Loading...
HomeMy WebLinkAbout20100617 Ver 1_More Info Received_20101029ti\ T 2oo South Tryon Street, Suite 1400 Charlotte, NC 28202 Charlotte p704 376 1555 r., 704 376 7851 www.coleje neststone. con) Raleigh Wilmington 10-0LO1-1 TRANSMITTAL ColeJenest Stone Shaping the Environment Realizing the Possibilities Land Planning Landscape Architecture Civil Engineering Urban Design Date: October 28, 2010 Reference: 50243.02 - Walgreens - Denver, NC - Construction Drawings Attention: Mr. Alan Johnson Company: North Carolina Department of Environment and (704) 235-2200 Natural Resources Division of Water Quality 610 East Center Avenue Mooresville, North Carolina 28115 We Are Transmitting: Transmitted Via: Remarks OCT 2' 9 201.0 Lj) DENR - WATER QUALITY WETLANDSANDSTORVIX,ERBRPJ4CH By: cc: ® Herewith ? Under Separate Cover Copies Dated Description 2 sets 10/28/10 Construction Documents - 24" x 36" See Attached Sheet List 2 10/28/10 Calculation Package 2 10/28/10 Sand Filter Su lement ? Mail ® Overnight ? Courier U Hana venvery U rtcK-up ® For Approval ? For Your Use ? As Requested ? For Review The attached Stormwater Permit Application Package is being submitted on behalf of Morgan Property Group. The plans and calculations have been revised in response to comments received from Mr. Joseph Gyamfi, dated October 14, 2010. The signed Operation and Maintenance Agreement will be submitted separately. Please contact us with any questions or comments. (J/7 f ?? V l JZ, R. Todd Fisher, PE Senior Project Manager sm? W. Joseph Gyaimfi - NCDENR w/attachments Mr. Trey Morgan - MPG Mr. Michael S. Cole, Sr., RLA, LEED AP - CJS Nnasrdulprojects\SDSKPROJ1502431 Correspondences120101Trans11028t Johnson, A., SW Permit App Pkg.doc 200 South Tryon Street, Suite 1400 Charlotte, NC 28202 P+7043761555 f+7043767851 url+www.colejeneststone.com Charlotte Raleigh Wilmington Coleja7mt 50243.02 - Walgreens - Denver, NC - Construction Drawings & Stme Sheet List October 28, 2010 Shaping the Environment Realizing the Possibilities Sheet Title CV1.0 Existing Conditions CV2.0 Staking and Materials Plan CV2.1 Staking and Materials Plan CV3.0 Stage 1 Erosion Control Plan CV3.1 Stage 2 Erosion Control Plan CV4.0 Grading and Drainage Plan CV4.1 Grading and Drainage Plan CV5.0 Water Distribution and Sanitary Sewer Plan Land Planning CV6.0 Planting Plan Landscape Architecture CV6.1 Planting Plan Civil Engineering CV6.2 Buffer Tree Inventory + CV6.3 Buffer Enhancement Plan Urban Design CV7.0 Site Details CV7.1 Site Details CV7.2 Site Details CV7.3 Site Details CV7.4 Site Details Engineering Services provided in Charlotte and Raleigh. \\nasrdu\projects\SDSKPROJ\50243LCorrespondences\2010\Misc\1028 Sheet list.docx Permit Number: I D- 0 LP 1 1 (to be provided by DWQ) Drainage Area Number: Sand Filter Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: - The drainage area will be carefully managed to reduce the sediment load to the sand filter. - The sedimentation chamber or forebay will be cleaned out whenever sediment depth exceeds six inches. - Once a year, sand media will be skimmed. - The sand filter media will be replaced whenever it fails to function properly after maintenance. The sand filter will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: Entire BMP Trash/debris is resent. Remove the t rash/debris. Adjacent pavement (if Sediment is present on the Sweep or vacuum the sediment as soon as applicable) pavement surface. possible. Perimeter of sand filter Areas of bare soil and/or erosive Regrade the soil if necessary to remove the gullies have formed. gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too long. Maintain vegetation at an appropriate height. Flow diversion structure The structure is clogged. Unclog the conveyance and dispose of any sediment offsite. The structure is damaged. Make any necessary repairs or replace if damage is too large for repair. Forebay or pretreatment area Sediment has accumulated to a Search for the source of the sediment and depth of greater than six inches. remedy the problem if possible. Remove the sediment and stabilize or dispose of it in a location where it will not cause im acts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. 11_Y -? V Weeds are present. Remove the weeds, preferably by hand. If a pesticide is used, wipe it on the plants rather than spraying. 1>1 Form SW401-Sand Filter O&M-Rev.4 2009Sept17 Page 1 of 3 BMP element: Potential robleur How I will remediate the problem: Filter bed and underdrain Water is ponding on the surface for Check to see if the collector system is collection system more than 24 hours after a storm. clogged and flush if necessary. If water still ponds, remove the top few inches of filter bed media and replace. If water still onds, then consult an expert. Outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment offsite. The outlet device is damaged Re air or replace the outlet device. Receiving water Erosion or other signs of damage Contact the NC Division of Water Quality have occurred at the outlet. 401 Oversight Unit at 919-733-1786. Form SW401-Sand Filter O&M-Rev.4 2009Sept17 Page 2 of 3 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name: Walareens - Store No. 13036 BMP drainage area number: 1.99 acres Print name: Trey Morgan, A4"`'S?