to the proposed project area consists of pasture, fallow agricultural fields, pocket wetlands and oak dominated forests as described by Schafale and Weakley (1990). Compared to more mountainous ecoregions within the Blue Ridge Belt, the Broad Basins ecoregion has a composite of oaks and pine dominated forests more similar to the Piedmont region of the state. Oaks and pines common to this ecoregion include white oak (Quercus alba), southern red oak (Q. falcata), black oak (Q. velutina), scarlet oak (Q. coccinea), shortleaf pine (Pinus echinata) and Virginia pine (P. virginiana). This ecoregion also contains a higher percentage of agricultural land and development than other regions within Blue Ridge mountain region. Habitat within and adjacent to the proposed project area consists of pasture, fallow agricultural fields, pocket wetlands and oak dominated forests as described by Schafale and Weakley (1990) below. Riparian areas ranged from relatively undisturbed to very disturbed. A general description of each community follows. 3.8.1 Dry-Mesic Oak-Hickory Forest This ecological community is located on the upland fringes of the grazing areas and low ridges near the project area. The dominant canopy species of the dry mesic oak forest area includes white oak (Quercus alba), northern red oak (Quercus rubra), black oak (Quercus velutina), mockernut hickory (Carya alba (tomentosa)), red hickory (Carya ovahs), and pignut hickory (Caryus glabra). Yellow poplar (Liriodendron tulipifera) is also common. Understory species included red maple (Acer rubrum), flowering dogwood (Cornus forida), sourwood (Oxydendrum arborem), American holly (Ilex opaca), black tupelo (Nyssa sylvatica) rhododendron (Rhododendron spp.), and mountain laurel (Kalmia latifolia). Shrubs include downy arrowwood (Viburnum r'afinesquianum),deerberry (Vaccinium stamineum), Blue Ridge blueberry (Vaccinium pallidum (vacillans)), and strawberry bush (Evonymus americana). Muscadine grapevines (Vitis rotundifolia) and poison ivy (Toxicodendron (Rhus) radicans)often are present. Herbs are fairly sparse, with Hexastylis spp., striped prince's pine (Chimaphila maculata), nakedflower ticktrefoil (Desmodium nudi lorum), and rattlesnakeweed common. MICHAEL BAKER ENGINEERING, INC. PAGE 3-18 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 3.8.2 Montane Oak-Hickory Forest Montane Oak-Hickory Forest communities present within the project area are also located in the mid to upland forested slopes along coves and ridgelines. Similar to the dry mesic oak forests present, this forest type at the project site was dominated by white oak (Quercus alba), and northern red oak (Q. rubra) as well as chestnut oak (Q. prinus). Other trees that are commonly found in Montane-Oak-Hickory forests include the mockernut hickory (Carya alba (tomentosa)) and pignut hickory (C. glabra). Black oak (Quercus velutina), red maple (Acer rubrum), tulip poplar (Liriodendron tulipifera), and scarlet oak (Q. coccinea) are also common to this forest type and were observed in the project area. The eastern white pine (Pinus strobes) or other pines may also be present in this forest type which historically was dominated by the American chestnut (Castanea dentate). Understory trees noted by Schafale and Weakley to occur in this forest type include sourwood (Oxydendrum arboretum), flowering dogwood (Cornus forida), blackgum (Nyssa sylvatica), and serviceberry (Amelanchier arborea). Shrub layers are usually made up of flame azalea (Rhododendron calendulaceum), bear huckleberry (Gaylussacia ursine), mapleleaf viburnum (Viburnum acerifolium), and witchhazel (Hamamelis virginiana). Rhododendron (Rhododendron maximum) and mountain laurel (Kalmia latifolia) can also be found. Due to the density of other cover, herbaceous cover tends to be sparse but diverse, with Indian cucumber (Medeola virginica), false Solomon's seal (Maianthemum (Smilacina) racemosum), Solomon's seal (Polygonatum biflorum), mountain bellwort (Uvularia puberula (pudica)), wild yam (Dioscorea villosa), and American cancer-root (Conopholis Americana) present. According to Schafale and Weakley's 1990 "Classification of the Natural Communities of North Carolina (Third Approximation)," Montane Oak-Hickory Forests differ from Dry Mesic Oak-Hickory Forests by the presence of species typical to the mountainous region of the state. These species include, but are not limited to the American chestnut (Castanea dentate), Flame azalea (Rhododendron calendulaceum), Yellow birch (Betula alleghaniensis (lutea)), and Buffalo nut (Pyrularia pubera). 3.8.3 Agricultural Area This community is the most dominant and covers approximately 40 percent of the project area. Pasture land within and adjacent to the project area was most recently used for cattle and horse grazing and hay production. Vegetation within open fields and pasture areas is primarily comprised of fescues (Festuca spp.) and dog fennel (Eupatorium capillifolium). Woody shrub and vine species including multiflora rose (Rosa multiflora), Chinese privet (Ligustrum sinense), maleberry (Lyonia ligustrina), tag alder (Alnus serrulata), greenbriar (Smilax rotundifolia), and muscadine (Vitis rotundifolia). Herbaceous species consist of dog fennel (Eupatorium capillifolium), soft rush (Juncus effusus), and various sedges (Carex spp.). 3.8.4 Invasive Species The primary invasive species present on the project site is multiflora rose (Rosa multifora), although Chinese privet (Ligustrum sinense) was also abundant in some areas. MICHAEL BAKER ENGINEERING, INC. PAGE 3-19 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 4.0 REFERENCE INDICATORS Design ratios for pattern and profile were based on evaluating dimensionless ratios from a reference reach site on a restoration project completed by Baker in Surry County and on-site data from stable sections of MC- UT1-3 and MC-UT1. Design ratios used by Baker that have been successful at many similar sites were also referenced (Table 4.0). Upon review of the data, a number of reference sites (including several from the same physiographic region), were chosen to supplement the mountain regional curve data. This allowed us to review geomorphic data for a watershed comparable to the project drainage area. In the process of extending the curve beyond the range of the published data, slightly modified regional curve power functions were developed to account for the increased range in data. The regional curve results were used as part of the design decision making process. Values derived from these new power functions are summarized in Section 7 where design criteria are presented in numeric form. MC-UT 1-3 and part of MC-UT 1 are being restored using a Priority 1, Restoration approach. This approach requires establishing a channel with correct dimension, pattern and profile that uses the existing valley floor as the bankfull elevation for the new channel. In order that we could evaluate the best meandering pattern for these new channels, we used the existing meandering pattern that is presently found in Reach 1 of UT1-3. While the number of meanders is limited, we felt that since this is the same stream, these meanders would provide the best information for dimensionless ratios that could guide the pattern design for the new Priority I channels. Reference reach information for pattern was collected from these meanders in Reach 1 and applied to the pattern design for streams in the lower field. Mickey Reach, the aforementioned Baker stream restoration project in Surry County was used to compare to design data for the Martin's Creek mitigation project due to its similar watershed size, substrate, sinuosity, and slope. Mickey Reach is located on an unnamed headwater tributary to the Mitchell River on the eastern escarpment of the Blue Ridge province and has a drainage area of approximately .45 square miles. While Mickey Reach is located on the eastern side of the Blue Ridge Mountains, both sites are located within the foothills region of the same physiographic area (Figure 4.1). The UT on which Mickey Reach is located is a small B-type step-pool channel with an approximate channel slope of 3.3% (Harman, et al, 2004). Mickey Reach begins in an upland forested landscape that transitions into a valley occupied by an open field once used for agricultural purposes. Substrate present in the Mickey Reach primarily consists of gravels and cobbles; bedrock is also present and contributes grade control much the way it does at the Martin's Creek Site. Reference reach data reviewed for the Martin's Creek mitigation project from Mickey Reach consists of geomorphic data obtained from the original reference conditions- portion of Mickey Reach located in the upland forested as well as the now-stable portion of Mickey Reach that was restored approximately 8 years ago. The design stream type for Mickey Reach was a B4 channel with structures installed to restore a step-pool stream system with appropriate bedform diversity. Like the Martin's Creek Site, the UT to the Mitchell River had become degraded due to impacts from historic timber harvesting and livestock access to the stream. The project was monitored for six years following construction and has remained stable, with diverse bedforms and excellent aquatic habitat. Given the similarities in channel slope and other geomorphic features, and the longevity of site stability captured through post-construction monitoring, it was determined that the reference reach, design and monitoring information generated by work performed on Mickey Reach would provide valuable data to supplement on-site reference reach data collected. Although design data from this project was evaluated for application at the Martin's Creek Site, B-type channels in the project area will not be completely regraded to form step-pool channels (a restoration approach). MICHAEL BAKER ENGINEERING, INC. PAGE 4-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN -KY- -VA- Lansing WI -TN- SON MITCHELL BURKE ROWAN CHEROKEE SWAIN 8y.. CLAY --_ _-c __ -GA- LEGEND Physiographic Province `?- Mountain Piedmont Coastal Plain Ecosystem 0 Reference Reach Site casar \\ BelwooU? Pdkville Fallsto \, La?vndale ? N.gstown N CLEVELAND 1springs Patterson springs Earl -sc- = Counties sbnley Figure 4.1 Reference Reach Location Martin Creek Mitigation Project Cherokee County, NC 10 5 0 10 Miles Instead an enhancement approach will be used; grade control structures will be utilized to prevent migration of headcutting while promoting a more diverse bedform and instream habitat and stable sections of the existing channel will not be disturbed or will have minimal disturbance to adjust dimension and profile. The specific design parameters are described in detail in Section 7. On-site data, restoration project design data, and reference reach data were used in this design and these data are described below and summarized in Table 4.1. Surveyed cross sections from the Site are included in Appendix D. Surveyed profiles of project reaches are provided in the mitigation planset. Table 4.0 Ratios from Reference Reaches used in the Design of Martin's Creek and its Tributaries Martin's Creek II Mitigation Project-NCEEP Project #92633 Parameter MIN MAX MIN MAX Stream Type (Rosgen) B4 C4 Bankfull Mean Velocity, Vbkf (ft/s) 4.0 6.0 3.5 5.0 Width to Depth Ratio, W/D (ft/ft) 12.0 18.0 10.0 14.0 Riffle Max Depth Ratio, Dmax/Dbkf 1.2 1.4 1.1 1.3 Bank Height Ratio, Dtob/Dmax (ft/ft) 1.0 1.1 1.0 1.1 Meander Length Ratio, Lm/Wbkf N/A N/A 7.0 12.0 Re Ratio, Rc/Wbkf N/A N/A 2.0 3.0 Meander Width Ratio, Wblt/Wbkf N/A N/A 3.5 8.0 Sinuosity, K 1.1 1.2 1.2 1.6 Riffle Slope Ratio, Srif/Schan 1.1 1.8 1.5 2.0 Pool Slope Ratio, Spool/Schan 0 .4 0 .2 Pool Max Depth Ratio, Dmaxpool/Dbkf 2.0 3.5 2.0 3.5 Pool Width Ratio, Wpool/Wbkf 1.1 1.5 1.3 1.7 Pool-Pool Spacing, Lps/Wbkf 1.5 5.0 4.0 7.0 MICHAEL BAKER ENGINEERING, INC. PAGE 4-3 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 4.1 Reference Reach Geomorphic Parameters: Unnamed Tributary 1 to Martin's Creek (MC-UT1) Martin's Creek II Mitigation Project-NCEEP Project #92633 MC UT1 Existing Conditions MC UT1 Design Mickey Reach Design Min Max Min Max Min Max 1. Stream Type Eb/FbB/G/Cb B/C A6a+B4c 2. Drainage Area (square miles) 0.09 0.17 0.09 0.17 .45 .45 3. Bankfull Width (wbkf) (ft) 7.8 9.9 7.7 8.5 11.7 21.7 4. Bankfull Mean Depth (dbkf) (ft) 0.5 0.6 0.54 0.71 0.6 1 5. Width/Depth Ratio (W/D ratio) 10.7 55.0 12.0 14.3 10.7 17 6. Cross-sectional Area (Abkf) (ft2)3 3.6 6.2 4.1 6.0 13.1 10.2 7. Bankfull Mean Velocity (vbkf) (ft/s) 4.2(min) 4.4(max) 3.9 4.3 --- --- 8. Bankfull Discharge (Qbkf) (ft /s) 16 26 16 26 --- --- 9. Bankfull Max Depth (dmbkf) (ft) 0.62 1.11 0.7 0.9 .9 2.5 10. dmbkf / dbkf ratio 1.2 1.8 1.3 1.3 1.1 3.1 11. Low Bank Height to dmbkf Ratio 1.0 4.1 1.0 1.0 1 1 12. Bank Height Ratio dlow/dmax 1.0 4.1 1.0 1.0 1 1 13. Floodprone Area Width (w a) (ft) 9 >31 16 100 20 410 14. Entrenchment Ratio (ER) 1.2 2.9 2 11.8 1.7 32 15. Meander length (Lm) (ft) 0 0 15 30 70 260 16. Meander length to bankfull width (Lm/wbkf) 0 0 1.8 3.8 4.4 17.6 17. Radius of curvature (RJ (ft) 0 0 30 40 28 47 18. Radius of curvature to bankfull width (Rc / wbkf) 0 0 3.8 4.7 2 3 19. Belt width (wbit) (ft) 0 0 40 40 16 55 20. Meander Width Ratio (wbic/Wbkf) 0 0 4.7 4.7 1.1 4.1 21. Sinuosity (K) Stream Length/ Valley Distance 0 0 1.05 1.4 1.19 1.19 22. Valley Slope - feet per foot 0.015 0.05 0.016 0.06 .0398 .0396 23. Channel Slope (sch? ,I) - feet per foot 0.015 0.05 0.01 0.057 .0333 .0333 24. Pool Slope (s ool) (feet per foot) 0 0 0 0 0 .005 25. Pool Slope to Average Slope (s,,., / schannei) --- --- 0 0 0 .15 26. Maximum Pool Depth (dpool) (ft) --- --- 1.6 2.0 2.2 2.5 27. Pool Depth to Average Bankfull Depth (dpool/dbkf) --- --- 2.8 2.9 2 4 28. Pool Width (wp,,,) (ft) --- --- 12 13 14.3 14.6 29. Pool Width to Bankfull Width (Wpool / wbkf) --- --- .9 .9 30. Pool Area (Apool) (ft) --- --- 11.5 14.3 14.8 15.9 31. Pool Area to Bankfull Area (Apool/Abkf) --- --- 1.9 2.4 1.1 1.2 32. Pool-to-Pool Spacing (L s/Wbkf) 30 85 12 45 48 231 33. Pool Spacing to Bankfull Width (p-p/wbkf) 3.0 10.9 1.5 5.8 3 7 34. Riffle Slope (s ffle) (feet per foot) 0.025 0.17 0.01 0.16 .2 1.9 35. Riffle Slope to Average Slope (s ifue/ sbkf) 0.45 3.1 1.1 3.5 .2 1.9 36. Particle Size Distribution of Riffle Material - (applies to those riffles built with onsite material) Fine to Medium Gravel Fine to Medium Gravel d16 - mm 0.6 0.8 0.6 0.8 d35 - mm 2.0 4.4 2.0 4.4 d50 - mm 3.6 8.7 3.6 8.7 d84 - mm 15.9 28.0 15.9 28.0 d95 - mm 66.8 102.1 66.8 102.1 Note: 'Existing Qbkf of 16cfs corresponds with the tributary with the smallest flow and drainage area of 0.09, Qbkf of 26 corresponds with the tributary with the largest flow and drainage area of 0.17 sq. mi. Existing conditions data reflects reference reach data evaluated on MC-UTl. 3Minimum values for flow and area (which correspond with the same cross-section) yield greater average velocity that maximum values for flow and area (i.e. Qbkfmin/Abkfmia VW ma and vice-versa). MICHAEL BAKER ENGINEERING, INC. PAGE 4-4 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 4.2 Reference Reach Geomorphic Parameters: Unnamed Tributary 1-3 to Martin's Creek (MC-UT1-3) Martin's Creek II Mitigation Project-NCEEP Project #92633 MC UTl-3 Existing Conditions MC UTl-3 Design Mickey Reach Design Min Max Min Max Min Max 1. Stream Type EbB/C/F B/C A6a+B4c 2. Drainage Area (square miles) 0.07 0.08 0.07 0.08 .45 .45 3. Bankfull Width (wbkf) (ft) 5.0 11.4 6 6.5 11.7 21.7 4. Bankfull Mean Depth (dbkf) (ft) 0.29 0.58 0.48 0.49 0.6 1 5. Width/Depth Ratio (W/D ratio) 8.6 39.7 12.5 12.5 10.7 17 6. Cross-sectional Area (Abkf) (ft) 2.9 3.3 2.85 3.2 13.1 10.2 7. Bankfull Mean Velocity (vbkf) (ft/s) 2 6 3.8 4.9 --- --- 8. Bankfull Discharge (Qbkf) (ft /s) 11 14 12 14 --- --- 9. Bankfull Max Depth (dmbkf) (ft) 0.87 1.0 0.6 0.6 .9 2.5 10. dmbkf / dbkf ratio 1.0 2.7 1.22 1.25 1.1 3.1 11. Low Bank Height to dmbkf Ratio 1.0 2.7 1.0 1.0 1 1 12. Bank Height Ratio dlow/dmax 1.0 2.7 1.0 1.0 1 1 13. Floodprone Area Width (w a) (ft) 10.3 26.2 11 100 20 410 14. Entrenchment Ratio (ER) 1.5 2.7 3.8 15.4 1.7 32 15. Meander length (Lm) (ft) 56 81 65 110 70 260 16. Meander length to bankfull width (Lm/wbkf) 4.9 16.2 10.8 16.9 4.4 17.6 17. Radius of curvature (RJ (ft) 14 28 15 40 28 47 18. Radius of curvature to bankfull width (Rc / wbkf) 1.2 5.6 2.5 6.7 2 3 19. Belt width (wbit) (ft) 22 46 26 50 16 55 20. Meander Width Ratio (wblt+ Wbkf) 1.9 9.2 4.3 8.3 1.1 4.1 21. Sinuosity (K) Stream Length/ Valley Distance 1.0 1.4 1.26 1.42 1.19 1.19 22. Valley Slope - feet per foot 0.007 0.04 0.007 0.069 .0398 .0396 23. Channel Slope (scha ,,) - feet per foot 0.007 0.04 0.005 0.054 .0333 .0333 24. Pool Slope (s,,,,) (feet per foot) N/A N/A 0 0 0 0.005 25. Pool Slope to Average Slope (s,,., / scha ,,) N/A N/A 0 0 0 0.15 26. Maximum Pool Depth (dl) (ft) N/A N/A 1.6 1.6 2.2 2.5 27. Pool Depth to Average Bankfull Depth (d ooI/dbkf) N/A N/A 2.7 2.7 2 4 28. Pool Width (w ool) (ft) N/A N/A 9 11 14.3 14.6 29. Pool Width to Bankfull Width (w ool / wbkf) N/A N/A 1.4 1.7 0.9 0.9 30. Pool Area (A,001) (ft) 3.0 3.0 8 10.2 14.8 15.9 31. Pool Area to Bankfull Area (A ool/Abkf) 0.9 1.0 2.5 3.2 1.1 1.2 32. Pool-to-Pool Spacing (L s/Wbkf) 20 100 10 60 48 231 33. Pool Spacing to Bankfull Width (p-p/wbkf) 1.8 20 1.6 9.2 3 7 34. Riffle Slope (s fe) (feet per foot) 0.013 0.10 0.01 0.18 0.2 1.9 35. Riffle Slope to Average Slope (Sniffle/ sbkf) 0.5 3.6 0.7 1.6 0.2 1.9 36. Particle Size Distribution of Riffle Material - (applies to those riffles built with onsite material) Fine Gravel Fine Gravel d16-mm 0.3 0.3 d35 - mm 1.1 1.1 d50 - mm 3.5 3.5 d84 - mm 12.1 12.1 d95 - mm 15.7 15.7 Notes: Existing conditions data reflects reference reach data evaluated on MC-UTl-3. No sediment data was collected for the restoration reach of UT1-3 due to the extremely poor substrate currently present. The restoration reach will be designed to facilitate bedload transport based on particle sizes observed upstream in the enhancement reach of UT1-3. See Section 7.3.1 for a discussion on the selection of particle sizes used to supplement channel substrate and construct riffles. MICHAEL BAKER ENGINEERING, INC. PAGE 4-5 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 5.0 PROJECT SITE WETLANDS (EXISTING CONDITIONS) 5.1 Jurisdictional Wetlands The proposed project area was reviewed for the presence of wetlands and waters of the United States in accordance with the provisions on Executive Order 11990, the Clean Water Act, and subsequent federal regulations. Wetlands have been identified by the USACE as "those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas" (33 CFR 328.3(b) and 40 CFR 230.3 (t)). The areas in the project boundaries that displayed one or more wetland characteristics were reviewed to determine the presence of wetlands. The wetland characteristics included: Prevalence of hydrophytic vegetation. Permanent or periodic inundation or saturation. Hydric soils. On June 5, 2007, the USACE and US Environmental Protection Agency (USEPA) issued joint guidance for their field offices for Clean Water Act jurisdictional determinations in response to the Supreme Court's decision in the consolidated cases of Rapanos v. United States and Carabell v. United States (USEPA and USACE, 2007). Based on this guidance, the agencies will assert jurisdiction over the following waters: • Traditional navigable waters (TNWs) • Wetlands adjacent to TNWs • Non-navigable tributaries of TNWs that are considered relatively permanent waters (RPWs). Such tributaries flow year-round or exhibit continuous flow for at least 3 months. • Wetlands that directly abut RPWs. The agencies will decide jurisdiction over the following waters based on a standardized analysis to determine whether they have a significant nexus with a traditional navigable water: • Non-navigable tributaries that are not relatively permanent waters (non-RPWs) • Wetlands adjacent to non-RPWs • Wetlands that are adjacent to but do not directly abut an RPW. The significant nexus analysis is fact-specific and assesses the flow characteristics of a tributary and the functions performed by all its adjacent wetlands to determine if they significantly affect the physical, chemical, and biological integrity of downstream TNWs. A significant nexus exists when a tributary, in combination with its adjacent wetlands, has more than a speculative or insubstantial effect on the physical, chemical, or biological integrity of a TNW. The USACE and USEPA will apply the significant nexus standard within the limits of jurisdiction specified by the Supreme Court decision in the case of Solid Waste Agency of Northern Cook County (SWANCC) v. US Army Corps of Engineers. Under the SWANCC decision, the USACE and USEPA cannot regulate isolated wetlands and waters that lack links to interstate commerce sufficient to serve as a basis for jurisdiction under the Clean Water Act. Though isolated wetlands and waters are not regulated by the USACE, within the state of North Carolina isolated wetlands and waters are considered "waters of the state" and are regulated by the NCDWQ under the isolated wetlands rules (15A NCAC 2H. 1300). MICHAEL BAKER ENGINEERING, INC. PAGE 5-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Following an in-office review of the National Wetland Inventory (NWI) map, NRCS soil survey, and USGS quadrangle map, a field survey of the project area was conducted May and June 2008, December 2008, and January 2009 to delineate wetlands and waters of the U. S. The project area was examined utilizing the jurisdictional definition detailed in the Corps of Engineer's Wetlands Delineation Manual (Environmental Laboratory, 1987). Supplementary information to further support wetland determinations was found in the National List ofPlant Species that Occur in Wetlands: Southeast (Region 2) (Reed, 1988). Based on the findings of the wetland delineation, three pockets of emergent wetlands (low mountain alluvial forest type) totaling 1.53 acres are present in the low elevation fields at the Martin's Creek project site (Appendix F). In addition, two small wetlands approximately .08 acres in size are present near MC-UT1 upstream of the barn and are supported by toe-slope drainage. Information on buried hydric soils located during wetland delineation surveys, ground water wells currently being monitored on-site, and topographic information have provided Baker with enough data to propose approximate boundaries for an additional total 5.2 acres of wetlands to be restored under this project. The original plant community located in these wetlands was most likely typical of other forested wetlands in the region; however, past agricultural land use practices have altered the composition of the plant community currently present. At least three wetlands are supported by toe-slope seepage; the other two wetlands appear to be hydrologically linked to MC-UT 1-3, which most likely followed a different pattern to Martin Creek in the past. It could be argued that the wetlands that are fed by toe-slope drainage or wetlands on-site that are hydrologically linked to a 1St order stream might once have been headwater forest wetlands given the forested conditions that were most likely present prior to the conversion of the project area for agricultural use. It is also entirely possible that the wetlands present might have historically been low mountain alluvial forested wetlands. This wetland type is also a reasonable approximation of the historic wetland type given the landscape positioning and proximity of the wetland complexes to nearby streams. Given the degree of disturbance to the vegetation community of the wetlands present, the extensive channel alteration that has occurred, and limited indicators present to identify the historic wetland type, the decision was made to restore the project wetlands as low mountain alluvial forest wetlands. These wetlands have formed as a result of depressional topography, poor drainage, and groundwater discharge. These existing wetlands will be incorporated into the design as wetland enhancement areas. Through the proposed stream and wetland restoration practices, these areas will experience a more natural hydrology and flooding regime once the project is completed. In addition, the exclusion of livestock from the area will provide long-term protection. Since most of the existing wetlands are dominated by herbaceous wetland species, some of the area will also be planted with native woody vegetation that is tolerant of flooded conditions. 5.1.1 Wetland Impacts All identified areas of existing wetlands and potential wetland restoration are located on the bottomland parcel (parcel that is located along Martin's Creek Road and Crisp Road). Under existing conditions, the bottomland parcel is partially drained by a ditch that runs southwest to northeast through the area, and intercepts flow coming into the site from a small stream in the southwestern corner of the parcel. It is likely that historically the small stream meandered through the bottomland areas of the site, providing much of the hydrology of the historic wetland system that has now been lost. There are now terra-cotta drainage tiles installed in the bottomland areas of the field that provide additional drainage. The eastern edge of the parcel is also drained by Martin's Creek, which is an incised stream system that exerts a drainage effect on the adjacent fields. The only existing wetlands on the parcel are toe-slope seepage wetlands that are located in isolated pockets along the western portion of the parcel and isolated wetland pockets adjacent to MC UT1-3, that total approximately 1.61 acres. MICHAEL BAKER ENGINEERING, INC. PAGE 5-2 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN The majority of wetland areas once present in the center of the bottomland parcel were drained and filled in the past to promote agricultural land uses, and stream flows were diverted to a ditch along the toe of the upland slope. Soil investigations have shown that portions of the former wetland areas are overlain with 12 - 24 inches of upland soils. The goal of the mitigation plan for the parcel is to restore the historic stream and associated wetland system as closely as possible to predicted pre- disturbance conditions. Temporary wetland impacts associated with the restoration activities are considered minimal and required for overall restoration success. These temporary impacts, which total approximately .24 acres, will involve surface roughening, removal of exotic, invasive vegetation, re-establishment of wetland vegetation native to the region and minor adjustments to drainage patterns as necessary to restore channel pattern to MCUT1 and MCUT1-3 and to improve wetland hydrology. Stream and wetland restoration measures will not negatively impact the hydrology, vegetation and soils of the existing wetlands. It should be noted that efforts were taken during the design process to minimize impacts to existing jurisdictional wetlands. While restoring sinuosity to MCUT1 and MCUT1-3, pattern adjustments were made that resulted in the channels being located along the fringe of the existing wetlands. Pattern adjustments to MCUT1 will actually be making use of a relic channel utilized by this stream before it was relocated some time in the past. 5.1.2 Jurisdictional Wetland Findings On-site surveys of the project areas were conducted in May and June 2008, December 2008, and January 2009 to identify potential U.S. Army Corps of Engineers (USACE) jurisdictional wetland locations and perennial and intermittent streams in the project area. Based on the findings of the wetland delineation, emergent wetlands (headwater forest type) are present in the bottomland parcel along Martin's Creek Road (Appendix B). Information on buried hydric soils located during wetland delineation surveys, ground water wells currently being monitored on-site, and topographic information have provided Baker with enough data to propose approximate boundaries for wetland restoration, enhancement, and preservation activities. Wetland locations were determined by evaluating existing soils, hydrology and hydrophytic vegetation within the project reaches. The original plant community located in these wetlands was most likely typical of other headwater forest wetlands in the region; however, past agricultural land use practices have altered the composition of the plant community currently present. Wetland boundaries were delineated and have been accepted by the USACE in a jurisdictional determination dated March 12, 2009. In total, there are 7.53 acres of existing wetlands on the project property (Figure 3), that will be restored or enhanced. 5.1.3 Palustrine Emergent Wetlands (Low Mountain Alluvial Forest) This group encompasses forested, seasonally and semipermanently flooded bottomland sites of the Piedmont and valleys in the lower elevation Blue Ridge Province. The wetlands on the project site have been cleared in the past for agricultural purposes. Consequently, vegetation present consists of shrubs, rushes, grasses and herbaceous cover and differs somewhat from the typical plant composition present in this type of wetland. According to Schafale and Weakley, shrubs common to this wetland type include spicebush (Lindera benzoin), redtwig doghobble (Leucothoe r'ecurva), beaked hazelnut (Corylus cornuta), and silky dogwood (Cornus amomum). Vines typically present include poison ivy (Toxicodendron (Rhus) radicans), Virginia creeper (Parthenocissus quinquefolia), crossvine (Bignonia(Anisostichus) capreolata), and wild grape (Vitis spp). Herbaceous cover usually consists of star chickweed (Stellaria pubera), blue-stemmed goldenrod (Solidago caesia), Eastern star (Aster divaricatus), broad looseflower sedge (Carex laxiflor'a), Virginia wildrye (Elymus virginicus), rattlesnake fern (Botrychium virginianum), small spike false nettle (Boehmeria cylindrical), eastern bottlebrush grass (Elymus hystrix (Hystrix patula)), white avens (Geum canadense), wingstem (Verbesina alternifolia), and violet (Viola spp). Many places are heavily invaded by Japanese MICHAEL BAKER ENGINEERING, INC. PAGE 5-3 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN honeysuckle (Lonicera japonica) and Japanese stiltgrass (Microstegium vimineum) at the expense of native herbs. 5.2 Hydrological Characterization 5.2.1 Site Hydrology Local drainage patterns of the bottomland parcel have been altered in the past to increase drainage and promote agricultural production. During conversion of the area to agriculture, flow from UT1-3 was diverted into a ditch that runs from the southwest corner of the parcel to its confluence with UT1 on the northern end of the parcel. Drainage tiles were installed in lowest portion of the field to provide further drainage, and upland fill material was placed over the low-lying areas to promote drier conditions for agriculture. Martin's Creek, which flows along the eastern edge of the parcel, was channelized and straightened, lowering the base flow elevation of the stream and providing additional drainage to the agricultural field areas. The existing hydrology of the site is controlled by the ditch, the channelized stream systems, and the drainage tiles that were placed through the center of the parcel. There are five existing wetland pockets, totaling 1.61 acres that are supported primarily by toe-slope seepage or hydrologic connectivity to MC UT1-3. Six automated groundwater wells were installed in the project area to evaluate current hydrologic conditions on-site, as shown in Figure 3.0. These wells provide a basis for comparing pre- and post- restoration hydrology on the site. Water table data were collected from the wells from November 2008 through November 2009, as shown in Figure 5.0. The wells were installed in existing pasture and field areas targeted for wetland restoration and wetland enhancement. Wells were installed across a range of elevations and locations to evaluate the range of hydrologic conditions on-site. The wells were installed to a depth of approximately 41 inches below ground surface, and the automated loggers (RDS EcotoneTM WM units) were programmed to record water table levels every two hours. Well locations exhibited similar trends in water table depth throughout the monitoring period that in part reflect seasonal changes in rainfall and evapotranspiration. Due to wetter than average conditions during the monitoring period, water table levels were relatively high for most well locations during the monitoring period. Water table depths were highest during the fall and early winter of 2009, when rainfall during September, October, and November 2009 was considerably greater than the long-term average (Figure 5.1). Water table levels remained relatively high for all locations during this period, due to frequent heavy rainfall. Water table levels were at their deepest during June and July 2009, when rainfall was slightly below average and evapotranspiration losses were at their greatest. Wells 1 and 6 experienced the highest water table levels during the monitoring period. Well 6 is located within one of the existing wetland areas on the site, and is supported by groundwater seepage during much of the year. As a result, water table levels during early and late 2009 were at or near the surface for Well 6. Well 1 is located just outside a jurisdictional wetland boundary, and therefore reflects the higher water table levels of the adjacent wetland. From early December 2008 through April2009, water table depths at Well 1 were less than 12 inches below the ground surface, and generally deeper than water table levels at Well 6. During the summer months, the trend reversed with deeper water table levels at Well 6 as compared to Well 1. These data indicate that the groundwater and seepage discharge at the Well 1 location are stronger during the summer months than the Well 6 location. Wells 3, 2, 5, and 4 exhibited progressively drier conditions, respectively, and document that the majority of the site does not currently support wetland hydrology in its drained condition. All wells are located in areas that were likely impacted by fill material that was placed over the field in the past. Of the four well locations, Well 3 is located a relatively low elevation near the middle of the field. Well 3 data show a rapid decrease in water table levels following rainfall events, attributed to the close proximity of the drain tiles that run through the center of the field. However, due to the MICHAEL BAKER ENGINEERING, INC. PAGE 5-4 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN relatively low topographic elevation, water table depths did not drop deeper than a depth of 24 inches during the monitoring period. Wells 2, 4, and 5 exhibited very similar hydrologic responses throughout the monitoring period. Each shows a tendency for rapid drop in water table levels following rainfall events, due to onsite drainage. Well 2 is located close to the drainage tiles that run through the center of the field, and is at a higher elevation than Well 3. Well 4 is located the closest to Martin's Creek and appears to exhibit some drainage effect from its proximity to the incised stream channel. Well 5 is located at a relatively high elevation between Martin's Creek and the channelized UT1-3. MICHAEL BAKER ENGINEERING, INC. PAGE 5-5 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Figure 5.0 Hydrographs of the Groundwater Monitoring Wells Compared to Local Rainfall (November 2008 through November 2009). u 4-1 Y 1a s 0 --1 I F-114 -6 -y' -10 -l y -11 -16 -1 £C =a -22 -e+ ti6 --s a -3+ -f+ -3S n carne a 2:-vcf ,_??+x= 111t??c? Date 1i) co _i S -? 5 s G _G 4 °5 +^ 4 'S 1 ,s I 11 10110'0? IOr. UP; 1t '1 110 Well =1 lvdl == Well =3 Well =4 -[bell =s Well =6 R91 fall rt+ ?I Water Level and Rainfall at all Wells MICHAEL BAKER ENGINEERING, INC. PAGE 5-6 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 7131109 2121709 3111'109 4.14'09 4:251n' 5,1 o1n9 51&09 6(27'09 711309 818'09 3C"9 05 9119109 5.2.2 Climatic Conditions The average growing season (defined as the period in which air temperatures are maintained above 28 degrees Fahrenheit at a frequency of 5 years in 10) for the project locale is 190 days, beginning on April 14 and ending October 21 (Cherokee County WETS Table 37039, Andrews, NC: NCO 184). The Town of Andrews, located approximately 15 miles northeast of the project site, experiences an average annual rainfall of 66 inches (Andrews, NC: NCO 184). In much of the southeastern US, average rainfall exceeds average evapotranspiration losses and these areas experience a moisture excess during most years. Excess water leaves a site by groundwater flow, runoff, channelized surface flow, or deep seepage. Annual losses due to deep seepage, or percolation of water to confined aquifer systems, are usually small and are not considered a significant loss pathway for excess water. Although groundwater flow can be significant in some systems, most excess water is lost via surface and shallow subsurface flow. Monthly precipitation amounts observed at a nearby weather station from December 2008 through November 2009 are compared with Cherokee County WETS table average monthly rainfall in Table 5.0 and Figure 5.1. Rainfall during the summer months of 2009 approximated normal rainfall conditions; however, rainfall amounts in the fall and early winter of 2009 greatly exceeded normal rainfall and promoted wet conditions across the site. Observed rainfall data were provided by the nearest automated weather station, located in the Town of Murphy (Station 316001). Table 5.0 Comparison of Monthly Rainfall Amounts for Project Site and Long-term Averages Martin's Creek II Mitigation Project-NCEEP Project #92633 11 t Dec-08 04°` 1 MOO" " ! 3 tl 9.72 Table Average Monthly 6.02 if- Deviation I II ' +3.7 Jan-09 6.64 7.1 -0.46 Feb-09 2.98 5.97 -2.99 Mar-09 4.91 6.97 -2.06 Apr-09 4.84 5.11 -0.27 May-09 6.79 5.43 +1.36 Jun-09 4.92 5.58 -0.66 Jul-09 4.49 5.05 -0.56 Aug-09 5.53 5.38 +0.15 Sep-09 8.9 4.44 +4.46 Oct-09 7.59 3.63 +3.96 Nov-09 6.41 5.33 +1.08 Sum 73.72 66.01 +7.71 MICHAEL BAKER ENGINEERING, INC. PAGE 5-7 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Figure 5.1. Graphical Comparison of Observed Rainfall with Long-term Average Conditions. 12 10 s c X61 4 2 5.3 0 .,A ???`Ja? ?at?r PQ?\ ?aa ,JCS Soil Characterization ,?A ??4- p0, Op0, O6 PJ y?Qae? p? oJe? ------ Long-Term Avg •..... 30% Low 30% High t Actual Rain While a recent Cherokee County Soil Survey is not available, older soil delineation maps on file with the NRCS indicate that the floodplain areas of the site are mapped primarily as Arkaqua loam, while the toe slopes are mapped primarily as Dillard loam. Arkaqua loam consists of somewhat poorly drained soils commonly found on nearly level flood plains along creeks and rivers in the Appalachian, Blue Ridge, and Great Smokey Mountains. The Arkaqua series is considered to be a Hydric `B"soil by the NRCS. Dillard loam consists of moderately well drained soils found on narrow, nearly level to sloping stream terraces and toe slopes. The Dillard series is not considered a hydric soil by the NRCS. The fact that there are existing jurisdictional wetlands that have been delineated within the mapped areas of Dillard soils indicates that the soil mapping in these areas is not accurate. To further investigate the soil conditions present on the site, Baker contracted with ECS Carolinas LLP to conduct a detailed soils evaluation of the site. During December 2009, a licensed soil scientist from ECS evaluated the site to determine the depth of hydric soil conditions and the presence of buried hydric soil layers in the bottomland parcel. Assessments were carried out using hand-augers and backhoe pits every 50 feet along transects across the field areas. The assessment report developed by ECS is provided in Appendix F. The results of the assessment indicate the presence of hydric indicators at depths typically ranging from 14 - 22 inches across much of the field areas (floodplain) adjacent to Martin's Creek. In several locations within the field, a "dark grayish loam A horizon" was discovered at a depth of approximately 14 - 22 inches. These results, along with observations of terra cotta drain tiles within the field, provide strong evidence that upland soils were placed over much of the field area in the past to promote better agricultural production from the field areas. It is possible that the upland soils placed on the field came from road construction nearby; thus, the field was likely used as a disposal area for excess spoil material. This practice was not uncommon prior to regulations protecting stream and wetlands, as it provided landowners and farmers with a way to convert wet fields into dry fields at little if any cost. MICHAEL BAKER ENGINEERING, INC. MARTIN'S CREEK 11 MITIGATION PLAN PAGE 5-8 9/22/2010 5.4 Plant Community Characterization The proposed restoration area is comprised of pasture fields. Vegetation within these open pasture fields is primarily comprised of Fescues (Festuca spp.) and other common pasture grasses. Multiflora rose (Rosa multiflora), and invasive exotic species, can also be found in clumps within the pasture areas. During 2009, cattle had access to the pasture fields and kept edible herbaceous vegetation grazed to a low height. MICHAEL BAKER ENGINEERING, INC. PAGE 5-9 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 6.0 REFERENCE WETLANDS 6.1 Hydrological Characterization The reference wetland site for the project is located on-site within the existing wetland pockets that have been delineated as part of the project (see Jurisdictional Wetlands section). The site is located approximately 200 feet west of the proposed wetland restoration areas in the bottomland parcel. The reference area is currently used as cattle pasture; therefore, the site is disturbed and consists primarily of herbaceous hydrophytic vegetation. The site is proposed as an onsite hydrologic reference, and will not be used to infer appropriate vegetation communities for restoration areas. The hydrology of the reference site will be compared with the restoration site during dry years when the hydrology of the restoration site may not meet defined success criteria, to determine if the dry conditions are climatic in nature. Hydrology of the reference site is driven by both groundwater discharge and periodic flooding of the tributary stream channels. 6.1.1 Gauge Data Summary Two automated recording wells (Wells # 1 and 46) were installed within the existing wetlands onsite during December 2008. Well # 1 is located in the existing wetland pocket in the southwestern corner of the bottomland parcel, while Well 46 is located in the larger wetland area on the northern side of the bottomland parcel. The wells were programmed to record groundwater levels every 2 hours to a maximum depth of 40 inches. During the monitoring period from December 2008 through November 2009, the two well locations documented consistently higher average water table levels than the remaining wells that were installed in the proposed restoration areas. During the monitoring period, Well 46 exhibited wetter conditions during the winter months (dormant season), while Well # 1 exhibited wetter conditions during the driest part of the growing season (April -August). One possible conclusion from these data is that the wetland area monitored by Well # 1 is driven more strongly from groundwater discharge and hillslope seepage (which would provide more stable water table levels throughout the year), whereas Well 46 is driven more by water supplied from the nearby small tributary, which decreases dramatically during the summer months. This conclusion is supported by the locations of the wells in relation to site features; Well # 1 is located at the down- valley edge of a seepage wetland, whereas Well 46 is located near the small tributary the flows south to north across the bottomland parcel. Average water table levels for Well # 1 ranged from approximately -8 inches during the spring months to -12 inches during the summer months. Well 46 average water table levels ranged from -3 inches during the spring months to -16 inches during the summer months. MICHAEL BAKER ENGINEERING, INC. PAGE 6-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Figure 6.1 Water Table Depths Recorded in Monitoring Wells Installed within the Reference Site. I Water Level and Rainfall at Reference Wells ?Yl I? L Date - %vell =1 - Well =6 -RaiufAl 6 n ° t; Er ' -10 a - - -16 1 -^ , 1 , 41 ? II'- _ __ II I lye, . I'10i I!3I C? _ )s ";i4)C1 -!401` 4:25.,1 c:IG tr.,: C- ._.r. 13: P:+ bra}^, „?:py crl' .. I..I)"7: IC-al•!? I..^' 7-• Q: MICHAEL BAKER ENGINEERING, INC. PAGE 6-2 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 6.2 Soil Characterization The soils located in the vicinity of the reference wetland are mapped as the Dillard loam and Arkaqua loam series on past soil map delineation files that are available at the local NRCS office (no Soil Survey is currently available for Cherokee County). Taxonomic classification and profile information for these soils is provided in Section 2.3. Arkaqua soils are considered somewhat poorly drained and hydric by the NRCS, while Dillard soils are moderately well drained and are not hydric. Two of the delineated existing wetland pockets on the bottomland parcel are located within the mapped area of Dillard soils. This indicates that the mapping of Dillard soils in these areas is incorrect. Soils of the existing wetland areas were examined by ECS Carolinas LLP as part of their wetland delineation of the site. Soils within the boundaries of the existing wetland pockets were described as having low-chroma soil matrix values, aquic moisture regimes, and exhibited redoximorphic features. MICHAEL BAKER ENGINEERING, INC. PAGE 6-3 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 7.0 PROJECT SITE MITIGATION PLAN This section relates the goals and objectives of the Martin Creek mitigation project to the goals identified in the Peachtree-Martins Creek LWP. It also covers the design criteria selected for stream restoration and enhancement on the Martin Creek project site. The design proposed for the project will include Restoration and Level I and II Enhancement approaches. Enhancement II approaches will address exotic invasive species and localized erosion. The justification for this is to help establish native species that provide terrestrial and aquatic benefits. Minor erosion repair is warranted from prior crossing and livestock impacts or other localized instability. Restoration and enhancement of streams and wetlands at the Martin Creek Site are justified for the following reasons: 1. Streams for which restoration or enhancement work is proposed have been channelized, bermed, and moved against the sides of the valleys or perched up on the hill slope. Most are incised along much of their length. Pattern, profile and dimension adjustments to the channels will reduce erosion, improve floodplain connectivity, and improve floodplain hydrology necessary for wetland restoration. 