Loading...
HomeMy WebLinkAbout20081589 Ver 1_Certification of Completion_20101022?igl?o `tom Progress Energy OCT 2 1 2010 SERIAL: BSEP 10-0121 401 Oversight/Express Permitting Unit North Carolina Division of Water Quality 1650 Mail Service Center Raleigh, NC 27699-1650 Subject: Brunswick Steam Electric Plant ??q' ??•?. ?ENR ?1??4Np-erO, .4 t Y Division of Water Quality (DWQ) Project # 08-1589v4 As-Built Survey Dear Sir or Madam: Enclosed is the as-built survey regarding DWQ Project # 08-1589v4. The action consisted of placing approximately 10,000 square feet of riprap material on the canal side of the fish diversion structure to stabilize the interior of the structure. It also included the maintenance of the existing structure by extending 51 feet of sheet pile from the previously installed 96 feet in 2008 for a total of 147 feet of sheet pile in the breached area. The action also extended riprap along 250 feet on the canal side of the fish diversion structure. Please contact Mr. Marty McGowan at (910) 457-2538 or Mr. Steve Cahoon at (919) 546-7457 if there are any questions concerning information contained in this submittal. Sincerely, .4?JaAl?? Edward J. Wills, Jr. Plant General Manager Brunswick Steam Electric Plant Enclosures: 1. Certification of Completion 2. As-built surveys for DWQ Project # 08-1589v4 Progress Energy Carolinas, Inc. Hrunswick Nuclear Plain PO Box 10429 Southpoil, NC 28461 Certification of Completion DWQ Project No.:County: (i) ru? n Std 1 L? Applicant: Project Name: Jbf. -K S 1 ck-,? c err P1dK'? D Vi er stop cu K?,e _ A' /G H-te ltl n?__ Date of Issuance of Wetland Permit:a F??nlo, ao10 Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Express Permitting Unit North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. Tt is not necessary to send certificates from all of these. Applicant's Certification T, El? L, V-IIZ45 SA, ?_, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: G?„ p?G??L /4C5. af ?ate: O Agent's Certification 1, N , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature;: WA-_ Date: If this project was designed by a Certified Professional 1, -- _.A , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc,) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: _ _?N_ ' Registration No. Date o 0) co 00 1- LO LO L _ o rn ao ----== _ - - - - - - - -- - -------- _ t111 CJMVH -W AVM)JIM I r I ? ? I I ,• ; I I. I .I ?. ----------- --------- I I t? , I I I I I 1 i I I I I I I I I I r-F T-- w LI l l I I I ?' 1 I I II I I I I ! I? ° I I I'; I co -J I I I' I ? I O 2 I i I I I' Z z F- I I I F a ZQ?i --I I I I. Q , z T-- -- '- z z `6 0 C) on O wtnH? w I I Q W F- N Q Q -?ti U 00 w 0 U m. Q• V w IL O Q 00 0 O W002 p = Z wO?:zQ i-• o ~ MZOY CL C) z ° w z W W LU F- o f L Z Q==? wcn UU) F- U) co z w O(nWw? W J OJ z< Ud W i ? ICI mO w O 0?-j a U) o< w Z i a Q2 a ?? W U cn Of z U) co ti 6 c0 LO L H z w co LO In M PGN SCOUR DEPTH LOG REF:+9'-TOP OF WALKWAY DEPTH DEPTH 17-Aug 17-Aug LOC. LOC. 4.5A -18.0 8.0 A -26.0 B -19.0 B -26.0 C -23.5 C -26.0 D -25.5 D -26.0 E -23.5 E -24.0 5.0 A -17.51 8.5 A -26.0 B -15.0 B -24.5 C -16.0 C -25.0 D -17.0 D -25.5 E -17.5 E -25.5 5.5 A -22.5 9.0 A -26.5 B -22.5 B -22.5 C -21.5 C -22.5 D -24.5 D -26.5 E -24.0 E -31.5 6.0 A -23.0 9.5 A -20.0 B -22.5 B -18.8 C -23.0 C -18.3 D -25.5 D -20.3 E -25.0 E -23.0 6.5 C -26.0 10.0 A -18.5 7A-A -22.0 B -16.3 7B-A -24.0 C -17.8 D -18.3 E -19.8 10.5 A -19.0 B -18.8 C -19.3 D -21.8 E -22.8 11.0 A -19.0 B -21.8 C -21.8 D -22.5 E -23.3 W Q 2 m LL O ? WZX >OW W(LW o_aox °Wso 0 J LL K I Wz Q ?g aO W 2 Y J m O z O J in th x N a w z w Lijm O? W QO Wx ?a mQ 0 x Y m m W w U Z z O U C7 z w u? W W ~Z UD (n (no- z - Z q 2 ¢ r Of W a W 06 1-- f- Z ? Oo° o a CV N USN < z P ?a a C0 z (D d (n ? Q FE - o U) Z LU Q U) w W W m Q W (n n Z U) Q J O z LLI W O < rV ^ 00 LL w 0- W k W w zZ 0 U U Z X w