`r ?cL I?eivcr . to } y U C- v l J Tit1e:?C?t ^+ 4r Address: 13024 Ballan ne Corporate Place, Suite 250 Date: /(->/.). Z / 10 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, o J kAt"--, , a Notary Public for the State of County off(. VO,??r , do hereby certify that ?day personally appeared before me this of (7 , and acknowledge the due execution of the forgoing sand filter maintenance requirements. Witness my hand and official seal, L nne C TakaC Notary Public Mecklenburg Coon North Caro I M Commission Fac __s_ 71 2013 SEAL My commission expires 7 - f 3 - /? Form SW401-Sand Filter O&M-Rev.4 2009Sept17 Page 3 of 3 Permit Number: (to be provided by DWQ) 1 O _ O ' o??F W ATF9pG M-MLI NCDENR ° STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM SAND FILTER SUPPLEMENT This form must be filled out on line, printed and submitted with all of the required information. Make sure to also fill out and submit the Required Items Checklist (Section 111) and the I&M Agreement (Section IV) Project name Walgreen's - Store No. 13036 Contact name R. Todd Fisher, PE Phone number (919) 719-1800 Date Drainage area number Site Characteristics Drainage area (AD) 86,684.00 ftz OK Impervious area 69,347.00 ftz % Impervious (IA) 80.0% % Design rainfall depth (RD) 1.00 in Peak Flow Calculations 1-yr, 24-hr runoff depth in 1-yr, 24-hr intensity in/hr Pre-development 1-yr, 24-hr runoff ft3/sec Post-development 1-yr, 24-hr runoff ft3/sec Pre/Post 1-yr, 24-hr peak control ft3/sec Storage Volume Design volume (WQV) 5,674.00 ft3 Adjusted water quality volume (WQVAdi) 4,255.50 ft3 OK Volume contained in the sedimentation basin and on top of the sand filter 4,480.00 Top of sand filter/grate elevation 36.25 ft amsl Weir elevation (between chambers) 34 ft amsl Maximum head on the sedimentation basin and sand filter (hMa,F;,ter) 4.00 ft OK Average head on the sedimentation basin and sand filter (hA) 2.00 ft OK Runoff Coefficient (Rv) 0.77 (unitless) Type of Sand Filter Open sand filter? N Y or N SHWT elevation ft amsl Bottom of the sand filter elevation ft amsl Clearance (dsHwr) Closed/pre-cast sand filter? Y Y or N SHWT elevation 25.00 ft amsl Bottom of the sand filter elevation 27.50 It amsl Clearance (dSHWT) 2.50 If this is a closed, underground closed sand filter: The clearance between the surface of the sand filter and the bottom of the roof of the underground 5.50 ft structure (dspace) % ?'X -, ?dLo orT 9'9 2U,o 9 qiYgNp,SA,oW0,V 1i N Form SW401-Sand Filter-Rev. 5 2009Sept17 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number: (to be provided by DWQ) Sedimentation Basin Surface area of sedimentation basin (As) 560.00 ft2 OK. Meets minimum, but may need to be increased to Sedimentation basin/chamber depth 8.00 ft Sand Filter Surface area of sand filter (AF) 560.00 ft2 Increase surface area.This will also increase the Top of sand media filter bed elevation 30.00 ft amsl Bottom of sand media filter bed/drain elevation 28.50 ft amsl Depth of the sand media filter bed (dF) 1.50 ft Coefficient of permeability for the sand filter (k) 3.50 (ft/day) Outlet diameter 24.00 in Outlet discharge/flowrate 12.14 ft3/sec Time to drain the sand filter (t) 27.00 hours OK. Submit drainage calculations. Time to drain the sand filter (t) 1.13 days Additional Information Does volume in excess of the design volume bypass the sand filter? Is an off-line flow-splitting device used? If draining to SA waters: Does volume in excess of the design volume flow evenly distributed through a vegetated filter? What is the length of the vegetated filter? Does the design use a level spreader to evenly distribute flow? Is the BMP located at least 30ft from surface waters (50ft if SA waters)? If not a closed bottom, is BMP located at least 100ft from water supply wells? Are the vegetated side slopes equal to or less than 3:1 Is the BMP located in a recorded drainage easement with a recorded access easement to a public Right of Way (ROW)? What is the width of the sedimentation chamber/forebay (Wsed)? What is the depth of sand over the outlet pipe (dpipe)? Y or N OK Yor N OK Yor N ft Yor N Yor N OK Yor N Yor N Y or N OK ft OK ft OK Form SW401-Sand Filter-Rev.5 2009Sept17 Parts I and II. Project Design Summary, Page 2 of 2 Charlotte Raleigh Wilmington I O- C) Lo 1 1 & 'e Land Planning Landscape Architecture Civil Engineering Urban Design 200 South Tryon Street, Suite 1400 Charlotte, North Carolina 28202 p+ 704 376 1555 f+ 704 376 7851 WALGREENS - STORE NO. 13036 CJS # 50243 CALCULATIONS FOR: EROSION CONTROL STORM DRAINAGE ANALYSIS TORMWA T N o T' ? 1 S ER (WATER QUALITY) DATE: 10.28.10 REV. ??••q?10 CA OF 0 % SEAL C- U = c-1367 _ c-103 fiR = G 4 CJS Project No. 50243 Issued: 07/20/10 Page 1 of 1 PROJECT NARRATIVE Walgreens - Denver Lincoln County, North Carolina PROJECT DESCRIPTION The proposed project consists of a Walgreens store to be constructed within a 2.44-acre parcel at the intersection of NC Highway 16 and NC Highway 73 in Lincoln County, North Carolina. The project will access both NC 16 and NC 73 via right-in/right-out driveways and will have an interparcel connection to a proposed full-movement driveway at NC 73 in conjunction with future developments to the west. The project lies outside of the Lake Norman/Catawba River watershed protection area and is not located within an NPDES Phase II community. Therefore, the project is not subject to stormwater management requirements under these programs. DRAINAGE DESIGN The property is traversed by an unnamed tributary to Forney Creek. The tributary is collected in an existing 60-inch culvert at the southeast corner of the property which carries the flow under Highway 73 (Culvert B). Under the proposed project, a portion of the existing onsite channel will be placed within a second culvert (Culvert A) to accommodate the proposed driveway connection to NC 16. Impacts to the existing channel are to be limited to 145 LF in accordance with Nationwide 39 General Permit Authorization No. SAW-2010-00882 issued by the U.S.A.C.O.E. Wilmington District-Asheville Field Office, July 9, 2010. The proposed Culvert A has been sized to pass the peak flow from the 25-year storm based on ultimate development conditions within the watershed under current zoning. However, drainage calculations indicate that the existing Highway 73 culvert is undersized relative to ultimate development peak flows within the watershed. Accordingly, unless the capacity of the existing Culvert B is increased, significant backwater at the inlet to the culvert is anticipated which will impact the performance of the proposed driveway Culvert A. In accordance with Condition