2. Wetlands have been drained, filled and otherwise manipulated to create more land suitable for agricultural purposes; and 3. There are widespread cattle impacts that have resulted in erosion and sedimentation, silt-clogged stream channels and the loss of woody vegetation within the riparian zone. A Priority 1 approach, involving construction of a new channel on the existing floodplain, will be applied to Reach 2 of MC-UT1. This work will remove the channel from the toe of the valley wall. Level I Enhancement efforts will be used to create grade control, repair bank erosion and restore proper dimension on Reach 3. For Reach 4, a Priority 1 approach will be used to reconnect the channel to its relic channel and where there is no relic channel a new channel will be constructed that uses the valley elevation as the new floodplain. This project is similar to a Priority 2 project in that the valley floor will be lowered to restore wetlands, but like Priority 1 in that the new channel will be aligned on this new valley floor. We are calling it a Priority I restoration because the valley lowering is associated with the wetland restoration and not the stream restoration. The new stream channel will utilize the new valley as its floodplain. Exotic invasive removal and re-planting with native vegetation will be conducted on all reaches. On UT1-3, the upper reach (Reach 1) will be restored with an Enhancement I approach, involving grade control structures to improve grade, habitat, and sediment transport, as well as with bank repairs and stream dimension adjustments to achieve stability. Reach 2 will be the same Restoration approach as UT1 Reach 4, will a new valley being constructed to restore wetlands and the pre-impact soil profile. The proposed meandering pattern is appropriate for a low slope stream with adjacent wetlands, and will have structure and habitat elements. Exotic invasive removal and re-planting with native vegetation will be conducted on both reaches. The stream types for the restored streams will be Rosgen "B" and "C" channels with design dimensions based on reference reaches, hydraulic and sediment transport analyses and geomorphic ratios and guidance from past projects. Tributaries on the hill slopes will have minimal pattern adjustment since they are already located in the lowest part of the valley and are naturally low sinuosity streams. They will have their dimension and profile adjusted to address unstable stream banks and significant changes in profile slope that indicates head cutting. The restoration and enhancement design for the Martin's Creek Site will allow stream flows at or larger than bankfull, to spread onto the restored floodplain, dissipating flow energies and reducing the stress on streambanks. Where abandoned, the old stream channels will be backfilled using fill material generated by the grading of new channel and floodplain benches. Any excess fill material generated during construction will be disposed of on-site in designated disposal areas. In-stream structures will be used to control MICHAEL BAKER ENGINEERING, INC. PAGE 7-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN streambed grade, reduce stresses on streambanks, and promote diversity of bedform and habitat. In-stream structures may consist of constructed riffles, boulder drop structures, and rock or log vanes. Reach-wide grade control will be provided by the aforementioned in-stream structures, constructed riffles and by bedrock where present. Structures will be spaced at a maximum distance that results in the downstream header protecting the upstream footer to create a redundancy that will ensure long-term vertical stability. Where possible, both wood and rock will be incorporated into the structures to promote a diversity of habitat features. Streambanks will be stabilized with a combination of bioengineering measures, erosion control matting, bare-root plantings, and live staking. This section discusses the design criteria selected for stream restoration on the Martin's Creek Site. 7.1 Mitigation Project Goals and Objectives As noted in the Executive Summary, the Martins Creek mitigation project area lies within the focus area of the Peachtree-Martins Creek Local Watershed Plan (LWP) and roughly corresponds to Restoration site # 1 & Preservation site # 1 of the LWP project atlas. Among the goals of the plan is the desire to work with local landowners, resource agencies and nongovernmental groups to implement wetland and stream restoration projects that reduce sources of sediment and nutrients by restoring riparian buffers, stabilizing stream banks, and restoring natural channel geomorphology, particularly in headwater streams. The NCEEP is also placing an emphasis on projects that contribute to the restoration and protection of habitat for priority fish, mussel, snail and crayfish species in the basin (NCEEP, 2008). To support these watershed goals, several project goals have been established for the Martin's Creek mitigation project: • Restore geomorphically stable stream channels within the Martin's Creek II mitigation project area, • Restoration or enhancement of wetlands on- site, • Exclude livestock from accessing the project streams, wetlands, and riparian zones, • Improve and restore hydrologic connections and achieve uplift of ecosystem functions, • Improve water quality within the Martin's Creek II project area through reduction of bank erosion, improved nutrient and sediment removal, and stabilization of streambanks, • The restoration and preservation of headwater tributaries to the Peachtree-Martins Creek Watershed and the Hiwassee River, and • Improve aquatic and terrestrial habitat through improved substrate and in-stream cover, addition of woody debris, reduction of water temperature, and restoration of riparian habitat. In order to accomplish the goals of the project and contribute to the overall success of goals set forth for the greater Peachtree-Martins Creek local watershed planning area, a number of general project objectives followed by design objectives were identified for this project and are listed below: • Utilize natural channel design concepts to restore or enhance channel profile, pattern and dimension to reduce bank and channel profile degradation and to allow greater floodplain connectivity to aid in the dissipation of energy during bankfull or greater flows; • Reduce streambank degradation and sediment and nutrient inputs by limiting livestock access of project tributaries to crossings agreed upon between the NCEEP and the landowner; • Further reduce sediment and nutrient inputs and streambank instability by restoring or enhancing native riparian vegetation along a 30-foot buffer along the project reach. • Improve bedform function and diversity by installing toe wood structures and grade control structures that also function to improve riffle and scour pool habitat. Design objectives: • Make important design decisions based on geomorphic analyses, reference conditions and supporting information from hydraulic modeling, MICHAEL BAKER ENGINEERING, INC. PAGE 7-2 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN • Use constructability as a guiding consideration in order to produce a realistic design that is possible to build given field constraints and construction tolerances. Design ideas are discussed with knowledgeable construction personnel to determine the constructability, likely footprint, and severity of impacts to on-site resources, • Minimize disturbance to ecologically functional and physically stable areas; mimic the character of these areas and borrow materials from them where appropriate to create a more natural design, and • The over-all design approach, including proposed structures, will attempt to use native materials and minimize materials brought onsite in order to produce habitat favoring native flora and fauna, reduce compaction and site disturbance from material transport, and produce an aesthetically pleasing result. The Martin's Creek II project site is an appropriate candidate for restoration, as significant erosion will occur before streams in the project area achieve a stable, quasi-equilibrium state. Although aggradation is present, overall stream conditions present on-site reflect varying degrees of incision and continued degradation. Bank erosion will continue contributing sediment to areas downstream of the project site and will cause widening of the stream. If implemented, project restoration and enhancement objectives will help to stabilize the channel, halt incision and widening, and significantly diminish bank erosion. The Martin's Creek II project will also support the LWP and river basin restoration plan priorities and goals by reducing sediment and nutrient loading into tributaries to Martin's Creek through the restoration or enhancement of riparian buffers, stabilizing streambanks and channel morphology through natural channel design concepts, and managing livestock access within the project area. This project will further improve terrestrial and aquatic habitat conditions through the reestablishment of a stable riparian corridor and more stable channel morphology. The accompanying plans depict the proposed restoration measures. The application of these measures is described below according to reach. Martin's Creek (Mainstem) Due to the location of the overhead power lines and the corresponding utility corridor easement, a conservative (low level of effort) approach will be taken to address the mainstem of Martin's Creek. This channel will be restored using an Enhancement II approach, which will consist primarily of the removal of invasive vegetation and replanting with native, woody vegetation, as well as the removal of parts of the berm, thereby restoring floodplain connectivity during lower return interval flood events. In addition, invasive species treatment and reforestation of the riparian zone with low growing woody vegetation will be done to improve overbank flow filtration, shading and rootmass density along the stream corridor. MC-UT1-1 and MC-UT1-2 These reaches will be protected through preservation. While no restoration work will be done on these reaches they will be protected from future development through the establishment of an conservation easement that will take in the channel and riparian zone. MC'.-T TT 1 Of the four reaches, three are slated for some level of enhancement or restoration. Only Reach 1 is slated for Preservation as described above. Reach 2 will be addressed with a Restoration approach. A Priority 1 approach, involving construction of a new channel on the existing floodplain, will be applied to remove the channel from the toe of the right valley wall. The design approach calls for dimension, profile and pattern adjustments with grade control used to protect the reach from down cutting, thus providing vertical stability. This will also protect the restored site from headcutting that could move upstream from a transition reach between Reaches 2 and 3 that could not be MICHAEL BAKER ENGINEERING, INC. PAGE 7-3 9/29/2010 MARTIN'S CREEK 11 MITIGATION PLAN • Use constructability as a guiding consideration in order to produce a realistic design that is possible to build given field constraints and construction tolerances. Design ideas are discussed with knowledgeable construction personnel to determine the constructability, likely footprint, and severity of impacts to on-site resources, • Minimize disturbance to ecologically functional and physically stable areas; mimic the character of these areas and borrow materials from them where appropriate to create a more natural design, and • The over-all design approach, including proposed structures, will attempt to use native materials and minimize materials brought onsite in order to produce habitat favoring native flora and fauna, reduce compaction and site disturbance from material transport, and produce an aesthetically pleasing result. The Martin's Creek II project site is an appropriate candidate for restoration, as significant erosion will occur before streams in the project area achieve a stable, quasi-equilibrium state. Although aggradation is present, overall stream conditions present on-site reflect varying degrees of incision and continued degradation. Bank erosion will continue contributing sediment to areas downstream of the project site and will cause widening of the stream. If implemented, project restoration and enhancement objectives will help to stabilize the channel, halt incision and widening, and significantly diminish bank erosion. The Martin's Creek II project will also support the LWP and river basin restoration plan priorities and goals by reducing sediment and nutrient loading into tributaries to Martin's Creek through the restoration or enhancement of riparian buffers, stabilizing streambanks and channel morphology through natural channel design concepts, and managing livestock access within the project area. This project will further improve terrestrial and aquatic habitat conditions through the reestablishment of a stable riparian corridor and more stable channel morphology. The accompanying plans depict the proposed restoration measures. The application of these measures is described below according to reach. Martin's Creek (Mainstem) Due to the location of the overhead power lines and the corresponding utility corridor easement, a conservative (low level of effort) approach will be taken to address the mainstem of Martin's Creek. This channel will be restored using an Enhancement II approach, which will consist primarily of sloping the left stream bank, removal of invasive vegetation and replanting with native, woody vegetation. This sloping will include removal of parts of the berm, restoring floodplain connectivity during lower return interval flood events. In addition, invasive species treatment and reforestation of the riparian zone with low growing woody vegetation will be done to improve overbank flow filtration, shading and rootmass density along the stream corridor. MC-UT1-1 and MC-UT1-2 These reaches will be protected through preservation. While no restoration work will be done on these reaches they will be protected from future development through the establishment of an conservation easement that will take in the channel and riparian zone. MC-UT1 Of the four reaches, three are slated for some level of enhancement or restoration. Only Reach 1 is slated for Preservation as described above. Reach 2 will be addressed with a Restoration approach. A Priority 1 approach, involving construction of a new channel on the existing floodplain, will be applied to remove the channel from the toe of the right valley wall. The design approach calls for dimension, profile and pattern adjustments with grade control used to protect the reach from down cutting, thus providing vertical stability. This will also protect the restored site from headcutting that could move upstream from a transition reach between Reaches 2 and 3 that could not be MICHAEL BAKER ENGINEERING, INC. PAGE 7-3 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN protected in the mitigation plan because it is either too close to a right-of-way to allow for protection with the easement or it is on another property. On Reach 3, Level I Enhancement efforts will be used to create grade control, repair bank erosion and restore proper dimension. Eroding banks will be stabilized with structures that will reduce near bank stress and promote grade control. Soil stability will be accomplished by eradicating exotic, invasive vegetation that is limiting the growth of deep rooted, native plant life. Once exotics are removed the site will be planted with native herbaceous and woody plant species that will provide extensive rootmass to stabilize the banks and shade to maintain the cool water habitat. For Reach 4, a combination of Priority 1 and 2 approaches will be used to relocate this channel in the low point of the valley. The relic channel for this stream is still present in the field adjoining the existing channelized channel. This stream will be reconnected to this relic channel just below where it now flows through a culverted crossing. The old channel will be filled and the existing exotic vegetation eradicated. Where needed a new floodplain at the historic floodplain elevation will be constructed. Due to cattle access there are areas where the old floodplain has been damaged and my need to be repaired. This relic channel has been lost in the existing wetland area at the low point of this drainage slope. From this point a new channel will be constructed with the bankfull elevation at the valley floor elevation. Using the Priority 1 and 2 descriptions for this part of the channel construction is somewhat confusing in this situation. This is because the valley floor will be lowered as a part of this project that has the objective of restoring wetland habitat to this valley. Since the reason for lowering the valley is to establish wetland habitat and functions and not to establish a new floodplain elevation for the stream we are calling this a Priority 1 Restoration; however, we recognize that this is a matter of perspective. The lower end of Reach 4 from the end of the relic channel to its new confluence with Martin's Creek will be restored with a new meandering channel across the lower valley from which it has been removed. This lowest reach on MC-UT1 will have a new confluence with UT1-3 and then with Martin's Creek. As this new channel reaches the point where it will confluence with Martin's Creek a new floodplain will need to be established as the stream drops down to the elevation of the mainstem. Dimension changes will also be made to improve the overall connectivity between the stream and the floodplain as the channel meanders through the wetland complex before converging with Martin's Creek. This will relocate these channels from where they presently cross onto the adjacent property owner to the north. He has agreed to allow this channel modification. Where abandoned, old stream channels will be backfilled using fill material generated by the grading of a new channel and floodplain benches or otherwise graded to make them continuous with other local surface features. Any excess fill material generated during construction will be stabilized on-site in locations that are well away from any surface water. Exotic invasive removal and re-planting with native vegetation will be conducted on Reaches 2-4. This will re-establish a buffer consisting of woody and herbaceous vegetation native to the ecoregion. MC'.-I TT1-3 Enhancement Level I activities are proposed on MC-UT1-3 from the property boundary to the driveway crossing just upstream of the lower field where Martin's Creek is located. The Enhancement I design approach on this tributary will entail bank grading and stabilization to correct channel dimension and livestock impacts, and the addition of grade control measures to maintain a more stable channel profile. Pattern adjustments made on this reach will be minimal due to the presence of many mature trees and the fact that existing sinuosity is appropriate for most of the reach. Pattern will be adjusted at three locations to address headcutting and lateral scour that is causing excessive sedimentation of the stream and instability of the stream bank. Profile adjustments will entail removal of headcuts and installation of grade control structures or constructed riffles to improve bedform diversity and regulate channel slope. As part of this MICHAEL BAKER ENGINEERING, INC. PAGE 7-4 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN effort, exotic invasive vegetation will be removed and native plant communities enhanced through riparian plantings. A Priority 1 Restoration approach will be applied downstream of the driveway crossing. As described for Reach 4 of MC-UT1, Priority 1 is also here qualified by saying that we are constructing the new channel across a valley floor that will be lowered to enhance wetland functions. Reach2 of MC-UT 1-3 was previously channelized across the pasture in a perched channel. Restoration efforts will include a sinuous pattern typical of low slope, wide floodplain settings, with the new channel to be constructed at the appropriate profile and dimensions as it meanders along its new alignment. Given the gradual slope of the reach, grade control structures placed in this section of the stream will primarily serve to reduce bank stress, aid in sediment transport, and to improve bedform diversity and habitat. As noted earlier, MC-UT 1-3 will be relocated within the greater wetland complex proposed and will have a new confluence with MC-UT1 and with Martin's Creek. The new channel will have a high degree of connectivity between the stream and floodplain as the channel meanders through the wetland complex. Where abandoned, old stream channels will be backfilled using fill material generated by the grading of a new channel and floodplain benches or otherwise graded to make them continuous with other local surface features. Any excess fill material generated during construction will be stabilized on-site in designated disposal areas. MC-UT2 UT2 is a short reach that flows under Martin's Creek Road and directly into right side of Martin's Creek. Enhancement Level II will be used to improve this channel. Like the mainstem of Martin's Creek opportunities for improvement are limited here because of the state road, overhead power-lines and its short length. Channel dimension will be improved by sloping vertical stream banks to a slope that will allow planting. Riparian enhancement will include the removal of exotic invasive vegetation and re-establishment of a buffer consisting of woody and herbaceous vegetation native to the project area. Right Prong Martin's Creek (Mainstem) There are two reaches. Reach 1 contains the vast majority of the stream length on the project property, is forested, and will be placed in preservation. Reach 2 falls along the lower part of the stream after it enters an old field. In this reach, riparian enhancement activities consist of removing exotic invasive vegetation and re- establishing a buffer consisting of woody and herbaceous vegetation native to the project area. RP-UT I There are two reaches. Reach 1 includes the vast majority of the length, is forested, and will be placed in preservation. Like the mainstem, Reach 2 of RP-UT1 is the lower part that enters an old field. In this reach, riparian enhancement activities consist of removing exotic invasive vegetation and re-establishing a buffer consisting of woody and herbaceous vegetation native to the project area. Other Preservation Reaches in the Right Prong Martin's Creek Drainage: RP-UT2, RP-UT2-1, RP-UT3-1, TP-UT4, TP-UT4-1, and RP-UT5 These reaches will be protected through preservation. While no restoration work will be done on these reaches they will be protected from future development through the establishment of an conservation easement that will take in the channel and riparian zone. The right to six stream crossings has been retained by the landowner and the location of these crossings may be determined in the future; however, the area that may be impacted by these crossings is very minimal compared to the area that will be protected. Riparian Wetland Restoration The existing pasture in the lower valley is currently drained by the channelized streams MC-UT1, MC-UT1- 3, mainstem Martin's Creek and by subsurface drain tiles. To restore wetland hydrology to the site, the soil placed on historic wetland areas will be excavated and removed. This will bring the buried hydric soils to an MICHAEL BAKER ENGINEERING, INC. PAGE 7-5 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN elevation that will allow them to support wetland functions. Existing streams will be relocated and raised onto the restored wetland floodplain to restore floodplain connectivity and flow dynamics between the restored streams and wetland areas. Excavated material will be placed in stockpile/disposal areas on-site as shown on the plans. The abandoned sections of channelized stream will be completely filled to eliminate the drainage effect caused by these features. Likewise, drain tiles within the fields will be excavated and removed where possible to disrupt drainage from the field. Grading activities will focus on restoring pre-disturbance valley topography by removing any field crowns, surface drains, or swales that were imposed during agriculture production. The topography of the restored site will be patterned after natural floodplain wetland reference sites, and grading activities will not seek to leave a smooth soil surface. A rough soil surface promotes diversity of hydrologic conditions and habitats common to natural wetland areas. Once design grades have been achieved, the soil surfaces will be tilled to depth of 6 to 10 inches to promote infiltration and better rooting conditions for planted vegetation. The restoration design for the wetland is based on a targeted "Low Mountain Alluvial Forest" riparian wetland type, as identified by Schafale and Weakley (1990). Hydrology of this system will be palustrine, "seasonally or intermittently flooded", as the restored channel is designed to carry the bankfull flow, and to flood (flow out of its banks) at discharges greater than bankfull. The revegetation plan for the overall riparian system will consider the combination of existing onsite native vegetation and riparian communities identified by Schafale and Weakley (1990) that include "Low Mountain Alluvial Forest", and "Mountain Bottomland Forest". The planting areas will be designated by wetness zones to represent anticipated site conditions. Riparian Wetland Enhancement Multiple pockets of existing jurisdictional wetlands have been delineated within the transitional upland and field areas of the project site. These wetlands, which cumulatively total 1.61 acres, have formed as a result of depressional topography, poor drainage, and hillslope seepage. As described in Section 5, jurisdictional wetlands in the project area that will be temporarily impacted through restoration and enhancement measures will ultimately be higher quality wetlands. These temporary impacts, which total approximately .24 acres, will involve surface roughening, removal of exotic, invasive vegetation, re-establishment of wetland vegetation native to the region and minor adjustments to drainage patterns are necessary to restore channel pattern to MCUT1 and MCUT1-3 and to improve wetland hydrology. Stream and wetland restoration measures will not negatively impact the hydrology, vegetation and soils of the existing wetlands. Efforts to minimize wetland-disturbing activities during the design process have included modifying the alignment of streams near the wetlands in a way that achieves the project stream mitigation objectives (which entails channel pattern and dimension adjustments) while avoiding wetland acreage loss. In fact, the proposed channel alignment of the tributaries to Martin Creek that are located near or adjacent to the existing wetlands was designed to ensure wetland restoration and enhancement objectives were met as well (i.e. improved hydrological connectivity, creation of native riparian vegetation communities). Through the stream and wetland restoration practices described above, these areas will experience a more natural hydrology and flooding regime once the project is completed. Since existing wetlands are dominated by herbaceous wetland species, the areas will also be planted with native wetland tree species that are tolerant of flooded conditions. Exotic, invasive species will be removed using mechanical and herbicidal methods as appropriate. MICHAEL BAKER ENGINEERING, INC. PAGE 7-6 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 7.2 Design Criteria Selection for Stream Restoration A number of analyses and data were incorporated in the development of site-specific natural channel design approaches. Among these are hydraulic and sediment analyses, existing site conditions data collection, incorporation of reference reach databases, regime equations, and evaluation of results from past projects. Design criteria are dependent on the general restoration approach determined to be a best fit for the Martin's Creek mitigation site (Table 7.0). The approach for restoration was based on an assessment of each reach and its potential. After selection of the general restoration approach, specific design criteria were developed so that the plan view layout, cross section dimensions, and profile could be described for each reach. These criteria are presented below and in the construction plans. Assigning an appropriate stream type for the corresponding valley that accommodates the existing and future hydrologic and sediment contributions was considered conceptually prior to selecting reference reach streams. Design criteria for the proposed stream concept were selected based on the range of the reference data and the desired performance of the proposed channel. Following initial application of the design criteria, refinements were made to accommodate the existing valley morphology, to work around project constraints, to minimize unnecessary disturbance of the riparian area, and to allow for natural channel adjustment following construction. The construction documents have been tailored to produce a cost and resource efficient design that is constructible, using a level of detail that corresponds to the tools of construction. The design also reflects a philosophy that the stream will adapt to the inherent uniformity of the mitigation project and be allowed to adjust over long periods of time under the processes of flooding, re-colonization of vegetation, and local topographic influences. Table 7.0 Project Design Stream Types Martin's Creek II Mitigation Project-NCEEP Project #92633 Proposed Stream Reach Stream Rationale Type Right I AB Preservation Prong Martin's 2 B Level 11 Enhancement Creek I A/B Preservation RP-UT 1 2 B Level 11 Enhancement Martin's I C Level 11 Enhancement, use existing dimensions, improve floodplain connectivity Creek I A/B Preservation 2 B Priority 1 Restoration MC-UT1 3 B Level I Enhancement 4 C Priority 2 Restoration in low slope valley 1 B Level I Enhancement in higher slope valley MC-UTI-3 2 C Priority 2 Restoration in low slope valley Notes: Streams only listed if they have Restoration or Enhancement reaches. 7.3 Stream Project Design & Justification The primary objective of the restoration design is to construct a stream with a stable dimension, pattern, and profile that has access to its floodplain at bankfull flows while enhancing riparian and aquatic habitat. The approach applied by Baker to the Martin's Creek Site consisted of creating stable B and C-type channels. The MICHAEL BAKER ENGINEERING, INC. PAGE 7-7 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN proposed design parameters for each of the reaches are detailed in Table 7.1. The design rationale and design parameters for all of the design reaches are presented below. Dimension Throughout the entire proposed design, the channel dimensions were adjusted to reduce velocities and near- bank shear stress. The selected design parameters eliminate incision and restore access to the floodplain, increasing the entrenchment ratio. The sloping reaches, design dimensions are for 13-type channels that are found in Type II colluvial valleys. These have a lower entrenchment ratio than alluvial streams which means that benching will be slightly sloping and of only moderate width. For the channels being routed through the lowest part of the main valley, C-type channels were designed and are expected to narrow to an E-type morphology over time as vegetation dominates the channel banks. E-type channels are difficult to construct due to high instability due to the lack of established rootmass immediately after construction. These channels will have high width/depth ratios, wide floodplains and very high entrenchment ratios. They have been kept wider rather than deeper to help maintain hydrology in the adjacent restored wetlands. In all cases, a bank height ratio (BHR) of 1.0 was chosen to develop a channel with access to its floodplain for relief during events having flows in excess of bankfull. Typical cross sections are shown on the plan sheets. Pattern The existing pattern of these project streams is representative of impacts one would expect from stream channelization, relocation and livestock impacts. In general, Reach 2 on MC-UT1 has been designed to dissipate energy vertically in steeper sections, and through meandering along Reach 4 of MC-UT1 that will flow adjacent to a restored wetland in the lower field. The restoration reach on MC-UT1-3 was also designed to dissipate energy through a meandering channel. A meandering morphology is most appropriate for streams that have slopes less than 2% as is the case withMC-UT1-3 and MC-UT1 as it enters the lower field. Reach 2 on MC-UT1, will be restored with a new pattern; however, the sinuosity will be low (1.06) due the slope of this reach (.05). The pattern change associated with this restoration reach will bring the channel away from the valley wall to allow for overbank flow on both sides of the stream and to avoid sedimentation off of the right hill slope into the stream. The sinuosity of MC-UT1, Reach 4 and MC-UT1-3, Reach 2 will increase from 1.0 to 1.4 and 1.0 to 1.42, respectively with the development of the meandering channels. High sinuosity is appropriate where these streams enter the wide, flat valley of the mainstem of Martin's Creek and flow through the restored wetlands. The radius of curvature for meanders ranged from 20 to 40 and meander length ranged from 80 to 110. These ranges were used to provide a diversity of form in order to avoid a "cookie cutter" appearance. The proposed enhancement approach for the tributaries is to correct or stabilize existing problem areas relative to dimension, and profile and to maintain the 13-type channels with improvements that will provide long-term stability. With the exception of Reach 1 on MC-UT 1-3, there will not be a significant modification of pattern on the enhancement reaches (Right Prong Martin's Creek, RP-UT1, Martin's Creek, MC-UT1 and MC-UT2). Slight pattern adjustments will be made at three locations on MC-UT1-3; at two sites where meanders are cutting into high clay banks and at another site to avoid a significant headcut. The minor changes to channel alignment on this enhancement reach does not warrant greater mitigation credit than what is given for Enhancement I due to their being short in length and localized in scope. ProfileBedform The profiles for the tributaries with higher slopes slated for restoration and enhancement (MC-UT1 Reaches 2 and 3, and MC-UT1-3 Reachl) have poor habitat and a lack of grade control. A step-pool morphology has been designed to establish a profile and bedform that is typical to 13-type channels and to ensure that the bed has colluvial elements that help induce pool formation, create habitat niches, and hold the vertical stability of the profile. MICHAEL BAKER ENGINEERING, INC. PAGE 7-8 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN The existing profiles of MC-UT1 Reach 4 and MC-UT1-3 Reach 2 have little diversity of bedform with long riffles and relatively short pools, a characteristic common to channelized streams. The proposed meandering channels will have a regular riffle - pool sequence. These slopes should provide for a diversity of bedform and maintain quality habitat as sediment is moved through the reach. Where structure is used, its purpose is to help hold the channel grade while riffles are developing, reduce bank stress while vegetation matures, and improve habitat. MICHAEL BAKER ENGINEERING, INC. PAGE 7-9 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 7.1 Geomorphic Characteristics of the Proposed MC-UT1 Martin's Creek II Mitigation Project Martin's Creek II Mitigation Project-NCEEP Project #92633 Reach 2 Sta. 0+00 to 10+70 Reach 3-4 Sta. 0+00 to 3+45, 5+48 to 16+97 Min Max Min (STA 0+00- 6+00) Max (STA 6+00- 11+00,11+00- 16+97) 1. Stream Type B/Cb B-C 2. Drainage Area - mil 0.09 0.17 0. 17, 0.25 3. Bankfull Width (wbkf) - ft 7.7 8.5 8.5, 11 4. Bankfull Mean Depth (dbkf) - ft 0.54 0.71 0.71, 0.81 5. Width/Depth Ratio (w/d ratio) 14.3 12.0 12.0, 13.5 6. Cross-sectional Area (Abkf) - ft2 4.1 6.0 6.0, 9.0 7. Bankfull Mean Velocity (vbkf) - ft/sec 3.9 4.3 4.3, 4.0 8. Bankfull Discharge (Qbkf) - WIsec 16 26 26,36 9. Bankfull Max Depth (dmbkf) - ft 0.7 0.9 0.9, 1.0 10. dmbkf / dbkf Ratio 1.3 1.3 1.3, 1.2 11. Low Bank Height to dmbkf ratio 1.0 1.0 1.0 12. Floodprone Area Width (wfpa) - feet 16 40 17 >100 13. Entrenchment Ratio (ER) 2 5.2 2 >11.8 14. Meander Length (L.) - ft* N/A 90 90 15. Meander Length to Bankf ill Width (Lm/wbkf)* N/A 10.5 10.5 16. Radius of Curvature (RJ - ft* N/A N/A 15-30 20-30 17. Radius of Curvature to Bankfull Width (R. / wbkf)* N/A N/A 1.8-3.8 2.3-3.8 18. Belt Width (wbt) - ft* N/A N/A 40 40 19. Meander Width Ratio (Wblt/Wbkf) N/A N/A 4.7 4.7 20. Sinuosity (K) (Stream Length / Valley Length) 1.06 1.18 1.4 21. Valley Slope 0.050 0.060 0.038, 0.016 22. Average Channel Slope (Sbkf) 0.047 0.057 0.027, 0.011 23. Pool Slope (s ooi) 0 0 0 0 24. Pool Slope to Average Slope (SPooi / Sbkf) 0 0 0 0 25. Maximum Pool Depth (dl) - ft 1.6 1.6 2.0 26. Ratio of Pool Depth to Average Bankfull Depth (dpooI/dbkf) 2.9 2.9 2.8 27. Pool Width (w ooi) - ft 12 12 13 28. Pool Width to Bankfull Width (Wp..l / wbkf) 1.6 1.4 1.5 29. Pool Area (Apool) - ft2 11.5 11.5 14.3 30. Pool Area to Bankfull Area (Apooi/Abkf) 2.8- 1.9 2.4 31. Pool-to-Pool Spacing (-) - ft 12 45 14 33 32. Pool-to-Pool Spacing to Bankfull Width (p-p/wbkf) 1.5 5.8 1.6 3.9 33. Riffle Slope (siffle) 0.05 0.16 0.06-0.14 0.03-0.076, 0.012-0.02 34. Riffle Slope to Average Slope (s,ife/ sbkf) 1.1 3.5 1.1-2.5 1.1-2.5, 1.1-2.0 MICHAEL BAKER ENGINEERING, INC. PAGE 7-10 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 7.1 (cont.) Geomorphic Characteristics of the P d M i ' k II Mi i i P C MC-UT1-3 ropose art n ree gat on roject s t Martin's Creek II Mitigation Project-NCEEP Project #92633 Sta. Reach 1 0+00 to 5+16 Sta. 5 Reach 2 +78 to 18+64 Min Max Min (5+78- 11+00) Max (5+78-11+00, 11+00-18+64) 1. Stream Type B C 2. Drainage Area - mil 0.07 0.08 3. Bankfull Width (wbkf) - ft 6 6.5 4. Bankfull Mean Depth (dbkf) - ft 0.48 0.49 5. Width/Depth Ratio (w/d ratio) 12.5 12.5 6. Cross-sectional Area (Abkf) - ftz 2.85 3.18 7. Bankfull Mean Velocity (vbkf) - ft/sec 4.9 3.8 8. Bankfull Discharge (Qbkf) - WIsec 14 12 9. Bankfull Max Depth (dmbkf) - ft 0.6 0.6 10 . Cbkf / dbkf Ratio 1.25 1.22 11 . Low Bank Height to dmbkf ratio 1.0 1.0 12 . Floodprone Area Width (wfpa) - feet 11 18 11-18 >100 13 . Entrenchment Ratio (ER) 3.8 6.3 3.8-6.3 >15.4 14 . Meander Length (L.) - ft* 65-90 80-110 15 . Meander Length to Bankfull Width (Lm/wbO* 10.8-15 12.3-16.9 16 . Radius of Curvature (RJ - ft* 15 40 20 40 17 . Radius of Curvature to Bankfull Width (R. / wbkf)* 2.5 6.7 3.1 6.15 18 . Belt Width (wbt) - ft* 26 50 35 50 19 . Meander Width Ratio (Wblt/AVbkf) 4.3 8.3 5.4 7.7 20 . Sinuosity (K) (Stream Length / Valley Length) 1.26 1.42 21 . Valley Slope 0.069 0.067 0.035, 0.007 22 . Average Channel Slope (Sbkf) 0.054 0.047 0.025, 0.005 23 . Pool Slope (s ooi) 0 0 0 0 24 . Pool Slope to Average Slope (SPooi / Sbkf) 0 0 25 . Maximum Pool Depth (dl) - ft 1.6 1.6 1.6 26. Ratio of Pool Depth to Average Bankfull Depth (d ooi/dbkf) 2.7 2.7 2.7 27 . Pool Width (w ooi) - ft 9 9 11 28 . Pool Width to Bankfull Width (Wp..l / wbkf) 1.5 1.4 1.7 29 . Pool Area (Apool) - ft2 8 8- 10.2 30 . Pool Area to Bankfull Area (Apooi/Abkf) 2.8 2.5-3.2 31 . Pool-to-Pool Spacing (-) - ft 10 20 40 60 32 . Pool-to-Pool Spacing to Bankfull Width (p-p/wbkf) 1.6 3.2 6.1 9.2 33 . Riffle Slope (siffle) 0.04 0.08 0.06 0.01 34 . Riffle Slope to Average Slope (s,ife/ sbkf) 0.7 1.6 1.4 2 MICHAEL BAKER ENGINEERING, INC. PAGE 7-11 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 7.3.1 Sediment Transport Analysis The factors that influence sediment transport are critical to the initiation and course of stream evolution. In the dynamic equilibrium that is achieved for stable channels, sediment transport is such that the inflowing and outgoing sediment loads are balanced. As discussed in the channel stability assessment, Lane (1955) describes a generalized relationship of stream stability wherein the product of sediment load and sediment size is proportional to the product of stream slope and discharge. Whereas sediment size, stream slope, and stream discharge are readily measured or calculated, sediment load is much more difficult to accurately quantify because of the numerous and complex processes controlling sediment delivery and movement within the stream system. Sediment transport is typically assessed by computing channel competency, capacity, or both. In this case, we have addressed sediment capacity by conducting shear stress analyses and looking at empirical data related to particle size mobility. Sediment transport competency is a measure of force per unit area (lbm/ ft2) that refers to the stream's ability to move a given grain size. Quantitative assessments include shear stress, tractive force, and critical dimensionless shear stress. Since these assessments help determine a size class that is mobile under certain flow conditions, they are most important in gravel bed studies in which the bed material ranges in size from sand to cobble (of which only a fraction are mobile during bankfull conditions). Sediment transport capacity refers to the stream's ability to move a mass of sediment past a cross section per unit of time, expressed in lbs/second or tons/year. In headwater streams and watersheds with good vegetative cover, sediment supply is likely to be a limiting factor in sediment transport capacity. In order to compensate for this condition, larger colluvial particles may protect smaller particles from movement. This armoring effect limits the potential down- cutting of the stream. An intensive assessment of transport capacity is not appropriate in this setting and would not provide any additional design guidance beyond what other methods are able to provide. The Martin's site has both steep tributary segments (>2%) and gentler slopes (0-2%). In the steeper reaches, the newly constructed channel will be constructed using colluvial-size particles in order to recreate the natural armoring present in a developed channel. At a minimum, these larger-size particles will be used to build grade control structures into the bed that will reduce the chance of vertical erosion of the bed. In the mainstem and tributaries in the flatter valley, riffles will be constructed out of existing bed material, with intermittent grade control (structures or constructed riffles) to hold the grade. The riffle material will incorporate material with low mobility mixed with other more mobile particles. In particular, the head and tail of constructed riffles will have larger size rock mixed in to form keys that will limit downcutting and act like these features do in a natural system. 7.3.1.1 Methodology To conduct the sediment competency analyses, pavement, subpavement, and bulk sediment samples were collected and weighed to generate cumulative frequency plots. Tributaries to Martin's Creek were found to have median particle sizes in the range of small to medium gravel. The largest particle sizes in these tributaries range from very coarse gravel to small cobble. This sampling is a snapshot of the sediment characteristics in the existing channel, affected by both systematic and local instability, as well as other impacts such as channelization. As such, interpretation of the data should consist of gross observations. Ultimately, the existing conditions sediment data will be one of the pieces of information that will help guide design decisions. Now that we have sediment characteristics and can assess the relative mobility of particles from a deductive approach, we will assess particle mobility based on an analytical approach. The final channel cross section geometry was used to calculate the shear stress acting on the design channel using the equation 'c=yRS, MICHAEL BAKER ENGINEERING, INC. PAGE 7-12 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Where i=average shear stress (lbm/ft2), y=unit weight water (lbm/ft3), R=hydraulic radius (ft), and S=bed slope, or commonly friction (EGL) slope (ft/ft). As described earlier, small HEC-RAS models were created for each reach to assess the cross sections collected. The existing conditions shear stresses were observed to compare to those of the design sections. In general, the design uses higher width-to-depth ratios as a conservative approach to natural channel design. This has multiple effects, one of which is the reduction of shear stress in the design channel due to the increased surface area and decreased depth. For each stream reach, a worksheet that compares multiple methods (all based on empirical data) was used to assess the critical particle size that is of sufficient size (mass) to resist movement when subjected to the critical (e.g. bankfull) shear stress. The methods include a dimensionless method based on Shields Diagram (Julien, 1995), a critical shear stress graph from Lane (1953), an Isbesh Curve method that selects requisite stone size based on velocity, a permissible tractive force graph from Raudkivi (1967), and a critical shear stress curve from Figure 2.6 of EPA WARSSS v1.0 (Reference). The result is a bracketing of the particle size required to resist motion at bankfull. Sediment capacity is analyzed in the following way for this project. The goal of a capacity analysis is to have sediment transport equilibrium; evidence to the contrary would suggest possible aggradation or degradation of the bed or banks. In this case, the tributaries higher in the watershed have more capacity due to their higher slopes. However, in a system with stable banks and good grade control, the export of material from the upper reaches is expected to be minimal. Material that is exported, or transported through the reach will be handled by building the proposed alluvial reaches with gently sloping side slopes. Large material will deposit in riffles as part of the natural armoring process, smaller materials will deposit on the banks due to the lower shear stress zones in these regions. Subsequent vegetation of the banks will help keep the banks stable and will improve the transport efficiency of the channel to maintain a balance in the system. 