Loading...
HomeMy WebLinkAboutNCS000446_PreCon Flow Chart_20201218Town of Apex Pre -Construction Process Flow Chart Construction Plan Approval Construction Plans Approved and 5 Signed Hard Copies and 1 Electronic Copy Returned to Development Services Tree Protection Fencing Fill Out Tree/Protection Fencing Installation Permit Application (Obtain from Planning Department) Have a surveyor flag the property line adjacent to buffers and other protection areas and flag the protection limits. Contact Planning Department at 919- 249-3426 at least 24 hours in advance to schedule an on -site meeting between Planning staff and owner or representative. Staff inspects flagging and recommends field changes, if necessary. Once limits are approved by Planning staff, install approved protection fencing and/or any other protection measures that may be required. Contact Planning staff for a final inspection of protection measures. Planning will forward their approval to Water Resources staff. Submit the applicable S&E performance guarantee to the Development Services Supervisor at 919-249-3394 in Development Services. Last updated: 10/18/19 S & E Measures Request Letter of Plan Approval from I Water Resources. Through the Infrastructure Inspections Manager at 919-249- 3386, schedule a pre -construction meeting with inspectors and other Town staff. Submit electronic Notice of Intent to NCDEMLR requesting a Certificate of Coverage Install gravel construction entrance, temporary diversions, silt fencing, sediment basins, bypass channels and/or other measures as shown on the approved plans. Clear only as necessary to install these devices. Call Water Resources at 919-362- 8166 for an on -site inspection and to request a Certificate of Compliance. Grading Permit Complete Grading Permit Application and Obtain Permit from Building Inspections & Permitting Department Grading Permit reviewed and issued by Building Inspections & Permitting Department. Contact Building Inspections & Permitting Department at 919-249 3418 to arrange a pre -construction meeting prior to any grading activities*. *This meeting is separate from a pre, construction meeting prior to building construction activities. Begin Site Construction q