No. 4 of General Water Quality Certification No. 3631 which accompanies the NWP 39 authorization, the NCDENR Division of Water Quality requires that the project include stormwater best management practices to control and treat site runoff. Accordingly, the project stormwater management plan includes a below grade sand filter to capture and treat the runoff from proposed building and parking areas. STREAM BUFFER Under the Lincoln County Streamside Buffer regulations, a 50-foot buffer will be established and maintained along the tributary channel at the Highway 16 frontage. In accordance with the variance approved on May 24, 2010, to allow the driveway and outfall channel encroachment into the buffer zone, the remaining undisturbed buffer area will be enhanced via supplemental planting per the Buffer Enhancement Plan. EROSION CONTROL SEDIMENT TRAP CALCULATIONS WALGREENS - STORE NO. 13036 CJS PROJECT NO.: 50243 TE: 10.28.10 BY: DJM VISED: RVW: RTF © Charlotte Raleigh ColeJenest Wilmington & Stone Land Planning + Landscape Architecture + Civil Engineering + Urban Design TEMPORARY SEDIMENT TRAP #1 NCDENR? 1 4 IF Yes, Type: 1 DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area (TDA) 2.2 ac Proposed sediment depth 2 ft Disturbed area(DA) 2.2 ac Bottom elevation of basin 728 ms/ Required sediment storage 3600xDA 7920 cf Depth of flow over spillway 1.0 ft BASIN CONFIGURATION Bottom elevation 728 msl Sediment Storage elevation 730 msl S illwa crest 731 msl To of Berm 731.5 msl ESTIMATED BASIN SIZE (RECTANGULAR) Length(ft) Width(ft) Bottom 85 41 To 99 55 BASIN EFFICIENCY Sediment storage required: 7920 cf Sediment storage provided: 8009 OKAY Surface area required. 4036.8 Surface area provided. 4589 OKAY PLANNED BASIN SIZE (REFER TO EROSION CONTROL PLAN Elev. Area (SF) Cumulative Volume (CF) 728 3433 0 729 3998 3716 730 4589 8009 731 5204 12906 732 5844 18430 X 0 0 X 0 0 X 0 0 X 0 0 X 0 0 X 0 0 SPILLWAY DESIGN DESIGN FLOW (Q=CIA SPILLWAY SIZE Composite soil coefficient 'C'= 0.6 Spillway design: (L=Q1(C*h"1.5)); C= 3.0 Area 'A'= 2.2 ac h= 1.00 10 yr. storm rainfall intensity, 7'= 7.03 in/hr Spillway length @ flow depth 10 Computed flow from site, 'Q'= 9.28 cfs Page 3 of 6 SEDIMENT TRAP CALCULATIONS WALGREENS - STORE NO. 13036 CJS PROJECT NO.: 50243 DATE: 10.28.10 BY: DJM REVISED: RM RTF © Charlotte Raleigh ColeJenest Wilmington & Stone Land Planning + Landscape Architecture + Civil Engineering + Urban Design TEMPORARY SEDIMENT TRAP #2 NCDENR? 1 4 IF Yes, Type: 1 DRAINAGE AREAS/REQ'D STORAGE DESIGN CRITERIA Total drainage area (TDA) 0.8 ac Proposed sediment depth 2 ft Disturbed area(DA) 0.8 ac Bottom elevation of basin 743 msl Required sediment stora a 3600xDA 2772 cf Depth of flow over spillway 1.0 ft BASIN CONFIGURATION Bottom elevation 743 msl Sediment Storage elevation 745 msl S illwa crest 745 msl To of Berm 746.5 msl ESTIMATED BASIN SIZE (RECTANGULAR) Length(ft) Width(ft) Bottom 49 23 To 63 37 BASIN EFFICIENCY Sediment storage required. 2772 cf Sediment storage provided: 2813.5 OKAY Surface area required: 1413.75 Surface area provided: 1850 OKAY PLANNED BASIN SIZE REFER TO EROSION CONTROL PLAN Elev. Area (SF) Cumulative Volume (CF) 743 991 0 744 1393 1192 745 1850 2814 746 2364 4921 X 0 0 X 0 0 X 0 0 X 0 0 X 0 0 X 0 0 X 0 0 SPILLWAY DESIGN DESIGN FLOW Q=CIA) SPILLWAY SIZE Composite soil coefficient 'C' = 0.6 Spillway design: (L=Q1(C*h"1.5)); C= 3.0 Area 'A'= 0.77 ac h= 1.00 10 yr. storm rainfall intensity, 7.03 in/hr Spillway length @ flow depth 10 Computed flow from site, 'Q'= 3.25 cfs 11 Page 4 of 6 RIPRAP APRON DESIGN WALGREENS - STORE NO. 13036 CJS PROJECT NO.: 50243 DATE: 07.20.10 BY: DJM Charlotte Raleigh +ColeJenest Wilmington & Stone EVISED: RVW: RTF 11 Land Planning + Landscape Architecture + Civil Engineering + Urban Design FES # DIA (ft) SLOPE (ft/ft) n V (ft/s) Q (cfs) RIP RAP CLASS LENGTH (ft) WIDTH (ft) DEPTH (In) FES-A1 2 0.005 0.013 5.09 12.14 B 16 22 24 STORM DRAINAGE ANALYSIS mRw:: oe? `e,vma ? N O o g a`> U E v N O r N O N O N d a 0 Z V 'a F `W r d ? T X .^_ Ill N N Q T 1011 N OWO N S N O n m N O 1011 0 S 1101 P I-I W N N Q O O .-I .i 1+1 N .i N N q .i N N ILI 1!l N o -N ?pp O?ppl ,R W m m T O O O O O OD N M h O V ' M M P P rN'1 ? M M I+1 ? M M M M M M M M M M m 0 W ,? nnnnnnnnnnnnnnn nnn nnr:nn J pp oo pp :' Y01 V N T 1011 N N S OI OWi N l m N N S N Lq M S S T N • N VP•1 Ol Y O 1? 1? 1? IG Ott 10 1lt 10 10 tll Ill Ill IG 10 1l1 '1 ?- n n n n n n n n n n 1: n n n n n n n ? n 1? n n :? Vl V pp O V 10 O a W n W n W O M 0 0 0 .N-I 0 0 O O S O O O O O O O S O O O S O 0 0 0 0 0 0 0 O O O O O CJ C O O O O O O O O O O O O O G O O `N n ?O?ppI ?m?DD a? N N N IW?1 Q n N T 1011 .Ni n 111 .N-1 O 7? O f n n n n M n n n n n n n n 1? n n n n n !? n n n n .ni A m n V N 100 N P C 1? N T 1011 n n IWIf .N-1 loll Q Oti 'd O V 10 1l1 111 M M M N m I N N, N n n n n n n n n n n n n n n n n n n n n n pp i 0000 tog 00 0o o ?NNI N+m Sao v`?i? ° ?NN n n oooovi ?c lri a?r?ir v; In In ri vi vi uiv vloroean i 4 i t L L L L L L L L t L L L t 'u 'u L u u u u u u c c c u _ L c c c c c I-1 P P ti .N.I w C C? 1.N?i W H N N W N .N.I N N N N O 9 M 1ff1 N V n UP N 7 11W1 b Cl! N 100 O n IO N M N ? 'l 1D M Ol W N T ?i O N O 1+1 OD 1? ? 1+1 tl1 V' ? ? N O S S O b Op M 1? h M N T n P N N 0 n n g g - 0 0 0 0 0 .1 . L O O N v lu 1? 'I m O O N t+l t+l 1i i S S S S 10 OND M I? n M OI N T N ti N N 0 ^^ li? b 0 0 0 0 0 .-t .ti C O N? b n w T O G N M M O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N 111 1011 N 111 Ill N Ill CI 111 Q 10 111 N 111 Ill N Q Q G 0 666 .. G Q C G .. a Z 2 ? 6 G 666 O O O G G . G O O? 0 0 P M 6 o m 0 . . 0 0 0 0 0 0 0? w o o w M O^ N Z? P ?0 O S M 2 Z 0 0 0 0 0 C G O O O O O O O C G G O G .-t v O O O O O O O O O O O O O p Op.? 0 0 0 0 0 0 0 0 0 V 1? ? P m M M N M P L O V V' ID M M M Ifl IG d' N O .rW ? N .?i .?.I 1+1 N H N O\ Q °oc?=m?