7.3.1.2 Sediment Transport Analysis Discussion The sediment samples were used to determine the range of competent particle sizes and assess the depth and slope required to move the largest particle size. The D50 of the subpavement samples for the smaller tributaries varied from 3.5 - 8 mm, and the D100 from 50 to 130 mm. Both step- pool and meandering geomorphic approaches are being pursued at the site; the applicable approach is determined based on the slope of each particular reach. Higher slope tributaries are built as step-pool channels with grade control features that prevent down-cutting and dissipate energy. While these steeper channels are designed to act predominantly as threshold (non-mobile bed) channels, any bed movement is most likely in the period after construction when particles do not have the degree of armoring and particle inter-locking characteristic of a natural channel. Grade control features are a measure of precaution to protect the investment against such bed movement, enhance habitat diversity through pool formation, and allow for grade drop over protected structures that are designed to be able to withstand vertical flow forces induced by critical flow and hydraulic jumps. Large events will still move particles in a threshold channel - it is the largest colluvial particles that create vertical grade control which protects the channel from incision. The lower slope tributaries are designed to meander through the floodplain shared with the mainstem of Martin's Creek, transporting alluvial sediments and dissipating energy through meandering. The meandering channels still have some grade control to help ensure the stability of the newly cut channel, Competency analyses in the step-pool systems look at two elements: the riffle or cascade material, and the step-structure material (i.e. large cobble or boulders). In the meandering system, the riffle material is the primary focus of the competency analyses. MICHAEL BAKER ENGINEERING, INC. PAGE 7-13 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN The design area for tributary MC-UT1 Reach 2 is 4.2 square feet. Based on the shear stress of the design channel, the existing conditions D84 particle in the existing channel is capable of being mobilized, but the D95 is not. At the full channel flow, the average shear stress is 1.3 lb/square foot. Shear stresses of this magnitude move particles through both suspended load and bedload transport and, based on the multiple empirical methods sets described in the Methods, may move particles that range in size from 70 mm to 300 mm in size. This is consistent with typical natural channel design goals in that it is likely to move particles in the D50 to D84 range, but much less likely to move particles in the D 100 size range. Whereas most methods predict the critical particle size to be 100 mm or less for this shear stress, Wildland Hydrology data depicted in the EPA WARSSS literature predicts a much higher value (327 mm). This is based on empirical data from Colorado only with an R2 of 0.838, whereas other methods are based on field data from various geographic settings and laboratory data, and typically have higher R2 values (e.g.; Leopold, Wolman and Miller (1964) data has W=0.9336). While the surface layer of riffle material should be consistent with the non-Colorado data, it is appropriate to consider sizing structures and riffle keys (requisite non-mobile features) with this upper bound from the Colorado Curve in mind. Practically speaking, this would result in a specification of some class B, 1, and/or 2 material to be included in the riffle keys (structures commonly consist of boulder material larger than class 2). This specification is based on practical experience that riffle keys are critical to prevent grade control failure (riffle keys are an engineered fail-safe). This fail-safe is necessary because constructed riffle material used in restoration projects is often poorly sorted as a practical matter, and provides less particle-to-particle shear resistance than in-situ riffle material. Natural riffles also have the benefit of an armor layer built by the stream through the winnowing process. This basis for the consideration of the Colorado data as an upper bound for conservative engineering of critical structural features applies to all of the project reaches. The design area for tributary MC-UT1 Reaches 3 and 4 is 6.0 square feet. Based on the shear stress of the design channel, the existing conditions D50 particle in the existing channel is capable of being mobilized, but the D84 and D95 are not. At the full channel flow, the average shear stress is 0.8 lb/square foot. This value is lower than the upper reach because of the change in valley slope. Still, both transport mechanisms are still feasible and based on the multiple empirical methods sets described in the Methods, the mobile particle range is may move particles that range in size from 50 mm to 200 mm in size. Again, this falls in line with typical natural channel design goals in that it is likely to move particles in the D50 to D84 range, but much less likely to move particles in the D100 size range. For this reach, the EPA WARS SS literature predicts 204 mm. It would be appropriate to size structures and riffle keys (requisite non-mobile features) with this upper bound in mind. For MC-UT1-3 Reach 1, the design channel dimension is 3.0 square feet. The sample collected above the driveway yielded a D50 of 3.5 mm and a D100 of 15.7 mm. With an estimated shear stress of 1.2 lb/square foot based on the design dimensions and slope of 4%, the existing conditions D 100 is estimated to be competent under flows much less than bankfull. The empirical critical particle dimension curves indicate that the particle size required for non- mobility is in the range of 70 mm to 300 mm. Since this reach will be built as a step-pool channel, the steps will be built out of material in the upper end of this range (1' intermediate axis) and constructed riffles/cascades will have a significant percentage of material greater than 70 mm. Where existing channel material is used to backfill the new channel bottom, new material will be mixed into the upper layer to prevent the washout of features that must have a stable grade. MC-UT1-3 Reach 2 has a design channel dimension of 3.3 square feet. The sample collected above the driveway was used as a representative sample for the analysis in this reach as well. The computed average shear stress is only 0.2 lb/square foot based on a significant decrease in MICHAEL BAKER ENGINEERING, INC. PAGE 7-14 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN the slope (it is only 0.8% in this reach). In this reach, the D84 from the existing conditions sample is competent but the D95 is not. The empirical critical particle dimension curves indicate that the particle size required for non-mobility is in the range of 15 mm to 50 mm. Since this reach will be built as a meandering alluvial channel, the existing material is deemed appropriate to use for constructing riffles. Some of the riffles, and all of the riffle keys will be built out of imported material. To reduce the risk of headcutting, this material will consist of particle sizes ranging from 15 to 50 mm. 7.3.2 HEC-RAS Analysis 7.3.2.1 Preliminary Modeling and Hydrologic Trespass The project has both regulated and non-regulated floodplains. The upper reaches of the unnamed tributaries are not regulated and do not pose a flooding threat to any structures or other infrastructure. The lower reaches of the tributaries share a floodplain with Martin's Creek, which is in a special flood hazard zone and must comply with Federal Emergency Management Agency (FEMA) requirements. Grading and other floodplain development activities in the Martin's Creek floodplain will be required to attain a no-impact certification. The lower portion of the Martin's Creek site, which consists of Martin's Creek and its valley, has been mapped within a Federal Emergency Management Agency (FEMA)-identified flood zone (Zone AE). This is a special flood hazard area with a designated 100-Year Base Flood Elevation (BFE) and non-encroachment areas. Modifications within the non-encroachment areas require a flood study to determine whether the proposed modifications will impact the established BFEs or non-encroachment widths. If the difference in the BFE is between 0 and -0.10 (decrease of 1/10 1h or less), this is considered "no impact". If a rise is indicated by the proposed changes, this would necessitate a Conditional Letter of Map Revisions (CLOMR) and post-project Letter of Map Revision (LOMR). If a decrease of greater than 0.10' is indicated (not a valid "no impact", but a valid "no rise"), this would require a post-project LOMR as well; typically, in such a case, the flood study demonstrating no rise in the BFEs would be accepted in lieu of a CLOMR and the project could proceed upon local or state review of the study. Based on the current plans, Baker has conducted preliminary modeling and believes that the project can be permitted with a no-impact certification (i.e. there are no rises, and all decreases are less than 0.10'). Upon acceptance of the restoration plan and drawings, Baker will finalize modeling and submit a report summarizing the project and modeling results to the designated floodplain administrator for Cherokee County. Baker has discussed this project with the county and does not anticipate any other requirements that will affect the project. 7.4 Site Construction 7.4.1 Site Grading, Structure Installation, and Other Project Related Construction 7.4.1.1 Narrative A construction sequence is provided below and can be found within the accompanying mitigation plan set for the Martin's Creek II project. 1. Equipment and materials shall be mobilized to the site. 2. Utility locations shown on these plans are approximate. The contractor shall have all underground utilities within the project limits located and marked prior to beginning construction. The contractor will be responsible for the repair of any utilities damaged during construction. MICHAEL BAKER ENGINEERING, INC. PAGE 7-15 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 3. A gravel "construction entrance" that consists of class A stone, at least 50 feet in length, shall be incorporated into every access point that connects to a public road. 4. Temporary and permanent stream crossings and temporary check dams shall be installed as shown in the plan set. Temporary check dams shall be removed when grading work upstream has been completed. Construction shall proceed upstream to downstream on each stream. Tributaries will be restored prior to the confluence with the mainstem being constructed. Grading of bankfull benches within a work area shall be done before new channels are graded. 6. Temporary coffer dams shall be installed upstream of each work area and flow in the work reach shall be diverted by pumping and piping around the work area. The length of each diversion shall be approximately 300 to 600 linear feet. Pumping will be done when work is required in a channel where the stream is flowing. Much of the mainstem work will be done offline. Existing channel material should be stockpiled and incorporated in constructed offline reaches. 7. Clearing and grubbing required within the grading limits shall be performed so as to limit sediment migration off-site. Logs and root wads from trees larger than 10 inches in diameter shall be stockpiled for use as in-stream structures. Salvageable native vegetation (black willow, tag alder, silky dogwood, etc.) shall be harvested for transplanting or for cutting and live-staking materials. Brush material for toe wood structures should be stockpiled and kept wet. Special attention should be given to the removal of nonnative, exotic species when clearing and grubbing takes place. 8. Wetland grading should be accomplished before stream restoration work is accomplished in the low valley. Graded areas should be tilled to roughen the wetland area and create heterogeneous topography. The site should then be seeded and mulched to stabilize the site. 9. The new channel sections shall be stabilized with in-stream structures, erosion control matting, seed, and transplants before turning water into these sections. Compacted soil channel plugs shall be installed in areas where the new channel diverges from the original channel, and the original, abandoned channel sections will be backfilled. 10. Dewatering of off-line sections shall be diverted through a sediment filter before being discharged into the downstream reach. 11. Earthwork shall be staged such that no more channel will be disturbed than can be stabilized by the end of the work day or before flow is diverted into a new channel segment. 12. Disturbed areas within the first 25 feet of buffer adjacent to the channel will be seeded, mulched or otherwise stabilized with temporary ground cover until a more permanent ground cover is established across the buffer area disturbed during construction. If temporary ground cover is not applied at the end of the workday, straw wattles will be staked down at the top of the bank where erosion control matting ends to prevent sediment loading from upland portions of the buffer that have not stabilized. 13. Excess soil materials shall be stockpiled in designated staging and stockpile areas, with silt fence installed on the downslope side(s) of the base of the stockpiles and maintained when sediment has accumulated above one third of the height of the silt fence and/or the silt fence MICHAEL BAKER ENGINEERING, INC. PAGE 7-16 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN has failed. Excess soil shall be hauled outside the conservation easement before de- mobilization. 14. The flow diversions and temporary stream crossings shall be removed when no longer needed and the banks in these areas stabilized with seeding and matting. 15. Bank and floodplain vegetation, including brush materials and live stakes, shall be installed during the dormant season, November to May. 16. Staging and stockpile areas, and silt fences shall be removed and the ground shall be repaired to its original conditions once planting is complete and once they are no longer needed. Construction entrances may also be removed or left in place if the landowner wishes to retain them. 7.4.1.2 In-stream Structures and Other Construction Elements A variety of in-stream structures are proposed for the Martin's Creek site. Structures such as constructed riffles, log vanes, boulder steps, and rootwads will be used to stabilize the newly- restored streams. This project will primarily utilize those structures which provide grade control and enhance pool habitat. Wood and boulder structures will be used on this site because they represent natural materials observed in the existing system. Some wood will be generated through the construction of this project; woody material that is not generated through the project will be brought to the site. Table 7.2 summarizes the use of in-stream structures at the site. Table 7.2 Proposed In-Stream Structure Types and Locations Martin's Creek 11 Mitigation Project-NCEEP Project #92633 Structure Type Location Constructed Riffle Through straight, steeper sections to provide grade control. Cover Log Located along outside bends or against one bank in straight reaches to increase pool diversity and provide cover for fish. Log/Rock Sequence In meander bends to turn water to protect outside banks and promote scour to maintain pools. Toe Wood Toe of a streambank to create overhead bank cover and improve aquatic habitat. Rock Cross Vane Downstream of floodplain constrictions to direct high velocity flow emerging from the constriction to the center of the channel to prevent bank erosion and provide grade control. Near the downstream end of the project to provide grade control to prevent possible downcutting downstream of the project from mi ratin into the project stream and causing bed erosion. Boulder Step Structure In steep channels to control grade and maintain step-pool system. Vegetated Geolift To create new banks in areas where cutting a new channel is not an option. Outside of meander bends under particularly high stress or in areas where slight lateral migration is unacceptable. Rootwads Outside bank of meander bends to reduce bank shear stress and improve aquatic habitat. Constructed Riffle A constructed riffle consists of the placement of coarse bed material in the stream at specific riffle locations along the profile. A buried log or rocks at the upstream and downstream end of riffles may be used to control the slope through the riffle in steeper sections. The purpose of this structure is to provide grade control and establish riffle habitat. Constructed riffles will be placed MICHAEL BAKER ENGINEERING, INC. PAGE 7-17 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN throughout all reaches. In the higher slope reaches, the constructed riffles and cross vanes will be intermixed to provide diversity of structure and in-stream habitat. Cover Log Cover logs are used typically driven into streambanks or secured using rebar and, as noted above, can be used in straight stream reaches as well as the outer bends of streams. The primary purpose of these structures is to improve bed form diversity by creating small pools in addition to those created by boulder steps and vanes. In addition to improving pool habitat, cover logs are also placed to create cover for trout and other fish. Log/Rock Sequence A log/rock sequence is used to protect the stream bank. The length of a single vane structure can span one-half to two-thirds the bankfull channel width. Vanes are located either upstream or downstream along a meander bend and function to initiate or complete the redirecting of flow energies resulting in reduced near bank shear stress and alignment maintenance. Vanes are located just downstream of the point where the stream flow intercepts the bank at acute angles. These vanes may also be used outside of meanders on moderate to steep channel gradients for grade control, a primary concern in this restoration project. Logs and or boulders may be used to construct vanes. Log Sequence In a log sequence, logs are usually placed in a series and at opposing angles and slopes. These structures are used in riffles to create small meanders within the riffle, diversifying habitat. Toe Wood Toe wood will be placed at the toe of streambanks to provide bank stabilization and improve fish habitat. Toe wood is a term for a crib-like structure consisting of wooden planks and wooden spacers nailed together that is staked to the channel bed using re-bar. In addition to providing resting areas for fish, these structures are the also a part of the bank stabilization process. The top of the crib-structure is backfilled using stone and ultimately, a soil base for which to replant riparian vegetation. Rock Cross Vane Cross vanes are used to provide grade control, keep the thalweg in the center of the channel, and protect the stream bank. A cross vane consists of two rock vanes joined by a center structure installed perpendicular to the direction of flow. This centering structure sets the invert elevation of the stream bed. Boulder Step Structure Boulder step structures consist of boulders placed in the channel in a U-shape constructed similarly to a cross-vane. These structures provide grade control in steep channels, direct high velocity flows to the center of the channel, and promote diverse habitat through the creation of plunge pools immediately downstream of the structure. Vegetated Geolift A geolift consists of a layer of biodegradable matting back filled with soil (creating a lift) that is stacked upon a stone toe base. A row of native, riparian, woody vegetation is laid on top of this first soil lift and a second lift is constructed on top of the woody material. This alternating of lift and woody material continues up to the desired elevation. The mesh that makes up the matting acts much like a traditional gabion, but is designed to break down over time and is more economical. Unlike gabions that are filled over with topsoil to create a bank, the geolift actually holds the soil in place between layers of matting that are set perpendicular to the bank slope making it more effective in supporting the slope while vegetation is established. Geolifts also work to retain moisture for live stakes or other vegetation and provide a substrate for the establishment of a root system. MICHAEL BAKER ENGINEERING, INC. PAGE 7-18 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Rootwad Rootwads are large intact root masses placed at the toe of the stream bank in high stress areas to absorb energy, increase flow roughness and provide a physical barrier to the erosion of vulnerable stream banks. In the process, they can help induce scour-pool formation and serve as habitat for organisms favoring wood or cover. In addition to stream bank protection, they provide structural support to the stream bank and habitat for fish and other aquatic animals. They also increase substrate surface area for aquatic insects and other benthic organisms. Root wads include the root mass or root ball of a tree plus a portion of the trunk which is driven or buried into the bank. 7.4.2 Natural Plant Community Restoration Native riparian vegetation will be established in the restored stream buffer. Any areas of invasive vegetation will be removed so as not to threaten the newly-established native plants within the conservation easement. Known invasive species to be treated include multiflora rose, Chinese privet and Japanese honeysuckle. 7.4.2.1 Soil Preparation and Amendments Soil amendments will be prepared according to the dominant soil types present within the floodplains for UT1 and its unnamed tributaries and subsequent analysis of the soils by the NRCS. Application of soil amendments will occur as temporary site stabilization measures are implemented during construction and during installation of permanent bank and riparian vegetation. The use of soil amendments will be minimized to the extent possible to prevent the accelerated growth of weed species as the native riparian seed mix becomes established. 7.4.2.2 Stream Buffer Vegetation Bare-root and containerized trees, live stakes, shrubs and permanent seeding will be planted within designated areas of the conservation easement. A preferred 30-foot buffer measured from the top of banks (sometimes slightly less and quite often, substantially more) will be established along the restored stream reaches. In the preservation reach, the combined buffer width for left and right banks will be approximately 100 feet. Bare-root and containerized vegetation (trees and shrubs) will be planted at a target density of 680 stems per acre, or an 8-foot by 8-foot grid. The proposed species to be planted are listed in Table 7.3. Planting of bare-root or containerized trees, live stakes and shrubs will be conducted during the first dormant season following construction. If construction activities are completed in summer/fall of a given year, all vegetation will be installed prior to the start of the growing season of the following calendar year. Species selection for re-vegetation of the site will generally follow those suggested by Schafale and Weakley (1990) and tolerances cited in the USACE Wetland Research Program (WRP) Technical Note VN-RS-4.1 (1997). Tree species selected for stream restoration areas will generally be weakly tolerant to tolerant of flooding. Weakly tolerant species are able to survive and grow in areas where the soil is saturated or flooded for relatively short periods of time. Moderately tolerant species are able to survive in soils that are saturated or flooded for several months during the growing season. Flood tolerant species are able to survive on sites in which the soil is saturated or flooded for extended periods during the growing season (WRP, 1997). Observations will be made during construction regarding the relative wetness of areas to be planted. Planting zones will be determined based on these observations, and planted species will be matched according to their wetness tolerance and the anticipated wetness of the planting area. Live stakes will be installed two to three feet apart using triangular spacing or at a density of 160 to 360 stakes per 1,000 square feet along the stream banks between the toe of the stream bank and bankfull elevation. Site variations may require slightly different spacing. Permanent seed mixtures will be applied to all disturbed areas of the project site. Table 7.4 lists the species, mixtures, and application rates that will be used. A mixture is provided for MICHAEL BAKER ENGINEERING, INC. PAGE 7-19 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN floodplain wetland and floodplain non-wetland areas. Mixtures will also include temporary seeding (rye grain during cold season or browntop millet during warm season). The permanent seed mixture specified for floodplain areas will be applied to all disturbed areas outside the banks of the restored stream channel and is intended to provide rapid growth of herbaceous ground cover and biological habitat value. The species provided are deep-rooted and have been shown to proliferate along restored stream channels, providing long-term stability. Temporary seeding will be applied to all disturbed areas of the site that are susceptible to erosion. These areas include constructed stream banks, access roads, side slopes, and spoil piles. If temporary seeding is applied from November through April, rye grain will be used and applied at a rate of 130 pounds per acre. If applied from May through October, temporary seeding will consist of browntop millet, applied at a rate of 45 pounds per acre. Table 7.3 Proposed Bare-Root and Live Stake Species (may also include species to be seeded or installed as container plantings) Martin's Creek II Mitigation Project -NCEEP Project #92633 Common Name Scientific Name % Planted by Species Wetness Tolerance Planting Location Riparian Buffer Plantings: Wetland and Floodplain 680 Tree Stems/Acre & 680 Shrub Stems/Acre Trees Overstory Shingle Oak Quercus imbricaria 12 FAC- Wetland & Floodplain River Birch Betula ni ra 14 FACW Wetland & Flood lain Persimmon Dios ros vir iniana 12 FAC Wetland & Flood lain Sycamore Platanus occidentalis 10 FACW- Wetland & Floodplain Black Willow Salix nigra 12 OBL Wetland & Floodplain Trees Understory Ironwood Carpinus carohniana 14 FAC Wetland & Floodplain Highland Doghobble Leucothoe fontanesiana (axilarris var. editorum) 14 N/A Wetland & Floodplain Tag Alder Alnus serrulata 12 FACW+ or OBL Wetland & Floodplain Shrubs Rivercane (giant cane) Arundinaria gigantea 30 FACW Wetland & Floodplain S icebush Lindera benzoin 25 FACW Wetland & Flood lain Winterbe flex verticillata 20 FACW Wetland & Flood lain Virginia Sweetspire ftea virginica 25 FACW+ Wetland & Floodplain Riparian Livestake Plantings Ninebark Physocarpus opulifolius 15 FAC- Wetland & Floodplain Elderberry Sambucus canadensis 20 FACW- Wetland & Floodplain Buttonbush Ce halanthus occidentalis 15 OBL Wetland & Flood lain Silky Willow Salix sericea 25 OBL Wetland & Flood lain Silky Dogwood Cornus amomum 25 FACW+ Wetland & Floo pain Note: Species selection may change due to refinement or availability at the time of planting. If species substitution is required, the planting Contractor will submit a revised planting list to Baker for approval prior to the procurement of plant stock. MICHAEL BAKER ENGINEERING, INC. PAGE 7-20 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 7.3 Proposed Bare-Root and Live Stake Species (may also include species to be seeded or installed as container plantings) Martin's Creek II Mitigation Project -NCEEP Project #92633 Common Name Scientific Name % Planted by Species Wetness Tolerance Planting Location Riparian Buffer Plantings: Upland 680 Tree Stems/Acre & 680 Shrub Stems/Acre Trees Overstory White Oak Quercus alba 10 FACU Upland Black (Sweet) Birch Betula lenta 10 FACU Upland Northern Red Oak uercus rubra 10 FACU Upland Mockernut Hickory Carya alba (tomentosa) 12 N/A Upland Shagbark Hickory Carya ovata 12 FACU Upland Post Oak Quercus stellata 6 N/A Upland Trees Understory Flame Azalea Rhododendron calendulaceum 6 N/A Upland Witch Hazel Hamamelis vir iniana 7 FACU Upland Sourwood Oxydendrum arboreum 5 FACU Upland Flowering Dogwood Cornus florida 10 FACU Upland Redbud Cercis canadensis 12 FACU Upland Shrubs Deerberry 1Vaccinium stamineum 35 FACU Upland Eastern Sweetshrub, Sweetshrub Calycanthus floridus, Calycanthus spp. 40 FACU Upland Sweetpepperbush Clethra spp. 25 N/A Upland Alternate Species Blight-resistant American Chestnut Castanea dentata N/A N/A Upland American Hazelnut Cor lus americana N/A FACU Upland Blue Ridge Blueberry 1Vaccinium allidum N/A N/A Upland Note: Species selection may change due to refinement or availability at the time of planting. If species substitution is required, the planting Contractor will submit a revised planting list to Baker for approval prior to the procurement of plant stock. MICHAEL BAKER ENGINEERING, INC. PAGE 7-21 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Table 7.4 Proposed Permanent Seed Mixture Martin's Creek 11 Mitigation Project-NCEEP Project #92633 Common Name Scientific Name % Planted by Species Density (lbs/ac) Wetness Tolerance Creeping Bentgrass Agrostis stolonifera 10% 1.5 FACW Big Bluestein Andropogon gerardii 2% 0.3 N/A Devil's Beggartick Bidens frondosa (or aristosa) 3% 0.45 FACW Northern Long Sedge Carex folliculata 2% 0.3 N/A Nodding Sedge Carex gynandra 5% 0.75 N/A Upright Sedge Carex stricta 2% 0.3 OBL Lance-leaved Tick Seed Coreopsis lanceolata 3% 0.45 N/A Virginia Wildrye Elymus virginicus 15% 2.25 FAC Soft Rush Juncus effusus 2% 0.3 FACW+ Tioga Deer Tongue Panicum clandestinum 10% 1.5 FACW Switch Grass Panicum virgatum 15% 2.25 FAC+ Pennsylvania Smartweed Polygonum pensylvanicum 5% 0.75 FACW Broadleaf Arrowhead Sagittaria latifolia var. pubescens 1% 0.15 OBL Little Bluestein Schizachyrium scoparium 5% 0.75 FACU Roundleaf Goldenrod Solidago patula 3% 0.45 OBL Indian Grass Sorghastrum nutans 10% 1.5 FACU Eastern Gamma Grass Tripsacum dactyloides 5% 0.75 FAC+ Joe Pye Weed Eupatorium fistulosum 2% 0.3 N/A Total 100 15 Note: Species selection may change due to refinement or availability at the time of planting. 7.4.2.3 On-site Invasive Species Management The site has some infestation of Chinese privet (Ligustrum sinense), multiflora rose (Rosa multijora), and Japanese honeysuckle (Lonicera japonica). These areas will be treated and monitored so that the invasive species do not threaten the newly-planted riparian vegetation. Fields within the easement boundaries are predominantly planted in fescue. Fescue will be treated by physical and chemical means in order to reduce competition for native grasses. The most appropriate means of treating invasive grasses growing in the creek and on the margins of the channel will be assessed and implemented prior to vegetation removal. In many cases, building a new offline channel will reduce or eliminate this issue and the long-term development of a forested creek will shade out this and other invasive grasses. These areas will initially be treated during construction. Subsequent evaluations of invasives on- site will be performed by the contract monitoring firm who will coordinate additional treatments with the NCEEP as necessary so that the invasive species do not threaten the newly-planted riparian vegetation. MICHAEL BAKER ENGINEERING, INC. PAGE 7-22 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 8.0 PERFORMANCE CRITERIA Baker has been involved in obtaining recent approvals from the regulatory agencies for a series of mitigation plans for NCEEP full-delivery projects. The stream restoration success criteria for the project site will follow accepted and approved success criteria presented in recent mitigation plans developed for these full delivery projects. These plans were based on the Stream Mitigation Guidelines issued in April 2003 by the USACE and NCDWQ. Specific success criteria components are presented below. 8.1 Stream Monitoring Channel stability and vegetation survival will be monitored on the project site. Post-restoration monitoring will be conducted for five years following the completion of construction to evaluate the effectiveness of the restoration practices. Monitored stream parameters include stream dimension (cross sections), pattern (longitudinal survey), profile (profile survey), and photographic documentation. Although monitoring services are not included in the current scope of work provided by Baker, the methods and success criteria below are what is commonly required by the regulatory entities that will issue permits for the Martin's Creek project. 8.1.1 Bankfull Events The occurrence of bankfull events within the monitoring period will be documented by the use of crest gauges and photographs. Crest gauges will be installed along the streambanks. The crest gauges will record the highest watermark between site visits, and the gauge will be checked each time there is a site visit to determine if a bankfull event has occurred. Photographs will be used to document the occurrence of debris lines and sediment deposition on the floodplain during monitoring site visits. Two bankfull flow events in separate years must be documented within the 5-year monitoring period. Otherwise, the stream monitoring will continue until two bankfull events have been documented in separate years. 8.1.2 Cross sections Permanent cross sections will generally be spaced at intervals of approximately 20 combined bankfullwidths or at an average distance interval not exceeding 500 feet. Because riffle cross sections are critical in determining bankfull design parameters, the number of riffle cross sections established will generally outnumber pool cross sections. Each cross section will be marked on both banks with permanent pins to establish the exact transect used. A common benchmark will be used for cross sections and consistently used to facilitate easy comparison of year-to-year data. The annual cross section survey will include points measured at all breaks in slope, including top of bank, bankfull, inner berm, edge of water, and thalweg, if the features are present. Riffle cross sections will be classified using the Rosgen Stream Classification System. There should be little change in as-built cross sections. If changes do take place, they should be evaluated to determine if they represent a movement toward a more unstable condition (e.g., down- cutting or erosion) or a movement toward increased stability (e.g., settling, vegetative changes, deposition along the banks, or decrease in width/depth ratio). Cross sections will be classified using the Rosgen Stream Classification System, and all monitored cross sections should fall within the quantitative parameters defined for channels of the design stream type. 8.1.3 Longitudinal Profile A longitudinal profile will be surveyed immediately after construction and annually thereafter for the duration of the five-year monitoring period. The as-built survey will be used as the baseline for year one monitoring. Measurements will include thalweg, water surface, bankfull, and top of low bank. MICHAEL BAKER ENGINEERING, INC. PAGE 8-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Each of these measurements will be taken at the head of each channel unit (e.g., riffle, pool) and at the maximum pool depth. The survey will be tied to a permanent benchmark. The longitudinal profiles should show that the bedform units are remaining stable; i.e., they are not aggrading or degrading. The pools should remain deep, with flat water surface slopes, and the riffles should remain steeper and shallower than the pools. Bedforms observed should be consistent with those observed for channels of the design stream type. 8.1.4 Bed Material Analyses Pebble counts will be conducted for at least six permanent cross sections (100-counts per cross section) across the Martin's Creek II project site. Pebble counts will be conducted immediately after construction and annually thereafter at the time the cross section and longitudinal surveys are performed during the five year monitoring period. These samples will reveal any changes in sediment gradation that occur over time as the stream adjusts to upstream sediment loads. Significant changes in sediment gradation will be evaluated with respect to stream stability and watershed changes. 8.1.5 Photo Reference Sites Photographs will be used to visually document restoration success. Reference stations will be photographed before construction and continued annually for at least five years following construction. Photographs will be taken from a height of approximately five to six feet. Permanent markers will be established to ensure that the same locations (and view directions) on the site are monitored in each monitoring period. Lateral reference photos. Reference photo transects will be taken at each permanent cross section. Photographs will be taken of both banks at each cross section. The survey tape will be centered in the photographs of the bank. The water line will be located in the lower edge of the frame, and as much of the bank as possible will be included in each photo. Photographers should make an effort to consistently maintain the same area in each photo over time. Structure photos. Photographs will be taken of grade control structures along the restored stream, and will be limited to boulder and log steps. Photographers will make every effort to consistently maintain the same area in each photo over time. Photographs will be used to evaluate channel aggradation or degradation, bank erosion, success of riparian vegetation, and effectiveness of erosion control measures subjectively. Lateral photos should not indicate excessive erosion or continuing degradation of the banks. A series of photos over time should indicate successive maturation of riparian vegetation. 8.2 Storm Water Management Monitoring No storm water BMPs are proposed at the Martin's Creek II mitigation project site. 8.3 Wetland Monitoring The wetland restoration areas will be monitored annually for five years following construction or until success criteria are met, whichever comes last. Five shallow groundwater/surface water gauges will be installed in the restored wetland areas. Two gauges will be placed in the existing wetland pockets at the northwestern and southwestern ends of the project, and will be used as reference gauges to monitor water elevations in these existing wetland areas for comparison to restored conditions. All the gauges will measure surface water and groundwater over a 20-inch or 40-inch vertical column on a daily basis. Data from each of the gauges will be downloaded on a bi-monthly basis. MICHAEL BAKER ENGINEERING, INC. PAGE 8-2 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Hydrologic success will be based on conditions of the on-site reference wetlands. Success will be determined by the following Criterion: Years One Through Three- Monitoring during 2009 indicates that the reference wetland areas (based on analysis of hydrographs from Well 46) were saturated or inundated continuously for approximately 30 days of the early growing season, and approximately 85 days of the late growing season. This correlates to a hydroperiod range of approximately 15% to 44%. It should be noted that the fall of 2009 was unseasonably wet; therefore, the 44% hydroperiod likely represents the high side of the expected hydroperiod range. Based on information from other Piedmont and Mountain wetland sites, a typical average hydroperiod for these type wetlands is expected to be approximately 25%, which is well within the range documented by the reference wetlands on-site. Hydrologic success criteria at the restored site will be met if the site demonstrates groundwater table levels within 12 inches of the soil surface for a minimum of 13% of the growing season (this criterion reflects a deviation of 50% from the duration of saturation expected for these type wetland systems (-25%). Success for monitoring years one through three will be determined based on this 50% tolerance of deviation from the duration of wetland hydrology at the reference sites. Years Four and Five- Success for monitoring years four and five will be determined based on a 20% tolerance of deviation from the duration of wetland hydrology at the reference sites. Therefore, it is expected that years four and five the site will achieve a minimum of 20% saturation. Based on reference conditions and the criterion stated above, it is expected that reference soil saturation for years one through five will continue to exceed the regulatory 12.5% minimum requirement of the growing season for Cherokee County (see Section 5.2.2). In order to attain conditions suitable for the formation of wetland vegetation and hydric soils, the site should be saturated within 12 inches of the surface or inundated for consecutive period equal to 24 days. However, to meet hydrologic success criteria and mimic the reference wetland hydrology, the site should demonstrate wetland hydrology for a minimum of 25 days in years one through three. In years four and five, this will increase to a minimum of 38 days. Overbank flooding from the adjacent channel will also be noted during monitoring. Reference areas will be monitored for the minimum of five years. 8.4 Vegetation Monitoring Successful restoration of the vegetation on a site is dependent upon hydrologic restoration, active planting of preferred canopy species, and volunteer regeneration of the native plant community. In order to determine if the criteria are achieved, vegetation monitoring quadrants shall be installed across the mitigation site. The Carolina Vegetation Survey (CVS)-EEP methodology for determining the number of vegetation plots required per mitigation site shall be used to figure the number of quadrants needed for the Martin's Creek II mitigation project. The CVS-EEP vegetation monitoring protocol will also be used in monitoring the post- construction survival of riparian vegetation planted. The size of individual quadrants will vary from 100 square meters for tree species to 1 square meter for herbaceous vegetation. Vegetation monitoring will occur in spring, after leaf-out has occurred. Individual quadrant data will be provided and will include diameter, height, density, and coverage quantities. Relative values will be calculated, and importance values will be determined. Individual seedlings will be marked to ensure that they can be found in succeeding monitoring years. Mortality will be determined from the difference between the previous year's living, planted seedlings and the current year's living, planted seedlings. At the end of the first growing season, species composition, density, and survival will be evaluated. For each subsequent year, until the final success criteria are achieved, the restored site will be evaluated between July and November. MICHAEL BAKER ENGINEERING, INC. PAGE 8-3 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Specific and measurable success criteria for plant density on the project site will be based on the recommendations found in the WRP Technical Note and past project experience. The interim measure of vegetative success for the site will be the survival of at least 320, 3-year old, planted trees per acre at the end of year three of the monitoring period. The final vegetative success criteria will be the survival of 260, 5-year old, planted trees per acre at the end of year five of the monitoring period. While measuring species density is the current accepted methodology for evaluating vegetation success on restoration projects, species density alone may be inadequate for assessing plant community health. For this reason, the vegetation monitoring plan will incorporate the evaluation of additional plant community indices to assess overall vegetative success. 