HomeMy WebLinkAbout20120673 Ver 3_R-2707 Phased Renewal Cleveland December 14 2020_20201213 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Telephone: (919) 707-6000 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 1000 BIRCH RIDGE DRIVE RALEIGH NC 27610 December 14, 2020 U. S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 ATTN: Mr. Monte Matthews NCDOT Coordinator Subject: Request for Renewal for Section 404 and 401 Individual Permit and Certification for the Shelby Bypass, Cleveland County, Division 12, Debit $570 from WBS 34497.1.FS6, TIP R-2707. Dear Sir: The purpose of this letter is to request renewal of the United States Army Corps of Engineers (USACE) Section 404 Individual Permit and NC Division of Water Quality (NCDWR) Certification for the above referenced project. The original Phased Individual Permit indicates that construction must be completed before December 31, 2020. The subsequent March 31, 2017 Phased Individual Permit Modification also indicates the original permit expiration of December 21, 2020 remains applicable. Major Permitting History Section 404 Permit SAW-2009-01449 401 Certification 20120673 R-2707 (overall project), and Sections A & B April 12, 2013 September 18, 2012 R-2707 C March 31, 2017 April 4, 2017 continued Project Status: Sect. Location Length Status Details* AA West of Peachtree Rd to east of Kimbrell Rd near Mooresboro 2 miles Complete Construction began in July 2013 and opened to traffic in September 2016. AB East of Kimbrell Rd to east of Plato Lee Rd near Lattimore 1.9 miles Complete Construction began in July 2014 and was completed in April 2018. B East of Plato Lee Rd to east of NC 226 north of Shelby 2.6 miles Complete Construction began in July 2014 and was completed in April 2018. C East of NC 226 to west of NC 150 heading northeast of Shelby 5.3 miles Under Construction Construction began in 2017 and should be completed in the Winter 2023. D* West of NC 150 to US 74 west of Long Branch Rd, east of Shelby 4.1 miles Design* Final designs are underway. Right of way purchasing is underway with construction beginning in 2024. E* US 74 west of Long Branch Rd to west to Stony Point Rd at US 74 Business in Kings Mountain 2.6 miles Design* Final designs are underway. Right of way purchasing is underway with construction beginning in 2024. *Future dates are preliminary and subject to change Remaining Impacts: Sub- Tip Location Design Level Wetlands Streams Permanent Fill Streams Permanent Bank Stabilization C East of NC 226 to west of NC 150 heading northeast of Shelby Final 0.94 7,644 D West of NC 150 to US 74 west of Long Branch Rd, east of Shelby Preliminary 0.4 5,840 76 E US 74 west of Long Branch Rd to west to Stony Point Rd at US 74 Business in Kings Mountain Preliminary 0.66 2,805 39 2.0 16,289 The C section of this project is scheduled for completion in 2023. The remaining two sections, D and E, are currently in project design, and in the merger process. Both sections are scheduled for construction beginning in 2024. Renewal is hereby requested for the USACE 404 permit and the 401 WQC from NCDWR for the C, D and E Sections with a requested expiration of December 31, 2029. Please debit $570.00 for processing of the WQC renewal for R-2707, as noted in the subject line of this application. A copy of this permit application and its distribution list will be posted in the NCDOT website at http://connect.ncdot.gov/resources/Environmental. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Jeff Hemphill jhemphill@ncdot.gov or (919) 707-6126. Sincerely, Philip S. Harris III, P.E., C.P.M. Environmental Analysis Unit Head cc: NCDOT Permit Application Standard Distribution List