+=dbaxaxxaaaaaa=?a t7omsoTiSfuuF7?oafc7t7?GGv,Ff? N ry W no3 mmaddba=aa=aoaaa?xx i7GxmooOuuvufoE7f??tlCi`ulnff m U >s 3 x r? ° z N ? Ditch A Worksheet for Triangular Channel Project Description Project File p:lsdskproj1502431engineeringlcalculations150243 di.fm2 Worksheet Ditch A Flow Element Triangular Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.054 Channel Slope 0.035000 ft/ft Left Side Slope 2.000000 H : V Right Side Slope 2.000000 H : V Discharge 0.81 cis Results Depth 0.47 ft Flow Area 0.44 ft2 Wetted Perimeter 2.11 ft Top Width 1.89 ft Critical Depth 0.40 ft Critical Slope 0.084333 ft/ft Velocity 1.82 ft/s Velocity Head 0.05 ft Specific Energy 0.52 ft Froude Number 0.66 Flow is subcritical. )7/20/10 FlowMaster v5.13 )2:54:51 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 Ditch B Worksheet for Trapezoidal Channel Project Description Project File p:\sdskprojk50243kengineering\calculations\50243 d1.fm2 Worksheet Ditch B Flow Element Trapezoidal Channel Method Manning's Formula Solve For Channel Depth Input Data Mannings Coefficient 0.032 Channel Slope 0.010000 ft/ft Left Side Slope 3.000000 H : V Right Side Slope 3.000000 H : V Bottom Width 2.00 ft Discharge 12.10 cfs Results Depth 0.86 ft Flow Area 3.97 ft2 Wetted Perimeter 7.47 ft Top Width 7.19 ft Critical Depth 0.73 ft Critical Slope 0.019995 ft/ft Velocity 3.05 ft/s Velocity Head 0.14 ft Specific Energy 1.01 ft Froude Number 0.72 Flow is subcritical. 7/20/10 FlowMaster v5.13 2:42:07 PM Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1 z c? W O U F- O i \ ?\ SS \ \ S .a ? SS \ SS ^ \ \ ll l , W I \ S\ al J N J li w W O? C.) a // \ UQ p < 1--Z Q l co rn 04 o / ?. ?- V o? Z CL L a o cc cc W L. JQ ? U CO) o o_ 0 N r - CD "a d 7 N H M Iq* gyp ? f N O RF ? Ln sill d\ Z 9 L -114kjti d'0o O e ?N / a` Vol ill a1 r?S_ 0 ?? / ? / 0 0 r l l i l l / i ?... 4-14 ?/ III I i y/ N o _ v 7 e i Rf ev o y1d IOaweI6Owp'pyV 09:44:L OLMOZIOL 'VO LLXL '6mp'EbZ09OO-4\s6umeJQ uogonpa&sueld\EYZ09\fOHdNSOS\:d WATER QUALITY NCDENR Sand Filter Calculation Charlotte WALGREENS - STORE NO. 13036 Raleigh +C01eJenest Wilmington CJS PROJECT NO.: 50243 & Stone DATE: 10.28.10 BY: DJM REVISED: RVW: RTF Land Planning + Landscape Architecture + Civil Engineering + Urban Design *Note: The Water Quality Protection Volume (WQv) is the runoff volume required when designing a BMP to treat the runoff from a 1-inch rainfall event. Rv = 0.05 + 0.009( 1 ) Rv = Volumetric Runoff Coefficient (Runoff/Rainfall) - unitless I = % Impervious WQv = (1.0*Rv*A)112 WQv = Water Quality Volume based on the 1-inch, 6-hour storm event (Ac. Ft.) WQv (Adj) = Adjusted Water Quality Volume = 0.75*WQv A = Total Drainage Area (ac) ("Simple Method" - Schueler, 1987) ..I.. = 80 Percent Impervious 1.99 Acres Rv = 0.77 Answer: WQv = 0.128 Ac. Ft. 5562 Cubic Feet Required WQv (Adj) = 4172 Cubic Feet IIMAXIMUM HEAD CALCULATIONS FOR FILTER hmaxfilter = WQv (Adj) I [As + Af], 2'- 6' IISURFACE AREA CALCULATIONS As = Sedimentation Basin Surface Area = [240*Rv*Ad]*Rd Af = Filter Bed Surface Area = (WQv)(df)/[(k)(hf+df)(tf)] As (min.) = 368 Sq. Ft. As (actual) = 560 Sq. Ft. Coefficient of permeability, k = 3.5 ft/day Height of water (ha) must be max 3:1 side slope and max 12" depth, average head Drain time (to must be within 40 hours (1.66 days) Filter bed depth (do must be 1.5ft minimum Fill in Values: k = 3.5 ft./day df = 2 feet ha = 2 feet tf = 1.66 days Answer: Af (min.) = 479 Square Feet Required For Sand Filter Bed Af (actual) = 560 Check [As + Af] * hma tfilter >= WQv (Adj): [As + Af] * hmaxfilter = 4480 OK WQv (Adj) = 4172 Check actual drain down time: tf = total storage volume / [Af * k *(ha+df)/df)] tf = [(As + Af)*hmaxfilter] 1 [Af * k *(ha+df)ldf)] = 1.14 days 27 hours OK Type.... Master Network Summary Page 1.01 Name.... Watershed File.... P:\SDSKPROJ\50243\Engineering\PondPack\50243 - Det Pond.ppw MASTER DESIGN STORM SUMMARY Network Storm Collection: Denver, NC Total Depth Rainfall Return Event - in Type RNF ID ------ ------- ---- 1 ------ 2.7600 ---------------- Synthetic Curve ---------- TypeII 24hr 2 3.3400 Synthetic Curve TypeII 24hr 10 4.8700 Synthetic Curve TypeII 24hr MASTER NETWORK SUMMARY SCS Unit Hydrograph Method (*Node=Outfall; +Node=Diversion;) (Trun= HYG Truncation: Blank=None; L=Left; R=Rt; LR=Left&Rt) Return HYG Vol Node ID Type Event ac-ft Trun ------ ----------------- POST-DEV ---- AREA ------ 1 ---- -- .336 POST-DEV AREA 2 .428 POST-DEV AREA 10 .675 POST-DEV PONDIN POND 1 .336 POST-DEV PONDIN POND 2 .428 POST-DEV PONDIN POND 10 .675 POST-DEV PONDOUT POND 1 .336 POST-DEV PONDOUT POND 2 .428 POST-DEV PONDOUT POND 10 .675 *PR-OUTFALL JCT 1 .336 *PR-OUTFALL JCT 2 .428 *PR-OUTFALL JCT 10 .675 Max Qpeak Qpeak Max WSEL Pond Storage hrs cfs ft ac-ft ----------- --------- 11.9200 -------- 6.16 -------- - 11.9200 7.75 11.9200 11.90 11.9200 6.16 11.9200 7.75 11.9200 11.90 11.9400 5.77 734.37 .112 11.9400 7.60 734.44 .114 11.9200 11.76 734.60 .118 11.9400 5.77 11.9400 7.60 11.9200 11.76 SIN: Bentley PondPack (10.01.04.00) Bentley Systems, Inc. 8:01 AM 10/28/2010 CULVERT ANALYSIS Culvert Designer/Analyzer Report Culvert A Analysis Component Storm Event Design Discharge 141.00 cfs Peak Discharge Method: User-Specified Design Discharge 141.00 cfs Check Discharge 173.00 cfs Tailwater Conditions: Constant Tailwater Tailwater Elevation 733.84 ft Name Description Discharge HW Elev. Velocity Culvert-1 1-72 inch Circular 141.00 cfs 734.49 ft 4.99 ft/s Weir Not Considered N/A N/A N/A Title: 50243 - Walgreens Denver Project Engineer: RTF p:\...