8.5 Schedule/Reporting Annual monitoring reports containing the information defined herein will be submitted to NCEEP by December 31 of the year during which the monitoring was conducted. Project success criteria must be met by the fifth monitoring year, or monitoring will continue until all success criteria are met. MICHAEL BAKER ENGINEERING, INC. PAGE 8-4 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 9.0 SITE PROTECTION AND ADAPTIVE MANAGEMENT STRATEGY The Martin's Creek II mitigation project area will be protected by a permanent conservation easement that will be held by the state. The NCEEP will select a professional environmental engineering firm to monitor the project site for a minimum of five years following construction. Post-construction monitoring activities will be conducted to evaluate site performance, to identify maintenance and/or repair concerns, and to maintain the integrity of the project boundaries. If during the post-construction monitoring period it is determined project compliance is jeopardized, then the firm contracted to perform project monitoring review the monitoring results and if necessary, shall take action to resolve the project concerns and bring the project back into compliance. If maintenance or site repairs become necessary, the NCEEP will evaluate the level of response required, secure a contractor to make the repairs and monitor the work performed by the construction contractor. Maintenance requirements vary from site to site and are generally driven by the following conditions: • Projects without established, woody floodplain vegetation are more susceptible to erosion from floods than those with a mature, hardwood forest. • Projects with sandy, non-cohesive soils are more prone to short-term bank erosion than cohesive soils or soils with high gravel and cobble content. • Alluvial valley channels with wide floodplains are less vulnerable than confined channels. • Wet weather during construction can make accurate channel and floodplain excavations difficult. • Extreme and/or frequent flooding can cause floodplain and channel erosion. • Extreme hot, cold, wet, or dry weather during and after construction can limit vegetation growth, particularly temporary and permanent seed. • The presence and aggressiveness of invasive species can affect the extent to which a native buffer can be established. Maintenance issues and recommended remediation measures will be detailed and documented in monitoring reports. The conditions listed above and any other factors that may have necessitated maintenance should be discussed. MICHAEL BAKER ENGINEERING, INC. PAGE 9-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 10.0 REFERENCES Adams, W.F. 1987. Indiana bat. In: Clark, M.K. (ed.). Endangered, Threatened and Rare Fauna of North Carolina, Part L A Re-evaluation of the Mammals. Occasional Papers of the North Carolina Biological Survey. North Carolina State Museum of Natural Science, Raleigh. Biedenham, David S., Ronald R. Copeland, Colin R. Thorne, Philip J. Soar, Richard D. Hey, and Chester C. Watson. 2000. United States Army Corps of Engineers (USACOE), Coastal and Hydraulics Laboratory. Effective Discharge Calculation: A Practical Guide. ERDCICHL TR-00-15. Washington, DC. Bratton, S. P. 1976. Resource Division in an Understory Herb Community: Responses to Temporal and Microtopographic Gradients. The American Naturalist 110 (974):679-693. Bruner, Gary W. 2002. HEC-RAS, River Analysis System Hydraulic Reference Manual. 2005. United States Army Corps of Engineers Hydrologic Engineering Center. Davis, CA. Churchill, E. P., Jr., and S. I. Lewis. 1924. Food and feeding in freshwater mussels. Bulletin of the Bureau of Fisheries 39:439-471. Clarke, A. H. 1981. The Tribe Alasmidontim (Unionidae: Anodontinae), Part 1: Pegias, Alasmidonta, and Arcidens. Smithsonian Contributions to Zoology, 326:1-101. Cooper, J.E., S.S. Robinson, and J.B. Funderburg (eds.). 1977. Endangered and Threatened Plants and Animals of North Carolina. North Carolina State Museum of Natural History, Raleigh. Copeland, R.R, D.N. McComas, C.R. Thorne, P.J. Soar, M.M. Jones, and J.B. Fripp. 2001. United States Army Corps of Engineers (USACOE). Hydraulic Design of Stream Restoration Projects. Washington, DC. Earley, L. S. 1991. Going, going...? Wildlife in North Carolina 55(3):14-19. Ehmfield, J. G., 1995. Microsite Differences in Surface Substrate Characteristics in Chamaecyparis Swamps of the New Jersey Pinelands. Wetlands 15(2):183-189. Federal Interagency Stream Restoration Working Group (FISRWG). 1998. Stream corridor restoration: Principles, processes and practices. National Technical Information Service. Springfield, VA. Hadley, J.B. and Nelson, A.E., 1971, Geologic map of the Knoxville quadrangle, North Carolina, Tennessee, and South Carolina: U.S. Geological Survey, Miscellaneous Geologic Investigations Map I-654, scale 1:250000. Hardin, J.W. 1977. Vascular plants. In: Cooper, J.E., S.S. Robinson, and J.B. Funderburg (eds.). Endangered and Threatened Plants and Animals of North Carolina. North Carolina State Museum of Natural History, Raleigh. Harman, W.A., G.D. Jennings, J.M. Patterson, D.R. Clinton, L.O. Slate, A.G. Jessup, J.R. Everhart, and R.E. Smith. 1999. Bankfull hydraulic geometry relationships for North Carolina streams. Wildland Hydrology. AWRA Symposium Proceedings. D.S. Olsen and J.P. Potyondy, eds. American Water Resources Association. June 30- July 2, 1999. Bozeman, MT. Harman, W.A., D.E. Wise, M.A. Walker, R. Morris, M.A. Cantrell, M. Clemmons, G.D. Jennings, D. Clinton, and J. Patterson. 2000. Bankfull Regional Curves for North Carolina Mountain Streams. In Proc. AWRA Conf. Water Resources in Extreme Environments, Anchorage, Alaska, ed. D.L. Kane, pp.185-190. Middleburg, Va.: American Water Resources Association. Henson, T.H. 1990. Bald eagle. In: Lee, D.S. and J.F. Parnell (eds.). Endangered, Threatened and Rare Fauna of North Carolina, Part III. A Re-evaluation of the Birds. Occasional Papers of the North Carolina Biological Survey. North Carolina Museum of Natural Sciences, Raleigh. MICHAEL BAKER ENGINEERING, INC. PAGE 10-1 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Julien, P. Y. 1995. Erosion and sedimentation. Cambridge University Press, 280p. Lane, E. W. 1955. Design of stable channels. Transactions of the American Society of Civil Engineers. Paper No. 2776: 1234-1279. Leopold, Luna B. M. Gordon Wolman, and John P. Miller. 1964. Fluvial Processes in Geomorphology. San Francisco, CA. (151). Lowe, D.W., J.R. Matthews, and C.J. Mosely (eds.). 1990. Official World Wildlife Fund Guide to Endangered Species of North America. Beacham Publishing, Washington, D.C. Lutz, H. J., 1940. Disturbance of Forest Soil Resulting from the Uprooting of Trees. Yale University School of Forestry Bulletin No. 45. McGrath, C. Personal Communication. 1996. Murdock, N. U.S. Fish and Wildlife Service. Ashville Field Office. Personal communication. National Oceanic and Atmospheric Administration (NOAA). National Weather Service Hydrometeorological Design Studies Center, Precipitation Frequency Data Server. 2007. [Online WWW]. Available URL: http://hdsc.nws.noaa.gov/hdsc/pfds/orb/nc pfds.html). North Carolina Floodplain Mapping Program.2009. [Online WWW]. Available URL: http://www.ncfloodmgps.com. North Carolina Division of Water Quality (NCDWQ) Basinwide Planning Program. Hiwassee River Basinwide Water Quality Plan (March 2007). North Carolina Department of Environment and Natural Resources. Raleigh, North Carolina. [Online WWW]. Available URL: http://h2o.enr.state.nc.usibasinwide/Hiwassee2007.htm North Carolina Ecosystem Enhancement Program and Equinox Environmental Consultation and Design. 2007. Peachtree-Martins Creek Local Watershed Plan (Phase3), Hiwassee River Basin, Cherokee and Clay Counties, North Carolina. October 2007 Watershed Management Plan. [Online WWW]. Available URL: http://www.nceep.net/services/lwps/pull_down/by basin/Hiwassee RB.html. North Carolina Ecosystem Enhancement Program. 2008. Hiwassee River Basin Restoration Priorities (2008). [Online YAW]. Available URL: http://www.nceep.net/services/lwps/pull_down/by_basin/Hiwassee_RB.htmlNorth Carolina Natural Heritage Program (NHP) Element Occurrence Database (Listing of State and Federally Endangered and Threatened Species of North Carolina). North Carolina Department of Environment and Natural Resources. Raleigh, North Carolina. 2006, 2008. [Online WWW]. Available URL: http: // 149.168.1.196/nhp/. North Carolina Natural Heritage Program (NHP) Element Occurrence Database (Listing of State and Federally Endangered and Threatened Species of North Carolina). North Carolina Department of Environment and Natural Resources. Raleigh, North Carolina, USA. 2006, 2008. [Online WWW]. Available URL: http://149.168.1.196/nhp . Potter, E.F., J.F. Parnell, and R.T. Teulings. 1980. Birds of the Carolinas. University of North Carolina Press, Chapel Hill, NC. Radford, A.E., H.E. Ahles, and C.R. Bell. 1964. Manual of the Vascular Flora of the Carolinas. University of North Carolina Press, Chapel Hill. Raudkivi, A.J. 1967. Loose Boundary Hydraulics. Oxford, England: Pergramon Press. 331pp. Rosgen, D. L. 1994. A classification of natural rivers. Catena 22:169-199. MICHAEL BAKER ENGINEERING, INC. PAGE 10-2 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN 1996. Applied River Morphology. Pagosa Springs, CO: Wildland Hydrology Books. 1997. A geomorphological approach to restoration of incised rivers. Proceedings of the Conference on Management of Landscapes Disturbed by Channel Incision. Wang, S.S.Y, E.J. Langendoen, and F.D. Shields, Jr., eds. 12-22. 1998. The reference reach - A blueprint for natural channel design (draft). ASCE Conference on River Restoration. Denver CO. March, 1998. ASCE. Reston, VA. 2001a. A stream channel stability assessment methodology. Proceedings of the Federal Interagency Sediment Conference. Reno, NV. March, 2001. 2001b. The cross-vane, w-weir andi-hook vane structures... their description, design and application for stream stabilization and river restoration. ASCE conference. Reno, NV. August, 2001. Schafale, M. P., and A. S. Weakley. 1990. Classification of the natural communities of North Carolina, third approximation. North Carolina Natural Heritage Program. Division of Parks and Recreation, NCDENR. Raleigh, NC. Simon, A. 1989. A model of channel response in disturbed alluvial channels. Earth Surface Processes and Landforms 14(1):11-26. Stephens, E. P., 1956. The Uprooting of Trees: a Forest Process. Soil Science Society of America Proceedings 20:113- 116. Terwilliger, K., J.R. Tate, and S.L. Woodward (eds.). 1995. A Guide to Endangered and Threatened Species in Virginia. The McDonald & Woodward Publishing Company, Blacksburg, Va. United States Army Corps of Engineers. 1987. Corps of Engineers Wetlands Delineation Manual. Technical Report Y-87-1. Environmental Laboratory. US Army Engineer Waterways Experiment Station. Vicksburg, MS. 1997. Corps of Engineers Wetlands Research Program. Technical Note VN-rs-4.1. Environmental Laboratory. US Army Engineer Waterways Experiment Station. Vicksburg, MS. United States Department of Agriculture, Natural Resources Conservation Service Soil Survey Division. Official Soil Series Descriptions, [Online WWW]. Available URL: (http://ortho.fhv.nrcs.usda.gov/cgi-bin/osd/osdnafne.cgi). United States Department of Agriculture, Natural Resources Conservation (MRCS). Soil Data Mart [Online WWW]. Available URL: http://soildatafnart.nres.usda.gov/Default.aspx. Official Soil Series Descriptions. [Online WWW]. Available URL: http://websoilsurvey.nres.usda.gov/app/ Web Soil Survey.aspx. United States Department of Interior, Fish and Wildlife Service (USFWS). Threatened and Endangered Species in North Carolina. Cherokee County. 2006-2008. [Online WWW]. Available URL: http://www.fxvs.gov/nc- es/es/couplyfr.htrnl. 1992a. Endangered and Threatened Species of the Southeastern United States (The Red Book). Prepared by Ecological Services, Division of Endangered Species, Southeast Region. Government Printing Office, Washington, D.C. 1997a. Endangered and Threatened Wildlife and Plants: Bog Turtle determined to be a Threatened Species. Federal Register 62(213):59605-59623. United States Environmental Protection Agency (USEPA). Watershed Assessment of River Stability & Sediment Supply (WARSSS). Dr. David L. Rosgen and the United States Environmental Protection Agency, 2008. [Online YAW]. Available URL: http://www.epa.gov/warsss/about.htm. United States Geological Survey (USGS) Land Cover Data. 2002. [Online WWW]. Available URL: http://seafnless.usgs.gov/. MICHAEL BAKER ENGINEERING, INC. PAGE 10-3 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN Wolman, M.G. Geogr'afiska Annaler. Series A, Physical Geography, Vol. 49, No. 2/4, Landscape and Processes: Essays in Geomorphology (1967), pp. 385-395 Yang, C.T. 1973. "Incipient Motion and Sediment Transport," Journal of the Hydraulics Division, American Society of Civil Engineers, Vol. 99, No HY10, October, 1973, pp 1679-1704. "Unit Stream Power Equations for Gravel," Journal of the Hydraulics Division, American Society of Civil Engineers, Vol. 110, No. 12, December, 1984, pp 1783-1797. MICHAEL BAKER ENGINEERING, INC. PAGE 10-4 9/22/2010 MARTIN'S CREEK 11 MITIGATION PLAN APPENDIX A. NCDWQ Stream Identification Forms North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: 1l Gi Project: MAR'Tltl Latitude: .d n Evaluator: GAM Site: i"jrdi 01;,jC,tA ev Longitude: Total Points: $0, D Stream is at least intermittent i >_ 19 or perennial i >_ 30 VV((Arti-vi fly. Other County: efir olet r- e.g. Quad Name: A. Geomorphology (Subtotal= J Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 1. Sinuosity 0 1 2 3. In-channel structure: riffle-pool sequence 0 1 2 4. Soil texture or stream substrate sorting 0 1 2 3: 5. Active/relic flood lain 0 1 2 6. Depositional bars or benches 0 1 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 0 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 2 3 11. Grade controls 0 0.5 1 C1 12. Natural valley or drainageway 0 0.5 CD 1.5 13. Second or greater order channel on existing USGS or NRCS ma or other documented evidence. No = 0 Yes aMan-made ditches are not rated; see discussions in manual B. Hydrology Subtotal = q - 5 14. Groundwater flow/discharge 0 1 2 3 _ 5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 0 1 2 x'73 16. Leaf litter 1.5 0.5 0 17. Sediment on plants or debris 0 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 01 1.5 19. Hydric soils (redoximorphic features) resent? No = 0 Yes in C. Bioloev (Subtotal = 16 20b. Fibrous roots in channel 3 2 1 0 2lb . Rooted plants in channel 3 2 1 0 22. Crayfish 0 0.5 1 1. 23. Bivalves 0 1 2 . 24. Fish 0 0.5 1 (l 4 .a, 25. Amphibians 0 0.5 1 26. Macrobenthos (note diversity and abundance) 0 0.5 1 27. Filamentous algae; eri hyton 0 Q 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other = b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: ?UCA.;At Sfreunn n4 i d A45t4 ??r4vtq k pfD PeA4? North Carolina Division of Water Quality Stream Identification Form. Version 3.1 LL W-T, 3 7)ate: I l l l Project: Mara; n Latitude: uvatuator: tm-ce Of1M . )Ile: 1<161f-f rKor,)6. i ongituue• Total Points: 3 b Stream is at least intermittent if >_ 19 or perennial i >_ 30 Other County: e.g. Quad Name: C E(2o KCB ' A. Geomorphology Subtotal = Absent Weak Moderate Strong le. Continuous bed and bank 0 1 2 3 2. Sinuosity 0 1 2 3. In-channel structure: riffle-pool sequence 0 1 2 4. Soil texture or stream substrate sorting 0 1 2 5. Active/relic flood lain 0 1 2 6. Depositional bars or benches 0 1 3 7. Braided channel 0 1 2 3 8. Recent alluvial deposits 0 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 1 2 3 11. Grade controls 0.5 1 1. 12. Natural valley or drainageway 0 0.5 1 1. 13. Second or greater order channel on existing USGS or NRCS ma or other documented evidence. No = 0 Yes =p aMan-made ditches are not rated; see discussions in manual R. Hvdrnlnuv (Subtotal = - 1 14: Groundwater flow/discharge 0 1 2 3 5. Water in channel and > 48 hrs since rain, or Water in channel -- dry or growing season 0 1 2 16. Leaf litter 1 5 1 0.5 0 17. Sediment on plants or debris I 0 0.5 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No = Yes = 1.5 C. Bioloev (Subtotal= 17 1 20b. Fibrous roots in channel 3 2 1 0 2lb. Rooted plants in channel 2 1 0 22. Crayfish 0 0.5 1 1.5 23. Bivalves 0 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 0.5 1 1.5 26. Macrobenthos (note diversity and abundance) 0 0.5 1.5 27. Filamentous algae; periphyton 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. "CrA(- 4 Jai' v1on4 Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ")ate: )I II VQ ? 1 Ti..,aluntar_ iMAA/ lr,?AA Project: MA(' 0 Latitude: Site: (CI G 0T ? 20 ?) C. Longitude: Total Points: Mft7jj0CAL Other Stream is at least intermittent County: e.g. Quad Name: j f? 19 or perennial i ? 30 Absent Weak Moderate Strong A. Geomor holo Subtotal = 3 I a Continuous bed and bank 0 1 2 . 2. Sinuosi 0 2 2 3 3 In-ehel structure: riffle-pool sequence 3 0 , Soil texture or stream substrate sortin 4 0 l 3 . Active/relic flood lain 5 2 3 . al bars or benches 6. Deposition 2 3 Braided channel 2 3 Recent alluvial de osits 8 V 2 3 . 9a. Natural levees 2 3 10. Headcuts 2 11. Grade controls 5 1 12. Natural valley or drain ewa 0 0. 5 1 13. Second or greater order channel on Ddgin USGS or NRCS No Yes = 3 MA71 or other documented evidence. aMan-made ditches are not rated; see discussions in manual 7 ? 13_ ri clrolo auvwaa¦ - - .14: Groundwater flow/discharge 0 2 3 5. Water in channel and > 48. hrs since rain, or 0 e 2 3 . Water in channel - or owin season 0 16. Leaf litter 1.5 1 5 Sediment on plants or debris 17 0.5 I 1.5 . I8. Organic debris lines or piles (wrack lines) 0) 1 0.5 1 1.5 t 9_ Rvdric soils (redoximorphic features) present? No 7 Yes= 1.5 t-. "Jology kauuautm -- 3 b 1 0 Fibrous roots in channel 20 . 2lb. Rooted plants in channel 3 i 1 0 22. Crayfish 0 1 1.5 23. Bivalves 0 0 l 0 5 2 1 3 1.5 24. Fish . 25. Amphibians 0.5 1 1.5 0 Macrobenthos note diversity and abundance) 26 EP 1 1.5 . Filamentous al ae; peri h on 27 I 2 3 . 28. Iron oxidizing bacteria/fun s. 0.5 1 1.5 29 . Wetland lams in streambed FAC FA CW=0.75 OBL =1.5 SAV= 2.0 Other = 0 'Items 20 and 21 focus on the resenee of upland Cants. Item 29 focuses on the resence of u atic or wetland plants. Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 -)ate: 1I li4 /Os cu- V u w i T.nnuitude: Evaluator: Mw c I C-hm .?........... .. ---o Total Points:rj ??lt-i ?? GY t Other Stream is at least inlermillent County: e.g. Quad Name: if ? 19 or perennial i 3 Absent Weak Moderate Strong A. Geomorphology (Subtotal= 2 3 Continuous bed and bank 1' 1 . 2. Sinuosity 1 1 2 2 3 3 In-channel structure: riffle-pool sequence 3 . Soil texture or stream substrate sorting 4 0 1 2 3 . 5. Active/relic flood lain ® 1 2 3 3 6. Depositional bars or benches 1 2 7. Braided channel 1 2 3 3 Recent alluvial deposits 8 ? 1 2 . 98. Natural levees ® 1 2 3 3 10. Headcuts 0 1 q 2 1 1.5 11. Grade controls 0 0 5 1 . 1.5 12. Natural valley or drain ewa . 13. Second or greater order channel on existin USGS or MRCS No =VJ Yes = 3 man or other documented evidence. 'Man-made ditches are not rated; see discussions in manual 0 13_ Hydrology ouqtuaa¦ - ,.14. Groundwater flow/dischar e 2 . Water in channel and > 48. hrs since rain, or 5 1 : . Water in channel - or owin season 1 L 5 1 1 16. Leaf litter . 5 0 1.5 17. Sediment on lants or debris . 5 1 18, Organic debris lines or piles (wrack lines 0.5 1 . t 9_ Hvdric soils (redoximorphic features) present? No = Yes =1.5 12 U. tsiology taunmwi -- - r b 3 2 1 Fibrous roots in channel 20 . 21b. Rooted plants in channel 3 1 0 22. Crayfish 0 0.5 1 1.5 23. Bivalves 1 0 5 2 1 3 1.5 24. Fish . 0 5 1 1.5 Amphibians 25 . . 26. Macrobenthos (note diversity and abundance 0.5 1 1.5 27. Filamentous algae; pert hyton 1 2 - 3 Iron oxidizing bacteria/fungus. 28 0.5 t- 71 1.5 . Wetland plants in streambed 29 FAC=0.5 FACW?0.75 OBL=1.5 SAV= 2.0 Other = . b items 20 and 21 focus on the resenee of u land lants. Item 29 focuses on the resence of uatic or and lanes. Project: MA 110 Latitude: Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ")ate: Project: M Q.d-. nn ? j -r 1 Latitude: 7.nnvitnde- Evatuator: yvim CNN V -- '°' - "1 y old H `' -Tr; b 5 Total Points: 35;, ome Other Stream is at least intermittent County: GN a?20? • e.g. Quad Name. i >_ 19 or perennial t ? 30 . Absent Weak Moderate -Strong A. Geomor bolo Subtotal = 1 2 V. Continuous bed and bank 0 3 2. Sinuosi 0 0 1 1 2 In-channel structure: riffle-pool sequence 3 . Soil texture or stream substrate sorting 4 0 1 2 . 5. Active/relic flood lain 0 1 2 3 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 1 2 3 ? 8. Recent alluvial deposits 2 3 9a. Natural levees 1 1 2 3 ts d H 10 cu ea . 0 0.5 1 11. Grade controls 0 0.5 1 12. Natural valley or drain ewa 13. Second or greater order channel on existing USGS or NRCS No = 0 Yes .4-- *.A P%I;fjPnpp aMan-made ditches are not rated; see discussions in manual B Hydrology (uubtotai = <<?? i ,14 Groundwater flow/discharge 5. Water in channel and > 48. hrs since ram, or Water in channel -- dry or growing season 16. Leaf litter 17 Sediment on plants or debris 18 Organic debris lines or piles (wrack lines) 19. Hydric soils (redoximorphic features) preset' 0 1 2 0 1 2 d 1.5 1 0.5 ® 0.5 1 1.5 0 1 1.5 No = Yes =1.5 V-bu(- 'j DPp?c?.tC''7? C. Biology (bubtotai = 3 2 0 A Fibrous roots in channel 1 0 21b. Rooted ]ants in channel 2 1 5 fish Cra 22 0 0.5 . y . 2 3 23. Bivalves 0 0 1 1.5 24. Fish 0 0.5 1 25. Amphibians t 0 u d 0 0.5 1 ance n 26. Macrobenthos note diversity d ab 3 27. Filamentous algae; eri hyton 1 2 5 1 1.5 0 28. Iron oxidizin bacteria/fun s. Wetland plants in streambed 29 FAC . .5 FACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 . b Items 20 and 21 focus on the presence of upland ]ants. Item 29 focuses on the resence of aquatic or wetland plants. Notes: (use back of fo/r?m? for fadditional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 gate: /'231 10 Latitude: L' Vi1luAtv? . c. f1 r.n, ?'; 1_. ••?•.• ? •••,••b•?•••••,• Total Points: 'i(o, Stream is at least intermittent 19 or perennial i >_ 30 Other County: U14 ;1n e.g. Quad Nante: A. Geomorphology Subtotal = ??1 Absent Weak Moderate Strong l a. Continuous bed and bank 0 1 2 3) 2. Sinuosity 0 r' } 2 3 3. In-channel structure: riffle-pool sequence 0 1 3 4. Soil texture or stream substrate sorting 0 1 2) 3 5. Active/relic flood lain 0 L? 2 3 6. Depositional bars or benches 0 1) 2 3 7. Braided channel 0 (1> 2 3 8. Recent alluvial deposits 0 (lj 2 3 9'. Natural levees (0> I 2 3 10. Headcuts 0 CJ5 2 3 11. Grade controls 0 0.5 1 A.5? 12. Natural valley or drainageway 0 0.5 1 1.5\ 13. Second or greater order channel on existin USGS or NRCS map or other documented evidence. No 0 = - Yes =3 'Man-made ditches are not rated; see discussions in manual 11 Avilminav Nnhtotal = q 1 14. Groundwater flow/discharge _ 0 1 2 (3> 5. Water in channel and > 48 hrs since rain. or Water in channel -- d or growing season 0 1 2 3) 16. Leaf litter 1.5 1) 0.5 0 17. Sediment on plants or debris 0 X0.5) 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1 '15) 19. Hydric soils (redoximorphic features) present? No = 0) Yes = 1.5 C'_ Riolouv (Subtotal= 8/ ('_ ) 20b. Fibrous roots in channel 3 2? 1 0 21b. Rooted plants in channel 1 2 1 0 22. Crayfish 0: 0.5 1 1.5 23. Bivalves 0 1 2 3 24. Fish 0 0.5 1 1.5 25. Amphibians 0 0.51 1 1.5 26. Macrobenthos (note diversity and abundance _ 0 0.5 1.5 27. Filamentous algae; eriphyton 0 1 2) 3 28. Iron oxidizing bacteria/fungus. 0) 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: Project: ""CYl ?' tgw North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Late: 1/4/01 Project: Latitude: Evaluator: MW, I ?h{yVy Site: KP - V-T L Longitude: Total Points: 26: Stream is at least intermittent i >_ 19 or perennial i >_ 30 County: Other C! I? o I< e.g. Quad Name: A. Geomorphology (Subtotal= 17.5 Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 2. Sinuosity 0 0 2 3 3. In-channel structure: riffle-pool sequence 0 2 3 4. Soil texture or stream substrate sorting 0 1 3 5. Active/relic flood lain 0 1 3 6. Depositional bars or benches M 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 0 2 3 10. Headcuts 0 1 3 11. Grade controls 0 0.5 G) 1.5 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existin USGS or NRCS ma or other documented evidence. No = 0 Yes ` aMan-made ditches are not rated; see discussions in manual B. Hvdrolonv (Subtotal = 4 14. Groundwater flow/discharge _ 0 1 2 3 5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 0 2 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1.5 19. Hydric soils (redoximorphic features) present? No Yes = 1.5 C. Biology (Subtotal = %15 20b. Fibrous roots in channel 3 2 1 0 2lb. Rooted plants in channel 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves (0 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos note diversity and abundance) 0 0.5 1 1.5 27. Filamentous algae; eri h on 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC= . FACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the resence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: Pfa T r Mt RP- ?AT - z-North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: 1`gioq Project: VVIA '?d Latitude: Evaluator: wl w1 c. ?( ?{ Site: Longitude: Total Points: ?? Stream is at least intermittent i >_ 19 or perennial i ? 30 Other County: Grwtz" lit e.g. Quad Name: A. Geomorphology Subtotal = Absent Weak Moderate Strong 1 a. Continuous bed and bank 0 2 3 2. Sinuosity 1 2 3 3. In-channel structure: riffle-pool sequence d 1 2 3 4. Soil texture or stream substrate sorting 0 2 3 5. Active/relic flood lain d 1 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 0 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 2 3 11. Grade controls 0 0.5 1 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existing USGS or NRCS ma or other documented evidence. No =J Yes 0 aMan-made ditches are not rated; see discussions in manual B. HvdroloL-v (Subtotal" 7 ?( 14. Groundwater flow/discharge 0 01 2 3 5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 0 2 3 16. Leaf litter 1.5 1 0.5 0 17. Sediment on plants or debris (? 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 1; 1.5 19. Hydric soils (redoximorphic features) present? No Yes = 1.5 C. Biology (Subtotal = 20b. Fibrous roots in channel 3 2 1 2lb. Rooted plants in channel 3 2 l 0 22. Crayfish 0 0.5 1 1.5 23. Bivalves R 1 2 3 24. Fish (0' 0.5 1 1.5 25. Amphibians 0 0.5 1 1.5 26. Macrobenthos (note diversity and abundance 0.5 1 1.5 27. Filamentous algae; peri h on 1 2 3 28. Iron oxidizing bacteria/fungus. 0 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other 0 b items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: 'I +v >e 99CA-K North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: z- Iz?/,o Project: MAlI-('d fit Latitude: L' VU1UUtUI. ( lj 'i,n 111, 01M. V V ?,t LUHgALUUU. Total Points: 'J'„ 7 Stream is at least intermittent 19 or perennial if ?30 Other County: e.g. Quad Name: A. Geomor holo (Subtotal= 10,", Absent Weak Moderate Strong la. Continuous bed and bank 0 1 "2 3 2. Sinuosity 0 1 ?_) 3 3. In-channel structure: riffle-pool sequence 0 (y 2 3 4. Soil texture or stream substrate sorting 0 1 2 3 5. Active/relic flood lain 0 2 3 6. Depositional bars or benches <0 1 2 3 7. Braided channel A 1 2 3 8. Recent alluvial deposits 0 (1 2 3 9a. Natural levees (b? 1 2 3 10. Headcuts (?J 1 2 3 11. Grade controls 0 0.5 1 1%.5 12. Natural valley or drainageway 0 0.5 1 1.5 13. Second or greater order channel on existine USGS or NRCS ma or other documented evidence. No Yes = 3 'Man-made ditches are not rated; see discussions in manual R Hvdrnlnuv (Subtotal= q 1 14. Groundwater flow/discharge 0 1 2 03 5. Water in channel and > 48 hrs since rain, or Water in channel -- or growing season 0 1 2 16. Leaf litter 1.5 J 0.5 0 17. Sediment on plants or debris 0 0". 5) 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No = 0 Yes = 1.5 C. Biologv (Subtotal = 31_15 >{e r 206. Fibrous roots in channel 3 2 1l 0 216. Rooted plants in channel 3 ?2) 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves ?b) 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos (note diversity and abundance 0.5 1 1.5 27. Filamentous algae; eriphyton (Q 1 2 3 28. Iron oxidizing bacteria/fungus. 0) 0.5 1 1.5 29 6. Wetland plants in streambed FAC=0.5 FACW V0 7? OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: lP- UT;- 1 North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: I qt pq Project: MP1Qa1 Latitude: Evaluator: MMe? G?`M Site: Kf-wi2 ? Longitude: Total Points: -7.5 Stream is at least intermittent i > 19 or perennial i >_ 30 Other County: C NCl?fl K. e.g. Quad Name: A. Geomorphology Subtotal = Absent Weak Moderate Strong la. Continuous bed and bank 0 2 3 2. Sinuosity 1 2 3 3. In-channel structure: riffle-pool sequence 0 1 2 3 4. Soil texture or stream substrate sorting (Q7 1 2 3 5. Active/relic flood lain 0 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 0 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 1 2 3 11. Grade controls 0 1 1.5 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existing USES or NRCS ma or other documented evidence. No Yes = 3 aMan-made ditches are not rated; see discussions in manual B. Hydrology Subtotal = Z.y f 14. Groundwater flow/discharge 0 1 2 3 .5. Water in channel and > 48 hrs since rain, or Water in channel -- dry or growing season 0 2 3 16. Leaf litter 1.5 1 0 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No 0 Yes = 1.5 C. Biology (Subtotal= 206. Fibrous roots in channel 3 2 1 0 216. Rooted plants in channel 3 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians ( 0.5 1 1.5 26. Macrobenthos (note diversity and abundance 0.5 1 1.5 27. Filamentous algae; peri h on 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other =iV b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: T to MA-K vv kw 14 cC-ywr? IV14,yyiil PB C'J.- North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: lig 0 Project Latitude: r valua Wj. J\A?r1L 1 t/i r\ v.?... ?r_ 1A , , .......b...... ?. Total Points: Stream is at least intermittent if?: 19 or perennial i >_ 30 Other County: e.g. Quad Name: A. Geomor bolo Subtotal = /? l Absent Weak Moderate Strong 1a. Continuous bed and bank 0 1 2 2. Sinuosi 0 1 2 3 3. In-channel structure: riffle-pool sequence 0 1 Z 4. Soil texture or stream substrate sorting 0 1 2 3 5. Active/relic flood lain 0 1 2 (3) 6. Depositional bars or benches 0 1 C 3 7. Braided channel 0 1 2 8. Recent alluvial deposits 0 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 1 2 11. Grade controls 0 0 1 1.5 12. Natural valley or drainageway 0 0.5 1 1.5 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No Yes = 3 aMan-made ditches are not rated; see discussions in manual R Av?lrnlnnv lCnhtntnl = :?• j 1 14. Groundwater flow/dischar e 0 1 2 3 5. Water in channel and > 48,hrs since rain, or - Water in channel -- dry or growing season 0 2 3 16. Leaf litter 1.5 - 1 0.5 0 17. Sediment on plants or debris 657 0.5 1 1.5 18. Organic debris lines or piles wrack lines) 0 1 1.5 19. Hydric soils (redoximorphic features) present? No Yes = 1.5 f Rinlnav (Cnhtntnl = ? 1 20b. Fibrous roots in channel 2 1 2lb. Rooted plants in channel 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 0.5 1 1.5 26. Macrobenthos (note diversity and abundance OD 0.5 1 1.5 27. Filamentous algae; eriphyton 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. (use back o M for additional n tes) r, V Vw?? - /rt!f ?, VX111 lw FH 6 V Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: 4 Project nom- .n t _ 4._a... j A Latitude: r,vaiuaw, : ?" l VWL-/ (,tt M Total Points: ?, : Stream is at least intermittent if >_ 19 or perennial i >_ 30 Other County: i e.g. Quad Name: ? '-_ A. Geomorphology (Subtotal= , Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 3 2. Sinuosity 0 1 2 3 3. In-channel structure: riffle-pool sequence 0 1 3 4. Soil texture or stream substrate sorting ( 1 2 3 5. Active/relic flood lain 0 1 ; C 3 6. Depositional bars or benches 1 2 3 7. Braided channel S 1 2 3 8. Recent alluvial deposits 0 1 2 3 9'. Natural levees 1 2 3 10. Headcuts 0 1 2 11. Grade controls 0 0.5 1 1.5 12. Natural valley or drainageway 0 0.5 1 1.5 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No Yes = 3 'Man-made ditches are not rated; see discussions in manual 14. Groundwater flow/discharge 0 1 2 3 5. Water in channel and > 48 hrs since rain, or Water in channel --!Iy or growing season 0 OD- 2 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 1 1.5 19. Hydric soils (redoximorphic features) present? No 0 Yes = 1.5 9- Rinln(rv LG1htntnl = 3S, 1 20b. Fibrous roots in channel 3 2 0 2lb. Rooted plants in channel 3 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 (TP 1 1.5 26. Macrobenthos (note diversity and abundance 0.5 1 1.5 27. Filamentous algae; eri hyton 1 2 3 28. Iron oxidizing bacteria/fungus. LOP 0.5 1 1.5 29 b Wetland plants in streambed FAC-0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other - b items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: I` III I{lX Project:)prj-?w Latitude: rwa?uawr: rvl1VjU (, M 1 1-2 ?....b........ Total Points: 14 Stream is at leas intermittent >_ 19 or perennial i ? 30 if?! 3'? T.r 4 Gvr+??r w? her County: Ots e.g. Quad Name: Gl Y? A. Geomor holo Subtotal = Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 3 2. Sinuosity 1 2 3 3. In-channel structure: riffle-pool sequence 0 ® 2 3 4. Soil texture or stream substrate sorting 1 2 3 5. Active/relic flood lain 1 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 1 2 3 11. Grade controls 0 0.5 1 1.5 12. Natural valley or drainageway 0 .5 1 5 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No Yes = 3 aMan-made ditches are not rated; see discussions in manual 14. Groundwater flow/discharge 1 2 3 5. Water in channel and > 48 hrs since rain, or Water in channel -- dry or growing season 1 2 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No = Yes = 1.5 C Rinlnav NuhtntA = 0 1 20b. Fibrous roots in channel 3 2 1 2lb . Rooted plants in channel 3 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves .1 2 3 24. Fish 0.5 1 1.5 25. Amphibians ] 0.5 1 1.5 26. Macrobenthos (note diversi and abundance 0.5 1 1.5 27. Filamentous algae; eriphyton 1 2 3 28. Iron oxidizing bacteria/fungus. to) 0.5 1 1.5 29b Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: 212Z? 1o Project: ?'?? i<!', Latitude: ?? n ,vim I Jr,vaiuatua - (fW`, K1 ?iw. v a...,b...,.... Total Points: 1 Stream is at least intermittent if> 19 or perennial if?30 Other County: e.g. Quad Name: A. Geomor holo (Subtotal= 1 Absent Weak Moderate Strong 1'. Continuous bed and bank 0 1 2 3 2. Sinuosity 0 (1) 2 3 3. In-channel structure: riffle-pool sequence 0 1 2? 3 4. Soil texture or stream substrate sorting 0 ll 2 3 5. Active/relic flood lain (0? 1 2 3 6. Depositional bars or benches ?0 1 2 3 7. Braided channel 0' 1 2 3 8. Recent alluvial deposits ( 1 2 3 9'. Natural levees 0) 1 2 3 10. Headcuts 10J 1 2 3 11. Grade controls 0 0.5 1 1.5 12. Natural valley or drainageway 0 0.5 1 ?1 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No =l0 Yes = 3 'Mau-made ditches are not rated; see discussions in manual R T4vdrn1nav (Suhtntal = 1 14. Groundwater flow/discharge 0 1 2 - 3 5. Water in channel and > 48 hrs since rain, or . Water in channel - dKy or growing season 0 1 2 3 16. Leaf litter 1.5 0.5 0 17. Sediment on plants or debris 0 0.5 ' 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1 1.5 ' 19. Hydric soils (redoximorphic features) present? No = 0 Yes = 1.5 C Rinlnav (Suhtntal = if p 0 .1 , / ;f e,q 20b. Fibrous roots in channel 3 (2) 1 0 21 b. Rooted plants in channel 3 2 1 0 22. Crayfish 01 0.5 1 1.5 23. Bivalves 0 1 2 3 24. Fish 0 0.5 1 1.5 25. Amphibians _ (9-) 0.5 1 1.5 26. Macrobenthos (note diversity and abundance 0 0.5 1.5 27. Filamentous algae; eriphyton 0 1 2' 3 28. Iron oxidizing bacteria/fungus. 0 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other rt_W n Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: KY-ut6-1 North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: I /gloO Project: 444,Y std Latitude: , Evaluator: AAAdr //4/4l Site: rZ P- 07 3 -1 Longitude: Total Points: 1 ,5 s Other t intermittent Stream is at lea County: e.g. Quad Name: if > 19 or perennial i >_ 30 c (Lo l = t S S b Absent Weak Moderate Strong , to a u A. Geomorphology la. Continuous bed and bank 0 2 3 Sinuosi 2 1 2 3 . 3. In-channel structure: riffle-pool sequence 0 4?5 2 3 4. Soil texture or stream substrate sorting C9 1 2 3 5. Active/relic flood lain 1 2 3 6. Depositional bars or benches C(la 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 2 3 10. Headcuts !0 1 2 3 11. Grade controls 0 0.5 (V 1.5 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existin USGS or NRCS No Yes = 3 man or other documented evidence. aMail-made ditches are not rated; see discussions in manual n. n urviv vuv.v.w. 14. Groundwater flow/discharge 1 2 3 5. Water in channel and > 48 hrs since rain, or I 2 3 Water in channel -- or growing season 1 0 5 ? 16. Leaf litter 1.5 . 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5 19 Hvdric soils (redoximorphic features) present? No =CIP - -Yes= 1.5 n 1... Dw?vy? ?ouv..,.s.. . 20b. Fibrous roots in channel 3 2 1 2lb. Rooted plants in channel 3 2 1 22. Crayfish 23. Bivalves P 0.5 1 1 2 1.5 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos (note diversi and abundance 10 0.5 1 1.5 27. Filamentous algae; eri hyton 0 1 2 3 28. Iron oxidizing bacteria/fungus. 29 b. Wetland plants in streambed 0.5 1 1.5 FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other =ilA b items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: V 4 North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: it 1 R 1,01 Project: X42-,Ir,.1 Latitude: Evaluator: MW t l e O M Sate: 1(,r- U-(q Longitude; Total Points: ,j Stream is at least intermittent i >_ 19 or perennial if?: 30 Other County: e.g. Quad Name: f A. Geomorphology Subtotal = Z I • S Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 2. Sinuosity 0 1 ® 3 3. In-channel structure: riffle-pool sequence 0 1 2 3 4. Soil texture or stream substrate sorting 0 1 2 0 5.. Active/relic flood lain 0 1 2 6. Depositional bars or benches 1 2 3 7. Braided channel 0 1 2 8. Recent alluvial deposits ® 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 1 2 3? 11. Grade controls 0 0.5 1 1.5 12. Natural valley or drainageway 0 0.5 1 1.5 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No =6? Yes = 3 aMan-made ditches are not rated; see discussions in manual 14.Groundwater flow/dischar e 0 1 2 3 5. Water in channel and > 48, hrs since rain, or Water in 6hannel--!ly or growing season 0 /,', C? 2 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or pile (wrack lines) 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No ! 0 Yes = 1.5 r Ia.I....., 0z..hr.,ra1 = Fl.s l 20b. Fibrous roots in channel 3 2 1 2lb. Rooted plants in channel 2 1 0 22. Crayfish 0 0.5 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 0.5 1.5 26. Macrobenthos note diversity and abundance) 0 0.5 1.5 27. Filamentous algae; peri hyton 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC ACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland lants. Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Kp-?A iq I)ate• 1 ? 1? f og Project: M,4((--110 Latitude: Evaluator: p4C MW site: KP_u'T Longltuae: Total Points: II-q, 1? Stream is at least intermittent i >_ 19 or perennial i >_ 30 Other County: e.g. Quad Name: A. Geomor polo Subtotal = Z Absent Weak Moderate Strong la. Continuous bed and bank 0 I 2 2. Sinuosity 0 1 3 3. In-channel structure: riffle-pool sequence 0 1 (? 3 4. Soil texture or stream substrate sorting 0 1 2 5. Active/relic flood lain 0 1 2 (? 6. Depositional bars or benches 7. Braided channel 0 0 1 1 2 2 3 'Y 8. Recent alluvial deposits 0 1 2 3 9a. Natural levees 0 1 2 3 10. Headcuts 0 1 2 11. Grade controls 0 0. 1 13 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on gxistin USGS or NRCS map or other documented evidence. No = 0? Yes = 3 'Man-made ditches are not rated; see discussions in manual R W...l..n1? , 7Cnh#n*01 = 9 1 14. Groundwater flow/discharge _ ?0 1 ) 3 5. Water it channel and > 48 ar's since Pain; _r Water in channel -- dry or growing season 0` y ? 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris (- 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5 19. Hydric soils (redoximorphic features) present?_ No = Yes = 1.5 !' R:nl.,..., !Gish*n*?1 = GJ , ? 1 20b. Fibrous roots in channel 3 2 1 0 2lb. Rooted plants in channel 15 2 1 0 22. Crayfish 0 0.5 1.5 23. Bivalves 1 2 3? 24. Fish 0.5 1 1.5 25. Amphibians 0 0.5 1.5 26. Macrobenthos (note diversity and abundance 0 071 1 1.5 27. Filamentous algae; eri h on 0 1 2 3 28. Iron oxidizing bacteria/fungus. CP 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: Mi'5 ?h f)"C'v. p$ North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: )11(01 Evaluator: AMMI:1410. Site: RP_?A-r Longrtuuv. Total Points: 71 Stream is at least intermittent i >_ 19 or perennial i >_ 30 Other County: e.g. Quad Name: totoV- A. Geomorphology (Subtotal= tfi Absent Weak Moderate Strong la. Continuous bed and bank 0 2 3 2. Sinuosity 1 2 3 3. In-channel structure: riffle-pool sequence 1 2 3 4. Soil texture or stream substrate sorting 1 2 3 5. Active/relic flood lain 1 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 2 3. 8. Recent alluvial deposits 1 2 3 9'. Natural levees t0? 1 2 3 10. Headcuts 0 1 2 3 11. Grade controls 0 0.5 s ; 1.5 U. Natural valley or drainageway 0 0.5 1 .5 13. Second or greater order channel on existin USGS or NRCS map or other documented evidence. No I =0) Yes = 3 'Man-made ditches are not rated; see discussions in manual n 14. Groundwater flow/discharge 0 1 2 3 .5. Water in channel and > 4& hrs since rain, or Water in channel -- dry or growing season 61 1 2 3 16. Leaf litter 1.5 1 0.5 0 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No 40) Yes = 1.5 20b. Fibrous roots in channel 3 2 1 21 b. Rooted plants in channel 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos note diversity and abundance 6) 0.5 1 1.5 27. Filamentous algae; peri hyton 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other b Items 20 and 21 focus on the resence of upland plants. Item 29 focuses on the presence of aquatic or wetland lants. Project: M kg°li0 Latitude: Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: I I l q Project: MAyf Latitude: Evaluator: ?,A?,1, Gig/v alte: KJ/-LAI q-- i,ongiluae: Total Points: ° pp±± Stream is at l: ntermittent i >-19 or perennial i >- 30 Other County: e.g. Quad Name: Wr fl'aT1 e A. Geomorphology (Subtotal= I?• Absent Weak Moderate Strong 18. Continuous bed and bank 0 1 3 2. Sinuosity 0 1 3 3. In-channel structure: riffle-pool sequence 0 2 3 4. Soil texture or stream substrate sortie 0 1 2 5. Active/relic flood lain 0 1 2 6. Depositional bars or benches 0 2 3 7. Braided channel (0 1 2 3 8. Recent alluvial deposits (? 1 2 3 9'. Natural levees 1 2 3 10. Headcuts 0 1 2 11. Grade controls 0 0.5 0 1.5 12. Natural valley or drainageway 0 0.5 1 1. 13. Second or greater order channel on existin USGS or NRCS map or other documented evidence. No Yes = 3 'Man-made ditches are not rated; see discussions in manual 4. Groundwater flow/discharge 1 0 1 2 C30 - 5. Water in channel and > 4& hrs since rain, or Water in channel -- dry or growing season 0 1 2 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 00 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 0 1.5 19. Hydric soils (redoximorphic features) present? No = 0 Yes - 1. r Rinlncr lCnhfnfal = l:! 1 20b. Fibrous roots in channel 3 2 1 2lb. Rooted plants in channel 2 1 0 22. Crayfish 0 0.5 D 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 0.5 1.5 26. Macrobenthos note diversity and abundance) 0 0.5 1 1.5 27. Filamentous algae; peri h on 1 2 3 28. Iron oxidizing bacteria/f nigus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC-0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b items 20 and 21 focus on the presence ofupland plants. Item 29 focuses on the presence of aquatic or wetland plants. 0% Notes: (use back of form for additional notes) Sketch: ?ticMe?al +Ipsfi?ie??*- o? P b?14 ro?i??- 9- P - U-t tt- I North Carolina Division of Water Quality Stream Identification Form. Version 3.1 -)ate: 11 kq' o% Evaluator: Mrv1 t f L h M cite: i,ongituae: MRi? S ti-W? Total Points: Stream is at least intermittent if?: 19 or perennial if?: 30 Other County: e.g. Quad Name: 1wroy r"V, A. Geomorphology Subtotal = ?r Absent Weak Moderate Strong 18. Continuous bed and bank 0 1 2 3 2. Sinuosity 1 2 3 3. In-channel structure: riffle-pool sequence 1 2 3 4. Soil texture or stream substrate sorting 1 2 3 5. Active/relic flood lain 0 1 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 0 1 2 3 10. Headcuts 0 1 2 3 11. Grade controls 0 0.5 1.5 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No Yes = 3 aMan-made ditches are not rated; see discussions in manual n 17_..1_...1...... /Q t.a,.& 1" n \ 14 Groundwater flow/discharge 1 2 3 5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 2 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No = 0 Yes = 1.5 20b. Fibrous roots in channel 3 2 1 2lb. Rooted plants in channel 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 6 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos note diversity and abundance) 0.5 1 1.5 27. Filamentous algae; peri h on 1 2 3 28. Iron oxidizing bacteria/fungus. 29 b. Wetland plants in streambed 0.5 1 1.5 FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other =C) b Items 20 and 21 focus on the presence ofupland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes Sketch: fLnIOJa (no.lly,'?vallcy a10n? Cfevl')rWhi?c_ t__VA1U Project: MA(°Clfi) Latitude: l??ll? Mj- La?Iel C?,G,l?l on?la(1c? North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: b1 / it Project: W AfTIO Latitude: 1 L`.s lnn*nr• •A .•i li?l u.. Site: RP - 0 T 5 Longitude: Total Points: 7fl Other Stream is at lead irdermilleni county: e.g. Qua d Name: if ? 19 or erennial if ? 30 cHt6a 6 = ? Absent Weak Moderate ng - A. Geomorphology (Subtotal t ! Continuous bed and bank 1 a 0 1 . 2. Sinuosi 0 2 t t 3 3. In-channel structure: riffle-pool sequence 0 I l 2 texture or stream substrate sorting Soil 4 0 1 . 5. Active/relic flood lain 0 1 2 3 6. Depositional bars or benches 1 2 7. Braided channel 1 2 3 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 1 2 2 3 10. Headcuts 0 5 0 0 1.5 11. Grade controls . 1 12. Natural valley or drain ewa 0 0.5 13. Second or greater order channel on existing USGS or NRCS No Yes = 3 --n nr nther documented evidence. 