Loading...
HomeMy WebLinkAboutNCC190013_NOT Closeout Documents_20201221North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Robeson Project: Hyde Park Baptist Church River basin: Lumber Person financially responsible: Hyde Park Baptist Church - Randy Hammonds, Project N: ROBES-2019-019 Project Manager Address: 301 Roberts Avenue, Lumberton, NC 28358 1. Project Location: Roberts Avenue, Lumberton Pictures: No 2. Weather and soil conditions: Clear Soil Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Larry Anderson, P.E. Inspection report: Sent Report 9. Corrective action needed: 10. Comments: Project is complete and stable. Close Project. Reported by: Nicholas Mills Date of inspection: December 14, 2020 cc: Title: Project Engineer Date given/sent: December 14, 2020 Others present: Time arriving on site: 11:00 AM Time leaving site: 11:30 AM