\50243\engineering\calculations\50243.cvm CJS Charlotte CulvertMaster v3.1 [03.01.009.00] 10/28/10 01:32:31 100entley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report Culvert A Component: Culvert-1 Culvert Summary Computed Headwater Elevi Inlet Control HW Elev. Outlet Control HW Elev. Headwater Depth/Height 734.49 ft 733.84 ft 734.49 ft 1.25 Discharge Tailwater Elevation Control Type 141.00 cfs 733.84 ft Outlet Control Grades Upstream Invert Length 727.00 ft 60.00 ft Downstream Invert Constructed Slope 724.00 ft 0.050000 ft/ft Hydraulic Profile Profile PressureProfile Slope Type N/A Flow Regime N/A Velocity Downstream 4.99 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 9.84 ft 1.56 ft 3.22 ft 0.003497 ft/ft Section Section Shape Section Material Section Size Number Sections Circular Concrete 72 inch 1 Mannings Coefficient Span Rise 0.013 6.00 ft 6.00 ft Outlet Control Properties Outlet Control HW Elev. Ke 734.49 ft 0.50 Upstream Velocity Head Entrance Loss 0.39 ft 0.19 ft Inlet Control Properties Inlet Control HW Elev. 733.84 ft Inlet Type Square edge w/headwall K 0.00980 M 2.00000 C 0.03980 Y 0.67000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form N/A 28.3 ft2 1 1 1 Title: 50243 - Walgreens Denver Project Engineer: RTF p:\...\50243\engineering\calculations\50243.cvm CJS Charlotte CulvertMaster v3.1 [03.01.009.00] 10/28110 01:32:31 IMBentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Culvert Designer/Analyzer Report Culvert B Analysis Component Storm Event Design Discharge 263.00 cfs Peak Discharge Method: User-Specified Design Discharge 263.00 cfs Check Discharge 324.00 cfs Tailwater Conditions: Constant Tailwater Tailwater Elevation N/A ft Name Description Discharge HW Elev. Velocity Culvert-1 1-60 inch Circular 263.00 cfs 733.84 ft 19.43 ft/s Weir Not Considered N/A N/A N/A Title: 50243 - Walgreens Denver Project Engineer: RTF p:\...\50243\engineering\calculations\50243.cvm CJS Charlotte CulvertMaster v3.1 [03.01.009.00] 10/28/10 01:33:05 lOOentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 1 of 2 Culvert Designer/Analyzer Report Culvert B Component: Culvert-1 Culvert Summary Computed Headwater Elev, Inlet Control HW Elev. Outlet Control HW Elev. Headwater Depth/Height 733.84 ft 733.84 ft 732.57 ft 2.08 Discharge Tailwater Elevation Control Type 263.00 cfs N/A ft Inlet Control Grades Upstream Invert Length 723.42 ft 107.00 ft Downstream Invert Constructed Slope 720.39 ft 0.028318 ft/ft Hydraulic Profile Profile S2 Slope Type Steep Flow Regime Supercritical Velocity Downstream 19.43 ft/s Depth, Downstream Normal Depth Critical Depth Critical Slope 3.26 ft 2.79 ft 4.50 ft 0.008978 ft/ft Section Section Shape Section Material Section Size Number Sections Circular Concrete 60 inch 1 Mannings Coefficient Span Rise 0.013 5.00 ft 5.00 ft Outlet Control Properties Outlet Control HW Elev. Ke 732.57 ft 0.50 Upstream Velocity Head Entrance Loss 3.10 ft 1.55 ft Inlet Control Properties Inlet Control HW Elev. 733.84 ft Inlet Type Square edge w/headwall K 0.00980 M 2.00000 C 0.03980 Y 0.67000 Flow Control Area Full HDS 5 Chart HDS 5 Scale Equation Form N/A 19.6 ft2 1 1 1 Title: 50243 - Walgreens Denver Project Engineer: RTF p:\...\50243\engineering\calculations\50243.cvm CJS Charlotte CulvertMaster v3.1 [03.01.009.00] 10/28/10 01:33:05 IQBentley Systems, Inc. Haestad Methods Solution Center Watertown, CT 06795 USA +1-203-755-1666 Page 2 of 2 Walgreens penver 1 2C6 .1MTSK^st"W S !'a Ld OD 11 ? PROJECT NO. 50243 BY. RTF f I fli/IOlte fVArth Cnr(I.ni11H11 ColeJenest Tel you. 376 1335 'a4 3,a '85 F DATE: 07/20/10 T.M.: RTF I r "x & Stone a wwO.a,kknestst nc.caM REVISED: P.M.: RTF RIPRAPAPRON DEStN Tractive Force Procedure Determine shear stress, T, at normal depth T=yds y = unit weight of water, 62.4 Ib/ft3 d = flow depth in feet = 4.67 ft (See attached FlowMaster calculation) s = channel gradient in ft/ft = 0.015 T = (62.4 Ib/ft) x (4.67 ft) x 0.015 T = 4.37 Ib/ft2 Td = Permissible Unit Shear Stress If Td > T, then the riprap is considered acceptable Therefore, choose Td >T Using Table 8.05g, Td of 5.0 Ib/ft2 corresponds with riprap size of 12" Determine riprap size for side slopes d5o (sides) = K,/K2 X dso (bottom) K, = 0.98 (Table 8.05h) B = width of channel bottom = 2.8 ft d = flow depth = 4.67 ft B/d = 2.8/4.67 = 0.6 z = side slope = 2.5 K2 = 0.84 (Table 8.05i) Angle of repose = 41.5° (d50 = 12 inches, angular) Side slope, z = 2.5 d5o(sides) = K, /K2 = 0.98/0.84 = 1.17' Therefore, use d50 = 15" for side slopes Thickness = 1.5 x largest rock in gradation Page 1 of 1 Walgreens Denve r zeoso?=eT.yo?Sn1,. PROJECT NO.. 50243 BY: RTF !.t a, ,A?i 1112!,rn? ColeJenest St Cfa fottc.-Nortfi Groli,a 28202 C`"' "°° Tef 704 376, 1555 485, F 4p4 76 DATE: 712012010 T.M.: RTF one 1,i hllt .!<1,7 F . 3 . . . ???n??,to^?.mm REVISED: P. M.: RTF CULVERT DESIGN DRAINAGE AREAS: (see attached drainage area map) Basin A 64.7 acres 0.101094 s . miles Basin B 59.6 acres 0.093125 s q. miles SOIL TYPES: (see attached soils map) I l Type Ce Name Cecil logic Soil Group B Gn Gaston C Wn Winnsboro D Zw Zion C CURVE NUMBER: Basin A Zonin % Impervious Soil Group Area ac % CN Md. CN _ Road ROW 90 C 3.03 0.05 96 4.5 I D 0.48 0.01 96 0.7 B-G (General Business) 85 C 7.67 0.12 94 11.1 D 1.19 0.02 95 1.7 B-N (Neighborhood Business) 85 C 2.56 0.04 94 3.7 R-T (Transitional Residential) 40 C 39.83 0.62 84 51.7 D 2.12 0.03 87 2.9 R-S (Residential Suburban) 40 C 1.45 0.02 84 1.9 D 6.36 0.10 87 8.6 Total 64.7 86.8 Com osite CN 86.8 Use CN = 87 Basin A Zoning % Impervious Soil Group Area ac % CN Wtd. CN Road ROW 90 B 0.83 0.01 94 1.2 C 0.94 0.01 96 1.4 D 3.93 0.06 96 5.8 B-G (General Business) 85 B 1.28 0.02 92 1.8 C 12.20 0.19 94 17.7 D 11.76 0.18 95 17.3 R-T (Transitional Residential) 40 C 20.00 0.31 84 26.0 D 8.17 0.13 87 11.0 R-S (Residential Suburban) 40 C 0.21 0.00 84 0.3 D 0.26 0.00 87 0.3 Total 59.6 82.8 Com osite CN 82.8 1 1 Use CN = 83 Page 1 of 1 Walgreens Denver [And rbnn;np 20U SU'dh't nice 5tmct _ _ _- uttr "00 LaKt?SCA?t' AR?IIl8lA1d Charla;te, North CUrollm 28202 PROJECT NO. 50243 BY: RTF COleieneStcffllct*,Lfimq ,'JUC 376.1555 far 704,376 . 