'Man-made ditches are not rated; see discussions in manual r / B. H drolo 5u01tURU = ?' 0 1 3 -14. Groundwater flow/dischar e 5. Water in channel and > 48, hrs since rain, or 0 1 (9 3 Water in channel - dry or owin season 0 5 0 16. Leaf litter 1.5 0 5 . 1 1.5 17. Sediment on plants or debris . 1 1 5 18. organic debris lines or piles (wrack lines) 0 . 19 Hwiric soils (redoximornhic features) present? No Yes = 1.5 C. 1310logy knuutoral -- ?D b 3 m 1 0 Fibrous roots in channel 20 . Rooted plants in channel 21b 2 1 0 . 22. Crayfish 0 0.5 1.5 . 23. Bivalves 1 0 5 1 3 1.5 24. Fish . 0 0.5 1 1.5 25. Amphibians 5 0 0 1 1.5 Macrobenthos (note diversity and abundance 26 . . Filamentous algae; peri h on 27 1 2 3 . Iron oxidizing bacteria/fun s. 28 0.5 1 1.5 . Wetland lams in streambed 29 FAC FACW?0.75 01311=1.5 SAV= 2.0 Other = 0 . b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the resence of uatic or wetland lams. Notes: (use back of form for additional notes) Sketch: P-E R/+-e,F•K North Carolina Division of Water Quality Stream Identification Form. Version 3.1 -late: I1 At 1 n 1 Project:N1.4tTjd Latitude: Evaluator: YvWt &R-K1 Site: \)-( 5 Longitude: Total Points: Other Stream Is at least intermittent County: CllX1'0 e.g. Quad Name: j f>_ 19 or perennial i ? 30 5 l= r ;; Absent Weak Moderate Strong ,, A. Geomorphology (Subtota 2 - 3 1'. Continuous bed and bank 0 3 V 1 2 2. Sinuosi 0 2 3 In-ehannel structure: riffle-pool sequence 3 . Soil texture or stream substrate sorting 4 1 2 3 . 5. Active/relic flood lain 1 2 3 3 6. Depositional bars or benches 1 2 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 9'. Natural levees 1 1 Headcuts 10 0 . 0 0.5 N 11. Grade controls 0 0 5 12. Natural vale or drain ewa . 13. Second or greater order channel on eAmj USGS or NRCS No =3 -- or nther documented evidence. Z% 'Man-made ditches are not rated; see discussions in manual 2 B. Hydrology sumotal = 0 IV 2 - 3 .14. Groundwater flow/discharge 5. Water in channel and > 48. hrs since rain, or 0 2 3 Water in channel - or growing season 1 0 5 cf? 16. Leaf litter 1.5 0 5 . 1 1.5 17. Sediment on plants or debris . 1 5 1 18. Organic debris lines or piles (wrack lines) 0.5 . I 9 Hvdric soils (redoximorphie features) present? No 71 Yes = 1.5 U. Biology (;5umotal = f- I b 3 2 - 1 . Fibrous roots in channel 20 0 21 . Rooted lams in channel 3 1 1 5 22. Crayfish 0.5 1 2 . 3 23. Bivalves 1 0 5 1 1.5 24. Fish . 0 5 1 1.5 25. Amphibians 1 . 5 0 1 1.5 Macrobenthos note diversity and abundance) 26 9 . . Filamentous algae; peri h ton 27 1? 1 2 3 . 28. Iron oxidizing bacteria/fim s. 0 0.5 1 1.5 Wetland plants in streambed 29 FAC=0.5 FACW=0.75 OBL =1.5 SAV= 2.0 Other = . b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the resence of aqu atic or wetland plants. Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: ,, ) 23 /1' Project: r.vaiuatui. L-'ri V,? t\ ! vXm. 1„ ;? awu?uuuc. Total Points: -? 1, `1 Stream is at least intermittent if> 19 or perennial i >30 r(;, County: Other uad Name: e. crtf.yr?!i??_ g. Q A. Geomor holo Subtotal = 1 Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 (, 2. Sinuosity 0 1 <==-t2 3 3. In-channel structure: riffle-pool sequence 0 1 r 3 4. Soil texture or stream substrate sorting 0 1 (2) 3 5. Active/relic flood lain 0 L"D 2 3 6. Depositional bars or benches 0 (1? 2 3 7. Braided channel (0) 1 2 3 8. Recent alluvial deposits 0 V 2 3 9'. Natural levees CO) 1 2 3 10. Headcuts U 1 2 3 11. Grade controls 0 0.5 1 X1.5 12. Natural valley or drainageway 0 0.5 1 1.5 13. Second or greater order channel on existinu USGS or NRCS ma or other documented evidence. No =&) Yes = 3 'Man-made ditches are not rated; see discussions in manual R Hvdralnvv Nuhtotal = ! , ?; 1 14. Groundwater flow/discharge 0 1 2 <_:p 5. Water in channel and > 48 hrs since rain, or Water in channel -- Lby or growing season 0 1 2 L3? 16. Leaf litter 1.5 (1) 0.5 0 17. Sediment on plants or debris 0 0.5 (A 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1 43) 19. Hydric soils (redoximorphic features) present? No T 0 Yes = 1.5 C_ Rinlnuv (Subtotal = `/ 1 20b. Fibrous roots in channel 3 2 1 0 2lb. Rooted plants in channel <-9 1 0 22. Crayfish (0) 0.5 1 1.5 23. Bivalves 6 1 2 3 24. Fish (0? 0.5 1 1.5 25, Amphibians 0 0.5 (1) 1.5 26. Macrobenthos (note diversity and abundance 0 0.5 (1) 1.5 27. Filamentous algae; eri hyton O 1 2 3 28. Iron oxidizing bacteria/fungus. (07) 1 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other ='0 b items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: W wlri North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: f11y1l0 Project: WA K " ???? Latitude: Lvaiuatuw . n N, i_ r vk i ..?.,?.?u.... Total Points:?. Stream is at least intermittent if? 19 or perennial i->30 Other County: c 1 0) f t { e.g. Quad Name: A. Geomorphology Subtotal = 18 Absent Weak Moderate Strong 1 a. Continuous bed and bank 0 1 2 C3`? 2. Sinuosity 0 1 -=, 2 3 3. In-channel structure: riffle-pool sequence 0 J1 (2) 3 4. Soil texture or stream substrate sorting 0 1 -2) 3 5. Active/relic flood lain 0 1 (2.) 3 6. Depositional bars or benches 1 2 3 7. Braided channel fl? 1 2 3 8. Recent alluvial deposits 0 (1) 2 3 9a. Natural levees 0 1 (2r 3 10. Headcuts 0 1 (?) 3 11. Grade controls 0 0.5 1 (LS 12. Natural valley or drainageway 0 0.5 1 (1.5? 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No-0, Yes =3 aMan-made ditches are not rated; see discussions in manual R Avdrnlnvv (Snhtotal = 1 14. Groundwater flow/discharge 0 1 2 3) 5. Water in channel and ? 48 hrs since rain, or Water in channel -- dry or growing season _ 0 1 2 31 16. Leaf litter 1.5 T 0.5 0 17. Sediment on plants or debris 0 116.5) 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1 (13) 19. Hydric soils (redoximorphic features) present? No = Q? Yes = 1.5 C Rinlnav Nnhtotal = 1 20b. Fibrous roots in channel 3 2 /1) '0 2lb. Rooted plants in channel 3? 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 0 1 2 3 24. Fish !0. 0.5 1 1.5 25. Amphibians (0 0.5 1 1.5 26. Macrobenthos (note diversity and abundance 0 0.5 D 1.5 27. Filamentous algae; eriphyton (Oj 1 2 3 28. Iron oxidizing bacteria/fungus. (01 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other - d) b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: $/? :?(,? c ?_p.,-. " : tic' $ North Carolina Division of Water Quality Stream Identification Form. Version 3.1 1/9,/0 Evaluator: Mpq Total Points: 64 Stream Lv at least intermillent . Project: All Ag f j1?1 Latitude: Site: me-, V1 I Longitude: Other County: C 11l e.g. Quad Name: q-> 19 or renniac i ? au Absent Weak Moderate Strong A. Geomor holo (Subtotal-- 2 Continuous bed and bank 0 1 a 1 . 2. Sinuosity 0 1 2 3 In-ehannel structure: riffle-pool sequence 0 3 1 . Soil texture or stream substrate sorting 0 4 1 2 . 5. Active/relic flood lain 0 1 3 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 2 2 3 8. Recent alluvial deposits 1 3 9a. Natural levees 1 1 2 2 0 ts d H 10 cu ea . 0 0.5 1 1.5 11. Grade controls 0 5 1 . 0 i n ewa 12. Natural valley or dra 13. Second or greater order channel on odst; USGS or MRCS No =6 Yes = 3 ma or other documented evidence. "Man-made dltcries are not rawU; boo ui5vuab,viw ......a.....__ -if B. Hydrology aumotat = k a o f 0 1 2 3 ,14. Groundwater flow/discharge 5. Water in channel and > 48, hrs since rain, or 0 1 2 Water in channel - dry or growing season 0 f litter L L5 1 ea 16. 0 5 1 1.5 17. Sediment on plants or debris . 1 5 organic debris lines or piles (wrack lines 18 0 0.5 . . 10 Hvdricr soils (redoximomhic features) present? No = 0 Yes = 1.5 o C. Biology (NUD101al ° i ? 1 20b. Fibrous roots in channel 21b. Rooted lams in channel Cra fish 22 0 2 2 l(: 1 1 1 0 0 1.5 y . 23. Bivalves T 0 5 2 1 3 1.5 Fish 24 . . 5 0 0 1.5 25. Amphibians . 0 D 1 1.5 26. Macrobenthos (note diversity and abundance . 3 27. Filamentous algae; peri h ton 2 1 5 28. Iron oxidizing bacteria/fim s. 29b Wetland plants in streambed . OS 1 FAC . FACW=0.75 0BL=1.5 SAV= 2.0 Other = 0 . b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of a uatic or wetland Iants. Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: Project: M A p_-(I Latitude: Evaluator: VAAC I G44M. Site: UtG -Wl 1 Longitude: Total Points: Stream is at least intermittent i >_ 19 or perennial if?: 30 Other County: ttAwuo C (7 E e.g. Quad Name: A. Geomorphology Subtotal Absent Weak Moderate Strong l a. Continuous bed and bank 0 L 2 2. Sinuosity 0 1 3 3. In-channel structure: riffle-pool sequence 0 1 3 4. Soil texture or stream substrate sorting 0 1 3 5. Active/relic flood lain 0 1 ;2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 0 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 1 3. 11. Grade controls 0 0.5 1.5 12. Natural valley or drainageway 0 0.5 13. Second or greater order channel on existin USGS or NRCS ma or other documented evidence. No = 0 Yes aMan-made ditches are not rated; see discussions in manual B. Hydrology Subtotal 14. Groundwater flow/discharge 0 1 .3 5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 0 1 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No = Yes = 1.5 C. Bioloev (Subtotal = ?' 5 ) 20b. Fibrous roots in channel 3 2 1 0 2lb. Rooted plants in channel 3 I 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 . 26. Macrobenthos (note diversity and abundance) 0.5 1 1.5 27. Filamentous algae; peri hyton 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC= . FACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: ' /A / ()% Project: A4AK710 Latitude: L`vuluutul-: vv',"GIl /V .maw. /V, l' V1 M1 1 ?..,..b_.._.. _.. Total Points: (o, 9 Stream is at least intermittent >_ 19 or perennial i >_ 30 if "i° fit ICS l??9Mlrf (1e ?ELE? rr?) County: Other Ot Quad Name: C 900 4 A. Geomorphology Subtotal = Absent Weak Moderate Strong 1'. Continuous bed and bank 0 2 3 2. Sinuosity 0 1 2 3 3. In-channel structure: riffle-pool sequence 1 2 3 4. Soil texture or stream substrate sorting 0 1 2 3 5. Active/relic flood lain 0 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9'. Natural levees 0 1 2 3 10. Headcuts 0 2 3 11. Grade controls 0 0. 1 1.5 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No = 0 Yes = 3? 'Mari-made ditches are not rated; see discussions in manual A u...1..?1.,.r., lQ.'h*afa1 = 2 1 14. Groundwater flow/discharge 0 2 3 5. Water in channel and > 48 hrs since rain, or Water in channel -- dry or growing season 0 2 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5. 19. Hydric soils (redoximorphic features) present? No Yes = 1.5 I- R:..1.,..., l6.hfnta1 = 'i .S 1 20b. Fibrous roots in channel 3 2 © 0 2lb. Rooted plants in channel 3 1 0 22. Crayfish 0 03 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 .5 1 1.5 26. Macrobenthos (note diversity and abundance 0 0. 1 1.5 27. Filamentous algae; eri hyton 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other =0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: ? A bt,lf f N_ 4(K ? ?/? k a ? 4Vi h COM II l , 1111? let! la -l North Carolina Division of Water Quality Stream Identification Form. Version 3.1 date: C }? Project: Iv AR jo Latitude: Evaluator: MM C, / Site: rAC-U (?-1 Longituae: Total Points: 30 Stream is at least intermittent if > 19 or perennial i ? 30 Other CQu?n o: ?CF c.. i e.g Quad Name: A. Geomor holo (Subtotal= Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 2. Sinuosity 0 1 3 3. In-channel structure: riffle-pool sequence 0 1 3 4. Soil texture or stream substrate sortie 0 1 2 5. Active/relic flood lain 0 1 3 6. Depositional bars or benches 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 0 1 2 3 10. Headcuts 0 1 2 11. Grade controls 0 0.5 4 1.5 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existin USGS or NRCS map or other documented evidence. No 4 Yes = 3 aMan-made ditches are not rated; see discussions in manual R U-Jl "lnav lCnhtntal c 6 1 14. Groundwater flow/discharge 0 1 2; .5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season p 1 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1.5 19. Hydric soils (redoximorphic features) present? No Yes = 1.5 C Rinlnav (Cnhtntal = 6, 5 1 20b. Fibrous roots in channel 3 2 1 0 21b. Rooted plants in channel 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves Q 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos note diversity and abundance) i0? 0.5 1 1.5 27. Filamentous algae; peri hyton 1 2 3 28. Iron oxidizing bacteria/fungus. E J 0.5 1 1.5 29 b. Wetland plants in streambed .5 ACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 FAC b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: 0'4?fftd CI) I- ?UICA V. 01, SK 'Av,7, North Carolina Division of Water Quality Stream Identification Form. Version 3.1 Date: Project: M`idi) Latitude: Total Points:q Stream is at least intermittent i > 19 or perennial i >_ 30 F'l f" r,.O here County: e.g. Quad Name: A. Geomorphology (Subtotal= Absent Weak Moderate Strong la. Continuous bed and bank 0 1 3 2. Sinuosity 0 1 2 3 3. In-channel structure: riffle-pool sequence 0 1 3 4. Soil texture or stream substrate sortie 0 3 5. Active/relic flood lain 0 2 3 6. Depositional bars or benches L® 1 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9'. Natural levees 1 2 3 10. Headcuts 0 1 3 11. Grade controls 0 01-5, 1 1.5 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No =@ Yes = 3 'Man-made ditches are not rated; see discussions in manual 14. Groundwater flow/dischar e 0 1 3 5. Water in channel and > 48 hrs since rain, or Water in channel -- dry or growing season 0 2 3 16. Leaf litter 1.5 1 0.5 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) p 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No = Yes = 1.5 r n;..l.,... t.Q„htntn 1 = 12i. 6 1 206. Fibrous roots in channel 3 2 0 2lb. Rooted plants in channel 3 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos (note diversity and abundance 0.5 1 1.5 27. Filamentous algae; eriphyton 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b Wetland plants in streambed FAC .5 ACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: (Ovn?/ 6b-vt ef= /Aklfl tC4',,- 6 1 5) North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: (?? qq Project: M A(Z7 t t Latitude: r Y Evaluator: npM(_/(,tM Site: KA&W"?-? Longitude: Total Points: Stream is at least intermittent if >_ 19 or perennial if?! 30 (LcR Vtl-- 1 DPI FtL D MAP) County: Other e.g. Quad Name: A. Geomor bolo Subtotal = Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 3 2. Sinuosi 0 2 3 3. In-channel structure: riffle-pool sequence 1 2 3 40 Soil texture or stream substrate sorting 0 2 3 5. Active/relic flood lain 0 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel 0 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 2 3 11. Grade controls 0 1 1.5 12. Natural valley or drainageway 0 0.5 1 1.5 13. Second or greater order channel on existin USGS or NRCS ma or other documented evidence. No 4 Yes = 3 Wan-made ditches are not rated; see discussions in manual B. Hydrology (Subtotal :z= Z ) 4. undWafer flow/discharge 1 0 © 2 3 - 5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 0 ". 2 3 16. Leaf litter 1.5 1 0.5 0 17. Sediment on plants or debris 0 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0.5 1 1.5 19. Hydric soils (redoximorphic features) present? No 0 . Yes = 1.5 C. Biology (Subtotal= 3 ) 20b. Fibrous roots in channel 3 2 0 2lb. Rooted plants in channel 3 2 1 0 22. Crayfish 0.5 1 1.5 23. Bivalves 0 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos (note diversity and abundance) 0.5 1 1.5 27. Filamentous al ae; peri hyton 1 2 3 28. I.ron oxidizing'bacteria/fungus. 0 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other = b`ltems 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of a uatic or wetland plants. North Carolina Division of Water Quality Stream Identification Form. Version 3.1 -)ate: I J?Jlq Project:Mfl_ `jo Latitude: Evaluator: M Site: MC. U-( -,I- Longltuae: Total Points: Tq Stream is at least intermittent ? 19 or perennial i >_ 30 i ,6ixAFre - neL.,P mAf Other County: C, 4tto Y, ?? e.g. Quad Name: A. Geomorphology Subtotal= f7 Absent Weak Moderate Strong l a. Continuous bed and bank 0 1 . 2 3 2. Sinuosity (U&viviPI aI Greta- Id, ad aetV4 S?}rwv? 0 1 2' 3. In-channel structure: riffle-pool sequence 0 1 3 4. Soil texture or stream substrate sorting 0 1 3 5. Active/relic flood lain 0 1 2 CP 6. Depositional bars or benches 1' 2 3 7. Braided channel 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 0 1. 3 11. Grade controls 0 0.5 l I 12. Natural valley or drainageway 0 0.5 1.5 13. Second or greater order channel on existin USGS or NRCS map or other documented evidence. No Yes = 3 aMan-made ditches are not rate//d; [see discussions in manual R i7...lrnln?..r- (Cnh4n4n1 c L 7 .l - 14. Groundwater flow/discharge 0 1 3 .5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 0 1 _ 3 16. Leaf litter 1.5 0.5 0 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1.5 19. Hydric soils (redoximorphic features) present? No = 0 Yes =(1.5 ('_ Rinlnav Nithtntal = 4 1 20b. Fibrous roots in channel 3 2 1 0 2lb . Rooted plants in channel 3 1 0 22. Crayfish 0 0.5 .1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0.5 1 1.5 26. Macrobenthos note diversity and abundance) 0.5 1 1.5 27. Filamentous algae; peri h on 1, 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC=0.5 FACW=0.75 OBL=1.5 SAV= 2.0 Other = b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the resence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: 1 / ? I Dq Project: MFl j (H Latitude: Evaluator: NA Site: MSC-V(ILongitude: Total Points: 10 Stream is at least intermittent i >_ 19 or perennial i > 30 "419nFF?? F1Fj-DMAC Other County: e.g. Quad Name: 4orrr' A. Geomorphology (Subtotal= S•? Absent Weak Moderate Strong la. Continuous bed and bank 0 1 2 3 2. Sinuosity 0 1 © 3 3. In-channel structure: riffle-pool sequence 1 2 3 4. Soil texture or stream substrate sorting 1 2 3 5. Active/relic flood lain 0 (D 2 3 6. Depositional bars or benches 1 2 3 7. Braided channel (G 1 2 3 8. Recent alluvial deposits 1 2 3 9a. Natural levees 1 2 3 10. Headcuts 1 2 3 11. Grade controls 0 0. 1 1.5 12. Natural valley or drainageway 0 0.5 Q 1.5 13. Second or greater order channel on existing USGS or NRCS map or other documented evidence. No Yes = 3 aMan-made ditches are not rated; see discussions in manual R uvarnln?rv rCnh4n4o1. 7 1 14. Groundwater flow/discharge 0 2 3 .5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season 0 ?j 2 3 16. Leaf litter 1.5 1 0.5 0 17. Sediment on plants or debris 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1.5 19. Hydric soils (redoximorphic features) Present? No = 0 . Yes = 1.5 C'_ RinlnQV Nuhtntal = I.1 1 20b. Fibrous roots in channel 3 2 1 0 2lb. Rooted plants in channel 3 2 0 22. Crayfish 0.5 1 1.5 23. Bivalves 1 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 0.5 1 1.5 26. Macrobenthos (note diversity and abundance) 0 0.5 1 1.5 27. Filamentous algae; peri hyton 0 1 2 3 28. Iron oxidizing bacteria/fungus. 0 0.5 1 1.5 29 b. Wetland plants in streambed FAC40 FACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: F?o aSC. DAVi'14 (?IW° WA ( -u-T I-3 North Carolina Division of Water Quality Stream Identification Form. Version 3.1 ')ate: ?? I c Project: `` ll Latitude: .., Longitude: Evaluator: MM c-? Site: C uTl -7 Total Points: l7_6 Stream is at least intermittent i >_ 19 or perennial i >_ 30 CAF Gf?RI? oN FI ELI County: Ot er Ot Quad Name: A. Geomorphology Subtotal = 1 Absent Weak Moderate Strong Ia. Continuous bed and bank 0 1 2 2. Sinuosity 0 1 2 3. In-channel structure: riffle-pool sequence 0 1 3 4. Soil texture or stream substrate sorting 0 1 2 5. Active/relic flood lain 0 1 2 t> 6. Depositional bars or benches 0 1 2 7. Braided channel & 1 2 3 8. Recent alluvial deposits 0 1 ® 3 9a. Natural levees 1 2 3 10. Headcuts 0 1 0 3 11. Grade controls 0 0.5 1 12. Natural valley or drainageway 0 0.5 1 13. Second or greater order channel on existing USGS or NRCS ma or other documented evidence. No <<?0 Yes = 3 'Man-made ditches are not rated; see discussions in manual R Avrirnlnov Nvihfnfal - _11 % 1 14. Groundwater flow/discharge 0 1 2 5. Water in channel and > 48. hrs since rain, or Water in channel -- dry or growing season U 1 2 ' °.r 16. Leaf litter 1.5 1 C.p:S 0 17. Sediment on plants or debris 0 0.5 1 1.5 18. Organic debris lines or piles (wrack lines) 0 0.5 1.5 19. Hydric soils (redoximorphic features) present? No - Yes= 1.5 C. Biolopv (Subtotal= 1? 1 20b. Fibrous roots in channel 3 2 1 0 2lb. Rooted plants in channel 2 1 0 22. Crayfish 0 0.5 1 23. Bivalves 0 2 3 24. Fish 0.5 1 1.5 25. Amphibians 0 0.5 Q 1.5 26. Macrobenthos note diversity and abundance) 0 0.5 1.5 27. Filamentous algae; peri h on 0 1 2 3 28. Iron oxidizing bacteria/fungus. 0.5 1 1.5 29 b. Wetland plants in streambed FAC= 5 FACW=0.75 OBL=1.5 SAV= 2.0 Other = 0 b Items 20 and 21 focus on the presence of upland plants. Item 29 focuses on the presence of aquatic or wetland plants. Notes: (use back of form for additional notes) Sketch: ?? ?? North Carolina Division of Water Quality Stream Identification Form. Version 3.1 date: 7 / 77 1 0 ? Project: ,M A(?,1 ) ) Latitude: Lon itude: Site: g Evaluator: ; AA Total Points:' j Other County:C??V4?G,??- e.g. Quad Name: Stream is at least inlerrnrllenl . if ? 19 or perennial i ? 30 A. Geomor holo (Subtotal= Absen Abs 0 1 2 ]a. Continuous bed and bank 0 1 2 2. Sinuosi 0 1 4_mi 3. In-channel, structure: riffle- Ise ence 0 1 2 4. Soil texture or stream substrate sornn 0 1 2 5. Active/relic flood lain 0 2 6. Depositional bars or benches 1 2 7. Braided channel 0 1 2 8. Recent alluvial deposits 0 1 2 98. Natural levees 0 1 10. Headcuts --- - 0 1 11. Grade controls 0 0 5 1 12. Natural valley or drain ewa _ 13. Second or greater order channel on eNL _ USES or MRCS No 0 Yes= 3 ma or other documented evidence. aMan-made ditches are not rated; see discussions in manual B. H drolo Subtotal = 0 1 2 14. Groundwater flow/disch e 2 5. Water in channel and > 4& hrs since rain, or 0 1 Water in channel -- or owizt season 1.5 _ 0.5 16. Leaf litter 0.$ 0 1 17. Sediment on lasts or debris 0 a.5 1 18. Or ame debris lines or files (wrack lines No = 0 Yes = 19. H dric soils redoximorphic features resent? - C. Biology (Subtotal = 3 1 Fibrous roots in channel - 3 ® 1 ooted ]ants in channel 0 05 - 1 rfish r22. a 2 i valves 0.5 ish 0 0.5 25. Am hibians 0 0,5 1 26. Macrobenthos note diversity and abundance - 1 2 h on 27. Filamentous algae; eri 4? 0 5 1 28. Iron oxidizing bacteria/fim s. FAC FACW=0.75 OBL-].5 SAV= 2.0 29 . Wetland ]ants in streambed L! Items 20 and 21 focus on t?resence of upland plants - -- Item 29 focuses on the presence of a quatic or wetland 1 Notes: (use back of form for additional notes) Sketch: Weak Moderate Strong t 6) 0 1.5 0 1.5 3 1.5 1.5 1.5 3 1.5 Irv6CA APPENDIX B. Regulatory Agency Correspondence Categorical Exclusion Form for Ecosystem Enhancement Program Projects K=Mi-e-neral Project Information Project Name: Martin Creek Stream and Wetland Restoration Project Count Name: Cherokee Count EEP Number: S-D0901 0S Project Sponsor: Michael Baker Engineering, Inc. "Baker" Project Contact Name: Mick Clemmons Project Contact Address: 797 Ha )Mood Rd., Suite 201 Asheville, NC 28806 Project Contact E-mail: mclemmons@mbakercorp.com EEP Project Manager: Paul Wiesner ® - Michael Baker Engineering, Inc., proposes to conduct stream restoration, enhancement and preservation activities on Martin Creek and its tributaries, 2.5 miles south of Murphy in Cherokee County. Martin Creek is a Class C water within cataloging unit 06020002 and DENR sub-basin 04-05-02 of the Hiwassee River Basin. Project goals include the restoration or enhancement of approximately 5,540 linear feet of stream. An additional 7,725 linear feet of high quality streams that converge with Martin Creek will also be preserved during the course of this project. The Martin Creek project site is also the location of several small wetlands that have been previously disturbed. This project will also include the restoration and enhancement of between 1.5 to 4 acres of wetlands. This work will be done for the purpose of obtaining stream miti ation credit in the Hiwassee River Basin. For Official Use Only Reviewed By: Date EEP Project Manager Conditional Approved By: Date For Division Administrator FHWA ? Check this box if there are outstanding issues Final Approval By: -.-,,I 0?? Date r Division Administrator FHWA Part 2: All Projects Regulation/Question Response Coastal Zone Management Act CZMA 1. Is the project located in a CAMA county? ? Yes ® No 2. Does the project involve ground-disturbing activities within a CAMA Area of ? Yes Environmental Concern (AEC)? ? No ® N/A 3. Has a CAMA permit been secured? ? Yes ? No ® N/A 4. Has NCDCM agreed that the project is consistent with the NC Coastal Management ? Yes Program? ? No ® N/A Comprehensive Environmental Response, Compensation and Liabilit Act C ERCLA 1. Is this a "full-delivery" project? ? Yes ® No 2. Has the zoning/land use of the subject property and adjacent properties ever been ? Yes designated as commercial or industrial? ® No ? N/A 3. As a result of a limited Phase I Site Assessment, are there known or potential ? Yes hazardous waste sites within or adjacent to the project area? ® No ? N/A 4. As a result of a Phase I Site Assessment, are there known or potential hazardous ? Yes waste sites within or adjacent to the project area? ? No ® N/A 5. As a result of a Phase 11 Site Assessment, are there known or potential hazardous ? Yes waste sites within the project area? ? No ® N/A 6. Is there an approved hazardous mitigation plan? ? Yes ? No ® N/A National Historic Preservation Act Section 106 1. Are there properties listed on, or eligible for listing on, the National Register of ? Yes Historic Places in the project area? ® No 2. Does the project affect such properties and does the SHPO/THPO concur? ? Yes ? No ® N/A 3. If the effects are adverse, have they been resolved? ? Yes ? No ® N/A Uniform Relocation Assistance and Real Property Acquisition Policies Act Uni form Act 1. Is this a "full-delivery" project? ? Yes ® No 2. Does the project require the acquisition of real estate? ? Yes ? No ® N/A 3. Was the property acquisition completed prior to the intent to use federal funds? ? Yes ? No ® N/A 4. Has the owner of the property been informed: ? Yes * prior to making an offer that the agency does not have condemnation authority; and ? No * what the fair market value is believed to be? ® N/A Part 3: Ground-Disturbing Activities Regulation/Question Response American Indian Religious Freedom Act AIRFA 1. Is the project located in a county claimed as "territory" by the Eastern Band of ® Yes C herokee Indians? ? No 2. Is the site of religious importance to American Indians? ? Yes ® No ? N/A 3. Is the project listed on, or eligible for listing on, the National Register of Historic ? Yes Pl aces? ® No ? N/A 4. Have the effects of the project on this site been considered? ® Yes ? No ? N/A Antiquities Act AA 1. Is the project located on Federal lands? ? Yes ® No 2. Will there be loss or destruction of historic or prehistoric ruins, monuments or objects ? Yes of antiquity? ? No ® N/A 3. Will a permit from the appropriate Federal agency be required? ? Yes ? No ® N/A 4. Has a permit been obtained? ? Yes ? No ® N/A Archaeological Resources Protection Act ARPA 1. Is the project located on federal or Indian lands (reservation)? ? Yes ® No 2. Will there be a loss or destruction of archaeological resources? ? Yes ? No ® N/A 3. Will a permit from the appropriate Federal agency be required? ? Yes ? No ® N/A 4. Has a permit been obtained? ? Yes ? No ® N/A Endangered Species Act (ESL 1. Are federal Threatened and Endangered species and/or Designated Critical Habitat ® Yes listed for the county? ? No 2. Is Designated Critical Habitat or suitable habitat present for listed species? ? Yes ® No ? N/A 3. Are T&E species present or is the project being conducted in Designated Critical ? Yes H abitat? ? No ® N/A 4. Is the project "likely to adversely affect" the species and/or "likely to adversely modify" ? Yes D esignated Critical Habitat? ? No ® N/A 5. Does the USFWS/NOAA-Fisheries concur in the effects determination? ? Yes ? No ® N/A 6. Has the USFWS/NOAA-Fisheries rendered a "jeopardy" determination? ? Yes ? No ® N/A Executive Order 13007 Indian Sacred Sites 1. Is the project located on Federal lands that are within a county claimed as "territory" ? Yes by the EBCI? ® No 2. Has the EBCI indicated that Indian sacred sites may be impacted by the proposed ? Yes project? ? No ® N/A 3. Have accommodations been made for access to and ceremonial use of Indian sacred ? Yes sites? ? No ® N/A Farmland Protection Policy Act FPPA 1. Will real estate be acquired? ® Yes ? No 2. Has NRCS determined that the project contains prime, unique, statewide or local ® Yes important farmland? ? No ? N/A 3. Has the completed Form AD-1006 been submitted to NRCS? ® Yes ? No ? N/A Fish and Wildlife Coordination Act FWCA 1. Will the project impound, divert, channel deepen, or otherwise control/modify any ® Yes w ater body? ? No 2. Have the USFWS and the NCWRC been consulted? ® Yes ? No ? N/A Land and Water Conservation Fund Act Section 6 1. Will the project require the conversion of such property to a use other than public, ? Yes outdoor recreation? ® No 2. Has the NPS approved of the conversion? ? Yes ? No ® N/A Magnuson-Stevens Fishery Conservation and Management Act Essential Fish Habitat 1. Is the project located in an estuarine system? ? Yes ® No 2. Is suitable habitat present for EFH-protected species? ? Yes ? No ® N/A 3. Is sufficient design information available to make a determination of the effect of the ? Yes project on EFH? ? No ® N/A 4. Will the project adversely affect EFH? ? Yes ? No ® N/A 5. Has consultation with NOAA-Fisheries occurred? ? Yes ? No ® N/A Migratory Bird Treat Act MBTA 1. Does the USFWS have any recommendations with the project relative to the MBTA? ? Yes ® No 2. Have the USFWS recommendations been incorporated? ? Yes ? No ® N/A Wilderness Act 1. Is the project in a Wilderness area? ? Yes ® No 2. Has a special use permit and/or easement been obtained from the maintaining ? Yes fe deral agency? ? No ® N/A Categorical Exclusion - Summary Project Background The Martin Creek Stream and Wetland Restoration Project involves the restoration or enhancement of approximately 5,540 linear feet in Cherokee County. In addition to restoration and enhancement activities, approximately 7,725 linear feet of stream will be preserved. The Martin Creek project site also hosts several small wetlands previously disturbed by agricultural land use. In addition to stream restoration and enhancement activities proposed, between 1.5 to 4 acres of wetlands will be restored, enhanced or preserved under this project. This work is being done for the purpose of obtaining stream mitigation credit for the NC Ecosystem Enhancement Program (NCEEP). Land cover on the property is predominantly forested with the exception of pasture land and residential development in the lower elevations of the project area. Three unnamed tributaries (UTs) are located in pastureland while the remaining unnamed tributaries in the project area are located in the forested upland portion of the project area near the source of Martin Creek and the Right Prong of Martin Creek. This project will involve riparian corridor preservation and enhancement in the upper extent of the project area with measurable improvements to channel pattern and profile on the tributaries located in and adjacent to pastureland. Due to the extent of exposed bedrock present and other site constraints such as a secondary road and overhead powerline, enhancement work performed on the mainstem of Martin Creek will consist of improvements to channel dimension and riparian enhancement through the removal of exotic, invasives and re-establishment of a buffer consisting of woody material and other vegetation native to the ecoregion. The National Environmental Policy Act of 1969 (NEPA) requires agencies to use an interdisciplinary approach in planning and decision-making for actions that will have an impact on the environment. The Federal Highway Administration (FHWA) and NC Department of Transportation (NCDOT) have determined that NCEEP projects will not involve significant impacts and therefore a Categorical Exclusion (CE) is the appropriate type of environmental document for this project. FHWA has also determined that stream restoration projects are considered land disturbing activities, so Parts 2 and 3 of the NCEEP checklist and the following environmental laws are applicable to this project (supporting information is located in the Appendix): Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) Environmental Data Resources, Inc. (EDR) prepared a Radius Map Report with GeoCheck on October 17, 2008. Based on the EDR report, there are no known or potential hazardous waste sites within or adjacent to the project area. The Executive Summary of the EDR report is included in the Appendix. National Historic Preservation Act (Section 106) Baker requested review and comment from the North Carolina State Historic Preservation Office (SHPO) on any possible issues that might emerge with respect to architectural or archaeological resources from the restoration project on November 20, 2008. Baker also requested review and comment from the Tribal Historic Preservation Office of the Eastern Band of Cherokee Indians on November 20, 2008. The SHPO responded on January 8, 2009, and requested that a Phase I Archaeological Survey be completed based on the high probability that prehistoric or historic archaeological sites may be present due to the topography and hydrological features of the area. The NCEEP contracted with Robert J. Goldstein & Associates, Inc. to perform a Phase I archaeological survey which was completed in May, 2009. The archaeological consulting group did locate one site within the project area; however it was determined that the site is not eligible for listing in the National Register of Historic Places. Other findings in the archaeological report included a recommendation that no further archaeological investigations be conducted for the purposes of this project. On June 10, 2009, the SHPO submitted correspondence to Baker agreeing with the findings. As of June 30, 2009, the Tribal Historic Preservation Office has not commented with concerns All correspondence on this issue is included in the Appendix. Uniform Relocation Assistance and Real Property Act Since this project is not a "full delivery" project compliance with the Uniform Act is not required at this stage by NCEEP. Compliance with the Uniform Act will be the responsibility of the State Property Office during the easement acquisition process. American Indian Religious Freedom Act (AIRFA) Baker requested review and comment from the Eastern Band of Cherokee Indians' Tribal Historic Preservation Office (THPO) on any possible issues that might emerge with respect to any architectural or archaeological resources from the restoration project on November 20, 2008. At this time, the THPO has not commented on the project. Baker will continue working with the THPO to ensure they do not have any concerns regarding the project. All correspondence on this issue is included in the Appendix. Endangered Species Act (ESA) Baker reviewed both the NC Natural Heritage Program (NCNHP) and the US Fish and Wildlife Service (USFWS) lists of rare and protected animal and plant species and found that seven federally listed species are known to occur in Cherokee County: Bald Eagle (Haliaeetus leucocephalus ), Bog Turtle (Clemmys muhlenbergii), Indiana Bat (Myotis soda/is), Cumberland Bean (Villosa trabalis), Little-wing Pearlymussel (Pegias fibula), Tan Riffleshell (Epioblasma florentina walkeri (=E. walkeri)), and the Small Whorled Pogonia (Isotria medeoloides). It was determined that suitable habitat was not present for any of the seven species listed for Cherokee County. Although some habitat features for the bog turtle were present in the wetlands at the Martin Creek site, overall habitat conditions were not favorable and no bog turtles were observed with the project area during preliminary site surveys in the spring and fall of 2008. Initially, the USFWS indicated a concern over the potential impacts to any Indiana bat populations that may be present in or around the project site. To alleviate concerns, Baker and the USFWS have reached an agreement on certain avoidance and mitigation measures summarized below to ensure the project will not adversely impact this federally listed species. Therefore, a "no effect" determination was made for all seven species listed. Access to restoration and enhancement reach sites will be achieved by utilizing previously established access routes on-site. Preservation of existing trees and vegetation enhancement within the stream riparian corridor will serve to protect and promote habitat for these species. More detail on each species and their habitat is listed in the following paragraphs. Bald Eagle, (Federally Protected): Bald eagles have been sighted in Cherokee County where large open waters such as the Hiwassee Lake are present. According to the NC Natural Heritage Program website, bald eagle habitat in the southeast typically consists of "dominant live pines or cypress trees that provide a clear flight path and are located within 0.5 miles of open water. Winter roosting usually occurs farther inland, within dominant tree types that are also used for nesting in warmer seasons. Based on information posted on the NC Natural Heritage Program website, there are no occurrences of the bald eagle that have been recorded within 2 miles of the project area. With the exception of Martin Creek, the project area consists of headwater streams with small drainage areas. The streams within the project area are not identified as trout supporting streams and are unlikely to hold prey-sized fish to support bald eagle populations. Biological Conclusion: No Effect Improvements made through this project will not adversely impact any bald eagle populations or habitat. Canopy improvements made to the riparian zone within the restoration and enhancement reaches of the project area could actually support bald eagles in the long term should any of the planted trees become dominant canopy trees. Stream preservation, restoration and enhancement activities will ultimately result in improved channel stability and water quality downstream through a reduction in sediment loading. Therefore, a determination was made that the proposed project will have no effect on this species. Bog Turtle, (Threatened): The NCNHP lists the preferred habitat for bog turtles as "shallow, spring-fed fens, sphagnaceous bogs, marshy meadows and pasture, with thick, grassy cover and crossed by slow, muddy bottomed streams, and swamps with aquatic and semiaquatic plants." The lower section of the Martin Creek project site is predominantly pastureland with pocket wetlands. These wetlands were found to have shallow, standing water during field surveys conducted in the spring and fall of 2008. These pocket wetlands contain both exotic, invasive plant vegetation, but also possess some hydrophytic vegetation such as sedges. Cattle had open access to these wetlands until the end of 2008. No evidence of bog turtle habitation or observations of bog turtles were made during the aforementioned field surveys during which site assessments were conducted. A search of the NCNHP database did not reveal any recorded observations of the bog turtle within two miles of the project area. Biological Conclusion: No Effect Correspondence was submitted to the USFWS December 2, 2008 that indicated the potential habitat present within the project area. Correspondence received from the USFWS March 10, 2009 and June 23, 2009 did not indicate concern over impacts the project might have on the bog turtle. Based on the lack of bog turtle observations made during on-site visits as well as a lack of recorded species observation in the NCNHP database, it was determined that this project will not impact the bog turtle or any known populations that may occur within Cherokee County. Furthermore, between 1.5 and 4 acres of wetlands will be restored through this project. While restoration activities will not result in the current wetland being converted to a bog, wetland functions will be restored to the site, which may enhance some habitat conditions favored by the bog turtle as well as other wildlife and plant communities. Indiana Bat, (Endangered): The NCNHP lists the preferred summer habitat as "females and young (maternity colonies) roost under loose bark and in tree hollows of shagbark hickory (Carya ovata) and oak near small-to medium-sized streams." Riparian corridors within the Martin Creek project may provide suitable summer foraging habitat for the Indiana bat; however there are no loose-barked trees within the project area or other habitat suitable for maternity colonies of the bat. There are also no mines or caves within the project area for winter hibernation. Clearing within the enhancement reaches of the project area will be limited to the removal of exotic, invasive vegetation such as multiflora rose and privet. Incidental removal of smaller, understory trees while removing exotic vegetation will be minimized to the extent possible. Biological Conclusion: No Effect As noted previously, the USFWS indicated concern over the potential impact the project might have on habitat or populations of the Indiana bat. In response, Baker submitted a letter to the USFWS outlining measures designed to minimize and avoid project impacts on the Indiana bat. These measures include performing tree and vegetation removal outside of the Indiana bat's maternity/roosting period, walking the site with the construction manager and marking any trees within the project area that may be favored by the bat. Trees that may be favored by the bat will be avoided to the extent possible. Baker has also proposed to incorporate trees favored by the Indiana bat into a planting plan for the site. Based on measures proposed, the USFWS submitted their concurrence for the project June 23, 2009. Therefore a "no effect" determination was made. Cumberland Bean (Mussel), (Endangered): The Cumberland bean is a medium-sized freshwater mussel or bivalve mollusk with an olive-colored shell displaying faint wavy green lines. This mussel can be found in sand, gravel, and cobble substrates in moderate to fast- moving waters at depths less than a meter. As is typical with many mussels, the Cumberland bean favors clean shoal areas and silt-free riffles consisting of relatively firm rubble, gravel, and sand. Its current range exists in the Hiwassee River in Polk County, Tennessee and North Carolina. Many intermittent and perennial streams within the project area that were found to contain water during field surveys also contained moderate amounts of silt and had slow to moderate currents. Some of these tributaries were also found to go subsurface for short distances as well. Historical agricultural land use practices of the project area and passage to perennial unnamed tributaries that have been affected by culvert installation and headcutting make it unlikely that any populations which may have existed prior to the conversion of the surrounding landscape would have survived. Biological Conclusion: No Effect Martin Creek is a targeted watershed within the Hiwassee River Basin and is known for its excessive sediment and nutrient loading problems, making it unlikely that the Cumberland bean is located on Martin Creek which is the largest waterbody within the project site. There are no recorded observations of the Cumberland bean within two miles of the project site and none were observed during site surveys. Stormwater and erosion control best management practices will be applied during construction activities associated with stream and wetland restoration and enhancement, minimizing impacts to any potential habitat or populations of the Cumberland bean on Martin Creek downstream of the project area. Furthermore, the project will not affect the ability of the mussel to migrate upstream or downstream of the project area on Martin Creek. Due to a lack of suitable mussel habitat, and the application of adequate erosion control measures during project construction, this project will not impact habitat for the Cumberland bean. Little-Wing Pearlymussel, (Endangered): The little-wing pearlymussel is a freshwater bivalve mollusk that reaches an average length of 24-millimeters at maturity. Immature little- wing pearlymussels possess dark rays at the base of their shell. By the time the mussel reaches adulthood, its outer shell is usually eroded away. This species is found in small, cool streams at the head of riffles, although it has been found to inhabit other areas in and below riffles in substrate consisting of sand or gravel and scattered cobbles. It has also been observed in silt-free environments underneath large rocks and is known to occupy sand pockets between rocks, cobbles and boulders. This mussel is most often found submerged on top or partially buried within substrate as previously described in approximately 6 to 10 inches of water. The mussel has been cited as occurring in the Hiwassee and Little Tennessee River basins in North Carolina. Specifically, it was formerly observed in the Valley River in Cherokee County and the Little Tennessee River in North Carolina. Based on state species account information provided by the NHP and the NC Wildlife Resource Commission's state atlas of freshwater mussels, it appears this species now only inhabits a section of the Little Tennessee River basin between Swain and Macon counties. Biological Conclusion: No Effect Based on the lack of observations made during on-site visits and information provided by the NCNHP and NC Wildlife Resources Commission, the little-wing pearlymussel does not inhabit the project site or waters within at least two miles of the project. Therefore, this project will not impact habitat or known populations of the little-wing pearlymussel in western North Carolina. Tan