HomeMy WebLinkAbout20201805 Ver 1_Pre-Filing Meeting Request_20201123ID#* 20201805
Version* 1
Regional Office* Wilmington Regional Office - (910) 796-7215
Reviewer List* Robb Mairs
Pre -Filing Meeting Request submitted 11/23/2020
Contact Name * Abram Young
Contact Email Address* abram.young@brunsvackcountync.gov
Project Name* Brunswick County EWP DRS 327
Project Owner* Brunswick County
Project County* Brunswick
Owner Address: Street Address
179 March 9, 1764 Drive NE
Address Line 2
aty State / Frovince / Region
Bolivia North Carolina
Rbstal / Zip Code Country
28422 United States
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
r- 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below. *
Brunswick County has received funding through the USDA -Natural
Resources and Conservation Service and the NC Department of
Agricultural and Consumer Services -Division of Soil and Water
Conservation to remove downed trees and vegetative debris
(snagging) from the ditches located on parcels of land as a result
from Hurricane Florence. By removing the woody debris, stream flow
should improve in these areas. In addition, a few select sites have be
chosen for sediment removal and streambank stabilization. This site
need a NCDCM-CAMA review, along with USACE.
Please give a couple of dates you are available for a meeting.
12/8/2020
12/9/2020
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
yw
Submittal Date 11/23/2020