7851 l M DATE: 07120110 T. M: RTF gn wunu.cnrNene rstonr.r? x ar, Da &, Stone _ 11REVISED: P.M.: RTF CULVERT DESIGN TIME OF CONCENTRATION - BASIN A Page 1 of 2 Walgreens Denver Land Planning 2u3 S0.1h I ryo. su"t u to 1400 Artfilleaure LO d 2 PROJECT NO. 50243 BY: RTF sca( n Clndoa Nonh CAroihu 21120 Co)eJenest civil 6nonmring rte' 1 376- 1555 U b t . O si W DATE: 07/20/10 T.M: RTF r an gn _,. -cco -e s t & Stogie REVISED: P.M.: RTF CULVERT DESIGN TIME OF CONCENTRATION - BASIN B Page 2 of 2 ' 1t#«RR#Rk Rk*fttt***4Rkk*k**f#tt#*fk4fktRkk t * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * JUN 1998 * VERSION 4.1 * * * RUN DATE 12JUN06 TIME 13:13:26 * ***ktfkfkkkt***R«RRk*t**#*«IkRkRtt*kfR*kk *RkkRkRk4kkk##"*R*RRkkRikfR«kRtkRkkRkRR * U.S. ARMY CORPS OF ENGINEERS * HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 ik!««Rki«k«*kk*k!«kk*k«f««k*#kkkt*A««Rk X x M Mxxx xxxxx x x v X X y M X XX X X xxxxxxx xxxx v x ^ v x x y x X y yy?/ x A vx?/yMVyV?/V?x/?/?/ ^ ?/?/?/yy^ xxx X X MM/? THIS PROGRAM REPLACES ALL PREVIOUS VERSIONS OF HEC-1 KNOWN AS HEC1(JAN 73), HECIGS, HEC1 DB, AND HEC1KW. THE DEFINITIONS OF VARIABLES -RTIMP- AND -RTIOR- HAVE CHANGED FROM THOSE USED WITH THE 1973-STYLE INPUT STRUCTURE. THE DEFINITION OF -AMSKK- ON RM-CARD WAS CHANGED WITH REVISIONS DATED 28 SEP 81. THIS IS THE FORTRAN77 VERSION NEW OPTIONS: DAMBREAK OUTFLOW SUBMERGENCE, SINGLE EVENT DAMAGE CALCULATION, DSS:WRITE STAGE FREQUENCY, DSS;READ TIME SERIES AT DESIRED CALCULATION INTERVAL LOSS RATE:GREEN AND AMPT INFILTRATION KINEMATIC WAVE: NEW FINITE DIFFERENCE ALGORITHM HEC-1 INPUT PAGE 1 LINE ID....... 1....... 2....... 3....... 4....... 5....... 6....... 7....... 8....... 9...... 10 FREE *** 1 ID 3509: WALGREENS EAST LINCOLN, LINCOLN COUNTY, NC 2 ID PROPOSED CULVERT DESIGN 3 ID ULTIMATE DEVELOPMENT CONDITIONS 4 IT 2 01JAN00 1200 1000 5 IN 6001JAN00 1200 6 10 0 0 " 10-YEAR STORM 7 KK A-10 8 KM TOTAL AT DRIVEWAY CULVERT 9 KO 3 1 10 BA 0.10109 11 LS 0 87 12 PB 4.90 13 PC 0 0.01 0.02 0.04 0.05 0.07 0.08 0.10 0.12 0.15 14 PC 0.19 0.24 0.66 0.78 0.82 0.86 0.88 0.90 0.92 0.94 15 PC 0.96 0.97 0.98 0.99 1 16 UD 0.17 17 KK B-10 18 KO 3 1 19 BA 0.09313 20 LS 0 83 21 UD 0.13 22 KK TOT-10 23 KM TOTAL AT HWY. 73 CULVERT 24 KO 3 1 25 HC 2 " 25-YEAR STORM 26 KK A-25 27 KM TOTAL AT DRIVEWAY CULVERT 28 KO 3 1 29 BA 0.10109 30 LS 0 87 31 PB 5.80 32 PC 0 0.01 0.02 0.04 0.05 0.07 0.08 0.10 0.12 0.15 33 PC 0.19 0.24 0.66 0.78 0.82 0.86 0.88 0.90 0.92 0.94 34 PC 0.96 0.97 0.98 0.99 1 35 UD 0.17 36 KK B-25 37 KO 3 1 38 BA 0.09313 39 LS 0 83 40 UD 0.13 1 HEC-1 INPUT PAGE 2 LINE ID....... 1....... 2....... 3....... 4....... 5....... 6....... 7....... 8....... 9...... 10 41 KK TOT-25 42 KM TOTAL AT HWY. 73 CULVERT 43 KO 3 1 44 HC 2 :50-YEAR STORM f 45 KK A-50 46 KM TOTAL AT DRIVEWAY CULVERT 47 KO 3 1 48 BA 0.10109 49 LS 0 87 50 PB 6.50 51 PC 0 0.01 0.02 0.04 0.05 0.07 0.08 0.10 0.12 0.15 52 PC 0.19 0.24 0.66 0.78 0.82 0.86 0.88 0.90 0.92 0.94 53 PC 0.96 0.97 0.98 0.99 1 54 UD 0.17 55 KK B-50 56 KO 3 1 57 BA 0.09313 58 LS 0 83 59 UD 0.13 60 KK TOT-50 61 KM TOTAL AT HWY. 73 CULVERT 62 KO 3 1 63 HC 2 100-YEAR STORM k 64 KK A-100 65 KM TOTAL AT DRIVEWAY CULVERT 66 KO 3 1 67 BA 0.10109 68 LS 0 87 69 PB 6.90 70 PC 0 0.01 0.02 0.04 0.05 0.07 0.08 0.10 0.12 0.15 71 PC 0.19 0.24 0.66 0.78 0.82 0.86 0.88 0.90 0.92 0.94 r 72 PC 0.96 0.97 0.98 0.99 1 73 UD 0.17 74 KK B-100 75 KO 3 1 76 BA 0.09313 77 LS 0 83 78 UD 0.13 1 HEC-1 INPUT LINE ID....... 1....... 2....... 3....... 4....... 5....... 6....... 7....... 8....... 9...... 10 79 KK TOT-100 80 KM TOTAL AT HWY. 73 CULVERT 81 KO 3 1 82 HC 2 83 84 ZZ likiftFRtkfttttk*#RRRRtk***•*Rt*RRRRR**R** • R " FLOOD HYDROGRAPH PACKAGE (HEC-1) * JUN 1998 * VERSI ON 4.1 ' * RUN DATE f 12JUN06 TIME 13:13:26 R k*#t*tt*RR4**kRRtR•RRt#k*RR}R}kRt*tt****i PAGE 3 i***it###kkkf4kk*444Rt****Rt44kRR44R*#4 * * * U.S. ARMY CORPS OF ENGINEERS * HYDROLOGIC ENGINEERING CENTER * 609 SECOND STREET * DAVIS, CALIFORNIA 95616 * (916) 756-1104 t * {e*R*k****t*#ft4ttt*kttf*R*4*#f*tk*kk*R# 3509: WALGREENS EAST LINCOLN, LINCOLN COUNTY, NC PROPOSED CULVERT DESIGN ULTIMATE DEVELOPMENT CONDITIONS 610 OUTPUT CONTROL VARIABLES IPRNT 0 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 2 MINUTES IN COMPUTATION INTERVAL IDATE 1JAN 0 STARTING DATE ITIME 1200 STARTING TIME NQ 1000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2JAN 0 ENDING DATE NDTIME 2118 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .03 HOURS TOTAL TIME BASE 33.30 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *tt R** *k. *** k}t *** *** #it i** t*t *** *** *** *** *** *** t** *** *** *** **t *R* *** **. *** f** *** R*R *** *** *** *** t** t RRRRitRffRRRRt * R 7 KK " A-10 9 KO 5 IN 10 BA 12 PB 13 PI ei?i?4t?Rf Rtii TOTAL AT DR IVEWAY CULVERT OU TPUT CONTROL VAR IABLES IP RNT 3 PRINT C ONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE TIME DATA FOR INPUT TI ME SERIES JXMIN 60 TIME INTERVAL IN MINUTES JXDATE 1JAN 0 STARTING DATE JXTIME 1200 STARTING TIME SUBBASIN RUNOFF DATA SUBBASIN CHARACTERI STICS TAREA .10 SUBBASIN AREA PRECIPITATION DATA STORM 4.90 BAS IN TOTAL PRECIPITATION INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00. .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 . .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 11 LS SCS LOSS RATE STRTL .30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS 16 UD SCS DIMENSIONLESS UNITGRAPH TLAG .17 LAG **k .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 AREA .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 ,00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 UNIT HYDROGRAPH 27 END-OF-PERIOD ORDINATES 22. 68. 141. 219. 258. 260. 234. 196. 145. 105. 78. 60. 45. 33. 25. 18. 14. 10. 8. 6. 4. 3. 3. 2. 1. 1. 0. tt* Rt* i*f t#* *** HYDROGRAPH AT STATION A-10 TOTAL RAINFALL = 4.90, TOTAL LOSS = 1.43, TOTAL EXCESS= 3.47 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 115. 12.00 30. 9. 7. 7. (INCHES) 2.738 3.473 3.473 3.473 (AC-FT) 15. 19. A. , 19. CUMULATIVE AREA = 10 SQ MI *** k#k •** *** *** *** *** *** **k *R* *** **R *** *** **R *** *** *** **k **k *** *** *** *** *** *** *** k*k *** *#i **k *** **f RR***f Yfk*tkRR * * 17 KK B-10 " * * ##kkRF!