Riffleshell, (Endangered): Like the Cumberland bean, the tan riffleshell is a medium- sized freshwater mussel that has multiple green rays and a brown to yellow colored shell. Its habitat requirement are also similar to the cumberland bean as it is found in headwaters, riffles, and shoals made up of sand and gravel substrates. While it is possible that populations of this mussel may still exist in the Hiwassee River, recorded populations of this species are located outside of the state, primarily within the Clinch River drainage in Tennessee. Based on population declines, it appears this mussel is particularly sensitive to poor water quality and habitat disturbance including the loss of glochidial hosts. Biological Conclusion: No Effect The Martin Creek project will not affect any tan riffleshell populations which may exist in the Hiwassee for the same factors listed in the biological conclusion for the Cumberland bean. According to the NCNHP database, there have been no recorded observations of the tan riffleshell within two miles of the project area which covers a segment of the Hiwassee River in the vicinity of the site. A review of the US Fish and Wildlife Service, Asheville Ecological Field Office website (last updated May 15, 2008) on threatened and endangered species associated with the North Carolina lists the tan riffleshell as being extirpated from the state. Small-Whorled Pogonia (Threatened): The small-whorled pogonia is a small, perennial member of the Orchidaceae. These plants arise from long slender roots, with hollow stems terminating in a whorl of five or six light green leaves. The single flower is approximately one inch long, with yellowish-green to white petals and three longer green sepals. This orchid blooms in late spring, from mid-May to mid-June. Populations of this plant are reported to have extended periods of dormancy and to bloom sporadically. This small spring ephemeral orchid is not observable outside of the spring growing season. When not in flower, young plants of Indian cucumber-root (Medeola virginiana) also resemble small- whorled pogonia; however, the hollow stout stem of Isotria separates it from the genus Medeola, which has a solid, more slender stem (U.S. Fish and Wildlife Service County Listing, 2008). Small-whorled pogonias may occur in young as well as maturing forests, but typically grows in open, dry, deciduous woods and areas along streams with acidic soil. It also grows in rich, mesic woods in association with white pine and rhododendron. Biological Conclusion: No Effect Suitable habitat as described above does not exist for the small-whorled pogonia in the restoration and enhancement reaches of the Martin Creek project area. No plants were located during field assessments performed; a review of the NCNHP database did not reveal any recorded observations within two miles of the project limits. Therefore this project will not have an impact on any small-whorled pogonia populations occurring in Cherokee County. The North Carolina Wildlife Resource Commission (NCWRC) was notified of the project via letter on November 24, 2008. A letter was submitted to the USFWS December 3, 2008. Baker received comments from NCWRC on December 9, 2008, which indicated that Martin Creek supports sensitive aquatic life like the sicklefin redhorse, mountain creekshell, and hiwassee crayfish. According to the NCWRC, these and several other sensitive species are found in the Hiwassee River further downstream. In addition to recommending minimization of site disturbance and implementation of effective erosion control measures, the NCWRC also anticipates requesting that stream construction be avoided from April 1St to June 15th during the spawning season for any sicklefin redhorse populations that may exist in Martin Creek. After discussions were held regarding impact avoidance measures to protect any Indiana bat colonies present on or near the project site, the USFWS submitted their concurrence for this project June 23, 2009. Correspondence on this issue is included in the Appendix. Farmland Protection Policy Act (FPPA) On December 15, 2008, Baker submitted the AD-1006 form for the Martin Creek project site to the Regional Natural Resources Conservation Service (NRCS) office in Waynesville, NC. The NRCS responded on January 7, 2009, with the determination that implementation of this restoration project would result in the conversion of 9.1 acres of prime farmland or farmland of state or local importance. The completed AD-1006 form and other correspondence on this issue is included in the Appendix. Fish and Wildlife Coordination Act (FWCA) A letter was sent by Baker to the NCWRC on November 24, 2008, requesting their comment and review on the Martin Creek restoration and enhancement project. The NCWRC responded on December 9, 2008, and expressed no concerns regarding anticipated impacts to federally listed species for the county. However, as stated above, the letter did indicate that less impacted segments of Martin Creek have been found to support sensitive aquatic life such as the sicklefin redhorse, mountain creekshell, and hiwassee crayfish. According to the NCWRC, these and several other sensitive species are found in the Hiwassee River further downstream. Correspondence pertaining to project permitting and design plans will be submitted to the NCWRC at a later time. Correspondence on this issue is included in the Appendix. Baker submitted a letter to the USFWS on December 3, 2008 requesting their comment and review of the Martin Creek restoration project site. On June 23, 2009, Baker received correspondence from the USFWS indicating their conditional concurrence with the project. All correspondence on this issue is included in the Appendix. Migratory Bird Treaty Act (MBTA) A letter was sent by Baker to the USFWS on December 3, 2008 requesting their comment and review on the Martin Creek Restoration and Enhancement Project in relation to migratory birds. On June 23, 2009, Baker received the USFWS' concurrence for the project. All correspondence on this issue is included in the Appendix. ,.. poo ?P!?OCi/=;ii FS EEP Floodplain Requirements Checklist This form was developed by the National Flood Insurance program, NC Floodplain Mapping program and Ecosystem Enhancement Program to be filled for all EEP projects. The forin is intended to summarize the Foodplain requirements during the design phase of the projects. The foi7n should be submitted to the Local Floodplain Administrator with three copies submitted to NFIP (attn. Edward Curtis), NC Floodplain Mapping Unit (attn. John Gerber) and NC Ecosystem Enhancement Program. Project Location Name of project: Martin Creek Stream and Wetland Restoration Name of stream or feature: Martin Creek and tributaries to Martin Creek County: Cherokee Name of river basin: Hiawassee Is project urban or rural? Rural Name of Jurisdictional municipality/county: Town of Murphy / Cherokee County DFIRM panel number for entire site: 4591 Consultant name: Michael Baker Engineering, Inc. ("Baker") Phone number: 828-350-1408 ext. 2007 (Jake McLean, PE, CFM) Address: 797 Haywood Road, Suite 201 Asheville, NC 28806 EEP_FEMA Floodplain_Checklist_Martin Page 1 of 7 Table ES.1 Mitigation Plan Overview Martin's Creek Mitigation Project--NCEEP Project #92633 Right Prong Martin's Creek (RP) Unnamed Tributaries RP-UT I Preservation 541 541 108 5:1 0.162 RP-UT1 Enhancement II 399 399 159 2.5:1 .169 RP-UT2 Preservation 2,472 2,472 494 5:1 0.076 RP-UT2-1 Preservation 1,366 1,366 273 5:1 0.037 -UT3 Preservation 1,379 1,379 276 5:1 0.097 RP-UT3-1 Preservation 1,060 1,060 212 5:1 0.027 RP-UT4 Preservation 1,832 1,832 366 5:1 0.073 -UT4-1 Preservation 698 698 140 5:1 0.019 RP-UT5 Preservation 818 818 164 5:1 0.016 RP-UT6 Preservation 1,069 1,069 214 5:1 0.036 -UT7 Preservation 791 791 158 5:1 0.013 Right Prong Martin's Creek (Reach 1) Preservation 5,208 5,208 1,042 5:1 0.413 Right Prong Martin's Creek (Reach 2) Enhancement 11 572 572 229 2.5:1 0.603 Martin's Creek (MC) Unnamed Tributaries MC-UTI (Reach 1) Preservation 2,482 2,482 496 5:1 0.065 MC-UTI (Reach 2) Restoration 1,070 1,070 1,070 1:1 0.092 MC-UTI (Reach 3) Enhancement I 345 345 230 1.5:1 0.161 MC-UT 1 (Reach 4) Restoration 332 1,149 1,149 1:1 0.176 MC-UT1-1 Preservation 689 689 138 5:1 0.018 C-UT1-2 Preservation 923 923 185 5:1 0.019 C-UT1-2-1 Preservation 202 202 40 5:1 0.005 MC-UT1-3 (Reach 1) Enhancement I 516 516 344 1.5:1 0.07 MC-UT 1-3 (Reach 2) Restoration 1,068 1,286 1,286 1:1 0.08 MC-UT2 Enhancement 11 75 75 30 2.5:1 0.385 Martin's Creek Enhancement 11 857 857 343 2.5:1 6.81 TOTAL STREAM FOOTAGE BY TYPE 26,764 27,799 9,146 Stream Design Approach Restoration 2,470 3,505 31505 1:1 Enhancement I 861 861 574 1.5:1 Stream Length/SMUs Enhancement 11 1,903 1,903 761 2.5:1 Preservation 215530 21,530 4,306 5:1 26,764 27,799 9,146 TOTAL WETLAND ACREAGE Wetland Design Approach (Acres) Restoration - 5.2 5.2 1:1 Total Wetland Acreage Enhancement 1.53 1.53 .77 2:1 EEP_FEMA Floodplain Checklist-Martin Page 3 of 7 Improve channel profile, sediment MC-UT1-3 (Reach 1) 516 LI E 516 1.5:1 344 0+00-5+16 transport function and bank stability where needed and adjust channel dimension Restore wetland hydrology and restore geomorphic form to MC-UT1-3 (Reach 2) 1 068 PI R 1 286 1:1 286 1 5+78-18+64 channel by relocating , , , channel within greater wetland complex and adjusting confluence of tributary with UT1 Improve riparian buffer Refer to Plan by removing MC-UT2 75 LII E 75 2.5:1 30 Sheet Pg. 16 invasive/exotic vegetation; replanting with native vegetation. Improve riparian buffer Refer to Plan by removing Martin's Creek 857 LII E 857 2.5:1 343 Sheet Pg. 16 invasive/exotic vegetation; replanting with native vegetation. Mitigation Unit Summations Riparian Wetland Nonriparian Total Buffer Stream (LF) (Ac) Wetland (Ac) Wetland (Ac) (Ac) Continent 9,146 6.73 NA 6.73 93.87 Floodplain Information Is project located in a Special Flood Hazard Area (SFHA)? r%" Yes` No If project is located in a SFHA, check how it was determined: W Redelineation [` Detailed Study Limited Detail Study r Approximate Study F Don't know List flood zone designation: Check if applies: AE Zone t ' Floodway r Non-Encroachment EEP_FEMA Floodplain_Checklist_Mwin Page 5 of 7 59 Hiwassee Street Murphy, NC 28906 (828) 837-6730 Cominents: Baker: A no rise certificate and supporting documentation has been prepared. The main efforts are'the restoration of two tributaries that share a floodplain with Martin Creek and grading to excavate buried wetland soil horizons as part of wetland restoration activities. There will be minor work on the mainstem to breach the existing levy in a couple of locations in order to restore hydrologic connectivity of the bankfull flow to the larger floodplain. In addition, the project entails work on tributaries higher in the watershed where no regulatory floodplain exists. Please refer to the No Impact Certification Report for more details. Per Silas Allen: Although these UT"s lie outside any SFHA, we respectfully request that a twenty-five to thirty foot undisturbed buffer be left intact when possible. This area has been and still is part of a previously protected and classed NCDWQ watershed for the Town of Murphy. Name: Ja&A eG?G?l Signature: Title: , C/--? c Date: ?/ .11? /0 EEP_FEMA Floodplain_Checklist_Martin Page 7 of 7 M V - c ? lU 1 i J}? W.. c,s` Z ? J -ji Lu v j V i Q .?11 X JJ y Q) r Y ?S n 7 .? yC-4- UJ Q1 4 ?. C ( V .1 ? Cnn\L c_ s s' } cc w w ?LL 0 M _ O O CD oT O 0 T O O ? 1A ? T In V W J ? U o N jo LO NC State Historic Preservation Office Attn: Ms. Renee Gledhill-Earley 4617 Mail Service Center Raleigh, NC 27699-4617 November 20, 2008 Subject: North Carolina Ecosystem Enhancement Program (NCEEP) Stream Mitigation Project on Martin Creek and Tributaries, Cherokee County, NC. Dear Ms. Gledhill-Earley, The North Carolina Ecosystem Enhancement Program (EEP) requests review and comment on any possible issues that might emerge with respect to archaeological or cultural resources associated with a potential stream restoration project area identified on the maps attached (a vicinity map, a USGS site map, and a restoration plan figure with areas of potential ground disturbance are enclosed). The Martin Creek site has been identified for the purpose of providing in-kind mitigation for unavoidable stream channel and wetland impacts. The project will involve restoration, enhancement or preservation of a section of Martin Creek, the Right Prong of Martin Creek and sections of four unnamed tributaries (UTs) that have been identified as being significantly degraded. Project goals include the restoration or enhancement of 5,540 linear feet of stream for the purpose of obtaining stream mitigation credit in the Hiwassee River Basin. Stream mitigation credits are also being extended to an additional 7,725 linear feet of stream being preserved. Preliminary visual assessments and data provided by the NCEEP indicate the presence of approximately 2.0 acres of mapped wetlands that will be protected under the proposed project. Buried hydric soils have also been located on-site in the vicinity of the existing wetlands and were likely filled to increase agricultural production. To determine the extent of wetland restoration work required, further analysis of the site is proposed. The location where wetland restoration may occur is provided in Restoration Plan Figure 1.3. No architectural structures or archaeological artifacts have been observed or noted during preliminary surveys of the site. The project area consists of moderate to steeply forested slopes and valleys with elevations ranging from 2,245' above sea level (ASL), in upland project reaches to approximately 1,600' ASL in the floodplain along Martin Creek. The majority of the project site on the floodplain and sections of the upland project area has historically been disturbed by agricultural land uses. As the enclosed aerial photograph shows, the majority of the area within the construction limits of the site consists of upland forest with the lower project area consisting of floodplain, pastureland and straightened stream channels. Mapped soils within the upland portion of the project area include the Thurmont-Dillard complex (8 to 15% slopes) and Junaluska-Tsali complexes (ranging from 15% to 50% slopes). Soils mapped within the pasture and floodplain portion of the project area consist of the Ark aqua loam and the Dillard loam series. Soils of the Thurmont-Dillard complex are dominant in areas adjacent to the streams in the forested area of the project. These soils are located on moderate slopes in the valley of the project, are well drained and lie above the seasonal high water table. In the lower section of the valley, project streams course through both Dillard loams and Ark aqua loams. Dillard loams are located in the project area in the transitional zone between the upland forested areas and the floodplain. This soil series is defined as being moderately well drained, rarely flooded and typically 24 to 36 inches above the water table. The Ark aqua loam soils are located in the lower valley of the Martin Creek watershed and are primarily within the floodplain for Martin Creek. As evidenced by the presence and location of wetlands on-site, the Ark aqua loams within the project area are somewhat poorly drained and are occasionally flooded. Whereas the depth to the water table in the upper extent of the project area ranges from 36 to 72 inches, the depth to the water table where Ark aqua loams are present is approximately 18 to 24 inches; however, water is at the ground surface in some wetland areas. Soils data presented in this letter were assembled from information provided by the Natural Resources Conservation Service office in Cherokee County and from the USDA-NRCS Soil Data Mart website (http://soildatafnart.nres.usda.gov/Default.aspx ). We ask that you review this site based on the attached information to determine the presence of any historic properties or other objects of cultural significance. Thank you in advance for your timely response and cooperation. Please feel free to contact us with any questions that you may have concerning the extent of site disturbance associated with this project. Sincerely, Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 Phone: 828.350.1408 xt. 2010, Email: cmcintyreAmbakercorp.com Cc: Mr. Paul Wiesner Mr. Tyler Howe NC Ecosystem Enhancement Program (EEP) EBCI Tribal Historic Preservation Office 2090 U. S. Highway 70 P.O. Box 455 Swannanoa, NC 28778 Cherokee, NC 28719 Eastern Band of Cherokee Indians Attn: Mr. Tyler Howe Tribal Historic Preservation Office P.O. Box 455 Cherokee, NC 28719 November 20, 2008 Subject: North Carolina Ecosystem Enhancement Program (NCEEP) Stream Mitigation Project on Martin Creek and Tributaries, Cherokee County, NC. Dear Mr. Howe, The North Carolina Ecosystem Enhancement Program (EEP) requests review and comment on any possible issues that might emerge with respect to archaeological or cultural resources associated with a potential stream restoration project area identified on the maps attached (a vicinity map, a USGS site map, and a restoration plan figure with areas of potential ground disturbance are enclosed). The Martin Creek site has been identified for the purpose of providing in-kind mitigation for unavoidable stream channel and wetland impacts. The project will involve restoration, enhancement or preservation of a section of Martin Creek, the Right Prong of Martin Creek and sections of four unnamed tributaries (UTs) that have been identified as being significantly degraded. Project goals include the restoration or enhancement of 5,540 linear feet of stream for the purpose of obtaining stream mitigation credit in the Hiwassee River Basin. Stream mitigation credits are also being extended to an additional 7,725 linear feet of stream being preserved. Preliminary visual assessments and data provided by the NCEEP indicate the presence of approximately 2.0 acres of mapped wetlands that will be protected under the proposed project. Buried hydric soils have also been located on-site in the vicinity of the existing wetlands and were likely filled to increase agricultural production. To determine the extent of wetland restoration work required, further analysis of the site is proposed. The location where wetland restoration may occur is provided in Restoration Plan Figure 1.3. No architectural structures or archaeological artifacts have been observed or noted during preliminary surveys of the site. The project area consists of moderate to steeply forested slopes and valleys with elevations ranging from 2,245' above sea level (ASL), in upland project reaches to approximately 1,600' ASL in the floodplain along Martin Creek. The majority of the project site on the floodplain and sections of the upland project area has historically been disturbed by agricultural land uses. As the enclosed aerial photograph shows, the majority of the area within the construction limits of the site consists of upland forest with the lower project area consisting of floodplain, pastureland and straightened stream channels. Mapped soils within the upland portion of the project area include the Thurmont-Dillard complex (8 to 15% slopes) and Junaluska-Tsali complexes (ranging from 15% to 50% slopes). Soils mapped within the pasture and floodplain portion of the project area consist of the Ark aqua loam and the Dillard loam series. Soils of the Thurmont-Dillard complex are dominant in areas adjacent to the streams in the forested area of the project. These soils are located on moderate slopes in the valley of the project, are well drained and lie above the seasonal high water table. In the lower section of the valley, project streams course through both Dillard loams and Ark aqua loams. Dillard loams are located in the project area in the transitional zone between the upland forested areas and the floodplain. This soil series is defined as being moderately well drained, rarely flooded and typically 24 to 36 inches above the water table. The Ark aqua loam soils are located in the lower valley of the Martin Creek watershed and are primarily within the floodplain for Martin Creek. As evidenced by the presence and location of wetlands on-site, the Ark aqua loams within the project area are somewhat poorly drained and are occasionally flooded. Whereas the depth to the water table in the upper extent of the project area ranges from 36 to 72 inches, the depth to the water table where Ark aqua loams are present is approximately 18 to 24 inches; however, water is at the ground surface in some wetland areas. Soils data presented in this letter were assembled from information provided by the Natural Resources Conservation Service office in Cherokee County and from the USDA-NRCS Soil Data Mart website (http://soildatafnart.nres.usda.gov/Default.aspx ). We ask that you review this site based on the attached information to determine the presence of any historic properties or other objects of cultural significance. Thank you in advance for your timely response and cooperation. Please feel free to contact us with any questions that you may have concerning the extent of site disturbance associated with this project. Sincerely, Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 Phone: 828.350.1408, Email: cmcintAmbakercorp.com Cc: Mr. Paul Wiesner Ms. Renee Gledhill-Earley NC Ecosystem Enhancement Program (EEP) State Historic Preservation Office 2090 U. S. Highway 70 4617 Mail Service Center Swannanoa, NC 28778 Raleigh, NC 27699-4617 01/09/2009 15:29 NC STATE HISTORIC PRESERVATION 4 918283501409 NO.857 P02 North Carolina Department of Cultural Resources State Ilistoric Preservation. Office Poor 13. sandbeclt, AdministrOtnr %Gchad F. Risley, Governor f. %b"11 C. Brans, $,CCrernLy Jeffrey J. Crow, Deputy Secretary January 8, 2009 Caa.-enen Horne-Mchityre Michael. Baker Enowering, In.c. 797 Haywood Road, Suite 201 Asheville, NC 28806 Office of.trchie(•li and I liamy Division )f f fistorical RcaflUrco 011•id Brook,1)ircetnr Re: Martin. Creel{ artd ,rribut:a.ries Streao-i Miti.¢ a ion, Cherokee Cou.aty, TiM 08-2843 Dear Ms, Flor:ne-McIntyre: Thank you for your letter comerni.ng the. above project, We apologize for the delay in our response. "I11ete are no lcn.own .tecordcd ,r.tc..hac:ologiod Sates within the projecC boLmdaries. However, the project atea has never heed systernatically sti-tveyed to del.erliulle the location o.1: si.gcuficance of archaeological resources. Based on the topognaphic and liyda:ologi.cal sitlmdon, there is a high pi,obability for tlae presence of prehistoric or hisrodc archaeological sites. We reconunen.d. that a cor.,nprelicttsive survey be conducted by ,in, ei pe.,:ietlced archaeologist to identify and eva..l.uate tlae significance of ar;cla.aeolo ,ticnl r cl,aains tb,.it may be darrmaged or destroyed by the proposed project. The archaeological sur.-trcy should be undertaken only at daost po.ttions of the project area where ground disimrbance i5 proposed. Potential affects on u.n.lcaown..tesources tr1.ust be assessed prio.t to the 4).Wapon of Construction acrivides. Two copies of the resu.ll?ra.g a.l:eh.aeo.lag.ic (1 survey report, as well as one copy of the appropriate site forms, should be fonvardmi to us Cal: review an.d. COIT.L sera as Sooaa as they a,:ee a?railable and well 6 :tdvante oL any constracdon acdvines. A list of archaeological consultants who laave conducted, o1: expressed all interest in contract work ui North Carolina is av.ai able at ±> cY.;1SCh.clcr sttte.nc,usjcnnsults.bti-7. The archaeologists listed, or any ocher experienced, ar:chacologist:, may be contacted. to conduct the .reconi,inended su.tircy. The above comment nave inad.e laua:suant to Section 106 of the National Historic preselvatio.n Act and the Advisory Council. on Flistoric Praservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. 1.oradurr, 109 East jngcR itrcel, li+lcil;h Vf: 2?Ci(a'I taAnilin .A+J+lrc?++: 1617 Elul Kur+ is Cuptur, at:+lcigh W ?.7699-4['17 lblcP.bana/l :+x (919 X117-6570/0!)7-6599 01/09/2009 15:29 NC STATE HISTORIC PRESERVATION -> 918283501409 NO.857 P03 Thank you for your coopcrado a arld conaid.ea:ati.o:n.. if you 11"we quo-,,Cl,ons collcellll119 the aboY'Q comrneni, please contnce Renee Gledhill-Earley, eaavii;oaa.memal tevimv cooxdin.o.tor, at 919/807-6579. In all faure communication conecrning this pa:ajecf, please cite the above cferenced t ackiilg number. Sincerely, ileeer Sandbeck aLw North Carolina Department of Cultural Resources - State Historic Preservation Office - Peter B. Sandbeck, Administrator Beverly Eaves Perdue, Governor Office of Archives and History Linda A. Carlisle, Secretary Division of Historical Resources Jeffrey J. Crow, Deputy Secretary David Brook, Director June 11, 2009 ._ Dawn-Reid Archaeological Consultants of the Carolinas, Inc. 121 East First Street Clayton, NC 27520 Re: Martin Creek and Tributaries Stream Mitigation, Cherokee County, ER 08-2843 Dear Ms. Reid: Thank you for your letter of May 15, 2009, transmitting the archaeological survey report by Michael O'Neal for the above project. During the course of the survey, one site was located within the project area. For purposes of compliance with Section 106 of the National Historic Preservation Act, we concur that the following property is not eligible for listing in the National Register of Historic Places under criterion D: 31CE767 This site does not retain sufficient subsurface integrity or artifact density to yield information important to history or prehistory. Mr. O'Neal has recommended that no further archaeological investigation be conducted in connection with this project. We concur with this recommendation since the project will not involve significant archaeological resources. The above comments are made pursuant to Section 106 of the National Historic Preservation Act and the Advisory Council on Historic Preservation's Regulations for Compliance with Section 106 codified at 36 CFR Part 800. Thank you for your cooperation and consideration. If you have questions concerning the above comment, please contact Renee Gledhill-Earley, environmental review coordinator, at 919/807-6579. In all future communication concerning this project, please cite the above referenced tracking number. Sincerely, zp?_? 'A?a r Peter Sandbeck cc: Michael Baker Engineering, Inc. Location: 109 East Jones Street, Raleigh NC 27601 Mailing Address: 4617 Mail Service Center, Raleigh NC 27699-4617 Telephone/Fax: (919) 807-6570/807-6599 ker U. S. Fish and Wildlife Service Attn: Ms. Marella Buncick Asheville Field Office Asheville, NC 28801 Michael Baker Engineering, Inc. 797 Haywood Road Suite 201 Asheville, North Carolina 28806 828-350-1408 FAX 828-350-1409 December 2, 2008 Subject: North Carolina Ecosystem Enhancement Program (NCEEP) Stream Mitigation Project on Martins Creek and Tributaries, Cherokee County, NC. Dear Ms. Buncick, The North Carolina Ecosystem Enhancement Program (EEP) requests review and comment on the presence of federally listed species, their habitat, and any other issues that might emerge with respect to a potential stream restoration project area identified on the maps attached (a vicinity map, a USGS site map, and a restoration plan figure with areas of potential ground disturbance are enclosed). The Martins Creek site has been identified for the purpose of providing in-kind mitigation for unavoidable stream channel and wetland impacts. The project will involve restoration, enhancement or preservation of a section of Martins Creek, the Right Prong of Martins Creek and sections of four unnamed tributaries (UTs) that have been identified as being significantly degraded. In addition, approximately 5 acres of wetlands will be restored and preserved under this project. Project goals include the restoration or enhancement of 5,540 linear feet of stream for the purpose of obtaining stream mitigation credit in the Hiwassee River Basin. Stream mitigation credits are also being extended to an additional 7,725 linear feet of stream being preserved. We have already obtained an updated species list for Cherokee County from your web site (http://www.fws.gov/ne-es/es/countyfr.htnil). The threatened, endangered or otherwise federally protected species for this county are: Bald Eagle (Haliaeetus leucocephalus), Bog Turtle (Clemmys muhlenbergii), Indiana Bat (Myotis sodalis), Cumberland bean (pearlymussel) (Villosa trabalis),Tan riffleshell (Epioblasma florentina walkeri (=E. walkeri)),and the Small whorled pogonia (Isotria medeoloides). Although there are no critical habitat areas listed for Cherokee County, favorable conditions for the bog turtle may be present on site. The potential bog turtle habitat consists of nearly two acres of wetlands present within the project area that are located in frequently used pastureland. Further site analysis will be required to confirm the wetland status of the three remaining acres assumed to be a filled wetland area. We are requesting that you please provide any known information for each species in the county. The USFWS will be contacted immediately if the agency determines that suitable habitat for a federally listed species exists within the project area or if the agency has records indicating the presence of a federally listed species on-site. Please provide comments on any possible issues that might emerge with respect to endangered species, migratory birds or other trust resources from the construction of a stream and wetland restoration project on the subject property. If we have not heard from you in 30 days, we will assume that our species list is correct, that you do not have any comments regarding associated laws, and that you do not have any information relevant to this project at the current time. Please feel free to contact us with any questions that you may have concerning the extent of site disturbance associated with this project. I can be reached at 828.350.1408 ext. 2010 or by email at emcintyre@mbakercorp.com. We thank you in advance for your timely response and cooperation. Sincerely, ,n Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 Phone: 828.350.1408, Email: emcintyre@mbakercorp.com Cc: Mr. Paul Wiesner NC Ecosystem Enhancement Program (EEP) 2090 U.S. Highway 70 Swannanoa, NC 28778 Review of stream mitigation projects in Cherokee County From: Carmen McIntyre To: Marella_Buncick@fws.gov Date: 1/5/2009 11:52 AM subject: Review of stream mitigation projects in Cherokee County Hi Marella, Do you happen to know the status of the usFws review for two stream restoration projects Michael Baker Engineering, Inc. has in Cherokee County? These projects have been proposed for completion on behalf of the NC Ecosystem Enhancement Program for stream and wetland impacts in the Hiwassee River Basin. I submitted a request for comment to the usFWS about 30 days ago for the Martin Creek Project and the unnamed Tributary (UT) to Martin Creek Project (also known as the Contreras site). Please note that the letter originally submitted for the Contreras site refers to Contreras Creek. "Contreras Creek" is actually an unnamed tributary to Martin creek, whereas the project area as a whole is referred to as the Contreras site. Therefore the project consists of three unnamed tributaries including the aforementioned UT to Martin Creek. As we finalize the environmental review documents, I wanted ensure any concerns held by the usFws about the two projects had been met. If you know when we can expect to receive comment or if there are any project concerns, please contact me at your earliest convenience at 828.350.1408 x. 2010 or by email. Thanks in advance for your assistance! Best, Carmen Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., suite 201 Asheville, NC 28806 P: 828.350.1408 x. 2010 F: 828.350.1409 Page 1 Re mitigation sites, Cherokee Co From: Carmen McIntyre To: Marella_Buncick@fws.gov Date: 3/10/2009 2:05 PM subject: Re: mitigation sites, Cherokee Co Hi Marella, I apologize for not getting back to you sooner. we've visited the project site a few more times since you and I spoke, and we're still doubtful as to the presence of habitat within the construction corridor for the Contreras and Martin creek projects. However, if we did miss a snag or hollow tree (which would be the closest thing to habitat you'll find where we are), I think we should still be able to meet your concerns. I spoke with our Project Manager, Micky Clemmons, regarding the construction schedule and others ways in which we could avoid adversely impacting any potential habitat or populations of the Indiana bat. Construction and tree removal work is scheduled for November and will continue into the beginning of 2010. Here are a few other thoughts we had as well: If we did locate any trees within the project area that may be favored by the Indiana bat we can mark them and instruct construction crews to avoid them to the extent possible. we are also willing to incorporate tree types favored by the Indiana bat into the planting list developed for the project site. would following the recommended time frame for construction activities (mid Oct-mid April) and implementation of the other measures noted sufficiently address your concerns? If so, I'll submit a letter to the USFwS proposing these measures for your concurrence. If you still have any concerns, please feel free to contact me by phone (828.350.1408 ext.2010) or email. Thanks, Carmen Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 P: 828.350.1408 x. 2010 F: 828.350.1409 >>> < Marella_Buncick@fws.gov > 1/26/2009 3:10 PM >>> Carmen, Based on our conversation today regarding the Contreras and Martin creek proposed mitigation sites in Cherokee Co., NC, I believe that you need to further address potential impacts to Indiana bat. For the areas where trees will be removed, we want to be sure that all suitable Indiana bat maternity/roosting trees are considered in the impacts analysis of the project. we consider all snags and hollow cavity trees; any trees with more than 25 percent exfoliating bark; and all shellbark, shagbark, and bitternut hickory trees (regardless of size or condition) as suitable roosting/maternity habitat for the Indiana bat. Further, Indiana bats are known to roost in trees as small as 3 inches in diameter at breast height. we believe that the activities of this project could result in direct, indirect, and/or cumulative impacts; and could result in the "take" of Indiana bats that may be roosting in trees located within and along the edges of the construction area. To avoid impacts to Indiana bats, any tree removal and construction activities should occur between October 15 and April 15 (outside the maternity/roosting period). If this recommendation is followed, we do not believe the project will impact the Indiana bat. (Alternatively, mist-netting surveys could also be conducted Page 1 Re mitigation sites, Cherokee Co to determine the presence/absence of the species.) we would appreciate the opportunity to review any measures or guidelines that will be implemented to further avoid direct, indirect, and cumulative impacts to the Indiana bat and its habitat. until an assessment of the direct, indirect, and cumulative impacts of this project to Indiana bats has been completed, we cannot conclude that the requirements of section 7 of the Act have been fulfilled. if you have further questions, please call or e-mail. marella marella buncick USFWS 160 zillicoa St. Asheville, NC 28801 828-258-3939 ext 237 People don't resist change, they resist being changed. Page 2 ?aker U.S. Fish and Wildlife Service Asheville Field Office Attn. Ms. Marella Buncick 160 Zillicoa Street Asheville, NC 28801 Subject: NCEEP Stream mitigation projects in Cherokee County Dear Ms. Buncick, Michael Baker Engineering, Inc. 797 Haywood Road Suite 201 Asheville, North Carolina 28806 828-350-1408 FAX 828-350-1409 April 28, 2009 Thank you for your response to our request for comment regarding the following two stream mitigation projects currently proposed in Cherokee County by the NC Ecosystem Enhancement Project: 1) Martin Creek Stream & Wetland Restoration Project; and 2) Unnamed Tributary (UT) to Martin Creek (Contreras Site) and associated UTs. This letter is intended to satisfy agency concerns regarding the potential projects impacts to the Indiana bat (Myotis sodalis). An additional account of existing features as well as mitigation and avoidance measures is provided below for the project sites. Stream restoration and enhancement work proposed at both sites is primarily located in pasture land. Woody vegetation in pastures on-site primarily consists of poplar, holly, alders, locust and red maple. These buffer areas are also made up of multiflora rose and privet as well as various grasses, weeds and rushes such as juncus. Restoration and enhancement reaches with denser stands of woody vegetation were found to lack habitat favored by the Indiana bat. Enhancement reaches in the Martin Creek project area that border forested upland areas will require minimal tree clearing. Enhancement activities proposed in these areas will primarily involve relocating the existing channel away from the edge of the valley wall back to the low point of the valley most recently managed as pastureland. Other enhancement work will consist of the removal of exotic, invasive vegetation and establishment of vegetation native to this region. The remaining restoration and enhancement work to be conducted is located in pastureland where the stream corridor does not present suitable maternity/roosting habitat for the Indiana bat. Based on a review of the schedule for each project, vegetation removal is slated to occur during November 2009 and will continue into the beginning of 2010. Prior to vegetation removal work, the restoration and enhancement reaches will be walked with personnel involved in construction oversight for the project. Any trees located within the project area that may be favored by the Indiana bat will be marked and avoided to the extent possible. Vegetation removal activities will be completed by April 15'1', thereby avoiding impacts to roosting/maternity colonies of the Indiana bat. Baker also proposes to incorporate tree types favored by the Indiana bat into the planting list developed for the project site. In addition to habitat considerations, selection of tree types will be based upon their occurrence and range within this region of the Hiwassee River Basin. We hope these efforts will satisfy your concerns regarding the protection of potential bat colonies and/or bat habitat present within Cherokee County. If you have any more questions or would like to discuss these projects in further detail, please contact me at your earliest convenience at 828.3 5 0.1408 ext. 2010 or by email at cmcint3Te@mbakercorp.com. Sincerely, Michael Baker Engineering, Inc. Carmen Horne-McIntyre Environmental Scientist X6/23/2009) Carmen McIntyre; Re NCEEP Stream Restoration Sites on Martin Creek and UTs Cherokee Co. Page 1 From: <Marella_Buncick@fws.gov> To: "Carmen McIntyre" <Cmcintyre@mbakercorp.com> Date: 6123/2009 11:11 AM Subject: Re: NCEEP Stream Restoration Sites on Martin Creek and UTs-Cherokee Cc Carmen, As we discussed previously, if you are conducting tree removal during the time Indiana bats are hibernating and also given the nature and location of the project, this should satisfy our concerns for Indiana bat for this stream restoration project. marella marella buncick USFWS 160 Zillicoa St. Asheville, NC 28801 828-258-3939 ext 237 People don't resist change, they resist being changed "Carmen McIntyre" <Cmcintyre@mbakercorp.com> 06/15/2009 08:47 AM To "Marella Buncick" <Marella_Buncick@fws.gov> cc Subject NCEEP Stream Restoration Sites on Martin Creek and UTs-Cherokee Co. Hi Marella, Just wanted to touch base with you to see if you guys had any further comment regarding the two stream restoration sites Baker will be working on with the NCEEP in Cherokee County. There were some earlier concerns regarding potential impacts to the Indiana bat; we attempted to alleviate these concerns as noted in a response letter submitted at the end of April. In short, vegetation removal work will take place within the time period (mid-Oct to mid-April) recommended by the USFWS. If you wouldn't mind emailing me or sending us a response back, that'd be great. I should be around for most of the week if we need to discuss the projects any further. Thanks for your assistance! Carmen Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 P: 828.350.1408 x. 2010 F: 828.350.1409 [attachment "USFWS_Letter Response.pdf' deleted by Marella Buncick/R4/FWS/DOIj ker North Carolina Wildlife Resources Commission Balsam Depot Attn: Mr. David McHenry 20830 Great Smoky Mountain Expressway Waynesville, NC 28786 Michael Baker Engineering, Inc. 797 Haywood Road Suite 201 Asheville, North Carolina 28806 828-350-1408 FAX 828-350-1409 November 24, 2008 Subject: North Carolina Ecosystem Enhancement Program (NCEEP) Stream Mitigation Project on Martins Creek and Tributaries, Cherokee County, NC. Dear Mr. McHenry, The North Carolina Ecosystem Enhancement Program (EEP) requests review and comment on any possible issues that might emerge with respect to fish and wildlife resources in the vicinity of a potential stream and wetland restoration project in the Martins Creek watershed, a drainage of the Hiwassee River. The potential stream restoration project area is identified on the attached maps which consist of a vicinity map, a U.S. Geological Survey site map and a restoration plan figure with areas of potential ground disturbance identified. The Martin Creek site has been identified for the purpose of providing in-kind mitigation for unavoidable stream channel and wetland impacts. The project will involve restoration, enhancement or preservation of a section of Martin Creek, the Right Prong of Martin Creek and sections of four unnamed tributaries (UTs) that have been identified as being significantly degraded. Project goals include the restoration or enhancement of 5,540 linear feet of stream for the purpose of obtaining stream mitigation credit in the Hiwassee River Basin. Stream mitigation credits are also being extended to an additional 7,725 linear feet of stream being preserved. We thank you in advance for your timely response and cooperation. Please feel free to contact Baker Engineering with any questions that you may have concerning the extent of site disturbance associated with this project. Sincerely, epxofftj hwe-01-114-ryrct Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 Phone: 828.350.1408, Email: cmcintyregmbakereorp.com Cc: Mr. Paul Wiesner NC Ecosystem Enhancement Program (EEP) 2090 U.S. Highway 70 Swannanoa, NC 28778 North Carolina Wildlife Resources Commission 10 Gordon Myers, Executive Director December 9, 2008 Carmen Horne-McIntyre Baker Engineering NY, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 SUBJECT EEP Stream Mitigation Projects in Cherokee County, Martins Creek Dear Ms. Horne-McIntyre: Biologists with the North Carolina Wildlife Resources Commission (Commission) received your letters dated November 24, 2008 regarding the Ecosystem Enhancement Program projects in the Martins Creek watershed in Cherokee County. Comments from the Commission are provided under provisions of the Fish and Wildlife Coordination Act (48 Stat. 401, as amended; 16 U.S.C. 661 et seq.). Cherokee County is a "trout county" per an agreement between the U.S. Army Corps of Engineers (ACOE) and the Commission. As such, Commission biologists review all Nationwide Permit applications there and make recommendations to minimize the adverse resource effects of some activities, including restoration work. Once a permit application is prepared for this project, a copy must be sent to me in order to solicit Commission concurrence and recommendations for consideration by the ACOE. Martins Creek supports sensitive aquatic life like the sicklefin redhorse, mountain creekshell (Villosa vanuxemensis (NCT)), and Cambarus hiwasseensis (NC watch list, Federal candidate). These and several other sensitive species are found in the Hiwassee River further downstream. The projects may improve habitat for aquatic life over time, but they also may initially degrade habitat depending upon the amount of construction disturbance and sedimentation they cause. As part of the 404 permits, the Commission will likely request that in stream construction be avoided from April I to June 15 when sicklefin redhorse should be spawning in Martins Creek. The Commission recommends that effective sediment and erosion controls be used and channel disturbance be avoided as much as possible during construction. Also, existing mature vegetation should be preserved as much as possible because it promotes the stability of channel work and provides seed sources for natural regeneration, organic material to the streams, and riparian habitat complexity until planted vegetation matures. The use of balled or container grown trees is recommended in the outside of Mailing Address: Division of Inland Fisheries • 1721 Mail Service Center • Raleigh, NC 27699-1721 Telephone: (919) 707-0220 • Fax: (919) 707-0028 EEP, Martins Creek Page 2 December 9, 2008 Cherokee channel bends to expedite long-term bank stability. Also, any stream channel modifications should create dimensions, patterns, and profiles that mimic stable, reference conditions. Overly and unnaturally sinuous stream channels should be avoided. Thank you for the opportunity to review and comment on this project. If there are any questions regarding these comments, please contact me at (828) 452-2546 ext. 24. Sincerely, e Dave McHenry Mountain Region Coordinator Habitat Conservation Program Michael Baker Engineering, Inc. 797 Haywood Road Suite 201 Asheville, North Carolina 28806 Mr. M. Kent Clary USDA-NRCS Area Resource Soil Scientist 589 Raccoon Road, Suite 246 Waynesville, NC 28786 828-350-1408 FAX 828-350-1409 December 15, 2008 Subject: Prime and Important Farmland Soils RE: NCEEP On-Call Project, on Martin Creek and Tributaries, Cherokee County, NC Dear Mr. Clary, The North Carolina Ecosystem Enhancement Program (NCEEP) requests your review and assistance in completing a Farmland Conversion Impact Rating form for the subject site. Enclosed please find a copy of the AD-1006 form, and site and location mapping for the project. The Martin Creek site has been identified for the purpose of providing in-kind mitigation for unavoidable stream channel impacts in the Hiwassee River Basin. The project will involve restoration, enhancement or preservation of a section of Martins Creek, the Right Prong of Martins Creek, and sections of four unnamed tributaries (UTs) that have been identified as being significantly degraded. Project goals include the restoration or enhancement of 5,540 linear feet of stream. Stream mitigation credits are also being extended to an additional 7,725 linear feet of stream being preserved. Preliminary visual assessments and data provided by the NCEEP indicate the presence of approximately 2.0 acres of mapped wetlands that will be protected under the proposed project. Buried hydric soils have also been located on-site in the vicinity of the existing wetlands and were likely filled to increase agricultural production. To determine the extent of wetland restoration work required, further analysis of the site is proposed. The location where wetland restoration may occur is provided in Restoration Plan Figure 1.3. Mapped soils within the upland portion of the project area include the Thurmont-Dillard complex (8 to 15% slopes) and Junaluska-Tsali complexes (ranging from 15% to 50% slopes). Soils mapped within the pasture and floodplain portion of the project area consist of the Ark aqua loam and the Dillard loam series. Soils of the Thurmont-Dillard complex are dominant in areas adjacent to the streams in the forested area of the project. These soils are located on moderate slopes in the valley of the project, are well drained and lie above the seasonal high water table. In the lower section of the valley, project streams course through both Dillard loams and Ark aqua loams. Dillard loams are located in the project area in the transitional zone between the upland forested areas and the floodplain. This soil series is defined as being moderately well drained, rarely flooded and typically 24 to 36 inches above the water table. The Ark aqua loam soils are located in the lower valley of the Martin Creek watershed and are primarily within the floodplain for Martin Creek. As evidenced by the presence and location of wetlands on-site, the Ark aqua loams within the project area are somewhat poorly drained and are occasionally flooded. Whereas the depth to the water table in the upper extent of the project area ranges from 36 to 72 inches, the depth to the water table where Ark aqua loams are present is approximately 18 to 24 inches; however, water is at the ground surface in some wetland areas. Soils data presented in this letter were assembled from information provided by the Natural Resources Conservation Service office in Cherokee County and from the USDA-NRCS Soil Data Mart website (http://soildatamart.nres.usda.gov/Default.aspx ). The total project area within the proposed conservation easement boundary is approximately 24.89 acres. Sections of the land within the easement are mapped as the Ark aqua loam series. Based on our review, this soil is considered to be Prime Farmland soil. No additional prime and important farmland designations were listed on the Soil Data Mart for Cherokee County, NC. The total acreage of Prime and Important Farmland that would be directly converted under this project is approximately 2.94 acres. We ask that you review this site based on the attached information to determine if you know of any other existing resources that we need to know about. We know that you have greater familiarity with farmland issues in this area than we do, and we will be happy to make any changes to the form that you deem appropriate. Please return the form to us with your determinations and we will complete the remainder of the form if needed. In addition, please let us know the level of involvement you may require (if needed), as it is anticipated this project will be implemented in the Summer of 2009. If we have not received a response from you within 30 days, we will assume that you have no comment regarding the project. This letter is intended to satisfy any requirements of the Farmland Protection Policy Act. If you have any questions, please feel free to contact me at cmcintyregmbakercorp.com or by phone at 828.350.1408 ext. 2010. Our fax number is 828.350.1409. Thank-you for your assistance in this matter. Sincerely, 6tf?'Oe4i 419aa- ?V16J4,Tyee Carmen Horne-McIntyre Environmental Scientist Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 Cc: Mr. Guy Pearce NC Ecosystem Enhancement Program (EEP) 1652 Mail Service Center Raleigh, NC 27699 Mr. Glenn Carson, District Conservationist USDA-NRCS 225 Valley River Ave., Suite J. Murphy, NC 28789 From: Carmen McIntyre To: kent.clary@nc.usda.gov Date: 1/6/2009 4:36 PM Subject: Cherokee Co. Stream Restoration Projects Sorry Kent-our server held the email due to its size. Here's the table I told you about earlier. I'll send the pdfs in another email in case you need those as well. Carmen Hi Kent, Thanks for getting back to me regarding the Farmland Conversion Impact Rating form for the Martin Creek and Contreras Site stream restoration projects. I've included a table below which provides the total acreage of soils within the project disturbance limits per soil type. Hopefully this will help. I'm also sending a pdf version of the project reach figures which were originally submitted in hard copy form in case you need those as well. Please let me know if you have any questions. Martin Creek Site Soil Type Site Area Acreage 131D Martin 153648.7800 3.5273 134E Martin 34489.0385 0.7918 233B Martin 64003.4482 1.4693 310D Martin 16727.5613 0.3840 310E Martin 26719.8168 0.6134 382E Martin 2039.5538 0.0468 45A Martin 39153.1718 0.8988 85A Martin 124696.2277 2.8626 *PRIME FARMLAND SOIL* Total Acreage: 10.59 Contreras Site Type Site Area Acreage 131B Contreras 54032.6223 131D Contreras 72045.0093 310D Contreras 154.1172 310E Contreras 57021.9360 382D Contreras 5220.6719 382E Contreras 10092.0264 382F Contreras 335.2609 72A Contreras 16152.2809 85A Contreras 424894.780 Total Acreage: 14.69 Best, Carmen 1.2404 1.6539 0.0035 1.3090 0.1199 0.2317 0.0077 0.3708 59.7542 *PRIME FARMLAND SOIL* Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 P: 828.350.1408 x. 2010 F: 828.350.1409 From: Carmen McIntyre To: Kent - Waynesville NC Clary Date: 1/7/2009 1:15 PM Subject: RE: AD-1006 Form for Stream Projects in Cherokee Co. Thanks Kent. Have a good afternoon! Carmen >>> "Clary, Kent - Waynesville, NC" < Kent.Clary@nc.usda.gov > 1/7/2009 1:01 PM >>> Carmen, Attached are the AD-1006's for the Martin Creek and Contreras Restoration and Enhancement sites in Cherokee County. Parts II, IV, and V have been completed as required of NRCS. Based on the information you provided, it appears that 9.1 acres of important farmlands (5.2 acres of prime and 3.9 acres of state-wide important) will be impacted at the Martin Creek site, and 13.1 acres of important farmlands (11.4 of prime and 1.7 of state-wide important) will be impacted at the Contreras site. If you have any questions or if I can be of further assistance, please feel free to contact me. Kent Clary Area Resource Soil Scientist USDA-NRCS 589 Raccoon Road Suite 246 Waynesville, NC 28786 828.456.6341 ext. 105 -----Original Message----- From: Carmen McIntyre [mailto:Cmcintyre@mbakercorp.com] Sent: Monday, December 15, 2008 3:00 PM To: Clary, Kent - Waynesville, NC Cc: Carson, Glenn - Murphy, NC Subject: AD-1006 Form for Stream Projects in Cherokee Co. Hi Kent, Here's the information on the projects I mentioned earlier. I'm also attaching the soils maps we used for the project area. Soil maps I-19 and I-21 were used for the Martin Creek project. Soil maps J-23 and J-25 were used for the Contreras site. If you have any questions about the project, I can be reached at 828.350.1408, etc. 2010 or by email at cmcintyre@mbakercorp.com . Thanks in advance for your assistance! Carmen Horne-McIntyre Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 P: 828.350.1408 x. 2010 F: 828.350.1409 ?aker Mr. M. Kent Clary USDA-NRCS Area Resource Soil Scientist 589 Raccoon Road, Suite 246 Waynesville, NC 28786 Michael Baker Engineering, Inc. 797 Haywood Road Suite 201 Asheville, North Carolina 28806 828-350-1408 FAX 828-350-1409 April 2, 2009 Subject: Prime and Important Farmland Soils RE: NCEEP On-Call Project, on Martin Creek and Unnamed Tributaries, Cherokee County, NC Dear Mr. Clary, Thank-you for your assistance in completing a Farmland Conversion Impact Rating form for the subject sites. As noted in earlier correspondence, the Martin Creek and Contreras Site stream mitigation projects have been proposed as mitigation projects for unavoidable stream channel impacts in the Hiwassee River Basin. Enclosed you will find a final copy of the form based on our evaluation of the sites in accordance with Part VI, "Site Assessment Criteria." If you have any questions regarding the cumulative scoring value for each site, please feel free to contact me at cmcintyre ,mbakerco .com or by phone at 828.350.1408 ext. 2010. Kind Regards, dcjwlfn? zfI""Ej A_ Carmen Horne-McIntyre Environmental Scientist Michael Baker Engineering, Inc. 797 Haywood Rd., Suite 201 Asheville, NC 28806 Cc: Mr. Glenn Carson, District Conservationist USDA-NRCS 225 Valley River Ave., Suite J. Murphy, NC 28789 U.S. Department of Agriculture FARMLAND CONVERSION IMPACT RATING PART I (To be completed by Federal Agency) Date Of Land Evaluation Request 12/15/08 Name Of Project Martin Creek Restoration and Enhancement Federal Agency Involved FHWA Proposed Land Use Stream and Riparian Enhancement County And State Cherokee, NC PART II (To be completed by NRCS) Date Request Received By NRCS Does the site contain prime, unique, statewide or local important farmland? Yes No (If no, the FPPA does not apply -- do not complete additional parts of this form). © ? Acres Irrigated - Average Farm Size 85 Acres Major Crop(s) Corn, Hay Farmable Land In Govt. Jurisdiction Acres: 103,357 % 35 Amount Of Farmland As Defined in FPPA Acres: 84,075 %28 Name Of Land Evaluation System Used Cherokee Cales Name Of Local Site Assessment System Date Land Evaluation Returned By NRCS 1/7/09 PART III (To be com leted b Federal A enc ) Alternative Site Rating p y g y Site A Site B Site C Site D A. Total Acres To Be Converted Directly 10.6 B. Total Acres To Be Converted Indirectly C. Total Acres In Site 10.6 0.0 0.0 0.0 PART IV (To be completed by NRCS) Land Evaluation Information A. Total Acres Prime And Unique Farmland 5.2 B. Total Acres Statewide And Local Important Farmland 3.9 C. Percentage Of Farmland In County Or Local Govt. Unit To Be Converted 0.0 D. Percentage Of Farmland In Govt. Jurisdiction With Same Or Higher Relative Value 5.5 PART V (To be completed by NRCS) Land Evaluation Criterion Relative Value Of Farmland To Be Converted (Scale of 0 to 100 Points) 63 0 0 0 PART VI (To be completed by Federal Agency) Site Assessment Criteria (These criteria are explained in 7 CFR 658.5(b) Maximum Points 1. Area In Nonurban Use 15 2. Perimeter In Nonurban Use 9 3. Percent Of Site Being Farmed 10 4. Protection Provided By State And Local Government 20 5. Distance From Urban Builtup Area 15 6. Distance To Urban Support Services 10 7. Size Of Present Farm Unit Compared To Average 9 8. Creation Of Nonfarmable Farmland 0 9. Availability Of Farm Support Services 3 10. On-Farm Investments 2 11. Effects Of Conversion On Farm Support Services 0 12. Compatibility With Existing Agricultural Use 0 TOTAL SITE ASSESSMENT POINTS 160 93 0 0 0 PART VII (To be completed by Federal Agency) Relative Value Of Farmland (From Part V) 100 63 0 0 0 Total Site Assessment (From Part VI above or a local site assessment) 160 93 0 0 0 TOTAL POINTS (Total of above 2lines) 260 156 0 0 0 Site Selected: Date Of Selection Was A Local Site Assessment Used? Yes D No Reason For Selection: On-call contract with NC-Ecosystem Enhancement Program to improve watershed health and obtain mitigation credits within the Hiwassee River Basin. (See Instructions on reverse side) Form AD-1006 (10-83) This form was electronically produced by National Production Services Staff - TN - LITTLE TE ESSEE 04-04 4 T HIWASSEE CHERO EE 04-05-02 1 us 64 HIWASSEE 04-05-01 ?. C Y i Martin Creek Project Site GRAHAM J 1_0 Map Inset LEGEND Figure 1.1 Project Location Map J , !f ` NCDWQ Sub-basin F-i Counties 0 USGS Hydrologic Unit Martin Creek Restoration Project Cherokee County, NC Project Hydrologic Unit 0 Cherokee County Cherokee County, NC 0 1 2 4 m Mlles F Iz. 0 1 J [?, V I 4 J'f? a? ; ! ?? 7 •O` I ='"'' a9 `pry ,{.?fy+ r?, •? \1E I I ?.,- G ,' 1 1r _ Id f^'4 'INN f • 00 r LEGEND: Figure 1.2 USGS Topographic Map Project Reach 0 Watershed Boundary Martin Creek Restoration Project Proposed Easement Boundary Cherokee County, NC 1?,4 OYUStelll Streams 0 200400 800 v Feet ?/ A ro ,? l4 l i i .441 f y. r ? Nes? Sa rFl d b LEGEND Figure 1.3 Proposed Restoration Proposed Restoration Type Enhancement-I ® Jurisdictional Wetlands Plan (Recommendation) Enhancement-II Proposed Disturbance Limits Martins Creek Restoration Project Restoration-P1 Preservation Pro osed Soil Removal Area Cherokee County, NC Ecosystem P Restoration-P2 0 Parcels 0 200 400 800 Feet APPENDIX C. EDR Transaction Screen Map Report Martin Creek Restoration Project 100 Pinebrook Road Murphy, NC 28906 Inquiry Number: 02342808.1r October 17, 2008 440 Wheelers Farms Road Cre Milford, CT 06461 .com 2.0050 E D R Environmental Data Resources Inc wwwToll.ed Free:rnet800 .com FORM-NULL-TIB TABLE OF CONTENTS SECTION PAGE Executive Summary ES1 Overview Map 2 Detail Map 3 Map Findings Summary 4 Map Findings 6 Orphan Summary 7 Government Records Searched/Data Currency Tracking GRA GEOCHECK ADDENDUM Physical Setting Source Addendum A-1 Physical Setting Source Summary A-2 Physical Setting Source Map A-7 Physical Setting Source Map Findings A-8 Physical Setting Source Records Searched A-11 Thank you for your business. Please contact EDR at 1-800-352-0050 with any questions or comments. Disclaimer - Copyright and Trademark Notice This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, Inc. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. NO WARRANTY EXPRESSED OR IMPLIED, IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, INC. SPECIFICALLY DISCLAIMS THE MAKING OF ANY SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, INC. BE LIABLE TO ANYONE, WHETHER ARISING OUT OF ERRORS OR OMISSIONS, NEGLIGENCE, ACCIDENT OR ANY OTHER CAUSE, FOR ANY LOSS OF DAMAGE, INCLUDING, WITHOUT LIMITATION, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES. ANY LIABILITY ON THE PART OF ENVIRONMENTAL DATA RESOURCES, INC. IS STRICTLY LIMITED TO A REFUND OF THE AMOUNT PAID FOR THIS REPORT. Purchaser accepts this Report "AS IS". Any analyses, estimates, ratings, environmental risk levels or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only a Phase I Environmental Site Assessment performed by an environmental professional can provide information regarding the environmental risk for any property. Additionally, the information provided in this Report is not to be construed as legal advice. Copyright 2008 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission. EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, Inc. or its affiliates. All other trademarks used herein are the property of their respective owners. TC02342808.1 r Page 1 EXECUTIVE SUMMARY A search of available environmental records was conducted by Environmental Data Resources, Inc. (EDR). The results of this search follow: TARGET PROPERTY ADDRESS FEDERAL RECORDS STATE AND LOCAL RECORDS TRIBAL EDR PROPRIET RECORDS AIRY RECORDS MARTIN CREEK RESTORATION PROJECT 100 PINEBROOK ROAD m MURPHY, NC 28906 J J U m Z Elevation: 1757 ft. -i z Q > EDR Inquiry Number: 02342808.1 r J 0 w 0 0 of CO of a z Z w (7 o w j w TARGET PROPERTY a Z ? w m Q 0 ? LL p (? (7 C7 W c 0 0 Z w co U } co Z _ w U w - p U (D U) a U a Z z U w U c a a Lu o C) 0 co 0 of m Z W _ w o_ 0 p ? D > a SEARCH RESULTS Direction o ? w _ J Z CV Q ? -i W 0 " (D ? co d - 0 m w p p w w of 0 J Z U Z Z Z Z Z 0 Disance t N o d ::j U U co ? Q Q Q Q Q z co m o p of U U _ ? U Q w U U Cl) Z - m U m J J U of of of w ? - w c? L S Distanceft. a o d W w 0 0 0 U U U U m 0 m rn 0 0 0 U U p J U j j cp m U a p p p p p 0 Site Z a p Z U U J U Cr Cr Cr Cr T- > > w = p Z D p L J U Z O p l = (? U w L (? (n Z (? O = J J Z Q ? > p m Z Z Z Z Z Z w Surrounding sites were not identified. TC02342808.1r Executive Summary 1 OVERVIEW MAP - 02342808.1 r Target Property a 1/4 1n 1 Mlles Sites at elevations higher than or equal to the target property F-? ] Indian Reservations BIA Hazardous Substance • Sites at elevations lower than AV Oil & Gas pipelines Disposal Sites the target property 0 National Wetland Inventory 1 7 Manufactured Gas Plants 0 State Wetlands l ir National Priority List Sites Dept. Defense Sites SITE NAME: Martin Creek Restoration Project CLIENT: Michael Baker Engineering, Inc. ADDRESS: 100 Pinebrook Road CONTACT: Carmen Horne-McIntyre Murphy NC 28906 INQUIRY #: 02342808.1 r LAT/LONG: 35.0563/84.0353 DATE: October 17, 2008 12:18 pm 00pyrlaht ® 2008 EDR, Inc. ® 2008 Tole Atlas Ral. 07/2007. DETAIL MAP - 02342808.1 r qua QD D/ S panel * Target Property A Sites at elevations higher than or equal to the target property • Sites at elevations lower than the target property 1 Manufactured Gas Plants r Sensitive Receptors National Priority List Sites Dept. Defense Sites 0 1116 1/8 1/4 Mlles Indian Reservations BIA Hazardous Substance Oil & Gas pipelines Disposal Sites SITE NAME: Martin Creek Restoration Project CLIENT: Michael Baker Engineering, Inc. ADDRESS: 100 Pinebrook Road CONTACT: Carmen Horne-McIntyre Murphy NC 28906 INQUIRY #: 02342808.1 r LAT/LONG: 35.0563/84.0353 DATE: October 17, 2008 12:18 pm 00pyrlaht ® 2008 EDR, Inc. ® 2008 Tole Atlas Ral. 07/2007. MAP FINDINGS SUMMARY Search Target Distance Total Database Property (Miles) < 1/8 1/8 - 1/4 1/4 - 1/2 1/2 - 1 > 1 Plotted FEDERAL RECORDS NPL 1.000 0 0 0 0 NR 0 Proposed NPL 1.000 0 0 0 0 NR 0 Delisted NPL 1.000 0 0 0 0 NR 0 NPL LIENS TP NR NR NR NR NR 0 CERCLIS 0.500 0 0 0 NR NR 0 CERC-NFRAP 0.500 0 0 0 NR NR 0 LIENS 2 TP NR NR NR NR NR 0 CORRACTS 1.000 0 0 0 0 NR 0 RCRA-TSDF 0.500 0 0 0 NR NR 0 RCRA-LQG 0.250 0 0 NR NR NR 0 RCRA-SQG 0.250 0 0 NR NR NR 0 RCRA-CESQG 0.250 0 0 NR NR NR 0 RCRA-NonGen 0.250 0 0 NR NR NR 0 US ENG CONTROLS 0.500 0 0 0 NR NR 0 US INST CONTROL 0.500 0 0 0 NR NR 0 ERNS TP NR NR NR NR NR 0 HMIRS TP NR NR NR NR NR 0 DOT OPS TP NR NR NR NR NR 0 US CDL TP NR NR NR NR NR 0 US BROWNFIELDS 0.500 0 0 0 NR NR 0 DOD 1.000 0 0 0 0 NR 0 FUDS 1.000 0 0 0 0 NR 0 LUCIS 0.500 0 0 0 NR NR 0 CONSENT 1.000 0 0 0 0 NR 0 ROD 1.000 0 0 0 0 NR 0 UMTRA 0.500 0 0 0 NR NR 0 ODI 0.500 0 0 0 NR NR 0 DEBRIS REGION 9 0.500 0 0 0 NR NR 0 MINES 0.250 0 0 NR NR NR 0 TRIS TP NR NR NR NR NR 0 TSCA TP NR NR NR NR NR 0 FTTS TP NR NR NR NR NR 0 HIST FTTS TP NR NR NR NR NR 0 SSTS TP NR NR NR NR NR 0 ICIS TP NR NR NR NR NR 0 PADS TP NR NR NR NR NR 0 MLTS TP NR NR NR NR NR 0 RADINFO TP NR NR NR NR NR 0 FINDS TP NR NR NR NR NR 0 RAATS TP NR NR NR NR NR 0 SCRD DRYCLEANERS 0.500 0 0 0 NR NR 0 STATE AND LOCAL RECORDS SHWS 1.000 0 0 0 0 NR 0 NC HSDS 1.000 0 0 0 0 NR 0 IMD 0.500 0 0 0 NR NR 0 SWF/LF 0.500 0 0 0 NR NR 0 TC02342808.1 r Page 4 MAP FINDINGS SUMMARY Database OLI HIST LF LUST LUST TRUST UST AST INST CONTROL VCP DRYCLEANERS BROWNFIELDS NPDES TRIBAL RECORDS Search Target Distance Property (Miles) 0.500 0.500 0.500 0.500 0.250 0.250 0.500 0.500 0.250 0.500 TP INDIAN RESERV INDIAN ODI INDIAN LUST INDIAN UST INDIAN VCP EDR PROPRIETARY RECORDS Manufactured Gas Plants Total < 1/8 1/8 - 1/4 1/4 - 1/2 1/2 - 1 > 1 Plotted 0 0 0 NR NR 0 0 0 0 NR NR 0 0 0 0 NR NR 0 0 0 0 NR NR 0 0 0 NR NR NR 0 0 0 NR NR NR 0 0 0 0 NR NR 0 0 0 0 NR NR 0 0 0 NR NR NR 0 0 0 0 NR NR 0 NR NR NR NR NR 0 1.000 0 0 0 0 NR 0 0.500 0 0 0 NR NR 0 0.500 0 0 0 NR NR 0 0.250 0 0 NR NR NR 0 0.500 0 0 0 NR NR 0 1.000 0 0 0 0 NR 0 NOTES: TP = Target Property NR = Not Requested at this Search Distance Sites may be listed in more than one database TC02342808.1 r Page 5 Map ID MAP FINDINGS Direction Distance EDR ID Number Elevation Site Database(s) EPA ID Number NO SITES FOUND TC02342808.1 r Page 6 PHYSICAL SETTING SOURCE MAP - 02342808.1 r County Boundary o 1/4 1/2 i Miles Major Roads /// Contour Lines ? Groundwater Flow Direction Wildlife Areas OO Earthquake epicenter, Richter 5 or greater c Indeterminate Groundwater Flow at Location Natural Areas ® Water Wells c v Groundwater Flow Varies at Location o Rare & Endangered Species © Public Water Supply Wells Cluster of Multiple Icons SITE NAME: Martin Creek Restoration Project CLIENT: Michael Baker Engineering, Inc. ADDRESS: 100 Pinebrook Road CONTACT: Carmen Horne-McIntyre Murphy NC 28906 INQUIRY #: 02342808.1 r LAT/LONG: 35.0563/84.0353 DATE: October 17, 2008 12:18 pm 00pyrlaht a 2008 EDR, Inc. ® 2008 Tole Atlas Ral. 07/2007. EDR LoanCheck' Basic: Environmental Risk Review October 17, 2008 Property Name 440 Wheelers Farms Road Milford, CT 06460 MARTIN CREEK RESTORATION PROJECT Phone:800-352-0050 EDR® 100 PINEBROOK ROAD Fax:800-231-6802 MURPHY, NC 28906 Web:www.edrnet.com ENVIRONMENTAL RISK LEVEL To help evaluate environmental risk, the EDR LoanCheck'Basic provides an Environmental Risk Level, based on a search of current government records requested to be searched by Michael Baker Engineering, Inc.. ELEVATED RISK Based on the records found in this report, the environmental risk level for this property is elevated. I-XILOW RISK Based on the records found in this report, the environmental risk level for this property is minimal. User Instructions For more information regarding this Environmental Risk Level, please refer to page 2 and other supporting reports. User Comments Reports and Databases The following reports an/or databases were requested by customer and were included in the Environmental Risk Level where available: • EDR Radius Map Report Disclaimer - Copyright and Trademark Notice This Report contains certain information obtained from a variety of public and other sources reasonably available to Environmental Data Resources, Inc. It cannot be concluded from this Report that coverage information for the target and surrounding properties does not exist from other sources. NO WARRANTY EXPRESSED OR IMPLIED, IS MADE WHATSOEVER IN CONNECTION WITH THIS REPORT. ENVIRONMENTAL DATA RESOURCES, INC. SPECIFICALLY DISCLAIMS THE MAKING OF ANY SUCH WARRANTIES, INCLUDING WITHOUT LIMITATION, MERCHANTABILITY OR FITNESS FOR A PARTICULAR USE OR PURPOSE. ALL RISK IS ASSUMED BY THE USER. IN NO EVENT SHALL ENVIRONMENTAL DATA RESOURCES, INC. BE LIABLE TO ANYONE, WHETHER ARISING OUT OF ERRORS OR OMISSIONS, NEGLIGENCE, ACCIDENT OR ANY OTHER CAUSE, FOR ANY LOSS OF DAMAGE, INCLUDING, WITHOUT LIMITATION, SPECIAL, INCIDENTAL, CONSEQUENTIAL, OR EXEMPLARY DAMAGES. ANY LIABILITY ON THE PART OF ENVIRONMENTAL DATA RESOURCES, INC. IS STRICTLY LIMITED TO A REFUND OF THE AMOUNT PAID FOR THIS REPORT. Purchaser accepts this Report "AS IS". Any analyses, estimates, ratings, environmental risk levels or risk codes provided in this Report are provided for illustrative purposes only, and are not intended to provide, nor should they be interpreted as providing any facts regarding, or prediction or forecast of, any environmental risk for any property. Only a Phase I Environmental Site Assessment performed by an environmental professional can provide information regarding the environmental risk for any Drooerty. Additionally. the information provided in this Report is not to be construed as Ieaal advice. Copyright 2008 by Environmental Data Resources, Inc. All rights reserved. Reproduction in any media or format, in whole or in part, of any report or map of Environmental Data Resources, Inc., or its affiliates, is prohibited without prior written permission. EDR and its logos (including Sanborn and Sanborn Map) are trademarks of Environmental Data Resources, Inc. or its affiliates. All other trademarks used herein are the property of their respective owners. 02342808.1r Page 1 EDR LoanCheck® Basic: Environmental Risk Review FINDINGS CONTRIBUTING TO THE ENVIRONMENTAL RISK LEVEL The environmental LOW RISK is based upon the findings listed below. Refer to the supporting report(s) for additional detail. TARGET PROPERTY Current Govt. Records No records identified (if any) were determined to be of elevated risk. EDR Proprietary Records No records identified (if any) were determined to be of elevated risk. SURROUNDING PROPERTIES Current Govt. Records No records identified (if any) were determined to be of elevated risk. EDR Proprietary Records No records identified (if any) were determined to be of elevated risk. 02342808.1r Page 2 APPENDIX D. Existing Conditions Geomorphic Data Table D1. Eroding bank proportions BEH I/NBS and Sediment Export Estimate for Project Site Streams: Martin's Creek II M itigation Proj ect ime Point egment/ Reach Linear Footage or AcreageZ v v , ; ao L > = °-° o g 0 L 0 0 5 3 o 3 o 3 O L > ri a`, O c ? Y o F3 Q V) a) X w ft % ft % ft % ft % ft % ft % ft % ft % ft % Ton/y Ft3/y RP-UT1 Reach 1 480 23 2 20 2 199 21 299 31 419 44 2.0 0.1 RP-Reach 2 540 95 9 44 4 167 15 229 21 545 50 5.9 0.2 MC-UT1 Reach 2 1,372 24 2 77 3 120 5 186 7 639 24 435 16 1,153 43 18.9 0.6 MC-UT1 Reach 3 420 30 4 34 4 108 13 224 27 80 10 364 43 6.5 0.3 P C t ti MC-UT1 Reach 4 340 21 3 11 2 261 38 98 14 289 43 4.9 0.3 re- ons ruc on MC-UT1-3 Reach 1 780 71 5 74 5 82 5 62 4 199 13 161 10 911 58 13.2 0.4 MC-UT1-3 Reach 2 1,099 1,256 57 942 43 1.8 0.0 MC-UT2 75 100 67 50 33 4.2 1.2 MC Mainstem 815 148 9 126 8 349 21 342 21 558 34 107 7 72.3 1.8 Total 129.7 4.9 Notes: (1) Other includes areas of deposition, bedrock, boulders,rootmass, or wetlands. Total linear footage is approximate and was totaled using a hip chain as the streams were assessed. (2) Linear footage is the "centerline" length of reach measured. Linear footage calculated for each BEHI category provided is the cumulative total of BEHI scores for left and right banks. 1635 MC-UT1, Reaches 3 & 4 1630 ®TWG -?- LTB RTB WS F 1625 Reach 3 Excluded area 7^ « by barn 1620 C 1.. _ 0 ?-? Reach 4-existing cv 1615 W k 1610 1605 1600 1595 0 100 200 300 400 500 600 700 800 900 Station (ft) 1770 MC-UT1, Reach 2 1760 a -e-TWG -v- RTB LTB 1750 -o@-WSF 1740 p 1730 c? d W 1720 1710 1700 1690 1680 - - - - - - 90 290 490 690 890 1090 1290 Station (ft) 1645 MC-UT1-3, Reach 1 1640 -? TWG -r- LTB RTB --.+- WSF 1635 1630 C 1625 cv W 1620 1615 1610 77 1605 90 190 290 390 490 590 690 790 890 Station (ft) 1614 MC-UT1-3, Reach 2 1612 ? -4--TWG 1610 -LTB RTB 1608 1606 )ev 1604 C O cv 1602 W 1600 1598 1596 1594 1592 0 200 400 600 800 1000 Station (ft) Cross-section Data: X1 (UT1 Reach 2, STA 1+44) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle Eb* 3.8 6.4 0.60 0.97 10.68 1.8 2.9 1754.70 1755.51 X1 - UT1 Reach 2, Riffle Looking Downstream 1756 ----------------------------- ----------------------------------------------------- 1755.5 C 1755 ------------------------------ 1754.5 W 1754 Bankfull ---- Floodprone 1753.5 100 105 110 115 120 Station (ft) * E-type channel functioning like "G" due to high bank height ratio Cross-section Data: X2 (UT1 Reach 2, STA 2+03) Stream BKF BKF Max BKF Feature Type BKF Area Width Depth Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle Fb* 3.9 7.5 0.52 0.62 14.45 2.2 1.2 1752.3 1753.02 X2 - UT1 Reach 2, Riffle 1753.5 LOOKIng uvwnsiream 1753 r_ 0 1752.5 as W ---- Bankfull ---- Floodprone 1752 1751.5 p T Y T 100 105 110 115 120 Station (ft) * Function and shape of channel similar to "G", is probably in widening stage (G-->F) 125 130 Cross-section Data: X3 (UT1 Reach 2, STA 5+70) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle B 3.6 14.0 0.25 0.65 55.0 1.3 >2.2 1730.96 1731.16 X3 - UT1 Reach 2, Riffle 1732.5 Looking Downstream ---- Bankfull ---- Floodprone 1732 ----------------------------------------------------------------------- ''' 1731.5 O 1731 ------------------------------------ W 1730.5 1730 - - 100 105 110 115 120 125 130 135 Station (ft) Cross-section Data: X4 (UT1 Reach 3, STA 0+87) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle G 4.6 5.9 0.78 1.09 7.6 1.8 1.6' 1624.20 1625.10 X4 - UT-1 Reach 3, Riffle 1626 Looking Downstream - 1625.5 .? 1625 1624.5 0 a 1624 as W 1623.5 1623 --- Bankfull ---- Floodprone 1622.5 100 102 104 106 108 110 112 114 Station (ft) Entrenchment ratio can vary by +/- 0.2, assume that 1.6 is extreme end of range for G-type channel classification; in this steeper setting, the sinuosity is on the low end of the range Cross-section Data: X5 (UT1 Reach 3, STA 2+01) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle E 6.0 7.2 0.83 1.21 8.6 1.2 >2.6 1621.18 1621.45 X5 - UT-1 Reach 3, Riffle 1623 Looking Downstream 1622.5 -------------------------------------------------------------------------------------------o 1622 c 1621.5 - ------------------------------- 1621 as w 1620.5 -- -- Bankfull --- Floodprone 1620 1619.5 100 105 110 115 120 Station (ft) Cross-section Data: X6 (UT1 Reach 3, STA 3+10) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle Cb 6.2 9.8 0.63 1.06 15.4 1.0 >2.1 1617.90 1617.90 X6 - UT-1 Reach 3, Riffle 1621 Looking Downstream 1620.5 1620 1619.5 0 1619 ------------------------------------------------------------------- > 1618.5 as w 1618 ------------------------------ 1617.5 1617 -- -- Bankfull --- Floodprone 1616.5 100 105 110 115 120 125 130 Station (ft) Cross-section Data: X7 (UT1 Reach 4, STA 7+75) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle G* 6.1 7.6 0.81 1.11 9.4 4.1 1.8 1600.90 1604.35 X7 - UT1 Reach 4, Riffle 1605 Looking Downstream 1604 1603 0 Iwo 11602 -------------------------- a? w 1601 -------------- 1600 ---- Bankfull ---- Floodprone 1599 100 110 120 130 140 150 Station (ft) *Doesn't fit well into classification scheme, but functions as moderately entrenched G channel Cross-section Data: X8 (UT1-3 Reach 1, STA 1+46) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle Eb 2.9 5.0 0.58 1.02 8.6 1.0 2.7 1624.20 1624.18 X8 - UT1-3 Reach 1, Riffle Looking Downstream 1627.5 1627 1626.5 1626 0 1625.5 ------------------------------------------- •- 1625 1624.5 W -------------- 1624 1623.5 1623 --- Bankfull --- Floodprone 1622 5 . 100 105 110 115 120 125 130 Station (ft) Cross-section Data: X9 (UT1-3 Reach 1, STA 1+74) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle B 3.0 6.8 0.45 0.87 15.2 1.8 1.7 1622.92 1623.639 X9 - UT1-3 Reach 1, Riffle 1625.5 Looking Downstream 1625 1624.5 1624 1623.5 °-' 1623 --------------------- 1622.5 1622 ---- Bankfull ---- Floodprone 1621.5 100 105 110 115 120 125 130 Station (ft) Cross-section Data: X10 (UT1-3 Reach 1, STA2+67) Stream BKF BKF Max BKF Feature Type BKF Area Width Depth Depth W/D BH Ratio ER BKF Elev TOB Elev Pool N/A 3.0 4.1 0.74 1.01 5.5 1.5 1.8 1619.30 1619.81 X10 - UT1-3 Reach 1, Pool Looking Downstream 1623 1622.5 1622 1621.5 0 1621 Iwo 1620.5 1620 w 1619.5 1619 1618.5 1618 --- &--Bank ull -- -- Floodprone 100 105 110 115 Station (ft) 120 125 130 Cross-section Data: X11 (UT1-3 Reach 2, STA 15+09) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle C* 3.3 11.4 0.29 0.88 39.7 1.0 2.3 1601.22 1601.47 X11 - UT1-3 Reach 2, Riffle 1604.5 Looking Downstream 1604 1603.5 1603 .° 1602.5 > 1602 -------------------------------------------- ? w 1601.5 -- ------------- 1601 1600.5 -- -- Bankfull --- Floodprone 1600 - - - 100 110 120 130 140 150 160 Station (ft) * Appears to be evolving from C-->E. Subsequent bankfull flows are likely to deposit material on bench and result in narrowing of the bankfull channel towards an E. Cross-section Data: X12 (UT1-3 Reach 2, STA 16+09) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle F* 2.9 6.9 0.43 0.90 16.0 3.0 1.5 1600.4 1602.21 X12 - UT1-3 Reach 2, Riffle Looking Downstream 1603.5 1603 1602.5 1602 c 1601.5 > 1601 0 w 1600.5 -------- 1600 1599.5 -- -- Bankfull --- Floodprone 1599 - - - - 100 110 120 130 140 150 160 170 Station (ft) * Moderately entrenched F channel. Cross-section Data: X13 (Martin Creek) Stream BKF BKF Max BKF Feature Type BKF Area Width Depth Depth W/D BH Ratio ER BKF Elev TOB Elev Riffle C 67.6 36.2 1.87 3.76 19.4 1.1 >1.9 1597.7 1598.26 X13 - Martin Creek, Riffle Looking Downstream 1602 1601 ------------------------------ ---- ------------------------------------------------- 1600 1599 c 1598 > 1597 as w 1596 1595 1594 1593 Station (ft) * Note manmade levy on left bank 100 110 120 130 140 150 160 170 180 Cross-section Data: X14 (Martin Creek) Feature Stream Type BKF Area BKF Width BKF Depth Max BKF Depth W/D BH Ratio ER BKF Elev TOB Elev Pool N/A 68.6 36.9 1.86 3.8 19.8 1.9 1.4 1596.66 1595.56 X14 - Martin Creek, Riffle 1602 Looking Downstream 1601 ----------------------------------------------------- 1600 1599 c 1598 1597 1596 w 1595 1594 1593 -- -- Bankfull --- Floodprone 1592 100 120 140 160 180 200 Station (ft) * Note manmade levy on left bank APPENDIX E. Photo Log of Existing Conditions Martin's Creek II Mitigation Project Site Photo Log Notes: Photos on Pages 1-4 depict Right Prong Martin Creek and tributaries in the upper extent of the project area. The region had been experiencing drought conditions at the time of surveys. -jo a' mel features on mainstem of Right Prong above confluence UT4. h Good channel dimension in perennial, upper reach of Right Prong Martin Creek. Bank dimension in strong intermittent reach of Right Prong Martin Bank dimension in intermittent reach of Right Prong Martin Creek. Creek. ?/ !L t ? ? y ? ? A ? > ? ' ? \•. ? ' J? fF'. rr' ?,' F.[?'1 I - ?? Vii' Y 4.- {? ?` s > t _ 'i , 12'x° ?}i, ? t ?? /tea,! h. !_? ? 1-wr ?_ I !5 ?k^ih• ?Y,y ??.?.4' - ? +t? ."'s ? = 't °- l" 4..'. 2` '. 4.wi „Ym' ` / ^` . ,'Jr 71? 4- 3 w Mf r °s' ti - '^ _ ?4 3 `• .?'9? '- - q Y, _ .r -f ??y l ?a? $„r i;? ? -?( -t 4 lE?`l- ?`1 P? rr? ? _ . e , ? ? si?;h?°?# i?_ . `?'f/4 ?. Y f •`•• r ? ,,Y~- ? ,._, - , AOW ? ? T. 4 ?`?M??+ , X k* ?? : ?l 4 L -3, ? ? f.1{i`• 1 ?: ? r . ?. ? ,. . ?, 'iAf`-k';^,, ? ?? ,? *?a'? ?'ra,?s? `? `?,r.- ? ? '?. '_ .a- ? - fix, - +?•? "`r SCI Iw-'? ? ' ?- ; 71P 1 . - 7 .T. Channel dimension of tributary in headwaters of MC-UT I. Cascading channel profile present in parts of Right Prong drainage. n + ? 4 . ki S ? ?{ tagy: a. E 1 R ?» 4 - /, 1 r y4 ..2- 4 ?•_ " ; V"F4x4A?.a?!p??,'Y p { t air. a ^.,? ?'S57dF' tY ?'1T F'? t\ ? ? y may. p1 30 ? }M"• f- t is. ?J r•a'FFF.FFF"`? ? 9y °? =`? 1-\ '+?. * it .? ?? ?1 Y r '•" :o-? FtiR. '-.? ? ? .r ,r i 0 y.i - '? 1 1 ? ??? ?. Pl'iN. k-°t.. Cu m w fi .." . } 7 p '?.. ,K rf1*7c, ?., r„ i?+,?,rrr l ! f 1•?_ ".. ,mil" 4SY' "i^'},'y? - ?£?t l . t: ??? r" Cascading channel profile section present on Right Prong Martin Channel dimension as valley slope becomes less steep in RP Creek. drainage. Martin's Creek II Mitigation Project Site Photo Log Notes: Photos on Pages 5-8 depict Martin Creek and tributaries in the lower half of the project area. K F 1 ( S Y f 1 ?f F Pattern adjustment is proposed along this reach of UTl to Martin Cr. MC-UTl in preservation reach. sS4 P-? 'r Al, p ?. } 3 1 d zl ;t S'_1 Sipe ? Ts ? ?? _ ?? J/`? ? k 1 E ' -? ?+ • P 3°b ?l ? Y¢ R ? ??. 1' ? fir. 4 ' i ?.: 1, ti 4 7?V Prn _ 3 G+ 1 ip- ? '. .,° 1F/* ! ti*?r - ? !R O? ?`b b°, F ? '?i aS+Q F ?-?' ;"'. ? L J• ? ? ` ? i b ? ? ? + f _ F, f ! g ?' ' ' I ?? f ? . ? ? *-'dam " ? ? _ • IFL' ? +"{ ? . F a, ? '- -'" `i .eft ,1, ?t Invasive plant removal and bank repair are proposed along this reach Streambank conditions along MC-UT1 near barn. of MC-UTl upstream of the barn. '1 Ji * qy Ids" m " : Mxu` 4 ° 1' ?1 / ' ?M1 6 y ? ~ ?.aF 4 p +v_'? ?' a }? ? ( f` Y1 s ? egg;' q ?? + s 4 } t ' + *r bt VOW ? 4'dr r d " d :7 ? ,{y?.r tt , "A4 + i ? 1W . ? s Y 1 ? -? , y. ? C .tea ? ` c? a ...t 'y ?> y' r ' yew 1 tA r4 ' . dr,V j - y ( .F I, ?y • ? GrI A r'v_ ` , ` . ?i.v. J 1 f1. F q ON" ., ?,y?` 9' ``y^.. "?`? w 1r L ?;: • ? ,? ,ld ` s s' +4 _ . ?ift.?iJ? `S` . i`>?t Instream view of riparian conditions along MC-UT1. Native MC-UT1 makes a 90° turn into this box culvert near the barn. vegetation will be replanted that promotes better bank stabilization J, Z r. t iC'?d? q?4Y Fyl ?, ,.f'/d .r$?"e 1 v ' ?Xr 9?lZ???-• Yf^,-?` `?? NJ. -.`a 'I' "qµ f ? !.? f ? «i - 41.. ?t ..sas ` < :1..,.g ????1 . mi '- ? d 5 `-z?ay r ?q rc- 'A 2 .f I? l' ? Upper extent of UT1-3. Cattle have trampled banks in this reach. Bank erosion along sharp bend in MC-UT 1-3. y 11, v. y0 $••rh? ry i? fciA Mu f ?I ?X41 1 ? ? ? I ? • t N?F? r ? C ?? ? `?s 4 ' +r' ' ' ?r_ b ~`N?.al ? W¢°"°"?'.MWii rl!%f _? - - ,?? s ? ' Y 3' i Jpw ]r4 y I w rL ! 0. Confluence of UT1-4 and Martin Creek Overhead utility lines pose constraints to stream restoration approach and potentially crediting. .fGF '°? Wt'Yy?yk T w 4??A trr'w? *iir?'rep+??4+3xa}?fV'r rx r -? ??? r:: F s w[?, w "A V, _ rawest ; 00- ? f p K n •? n L q Enhancement efforts on Martins Creek will include removal of exotic, invasive vegetation and bank stabilization. W- C_ APPENDIX F. Wetland Delineation Findings TM ECS CAROLINAS, LLP C. OLLU A-- Gentechnical Construction Materials Environmental Facilities December 29, 2008 Mickey Clemmons Baker Engineering NY, Inc. 797 Haywood Road Suite 201 Asheville, North Carolina 28806 Reference: Report of Hydric Soil Delineation Lower Martin's Creek II Site Martin's Creek Road and Crisp Road Murphy, North Carolina ECS Project 31-1219 Dear Mr. Clemmons: ECS Carolinas, LLP (ECS) is pleased to provide you with our Report of Hydric Soil Delineation for the site located at the intersection of Martin's Creek Road and Crisp Road in Murphy, North Carolina. Our services were provided in general accordance with ECS Proposal No. 31-315-P. BACKGROUND The site is located at the intersection of Martin's Creek Road and Crisp Road in Murphy, North Carolina. The site is being evaluated for a potential wetland restoration project for the North Carolina Ecosystem Enhancement Program. SCOPE OF SERVICES ECS has conducted an investigation of the soils to determine the depth of hydric soil conditions and the depth of buried hydric soils within the area along the creek and adjacent to the drainage ditch. The assessment was conducted in accordance with current soil science practices and technology and field guides from the Natural Resources Conservation Service, USDA. To establish soil conditions, ECS dug holes using a hand auger approximately every 50 feet along transects across the field and excavated ten test pits to a depth of approximately 2 feet with a back hoe to confirm the hand auger holes. The locations of the hand augers holes and test pits and a diagram of the findings are depicted on an aerial photo provided by Baker Engineering NY, Inc (attached). A photo log of the excavation pits is also attached. REPORT OF FINDINGS PINK/BLACK A The surface layer has a texture of loam, 6 to 10 inches deep. The structure appears to be granular. The consistence is friable. The subsurface layer from 10 to 48 inches has textures of clay loam and clay. The consistence is firm, sticky, and plastic to very plastic. The subsurface layer from 40 inches to 48 inches has low chroma mottles of less than 2. The depth to the seasonal high water table is greater than 40 inches. Sample sites and pits are flagged with pink/black survey tape. ORANGE O The surface layer has a texture of loam, 7 to 10 inches deep. The structure appears to be granular. The consistence is friable. The subsurface layer from 10 to 39 inches has textures of clay loam and clay. The consistence is firm, sticky, and plastic to very plastic. The subsurface layer from 27 inches to 39 inches has low chroma mottles of less than 2. The depth to the seasonal high water table is greater than 27 inches. Sample sites and pits are flagged with orange wooden stakes. 200 Ridgefield Court, Suite 222, Asheville, NC 28806 ro (828)-665-2307 0 Fax (828)-665-8128 ? www.ecslimited.com A,1- i I I'. N C e Chas kale. N L' o f;-n+b++ru, N C 6 G...•rn i 11,, SC a Ra Lri a h. SC r S..masl+aar, tiC e A'llr+rm?wn, ^:C Hydric Soil Delineation Lower Martin's Creek 11 Site Murphy, North Carolina ECS Project 31-1219 RED R The surface layer has a texture of loam, 5 to 9 inches deep. The structure appears to be granular. The consistence is friable. The subsurface layer from 9 to 39 inches has textures of clay loam and clay. The consistence is firm, sticky, and plastic to very plastic. The subsurface layer from 15 inches to 22 inches has low chroma mottles of less than 2. The depth to the seasonal high water table is greater than 15 inches. Sample sites and pits are flagged with red wooden stakes. RED B The surface layer has a texture of loam, 14 to 18 inches deep. The structure appears to be granular. The consistence is friable. The subsurface layer from 14 to 22 inches has textures of dark grayish loam. The subsurface layer from 22 to 39 inches has textures of clay loam and clay. The consistence is firm, sticky, and plastic to very plastic. The subsurface layer from 22 inches to 39 inches has low chroma mottles of less than 2. The depth to the seasonal high water table is greater than 14 inches. Sample sites and pits are flagged with red wooden stakes. RED/BLACK P Excavation of the pit exposed a terra cotta pipe used for drainage. Water was freely moving through the pipe. The pit is flagged with a red/black survey tape. CONCLUSIONS PINK/BLACK A Mottles with chroma of less than 2 were observed at depths greater than 40 inches ORANGE O Mottles with chroma of less than 2 were observed at depths of 27 to 34 inches. RED R Mottles with chroma of less than 2 were observed at depths of 15 to 22 inches. RED B A dark grayish loam A horizon was observed from 14 to 22 inches. The texture of the overlying material was found to be loam and sandy loam. The dark grayish color (chroma of less than 2) in the A horizon indicates that this soil formed under conditions of saturation, flooding, and/or ponding long enough to develop anaerobic conditions. RED/BLACK P A terra cotta pipe installed for subsurface drainage was observed with water flowing freely. CLOSING ECS is pleased to offer you our professional services and we look forward to assisting in any of your site analysis needs in the future. If you have any questions or require further assistance, please contact Lauren Sicarelli at 828-665-2307 or Joe Hinton at (336) 362-4906. Respectfully, ECS CAROLINAS, LLP J ph A. Hinton, LSS Denise M. Poulos, LSS Senior Soil Scientist Principal Scientist Attachments: Figure 1 - Site Plan Figure 2 - Exploration Location Diagram Photo Log of Test Pits 2 I:? y Y . R ZR L ail I. Lager Martins r, 11 Site V IR B 113 B t? ' A? t ` iAp T," AL ?ft. LEGEND A : DRAINAGE MOTTLES >40 INCHES t A R R P R RR R R r R R y- a RR,. RR R R - R R B R PbtqptWjwafland S Yr -' R y, +r R R R R IES R : DRAINAGE MOTTLES - 14 TO 22 INCHES B : BURIED DARK GRAYISH A HORIZON P : TERRA COTTA PIPE PIT A : LOCATION OF PIT R : LOCATION OF PIT--B: LOCATION OF PIT _._ FIGURE I SOURCE: BAKER ENGINEERING NY, INC. SCALE 1 INCH = -200 FEET SITE PLAN LOWER MARTIN'S CREEK II SITE MARTIN'S CREEK ROAD & CRISP ROAD MURPHY, NORTH CAROLINA ECS PROJECT 31-1219 f p HA-49 66 HA-48 l HA-47 HA-46 0 HA-45 4! HA-44 HA-43 HA-38 HA-37 HA-36 HA-35 T6 Q) HA -50 a rc' r; HA-20 ?m $ A THA-21 O HA-22 e HA-23 v . HA-24 s MA-14 24 z HA-15 $ HA-16 I S& HAS-17 HA 18 - TP-17 P HA-19 HA-8 F9 A-11 HA-12 Q9 HA-13 HA-1 - A HA-2 T? HA-3 HA-4 HA-5 ?T?H0 6 HA-39 ? _ . HA-440 HA-41 HA-42 LEGEND HA-1 Hand Auger Location a TP-1 Test Pit Location SOURCE: FIGURE 2 EXPLORATION LOCATION DIAGRAM BAKER ENGINEERING NY, INC. LOWER MARTIN'S CREEK II SITE MARTIN'S CREEK ROAD & CRISP ROAD SCALE 1 INCH = 100 FEET ?+? ply ?? ?+ MURPHY, NORTH CAROLINA CAF•ULI1 VI'1?7 ECS PROJECT 31-1219 HA-34 Q5 HA-33 HA-32 HA-31 HA-30 -25 HA-26 P HA-27 A T 26 H -28 HA-29 TP8 4a Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 f '°•?? ,a? ?.-a .-??' ?»' ?; . ? ? ? i " ray°- Ns W, r ? r is ? wA•? ?'.sW7 ? ,i ?' .?.? '?,4°'+'?, Photo 1: Test Pit TP-1 f. 4p 14, 0. Photo 2: Test Pit TP-1 ECS Carolinas, LLP Page 1 Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 q??, mss.! •! : _? `? M ) e .,b'1/??A ! K YA ?145 a?`„kltT? ? ?9? ? \ y? A..r j ?..,.j l?.?'r?. ?'P. '?, .,5"' A, ?e?, Io , Photo 3: Test Pit TP-6 c .4 = _r 4 P r R9r' 41 ECS .a 1 Carolinas, LLP F M'4N ' it r.? ?'?Y Photo 4: Test Pit TP-6 z. Page 2 Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 i .. ? A y 1 7 -` •a. te ` e ? Ti Photo 5: Test Pit TP-16 u ?I Photo 6: Test Pit TP-16 w- i ECS Carolinas, LLP Page 3 Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 MEMO" i ;-.( 1.1 Y L: a ;? d`7g r s yar 'Aff r s 41 .L? _ >r . .: c .. :. ' .. r•, :..._ PSI `t a. 4 Photo 8: Test Pit TP-17 , ylr N ? A I t ? e M? ECS Carolinas, LLP Page 4 Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 3 " v lY r' f.I .. .S.Y ? n V _ .1a..:t S t 177 TT''?? A Photo 9: Test Pit TP-24 r . r- 1A XWO A.4 r A Ilk Photo 10: Test Pit TP-24 ECS Carolinas, LLP Page 5 Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 71 *r ?$ a j 7 r yr 7 Photo 11: Test Pit TP-26 W N? I ?j .w.1'. ?• iJw?' - • ?.,? - r" Gib R•. i 4 ECS Carolinas, LLP Page 6 Photo 12: Test Pit TP-26 Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 E ,t F ` taw R AI v2` 7 i T N %4. ECS Carolinas, LLP Page 7 Photo 13: Test Pit TP-36 Photo 14: Test Pit TP-36 Hydric Soil Assessment - Lower Martin's Creek Site Martin's Creek Road and Crisp Road, Murphy, North Carolina ECS Project No. 31-1219 _ r _r 24 N ice. C ?{`q1, _ ,K r { ,r w1 .I 0.. :t 7 r?A :.rJ.v-, t.rk! ? r ?3 a -?