##!1f## 18 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IP LOT 1 PLOT CO NTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 19 BA SU BBASIN CHARACTERISTICS TAREA .09 SUBBASIN AREA PRECIPITATIO N DATA 12 PB STORM 4.90 BAS IN TOTAL PRECIPITATION 13 PI INCREMENTAL PRECIPITATION PATTE RN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 20 LS SCS LOSS RATE STRTL .41 INITIAL ABSTRACTION CRVNBR 83.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOW 21 UD SCS DIMENSIONLESS UNITGRAPH TLAG .13 LAG *Rk r .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 AREA UNIT HYDROGRAPH .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 21 END-OF-PERIOD ORDINATES 38. 122. 242. 304. 297. 248. 175. 116. 81. 57. 39. 27. 18. 13. 9. 6. 4. 3. 2. 1. 1. HYDROGRAPH AT STATION B-10 TOTAL RAINFALL = 4.90, TOTAL LOSS = 1.82, TOTAL EXCESS= 3.08 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 98. 12.00 25. 8. 6. 6. (INCHES) 2.453 3.084 3.084 3.084 (AC-FT) 12. 15. 15. 15. CUMULATIVE AREA = .09 SQ MI *** f** *** *** *** *** t*i *** *** *** *A* *** *** *** *** *** *** **R *** - *** *** *** *** *** *** *** *** *** **f *** *** *** •*t1Nkf*****• 22 KK * TOT-10 " * * *k**k******tit TOTAL AT HWY. 73 CULVERT 24 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL (PLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 25 HC HYDROGRAPH COMBINATION ICOMP 2 NUMBER OF HYDROGRAPHS TO COMBINE i.t ttk ..t ttt tit .#. HYDROGRAPH AT STATION TOT-10 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 213. 12.00 54. 17. 12. 12. (INCHES) 2.600 3.286 3.286 3.286 (AC-FT) 27. 34. 34. 34. CUMULATIVE AREA = .19 SQ MI i.i iii i.i i.i i.. i.t t#......i ..f ti. iii iii ... ii. i...ft tit .ki ti. ti. iii ... t.f ttt fit of #..... R.t f.f ##. itf f kftitkfttftit . i 26 KK A-25 t f f TOTAL AT DRIVEWAY CULVERT 28 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL (PLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 5 IN TIME DATA FOR INPUT TIME SERIES JXMIN 60 TIME INTERVAL IN MINUTES JXDATE 1JAN 0 STARTING DATE JXTIME 1200 STARTING TIME SUBBASIN RUNOFF DATA 29 BA SUBBASIN CHARACTERISTICS TAREA .10 SUBBASIN AREA PRECIPITATION DATA 31 PB STORM 5.80 BASIN TOTAL PRECIPITATION 32 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .oo .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 r r 30 LS 35 UD .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00' .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 SCS LOSS RATE STRTL .30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS SCS DIMENSIONLESS UNITGRAPH TLAG .17 LAG #Rk .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 AREA UNIT HYDROGRAPH .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 27 END-OF-PERIOD ORDINATES 22. 68. 141. 219. 258. 260. 234. 196. 145. 105. 78. 60. 45. 33. 25. 18. 14. 10. 8. 6. 4. 3. 3. 2. 1. 1. 0. RR#' t*f *RR ttf **R HYDROGRAPH AT STATION A-25 TOTAL RAINFALL = 5.80, TOTAL LOSS = 1.47, TOTAL EXCESS = 4.33 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 141. 12.00 37. 12. 8. 8. (INCHES) 3.396 4.326 4.326 4.326 (AC-FT) 18. 23. 23. 23. CUMULATIVE AREA = 10 SQ MI tkf Rtt tRt ifR tR• #kR 1ff tfR ### Rff 11t #*R ### fkt fRt R## #1R *Rf •RR RR* *tR #kk ##* #!# ### t1R #tR ktt itt *R• *## #*# ### tttitifitR#*## * t 36 KK * * B-25 " * kkkkkktkRRf•k 37 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL (PLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUN OFF DATA 38 BA SUBBASIN CHARACTERISTICS TAREA .09 SUBBASIN AREA PRECIPITATIO N DATA 31 PB STORM 5.80 BASIN TOTAL PRECIPITATION 32 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .60 0o .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 I .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 39 LS SCS LOSS RATE STRTL .41 INITIAL ABSTRACTION CRVNBR 83.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS 40 UD SCS DIMENSIONLESS UNITGRAPH TLAG .13 LAG itt .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 AREA UNIT HYDROGRAPH 21 END-OF-PERIOD ORDINATES 38. 122. 242. 304. 297. 248. 175. 116. 81. 57. 39. 27. 18. 13. 9. 6. 4. 3. 2. 1. 1. iki itt ttt ikk iii HYDROGRAPH AT STATION B-25 TOTAL RAINFALL = 5.80, TOTAL LOSS = 1.89, TOTAL EXCESS = 3.91 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 122. 12.00 31. 10. 7. 7. (INCHES) 3.093 3.906 3.906 3.906 (AC-FT) 15. 19. 19. 19. CUMULATIVE AREA = .09 SQ MI RR* *tf RR* *RR **4 **t RRf **! #R* t** *** *** fk* *R# - *t* *** ik4 *** *** *** !#! **# *** **4 **k t[f *?* R#k *?* *** *** *kk !R!*RR*RR#fft* f R 41 KK TOT-25 * ? Rtt#tfk***t*** TOTAL AT HWY. 73 CULVERT 43 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 44 HC HYDROGRAPH COMBINATION [COMP 2 NUMBER OF HYDROGRAPHS TO COMBINE *RR i!t #k# t*4 #tf 4## HYDROGRAPH AT STATION TOT-25 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 263. 12.00 68. 22. 16. 16. (INCHES) 3.248 4.125 4.125 4.125 (AC-FT) 34. 43. 43. 43. CUMULATIVE AREA = .19 SQ MI #Rf RRR RRR 44R Rft #tR ?R* **R *[4 iff fki fRf !#t #?f R** *RR •1R f#R RR! fR* *4[ tkk kRR #k4 #44 ##k 4kk *4# •## 1!! *RR ##R ### ft*k4Rf4flRtf? ? h 45 KK f A-50 * f #RlRR*1t*k**?# TOTAL AT DRIVEWAY CULVERT 47 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 5 IN TIME DATA FOR INPUT TIME SERIES JXMIN 60 TIME INTERVAL IN MINUTES JXDATE 1JAN 0 STARTING DATE JXTIME 1200 STARTING TIME SUBBASIN RUNOFF DATA • 48 BA SUBBASIN CHARACTERISTICS TAREA .10 SUBBAS IN AREA PRECI PITATIO N DATA 50 PB STORM 6.50 BASI N TOTAL PRE CIPITATION 51 PI INCREMENTAL PRECIPITATION PATTE RN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 ,00 .00 49 LS SCS LOSS RATE STRTL .30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS AREA 54 UD SCS DIMENSIONLESS UNITGRAPH TLAG .17 LAG kRi UNIT HYDROGRAPH 27 END-OF-PERIOD ORDINATES 22. 68. 141. 219. 258. 260. 234. 196. 145. 105. 78. 60. 45. 33. 25. 18. 14. 10. 8. 6. 4. 3. 3. 2. 1. 1. 0. HYDROGRAPH AT STATION A-50 TOTAL RAINFALL = 6.50, TOTAL LOSS = 1.50, TOTAL EXCESS = 5.00 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 161. 12.00 43. 14. 10. 10. (INCHES) 3.911 4.997 4.997 4.997 (AC-FT) 21. 27. 27. 27. CUMULATIVE AREA = 10 SQ MI #;Y ttt *kf ifk 4Rt tfk ttt #1f R#; #1k ftf #f; ikt kf* k;# tt! #ft *** *#* **; f4k t!t ttk f!t *#! ftt t*f ##* *#* RR* tfR **t *** *#;tktf#RRtttR * k 55 KK B-50 ' f # f;ffttt4*tktkt 56 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBASIN RUNOFF DATA 57 BA SUBBASIN CHARACTERISTICS TAREA .09 SUBBASIN AREA PRECIPITATION DATA 60 PB STORM 6.50 BASIN TOTAL PRECIPITATION G 51 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 101 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .oo .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 58 LS SCS LOSS RATE STRTL .41 INITIAL ABSTRACTION CRVNBR 83.00 CURVE NUMBER RTIMP 00 PERCENT IMPERVIOUS AREA 59 UD SCS DIMEN SIONLESS UNITGRAPH TLAG .13 LAG itR UNIT HYDROGRAPH 21 END-OF-PERIOD ORDINATES 38. 122. 242. 304. 297. 248. 175. 116. 81. 57. 39. 27. 18. 13. 9. 6. 4. 3. 2. 1, 1. kRt 1tt itR fit ifR HYDROGRAPH AT STATION B-50 TOTAL RAINFALL = 6.50, TOTAL LOSS = 1.94, TOTAL EXCESS = 4.56 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 141. 12.00 36. 11. 8. 8. (INCHES) 3.596 4.558 4.558 4.558 (AC-FT) 18. 23. 23. 23. CUMULATIVE AREA = .09 SQ MI ttR R#f }1t i## tti ### ### ### iRR #RR RR# #fk #ik tit ##k iRk *RR R#l tkt ### iRt Ri# ### ### *•k ##* RRR ik# itk k## #RR ### ### tRiti#kitt#1t4 i t 60 KK TOT-50 ****R*#Rft•**R TOTAL AT HWY. 73 CULVERT 62 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 63 HC HYDROGRAPH COMBINATION ICOMP 2 NUMBER OF HYDROGRAPHS TO COMBINE t#t AMR tik **# itf iif HYDROGRAPH AT STATION TOT-50 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 302. 12.00 79. 25. 18. 18. (INCHES) 3.759 4.786 4.786 4.786 (AC-FT) 39. 50. 50. 50. CUMULATIVE AREA = .19 SQ MI k#4 Rot 44# }}} tot kk4 k44 444 #Rk 444 4#R Rhk ##t YRR iY4 !k4 *4t 4R4 kRk *kf RtR 4R# }k4 *#* #Rk }#k YRk #k# Rkk #4# Rkk 44R #kR }}t4R}#YR#YtkR } t 64 KK 4 A-100 } 4 } ##k#RiR#4tY}}; TOTAL AT DRIVEWAY CULVERT 66 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 5 IN TIME DATA FOR INPUT TIME SERIES JXMIN 60 TIME INTERVAL I N MIN UTES JXDATE 1JAN 0 STARTING DATE JXTIME 1200 STARTING TIME SUBBASIN RUNOFF DATA 67 BA SUBBASIN CHARACTERISTICS TAREA .10 SUBBASIN AREA PRECIPITATIO N DATA 69 PB STORM 6.90 BASIN TOTAL PRECIPITATION 70 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00. .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .oo .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 68 LS SCS LOSS RATE STRTL .30 INITIAL ABSTRACTION CRVNBR 87.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS 73 UD SCS DIMENSIONLESS UNITGRAPH TLAG .17 LAG fft .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 AREA UNIT HYDROGRAPH .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 27 END-OF-PERIOD ORDINATES 22. 68. 141. 219. 258. M. 234. 196. 145. 105. 78. 60. 45. 33. 25. 18. 14. 10. 8. 6. 4. 3. 3. 2. 1. 1. 0. fff tkR ftt ffi tfi HYDROGRAPH AT STATION A-100 TOTAL RAINFALL = 6.90, TOTAL LOSS = 1.52, TOTAL EXCESS= 5.38 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 173. 12.00 46. 15. 11. 11. (INCHES) 4.206 5.383 5.383 5.383 (AC-FT) 23. 29. 29. 29. CUMULATIVE AREA = .10 SQ MI I 40 0 n *** *** *** ***'*** *** *** *k* *** *** *** *** *** *** *** *** *k* *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 74 KK # B-100 " * * 4Ri4444R4k44#4 75 KO OUTPUT CONTROL VARIABLES IPR NT 3 PRI NT CONTROL (PLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE SUBBAS IN RUN OFF DATA 76 BA SUB BASIN CHARACTERISTICS TAREA .09 SUBBASIN AREA PRECIPITATION DATA 69 PB S TORM 6.90 BASIN TOTAL PRECIPITATION 70 PI INCREMENTAL PRECIPITATION PATTERN .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .01 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .oo .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 77 LS SCS LOSS RATE STRTL .41 INITIAL ABSTRACTION CRVNBR 83.00 CURVE NUMBER RTIMP .00 PERCENT IMPERVIOUS 78 UD SCS DIMENSIONLESS UNITGRAPH TLAG .13 LAG 1RR .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 AREA .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 .00 UNIT HYDROGRAPH 21 END-OF-PERIOD ORDINATES 38. 122. 242. 304. 297. 248. 175. 116. 81. 57. 39. 27. 18. 13. 9. 6. 4. 3. 2. 1. 1. HYDROGRAPH AT STATION B-100 TOTAL RAINFALL = 6.90, TOTAL LOSS = 1.97, TOTAL EXCESS= 4.93 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 151. 12.00 39. 12. 9. 9. (INCHES) 3.887 4.933 4.933 4.933 (AC-FT) 19. 25. 25. 25. CUMULATIVE AREA = .09 SQ MI J k#k #Rk #RR RRk tRk #RR *RR RRR RRR #RR #RR ### iRR RR# ### fRR ### RRk *R• #RR ftt R1f 11R ##+ •R• t#f ### fRR RRk #RR #RR RRk Rft c 79 KK * TOT-100 ' • i,iY,Yik,R,YYY TOTAL AT HWY. 73 CULVERT 81 KO OUTPUT CONTROL VARIABLES IPRNT 3 PRINT CONTROL IPLOT 1 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE HEC-1 ERROR 1 *** INVALID CARD IDENTIFICATION CODE OR CARD OUT OF SEQUENCE CARD NO. 83 82 HC HYDROGRAPH COMBINATION ICOMP 2 NUMBER OF HYDROGRAPHS TO COMBINE „k 4,f ,Yk iif „t HYDROGRAPH AT STATION TOT-100 PEAK FLOW TIME MAXIMUM AVERAGE FLOW 6-HR 24-HR 72-HR 33.30-HR + (CFS) (HR) (CFS) + 324. 12.00 85. 27. 19. 19. (INCHES) 4.052 5.167 5.167 5.167 (AC-FT) 42. 54. 54. 54. CUMULATIVE AREA = .19 SO MI 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + A-10 115. 12.00 30. 9. 7. .10 HYDROGRAPH AT + B-10 98. 12.00 25. 8. 6. .09 2 COMBINED AT + TOT-10 213. 12.00 54. 17. 12. .19 HYDROGRAPH AT + A-25 141. 12.00 37. 12. 8. .10 HYDROGRAPH AT + B-25 122. 12.00 31. 10. 7. .09 2 COMBINED AT + TOT-25 263. 12.00 68. 22. 16. .19 HYDROGRAPH AT + A-50 161. 12.00 43. 14. 10. .10 HYDROGRAPH AT + B-50 141. 12.00 36. 11. 8. .09 2 COMBINED AT + TOT-50 302. 12.00 79. 25. 18. .19 HYDROGRAPH AT + A-100 173. 12.00 46. 15. 11. .10 HYDROGRAPH AT + B-100 151. 12.00 39. 12. 9. .09 2 COMBINED AT + TOT-100 324. 12.00 85. 27. 19. .19 1 r y .`. 1 ERROR(S) DETECTED BY HEC-1 ` c ? r ll R ii /? J CD ' ! R c _cc 0 0 jis? Lo j, ! ( r I \ - / to air. p N ep .0 12 1 hi i; n;i ri } q:.Ah n 4' I•.4 J Pr'I ':a fill r N' U to gm if LU do Sd'i:. -.11 cc / / '•I' ?I it ?Ii:?':3. r ' \ I f , J / J Z o 0 co cts cc ? 0 = c 0z U 75 / '? I I/ / \ \ !4 = d L \ ``/ // 1 A 1?° aU ?? a 1t w a 5 IN ?0 f