•, .r 1? ? :?? ,t _ {fir- T-? Photo 15: Test Pit TP-20 Photo 16: Test Pit TP-20 t ECS Carolinas, LLP Page 8 TM WETLAND JURISDICTIONAL REVIEW LOWER MARTIN'S CREEK II SITE MARTIN'S CREEK ROAD AND CRISP ROAD MUPRHY, CHEROKEE COUNTY, NORTH CAROLINA Th1 @.sl'.alT ® acs CaRaL1NAs, LLr C. s LL,jm -_ Geotechnical Construction N9aterials Environmental Facilities Ms. Loretta. Beckwith U.S. Army Corps of Engineers Asheville Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, North Carolina 28801-5006 RE: Wetland Jurisdictional Review Lower Martin's Creel II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Carolinas, LLP Project No. 31:1219 Dear Ms. Beckwith: January 22, 2009 Please review the attached material included for a wetland jurisdictional determination for the above- mentioned property. The site is located in the northwest quadrant of the intersection of Martin's Creek Road and Crisp Road in Murphy, Cherokee County, North Carolina, and is further identified as a portion of Cherokee County Tax Parcel No. 459100146624000. At the time of the wetland delineation the subject site, was in use as a cattle pasture. According to the U.S. Environmental Protection Agency's (EPA), Enviromapper website, the site is located in the Hiawassee River Basin (HUC Code 06020002). On December 4, 2008, ECS Carolinas, LLP (ECS) delineated three wetland areas located on the site, labeled as Wetland A, Wetland B, and Wetland C. The three wetland areas are situated from south to north along an agricultural ditch in the central portion of the site. Vegetation in the wetland areas consisted of Juncus effusus, Ponterderia cordata, Polygonum spp., Phragmites austrahs and Carex spp. Soils for the site were not available on the USDA Web Soil Survey, however, soils in the wetland exhibited hydric conditions and were consistently a 10YR 6/1 on the Munsell Soil Color Chart. The ditch exhibited characteristics of an ordinary high water mark and flowed directly into Martin's Creek, a perennial stream. The delineation was performed based upon the hydrology of the wetland, hydric characteristics of the soil and hydrophytic vegetation, as described in the 1987, U.S. Corps of Engineers, Wetland Delineation Manual. ECS also performed Routine Wetland Delineation Data Form test plots (copies enclosed) to verify the difference between the wetland and upland areas located at the site. As requested by the client, Mr. Micky Clemmons of Michael Baker Engineering, Inc, ECS is enclosing the following materials to assist with your jurisdictional review of the wetland boundary: • Copies of the Routine Wetland Delineation Data Forms; • Jurisdictional Determination Form; • Property owner's signed letter of authorization for allowed site visits; • Driving directions and map to the site; • Map showing the location of the site (Figure 1), a USGS Quad map with site boundaries depicted and the coordinates for the center of the site shown in deci-degrees (Figure 2), the US Fish and Wildlife Service National Wetland Inventory Map (Figure 3), and field sketch of the wetland delineation (Figure 4); • Photo Log. 200 Ridgefield Court, Suite 222, Asheville, NC 28806 a (828)-665-2307 • Fax {828}-665-8128 0 www.ecslimited.com :1:hF-"dlt N, [lwe I,i [v NC +(:r?vr Ir r.•. M'+i.a . ill'. "t +R 3 aA, N(-; .hire .r, Wetland Jurisdictional Review -Lower Martin 's Creek II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Carolinas, LLP Project No. 31:1219 January 22, 2009 Applicant/Address: Mr. Micky Clemmons Michael Baker Engineering, Inc. 797 Haywood Road Asheville, North Carolina 28806 ECS' objective is to have a final determination by your office as to the delineated, jurisdictional boundaries of the wetlands. Thank you in advance for your assistance with this project. If you have any questions or need additional information please contact Lauren Sicarelli at (828) 989-6911. ECS Carolinas, LLP 6x? JSicarelli Environmental Scientist Enclosures: Appendices DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: crr Date: Applicant/Owner. - ° , County: Investigator: State: Do Normal Circumstances Exist on the site? Yes. No Is the site significantly disturbed (Atypical Situation)? Yes 'No Community ID: Transect ID: Is the area a potential Problem Area? Yes Flo; Plot ID: (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 9. 2. 10. 3. 11. 4. 12. 5. 13. 6. _ 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC-). Remarks: HYDROLOGY _ Recorded Data (Describe in Remarks): Wetland hydrology Indicators: Stream, Lake, or Tide Gauge Primary Indicators: Aerial Photographs Inundated Other Saturated in Upper 12 Inches No Recorded Data Available Water Marks Drift Lines Sediment Deposits Field Observations: Drainage Patterns in Wetlands Secondary Indicators (2 or more required): Depth of Surface Water: (in.) Oxidized Root Channels in Upper 12" Water-Stained Leaves Depth to Free Water in Pit:(in.) Local Soil Survey Data FAC-Neutral Test Depth to Saturated Soil: (in.) Other (Explain in Remarks) Remarks: SOILS Map Unit Name (Series and Phase):`?,??f .. Drainage Class: Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes No J Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. r ?? y Hydric Soil Indicators: Histosol _ Concretions _ _ Histic Epipedon _ High Organic Content in Surfa ce Layer Sandy Soils _ Sulfidic Odor _ Organic Streaking in Sandy Soils Aquic Moisture Regime _ Listed on Local Hydric Soils List Reducing Conditions _ Listed on National Hydric Soils List Gleyed or Low-Chroma Colors _ Other (Explain in Remarks) Remarks: WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes No (Circle) (Circle) Wetland Hydrology Present? :Yes. No Hydric Soils Present? 'fifes No Is this Sampling Point Within a Wetland? Yes No Gl U? . Remarks: ?C? C 4 ? (/\ p t fy c f C4-f (2 , SSA 11 a s d / -4-LL,. ??J11 dl ???c ?'??7w??,, 7?l M 1 at d (t a ltd pD ?i-i en S v -f- Jt-ez i 4-e-J Ci/ ?-/ (e s Hpprovea oy nUUaNUr 3roZ DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Date: ' Applicant/Owner: County: Investigator: - State: Do Normal Circumstances Exist on the site? Yes No Community ID: ?l Is the site significantly disturbed (Atypical Situation)? Yes No.° Transact ID: . Iron Is the area a potential Problem Area? Yes 'No Plot ID: (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 9. 10. 3. 11. 4. 12. 5. 13. 6. _ 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC-). Remarks: 11 HYDROLOGY _ Recorded Data (Describe in Remarks): Wetland hydrology Indicators: Stream, Lake, or Tide Gauge Primary Indicators: Aerial Photographs Inundated Other Saturated in Upper 12 Inches No Recorded Data Available Water Marks Drift Lines Sediment Deposits Field Observations: Drainage Patterns in Wetlands Secondary Indicators (2 or more required): Depth of Surface Water: _(in.) Oxidized Root Channels in Upper 12" Water-Stained Leaves Depth to Free Water in Pit:' (in.) Local Soil Survey Data FAC-Neutral Test Depth to Saturated Soil: (in.) Other (Explain in Remarks) Remarks: SOILS Map Unit Name (Series and Phase): Drainage Class: Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes "Nor Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. Hydric Soil Indicators: _ Histosol _ Concretions _ Histic Epipedon _ High Organic Content in Surface Layer Sandy Soils _ Sulfidic Odor _ Organic Streaking in Sandy Soils Aquic Moisture Regime _ Listed on Local Hydric Soils List _ Reducing Conditions _ Listed on National Hydric Soils List Gleyed or Low-Chroma Colors - Other (Explain in Remarks) Remarks: WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes No (Circle) Wetland Hydrology Present? Yes No Hydric Soils Present? Yes No Remarks: (Circle) Is this Sampling Point Within a Wetland? Yes Not Approved by HQUSACE 3192 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: .. ?; Date: 1 " . < Applicant/Owner: Fr? e, County: 0 Investigator: State: Do Normal Circumstances Exist on the site? Yes No. Community ID: Is the site significantly disturbed (Atypical Situation)? Yes No Transect ID: Is the area a potential Problem Area? Yes ' o Plot ID: (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 9. 2. 10. 3. 11. 4. 12. 5. 13. 6. _ 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC-). Remarks: HYDROLOGY _ Recorded Data (Describe in Remarks): Wetland hydrology Indicators: Stream, Lake, or Tide Gauge Primary Indicators: Aerial Photographs Inundated Other -"'Saturated in Upper 12 Inches No Recorded Data Available Water Marks Drift Lines Sediment Deposits Field Observations: Drainage Patterns in Wetlands Secondary Indicators (2 or more required): Depth of Surface Water. Oxidized Root Channels in Upper 12" Water-Stained Leaves Depth to Free Water in Pit: (in.) Local Soil Survey Data FAC-Neutral Test Depth to Saturated Soil: (in.) Other (Explain in Remarks) Remarks: SOILS Map Unit Name (Series and Phase): sl+ (d J` ???r ; Drainage Class: Taxonomy (Subgroup): Field Observations Confirm Ma e? Yes No ed T pp yp Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. Hydric Soil Indicators: _ Histosol ' Concretions _ Histic Epipedon _ High Organic Content in Surface Layer Sandy Soils Sulfidic Odor _ Organic Streaking in Sandy Soils Aquic Moisture Regime _ Listed on Local Hydric Soils List Reducing Conditions _ Listed on National Hydric Soils List _Gleyed or Low-Chroma Colors _ Other (Explain in Remarks) Remarks: WETLAND DETERMINATION Hydrophytic Vegetation Present? ;-Yes No (Circle) (Circle) Wetland Hydrology Present? des No Hydric Soils Present? kYeS No Is this Sampling Point Within a Wetland? Yes No Remarks: Approved by HQUSACE 3/92 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: Date: Applicant/Owner: i County: Investigator: State: Do Normal Circumstances Exist on the site? Yes No Community ID: Is the site significantly disturbed (Atypical Situation)? Yes o, Transect ID: Is the area a potential Problem Area? Yes NO Plot ID: (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. s sw.;.. r 9. 10. 3. 11. 4. 12. 5. 13. 6. _ 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC-)._- . Remarks: HYDROLOGY _ Recorded Data (Describe in Remarks): Wetland hydrology Indicators: Stream, Lake, or Tide Gauge Primary Indicators: Aerial Photographs Inundated Other Saturated in Upper 12 Inches No Recorded Data Available Water Marks Drift Lines Sediment Deposits Field Observations: Drainage Patterns in Wetlands Secondary Indicators (2 or more required): Depth of Surface Water: (in.) Oxidized Root Channels in Upper 12" Water-Stained Leaves Depth to Free Water in Pit: (in.) Local Soil Survey Data FAC-Neutral Test Depth to Saturated Soil: (in.) Other (Explain in Remarks) Remarks: SOILS Map Unit Name (Series and Phase): Drainage Class: Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes No Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. Hydric Soil Indicators: _ Histosol Concretions _ Histic Epipedon _ High Organic Content in Surfa ce Layer Sandy Soils _ Sulfidic Odor _ Organic Streaking in Sandy Soils Aquic Moisture Regime _ Listed on Local Hydric Soils List Reducing Conditions Listed on National Hydric Soils List Gleyed or Low-Chroma Colors _ -Other (Explain in Remarks) Remarks: WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes No (Circle) Wetland Hydrology Present? Yes No Hydric Soils Present? Yes No Remarks: (Circle) Is this Sampling Point Within a Wetland? Yes No Approved by HQUSACE 3/92 DATA FORM ROUTINE WETLAND DETERMINATION (1987 COE Wetlands Delineation Manual) Project/Site: _ Date: Applicant/Owner: Investigator: County: State: Do Normal Circumstances Exist on the site? Yes No Community ID: Is the site significantly disturbed (Atypical Situation)? Yes "No Transect ID: Is the area a potential Problem Area? Yes No Plot ID: (If needed, explain on reverse.) VEGETATION Dominant Plant Species Stratum Indicator Dominant Plant Species Stratum Indicator 1. - 9. 2 _ 10. 3. 11. 4. 12. 5. 13. 6. _ 14. 7. 15. 8. 16. Percent of Dominant Species that are OBL, FACW or FAC (excluding FAC-). Remarks: HYDROLOGY _ Recorded Data (Describe in Remarks): Wetland hydrology Indicators: Stream, Lake, or Tide Gauge Primary Indicators: Aerial Photographs Inundated Other Saturated in Upper 12 Inches _ No Recorded Data Available Water Marks Drift Lines Sediment Deposits Field Observations: Drainage Patterns in Wetlands Secondary Indicators (2 or more required): Depth of Surface Water: (in.) Oxidized Root Channels in Upper 12" 7 of ' Water-Stained Leaves Depth to Free Water in Pit: (in.) Local Soil Survey Data FAC-Neutral Test Depth to Saturated Soil: (in.) Other (Explain in Remarks) Remarks: SOILS Map Unit Name (Series and Phase): ' j 3fd/ Y € Drainage Class: Field Observations Taxonomy (Subgroup): Confirm Mapped Type? Yes (No, Profile Description: Depth Matrix Color Mottle Colors Mottle Texture, Concretions, inches Horizon (Munsell Moist) (Munsell Moist) Abundance/Contrast Structure, etc. A Hydric Soil Indicators: Histosol _ Concretions _ _ Histic Epipedon _ High Organic Content in Surface Layer Sandy Soils Sulfidic Odor _ Organic Streaking in Sandy Soils _ - Aquic Moisture Regime _ Listed on Local Hydric Soils List Reducing Conditions _ Listed on National Hydric Soils List Gleyed or Low-Chroma Colors -Other (Explain in Remarks) Remarks: WETLAND DETERMINATION Hydrophytic Vegetation Present? Yes Wetland Hydrology Present? Yes Hydric Soils Present? Yes Remarks: No (Circle) (Circle) No No Is this Sampling Point Within a Wetland? Yes No Approves ny NUUwAUL siaZ APPROVED JURISDICTIONAL DETERMINATION FORM U.S. Army Corps of Engineers This form should be completed by following the instructions provided in Section IV of the JD Form Instructional Guidebook. SECTION L• BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR APPROVED JURISDICTIONAL DETERMINATION (JD): B. DISTRICT OFFICE, FILE NAME, AND NUMBER: C. PROJECT LOCATION AND BACKGROUND INFORMATION: State: County/parish/borough: City: Center coordinates of site (lat/long in degree decimal format): Lat. -84.025° N, Long. 35.054° W. Universal Transverse Mercator: Name of nearest waterbody: Markin Creek Name of nearest Traditional Navigable Water (TNW) into which the aquatic resource flows: Hiawassee River Name of watershed or Hydrologic Unit Code (HUC): ® Check if map/diagram of review area and/or potential jurisdictional areas is/are available upon request. ? Check if other sites (e.g., offsite mitigation sites, disposal sites, etc... ) are associated with this action and are recorded on a different JD form. D. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ? Office (Desk) Determination. Date: ? Field Determination. Date(s): SECTION IL• SUMMARY OF FINDINGS A. RHA SECTION 10 DETERMINATION OF JURISDICTION. There Are no "navigable waters of the U.S." within Rivers and Harbors Act (RHA) jurisdiction (as defined by 33 CFR part 329) in the review area. [Required] ? Waters subject to the ebb and flow of the tide. ? Waters are presently used, or have been used in the past, or may be susceptible for use to transport interstate or foreign commerce. Explain: B. CWA SECTION 404 DETERMINATION OF JURISDICTION. There Are "waters of the U.S." within Clean Water Act (CWA) jurisdiction (as defined by 33 CFR part 328) in the review area. [Required] 1. Waters of the U.S. a. Indicate presence of waters of U. S. in review area (check all that apply): ' ? TNWs, including territorial seas ? Wetlands adjacent to TNWs ® Relatively permanent waters (RPWs) that flow directly or indirectly into TNWs ? Non-RPWs that flow directly or indirectly into TNWs ® Wetlands directly abutting RPWs that flow directly or indirectly into TNWs ? Wetlands adjacent to but not directly abutting RPWs that flow directly or indirectly into TNWs ? Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs ? Impoundments of jurisdictional waters ? Isolated (interstate or intrastate) waters, including isolated wetlands b. Identify (estimate) size of waters of the U. S. in the review area: Non-wetland waters: 850 linear feet: 3-4 width (ft) and/or acres. Wetlands: -2-3 acres. c. Limits (boundaries) of jurisdiction based on: 1987 Delineation Manual Elevation of established OHWM (if known): 2. Non-regulated waters/wetlands (check if applicable) :3 ? Potentially jurisdictional waters and/or wetlands were assessed within the review area and determined to be not jurisdictional. Explain: ' Boxes checked below shall be supported by completing the appropriate sections in Section III below. z For purposes of this form, an RPW is defined as a tributary that is not a TNW and that typically flows year-round or has continuous flow at least "seasonally" (e.g., typically 3 months). s Supporting documentation is presented in Section IILF. SECTION III: CWA ANALYSIS A. TNWs AND WETLANDS ADJACENT TO TNWs The agencies will assert jurisdiction over TNWs and wetlands adjacent to TNWs. If the aquatic resource is a TNW, complete Section III.A.1 and Section IILD.1. only; if the aquatic resource is a wetland adjacent to a TNW, complete Sections IILA.1 and 2 and Section HLDA.; otherwise, see Section HLB below. 1. TNW Identify TNW: Summarize rationale supporting determination: 2. Wetland adjacent to TNW Summarize rationale supporting conclusion that wetland is "adjacent B. CHARACTERISTICS OF TRIBUTARY (THAT IS NOT A TNW) AND ITS ADJACENT WETLANDS (IF ANY): This section summarizes information regarding characteristics of the tributary and its adjacent wetlands, if any, and it helps determine whether or not the standards for jurisdiction established under Rapanos have been met. The agencies will assert jurisdiction over non-navigable tributaries of TNWs where the tributaries are "relatively permanent waters" (RPWs), i.e. tributaries that typically flow year-round or have continuous flow at least seasonally (e.g., typically 3 months). A wetland that directly abuts an RPW is also jurisdictional. If the aquatic resource is not a TNW, but has year-round (perennial) flow, skip to Section IH.D.2. If the aquatic resource is a wetland directly abutting a tributary with perennial flow, skip to Section HLDA. A wetland that is adjacent to but that does not directly abut an RPW requires a significant nexus evaluation. Corps districts and EPA regions will include in the record any available information that documents the existence of a significant nexus between a relatively permanent tributary that is not perennial (and its adjacent wetlands if any) and a traditional navigable water, even though a significant nexus finding is not required as a matter of law. If the waterbody4 is not an RPW, or a wetland directly abutting an RPW, a JD will require additional data to determine if the waterbody has a significant nexus with a TNW. If the tributary has adjacent wetlands, the significant nexus evaluation must consider the tributary in combination with all of its adjacent wetlands. This significant nexus evaluation that combines, for analytical purposes, the tributary and all of its adjacent wetlands is used whether the review area identified in the JD request is the tributary, or its adjacent wetlands, or both. If the JD covers a tributary with adjacent wetlands, complete Section III.B.1 for the tributary, Section IILB.2 for any onsite wetlands, and Section IILB.3 for all wetlands adjacent to that tributary, both onsite and offsite. The determination whether a significant nexus exists is determined in Section IH.C below. 1. Characteristics of non-TNWs that flow directly or indirectly into TNW (i) General Area Conditions: Watershed size: 20 acres Drainage area: 10 Pick List Average annual rainfall: 57 inches Average annual snowfall: 5 inches (ii) Physical Characteristics: (a) Relationship with TNW: ? Tributary flows directly into TNW. ® Tributary flows through 2 tributaries before entering TNW. from TNW. Project waters are 1 (or less) aerial (straight) Project waters cross or serve as state boundaries. Explain: Project waters are 2-5 river miles from TNW Project waters RPW. are 1 (or less) river miles from Project waters are 1-2 aerial (straight) miles f Pro miles from RPW. Identify flow route to TNWs: wetlands flow into agricultural ditch (which was created in wetlands) and then flows into Martin's Creek Martin's Creek flows directly into the Hiawasse River. a Note that the Instructional Guidebook contains additional information regarding swales, ditches, washes, and erosional features generally and in the and West. 5 Flow route can be described by identifying, e.g., tributary a, which flows through the review area, to flow into tributary b, which then flows into TNW. Tributary stream order, if known: 1 st. (b) General Tributary Characteristics (check all that apps Tributary is: ? Natural ? Artificial (man-made). Explain: ® Manipulated (man-altered). Explain: Stream was likely moved or ditch was created to drain wetlands. Tributary properties with respect to top of bank (estimate): Average width: 3-4 feet Average depth: 2-3 feet Average side slopes: Vertical (1:1 or less). Primary tributary substrate composition (check all that apply): ® Silts ? Sands ? Concrete ® Cobbles ? Gravel ? Muck ? Bedrock ? Vegetation. Type/% cover: ? Other. Explain: Tributary condition/stability [e.g., highly eroding, sloughing banks]. Explain: poor condition, has been ditched. Presence of run/riffle/pool complexes. Explain: no run/riffle/pool complexes. Tributary geometry: Relatively straight Tributary gradient (approximate average slope): -l % (c) Flow: Tributary provides for: Intermittent but not seasonal flow Estimate average number of flow events in review area/year: 11-20 Describe flow regime: Other information on duration and volume: Surface flow is: Discrete and confined. Characteristics: Subsurface flow: No. Explain findings: ? Dye (or other) test performed: Tributary has (check all that apply): ® Bed and banks ? OHWM6 (check all indicators that apply): ? clear, natural line impressed on the bank ® changes in the character of soil ? ? shelving ? ® vegetation matted down, bent, or absent ? ? leaf litter disturbed or washed away ? ? sediment deposition ? ® water staining ? ? other (list): ? Discontinuous OHWM' Explain: the presence of litter and debris destruction of terrestrial vegetation the presence of wrack line sediment sorting scour multiple observed or predicted flow events abrupt change in plant community If factors other than the OHWM were used to determine lateral extent of CWA jurisdiction (check all that apply): ? High Tide Line indicated by: ? Mean High Water Mark indicated by: ? oil or scum line along shore objects ? survey to available datum, ? fine shell or debris deposits (foreshore) ? physical markings; ? physical markings/characteristics ? vegetation lines/changes in vegetation types. ? tidal gauges ? other (list): (iii) Chemical Characteristics: Characterize tributary (e.g., water color is clear, discolored, oily film, water quality; general watershed characteristics, etc.). Explain: ditch was over-grown with briars and flow was low, but wate was present. Identify specific pollutants, if known: 'A natural or man-made discontinuity in the OHWM does not necessarily sever jurisdiction (e.g., where the stream temporarily flows underground, or where the OHWM has been removed by development or agricultural practices). Where there is a break in the OHWM that is unrelated to the waterbody's flow regime (e.g., flow over a rock outcrop or through a culvert), the agencies will look for indicators of flow above and below the break. 'Ibid. (iv) Biological Characteristics. Channel supports (check all that apply): ? Riparian corridor. Characteristics (type, average width): ® Wetland fringe. Characteristics: three wetland pockets were delineated along ditch. ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: ? Aquatic/wildlife diversity. Explain findings: 2. Characteristics of wetlands adjacent to non-TNW that flow directly or indirectly into TNW (i) Physical Characteristics: (a) General Wetland Characteristics: Properties: Wetland size:2-3 acres Wetland type. Explain: palustrine . Wetland quality. Explain:fairly good qualtiy with well established wetland species. Project wetlands cross or serve as state boundaries. Explain: (b) General Flow Relationship with Non-TNW: Flow is: Intermittent flow. Explain: Surface flow is: Di Characteristics: Subsurface flow: Yes. Explain findings: wetland hydrology appeared to come from base of hill side, rather than from ditch. Ditch hydrology was from wetlands. ? Dye (or other) test performed: (c) Wetland Adjacency Determination with Non-TNW: ® Directly abutting ? Not directly abutting ? Discrete wetland hydrologic connection. Explain: ? Ecological connection. Explain: ? Separated by berm/barrier. Explain: (d) Proximity (Relationship) to TNW Project wetlands are 2-5 river miles from TNW. Project waters are 1-2 aerial (straight) miles from TNW. Flow is from: Wetland to navigable waters. Estimate approximate location of wetland as within the 10 - 20-year floodplain. (ii) Chemical Characteristics: Characterize wetland system (e.g., water color is clear, brown, oil film on surface; water quality, general watershed characteristics; etc.). Explain: wetland plants well established, little impact/ erosion from cattle. Identify specific pollutants, if known: (iii) Biological Characteristics. Wetland supports (check all that apply): ® Riparian buffer. Characteristics (type, average width): ? Vegetation type/percent cover. Explain: ? Habitat for: ? Federally Listed species. Explain findings: ? Fish/spawn areas. Explain findings: ? Other environmentally-sensitive species. Explain findings: ? Aquatic/wildlife diversity. Explain findings: Characteristics of all wetlands adjacent to the tributary (if any) All wetland(s) being considered in the cumulative analysis: 3 Approximately ( 2-3 ) acres in total are being considered in the cumulative analysis. For each wetland, specify the following: Directly abuts? (Y/N) Size (in acres) Directly abuts? (Y/N) Size (in acres) Wetland A Y 1.5-2.0 Wetland B Y 0.75 Wetland C Y 0.25 Summarize overall biological, chemical and physical functions being performed: Primary beneficial function is nutrient removal as the wetlands are located in a cattle pasture . C. SIGNIFICANT NEXUS DETERMINATION A significant nexus analysis will assess the flow characteristics and functions of the tributary itself and the functions performed by any wetlands adjacent to the tributary to determine if they significantly affect the chemical, physical, and biological integrity of a TNW. For each of the following situations, a significant nexus exists if the tributary, in combination with all of its adjacent wetlands, has more than a speculative or insubstantial effect on the chemical, physical and/or biological integrity of a TNW. Considerations when evaluating significant nexus include, but are not limited to the volume, duration, and frequency of the flow of water in the tributary and its proximity to a TNW, and the functions performed by the tributary and all its adjacent wetlands. It is not appropriate to determine significant nexus based solely on any specific threshold of distance (e.g. between a tributary and its adjacent wetland or between a tributary and the TNW). Similarly, the fact an adjacent wetland lies within or outside of a floodplain is not solely determinative of significant nexus. Draw connections between the features documented and the effects on the TNW, as identified in the Rapanos Guidance and discussed in the Instructional Guidebook. Factors to consider include, for example: • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to carry pollutants or flood waters to TNWs, or to reduce the amount of pollutants or flood waters reaching a TNW? • Does the tributary, in combination with its adjacent wetlands (if any), provide habitat and lifecycle support functions for fish and other species, such as feeding, nesting, spawning, or rearing young for species that are present in the TNW? • Does the tributary, in combination with its adjacent wetlands (if any), have the capacity to transfer nutrients and organic carbon that support downstream foodwebs? • Does the tributary, in combination with its adjacent wetlands (if any), have other relationships to the physical, chemical, or biological integrity of the TNW? Note: the above list of considerations is not inclusive and other functions observed or known to occur should be documented below: Significant nexus findings for non-RPW that has no adjacent wetlands and flows directly or indirectly into TNWs. Explain findings of presence or absence of significant nexus below, based on the tributary itself, then go to Section IILD: Significant nexus findings for non-RPW and its adjacent wetlands, where the non-RPW flows directly or indirectly into TNWs. Explain fmdings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section IILD: wetland areas and ditch flow into Lower Martin's Creek which flows directly into the Hiawassee River approximately 4 river miles away. The wetlands provide nutrient removal from the cattle pasture they are a part of. 3. Significant nexus findings for wetlands adjacent to an RPW but that do not directly abut the RPW. Explain findings of presence or absence of significant nexus below, based on the tributary in combination with all of its adjacent wetlands, then go to Section IILD: D. DETERMINATIONS OF JURISDICTIONAL FINDINGS. THE SUBJECT WATERS/WETLANDS ARE (CHECK ALL THAT APPLY): TNWs and Adjacent Wetlands. Check all that apply and provide size estimates in review area: ? TNWs: linear feet width (ft), Or, acres. ? Wetlands adjacent to TNWs: acres. RPWs that flow directly or indirectly into TNWs. ? Tributaries of TNWs where tributaries typically flow year-round are jurisdictional. Provide data and rationale indicating that tributary is perennial: Z Tributaries of TNW where tributaries have continuous flow "seasonally" (e.g., typically three months each year) are jurisdictional. Data supporting this conclusion is provided at Section IILB. Provide rationale indicating that tributary flows seasonally: first order ditch with hydric soils and substrate differs from surrounding uplands. Provide estimates for jurisdictional waters in the review area (check all that apply): ® Tributary waters: 850 linear feet 3-4width (ft). ? Other non-wetland waters: acres. Identify type(s) of waters: 3. Non-RPWs8 that flow directly or indirectly into TNWs. ? Waterbody that is not a TNW or an RPW, but flows directly or indirectly into a TNW, and it has a significant nexus with a TNW is jurisdictional. Data supporting this conclusion is provided at Section IILC. Provide estimates for jurisdictional waters within the review area (check all that apply): ? Tributary waters: linear feet width (ft). ? Other non-wetland waters: acres. Identify type(s) of waters: Wetlands directly abutting an RPW that flow directly or indirectly into TNWs. ? Wetlands directly abut RPW and thus are jurisdictional as adjacent wetlands. ? Wetlands directly abutting an RPW where tributaries typically flow year-round. Provide data and rationale indicating that tributary is perennial in Section III.D.2, above. Provide rationale indicating that wetland is directly abutting an RPW: ? Wetlands directly abutting an RPW where tributaries typically flow "seasonally." Provide data indicating that tributary is seasonal in Section III.B and rationale in Section IILD.2, above. Provide rationale indicating that wetland is directly abutting an RPW: Provide acreage estimates for jurisdictional wetlands in the review area: acres. 5. Wetlands adjacent to but not directly abutting an RPW that flow directly or indirectly into TNWs. ® Wetlands that do not directly abut an RPW, but when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisidictional. Data supporting this conclusion is provided at Section IILC. Provide acreage estimates for jurisdictional wetlands in the review area: 2-3 acres. Wetlands adjacent to non-RPWs that flow directly or indirectly into TNWs. ? Wetlands adjacent to such waters, and have when considered in combination with the tributary to which they are adjacent and with similarly situated adjacent wetlands, have a significant nexus with a TNW are jurisdictional. Data supporting this conclusion is provided at Section IILC. Provide estimates for jurisdictional wetlands in the review area: acres. Impoundments of jurisdictional waters.9 As a general rule, the impoundment of a jurisdictional tributary remains jurisdictional. ? Demonstrate that impoundment was created from "waters of the U.S.," or ? Demonstrate that water meets the criteria for one of the categories presented above (1-6), or ? Demonstrate that water is isolated with a nexus to commerce (see E below). E. ISOLATED [INTERSTATE OR INTRA-STATE] WATERS, INCLUDING ISOLATED WETLANDS, THE USE, DEGRADATION OR DESTRUCTION OF WHICH COULD AFFECT INTERSTATE COMMERCE, INCLUDING ANY SUCH WATERS (CHECK ALL THAT APPLY):" ? which are or could be used by interstate or foreign travelers for recreational or other purposes. 'See Footnote # 3. 9 To complete the analysis refer to the key in Section IILD.6 of the Instructional Guidebook. 10 Prior to asserting or declining CWA jurisdiction based solely on this category, Corps Districts will elevate the action to Corps and EPA HQ for review consistent with the process described in the Corps/EPA Memorandum Regarding CWA Act Jurisdiction Following Rapanos ? from which fish or shellfish are or could be taken and sold in interstate or foreign commerce. ? which are or could be used for industrial purposes by industries in interstate commerce. ? Interstate isolated waters. Explain: ? Other factors. Explain: Identify water body and summarize rationale supporting determination: Provide estimates for jurisdictional waters in the review area (check all that apply): ? Tributary waters: linear feet width (ft). ? Other non-wetland waters: acres. ? Wetlands acres. NON-JURISDICTIONAL WATERS, INCLUDING WETLANDS (CHECK ALL THAT APPLY): ? If potential wetlands were assessed within the review area, these areas did not meet the criteria in the 1987 Corps of Engineers Wetland Delineation Manual and/or appropriate Regional Supplements. ? Review area included isolated waters with no substantial nexus to interstate (or foreign) commerce. ? Prior to the Jan 2001 Supreme Court decision in "SWANCC," the review area would have been regulated based solely on the "Migratory Bird Rule" (MBR). ? Waters do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction. Explain: ? Other: (explain, if not covered above): Provide acreage estimates for non-jurisdictional waters in the review area, where the sole potential basis of jurisdiction is the MBR factors (i.e., presence of migratory birds, presence of endangered species, use of water for irrigated agriculture), using best professional judgment (check all that apply): ? Non-wetland waters (i.e., rivers, streams): linear feet width (ft). ? Lakes/ponds: acres. ? Other non-wetland waters: acres. List type of aquatic resource: ? Wetlands: acres. Provide acreage estimates for non-jurisdictional waters in the review area that do not meet the "Significant Nexus" standard, where such a finding is required for jurisdiction (check all that apply): ? Non-wetland waters (i.e., rivers, streams): linear feet, width (ft). ? Lakes/ponds: acres. ? Other non-wetland waters: acres. List type of aquatic resource: ? Wetlands: acres. SECTION IV: DATA SOURCES. A. SUPPORTING DATA. Data reviewed for JD (check all that apply - checked items shall be included in case file and, where checked and requested, appropriately reference sources below): ® Maps, plans, plots or plat submitted by or on behalf of the applicant/consultant: ® Data sheets prepared/submitted by or on behalf of the applicant/consultant. ? Office concurs with data sheets/delineation report. ? Office does not concur with data sheets/delineation report. ? Data sheets prepared by the Corps: ? Corps navigable waters' study: ? U.S. Geological Survey Hydrologic Atlas: ? USGS NHD data. ? USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: Murphy, NC 7.5 min. ? USDA Natural Resources Conservation Service Soil Survey. Citation: ® National wetlands inventory map(s). Cite name: Murphy, NC. ? State/Local wetland inventory map(s): ? FEMA/FIRM maps: ? 100-year Floodplain Elevation is: (National Geodectic Vertical Datum of 1929) ® Photographs: ® Aerial (Name & Date): Obtained from Google Earth, dated July 2006. or ® Other (Name & Date):Photo log from December 5, 2008 during delineation. ? Previous determination(s). File no. and date of response letter: ? Applicable/supporting case law: ? Applicable/supporting scientific literature: ? Other information (please specify): Identify type(s) of waters: B. ADDITIONAL COMMENTS TO SUPPORT JD: January 2, 2009 Ms. Loretta Beckwith, Project Manager Asheville Regulatory Field Office U.S. Army Corps of Engineers 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 Reference: Agent Authorization and Site Access Authorization Jurisdictional Wetland Determination Lower Martin's Creek II Site Lower Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina EEP Contract #13090105, Baker Project #114414, ECS Project # 31-1219 Dear Ms. Beckwith: As the property owner, I am hereby authorizing you and/or other employees of the U.S. Army Corps of Engineers (USAGE), Asheville Regulatory Field Office, to enter and inspect the above- referenced project site. I understand that this site inspection will result in determination of the jurisdictional status of the property's wetlands/surface waters under the USAGE Section 404/401 Regulatory Program. Additionally, as the property owner, I hereby authorize Michael Baker Engineering, Inc. to act as my authorized agent regarding wetlands and streams on my property and for their subconsultant, ECS Carolinas, LLP, to make a formal request for a wetland determination on my property. Please contact me if you need additional information. Sincerely, (Owner Signature) (Print fl, Name) (Date) R .10 Q lfl ( 11-V 12 1-1 (Phone No.) (Address) Site Location aMft 1 Wetland A Crisp Road Lend ® Wetland Area ?Ditch Data Point Approximate Stream Locations Figure No. ti Google Earth 4 W , Wetland Assessment ?a?uw ram ?; Lower Martin's Creek II Site ECS Project # Martin's Creek Road and Crisp Road 31:1219 Not to Scale Murphy, Cherokee County, North Carolina Wetland Delineation-Lower Martin's Creek II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Project No. 31:1219 t w ?? r r ? t h'? Ilk ti ?E+ f ?y! fIfrc .E rt Mod. , a m r`P .., ?d an Photo 1: A view of Wetland A, looking east. 5 71. 1}.may+•r? ECS Carolinas, LLP Page 1 Photo 2: A view of Wetland A, looking south. Wetland Delineation-Lower Martin's Creek II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Project No. 31:1219 ycl" T i.;y?. Ay ?7; fl _ le ; 111 'ow Y 1 \ '111 :?? ? ? ? ? 4? ? A• q v? ? If t I z 7 ? ? 'I 5 a? ? 1? c ?r y+l L - ?< <' ,a?• ? ? f$_t. +e'• 3?• ??` "?ti?,?" tote ?' ,? Photo 3: A view of Wetland A, looking southwest. .1 ? y 1 _ ? ? lam{ ti - wOFc •` n .rte !T??,y 'Y yyfr. " 117 ECS Carolinas, LLP Page 2 Photo 4: A view of Wetland A, looking west. Wetland Delineation-Lower Martin's Creek II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Project No. 31:1219 lk? `?W?li .\4T ..? . er S 14!. ! ,ro, <1 1 h7 r 5'I?1?Y v. ' All lit e r° .A" +.?fL A F Y ? . ?,.i i4 'Y?? w.c _11.w. h-lE'i ?. e. Photo 6: A view of Wetland B, looking northeast. ECS Carolinas, LLP Page 3 Photo 5: A view of a Wetland B, looking north. Wetland Delineation-Lower Martin's Creek II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Project No. 31:1219 ' M, 'tea ?}`G • r i a 9 i -41 b }j ? y b j• 01 4 p y r:f •+-lay 1. yc ? ': r ^-.? . , Al ^ y r ` < yp ( y fi , ECS Carolinas, LLP Page 4 Photo 5: A view of a Wetland B, looking west. Photo 6: A view of Wetland B, looking south. Wetland Delineation-Lower Martin's Creek II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Project No. 31:1219 Photo 5: A view of the boundary of Wetland C, looking west. X 4 7# a ±^. 'f 5 f ?'1"!LY !F ?l M 'I y.y?;Vex. ?•C:? 1 ! fly ? E ECS Carolinas, LLP Page 5 Photo 6: A view from within Wetland C, looking south. Wetland Delineation-Lower Martin's Creek II Site Martin's Creek Road and Crisp Road Murphy, Cherokee County, North Carolina ECS Project No. 31:1219 ! 9fJ? ' ?c µ, 1T ,$y ?1 Y1' I Y? R'e roy vat `S ?* I r ?Qyy' Am '•"? r'? r?' gyp' d ? ?i ? 1 Photo 5: A view of Wetland C, looking southwest - r'?C,Y?,-• r. , lei ' V L H ai- Photo 6: A view of a Wetland C, looking northwest. m ECS Carolinas, LLP Page 6 U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. 2009-00209 County: Cherokee NOTIFICATION OF JURISDICTIONAL DETERMINATION Property Owner: Ms. Barbara Lutz Address: 100 Pine Brook Road East Hampton, CT 06424 Agent: Michael Baker Engineering, Inc. Attn: Mr. Micky Clemmons Address: 797 Haywood Road Asheville, NC 28806 Property description: Size (acres) 29.3-acre review area Nearest Waterway Martin's Creek USGS HUC 06020002 Nearest Town Murphy River Basin Hiwassee Coordinates 35.054 west / -84.025 north Location description: The property is located in the northwest quadrant of the intersection of Martin's Creek Road and Crisp Road in Murphy, Cherokee County, North Carolina. Indicate Which of the Following Apply: A. Preliminary Determination Based on preliminary information, there may be waters of the United States (U.S.) on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). B. Approved Determination There are Navigable Waters of the U.S. within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. X There are waters of the U.S. on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC ? 1344). Unless there is a change in the law or our published regulations this determination may be relied upon for a period not to exceed five years from the date of this notification. We strongly suggest you have the waters of the U.S. on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. X The waters of the U.S. on your property have been delineated and the delineation has been verified by the Corps We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps Once verified this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which provided there is no change in the law or our published regulations may be relied upon for a period not to exceed five years. Action Id. 2009-00209 The waters of the U.S. have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below on _. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. Placement of dredged or fill material within waters of the U.S. without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding 828-271-7980, ext. 226. this determination and/or the Corps regulatory program, please contact Lori BeckwV C. Basis For Determination The site contains wetlands as determined by the USACE 1987 Wetland Delineation Manual and they abut a stream channel (an unnamed tributary to Martin's Creek) on the property that exhibits indicators of an ordinary high water mark. The stream channels on the property are an unnamed tributary to Martin's Creek and Martin's Creek. Martin's Creek eventually flows into the Hiwassee River which flows into the Tennessee River; the Tennessee River is a Section 10 water. D. Remarks: Waters of the U.S. on-site are 3 wetlands and 2 streams. E. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) Attached to this verification is an approved jurisdictional determination. If you are not in agreement with that approved jurisdictional determination, you can make an administrative appeal under 33 CFR 331. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you must submit a completed RFA form to the following address: District Engineer, Wilmington Regulatory Program Attn: Lori Beckwith, Regulatory Specialist 151 Patton Avenue, Room 208 Asheville, North Carolina 28801 In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by May 11, 2009. **It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.** Corps Regulatory Official: Lori Beckwith Issue Date: March 12, 2009 Expiration Date: March 11, 2014 2 Action Id. 2009-00209 SURVEY PLATS, FIELD SKETCH, WETLAND DELINEATION FORMS, PROJECT PLANS, ETC., MUST BE ATTACHED TO THE FILE COPY OF THIS FORM, IF REQUIRED OR AVAILABLE. Copy Furnish: ECS Carolinas LLP, Attention: Ms. Lauren Sicarelli, 200 Ridgefield Court, Suite 222, Asheville, NC, 28806 NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Ms. Barbara Lutz File Number: 2009-00209 Date: March 12, 2009 Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of A permission) PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMIT DENIAL C X APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision. Additional information may be found at http://www.usace.army.mil/inet/functions/ew/ceewo/reg or Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Perrrrit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section 11 of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appeal the permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain tern-is and conditions therein, you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by completing Section 11 of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may accept or appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD. • APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers Administrative Appeal Process by completing Section lI of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed), by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the Corps to reevaluate the JD. SECTION H - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record. However, you may provide additional information to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision If you only have questions regarding the appeal process you and/or the appeal process you may contact: may also contact: Lori Beckwith, Regulatory Specialist Mr. Michael F. Bell, Administrative Appeal Review USACE, Asheville Regulatory Field Office Officer 151 Patton Ave CESAD-ET-CO-R RM 208 U.S. Army Corps of Engineers, South Atlantic Division Asheville, NC 28806 60 Forsyth Street, Room 9M15 828-271-7980 Atlanta, Georgia 30303-8801 RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day notice of any site investigation, and will have the opportunity to participate in all site investigations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits and approved Jurisdictional Determinations send this form to: District Engineer, Wilmington Regulatory Division, Attn: Lori Beckwith, Regulatory Specialist, Asheville Regulatory Field Office, 151 Patton Avenue, Room 208, Asheville, NC 28801. Approximate Stream Locations Figure No. Google Earth 4 IV E (t( Wetland Assessment rfia ? Uba ?? S Lower Martin's Creek II Site ECS Project # Martin's Creek Road and Crisp Road 31:1219 Not to Scale Murphy, Cherokee County, North Carolina